Public Act 096-0073 |
||||
| ||||
| ||||
AN ACT concerning State buildings.
| ||||
Be it enacted by the People of the State of Illinois,
| ||||
represented in the General Assembly:
| ||||
Section 1. Short title. This Act may be cited as the Green | ||||
Buildings Act. | ||||
Section 5. Findings.
The General Assembly finds that an | ||||
efficient green building plan is essential to: | ||||
(1) reduce the increasing costs of energy for public | ||||
buildings and reduce the State's overall energy usage; | ||||
(2) preserve the environment and make State buildings | ||||
better for those who work and study in them, as well as the | ||||
area around them; and | ||||
(3) cut pollution, moderate peak energy demand, better | ||||
assure the reliability of energy studies, and stabilize energy | ||||
costs.
| ||||
Section 10. Definitions. In this Act: | ||||
"Board" means the Capital Development Board. | ||||
"USGBC" means the United States Green Building Council. | ||||
"LEED" means the USGBC Leadership in Energy and | ||||
Environmental Design green building rating standard. | ||||
"GBI" means The Green Building Initiative. | ||||
"Green Globes" means the GBI green building construction |
model. | ||
"Major renovation" means a project with a construction | ||
budget that equals 40% or more of the building's current | ||
replacement cost.
| ||
Section 15. Green Buildings Standards.
| ||
(a) All new State-funded building construction and major | ||
renovations of existing State-owned facilities are required to | ||
seek LEED, Green Globes, or equivalent certification. | ||
(b) All construction and major renovation projects, | ||
regardless of size, must achieve the highest level of | ||
certification practical within the project budget. | ||
(1) New buildings and major renovations of less than | ||
10,000 square feet must meet the highest standard of the | ||
Leadership in Energy and Environmental Design's rating | ||
system for new commercial construction and major | ||
renovation projects, as established by the United States | ||
Green Building Council, or an equivalent standard, | ||
including, but not limited to, the Green Building | ||
Initiative's Green Globes USA design program. USGBC LEED, | ||
GBI Green Globes, or the equivalent certification is not | ||
required. | ||
(2) New buildings and major renovations of 10,000 | ||
square feet or more must achieve the silver building rating | ||
of the Leadership in Energy and Environmental Design's | ||
rating system for new commercial construction and major |
renovation projects, as established by the United States | ||
Green Building Council, or an equivalent standard, | ||
including, but not limited to, a two-globe rating in the | ||
Green Globes USA design program. USGBC LEED, GBI Green | ||
Globes, or the equivalent certification is required. | ||
(c) Exemptions to these standards are buildings that are | ||
not "comfort" conditioned as determined by the Board. However, | ||
the project design team must document and incorporate all | ||
appropriate sustainable building methods, strategies, and | ||
technologies in the final design. | ||
(d) State agencies and the project design team may apply to | ||
the Board for a waiver from these standards. | ||
(e) Waivers shall be granted by the Board or an appropriate | ||
agency when the applicant can demonstrate and document:
| ||
(1) An unreasonable financial burden, taking into | ||
account the operating and construction costs over the life | ||
of the building and the total cost of ownership of the | ||
building. | ||
(2) An unreasonable impediment to construction. | ||
(3) The standards would impair the principal function | ||
of the building. | ||
(4) The standards would compromise the historic nature | ||
of the structure. | ||
Documentation on the submittal must include at a minimum: | ||
(1) Life cycle cost analysis. | ||
(2) Energy modeling. |
The design team must provide the documentation for the new | ||
project to confirm that LEED, Green Globes, or the equivalent | ||
construction standards have been followed. | ||
(f) In addition to any required LEED, Green Globes, or the | ||
equivalent criteria, the Board shall require that all projects | ||
referenced in subsection (a) implement at least one LEED | ||
alternative transportation criterion for public transportation | ||
or bicycle access. | ||
(g) The green building standards contained in this Act | ||
shall be analyzed and evaluated by the Board 5 years after the | ||
effective date of this Act or upon the completion of 10 Board | ||
green projects, whichever comes first. | ||
Section 99. Effective date. This Act takes effect upon | ||
becoming law.
|