Illinois General Assembly

  Bills & Resolutions  
  Compiled Statutes  
  Public Acts  
  Legislative Reports  
  IL Constitution  
  Legislative Guide  
  Legislative Glossary  

 Search By Number
 (example: HB0001)
Search Tips

Search By Keyword

Illinois Compiled Statutes

Information maintained by the Legislative Reference Bureau
Updating the database of the Illinois Compiled Statutes (ILCS) is an ongoing process. Recent laws may not yet be included in the ILCS database, but they are found on this site as Public Acts soon after they become law. For information concerning the relationship between statutes and Public Acts, refer to the Guide.

Because the statute database is maintained primarily for legislative drafting purposes, statutory changes are sometimes included in the statute database before they take effect. If the source note at the end of a Section of the statutes includes a Public Act that has not yet taken effect, the version of the law that is currently in effect may have already been removed from the database and you should refer to that Public Act to see the changes made to the current law.

MUNICIPALITIES
(65 ILCS 5/) Illinois Municipal Code.

65 ILCS 5/11-135.5-65

    (65 ILCS 5/11-135.5-65)
    Sec. 11-135.5-65. Small projects. In any case where the total overall cost of the project is estimated to be less than $12,000,000, the commission may combine the two-phase procedure for selection described in Section 11-135.5-60 into one combined step, provided that all the requirements of evaluation are performed in accordance with Section 11-135.5-60.
(Source: P.A. 102-1134, eff. 2-10-23.)

65 ILCS 5/11-135.5-70

    (65 ILCS 5/11-135.5-70)
    Sec. 11-135.5-70. Submission of proposals. Proposals must be properly identified and sealed. Proposals may not be reviewed until after the deadline for submission has passed as set forth in the request for proposals. All design-build entities submitting proposals shall be disclosed after the deadline for submission, and all design-build entities who are selected for Phase II evaluation shall also be disclosed at the time of that determination.
    Proposals shall include a bid bond in the form and security as designated in the request for proposals. Proposals shall also contain a separate sealed envelope with the cost information within the overall proposal submission. Proposals shall include a list of all design professionals, public art designers, and other entities to which any work may be subcontracted during the performance of the contract.
    Proposals must meet all material requirements of the request for proposal or they may be rejected as non-responsive. The commission has the right to reject any and all proposals.
    The drawings and specifications of the proposal may remain the property of the design-build entity.
    The commission shall review the proposals for compliance with the performance criteria and evaluation factors.
    Proposals may be withdrawn prior to evaluation for any cause. After evaluation begins by the commission, clear and convincing evidence of error is required for withdrawal.
(Source: P.A. 102-1134, eff. 2-10-23.)

65 ILCS 5/11-135.5-75

    (65 ILCS 5/11-135.5-75)
    Sec. 11-135.5-75. Award; performance. The commission may award the contract to the highest overall ranked entity. Notice of award shall be made in writing. Unsuccessful entities shall also be notified in writing. The commission may not request a best and final offer after the receipt of proposals. The commission may negotiate with the selected design-build entity after award but prior to contract execution for the purpose of securing better terms than originally proposed, provided that the salient features of the request for proposal are not diminished.
    A design-build entity and associated design professionals shall conduct themselves in accordance with the relevant laws of this State and the related provisions of the Illinois Administrative Code.
(Source: P.A. 102-1134, eff. 2-10-23.)