[ Search ] [ Legislation ] [ Bill Summary ]
[ Home ] [ Back ] [ Bottom ]
[ Introduced ] | [ Enrolled ] | [ Senate Amendment 002 ] |
90_SB0140eng 415 ILCS 5/39.2 from Ch. 111 1/2, par. 1039.2 Amends the Environmental Protection Act to provide that a governing authority of a municipality contiguous to a proposed site for a pollution control facility or contiguous to a municipality in which a proposed site is located shall be notified of an application for location approval for the facility and may participate in a public hearing concerning the application. Effective immediately. LRB9001061DPcc SB140 Engrossed LRB9001061DPcc 1 AN ACT to amend the Environmental Protection Act by 2 changing Section 39.2. 3 Be it enacted by the People of the State of Illinois, 4 represented in the General Assembly: 5 Section 5. The Environmental Protection Act is amended 6 by changing Section 39.2 as follows: 7 (415 ILCS 5/39.2) (from Ch. 111 1/2, par. 1039.2) 8 Sec. 39.2. Local siting review. 9 (a) The county board of the county or the governing body 10 of the municipality, as determined by paragraph (c) of 11 Section 39 of this Act, shall approve or disapprove the 12 request for local siting approval for each pollution control 13 facility which is subject to such review. An applicant for 14 local siting approval shall submit sufficient details 15 describing the proposed facility to demonstrate compliance, 16 and local siting approval shall be granted only if the 17 proposed facility meets the following criteria: 18 (i) the facility is necessary to accommodate the 19 waste needs of the area it is intended to serve; 20 (ii) the facility is so designed, located and 21 proposed to be operated that the public health, safety 22 and welfare will be protected; 23 (iii) the facility is located so as to minimize 24 incompatibility with the character of the surrounding 25 area and to minimize the effect on the value of the 26 surrounding property; 27 (iv) the facility is located outside the boundary 28 of the 100 year flood plain or the site is flood-proofed; 29 (v) the plan of operations for the facility is 30 designed to minimize the danger to the surrounding area 31 from fire, spills, or other operational accidents; SB140 Engrossed -2- LRB9001061DPcc 1 (vi) the traffic patterns to or from the facility 2 are so designed as to minimize the impact on existing 3 traffic flows; 4 (vii) if the facility will be treating, storing or 5 disposing of hazardous waste, an emergency response plan 6 exists for the facility which includes notification, 7 containment and evacuation procedures to be used in case 8 of an accidental release; 9 (viii) if the facility is to be located in a county 10 where the county board has adopted a solid waste 11 management plan consistent with the planning requirements 12 of the Local Solid Waste Disposal Act or the Solid Waste 13 Planning and Recycling Act, the facility is consistent 14 with that plan; and 15 (ix) if the facility will be located within a 16 regulated recharge area, any applicable requirements 17 specified by the Board for such areas have been met. 18 The county board or the governing body of the 19 municipality may also consider as evidence the previous 20 operating experience and past record of convictions or 21 admissions of violations of the applicant (and any subsidiary 22 or parent corporation) in the field of solid waste management 23 when considering criteria (ii) and (v) under this Section. 24 (b) No later than 14 days prior to a request for 25 location approval the applicant shall cause written notice of 26 such request to be served either in person or by registered 27 mail, return receipt requested, on the owners of all property 28 within the subject area not solely owned by the applicant, 29 and on the owners of all property within 250 feet in each 30 direction of the lot line of the subject property, said 31 owners being such persons or entities which appear from the 32 authentic tax records of the County in which such facility is 33 to be located; provided, that the number of all feet occupied 34 by all public roads, streets, alleys and other public ways SB140 Engrossed -3- LRB9001061DPcc 1 shall be excluded in computing the 250 feet requirement; 2 provided further, that in no event shall this requirement 3 exceed 400 feet, including public streets, alleys and other 4 public ways. 5 Such written notice shall also be served upon members of 6 the General Assembly from the legislative district in which 7 the proposed facility is located and shall be published in a 8 newspaper of general circulation published in the county in 9 which the site is located. 10 Such notice shall state the name and address of the 11 applicant, the location of the proposed site, the nature and 12 size of the development, the nature of the activity proposed, 13 the probable life of the proposed activity, the date when the 14 request for site approval will be submitted, and a 15 description of the right of persons to comment on such 16 request as hereafter provided. 17 (c) An applicant shall file a copy of its request with 18 the county board of the county or the governing body of the 19 municipality in which the proposed site is located. The 20 request shall include (i) the substance of the applicant's 21 proposal and (ii) all documents, if any, submitted as of that 22 date to the Agency pertaining to the proposed facility, 23 except trade secrets as determined under Section 7.1 of this 24 Act. All such documents or other materials on file with the 25 county board or governing body of the municipality shall be 26 made available for public inspection at the office of the 27 county board or the governing body of the municipality and 28 may be copied upon payment of the actual cost of 29 reproduction. 30 Any person may file written comment with the county board 31 or governing body of the municipality concerning the 32 appropriateness of the proposed site for its intended 33 purpose. The county board or governing body of the 34 municipality shall consider any comment received or SB140 Engrossed -4- LRB9001061DPcc 1 postmarked not later than 30 days after the date of the last 2 public hearing. 3 (d) At least one public hearing is to be held by the 4 county board or governing body of the municipality no sooner 5 than 90 days but no later than 120 days from receipt of the 6 request for site approval. No later than 14 days prior to 7 such hearing notice shall be, such hearing to be preceded by8 publishednoticein a newspaper of general circulation 9 published in the county of the proposed site, andnotice10 delivered by certified mail to all members of the General 11 Assembly from the district in which the proposed site is 12 located, to the governing authority of every municipality 13 contiguous to the proposed site or contiguous to the 14 municipality in which the proposed site is to be located, to 15 the county board of the county where the proposed site is to 16 be located, if the proposed site is located within the 17 boundaries of a municipality, and to the Agency. Members or 18 representatives of the governing authority of a municipality 19 contiguous to the proposed site or contiguous to the 20 municipality in which the proposed site is to be located 21 and, if the proposed site is located in a municipality, 22 members or representatives of the county board of a county in 23 which the proposed site is to be located may appear at and 24 participate in public hearings held pursuant to this Section. 25 The public hearing shall develop a record sufficient to form 26 the basis of appeal of the decision in accordance with 27 Section 40.1 of this Act. The fact that a member of the 28 county board or governing body of the municipality has 29 publicly expressed an opinion on an issue related to a site 30 review proceeding shall not preclude the member from taking 31 part in the proceeding and voting on the issue. 32 (e) Decisions of the county board or governing body of 33 the municipality are to be in writing, specifying the reasons 34 for the decision, such reasons to be in conformance with SB140 Engrossed -5- LRB9001061DPcc 1 subsection (a) of this Section. In granting approval for a 2 site the county board or governing body of the municipality 3 may impose such conditions as may be reasonable and necessary 4 to accomplish the purposes of this Section and as are not 5 inconsistent with regulations promulgated by the Board. Such 6 decision shall be available for public inspection at the 7 office of the county board or governing body of the 8 municipality and may be copied upon payment of the actual 9 cost of reproduction. If there is no final action by the 10 county board or governing body of the municipality within 180 11 days after the filing of the request for site approval the 12 applicant may deem the request approved. 13 At any time prior to completion by the applicant of the 14 presentation of the applicant's factual evidence and an 15 opportunity for cross-questioning by the county board or 16 governing body of the municipality and any participants, the 17 applicant may file not more than one amended application upon 18 payment of additional fees pursuant to subsection (k); in 19 which case the time limitation for final action set forth in 20 this subsection (e) shall be extended for an additional 21 period of 90 days. 22 (f) A local siting approval granted under this Section 23 shall expire at the end of 2 calendar years from the date 24 upon which it was granted, unless the local siting approval 25 granted under this Section is for a sanitary landfill 26 operation, in which case the approval shall expire at the end 27 of 3 calendar years from the date upon which it was granted, 28 and unless within that period the applicant has made 29 application to the Agency for a permit to develop the site. 30 In the event that the local siting decision has been 31 appealed, such expiration period shall be deemed to begin on 32 the date upon which the appeal process is concluded. 33 Except as otherwise provided in this subsection, upon the 34 expiration of a development permit under subsection (k) of SB140 Engrossed -6- LRB9001061DPcc 1 Section 39, any associated local siting approval granted for 2 the facility under this Section shall also expire. 3 If a first development permit for a municipal waste 4 incineration facility expires under subsection (k) of Section 5 39 after September 30, 1989 due to circumstances beyond the 6 control of the applicant, any associated local siting 7 approval granted for the facility under this Section may be 8 used to fulfill the local siting approval requirement upon 9 application for a second development permit for the same 10 site, provided that the proposal in the new application is 11 materially the same, with respect to the criteria in 12 subsection (a) of this Section, as the proposal that received 13 the original siting approval, and application for the second 14 development permit is made before January 1, 1990. 15 (g) The siting approval procedures, criteria and appeal 16 procedures provided for in this Act for new pollution control 17 facilities shall be the exclusive siting procedures and rules 18 and appeal procedures for facilities subject to such 19 procedures. Local zoning or other local land use requirements 20 shall not be applicable to such siting decisions. 21 (h) Nothing in this Section shall apply to any existing 22 or new pollution control facility located within the 23 corporate limits of a municipality with a population of over 24 1,000,000. 25 (i) The Department shall make a study of technical 26 considerations relating to the siting of new pollution 27 control facilities. Such study shall include, but need not be 28 limited to, a determination of the geologic and hydrologic 29 conditions in the State most suitable for the siting of such 30 facilities, the establishment of a data base on such 31 conditions in Illinois, and recommendations for the 32 establishment of technical guidelines and criteria to be used 33 in making such siting decisions. The Department shall report 34 such study and recommendations to the General Assembly, the SB140 Engrossed -7- LRB9001061DPcc 1 Governor, the Board and the public no later than October 1, 2 1984. 3 The Board shall adopt regulations establishing the 4 geologic and hydrologic siting criteria necessary to protect 5 usable groundwater resources which are to be followed by the 6 Agency in its review of permit applications for new pollution 7 control facilities. Such regulations, insofar as they apply 8 to new pollution control facilities authorized to store, 9 treat or dispose of any hazardous waste, shall be at least as 10 stringent as the requirements of the Resource Conservation 11 and Recovery Act and any State or federal regulations adopted 12 pursuant thereto. 13 (j) Any new pollution control facility which has never 14 obtained local siting approval under the provisions of this 15 Section shall be required to obtain such approval after a 16 final decision on an appeal of a permit denial. 17 (k) A county board or governing body of a municipality 18 may charge applicants for siting review under this Section a 19 reasonable fee to cover the reasonable and necessary costs 20 incurred by such county or municipality in the siting review 21 process. 22 (l) The governing Authority as determined by subsection 23 (c) of Section 39 of this Act may request the Department of 24 Transportation to perform traffic impact studies of proposed 25 or potential locations for required pollution control 26 facilities. 27 (m) An applicant may not file a request for local siting 28 approval which is substantially the same as a request which 29 was disapproved pursuant to a finding against the applicant 30 under any of criteria (i) through (ix) of subsection (a) of 31 this Section within the preceding 2 years. 32 (n) In any review proceeding of a decision of the county 33 board or governing body of a municipality made pursuant to 34 the local siting review process, the petitioner in the review SB140 Engrossed -8- LRB9001061DPcc 1 proceeding shall pay to the county or municipality the cost 2 of preparing and certifying the record of proceedings. 3 Should the petitioner in the review proceeding fail to make 4 payment, the provisions of Section 3-109 of the Code of Civil 5 Procedure shall apply. 6 In the event the petitioner is a citizens' group that 7 participated in the siting proceeding and is so located as to 8 be affected by the proposed facility, such petitioner shall 9 be exempt from paying the costs of preparing and certifying 10 the record. 11 (o) Notwithstanding any other provision of this Section, 12 a transfer station used exclusively for landscape waste, 13 where landscape waste is held no longer than 24 hours from 14 the time it was received, is not subject to the requirements 15 of local siting approval under this Section, but is subject 16 only to local zoning approval. 17 (Source: P.A. 88-557, eff. 7-27-94; 88-681, eff. 12-22-94; 18 89-102, eff. 7-7-95; 89-200, eff. 1-1-96; 89-626, eff. 19 8-9-96.) 20 Section 99. Effective date. This Act takes effect 21 January 1, 1998.