Illinois General Assembly - Full Text of SB1035
Illinois General Assembly

Previous General Assemblies

Full Text of SB1035  94th General Assembly

SB1035sam001 94TH GENERAL ASSEMBLY

Sen. Deanna Demuzio

Filed: 5/13/2005

 

 


 

 


 
09400SB1035sam001 LRB094 04707 RSP 46562 a

1
AMENDMENT TO SENATE BILL 1035

2     AMENDMENT NO. ______. Amend Senate Bill 1035 by replacing
3 everything after the enacting clause with the following:
 
4     "Section 5. The Environmental Protection Act is amended by
5 changing Sections 57.2, 57.7, 57.8, and 57.15 as follows:
 
6     (415 ILCS 5/57.2)
7     Sec. 57.2. Definitions. As used in this Title:
8     "Audit" means a systematic inspection or examination of
9 plans, reports, records, or documents to determine the
10 completeness and accuracy of the data and conclusions contained
11 therein.
12     "Bodily injury" means bodily injury, sickness, or disease
13 sustained by a person, including death at any time, resulting
14 from a release of petroleum from an underground storage tank.
15     "Release" means any spilling, leaking, emitting,
16 discharging, escaping, leaching or disposing of petroleum from
17 an underground storage tank into groundwater, surface water or
18 subsurface soils.
19     "Fill material" means non-native or disturbed materials
20 used to bed and backfill around an underground storage tank.
21     "Fund" means the Underground Storage Tank Fund.
22     "Heating Oil" means petroleum that is No. 1, No. 2, No. 4 -
23 light, No. 4 - heavy, No. 5 - light, No. 5 - heavy or No. 6
24 technical grades of fuel oil; and other residual fuel oils

 

 

09400SB1035sam001 - 2 - LRB094 04707 RSP 46562 a

1 including Navy Special Fuel Oil and Bunker C.
2     "Indemnification" means indemnification of an owner or
3 operator for the amount of any judgment entered against the
4 owner or operator in a court of law, for the amount of any
5 final order or determination made against the owner or operator
6 by an agency of State government or any subdivision thereof, or
7 for the amount of any settlement entered into by the owner or
8 operator, if the judgment, order, determination, or settlement
9 arises out of bodily injury or property damage suffered as a
10 result of a release of petroleum from an underground storage
11 tank owned or operated by the owner or operator.
12     "Corrective action" means activities associated with
13 compliance with the provisions of Sections 57.6 and 57.7 of
14 this Title.
15     "Occurrence" means an accident, including continuous or
16 repeated exposure to conditions, that results in a sudden or
17 nonsudden release from an underground storage tank.
18     When used in connection with, or when otherwise relating
19 to, underground storage tanks, the terms "facility", "owner",
20 "operator", "underground storage tank", "(UST)", "petroleum"
21 and "regulated substance" shall have the meanings ascribed to
22 them in Subtitle I of the Hazardous and Solid Waste Amendments
23 of 1984 (P.L. 98-616), of the Resource Conservation and
24 Recovery Act of 1976 (P.L. 94-580); provided however that the
25 term "underground storage tank" shall also mean an underground
26 storage tank used exclusively to store heating oil for
27 consumptive use on the premises where stored and which serves
28 other than a farm or residential unit.
29     "Licensed Professional Engineer" means a person,
30 corporation, or partnership licensed under the laws of the
31 State of Illinois to practice professional engineering.
32     "Licensed Professional Geologist" means a person licensed
33 under the laws of the State of Illinois to practice as a
34 professional geologist.

 

 

09400SB1035sam001 - 3 - LRB094 04707 RSP 46562 a

1     "Site" means any single location, place, tract of land or
2 parcel of property including contiguous property not separated
3 by a public right-of-way.
4     "Site investigation" means activities associated with
5 compliance with the provisions of subsection (a) of Section
6 57.7.
7     "Property damage" means physical injury to, destruction
8 of, or contamination of tangible property, including all
9 resulting loss of use of that property; or loss of use of
10 tangible property that is not physically injured, destroyed, or
11 contaminated, but has been evacuated, withdrawn from use, or
12 rendered inaccessible because of a release of petroleum from an
13 underground storage tank.
14     "Class I Groundwater" means groundwater that meets the
15 Class I: Potable Resource Groundwater criteria set forth in the
16 Board regulations adopted pursuant to the Illinois Groundwater
17 Protection Act.
18     "Class III Groundwater" means groundwater that meets the
19 Class III: Special Resource Groundwater criteria set forth in
20 the Board regulations adopted pursuant to the Illinois
21 Groundwater Protection Act.
22     "Scope of work" means a comprehensive, all-inclusive
23 listing of services and activities included in a specific task.
24 (Source: P.A. 92-554, eff. 6-24-02; 92-735, eff. 7-25-02;
25 revised 9-9-02.)
 
26     (415 ILCS 5/57.7)
27     Sec. 57.7. Leaking underground storage tanks; site
28 investigation and corrective action.
29     (a) Site investigation.
30         (1) For any site investigation activities required by
31     statute or rule, the owner or operator shall submit to the
32     Agency for approval a site investigation plan designed to
33     determine the nature, concentration, direction of

 

 

09400SB1035sam001 - 4 - LRB094 04707 RSP 46562 a

1     movement, rate of movement, and extent of the contamination
2     as well as the significant physical features of the site
3     and surrounding area that may affect contaminant transport
4     and risk to human health and safety and the environment.
5         (2) Any owner or operator intending to seek payment
6     from the Fund shall submit to the Agency for approval a
7     site investigation budget that includes, but is not limited
8     to, an accounting of all costs associated with the
9     implementation and completion of the site investigation
10     plan.
11         (3) Remediation objectives for the applicable
12     indicator contaminants shall be determined using the
13     tiered approach to corrective action objectives rules
14     adopted by the Board pursuant to this Title and Title XVII
15     of this Act. For the purposes of this Title, "Contaminant
16     of Concern" or "Regulated Substance of Concern" in the
17     rules means the applicable indicator contaminants set
18     forth in subsection (d) of this Section and the rules
19     adopted thereunder.
20         (4) Upon the Agency's approval of a site investigation
21     plan, or as otherwise directed by the Agency, the owner or
22     operator shall conduct a site investigation in accordance
23     with the plan.
24         (5) Within 60 30 days after completing the site
25     investigation, the owner or operator shall submit to the
26     Agency for approval a site investigation completion
27     report. At a minimum the report shall include all of the
28     following:
29             (A) Executive summary.
30             (B) Site history.
31             (C) Site-specific sampling methods and results.
32             (D) Documentation of all field activities,
33         including quality assurance.
34             (E) Documentation regarding the development of

 

 

09400SB1035sam001 - 5 - LRB094 04707 RSP 46562 a

1         proposed remediation objectives.
2             (F) Interpretation of results.
3             (G) Conclusions.
4     (b) Corrective action.
5         (1) If the site investigation confirms none of the
6     applicable indicator contaminants exceed the proposed
7     remediation objectives, within 60 30 days after completing
8     the site investigation the owner or operator shall submit
9     to the Agency for approval a corrective action completion
10     report in accordance with this Section.
11         (2) If any of the applicable indicator contaminants
12     exceed the remediation objectives approved for the site,
13     within 60 30 days after the Agency approves the site
14     investigation completion report the owner or operator
15     shall submit to the Agency for approval a corrective action
16     plan designed to mitigate any threat to human health, human
17     safety, or the environment resulting from the underground
18     storage tank release. The plan shall describe the selected
19     remedy and evaluate its ability and effectiveness to
20     achieve the remediation objectives approved for the site.
21     At a minimum, the report shall include all of the
22     following:
23             (A) Executive summary.
24             (B) Statement of remediation objectives.
25             (C) Remedial technologies selected.
26             (D) Confirmation sampling plan.
27             (E) Current and projected future use of the
28         property.
29             (F) Applicable preventive, engineering, and
30         institutional controls including long-term
31         reliability, operating, and maintenance plans, and
32         monitoring procedures.
33             (G) A schedule for implementation and completion
34         of the plan.

 

 

09400SB1035sam001 - 6 - LRB094 04707 RSP 46562 a

1         (3) Any owner or operator intending to seek payment
2     from the Fund shall submit to the Agency for approval a
3     corrective action budget that includes, but is not limited
4     to, an accounting of all costs associated with the
5     implementation and completion of the corrective action
6     plan.
7         (4) Upon the Agency's approval of a corrective action
8     plan, or as otherwise directed by the Agency, the owner or
9     operator shall proceed with corrective action in
10     accordance with the plan.
11         (5) Within 60 30 days after the completion of a
12     corrective action plan that achieves applicable
13     remediation objectives the owner or operator shall submit
14     to the Agency for approval a corrective action completion
15     report. The report shall demonstrate whether corrective
16     action was completed in accordance with the approved
17     corrective action plan and whether the remediation
18     objectives approved for the site, as well as any other
19     requirements of the plan, have been achieved.
20         (6) If within 4 years after the approval of any
21     corrective action plan the applicable remediation
22     objectives have not been achieved and the owner or operator
23     has not submitted a corrective action completion report,
24     the owner or operator must submit a status report for
25     Agency review. The status report must include, but is not
26     limited to, a description of the remediation activities
27     taken to date, the effectiveness of the method of
28     remediation being used, the likelihood of meeting the
29     applicable remediation objectives using the current method
30     of remediation, and the date the applicable remediation
31     objectives are expected to be achieved.
32         (7) If the Agency determines any approved corrective
33     action plan will not achieve applicable remediation
34     objectives within a reasonable time, based upon the method

 

 

09400SB1035sam001 - 7 - LRB094 04707 RSP 46562 a

1     of remediation and site specific circumstances, the Agency
2     may require the owner or operator to submit to the Agency
3     for approval a revised corrective action plan. If the owner
4     or operator intends to seek payment from the Fund, the
5     owner or operator must also submit a revised budget.
6 or Licensed Professional Geologist or Licensed Professional
7 Geologist or Licensed Professional Geologist or Licensed
8 Professional Geologist or Licensed Professional Geologist or
9 Licensed Professional Geologist or Licensed Professional
10 Geologist or Licensed Professional Geologist or Licensed
11 Professional Geologist or Licensed Professional Geologist
12     (c) Agency review and approval.
13         (1) Agency approval of any plan and associated budget,
14     as described in this subsection (c), shall be considered
15     final approval for purposes of seeking and obtaining
16     payment from the Underground Storage Tank Fund if the costs
17     associated with the completion of any such plan are less
18     than or equal to the amounts approved in such budget.
19         (2) In the event the Agency fails to approve,
20     disapprove, or modify any plan or report submitted pursuant
21     to this Title in writing within 90 120 days of the receipt
22     by the Agency, the plan or report shall be considered to be
23     rejected by operation of law for purposes of this Title and
24     rejected for purposes of payment from the Underground
25     Storage Tank Fund.
26             (A) For purposes of those plans as identified in
27         paragraph (5) of this subsection (c), the Agency's
28         review may be an audit procedure. Such review or audit
29         shall be consistent with the procedure for such review
30         or audit as promulgated by the Board under Section
31         57.14. The Agency has the authority to establish an
32         auditing program to verify compliance of such plans
33         with the provisions of this Title.
34             (B) For purposes of corrective action plans

 

 

09400SB1035sam001 - 8 - LRB094 04707 RSP 46562 a

1         submitted pursuant to subsection (b) of this Section
2         for which payment from the Fund is not being sought,
3         the Agency need not take action on such plan until 90
4         120 days after it receives the corrective action
5         completion report required under subsection (b) of
6         this Section. In the event the Agency approved the
7         plan, it shall proceed under the provisions of this
8         subsection (c).
9         (3) In approving any plan submitted pursuant to
10     subsection (a) or (b) of this Section, the Agency shall
11     determine, by a procedure promulgated by the Board under
12     Section 57.14, that the costs associated with the plan are
13     reasonable, will be incurred in the performance of site
14     investigation or corrective action, and will not be used
15     for site investigation or corrective action activities in
16     excess of those required to meet the minimum requirements
17     of this Title. The Agency must adhere to the following
18     items in making a reasonableness determination as to the
19     costs of a plan:
20             (A) The Agency may set rates for corrective
21         activities typically requested for reimbursement. In
22         setting these rates the Agency must use a
23         scientifically defensible method that includes a
24         defined scope of work for each activity. The method and
25         list of rates to be determined must be reviewed and
26         approved by the Board. The Agency may also use rates
27         obtained through a current edition, published manual
28         produced by another State agency.
29             (B) Rates must be adjusted annually for inflation,
30         at a minimum. Complete and accurate geographic
31         distances must be considered as well. Professional
32         oversight shall be allowed for all hours in which
33         technically required field activities are occurring.
34             (C) The rates that are set by paragraph (A) may be

 

 

09400SB1035sam001 - 9 - LRB094 04707 RSP 46562 a

1         exceeded in the following instances:
2                 (i) The contractor receives 3 bids in excess of
3             the rate that has been set; provided that the bids
4             must be obtained from subcontractors capable of
5             performing the work and must be obtained in the
6             units for which the rate is set.
7                 (ii) The contractor uses rates from a
8             qualified reference. A list of qualified
9             references must be contained in rules adopted by
10             the Board.
11                 (iii) The contractor provides justification to
12             the satisfaction of the Agency based on
13             site-specific factors for unusual or extraordinary
14             circumstances.
15                 (iv) The activities that are necessary to meet
16             the minimum requirements of this Act exceed the
17             scope of the work defined for a particular rate.
18             (D) If a statistically significant percentage of
19         the number of submittals in the period of one year for
20         a particular rate that has been set are exceeded under
21         (C)(i) and (C)(ii) of this part, the Agency must review
22         the rate and determine if an adjustment needs to be
23         made.
24             (E) Remediation to any remediation objective
25         determined using the tiered approach to corrective
26         action objectives rules adopted by the Board pursuant
27         to this Title and Title XVII of this Act is a
28         reasonable cost.
29             (F) Fees assessed by a State agency that are
30         necessary to meet technical requirements are
31         reasonable costs.
32         (4) For any plan or report received after June 24,
33     September 13, 2002, any action by the Agency to disapprove
34     or modify a plan submitted pursuant to this Title shall be

 

 

09400SB1035sam001 - 10 - LRB094 04707 RSP 46562 a

1     provided to the owner or operator in writing within 90 120
2     days of the receipt by the Agency or, in the case of a site
3     investigation plan or corrective action plan for which
4     payment is not being sought, within 90 120 days of receipt
5     of the site investigation completion report or corrective
6     action completion report, respectively, and shall be
7     accompanied by:
8             (A) an explanation of the Sections of this Act
9         which may be violated if the plans were approved;
10             (B) an explanation of the provisions of the
11         regulations, promulgated under this Act, which may be
12         violated if the plan were approved;
13             (C) an explanation of the specific type of
14         information, if any, which the Agency deems the
15         applicant did not provide the Agency; and
16             (D) a statement of specific reasons why the Act and
17         the regulations might not be met if the plan were
18         approved.
19         Any action by the Agency to disapprove or modify a plan
20     or report is a draft denial, to which the owner or operator
21     has 30 days to respond. The owner or operator may respond
22     by either (i) appealing to the Agency to reverse its
23     disapproval or modification order or (ii) electing to
24     incorporate the Agency's modifications. If the owner or
25     operator appeals to the Agency, the Agency has 30 days from
26     the receipt of the owner's or operator's written
27     notification of appeal in which to respond. The Agency's
28     response to an appeal or failure to respond within the 30
29     days is a final action of the Agency and is subject to
30     appeal to the Board in accordance with the procedures of
31     Section 40 of this Act. The or the rejection of any plan or
32     report by operation of law shall be subject to appeal to
33     the Board in accordance with the procedures of Section 40.
34     If the owner or operator elects to incorporate

 

 

09400SB1035sam001 - 11 - LRB094 04707 RSP 46562 a

1     modifications required by the Agency rather than appeal, an
2     amended plan shall be submitted to the Agency within 35
3     days of receipt of the Agency's written notification.
4         (5) For purposes of this Title, the term "plan" shall
5     include:
6             (A) Any site investigation plan submitted pursuant
7         to subsection (a) of this Section;
8             (B) Any site investigation budget submitted
9         pursuant to subsection (a) of this Section;
10             (C) Any corrective action plan submitted pursuant
11         to subsection (b) of this Section; or
12             (D) Any corrective action plan budget submitted
13         pursuant to subsection (b) of this Section.
14         (6) The Agency shall develop and maintain review
15     guidelines for all plans, reports, and budgets submitted
16     pursuant to this Title. These review guidelines shall be
17     published to provide notice to owners and operators as to
18     the specific information the Agency requires for each plan,
19     report, and budget. The review guidelines shall be
20     uniformly applied to all documents submitted to the Agency
21     under this Title.
22     (d) For purposes of this Title, the term "indicator
23 contaminant" shall mean, unless and until the Board promulgates
24 regulations to the contrary, the following: (i) if an
25 underground storage tank contains gasoline, the indicator
26 parameter shall be BTEX and Benzene; (ii) if the tank contained
27 petroleum products consisting of middle distillate or heavy
28 ends, then the indicator parameter shall be determined by a
29 scan of PNA's taken from the location where contamination is
30 most likely to be present; and (iii) if the tank contained used
31 oil, then the indicator contaminant shall be those chemical
32 constituents which indicate the type of petroleum stored in an
33 underground storage tank. All references in this Title to
34 groundwater objectives shall mean Class I groundwater

 

 

09400SB1035sam001 - 12 - LRB094 04707 RSP 46562 a

1 standards or objectives as applicable.
2     (e) (1) Notwithstanding the provisions of this Section, an
3     owner or operator may proceed to conduct site investigation
4     or corrective action prior to the submittal or approval of
5     an otherwise required plan. If the owner or operator elects
6     to so proceed, an applicable plan shall be filed with the
7     Agency at any time. Such plan shall detail the steps taken
8     to determine the type of site investigation or corrective
9     action which was necessary at the site along with the site
10     investigation or corrective action taken or to be taken, in
11     addition to costs associated with activities to date and
12     anticipated costs.
13         (2) Upon receipt of a plan submitted after activities
14     have commenced at a site, the Agency shall proceed to
15     review in the same manner as required under this Title. In
16     the event the Agency disapproves all or part of the costs,
17     the owner or operator may appeal such decision to the
18     Board. The owner or operator shall not be eligible to be
19     reimbursed for such disapproved costs unless and until the
20     Board determines that such costs were eligible for payment.
21     (f) All investigations, plans, and reports conducted or
22 prepared under this Section shall be conducted or prepared
23 under the supervision of a licensed professional engineer and
24 in accordance with the requirements of this Title.
25 (Source: P.A. 92-554, eff. 6-24-02; 92-574, eff. 6-26-02;
26 92-651, eff. 7-11-02; 92-735, eff. 7-25-02; revised 10-3-02.)
 
27     (415 ILCS 5/57.8)
28     Sec. 57.8. Underground Storage Tank Fund; payment; options
29 for State payment; deferred correction election to commence
30 corrective action upon availability of funds. If an owner or
31 operator is eligible to access the Underground Storage Tank
32 Fund pursuant to an Office of State Fire Marshal
33 eligibility/deductible final determination letter issued in

 

 

09400SB1035sam001 - 13 - LRB094 04707 RSP 46562 a

1 accordance with Section 57.9, the owner or operator may submit
2 a complete application for final or partial payment to the
3 Agency for activities taken in response to a confirmed release.
4 An owner or operator may submit a request for partial or final
5 payment regarding a site no more frequently than once every 90
6 days.
7     (a) Payment after completion of corrective action
8 measures. The owner or operator may submit an application for
9 payment for activities performed at a site after completion of
10 the requirements of Sections 57.6 and 57.7, or after completion
11 of any other required activities at the underground storage
12 tank site.
13         (1) In the case of any approved plan and budget for
14     which payment is being sought, the Agency shall make a
15     payment determination within 90 120 days of receipt of the
16     application. Such determination shall be considered a
17     final decision. The Agency's review shall be limited to
18     generally accepted auditing and accounting practices. In
19     no case shall the Agency conduct additional review of any
20     plan which was completed within the budget, beyond auditing
21     for adherence to the corrective action measures in the
22     proposal. If the Agency fails to approve the payment
23     application within 90 120 days, such application shall be
24     deemed approved by operation of law and the Agency shall
25     proceed to reimburse the owner or operator the amount
26     requested in the payment application. However, in no event
27     shall the Agency reimburse the owner or operator an amount
28     greater than the amount approved in the plan.
29         (2) If sufficient funds are available in the
30     Underground Storage Tank Fund, the Agency shall, within 60
31     days, forward to the Office of the State Comptroller a
32     voucher in the amount approved under the payment
33     application.
34         (3) In the case of insufficient funds, the Agency shall

 

 

09400SB1035sam001 - 14 - LRB094 04707 RSP 46562 a

1     form a priority list for payment and shall notify persons
2     in such priority list monthly of the availability of funds
3     and when payment shall be made. Payment shall be made to
4     the owner or operator at such time as sufficient funds
5     become available for the costs associated with site
6     investigation and corrective action and costs expended for
7     activities performed where no proposal is required, if
8     applicable. Such priority list shall be available to any
9     owner or operator upon request. Priority for payment shall
10     be determined by the date the Agency receives a complete
11     request for partial or final payment. Upon receipt of
12     notification from the Agency that the requirements of this
13     Title have been met, the Comptroller shall make payment to
14     the owner or operator of the amount approved by the Agency,
15     if sufficient money exists in the Fund. If there is
16     insufficient money in the Fund, then payment shall not be
17     made. If the owner or operator appeals a final Agency
18     payment determination and it is determined that the owner
19     or operator is eligible for payment or additional payment,
20     the priority date for the payment or additional payment
21     shall be the same as the priority date assigned to the
22     original request for partial or final payment.
23         (4) Any deductible, as determined pursuant to the
24     Office of the State Fire Marshal's eligibility and
25     deductibility final determination in accordance with
26     Section 57.9, shall be subtracted from any payment invoice
27     paid to an eligible owner or operator. Only one deductible
28     shall apply per underground storage tank site.
29         (5) In the event that costs are or will be incurred in
30     addition to those approved by the Agency, or after payment,
31     the owner or operator may submit successive plans
32     containing amended budgets. The requirements of Section
33     57.7 shall apply to any amended plans.
34         (6) For purposes of this Section, a complete

 

 

09400SB1035sam001 - 15 - LRB094 04707 RSP 46562 a

1     application shall consist of:
2             (A) A certification from a Licensed Professional
3         Engineer or Licensed Professional Geologist as
4         required under this Title and acknowledged by the owner
5         or operator.
6             (B) A statement of the amounts approved in the
7         budget and the amounts actually sought for payment
8         along with a certified statement by the owner or
9         operator that the amounts so sought were expended in
10         conformance with the approved budget.
11             (C) A copy of the Office of the State Fire
12         Marshal's eligibility and deductibility determination.
13             (D) Proof that approval of the payment requested
14         will not result in the limitations set forth in
15         subsection (g) of this Section being exceeded.
16             (E) A federal taxpayer identification number and
17         legal status disclosure certification on a form
18         prescribed and provided by the Agency.
19     (b) Commencement of site investigation or corrective
20 action upon availability of funds. The Board shall adopt
21 regulations setting forth procedures based on risk to human
22 health or the environment under which the owner or operator who
23 has received approval for any budget plan submitted pursuant to
24 Section 57.7, and who is eligible for payment from the
25 Underground Storage Tank Fund pursuant to an Office of the
26 State Fire Marshal eligibility and deductibility
27 determination, may elect to defer site investigation or
28 corrective action activities until funds are available in an
29 amount equal to the amount approved in the budget. The
30 regulations shall establish criteria based on risk to human
31 health or the environment to be used for determining on a
32 site-by-site basis whether deferral is appropriate. The
33 regulations also shall establish the minimum investigatory
34 requirements for determining whether the risk based criteria

 

 

09400SB1035sam001 - 16 - LRB094 04707 RSP 46562 a

1 are present at a site considering deferral and procedures for
2 the notification of owners or operators of insufficient funds,
3 Agency review of request for deferral, notification of Agency
4 final decisions, returning deferred sites to active status, and
5 earmarking of funds for payment.
6     (c) When the owner or operator requests indemnification for
7 payment of costs incurred as a result of a release of petroleum
8 from an underground storage tank, if the owner or operator has
9 satisfied the requirements of subsection (a) of this Section,
10 the Agency shall forward a copy of the request to the Attorney
11 General. The Attorney General shall review and approve the
12 request for indemnification if:
13         (1) there is a legally enforceable judgment entered
14     against the owner or operator and such judgment was entered
15     due to harm caused by a release of petroleum from an
16     underground storage tank and such judgment was not entered
17     as a result of fraud; or
18         (2) a settlement with a third party due to a release of
19     petroleum from an underground storage tank is reasonable.
20     (d) Notwithstanding any other provision of this Title, the
21 Agency shall not approve payment to an owner or operator from
22 the Fund for costs of corrective action or indemnification
23 incurred during a calendar year in excess of the following
24 aggregate amounts based on the number of petroleum underground
25 storage tanks owned or operated by such owner or operator in
26 Illinois.
27         Amount                               Number of Tanks
28         $2,000,000............................fewer than 101
29         $3,000,000....................................101 or more
30         (1) Costs incurred in excess of the aggregate amounts
31     set forth in paragraph (1) of this subsection shall not be
32     eligible for payment in subsequent years.
33         (2) For purposes of this subsection, requests
34     submitted by any of the agencies, departments, boards,

 

 

09400SB1035sam001 - 17 - LRB094 04707 RSP 46562 a

1     committees or commissions of the State of Illinois shall be
2     acted upon as claims from a single owner or operator.
3         (3) For purposes of this subsection, owner or operator
4     includes (i) any subsidiary, parent, or joint stock company
5     of the owner or operator and (ii) any company owned by any
6     parent, subsidiary, or joint stock company of the owner or
7     operator.
8     (e) Costs of corrective action or indemnification incurred
9 by an owner or operator which have been paid to an owner or
10 operator under a policy of insurance, another written
11 agreement, or a court order are not eligible for payment under
12 this Section. An owner or operator who receives payment under a
13 policy of insurance, another written agreement, or a court
14 order shall reimburse the State to the extent such payment
15 covers costs for which payment was received from the Fund. Any
16 monies received by the State under this subsection (e) shall be
17 deposited into the Fund.
18     (f) (Blank.)
19     (g) The Agency shall not approve any payment from the Fund
20 to pay an owner or operator:
21         (1) for costs of corrective action incurred by such
22     owner or operator in an amount in excess of $1,500,000 per
23     occurrence; and
24         (2) for costs of indemnification of such owner or
25     operator in an amount in excess of $1,500,000 per
26     occurrence.
27     (h) Payment of any amount from the Fund for corrective
28 action or indemnification shall be subject to the State
29 acquiring by subrogation the rights of any owner, operator, or
30 other person to recover the costs of corrective action or
31 indemnification for which the Fund has compensated such owner,
32 operator, or person from the person responsible or liable for
33 the release.
34     (i) If the Agency refuses to pay or authorizes only a

 

 

09400SB1035sam001 - 18 - LRB094 04707 RSP 46562 a

1 partial payment, the affected owner or operator may petition
2 the Board for a hearing in the manner provided for the review
3 of permit decisions in Section 40 of this Act.
4     (j) Costs of corrective action or indemnification incurred
5 by an owner or operator prior to July 28, 1989, shall not be
6 eligible for payment or reimbursement under this Section.
7     (k) The Agency shall not pay costs of corrective action or
8 indemnification incurred before providing notification of the
9 release of petroleum in accordance with the provisions of this
10 Title.
11     (l) Corrective action does not include legal defense costs.
12 Legal defense costs include legal costs for seeking payment
13 under this Title unless the owner or operator prevails before
14 the Board in which case the Board may authorize payment of
15 legal fees.
16     (m) The Agency may apportion payment of costs for plans
17 submitted under Section 57.7 if:
18         (1) the owner or operator was deemed eligible to access
19     the Fund for payment of corrective action costs for some,
20     but not all, of the underground storage tanks at the site;
21     and
22         (2) the owner or operator failed to justify all costs
23     attributable to each underground storage tank at the site.
24     (n) The Agency shall not pay costs associated with a
25 corrective action plan incurred after the Agency provides
26 notification to the owner or operator pursuant to item (7) of
27 subsection (b) of Section 57.7 that a revised corrective action
28 plan is required. Costs associated with any subsequently
29 approved corrective action plan shall be eligible for
30 reimbursement if they meet the requirements of this Title.
31     (o) The Agency shall, by January 1, 2006, develop or obtain
32 an electronic system for submittal and review of budgets and
33 reimbursement requests that are submitted pursuant to this
34 Title. For budgets and reimbursement requests submitted

 

 

09400SB1035sam001 - 19 - LRB094 04707 RSP 46562 a

1 electronically, the Agency review time is limited to 60 days.
2 (Source: P.A. 91-357, eff. 7-29-99; 92-554, eff. 6-24-02;
3 92-574, eff. 6-26-02; 92-735, eff. 7-25-02; revised 10-3-02.)
 
4     (415 ILCS 5/57.15)
5     Sec. 57.15. Authority to audit. The Agency has the
6 authority to audit all data, reports, plans, documents and
7 budgets submitted pursuant to this Title. If the Agency, in the
8 process of its audit, determines that additional information is
9 required to support the claims within the data, report, plan,
10 document, or budget, the Agency must request this information
11 in writing via certified mail and allow 30 days for a response.
12 If, following this request, it has been determined that If the
13 data, report, plan, document or budget audited by the Agency
14 pursuant to this Section fails to conform to all applicable
15 requirements of this Title, the Agency may take appropriate
16 actions in accordance with Section 57.17. A request completed
17 in accordance with this Section extends the Agency's applicable
18 review period by 30 days.
19 (Source: P.A. 88-496.)".