State of Illinois
90th General Assembly
Legislation

   [ Search ]   [ Legislation ]   [ Bill Summary ]
[ Home ]   [ Back ]   [ Bottom ]



90_HB0024

      735 ILCS 5/7-103          from Ch. 110, par. 7-103
          Amends the Code of  Civil  Procedure  to  authorize  Kane
      County  to use quick-take eminent domain power to acquire the
      necessary right-of-way to complete the  improvement  of  Kane
      County  Highway  34 (Randall Road) from its intersection with
      Illinois Route 72 to the  Kane-McHenry  county  line.    Also
      makes revisory changes.  Effective immediately.
                                                     LRB9000435EGfg
                                               LRB9000435EGfg
 1        AN  ACT  to amend the Code of Civil Procedure by changing
 2    Section 7-103.
 3        Be it enacted by the People of  the  State  of  Illinois,
 4    represented in the General Assembly:
 5        Section  5.   The  Code  of Civil Procedure is amended by
 6    changing Section 7-103 as follows:
 7        (735 ILCS 5/7-103) (from Ch. 110, par. 7-103)
 8        Sec. 7-103.  "Quick-take".  This Section applies only  to
 9    proceedings under this Article:
10             (1)  by  the  State  of  Illinois, the Illinois Toll
11        Highway Authority or  the  St.  Louis  Metropolitan  Area
12        Airport   Authority   for  the  acquisition  of  land  or
13        interests therein for highway purposes;
14             (2)  (blank);
15             (3)  by the Department  of  Commerce  and  Community
16        Affairs  for  the  purpose specified in the Illinois Coal
17        Development Bond Act;
18             (4)  (blank);
19             (5)  for the purpose  specified  in  the  St.  Louis
20        Metropolitan Area Airport Authority Act;
21             (6)  for  a  period  of  24 months after May 24, the
22        effective date of this amendatory Act  of  1996,  by  the
23        Southwestern  Illinois  Development Authority pursuant to
24        the Southwestern Illinois Development Authority Act;
25             (7)  for a period of  3  years  after  December  30,
26        1987,  by  the  Quad Cities Regional Economic Development
27        Authority  (except  for  the  acquisition  of   land   or
28        interests  therein  that  is  farmland,  or upon which is
29        situated a farm dwelling and appurtenant  structures,  or
30        upon  which  is  situated a residence, or which is wholly
31        within  an  area  that  is  zoned  for  residential  use)
                            -2-                LRB9000435EGfg
 1        pursuant to the Quad Cities Regional Economic Development
 2        Authority Act;
 3             (8)  by  a  sanitary  district  created  under   the
 4        Metropolitan  Water  Reclamation  District  Act   for the
 5        acquisition of land or  interests  therein  for  purposes
 6        specified in that Act;
 7             (9)  by  a  rail carrier within the time limitations
 8        and subject to the terms  and  conditions  set  forth  in
 9        Section 18c-7501 of the Illinois Vehicle Code;
10             (10)  for  a  period  of 18 months after January 26,
11        1987, for  the  purpose  specified  in  Division  135  of
12        Article   11   of  the  Illinois  Municipal  Code,  by  a
13        commission  created  under  Section  2   of   the   Water
14        Commission Act of 1985;
15             (11)  by  a  village containing a population of less
16        than 15,000 for the purpose of acquiring property  to  be
17        used  for  a  refuse  derived  fuel  system   designed to
18        generate  steam  and  electricity,  and  for   industrial
19        development that will utilize such steam and electricity,
20        pursuant  to  Section  11-19-10 of the Illinois Municipal
21        Code;
22             (12)  after receiving the prior approval of the City
23        Council, by a municipality having a  population  of  more
24        than  500,000  for  the  purposes  set  forth  in Section
25        11-61-1a and Divisions 74.2 and 74.3 of Article 11 of the
26        Illinois Municipal Code, and for the same  purposes  when
27        established pursuant to home rule powers;
28             (13)  by  a  home  rule municipality, after a public
29        hearing  held  by  the  corporate  authorities  or  by  a
30        committee of the corporate authorities and after approval
31        by a majority of the  corporate  authorities,  within  an
32        area designated as an enterprise zone by the municipality
33        under the Illinois Enterprise Zone Act;
34             (14)  by  the  Illinois  Sports Facilities Authority
                            -3-                LRB9000435EGfg
 1        for the purpose specified in Section 12 of  the  Illinois
 2        Sports Facilities Authority Act;
 3             (15)  by  a municipality having a population of more
 4        than 2,000,000 for the purpose of acquiring the  property
 5        described in Section 3 of the Sports Stadium Act;
 6             (16)  for a period of 18 months after July 29, 1986,
 7        in  any  proceeding  by  the  Board  of  Trustees  of the
 8        University of Illinois for the  acquisition  of  land  in
 9        Champaign  County  or  interests  therein as a site for a
10        building or for any educational purpose;
11             (17)  for a period of 2 years after July 1, 1990, by
12        a  home  rule  municipality  and  a  county  board,  upon
13        approval of a majority of the  corporate  authorities  of
14        both  the  county  board  and the municipality, within an
15        area designated as an enterprise zone by the municipality
16        and  the  county  board  through   an   intergovernmental
17        agreement  under  the  Illinois Enterprise Zone Act, when
18        the purpose of the condemnation proceeding is to  acquire
19        land  for  the construction of an industrial harbor port,
20        and when the total amount of land to be acquired for that
21        purpose is less than 75 acres  and  is  adjacent  to  the
22        Illinois River;
23             (18)  by  an airport authority located solely within
24        the boundaries of Madison County, Illinois, and which  is
25        organized  pursuant  to  the  provisions  of  the Airport
26        Authorities Act, (i) for the acquisition of 160 acres, or
27        less, of land  or  interests  therein  for  the  purposes
28        specified  in  that Act which may be necessary to extend,
29        mark, and light runway 11/29 for a distance of 1600  feet
30        in  length by 100 feet in width with parallel taxiway, to
31        relocate and mark  County  Highway  19,  Madison  County,
32        known  as  Moreland  Road,  to  relocate  the  instrument
33        landing system including the approach lighting system and
34        to  construct  associated  drainage,  fencing and seeding
                            -4-                LRB9000435EGfg
 1        required for the foregoing project and (ii) for a  period
 2        of  6 months after December 28, 1989, for the acquisition
 3        of 75 acres, or less, of land or  interests  therein  for
 4        the purposes specified in that Act which may be necessary
 5        to  extend,  mark and light the south end of runway 17/35
 6        at such airport;
 7             (19)  by  any  unit  of  local  government   for   a
 8        permanent   easement  for  the  purpose  of  maintaining,
 9        dredging or cleaning the Little Calumet River;
10             (20)  by  any  unit  of  local  government   for   a
11        permanent   easement  for  the  purpose  of  maintaining,
12        dredging or cleaning the Salt Creek in DuPage County;
13             (21)  by  St.  Clair  County,  Illinois,   for   the
14        development  of  a  joint use facility at Scott Air Force
15        Base;
16             (22)  by the Village of Summit, Illinois, to acquire
17        land for a waste to energy plant;
18             (23)  for a period of 15 months after  September  7,
19        1990,  by the Department of Transportation or by any unit
20        of   local   government   under   the   terms    of    an
21        intergovernmental   cooperation   agreement  between  the
22        Department  of  Transportation  and  the  unit  of  local
23        government  for  the  purpose  of   developing   aviation
24        facilities  in  and  around  Chanute  Air  Force  Base in
25        Champaign County, Illinois;
26             (24)  for a period of  1  year  after  December  12,
27        1990,  by  the  City of Morris for the development of the
28        Morris Municipal Airport;
29             (25)  for a period of 1 year after June 19, 1991, by
30        the  Greater  Rockford  Airport  Authority  for   airport
31        expansion purposes;
32             (26)  for a period of 24 months after June 30, 1991,
33        by  the  City  of  Aurora for completion of an instrument
34        landing system and construction of an east-west runway at
                            -5-                LRB9000435EGfg
 1        the Aurora Municipal Airport;
 2             (27)  for the acquisition by the  Metropolitan  Pier
 3        and   Exposition   Authority  of  property  described  in
 4        subsection (f) of Section 5 of the Metropolitan Pier  and
 5        Exposition  Authority  Act  for the purposes of providing
 6        additional grounds, buildings, and facilities related  to
 7        the  purposes  of  the  Metropolitan  Pier and Exposition
 8        Authority;
 9             (28)  for a period of 24 months after March 1, 1992,
10        by the Village of  Wheeling  and  the  City  of  Prospect
11        Heights,  owners  of  the Palwaukee Municipal Airport, to
12        allow for the acquisition of right of way to complete the
13        realignment of Hintz Road and Wolf Road;
14             (29)  for a period of one year  from  the  effective
15        date   of   this   amendatory   Act   of   1992,  by  the
16        Bloomington-Normal   Airport   Authority   for    airport
17        expansion purposes;
18             (30)  for  a period of 24 months after September 10,
19        1993, by the Cook  County  Highway  Department  and  Lake
20        County  Department  of  Transportation  to  allow for the
21        acquisition of necessary right-of-way for construction of
22        underpasses   for   Lake-Cook   Road   at   the   Chicago
23        Northwestern Railroad crossing, west of Skokie Boulevard,
24        and the Chicago, Milwaukee, St. Paul and Pacific Railroad
25        crossing, west of Waukegan Road;
26             (31)  for a period of one year  after  December  23,
27        1993,  by  the City of Arcola and the City of Tuscola for
28        the development of the Arcola/Tuscola Water  Transmission
29        Pipeline   Project   pursuant  to  the  intergovernmental
30        agreement between the City of  Arcola  and  the  City  of
31        Tuscola;
32             (32)  for  a  period  of 24 months from December 23,
33        1993, by the Village of Bensenville for  the  acquisition
34        of  property bounded by Illinois Route 83 to the west and
                            -6-                LRB9000435EGfg
 1        O'Hare International Airport to the east  to  complete  a
 2        flood control project known as the Bensenville Ditch;
 3             (33)  for  a  period  of  9 months after November 1,
 4        1993, by the Medical Center Commission for the purpose of
 5        acquiring a site for the Illinois State  Police  Forensic
 6        Science  Laboratory  at  Chicago, on the block bounded by
 7        Roosevelt Road on the north, Wolcott Street on the  east,
 8        Washburn  Street  on  the  south, and Damen Avenue on the
 9        west in Chicago, Illinois;
10             (34)  for a period of 36 months after July 14, 1995,
11        by White County for  the  acquisition  of  a  3 1/2  mile
12        section  of Bellaire Road, which is described as follows:
13        Commencing at the Northwest Corner of the  Southeast  1/4
14        of Section 28, Township 6 South, Range 10 East of the 3rd
15        Principal  Meridian;  thence  South  to  a  point  at the
16        Southwest Corner of  the  Southeast  1/4  of  Section  9,
17        Township  7  South,  Range  10  East of the 3rd Principal
18        Meridian;
19             (35)  for a period of one year after July 14,  1995,
20        by  the  City  of  Aurora  for  permanent  and  temporary
21        easements  except  over land adjacent to Indian Creek and
22        west of Selmarten Creek located within the City of Aurora
23        for the construction of Phase  II  of  the  Indian  Creek
24        Flood Control Project;
25             (35.1)  for  a  period  beginning June 24, 1995 (the
26        day following the effective date of Public Act 89-29) and
27        ending on July 13, 1995 (the day preceding the  effective
28        date  of  Public  Act  89-134), by the City of Aurora for
29        permanent and temporary easements for the construction of
30        Phase II of the Indian Creek Flood Control Project;
31             (36)  for a period of 3 years from July 14, 1995, by
32        the Grand Avenue Railroad Relocation  Authority  for  the
33        Grand Avenue Railroad Grade Separation Project within the
34        Village of Franklin Park, Illinois;
                            -7-                LRB9000435EGfg
 1             (37)  for  a  period of 3 years after July 14, 1995,
 2        by the Village  of  Romeoville  for  the  acquisition  of
 3        rights-of-way  for the 135th Street Bridge Project, lying
 4        within the South 1/2 of Section 34,  Township  37  North,
 5        Range  10  East and the South 1/2 of Section 35, Township
 6        37 North, Range 10 East of the Third Principal  Meridian,
 7        and  the North 1/2 of Section 2, Township 36 North, Range
 8        10 East and the North  1/2  of  Section  3,  Township  36
 9        North,  Range  10  East of the 3rd Principal Meridian, in
10        Will County, Illinois;
11             (37.1)  for a period of 3 years after June 23, 1995,
12        by the Illinois  Department  of  Transportation  for  the
13        acquisition  of rights-of-way for the 135th Street Bridge
14        Project between the Des  Plaines  River  and  New  Avenue
15        lying  within  the  South  1/2 of Section 35, Township 37
16        North, Range 10 East of the Third Principal Meridian  and
17        the North 1/2 of Section 2, Township 36 North,  Range  10
18        East  of  the  3rd  Principal  Meridian,  in Will County,
19        Illinois;
20             (38)  for a period beginning June 24, 1995 (the  day
21        after  the effective date of Public Act 89-29) and ending
22        18 months after July 14,  1995  (the  effective  date  of
23        Public   Act   89-134),   by   the  Anna-Jonesboro  Water
24        Commission for the acquisition of land and easements  for
25        improvements   to   its   water   treatment  and  storage
26        facilities and water transmission pipes;
27             (39)  for a period of 36 months after July 14, 1995,
28        by the City of Effingham for the acquisition of  property
29        which is described as follows:
30        Tract 1:
31             Lots  26  and  27 in Block 4 in RAILROAD ADDITION TO
32        THE TOWN (NOW CITY) OF EFFINGHAM (reference made to  Plat
33        thereof recorded in Book "K", Page 769, in the Recorder's
34        Office  of  Effingham  County),  situated  in the City of
                            -8-                LRB9000435EGfg
 1        Effingham, County of Effingham and State of Illinois.
 2             Tract 2:
 3             The alley lying South  and  adjoining  Tract  1,  as
 4        vacated  by  Ordinance  recorded on July 28, 1937 in Book
 5        183, Page 465, and all right, title and interest  in  and
 6        to said alley as established by the Contract for Easement
 7        recorded on August 4, 1937 in Book 183, Page 472;
 8             (40)  for  a period of one year after July 14, 1995,
 9        by  the  Village  of  Palatine  for  the  acquisition  of
10        property located along the  south  side  of  Dundee  Road
11        between  Rand  Road  and  Hicks  Road  for  redevelopment
12        purposes;
13             (41)  for  a  period  of 6 years after July 1, 1995,
14        for the acquisition by the  Medical  Center  District  of
15        property  described  in Section 3 of the Illinois Medical
16        District Act within  the  District  Development  Area  as
17        described  in  Section 4 of that Act for the purposes set
18        forth in that Act;.
19             (41.5)  for a period of 24 months after June 21, the
20        effective date of this amendatory Act of 1996 by the City
21        of Effingham, Illinois for acquisition  of  property  for
22        the South Raney Street Improvement Project Phase I;
23             (42)  for  a  period  of  3 years after June 21, the
24        effective date of this amendatory Act  of  1996,  by  the
25        Village  of  Deerfield  for  the acquisition of territory
26        within the Deerfield Village Center, as designated as  of
27        that the effective date of this amendatory Act of 1996 by
28        the  Deerfield  Comprehensive Plan, with the exception of
29        that area north of Jewett Park Drive  (extended)  between
30        Waukegan  Road  and  the  Milwaukee  Railroad Tracks, for
31        redevelopment purposes;
32             (43)  for a period of 12 months after June  21,  the
33        effective  date  of  this  amendatory Act of 1996, by the
34        City of Harvard for the  acquisition  of  property  lying
                            -9-                LRB9000435EGfg
 1        west  of  Harvard  Hills Road of sufficient size to widen
 2        the Harvard Hills Road right of way and  to  install  and
 3        maintain  city  utility  services  not more than 200 feet
 4        west of the center line of Harvard Hills Road;
 5             (44) (42)  for a period of 5 years  after  June  21,
 6        the effective date of this amendatory Act of 1996, by the
 7        Village  of  River  Forest,  Illinois,  within  the  area
 8        designated as a tax increment financing district when the
 9        purpose of the condemnation proceeding is to acquire land
10        for any of the purposes contained in the River Forest Tax
11        Increment   Financing  Plan  or  authorized  by  the  Tax
12        Increment Allocation  Redevelopment  Act,  provided  that
13        condemnation  of  any property zoned and used exclusively
14        for residential purposes shall be prohibited;.
15             (45) (42)  for a period of 18 months after June  28,
16        the effective date of this amendatory Act of 1996, by the
17        Village  of  Schaumburg  for  the  acquisition  of  land,
18        easements,  and  aviation  easements for the purpose of a
19        public airport in Cook and DuPage Counties; provided that
20        if any proceedings under the provisions of  this  Article
21        are pending on that the effective date of this amendatory
22        Act  of 1996, "quick-take" may be utilized by the Village
23        of Schaumburg;
24             (46) (43)  for a period of one year after  June  28,
25        the effective date of this amendatory Act of 1996, by the
26        City  of  Pinckneyville  for  the acquisition of land and
27        easements  to  provide  for  improvements  to  its  water
28        treatment and storage facilities and  water  transmission
29        pipes,  and  for the construction of a sewerage treatment
30        facility and sewerage transmission  pipes  to  serve  the
31        Illinois    Department   of   Corrections   Pinckneyville
32        Correctional Facility;.
33             (47) (42)  for a period of 6 months after  June  28,
34        the effective date of this amendatory Act of 1996, by the
                            -10-               LRB9000435EGfg
 1        City   of   Streator  for  the  acquisition  of  property
 2        described as follows for a  first  flush  basin  sanitary
 3        sewer system:
 4                  Tract  5:  That part of lots 20 and 21 in Block
 5             6 in Moore and  Plumb's  addition  to  the  city  of
 6             Streator,  Illinois, lying south of the right of way
 7             of the switch  track  of  the  Norfolk  and  Western
 8             Railroad  (now  abandoned) in the county of LaSalle,
 9             state of Illinois.
10                  Tract 6:  That part of lots 30, 31  and  32  in
11             Block 7 in Moore and Plumb's Addition to the city of
12             Streator, Illinois, lying north of the centerline of
13             Coal  Run Creek and south of the right of way of the
14             switch track of the  Norfolk  and  Western  Railroad
15             (now  abandoned)  in the county of LaSalle, state of
16             Illinois;
17             (48)  for a period of one year after  the  effective
18        date  of  this  amendatory  Act of 1997, by the County of
19        Kane, for the acquisition of  necessary  right-of-way  to
20        complete  the  improvement  of  Kane  County  Highway  34
21        (Randall  Road) from its intersection with Illinois Route
22        72 to the Kane-McHenry county line.
23        In a proceeding subject to this Section,  the  plaintiff,
24    at  any  time  after  the complaint has been filed and before
25    judgment is entered in the proceeding,  may  file  a  written
26    motion  requesting  that,  immediately  or  at some specified
27    later date, the plaintiff  either  be  vested  with  the  fee
28    simple title (or such lesser estate, interest or easement, as
29    may  be  required) to the real property, or specified portion
30    thereof, which is the  subject  of  the  proceeding,  and  be
31    authorized  to  take  possession of and use such property; or
32    only be authorized to take possession  of  and  to  use  such
33    property,  if such possession and use, without the vesting of
34    title, are sufficient to permit the plaintiff to proceed with
                            -11-               LRB9000435EGfg
 1    the project until the final  ascertainment  of  compensation;
 2    however, no land or interests therein now or hereafter owned,
 3    leased,  controlled or operated and used by, or necessary for
 4    the actual  operation  of,  any  common  carrier  engaged  in
 5    interstate  commerce,  or any other public utility subject to
 6    the jurisdiction of the Illinois Commerce  Commission,  shall
 7    be  taken or appropriated hereunder by the State of Illinois,
 8    the Illinois Toll Highway Authority, the  sanitary  district,
 9    the  St.  Louis  Metropolitan  Area  Airport Authority or the
10    Board of Trustees of the University of Illinois without first
11    securing the approval of such Commission.
12        Except as hereinafter stated, the motion for taking shall
13    state: (1) an accurate description of the property  to  which
14    the  motion  relates  and the estate or interest sought to be
15    acquired therein; (2) the formally adopted schedule  or  plan
16    of  operation  for  the execution of the plaintiff's project;
17    (3) the  situation  of  the  property  to  which  the  motion
18    relates,  with  respect  to  the  schedule  or  plan; (4) the
19    necessity for taking such property in the manner requested in
20    the  motion;  and  (5)  if  the  property  (except   property
21    described  in Section 3 of the Sports Stadium Act or property
22    described as Site B in Section 2 of the Metropolitan Pier and
23    Exposition Authority Act)  to  be  taken  is  owned,  leased,
24    controlled  or  operated  and  used  by, or necessary for the
25    actual operation of, any interstate common carrier  or  other
26    public  utility  subject  to the jurisdiction of the Illinois
27    Commerce Commission, a  statement  to  the  effect  that  the
28    approval  of  such proposed taking has been secured from such
29    Commission, and attaching to such motion a certified copy  of
30    the  order  of such Commission granting such approval. If the
31    schedule or plan of operation is not set forth fully  in  the
32    motion,  a copy of such schedule or plan shall be attached to
33    the motion.
34    (Source: P.A. 88-486; 88-526; 88-670,  eff.  12-2-94;  89-29,
                            -12-               LRB9000435EGfg
 1    eff.  6-23-95;  89-134,  eff.  7-14-95; 89-343, eff. 8-17-95;
 2    89-356, eff.  8-17-95;  89-445,  eff.  2-7-96;  89-460,  eff.
 3    5-24-96;  89-494, eff. 6-21-96; 89-502, eff. 6-28-96; 89-504,
 4    eff. 6-28-96;  89-592,  eff.  8-1-96;  89-626,  eff.  8-9-96;
 5    revised 8-14-96.)
 6        Section  99.  Effective date.  This Act takes effect upon
 7    becoming law.

[ Top ]