Public Act 094-0615 |
||||
| ||||
| ||||
AN ACT concerning civil law.
| ||||
Be it enacted by the People of the State of Illinois,
| ||||
represented in the General Assembly:
| ||||
Section 2. If and only if Senate Bill 1930 of the 94th | ||||
General Assembly becomes law in the form in which it passed the | ||||
Senate, the Mechanics Lien Act is amended by changing
Section | ||||
21 as follows:
| ||||
(770 ILCS 60/21) (from Ch. 82, par. 21)
| ||||
Sec. 21. Sub-contractor defined; lien of sub-contractor; | ||||
notice; size of type; service of notice; amount of lien; | ||||
default by contractor.
| ||||
(a) Subject to the provisions of Section 5, every mechanic,
| ||||
worker or other person who shall furnish any labor, services, | ||||
material, fixtures, apparatus or
machinery, forms or form work | ||||
for the
contractor, or shall furnish any material to be | ||||
employed in the process
of construction as a means for | ||||
assisting in the erection of the building
or improvement in | ||||
what is commonly termed form or form work where
concrete, | ||||
cement or like material is used in whole or in part, shall be
| ||||
known under this Act as a sub-contractor, and shall have a lien | ||||
for the
value thereof, with interest on such amount from the | ||||
date the same is
due, from the same time, on the same property | ||||
as provided for the
contractor, and, also, as against the | ||||
creditors and assignees, and
personal and legal | ||||
representatives of the contractor, on the material,
fixtures, | ||||
apparatus or machinery furnished, and on the moneys or other
| ||||
considerations due or to become due from the owner under the | ||||
original
contract. | ||||
(b) If the legal effect of any contract between the owner | ||||
and
contractor is that no lien or claim may be filed or | ||||
maintained by any
one and the waiver is not prohibited by this | ||||
Act, or that such contractor's lien shall be subordinated to |
the interests of any other party, such provision shall be
| ||
binding; but the only admissible evidence
thereof as against a | ||
subcontractor or material supplier, shall be proof of
actual | ||
notice thereof to him or her before his or her contract is | ||
entered into. Such waiver or subordination provision shall not | ||
be binding on the subcontractor unless set forth in its | ||
entirety in writing in the contract between the contractor and | ||
subcontractor or material supplier.
| ||
(c) It shall be the duty of each subcontractor who has | ||
furnished, or is
furnishing, labor, services, material, | ||
fixtures, apparatus or machinery, forms or form work for an | ||
existing owner-occupied single
family residence, in order to | ||
preserve his lien, to notify the occupant
either personally or | ||
by certified mail, return receipt requested,
addressed to the | ||
occupant or his agent of the residence within 60 days
from his | ||
first furnishing labor, services, material, fixtures, | ||
apparatus or machinery, forms or form work, that he is | ||
supplying labor, services, material, fixtures, apparatus or | ||
machinery, forms or form work provided, however, that any | ||
notice given after 60
days by the subcontractor shall preserve | ||
his lien, but only to the
extent that the owner has not been | ||
prejudiced by payments made prior to
receipt of the notice. The | ||
notification shall include a warning to the
owner that before | ||
any payment is made to the contractor, the owner
should receive | ||
a waiver of lien executed by each subcontractor who has
| ||
furnished labor, services, material, fixtures, apparatus or | ||
machinery, forms or form work.
| ||
The notice shall contain the name and address of the | ||
subcontractor or
material man, the date he started to work or | ||
to deliver materials, the
type of work done and to be done or | ||
the type of materials delivered and
to be delivered, and the | ||
name of the contractor requesting the work.
The notice shall | ||
also contain the following warning:
| ||
"NOTICE TO OWNER
| ||
The subcontractor providing this notice has performed work | ||
for or
delivered material to your home improvement contractor. |
These services or
materials are being used in the improvements | ||
to your residence and entitle
the subcontractor to file a lien | ||
against your residence if the services or
materials are not | ||
paid for by your home improvement contractor. A lien
waiver | ||
will be provided to your contractor when the subcontractor is | ||
paid,
and you are urged to request this waiver from your | ||
contractor when paying
for your home improvements."
| ||
Such warning shall be in at least 10 point bold face type. | ||
For
purposes of this Section, notice by certified mail is | ||
considered served
at the time of its mailing.
| ||
(d) In no case, except as hereinafter provided, shall the | ||
owner be
compelled to pay a greater sum for or on account of | ||
the completion of
such house, building or other improvement | ||
than the price or sum
stipulated in said original contract or | ||
agreement, unless payment be
made to the contractor or to his | ||
order, in violation of the rights and
interests of the persons | ||
intended to be benefited by this act: Provided,
if it shall | ||
appear to the court that the owner and contractor
fraudulently, | ||
and for the purpose of defrauding sub-contractors fixed an
| ||
unreasonably low price in their original contract for the | ||
erection or
repairing of such house, building or other | ||
improvement, then the court
shall ascertain how much of a | ||
difference exists between a fair price for
labor, services, | ||
material, fixtures, apparatus or machinery, forms or form work | ||
used in said house, building or other improvement,
and the sum | ||
named in said original contract, and said difference shall
be | ||
considered a part of the contract and be subject to a lien. But | ||
where
the contractor's statement, made as provided in Section | ||
5, shows the
amount to be paid to the sub-contractor, or party | ||
furnishing material,
or the sub-contractor's statement, made | ||
pursuant to Section 22, shows
the amount to become due for | ||
material; or notice is given to the owner,
as provided in | ||
Sections 24 and 25, and thereafter such sub-contract
shall be | ||
performed, or material to the value of the amount named in such
| ||
statements or notice, shall be prepared for use and delivery, | ||
or
delivered without written protest on the part of the owner |
previous to
such performance or delivery, or preparation for | ||
delivery, then, and in
any of such cases, such sub-contractor | ||
or party furnishing or preparing
material, regardless of the | ||
price named in the original contract, shall
have a lien | ||
therefor to the extent of the amount named in such
statements | ||
or notice. In case of default or abandonment by the
contractor, | ||
the sub-contractor or party furnishing material, shall have
and | ||
may enforce his lien to the same extent and in the same manner | ||
that
the contractor may under conditions that arise as provided | ||
for in
Section 4 of this Act, and shall have and may exercise | ||
the same rights
as are therein provided for the contractor.
| ||
(e) Any provision in a contract, agreement, or | ||
understanding,
when payment from a contractor to a | ||
subcontractor or supplier is
conditioned upon receipt of the | ||
payment from any other party including a
private or public | ||
owner, shall not be a defense by the
party responsible for | ||
payment to a claim brought under Section 21, 22, 23,
or 28 of | ||
this Act against the party. For the purpose of this Section,
| ||
"contractor" also includes subcontractor or supplier. The | ||
provisions of
Public Act 87-1180 shall be construed as
| ||
declarative of existing law and not as a new enactment.
| ||
(Source: P.A. 87-361; 87-362; 87-895; 87-1180; 88-45; | ||
94SB1930eng.)
| ||
Section 5. The Tool and Die Lien Act is amended by changing | ||
Sections 1, 2, 3, 5, and 6 and by adding Sections 4.1 and 5.1 as | ||
follows:
| ||
(770 ILCS 105/1) (from Ch. 82, par. 351)
| ||
Sec. 1. Lien. | ||
(A) Plastic or metal processors or persons conducting a
| ||
plastic or metal processing business shall have a lien on the | ||
tools, dies,
molds, jigs, fixtures, forms or patterns in their | ||
possession belonging to a
customer, for the balance due them | ||
from such customer for plastic or metal
processing work, and | ||
for all materials related to such work. The processor
may |
retain possession of the tool, die, mold, jig, fixture, form or | ||
pattern
until such balance is paid, subject only to a security | ||
interest
properly perfected pursuant to Article 9 of the | ||
Uniform Commercial
Code.
| ||
(B) A toolmaker has a lien on all special tools produced by | ||
it and on all proceeds from the assignment, sale, transfer, | ||
exchange, or other disposition of the special tool produced by | ||
it until the toolmaker is paid in full all amounts due the | ||
toolmaker for the production of the special tool. For the | ||
purpose of this subsection:
| ||
(1) the lien attaches when the special tool is | ||
delivered from the toolmaker to the customer;
| ||
(2) the amount of the lien is the amount that a | ||
customer or processor owes the toolmaker for the | ||
fabrication, repair, or modification of the special tool; | ||
and
| ||
(3) the toolmaker retains the lien even if the | ||
toolmaker is not a possession of the special tool for which | ||
the lien is claimed.
| ||
(Source: P.A. 85-381.)
| ||
(770 ILCS 105/2) (from Ch. 82, par. 352)
| ||
Sec. 2. Definitions. For purposes of this Act:
| ||
(A) The term "processor" means any individual or entity | ||
including, but
not limited to, a tool or die maker, who | ||
contracted with, or uses a tool,
die, mold, jig, fixture, form | ||
or pattern to manufacture, assemble, or
otherwise make a | ||
plastic or metal product or products for a customer.
| ||
(B) The term "customer" means any individual or entity who | ||
contracted with,
or caused a plastic or metal processor to use | ||
a tool, die, mold, jig,
fixture, form or pattern to | ||
manufacture, assemble, or otherwise make
plastic or metal | ||
components or products.
| ||
(C) The term "special tool" means a tool, die, mold, jig, | ||
fixture, form ,
or pattern , or part used to manufacture, | ||
assemble, or otherwise make plastic or
metal components or |
products.
| ||
(D) The term "toolmaker" means a person including, but not | ||
limited to, a mold builder, model maker, patternmaker, molder, | ||
die maker, metal former, jig and fixture builder, die sinker, | ||
die caster, mold designer, mold programmer, die designer, die | ||
programmer, and mold or die engineer, that fabricates, cuts, | ||
casts, forms, or designs molds for the plastic industry or dies | ||
for the metal forming industry.
| ||
(Source: P.A. 85-381.)
| ||
(770 ILCS 105/3) (from Ch. 82, par. 353)
| ||
Sec. 3. Notice. Before enforcing a
such lien as provided | ||
for in subsection (A) of Section 1 of this Act , an initial | ||
notice in
writing shall be given to the customer, either | ||
delivered personally or sent
by registered mail to the last | ||
known address of the customer. This notice
shall state that a | ||
lien is claimed in the amount therein set forth or
thereto | ||
attached for processing work contracted or performed for the
| ||
customer. This notice shall also include a demand for payment. | ||
Before enforcing a lien as provided in subsection (B) of | ||
Section 1 of this Act, an initial notice in writing shall be | ||
given to the customer and processor, either delivered | ||
personally or sent by registered mail to the last known address | ||
of the customer and the processor. The notice shall state that | ||
a lien is claimed in the amount set forth in or attached to the | ||
notice for the fabrication, repair, or modification of the | ||
special tool. The notice shall also include a demand for | ||
payment.
| ||
(Source: P.A. 85-381.)
| ||
(770 ILCS 105/4.1 new)
| ||
Sec. 4.1. Possession of special tool. If the toolmaker has | ||
not been paid the amount claimed in the notice within 90 days | ||
after the initial notice is received by the customer and by the | ||
processor, the toolmaker has a right to possession of the | ||
special tool and may do the following: |
(1) enforce the right to possession of the special tool | ||
by judgement, foreclosure, or any available judicial | ||
procedure;
| ||
(2) commence a civil action in circuit court to enforce | ||
the lien, including by obtaining a judgment for the amount | ||
owed and a judgment permitting the special tool to be sold | ||
at an execution sale;
| ||
(3) take possession of the special tool, if possession | ||
without judicial process can be done without breach of the | ||
peace; and
| ||
(4) sell the special tool in a public auction. | ||
A toolmaker that suffers damages under this Act may obtain | ||
appropriate legal and equitable relief, including damages, in a | ||
civil action. The court shall award the toolmaker that is the | ||
prevailing party reasonable attorney's fees, court costs, and | ||
expenses related to enforcement of the lien.
| ||
(770 ILCS 105/5) (from Ch. 82, par. 355)
| ||
Sec. 5. Second notice; publication ; sale by processor . | ||
(A) Before a processor may sell
the die, mold or special | ||
tool, the processor shall provide a second written
notification | ||
to the customer, by registered mail, return receipt requested.
| ||
The second notice shall include the following information:
| ||
(1) The processor's intention to sell the die, mold, or | ||
special tool;
| ||
(2) A description of the die, mold, or special tool to be | ||
sold;
| ||
(3) The time and place of the sale; and
| ||
(4) An itemized statement for the amount due.
| ||
(B) In addition to this notification by mail, the processor | ||
shall publish in
a newspaper of general circulation in the | ||
place where the die, mold, or
special tool is being held for | ||
sale by the processor, notice of the
processor's intention to | ||
sell the die, mold, or special tool. The notice
shall include a | ||
description of the die, mold, or special tool and name of the | ||
customer.
|
(Source: P.A. 85-381.)
| ||
(770 ILCS 105/5.1 new) | ||
Sec. 5.1. Second notice; publication; sale by toolmaker. | ||
(A) Before a toolmaker may sell the special tool, the | ||
toolmaker shall provide a second written notification to the | ||
customer and processor, by registered mail, return receipt | ||
requested. The second notice shall include the following | ||
information: | ||
(1) the toolmaker's intention to sell the special tool;
| ||
(2) a description of the special tool to be sold;
| ||
(3) the time and place of the sale; and
| ||
(4) an itemized statement for the amount due.
| ||
(B) In addition to this notification by mail, the toolmaker | ||
shall publish in a newspaper of general circulation in the | ||
place where the special tool is being held for sale by the | ||
toolmaker, notice of the toolmaker's intention to sell the | ||
special tool. The notice shall include a description of the | ||
special tool and name of the customer and processor.
| ||
(770 ILCS 105/6) (from Ch. 82, par. 356)
| ||
Sec. 6. Inspection. (A) Prior to the sale of any die, mold | ||
or special
tool in accordance with this Act, such item must be | ||
available for
inspection, upon request, by members of the | ||
public during normal business
hours for a period of at least 2 | ||
weeks prior to the sale.
| ||
(B) If the sale is for a sum greater than the amount of the | ||
lien, the
excess shall be paid to any prior lienholder and any | ||
remainder to the customer and the processor .
| ||
(C) A sale shall not be made or a possession shall not be | ||
obtained under this Act if it would be in violation
of any | ||
right of a customer or a processor under federal patent , | ||
bankruptcy, or copyright law.
| ||
(Source: P.A. 85-381.)
|