Public Act 095-0805
Public Act 0805 95TH GENERAL ASSEMBLY
|
Public Act 095-0805 |
HB4646 Enrolled |
LRB095 16528 HLH 42558 b |
|
| AN ACT concerning local government.
| Be it enacted by the People of the State of Illinois,
| represented in the General Assembly:
| Section 5. The Counties Code is amended by adding Section | 42000 as follows: | (55 ILCS 5/42000 new) | Sec. 42000. Wind farms. A county may own and operate a wind | generation turbine farm, either individually or jointly with | another unit of local government, school district, or community | college district that is authorized to own and operate a wind | generation turbine farm, that directly or indirectly reduces | the energy or other operating costs of the county. The county | may ask for the assistance of any State agency, including | without limitation the Department of Commerce and Economic | Opportunity, the Illinois Power Agency, or the Environmental | Protection Agency, in obtaining financing options for a wind | generation turbine farm. | Section 10. The Illinois Municipal Code is amended by | adding Section 11-15.3-1 as follows: | (65 ILCS 5/11-15.3-1 new) | Sec. 11-15.3-1. Wind farms. A municipality may own and |
| operate a wind generation turbine farm, either individually or | jointly with another unit of local government, school district, | or community college district that is authorized to own and | operate a wind generation turbine farm, that directly or | indirectly reduces the energy or other operating costs of the | municipality. The municipality may ask for the assistance of | any State agency, including without limitation the Department | of Commerce and Economic Opportunity, the Illinois Power | Agency, or the Environmental Protection Agency, in obtaining | financing options for a wind generation turbine farm. | Section 15. The School Code is amended by changing and | renumbering Sections 10-20.40 and 34-18.34 as follows: | (105 ILCS 5/10-20.42) | Sec. 10-20.42
10-20.40 . Wind farm. A school district may | own and operate a wind generation turbine farm, either | individually or jointly with a unit of local government, school | district, or community college district that is authorized to | own and operate a wind generation turbine farm , that directly | or indirectly reduces the energy or other operating costs of | the school district. The school district may ask for the | assistance of any State agency, including without limitation | the State Board of Education , the Illinois Power Agency, or the | Environmental Protection Agency, in obtaining financing | options for a wind generation turbine farm.
|
| (Source: P.A. 95-390, eff. 8-23-07; revised 12-7-07.) | (105 ILCS 5/34-18.36) | Sec. 34-18.36
34-18.34 . Wind farm. The school district may | own and operate a wind generation turbine farm, either | individually or jointly with a unit of local government, school | district, or community college district that is authorized to | own and operate a wind generation turbine farm , that directly | or indirectly reduces the energy or other operating costs of | the school district. The school district may ask for the | assistance of any State agency, including without limitation | the State Board of Education , the Illinois Power Agency, or the | Environmental Protection Agency, in obtaining financing | options for a wind generation turbine farm.
| (Source: P.A. 95-390, eff. 8-23-07; revised 12-7-07.) | Section 20. The Public Community College Act is amended by | changing Section 3-42.3 as follows: | (110 ILCS 805/3-42.3)
| Sec. 3-42.3. Wind farm. To own and operate a wind | generation turbine farm, either individually or jointly with a | unit of local government, school district, or community college | district that is authorized to own and operate a wind | generation turbine farm , that directly or indirectly reduces | the energy or other operating costs of the community college |
| district. The board may ask for the assistance of any State | agency, including without limitation the State Board , the | Illinois Power Agency, or the Environmental Protection Agency, | in obtaining financing options for a wind generation turbine | farm.
| (Source: P.A. 95-390, eff. 8-23-07.)
| Section 99. Effective date. This Act takes effect upon | becoming law.
|
Effective Date: 8/12/2008
|