State of Illinois
90th General Assembly
Legislation

   [ Search ]   [ Legislation ]   [ Bill Summary ]
[ Home ]   [ Back ]   [ Bottom ]


[ Engrossed ][ Enrolled ]

90_SB0088

          Makes appropriations and reappropriations to the  Capital
      Development Board by amending Public Act 89-0501.  Also makes
      appropriations   to  the  Department  of  Central  Management
      Services, Department  of  Natural  Resources,  Department  of
      Transportation,   and   Environmental  Protection  Agency  by
      amending Public Act 89-0501.
      FUND                       NEW    REAPPROPS.           TOTAL
                      To Capital Development Board
      Capital Development $415,065.8      $2,578.4      $417,644.2
              To Department of Central Management Services
      Capital Development  $89,800.0          $0.0       $89,800.0
                   To Department of Natural Resources
      Capital Development   $8,000.0          $0.0        $8,000.0
      Conservation 2000     $3,000.0          $0.0        $3,000.0
        Projects
                     To Department of Transportation
      Transportation       $48,000.0          $0.0       $48,000.0
        Series B
                   To Environmental Protection Agency
      Anti-Pollution       $50,000.0          $0.0       $50,000.0
                                                     SRA90S0011MWcb
                                               SRA90S0011MWcb
 1        AN ACT  making  appropriations  and  reappropriations  by
 2    amending Public Act 89-0501.
 3        Be  it  enacted  by  the People of the State of Illinois,
 4    represented in the General Assembly:
 5        Section   1.    "AN   ACT   making   appropriations   and
 6    reappropriations," Public  Act  89-0501,  approved  June  28,
 7    1996,  is  amended by adding new Sections 1A, 2A, 3B, 4B, 5A,
 8    6B, 7A, 8A, 9A, 10B, 11A, 24A, 28A,  28B,  28C,  and  28D  to
 9    Article 77 as follows:
10        (P.A. 89-0501, Art. 77, Sec. 1A new)
11        Sec. 1A.  The following named amounts, or so much thereof
12    as  may  be  necessary,  are  appropriated  from  the Capital
13    Development Fund to the Capital  Development  Board  for  the
14    Department   of  Agriculture  for  the  projects  hereinafter
15    enumerated:
16                ANIMAL DISEASE LABORATORY - CENTRALIA
17    For upgrading the diagnostic laboratory
18      facility, in addition to funds previously
19      appropriated ................................. $    200,000
20              ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
21    For replacing and/or repairing sidewalks,
22      curbs, gutters and streets, in addition
23      to funds previously appropriated .............    1,050,000
24    For completing the installation of fiber
25      optics system, in addition to funds
26      previously appropriated ......................       25,000
27    For upgrading the storm/sanitary and water
28      systems, in addition to funds previously
29      appropriated .................................    1,600,000
30    For renovation or replacement of
31      comfort stations, in addition
32      to funds previously appropriated .............    1,273,000
                            -2-                SRA90S0011MWcb
 1    For upgrading Building 13, in addition to
 2      funds previously appropriated ................      733,000
 3        Total, Section 1A                              $4,881,000
 4        (P.A. 89-0501, Art. 77, Sec. 2A new)
 5        Sec. 2A.  The following named amounts, or so much thereof
 6    as may  be  necessary,  are  appropriated  from  the  Capital
 7    Development  Fund  to  the  Capital Development Board for the
 8    Department of Central Management Services  for  the  projects
 9    hereinafter enumerated:
10                     ILLINOIS REHABILITATION AND
11               EDUCATION CENTER (ROOSEVELT) - CHICAGO
12    For upgrading the HVAC system ..................    2,250,000
13        SUBURBAN NORTH REGIONAL OFFICE BUILDING - DES PLAINES
14    For renovation of Suburban North Regional
15      Office Building (formerly Maine Township
16      North High School building), in addition
17      to funds previously appropriated for such
18      purpose, Phase III ...........................    5,400,000
19    For renovation and expansion of garage .........      375,000
20                   MARION REGIONAL OFFICE BUILDING
21    For construction of a Regional Office
22      Building Addition ............................    2,000,000
23                   COMPUTER FACILITY - SPRINGFIELD
24    For replacement of the halon fire
25      suppression system ...........................      875,000
26        Total, Section 2A                             $10,900,000
27        (P.A. 89-0501, Art. 77, Sec. 3B new)
28        Sec  3B.  The following named amounts, or so much thereof
29    as may  be  necessary,  are  appropriated  from  the  Capital
30    Development  Fund  to  the  Capital Development Board for the
31    Department  of  Corrections  for  the  projects   hereinafter
32    enumerated:
33                              STATEWIDE
                            -3-                SRA90S0011MWcb
 1    For correction of deficiencies in
 2      water systems at three correctional
 3      facilities ................................... $    100,000
 4    For replacement of locks, windows and
 5      doors at the following locations
 6      as set forth below: ..........................    4,000,000
 7       Dwight ...............................291,400
 8       IYC Harrisburg .......................943,000
 9       IYC Joliet ...........................367,500
10       Menard .............................1,350,000
11       Pontiac ...............................77,100
12       IYC Valley View ......................500,000
13       Vienna ...............................471,000
14    For planning, design, construction,
15      equipment and other necessary costs
16      for a Correctional Facility for
17      juveniles ....................................   42,750,000
18    For planning, design, construction,
19      equipment and other necessary costs
20      for a Medium Security Correctional
21      Facility .....................................   69,000,000
22                    DANVILLE CORRECTIONAL CENTER
23    For renovation of interior and
24      exterior walls, in addition to
25      funds previously appropriated ................    4,000,000
26                 DECATUR WOMEN'S CORRECTIONAL CENTER
27    For the planning and conversion of
28      Meyer Mental Health Center into a
29      correctional facility ........................   23,000,000
30                      DIXON CORRECTIONAL CENTER
31    For renovation of the groundwater
32      storage tank  and abatement of crawl-
33      space pipes in Bldgs. 26, 27 and 29 ..........      700,000
34                     DWIGHT CORRECTIONAL CENTER
                            -4-                SRA90S0011MWcb
 1    For completion of medical unit,
 2      in addition to funds previously
 3      appropriated .................................    3,500,000
 4    For expansion of the Education Building
 5      and Dietary and construction of
 6      a warehouse ..................................    4,700,000
 7                   EAST MOLINE CORRECTIONAL CENTER
 8    For upgrading locking system, in addition
 9      to funds previously appropriated .............      800,000
10                 ILLINOIS YOUTH CENTER - HARRISBURG
11    For upgrading the domestic water system ........      675,000
12    For upgrading the HVAC system ..................      532,000
13                   ILLINOIS YOUTH CENTER - JOLIET
14    For planning, site improvements,
15      utility upgrade, equipment and all
16      costs necessary to construct a
17      housing unit and dietary facility.............    7,000,000
18               ILLINOIS YOUTH CENTER - PERE MARQUETTE
19    For upgrading the electrical
20      distribution system ..........................      215,000
21                 ILLINOIS YOUTH CENTER - VALLEY VIEW
22    For upgrading dormitory restrooms
23      and fixtures, in addition to
24      funds previously appropriated ................      550,000
25                     JOLIET CORRECTIONAL CENTER
26    For upgrading the power house and
27      installation of a generator ..................      407,000
28               STATEVILLE CORRECTIONAL CENTER - JOLIET
29    For replacement of the MSU .....................    6,500,000
30                     LINCOLN CORRECTIONAL CENTER
31    For upgrading the water softener system ........      150,000
32                MENARD CORRECTIONAL CENTER - CHESTER
33    For upgrading roads and sidewalks ..............      310,000
34    For upgrading the plumbing systems in
                            -5-                SRA90S0011MWcb
 1      two buildings ................................      400,000
 2    For upgrading the coal handling system
 3      and repair or replace boiler system ..........      950,000
 4    For conversion of the Maintenance Building
 5      to an inmate dormitory .......................      250,000
 6    For conversion of the Administration
 7      Building basement to a courtroom and
 8      attorney offices .............................      100,000
 9    For upgrading the steam and water distribution
10      systems, in addition to funds previously
11      appropriated .................................    2,400,000
12                     PONTIAC CORRECTIONAL CENTER
13    For renovation of main sally port ..............      300,000
14                    VANDALIA CORRECTIONAL CENTER
15    For renovation of dormitory shower rooms .......      450,000
16                     VIENNA CORRECTIONAL CENTER
17    For upgrading the steam distribution system
18      and renovation of Powerhouse, in addition
19      to funds previously appropriated .............    4,000,000
20    For installation of security fencing ...........    1,000,000
21    For upgrading air conditioning system
22      and replacement of cooling tower .............    1,100,000
23    For upgrading the electrical, plumbing and
24      HVAC systems in four buildings ...............      850,000
25        Total, Section 3B                            $180,689,000
26        (P.A. 89-0501, Art. 77, Sec. 4B new)
27        Sec. 4B.  The following named amounts, or so much thereof
28    as  may  be  necessary,  are  appropriated  from  the Capital
29    Development Fund to the Capital  Development  Board  for  the
30    Department  of  Mental  Health and Developmental Disabilities
31    for the projects hereinafter enumerated:
32                              STATEWIDE
33    For replacement of roofing systems at the
34      following locations at the approximate costs
                            -6-                SRA90S0011MWcb
 1      set forth below: ............................. $  2,333,900
 2        Alton Mental Health Center ..........217,000
 3        Choate Mental Health Center .........134,900
 4        Chester Mental Health Center ......1,350,000
 5        Fox Developmental Center ............101,000
 6        Howe Developmental Center ...........166,000
 7        Jacksonville Developmental Center ....21,000
 8        Lincoln Developmental Center ........344,000
 9             ALTON MENTAL HEALTH CENTER - MADISON COUNTY
10    For rehabilitation of the central dietary ......    1,950,000
11    For replacement of life/safety and
12      security system in a residential
13      building .....................................      246,000
14               CHESTER MENTAL HEALTH CENTER - CHESTER
15    For installation of emergency generator
16      and upgrading EMS system .....................      350,000
17             CHICAGO READ MENTAL HEALTH CENTER - CHICAGO
18    For renovating residential units, in
19      addition to funds previously
20      appropriated .................................    2,171,000
21                 CHOATE MENTAL HEALTH CENTER - ANNA
22    For upgrading mechanical equipment, in
23      addition to funds previously
24    appropriated ...................................      837,000
25    For renovating a residential building,
26      in addition to funds previously
27      appropriated .................................    2,334,000
28              ELGIN MENTAL HEALTH CENTER - KANE COUNTY
29    For construction of an Adult Psychiatric
30      Building, in addition to funds previously
31      appropriated .................................    3,681,000
32    For construction of roads, parking lots
33      and street lights ............................    2,500,000
34    For upgrading and expanding the mechanical
                            -7-                SRA90S0011MWcb
 1      infrastructure, in addition to funds
 2      previously appropriated ......................    4,500,000
 3    For construction of a forensic services complex
 4      at Elgin Mental Health Center, in addition
 5      to funds previously appropriated .............    4,815,500
 6                 FOX DEVELOPMENTAL CENTER  - DWIGHT
 7    For replacement of absorbers and
 8      upgrading HVAC system ........................      738,000
 9    For renovation of dietary ......................      843,000
10               HOWE DEVELOPMENTAL CENTER - TINLEY PARK
11    For renovation of residential buildings ........    2,561,000
12          JACKSONVILLE DEVELOPMENTAL CENTER - MORGAN COUNTY
13    For rehabilitation of bathrooms and
14      replacing doors ..............................    1,575,000
15    For rehabilitation of the electrical
16      distribution system, in addition to funds
17      previously appropriated ......................    1,257,000
18             LINCOLN DEVELOPMENTAL CENTER - LOGAN COUNTY
19    For installation of a rethermalization food
20      service system, in addition to funds
21      previously appropriated ......................      732,000
22             LUDEMAN DEVELOPMENTAL CENTER - PARK FOREST
23    For renovation of residential buildings,
24      in addition to funds previously
25      appropriated .................................    1,888,500
26    For rehabilitation of the roads and parking
27      areas and constructing walks .................      800,000
28                 MADDEN MENTAL HEALTH CENTER - HINES
29    For renovation of pavilions, in addition
30      to funds previously appropriated .............      844,000
31            MCFARLAND MENTAL HEALTH CENTER - SPRINGFIELD
32    For replacement of the HVAC management
33      control panel, in addition to funds
34      previously appropriated ......................      150,000
                            -8-                SRA90S0011MWcb
 1    For rehabilitation of the dietary facility .....      413,000
 2               MURRAY DEVELOPMENTAL CENTER - CENTRALIA
 3    For replacement of the boiler
 4      shells and controls, in addition
 5      to funds previously appropriated .............      132,000
 6    For rehabilitation of the hot water
 7      distribution system, in addition to
 8      funds previously appropriated ................      514,000
 9    For replacement of cooling towers and
10      support beams, in addition to funds
11      previously appropriated ......................      335,000
12               SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
13    For completion of the HVAC system, in
14      addition to funds previously
15      appropriated .................................      598,000
16    For replacement of boiler, in
17      addition to funds previously
18      appropriated .................................      765,000
19    For replacement of electrical feeder
20      cable, in addition to the funds
21      previously appropriated ......................      586,000
22    For rehabilitation of sewers and
23      manholes, in addition to funds
24      previously appropriated ......................      777,000
25    For replacement of water mains
26      and valves ...................................    1,826,000
27               SINGER MENTAL HEALTH CENTER - ROCKFORD
28    For replacement of absorbers ...................      746,000
29           TINLEY PARK MENTAL HEALTH CENTER - COOK COUNTY
30    For replacement of the bar screen and
31      renovating the sewer system, in
32      addition to funds previously appropriated ....      655,000
33    For rehabilitation of the electrical
34      distribution system, in addition to
                            -9-                SRA90S0011MWcb
 1      funds previously appropriated ................    2,250,000
 2                ZELLER MENTAL HEALTH CENTER - PEORIA
 3    For renovation of the nurses' stations,
 4      in addition to funds previously
 5      appropriated .................................    1,720,000
 6        Total, Section 4B                             $48,423,900
 7        (P.A. 89-0501, Art. 77, Sec. 5A new)
 8        Sec. 5A.  The following named amounts, or so much thereof
 9    as may  be  necessary,  are  appropriated  from  the  Capital
10    Development  Fund  to  the  Capital Development Board for the
11    Department of Military Affairs for the  projects  hereinafter
12    enumerated:
13                     NORTHWEST ARMORY - CHICAGO
14    For renovation of interior and exterior,
15      in addition to funds previously
16      appropriated for such purposes ...............    1,200,000
17                      DIXON ARMORY - LEE COUNTY
18    For construction of an addition,
19       remodeling, extending utilities and
20      installing a kitchen .........................      280,000
21                    SALEM ARMORY - MARION COUNTY
22    For replacement of the boiler and
23      all domestic plumbing, piping and
24      fixtures .....................................      800,000
25                  STREATOR ARMORY - LASALLE COUNTY
26    For renovation of the mechanical
27      systems,  in addition to funds
28      previously appropriated ......................      450,000
29        Total, Section 5A                              $2,730,000
30        (P.A. 89-0501, Art. 77, Sec. 6B new)
31        Sec. 6B.  The following named amounts, or so much thereof
32    as  may  be  necessary,  are  appropriated  from  the Capital
33    Development Fund to the Capital  Development  Board  for  the
                            -10-               SRA90S0011MWcb
 1    Department  of Natural Resources for the projects hereinafter
 2    enumerated:
 3             CHAIN O' LAKES STATE PARK - MCHENRY COUNTY
 4    For construction of a concession building
 5      and upgrading the horse concession, in
 6      addition to funds previously appropriated ....      500,000
 7                   CHAMPAIGN - STATE WATER SURVEY
 8    For planning the renovation of the central
 9      utilities plant ..............................       30,000
10    For renovation of office and
11      laboratory buildings .........................      793,000
12    For replacement and upgrade of the exterior
13      lighting system ..............................      146,000
14              CHAMPAIGN - STATE NATURAL HISTORY SURVEY
15    For renovation of Natural History
16      Research Center (formerly Burnham
17      Hospital) in Champaign .......................    6,000,000
18                DELABAR STATE PARK - HENDERSON COUNTY
19    For replacement of waterlines and
20      fountains ....................................      110,000
21               EAGLE CREEK STATE PARK - SHELBY COUNTY
22    For rehabilitation of the sewage treatment
23      system, in addition to funds previously
24      appropriated .................................      312,000
25          HENNEPIN CANAL PARKWAY STATE PARK AND ACCESS AREA
26    For replacement and rehabilitation
27      of arch culverts and canal ...................      600,000
28            JOHNSON SAUK TRAIL STATE PARK - HENRY COUNTY
29    For rehabilitation of the concession
30      building, in addition to funds
31      previously appropriated ......................      140,000
32               KICKAPOO STATE PARK - VERMILION COUNTY
33    For construction of a sewage treatment
34      plant, in addition to funds
                            -11-               SRA90S0011MWcb
 1      previously appropriated ......................    1,110,000
 2              MORAINE HILLS STATE PARK - MCHENRY COUNTY
 3    For renovation of the trail ....................      345,000
 4               MORAINE VIEW STATE PARK - MCLEAN COUNTY
 5    For construction of a sewage treatment
 6      system and plant .............................    1,625,000
 7              PERE MARQUETTE STATE PARK - JERSEY COUNTY
 8    For renovation of two buildings and
 9      replacement of a storage building ............      180,000
10              STARVED ROCK STATE PARK - LASALLE COUNTY
11    For construction of a visitors'
12      center, in addition to funds
13      previously appropriated ......................      365,000
14    For rehabilitation of trails, in addition
15      to funds previously appropriated  ............    1,000,000
16    For reconstruction of the seawall, in
17      addition to funds previously
18      appropriated .................................      500,000
19    For rehabilitation of the sewer
20      system - Phase I .............................      180,000
21      STATE MUSEUM RESEARCH AND COLLECTION CENTER - SPRINGFIELD
22    For the completion of site improvements ........      559,000
23                     STATE MUSEUM - SPRINGFIELD
24    For planning and replacement of the main
25      museum exhibits, in addition to funds
26      previously appropriated ......................      700,000
27        Total, Section 6B                             $15,195,000
28        (P.A. 89-0501, Art. 77, Sec. 7A new)
29        Sec. 7A.  The following named amounts, or so much thereof
30    as may  be  necessary,  are  appropriated  from  the  Capital
31    Development  Fund  to  the  Capital Development Board for the
32    Department  of  Rehabilitation  Services  for  the   projects
33    hereinafter enumerated:
34      ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE
                            -12-               SRA90S0011MWcb
 1    For upgrading campus lighting ..................      150,000
 2    For the renovation of Building No. 4 ...........      700,000
 3             ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
 4    For replacement of roofing systems .............      535,000
 5    For planning the upgrade of the heat
 6      and smoke detection system ...................      100,000
 7    For the renovation of Cullom Hall ..............    2,100,000
 8        Total, Section 7A                              $3,585,000
 9        (P.A. 89-0501, Art. 77, Sec. 8A new)
10        Sec. 8A.  The following named amounts, or so much thereof
11    as  may  be  necessary,  are  appropriated  from  the Capital
12    Development Fund to the Capital  Development  Board  for  the
13    Department of Revenue for the project hereinafter enumerated:
14                 WILLARD ICE BUILDING - SPRINGFIELD
15    For completion of the replacement of the
16      fire alarm and security system ...............  $    70,000
17    For upgrade of the uninterruptible
18      power system .................................    1,300,000
19    For completion of the renovation of
20      the atrium landscaping .......................      100,000
21        Total, Section 8A                              $1,470,000
22        (P.A. 89-0501, Art. 77, Sec. 9A new)
23        Sec. 9A.  The following named amounts, or so much thereof
24    as  may  be  necessary,  are  appropriated  from  the Capital
25    Development Fund to the Capital  Development  Board  for  the
26    Department  of  State  Police  for  the  projects hereinafter
27    enumerated:
28    For replacing radio communication
29      towers, equipment, buildings and
30      installing emergency power
31      generators at various locations ..............    1,150,000
32       District #22, Effingham (Mason site)
33       District #10, Pesotum
                            -13-               SRA90S0011MWcb
 1       District #21, Askum
 2       District #6, Pontiac
 3                DISTRICT 18 HEADQUARTERS - LITCHFIELD
 4    For rehabilitation of headquarters facilities ..      377,000
 5        Total, Section 9A                              $1,527,000
 6        (P.A. 89-0501, Art. 77, Sec. 10B new)
 7        Sec.  10B.  The  following  named  amounts,  or  so  much
 8    thereof as  may  be  necessary,  are  appropriated  from  the
 9    Capital Development Fund to the Capital Development Board for
10    the  Capital  Development  Board for the projects hereinafter
11    enumerated:
12                              STATEWIDE
13    For renovation to meet the requirements
14      of the Americans with Disabilities Act .......    3,000,000
15                    CAPITOL COMPLEX - SPRINGFIELD
16    For energy improvements and upgrading the
17      HVAC, security and electrical systems,
18      in addition to funds previously
19      appropriated - Attorney General's
20      Building .....................................      225,000
21    To renovate the interior, exterior and
22      site improvements, in addition to
23      funds previously appropriated -
24      Executive Mansion ............................      190,000
25    For upgrading environmental equipment
26      and HVAC, in addition to funds previously
27      appropriated - Archives Building .............    2,150,000
28    For planning and beginning the rehabilitation
29      of the Power Plant ...........................    3,805,000
30    For upgrading sewer system - Capitol Complex,
31      in addition to funds previously
32      appropriated .................................    2,100,000
33    For renovation of the lower level and
34      ground floor, in addition to funds
                            -14-               SRA90S0011MWcb
 1      previously appropriated - Old Power Plant ....    2,180,000
 2        Total, Section 10B                            $13,650,000
 3        (P.A. 89-0501, Art. 77, Sec. 11A new)
 4        Sec.  11A.  The  following  named  amounts,  or  so  much
 5    thereof as  may  be  necessary,  are  appropriated  from  the
 6    Capital Development Fund to the Capital Development Board for
 7    the Historic Preservation Agency for the projects hereinafter
 8    enumerated:
 9                       STATEWIDE HISTORIC SITE
10    For matching ISTEA federal grant funds ......... $    500,000
11                  DAVID DAVIS MANSION - BLOOMINGTON
12    For renovation of the David Davis Mansion
13      to eliminate basement leakage ................      231,000
14             CAHOKIA COURTHOUSE STATE MEMORIAL - CAHOKIA
15    For renovation of the Cahokia Courthouse
16      and the Jarrot House .........................      387,000
17             CAHOKIA MOUNDS HISTORIC SITE - COLLINSVILLE
18    For replacement of Monk's Mound stairs .........      465,000
19    For restoration of Monk's Mound ................    1,800,000
20           LINCOLN LOG CABIN HISTORIC SITE - COLES COUNTY
21    For construction of a visitors' center .........    1,625,000
22    For replacement of bridges .....................      180,000
23                  LINCOLN'S NEW SALEM - PETERSBURG
24    For renovation of the River Ridge
25      Restaurant and improvements to the
26      domestic water system ........................      273,000
27                   OLD STATE CAPITOL - SPRINGFIELD
28    For renovation of the Old State
29      Capitol to eliminate basement
30      leakage ......................................      620,000
31        Total, Section 11A                             $6,081,000
32        (P.A. 89-0501, Art. 77, Sec. 24A new)
33        Sec.  24A.  The  following  named  amounts,  or  so  much
                            -15-               SRA90S0011MWcb
 1    thereof  as  may  be  necessary,  are  appropriated  from the
 2    Capital Development Fund to the Capital Development Board for
 3    the  Department  of  Veterans'  Affairs   for   the   project
 4    hereinafter enumerated:
 5                  ILLINOIS VETERANS' HOME - MANTENO
 6    For construction of a special care facility ....   $5,550,000
 7                  ILLINOIS VETERANS' HOME - QUINCY
 8    For upgrading HVAC system ......................      254,000
 9    For replacing steam lines ......................       83,000
10    For replacing the domestic hot water loop ......      305,000
11    For renovating the elevator ....................      197,000
12        Total, Section 24A                             $6,389,000
13        (P.A. 89-0501, Art. 77, Sec. 28A new)
14        Sec.  28A.  The  following  named  amounts,  or  so  much
15    thereof  as  may  be  necessary,  are  appropriated  from the
16    Capital Development Fund to the Capital Development Board for
17    the  Illinois  Community  College  Board  for  the   projects
18    hereinafter enumerated:
19                       BELLEVILLE AREA COLLEGE
20    For constructing a building, additions
21      and site improvements at the
22      Belleville and Red Bud campuses,
23      in addition to funds previously
24      appropriated ................................. $ 10,797,100
25            DANVILLE COMMUNITY COLLEGE - VERMILION COUNTY
26    To rehabilitate infrastructure,
27      construct a classroom facility
28      and a day care center, in addition
29      to funds previously appropriated .............    4,770,200
30              HEARTLAND COMMUNITY COLLEGE - BLOOMINGTON
31    For planning buildings, parking areas,
32      utilities, and site development and
33       preliminary site preparation
34       required to establish permanent
                            -16-               SRA90S0011MWcb
 1       campus facilities ...........................    2,500,000
 2                   JOHN A. LOGAN COMMUNITY COLLEGE
 3    For constructing additions and site
 4      improvements, in addition to funds
 5      previously appropriated ......................   12,315,900
 6                  SHAWNEE COMMUNITY COLLEGE - ULLIN
 7    For planning additions to the main
 8      building, parking areas, site
 9      improvements and roofing
10      replacements .................................      310,000
11        Total, Section 28A                            $30,693,200
12        (P.A. 89-0501, Art. 77, Sec. 28B new)
13        Sec.  28B.  The  following  named  amounts,  or  so  much
14    thereof  as  may  be  necessary,  are  appropriated  from the
15    Capital Development Fund to the Capital Development Board for
16    the Board of Higher Education for  the  projects  hereinafter
17    enumerated:
18                      MATH AND SCIENCE ACADEMY
19    For replacing air conditioning units,
20      controls and upgrading the energy
21      management system ............................ $  2,370,000
22                      CHICAGO STATE UNIVERSITY
23    For renovating campus buildings and
24      upgrading mechanical systems..................    2,432,200
25              EASTERN ILLINOIS UNIVERSITY - CHARLESTON
26    For planning an addition and renovation
27      of Booth Library .............................    1,000,000
28                     GOVERNORS STATE UNIVERSITY
29    For upgrading and replacing cooling
30      and refrigeration systems and
31      equipment ....................................    2,299,400
32             NORTHEASTERN ILLINOIS UNIVERSITY - CHICAGO
33    For purchasing equipment
34      for the Fine Arts Complex ....................    4,000,000
                            -17-               SRA90S0011MWcb
 1                WESTERN ILLINOIS UNIVERSITY - MACOMB
 2    For converting Simpkins Hall
 3      gymnasium and adjacent areas into
 4      a performing arts facility ...................    2,309,300
 5                 ILLINOIS STATE UNIVERSITY - NORMAL
 6    For purchasing equipment for
 7      the Science Laboratory building ..............    4,000,000
 8              SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE
 9    For site improvements and purchasing
10      equipment for the Engineering and
11      Technology Building ..........................    1,259,000
12    For planning addition, remodeling and
13    upgrading the HVAC system in Altgeld Hall ......      574,000
14             SOUTHERN ILLINOIS UNIVERSITY - EDWARDSVILLE
15    For construction of the Engineering Facility
16      building and related site improvements .......   21,256,200
17                UNIVERSITY OF ILLINOIS - SPRINGFIELD
18    For upgrading and completing the south
19      access roadway ...............................      451,600
20                  UNIVERSITY OF ILLINOIS - CHICAGO
21    For the renovation of the court area and
22      Lecture Center, in addition to funds
23      previously appropriated ......................    5,900,000
24                 UNIVERSITY OF ILLINOIS - CHAMPAIGN
25    For completion of campus flood control .........    6,000,000
26        Total, Section 14                             $53,851,700
27        (P.A. 89-0501, Art. 77, Sec. 28C new)
28        Sec.  28C.  The  following  named  amounts,  or  so  much
29    thereof as may be necessary, is appropriated from the Capital
30    Development  Fund  to  the  Capital Development Board for the
31    Board  of  Higher   Education   for   miscellaneous   capital
32    improvements  including  construction,   capital  facilities,
33    cost  of  planning,  supplies, equipment, materials, services
34    and all other expenses required to complete the work  at  the
                            -18-               SRA90S0011MWcb
 1    various  universities  set  forth  below.  This appropriation
 2    shall be in addition to any other appropriated amounts  which
 3    can be expended for these purposes.
 4      For Chicago State University ..........525,000
 5      For Eastern Illinois University .......980,000
 6      For Governors State University ........315,000
 7      For Illinois State University .......2,030,000
 8      For Northeastern Illinois University ..735,000
 9      For Northern Illinois University ....2,240,000
10      For Southern Illinois University ....4,830,000
11      For University of Illinois .........13,090,000
12      For Western Illinois University .....1,505,000
13        (P.A. 89-0501, Art. 77, Sec. 28D new)
14        Sec.  28D.  The  sum of $8,750,000, or so much thereof as
15    may  be  necessary,  is   appropriated   from   the   Capital
16    Development  Fund  to  the  Capital Development Board for the
17    Illinois Community College Board  for  miscellaneous  capital
18    improvements    including    construction,    reconstruction,
19    remodeling,  improvement,  repair and installation of capital
20    facilities, cost of planning, supplies, equipment, materials,
21    services and all other expenses required to complete the work
22    at the various community colleges.  This appropriation  shall
23    be in addition to any other appropriated amounts which can be
24    expended for these purposes.
25        Section  2.   "AN  ACT  making appropriations, Public Act
26    89-0501, approved June  28,  1996,  is  amended  by  changing
27    Sections 5, 9 and 21 of Article 78 as follows:
28        (P.A. 89-0501, Art. 78, Sec. 5)
29        Sec.  5.  The following named amounts, or so much thereof
30    as may be necessary and remain unexpended  at  the  close  of
31    business  on  June 30, 1996, from reappropriations heretofore
32    made for such purposes in Article 80, Section  5,  of  Public
                            -19-               SRA90S0011MWcb
 1    Act  89-0022, are reappropriated from the Capital Development
 2    Fund to the Capital Development Board for the  Department  of
 3    Corrections for the projects hereinafter enumerated:
 4                    CENTRALIA CORRECTIONAL CENTER
 5    For renovation of the Dietary .................. $    576,008
 6                    DANVILLE CORRECTIONAL CENTER
 7    For installation of a water softener system  ...       80,000
 8    For renovation of interior walls and
 9      exterior masonry walls .......................      743,387
10    For correction of construction defects .........      363,136
11    For planning, utilities, site improvements,
12      and other expenses necessary for the
13      construction of a correctional facility ......       32,511
14                      DIXON CORRECTIONAL CENTER
15    For completing the upgrade of Sewage Treatment
16      Plant, in addition to funds previously
17      appropriated .................................      805,336
18    For renovation of the Dietary and
19      replacement of the blast chillers ............      220,918
20    For replacement of the cooling tower in
21      the medical unit .............................        7,030
22    For upgrading the steam distribution system
23      and replacement of the boiler system
24      including asbestos abatement .................      304,916
25    For replacement of the cooling tower ...........       14,864
26                         DU QUOIN WORK CAMP
27    For construction of classroom space and
28      maintenance building, and
29      site improvement .............................       83,026
30                     DWIGHT CORRECTIONAL CENTER
31    For renovation of buildings  ...................    1,255,872
32    For tuckpointing and renovation of walls for
33      17 buildings .................................        5,223
34    For installation of handicapped lifts and
                            -20-               SRA90S0011MWcb
 1      construction of ramps ........................       58,899
 2    For renovation of the basement walls and
 3      correction of water infiltration of
 4      eight housing units  .........................        6,552
 5    For rehabilitation of the water and sewer
 6      systems ......................................       86,877
 7                   EAST MOLINE CORRECTIONAL CENTER
 8    For planning the upgrade of locking
 9      systems in nine buildings ....................       34,995
10    For stabilization of the slopes ................      150,121
11    For upgrading the steam distribution system
12      and replacement of boilers, including
13      asbestos abatement ...........................      264,888
14               SOUTHWESTERN ILL. CORRECTIONAL FACILITY
15    For providing equipment and telecom,
16      constructing a warehouse and upgrading
17      a parking lot, in addition to funds
18      previously appropriated ......................    1,278,823
19    For completing the conversion of existing
20      buildings into a minimum security
21      correctional facility, in addition to funds
22      previously appropriated ......................       44,937
23                        HANNA CITY WORK CAMP
24    For the purchase and upgrade of the
25      water system .................................        5,051
26                 ILLINOIS YOUTH CENTER - HARRISBURG
27    For purchasing and installation of equipment
28      to complete the dietary expansion  ...........       25,607
29    For replacement of absorption chiller units
30      and boiler systems in three buildings ........      239,985
31                     JOLIET CORRECTIONAL CENTER
32    For completing the west cellhouse renovation,
33      including asbestos abatement, in addition
34      to funds previously appropriated .............    8,503,812
                            -21-               SRA90S0011MWcb
 1    For renovation of the west cellhouse, in
 2      addition to funds previously appropriated ....       45,445
 3    For rehabilitation of the electrical
 4      distribution system and renovation
 5      of the sanitary system at the
 6      barscreen ....................................       12,041
 7    For renovation of steam, water, sewage and
 8      electrical systems ...........................       11,048
 9    For planning the rehabilitation of
10      West Cellhouses ..............................      172,010
11                   ILLINOIS YOUTH CENTER - JOLIET
12    For completing the upgrade of electrical
13      systems, in addition to funds
14      previously appropriated ......................    2,090,299
15    For upgrading the fire alarm system ............      893,150
16    For upgrading the storm and sanitary sewers ....      965,000
17    For completing the upgrade of the utilities, in
18      addition to funds previously appropriated ....       83,738
19    For completion of the steam system upgrade
20      and initiation of the electrical
21      system upgrade ...............................        6,239
22                            KANKAKEE MSU
23    For providing equipment, telecom, lighting
24      and freezer units, in addition to funds
25      previously appropriated ......................       94,419
26    For planning, construction, utilities,
27      renovation, site improvements, and
28      other expenses necessary for a minimum
29      security women's prison ......................        4,133
30    For rehabilitation of the heating and air
31      handling system in the resident buildings ....        4,817
32                     LINCOLN CORRECTIONAL CENTER
33    For upgrading the locking systems and doors  ...       77,700
34    For upgrading the water supply .................      356,077
                            -22-               SRA90S0011MWcb
 1    For renovation of the Dietary, construction
 2      of a cooler addition and installation
 3      of blast chillers  ...........................      487,520
 4                      LOGAN CORRECTIONAL CENTER
 5    For renovation of sewer system .................      881,858
 6    For renovation of the water tower ..............      125,088
 7    For rehabilitation of the roof ventilation
 8      systems ......................................       77,948
 9                     MENARD CORRECTIONAL CENTER
10    For planning, completion and rehabilitation
11    or replacement of the MSU "C" Building .........    2,525,680
12    For replacement of East and West
13      Cellhouse windows and boilers.................      511,346
14    For improving the south yard for outdoor
15      recreation ...................................       34,346
16    For repairs due to the Great Flood of
17      1993 and projects to protect the facility
18      from future floods ...........................      825,890
19    For upgrading the steam and water distribution
20      systems and replacement of the MSU
21      "C" Building .................................      576,422
22    For replacement of the chimney stack and
23      boilers, in addition to funds previously
24      appropriated .................................      400,000
25    For replacement of hot water heaters and
26      deairing tanks ...............................      110,000
27    For planning the renovation of the old
28      hospital building ............................      207,540
29    For renovation of the North Cellhouse II,
30      Phase II .....................................        5,512
31    For renovation of elements of the power
32      plant, including the main generator ..........       52,501
33    For planning for renovation of the
34      Administration Building ......................       15,604
                            -23-               SRA90S0011MWcb
 1    For completing the renovation of the
 2      Psychiatric Cellhouse ........................        5,247
 3               ILLINOIS YOUTH CENTER - PERE MARQUETTE
 4    For completing the renovation of control
 5      center and construction of a confinement
 6      addition, in addition to funds previously
 7      appropriated .................................      250,279
 8    For upgrading the dormitory restrooms  .........       65,380
 9                     PONTIAC CORRECTIONAL CENTER
10    For upgrading selected utilities and planning
11      the rehabilitation and upgrade of the total
12      system .......................................       31,129
13    For renovation of steam, water, sewage and
14      electrical systems ...........................        5,875
15                    ROBINSON CORRECTIONAL CENTER
16    For Health and Life Safety improvements ........        8,875
17                     SHAWNEE CORRECTIONAL CENTER
18    For upgrading the heating and hot
19      water system .................................      581,309
20                    SHERIDAN CORRECTIONAL CENTER
21    For completion of water and sewer systems
22      upgrade, in addition to funds previously
23      appropriated .................................        2,699
24    For planning the upgrade of sewer and
25      water utilities ..............................        6,954
26                   STATEVILLE CORRECTIONAL CENTER
27    For upgrading the the gatehouse ................      464,185
28    For completing the upgrade of the security
29      system, in addition to funds previously
30      appropriated .................................      200,000
31    For rehabilitation of plumbing in Dietary  .....       79,710
32    For upgrading the doors, locks and hardware
33      in B Cellhouse ...............................       59,940
34    For rehabilitation of the intercom system  .....      380,924
                            -24-               SRA90S0011MWcb
 1    For upgrading the water supply to B house  .....      187,633
 2    For upgrade of the utility system ..............        7,177
 3                 ILLINOIS YOUTH CENTER - ST. CHARLES
 4    For completing the upgrade of the water distribution
 5      system, in addition to funds previously
 6      appropriated .................................      308,328
 7    For replacement of Madison Cottage .............      504,802
 8    For rehabilitation of the utilities ............       42,004
 9                   TAYLORVILLE CORRECTIONAL CENTER
10    For Health and Life Safety improvements  .......        2,115
11                 ILLINOIS YOUTH CENTER - VALLEY VIEW
12    For planning the upgrade of dormitory restrooms
13      and fixtures .................................       68,560
14    (From Article 80, Section 6 of Public Act 89-0022):
15    For upgrading locking systems and doors
16      in J Hall ....................................       13,520
17                    VANDALIA CORRECTIONAL CENTER
18    For completing Dormitory G renovation and
19      replacement of the cold storage facility, in
20      addition to funds previously appropriated ....        3,230
21    For rehabilitation of the south wall of
22      Dormitory G ..................................       35,833
23                     VIENNA CORRECTIONAL CENTER
24    For completing the rehabilitation of duct
25      system and walls, in addition to
26      funds previously appropriated ................    2,909,382
27    For upgrading the electrical system ............      455,994
28    For planning the upgrade of the steam
29      distribution system ..........................      200,471
30    For planning the replacement of the
31      absorption chiller and cooling tower .........       42,625
32    For upgrading the library and school
33      buildings ....................................      107,592
34    For planning the rehabilitation of the
                            -25-               SRA90S0011MWcb
 1      duct system and walls ........................      138,027
 2    For upgrading the water and sewer
 3      utilities ....................................      396,000
 4                 ILLINOIS YOUTH CENTER - WARRENVILLE
 5    For installation of bathroom fixtures in
 6      cottages .....................................       11,523
 7                              STATEWIDE
 8    For planning, design, construction,
 9      equipment and all other necessary
10      costs for a youth boot camp at a
11      site to be chosen from the list of
12      finalists not selected for the
13      super maximum security prison  ...............    5,198,856
14    For planning the construction of
15      two work camps at sites to be
16      chosen from the list of finalists not
17      selected for the super maximum
18      security prison ..............................      153,941
19    For completion of planning, site improvements,
20      utility upgrade, equipment and construction of
21      three housing units to add 672 cells
22      to the adult correctional system .............      317,978
23    For planning, construction, utilities, site
24      improvements, equipment and other expenses
25      necessary for the construction of a close
26      supervision super maximum security prison ....   43,312,099
27    For upgrading for fire safety at five
28      locations and replacing boilers...............    3,799,775
29    For correcting defects in the food preparation
30      areas, including roofs .......................      215,323
31    For planning, construction, utilities,
32      site improvements, and other expenses
33      necessary for the construction of two
34      minimum and one medium security
                            -26-               SRA90S0011MWcb
 1      prisons ......................................      204,213
 2    For utilities, construction, planning,
 3      design, site improvements, rehabilitation,
 4      equipment, or any other means of acquiring
 5      community correctional centers, adult work
 6      camps, and boot camps ........................       26,609
 7    For replacement of boiler systems at the
 8      following locations at the approximate
 9      costs set forth below: .......................       17,704
10        Illinois Youth Center -
11          Joliet .............................17,704
12    For renovation and improvements at various
13      correctional facilities at the approximate
14      costs set forth below: .......................      117,693
15        Roof Replacement .....................70,000
16        Road Repavement ......................47,693
17    For replacement of cell doors and locks
18      and rehabilitation of locking systems at
19      the following locations at the approximate
20      costs set forth below: .......................      118,902
21        Kankakee MSU
22          For rehabilitation of locking
23          systems ...........................118,902
24    For renovation of roads and parking lots
25      and replacement of boilers at the
26      following locations at the approximate
27      costs set forth below ........................      176,152
28        Dixon Correctional Center
29          For roads and parking ..............30,000
30        Hanna City Work Camp
31          For roads and parking ..............37,000
32        Logan Correctional Center
33          For roads and parking ..............10,000
34        Menard Correctional Center
                            -27-               SRA90S0011MWcb
 1          For roads and parking and
 2           replacement of boilers............168,832
 3        Vienna Correctional Center
 4          For roads ..........................30,000
 5    For replacement of roofs at various Department of
 6      Corrections locations ........................      500,000
 7    For roof replacement at the following
 8      locations at the approximate costs
 9      set forth below: .............................    1,109,004
10        Dixon Correctional Center
11          Five Buildings .....................25,000
12        Dwight Correctional Center
13          Three buildings ...................122,000
14        Dwight Correctional Center
15          Multi-Purpose Building .............85,000
16        Graham Correctional Center
17          Five buildings ....................125,000
18        Graham Correctional Center
19          Thirty-two buildings ..............150,000
20        Hanna City Work Camp
21          13 buildings ........................7,000
22        Joliet Correctional Center
23          Five buildings ....................160,000
24        Logan Correctional Center
25          Two buildings .....................200,000
26        Menard Psychiatric Center
27          Six buildings .....................485,000
28        Menard Correctional Center
29          Warehouse Building .................70,000
30        Menard Correctional Center
31          Five buildings ....................700,000
32        Pontiac Correctional Center
33          Nine buildings .....................40,000
34        Pontiac Correctional Center
                            -28-               SRA90S0011MWcb
 1          Eight buildings ....................75,000
 2        Illinois Youth Center-
 3          St. Charles
 4          three buildings ...................175,000
 5        Sheridan Correctional Ctr
 6          Six buildings ......................50,000
 7        Stateville Correctional Ctr
 8          16 buildings .......................50,000
 9        Stateville Correctional Ctr
10          Seven buildings ...................135,000
11        Ill Youth Center-
12          Valley View
13          Administration Building and
14          Kitchen Addition ..................100,688
15        Illinois Youth Center-
16          Warrenville
17          One residential building ..........150,000
18        Total, Section 5                $89,691,716   $89,519,706
19        (P.A. 89-0501, Art. 78, Sec. 9)
20        Sec.  9.  The following named amounts, or so much thereof
21    as may be necessary and remain unexpended  at  the  close  of
22    business  on  June 30, 1996, from reappropriations heretofore
23    made for such purposes in  Article 80, Section  9  of  Public
24    Act  89-0022, as amended, are reappropriated from the Capital
25    Development Fund to the Capital  Development  Board  for  the
26    Department  of  Mental  Health and Developmental Disabilities
27    for the projects hereinafter enumerated:
28                     ALTON MENTAL HEALTH CENTER
29    For rehabilitation of storm and sanitary sewers, in
30      addition to funds previously appropriated .... $    528,468
31    For rehabilitation of storm and sanitary
32      sewers, in addition to funds previously
33      appropriated .................................       11,579
34    For installation of security screens ...........       75,000
                            -29-               SRA90S0011MWcb
 1    For replacement of domestic hot water
 2      lines in seven buildings .....................       19,048
 3    For upgrading fire safety systems in
 4      eight buildings   ............................       43,900
 5    For renovation of ceilings in Holly, Maple,
 6      Locust and Elm ...............................       42,444
 7    For replacement of the chiller and
 8      connection of the HVAC to the energy
 9      management system ............................      149,551
10    For replacement of two cooling towers in
11      the Willow Building ..........................       68,639
12    For installation of emergency generators
13      in four buildings ............................       14,137
14    For rehabilitation of bathrooms for
15      handicapped accessibility ....................       25,847
16    For rehabilitation of the electrical
17      distribution system ..........................      105,257
18                    CHESTER MENTAL HEALTH CENTER
19    For replacement of windows and door frames, in
20      addition to funds previously appropriated  ...       34,509
21    For construction of a storage building  ........      803,585
22    For renovation of the HVAC system ..............      148,822
23    For upgrading the security system ..............      390,000
24    For planning the replacement of the
25      security windows .............................       15,607
26    For construction of a Rehabilitative
27      Services building ............................       79,400
28    For replacement of the emergency generator .....      167,651
29                          CHICAGO METRO C&A
30    For renovation of ISPI building ................    4,500,000
31    For planning and renovation of residential
32      and program units for children and
33      adolescent services ..........................    1,039,329
34                  CHICAGO READ MENTAL HEALTH CENTER
                            -30-               SRA90S0011MWcb
 1    For renovation of utility rooms and installation of
 2      drinking fountains ...........................      218,000
 3    For renovation of the West Campus Nurses'
 4      Stations .....................................    1,304,000
 5    For renovation of Henry Horner Children's Center
 6      and West Campus for fire and life safety
 7      codes ........................................    1,421,941
 8    For renovation of the West Campus shower
 9      and toilet rooms .............................      685,520
10    For replacement of penthouse louvers at
11      the West Campus ..............................       65,347
12    For installation of an emergency generator
13      in Henry Horner Children's Center ............       15,158
14    For rehabilitation of the bathroom shower
15      walls in ten buildings .......................       96,691
16    For improvement of the site drainage and
17      for upgrading the fire lane ..................       62,698
18            CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER
19    For upgrading the mechanical
20      equipment, in addition to funds
21      previously appropriated ........      522,080        92,668
22    For planning and beginning the renovation of a
23      residential building .........................       75,131
24    For renovation of the kitchen and residential
25      units for rethermalization and air
26      condition the kitchen, in addition to
27      funds previously appropriated  ...............      101,678
28    For separating and upgrading of the combined
29      sewer system, in addition to funds
30      previously appropriated ......................      194,466
31    For rehabilitation of resident buildings
32      and upgrading of temperature controls ........      793,150
33    For renovation of the kitchen for
34      rethermalization and air conditioning ........      102,476
                            -31-               SRA90S0011MWcb
 1    For planning the separation and beginning
 2      the renovation of the combined sewers  .......       35,634
 3    For construction of a coal pile retaining
 4      wall .........................................       18,748
 5                     ELGIN MENTAL HEALTH CENTER
 6    For upgrading and expanding the mechanical
 7      infrastructure, in addition to funds
 8      previously appropriated ......................    3,300,000
 9    For renovation of the HVAC systems,
10      replacement of windows and installation
11      of security screens, in addition
12      to funds previously appropriated .............    2,092,543
13    For construction of a Forensic Services
14      Facility, in addition to funds
15      previously appropriated  .....................   24,612,256
16    For upgrading and expanding mechanical
17      infrastructure, in addition to funds
18      previously appropriated ......................    1,350,571
19    For upgrading for fire and life safety .........      902,122
20    For planning the renovation of the Forensic
21      Building and abating asbestos ................      251,946
22    For renovation of the Central Stores
23      Building .....................................      181,034
24    For upgrading the Medical Building HVAC
25      system and replacement of the cooling
26      towers .......................................       21,336
27    For upgrading the security systems and
28      constructing a multi-purpose building
29      for the Forensic Complex .....................       64,550
30    For the demolition of the Old Main Building
31      and construction of an Adult
32      Psychiatric Center ...........................   14,751,842
33                      FOX DEVELOPMENTAL CENTER
34    For renovation of Building #8, in addition
                            -32-               SRA90S0011MWcb
 1      to funds previously appropriated .............    1,619,590
 2    For renovation of the exterior of Building #1,
 3      in addition to funds previously
 4      appropriated .................................      499,782
 5    For planning the renovation of Building #8 .....       44,709
 6    For installation of an elevator and
 7      rehabilitation of corridor exits .............       25,140
 8               HOWE DEVELOPMENTAL CENTER - TINLEY PARK
 9    For renovation of residences ...................      797,135
10    For replacement of steam and
11      condensate lines .............................      565,000
12    For renovation of homes and walkways ...........      581,784
13    For renovation of the boilers in the power
14      plant ........................................      241,583
15    For renovation of bathrooms and utility rooms
16      in ten residences ............................       11,904
17         JACKSONVILLE MENTAL HEALTH AND DEVELOPMENTAL CENTER
18    For replacement of code compliance
19      generators ...................................      158,336
20    For providing storage space ....................      154,718
21    For planning and beginning electrical
22      distribution renovation ......................       21,950
23    For replacement of piping and heating units ....      495,095
24    For rehabilitation of bathrooms and replacement
25      of doors .....................................      595,847
26    For rehabilitation of the boilers, turbine
27      generator and switchgear .....................       40,851
28    For installation of fire safety systems in
29      four buildings and replacement of a
30      code compliance generator ....................      545,074
31    For replacement of two water softeners and
32      four heaters .................................       41,100
33                     KILEY DEVELOPMENTAL CENTER
34    For renovation of homes ........................      630,000
                            -33-               SRA90S0011MWcb
 1    For renovation of bathrooms in homes ...........      637,788
 2    For installation of fire safety systems in
 3      six buildings ................................      187,025
 4                    LINCOLN DEVELOPMENTAL CENTER
 5    For replacement of an absorber, in addition to
 6      funds previously appropriated ................      120,000
 7    For upgrading the architectural and mechanical
 8      systems, in addition to funds
 9      previously appropriated ......................    1,528,728
10    For installation of a code compliance generator   .   107,000
11    For rehabilitation of the coal bunker
12      in the Powerhouse ............................      261,000
13    For installation of rethermalization food
14      service system ...............................      707,034
15    For expansion of the sprinkler system in
16      four buildings ...............................      185,081
17    For renovation of the boilers, replacement of
18      controls and tuckpointing the exterior .......      194,718
19    For installation of air conditioning in
20      Coty and Dietary Buildings ...................       49,508
21    For upgrading the HVAC systems, including
22      chillers .....................................      104,852
23                    LUDEMAN DEVELOPMENTAL CENTER
24    For renovation of residences ...................      709,410
25    For renovation of residences ...................      783,000
26    For renovation of restrooms for accessibility
27      in two buildings .............................      178,501
28    For renovation of bathrooms in 15 residences ...      157,589
29    For installation of automatic sprinkler
30      and fire alarm system ........................        9,133
31                 MABLEY DEVELOPMENTAL CENTER - DIXON
32    For installation of a sewer screening system  ..       79,101
33    For construction of a dietary and stores
34      building .....................................       19,002
                            -34-               SRA90S0011MWcb
 1                 MADDEN MENTAL HEALTH CENTER - HINES
 2    For renovation of pavilions ....................      370,000
 3    For upgrading residences for safety and
 4      security .....................................      330,898
 5    For replacing controls for sewage ejector ......       39,000
 6    For replacement of a cooling tower and
 7      chiller ......................................      288,922
 8    For installation of return air fan systems .....       42,195
 9    For replacement of hot water heaters ...........      129,975
10    For upgrade of the central kitchen and
11      renovation of eight pavilions ................        6,062
12            MCFARLAND MENTAL HEALTH CENTER - SPRINGFIELD
13    For renovation of a residential building .......      483,226
14    For replacement of the HVAC control panel ......      191,759
15               MURRAY DEVELOPMENTAL CENTER - CENTRALIA
16    For replacement of cooling towers ..............      581,288
17    For installation of fire safety systems ........    1,366,824
18    For rehabilitation of the electrical
19      distribution system ..........................      237,000
20    For replacement of the sewage ejector
21      equipment and bar screen .....................       24,971
22    For replacement of the boiler shell and
23      controls .....................................        5,747
24    For rehabilitation of the hot water
25      distribution system ..........................       48,665
26    For renovation of Daisy Cottage ................      125,349
27               SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
28    For replacement of the roof and masonry repair,
29      in addition to funds previously
30      appropriated .................................      128,000
31    For replacement of valves in the powerhouse ....      276,000
32    For replacement of electrical feeder cable .....      212,000
33    For planning and beginning sewer and
34      manhole renovation ...........................       57,645
                            -35-               SRA90S0011MWcb
 1      as amended):
 2    For rehabilitation of the boilers ..............      587,000
 3    For planning and replacement of windows ........      234,721
 4    For installation of an emergency generator .....      646,000
 5    For upgrading fire safety systems in the
 6      support buildings ............................      677,677
 7    For upgrading the HVAC system and installation
 8      air conditioning in the Dietary Building .....      225,383
 9    For replacement of expansion joints in the
10      utility tunnels ..............................      107,208
11    For installation of emergency generators in
12      three residences .............................      330,000
13    For installation of air conditioning in
14      Building #704, in addition to funds
15      previously appropriated ......................      108,049
16    For replacement of hot water tanks in the
17      Laundry Building .............................      191,431
18    For replacement of switches and switchgear,
19      in addition to funds previously
20      appropriated .................................      183,051
21    For replacement of the water softener
22      system in the powerhouse .....................      107,000
23    For replacement of cooling towers in
24      Buildings #100A and #100B ....................      132,813
25    For replacement of roofing systems and
26      renovation of the exterior in two
27      buildings ....................................       49,253
28    For replacement of the electrical switchgear
29      in the Power Plant ...........................       29,421
30    For replacement of the heating system in
31      the Work Activity Center .....................       37,210
32    For planning the installation of an air
33      conditioning system for Building #704 ........       45,376
34    For upgrading the HVAC system in the
                            -36-               SRA90S0011MWcb
 1      Administration building and other
 2      buildings ....................................      233,321
 3    For installation of air conditioning in
 4      Buildings #502 and #514 ......................      238,756
 5    For upgrading the electrical system ............      124,571
 6    For upgrade of the electrical distribution
 7      system .......................................       62,102
 8                     SINGER MENTAL HEALTH CENTER
 9    For replacement of cooling tower, expansion
10      tanks and test absorbers .....................      179,923
11    For replacement of the water main ..............      570,258
12    For replacement of HVAC pumps and valves .......      258,409
13    For replacement of mechanical equipment ........       34,638
14                  TINLEY PARK MENTAL HEALTH CENTER/
15                      HOWE DEVELOPMENTAL CENTER
16    For renovating and making mechanical
17      improvements to Spruce Hall ..................      302,823
18    For planning the rehabilitation of the
19      electrical distribution system ...............      101,337
20    For installation of security screens, in
21      addition to funds previously appropriated ....      142,161
22    For renovation for accessibility in four
23      buildings ....................................      703,813
24    For planning the sewer system renovation and
25      replacement of the rag catcher ...............      390,886
26    For renovation for fire and life safety in
27      three residences .............................      625,000
28    For replacement of piping in Maple Hall ........      234,158
29    For renovation of nursing stations and
30      medication rooms in three residences .........      591,298
31    For rehabilitation of the domestic hot water
32      system for Willow and Pine Halls .............      108,263
33    For rehabilitation of the washrooms in
34      Spruce Hall ..................................      108,000
                            -37-               SRA90S0011MWcb
 1    For replacement of the windows in nine
 2      buildings ....................................       70,125
 3                     ZELLER MENTAL HEALTH CENTER
 4    For renovation of Nurses' Stations and
 5      seclusion rooms ..............................    1,223,000
 6    For replacement of the heating and cooling
 7      pumps ........................................       12,465
 8                              STATEWIDE
 9                             ALTON/ELGIN
10    For construction of a forensic services complex
11      at Alton Mental Health Center and Elgin
12      Mental Health Center, in addition to funds
13      previously appropriated ......................    8,346,593
14    For conducting the preliminary design to
15      construct, convert and/or rehabilitate
16      a forensic facility ..........................      212,483
17                              STATEWIDE
18    For replacement of the roofing systems,
19      upgrading the ventilation systems, and
20      enclosure of HVAC units at the following
21      locations at the approximate costs set
22      forth below: .................................        5,763
23        Jacksonville Mental Health Ctr
24          Gillespie and Drake buildings
25          including the enclosure of the
26          rooftop HVAC unit on Gillespie ......5,763
27    For upgrading and rehabilitation of roads,
28      parking lots and drainage systems at the
29      following locations at the approximate
30      costs set forth below: .......................      105,769
31        Chester Mental Health Center
32          For rehabilitation of the
33          drainage system and upgrading
34          parking lots ......................113,986
                            -38-               SRA90S0011MWcb
 1    For upgrading roads and parking lots at
 2      the following locations at the
 3      approximate costs set forth below: ...........       40,544
 4        McFarland Mental Health Ctr ...........5,544
 5        Shapiro Developmental Center .........35,000
 6    For rehabilitation of water towers -
 7      Murray and Chester ...........................      500,000
 8    For replacement of roofs at the following
 9      locations at the approximate costs set
10      forth below: .................................    3,031,603
11        Alton Mental Health Center -
12          five buildings ....................342,687
13        Choate Mental Health Center -
14          three buildings ....................17,479
15        Choate Mental Health and
16          Developmental Center
17          Five buildings .....................15,034
18        Chester Mental Health Ctr
19          21 buildings .......................49,555
20        Elgin Mental Health Center -
21          three buildings ....................52,000
22        Elgin Mental Health Center
23          Six Buildings .....................115,000
24        Jacksonville Developmental Center -
25          one building .......................53,750
26        Lincoln Developmental Center -
27          three buildings ...................413,510
28        Lincoln Developmental Center
29          four buildings ......................6,601
30        Ludeman Developmental Center
31          Support buildings ..................91,447
32        Ludeman Developmental Center
33          residences .........................22,158
34        Mabley Developmental Center -
                            -39-               SRA90S0011MWcb
 1          one building ......................103,517
 2        Madden Mental Health Center -
 3          buildings and covered walkways .....72,822
 4        McFarland Mental Health Center -
 5          three buildings ...................144,240
 6        Meyer Mental Health Center -
 7          one building ......................315,514
 8        Shapiro Developmental Center -
 9          three buildings ...................187,000
10        Shapiro Developmental Center
11          two buildings ......................16,351
12        Shapiro Developmental Center
13          Five buildings .....................67,831
14        Tinley Park Mental Health Center -
15          one building .......................26,048
16        Tinley Park Mental Health Ctr
17          Oak Hall ..........................109,034
18                       STATEWIDE - FIRE SAFETY
19    To renovate fire safety systems, including
20      installation of sprinklers, at the following
21      locations at the approximate costs set
22      forth below: .................................      354,529
23        Anna Mental Health and
24          Developmental Center ...............12,318
25        Singer Mental Health and
26          Developmental Center ..............335,021
27    For fire safety and other work necessary to meet
28      state and federal certification standards for
29      the following projects:
30    For installation of sprinkler systems at
31      Chicago-Read Mental Health Center ............      148,010
32    For installation of sprinkler systems at
33      Murray Developmental Center ..................        2,000
34    For installation of sprinkler systems at
                            -40-               SRA90S0011MWcb
 1      Waukegan Developmental Center ................       18,547
 2        Total, Section 9               $102,309,844  $103,689,207
 3        (P.A. 89-0501, Art. 78, Sec. 21)
 4        Sec. 21.  The following named amounts, or so much thereof
 5    as may be necessary and remain unexpended  at  the  close  of
 6    business  on  June 30, 1996, from reappropriations heretofore
 7    made for such purposes in  Article 80, Section 21  of  Public
 8    Act  89-0022, are reappropriated from the Capital Development
 9    Fund to  the  Capital  Development  Board  for  the  Illinois
10    Community   College   Board   for  the  projects  hereinafter
11    enumerated:
12                      BELLEVILLE AREA COLLEGE
13    For planning buildings, additions and
14      site improvements ............................ $ 1,746,900
15                   DANVILLE AREA COMMUNITY COLLEGE
16    For rehabilitation of infrastructure
17      and beginning construction of a
18      classroom facility ...........................    2,305,427
19    For rehabilitation of the infrastructure and
20      planning campus buildings ....................    1,522,392
21                          COLLEGE OF DUPAGE
22    For completing the addition to
23      the Student Resource Center ..................    2,180,400
24                 ILLINOIS EASTERN COMMUNITY COLLEGE
25    For remodeling the Student Services Office
26      facilities ...................................       26,557
27    For replacement of the roofing system ..........      104,172
28                       ELGIN COMMUNITY COLLEGE
29    For construction of addition, site improvements,
30      remodeling and purchasing equipment ..........    9,192,689
31    (From Article 80, Section 23 of Public Act 89-0022):
32    For planning, design, site improvements, utility
33      adjustments, and any other costs associated
34      with construction of a new Instructional
                            -41-               SRA90S0011MWcb
 1      Building at Elgin Community College ..........      428,894
 2                   JOHN A. LOGAN COMMUNITY COLLEGE
 3    For planning an addition and site improvements .      409,400
 4    For construction of classroom additions
 5      and remodeling the existing facility,
 6      including utilities and site improvements ....       33,745
 7                     JOHN WOOD COMMUNITY COLLEGE
 8    For construction of a science and technology
 9      center and access road .......................    1,697,465
10                        JOLIET JUNIOR COLLEGE
11    For construction of a business and technology
12      center and remodeling the main campus
13      building .....................................    1,343,174
14    For planning, design and site preparation of
15      a Business Technology Center .................       12,744
16                    KISHWAUKEE COMMUNITY COLLEGE
17    For construction and reconstruction at
18      the library ..................................      100,055
19                       COLLEGE OF LAKE COUNTY
20    For construction of a multi-use Instructional
21      Center, including acquisition of equipment
22      and remodeling of existing facilities ........    5,421,861
23    For initial costs associated with planning,
24      design, construction, site improvements,
25      utilities, remodeling and equipment for
26      a multi-use instructional facility ...........      774,155
27    For planning a multi-use instructional
28      building .....................................      159,865
29                    LAKE LAND COLLEGE - EFFINGHAM
30    For construction of an education and
31      technology center ............................       29,622
32                 LEWIS AND CLARK COMMUNITY COLLEGE
33    For renovation of buildings, construction of an
34      addition and site improvements ...............      815,800
                            -42-               SRA90S0011MWcb
 1    For construction of health,
 2      mathematics and science
 3      laboratory facilities and
 4      remodeling Fobes Hall ..........    2,801,529       824,549
 5    For renovation of the main complex .............      464,317
 6    For planning, design, and site preparation,
 7      and construction of a multi-purpose
 8      building .....................................       24,932
 9                       MCHENRY COUNTY COLLEGE
10    For construction of an addition, including
11      equipment, a parking area and
12      site improvements ............................      291,590
13    For expansion of existing library facilities
14      and construction of classrooms at McHenry
15      County College ...............................       45,736
16                  MORAINE VALLEY COMMUNITY COLLEGE
17    For planning and constructing a new classroom
18      facility .....................................      500,000
19    For providing for an architectural engineering
20      study, renovations, construction,
21      reconstruction and remodeling of Buildings
22      A, B and L ...................................      483,482
23               MORTON COMMUNITY COLLEGE - COOK COUNTY
24    For construction of an addition and
25      site improvements ............................      272,000
26                    PARKLAND COLLEGE - CHAMPAIGN
27    For construction of a child care center
28      and access drives ............................        9,820
29                   PRAIRIE STATE COMMUNITY COLLEGE
30    For construction of a Learning Resource
31      Center addition ..............................      942,828
32                          REND LAKE COLLEGE
33    For construction of an aquatic and
34      rehabilitation center ........................    1,694,587
                            -43-               SRA90S0011MWcb
 1    For replacement of the roof ....................       30,889
 2                    SOUTHEASTERN ILLINOIS COLLEGE
 3    For construction of humanities,
 4      administration, and child care facilities
 5      and remodeling campus buildings ..............    4,552,440
 6    For the planning, design and site preparation
 7      of a Humanities/Administration Building ......       60,426
 8               TRITON COMMUNITY COLLEGE - RIVER GROVE
 9    For planning, site improvements, construction
10      and other expenses necessary for the
11      construction of an addition to the Learning
12      Resource Center ..............................      182,692
13          WILLIAM RAINEY HARPER COMMUNITY COLLEGE -PALATINE
14    For planning, developing, and designing a multi-
15      purpose telecommunications
16      instructional delivery center ................      350,000
17                  STATEWIDE - CONSTRUCTION DEFECTS
18    For planning, construction and renovation
19      to correct defectively designed or
20      constructed community college facilities,
21      provided that monies recovered based upon
22      claims arising out of such defective design
23      or construction shall be paid to the state
24      as required by Section 105.12 of the Public
25      Community College Act as reimbursement for
26      monies expended pursuant to this
27      appropriation ................................    5,300,930
28        Total, Section 21               $46,313,515   $44,336,535
29        Section 3.  "AN ACT making  appropriations,"  Public  Act
30    89-0501,  approved  June  28,  1996,  is  amended  by  adding
31    Sections 9A, 9B and 23A to Article 49 as follows:
32        (P.A. 89-0501, Art. 49, Sec. 9A new)
33        Sec. 9A.  The amount of $3,000,000,  is appropriated from
                            -44-               SRA90S0011MWcb
 1    the  Capital  Development  Fund  to the Department of Natural
 2    Resources for deposit into  the  Conservation  2000  Projects
 3    Fund.
 4        (P.A. 89-0501, Art. 49, Sec. 9B new)
 5        Sec. 9B.  The amount of $3,000,000, or so much thereof as
 6    may  be necessary, is appropriated from the Conservation 2000
 7    Projects Fund to the Department of Natural Resources for  the
 8    following projects as the approximate costs set forth below:
 9    Site M planning and development ................ $  2,500,000
10    Acquisition of land and long-term
11      easements for ecosystem-based
12      management of Illinois'
13      natural resources ............................      500,000
14        Total                                          $3,000,000
15        (P.A. 89-0501, Art. 49, Sec. 23A new)
16        Sec.  23A.  The  amount of $5,000,000, or so much thereof
17    as  may  be  necessary,  is  appropriated  from  the  Capital
18    Development Fund to the Department of Natural  Resources  for
19    the  Office  of Water Resources for the following projects at
20    the approximate costs set forth below, in addition  to  funds
21    previously appropriated.
22    East Peoria
23      East Peoria Levee construction
24      cost share ..........................2,000,000
25    Loves Park
26      Construction cost share ...............750,000
27    Metro East Sanitary District
28      Cost share for two pump stations
29      and closure structures ................850,000
30    Fox River
31      Flood control at Algonquin
32      and McHenry Dams ......................600,000
33    Granite City
                            -45-               SRA90S0011MWcb
 1      Reduce urban groundwater flooding .....300,000
 2    Chicago Harbor/Lake Michigan
 3      Control leakage - mouth
 4      of Chicago River ......................500,000
 5        Section  4.  "AN  ACT  making  appropriations, Public Act
 6    89-0501, approved June 28, 1996, is amended by adding Section
 7    57A to Article 51 as follows:
 8        (P.A. 89-0501, Art. 51, Sec. 57A new)
 9        Sec. 57A.  The following named sums, or so  much  thereof
10    as may be necessary, are appropriated from the Transportation
11    Bond  Series  B  Fund to the Department of Transportation for
12    construction  costs,  making  grants  and  providing  project
13    assistance   to   municipalities,   special    transportation
14    districts,  private  non-profit carriers, mass transportation
15    carriers, and the Intercity Rail Program for the acquisition,
16    construction, extension, reconstruction  and  improvement  of
17    mass  transportation  facilities,  including  rapid  transit,
18    intercity  rail,  bus  and other equipment used in connection
19    therewith, as provided by law, as follows:
20      Pursuant to Section 4(b)(1) of
21       the General Obligation Bond Act,
22       as amended................................... $ 35,000,000
23      For the counties of the state
24       outside of Cook, DuPage, Kane,
25       McHenry, and Will pursuant to
26       Section 4(b)(1) of the General
27       Obligation Bond Act, as amended .............    3,000,000
28      For the Department of Transportations's
29       Operation Greenlight Program
30       pursuant to Section 4(b)(1)
31       of the General Obligation Bond
32       Act, as amended .............................   10,000,000
33        Total                                         $48,000,000
                            -46-               SRA90S0011MWcb
 1        Section   5.  "AN   ACT   making    appropriations    and
 2    reappropriations,"  Public  Act  89-0501,  approved  June 28,
 3    1996, is amended by adding Sections 10 and 11 to Article  67,
 4    as follows:
 5        (P.A. 89-0501, Art. 67, Sec. 10 new)
 6        Sec.  10.  The  amount of $73,000,000, or so much thereof
 7    as  may  be  necessary,  is  appropriated  from  the  Capital
 8    Development Fund to  the  Department  of  Central  Management
 9    Services  on  behalf of the Department of Corrections for the
10    payment on the contract for  purchase,  improvement  and  any
11    other   costs  associated  with  the  acquisition  of  a  new
12    correctional facility at Pinckneyville, Illinois.
13        (P.A. 89-0501, Art. 67, Sec. 11 new)
14        Sec. 11.  The amount of $16,800,000, or so  much  thereof
15    as  may  be  necessary,  is  appropriated  from  the  Capital
16    Development  Fund  to  the  Department  of Central Management
17    Services on behalf of the Department of Corrections  for  the
18    payment  on  the  contract  for purchase, improvement and any
19    other  costs  associated  with  the  acquisition  of  a   new
20    correctional   facility  at  Graham  and  Logan  Correctional
21    Centers.
22        Section   6.  "AN   ACT   making    appropriations    and
23    reappropriations,"  Public  Act  89-0501,  approved  June 28,
24    1996, is amended by  adding  Section  56  to  Article  47  as
25    follows:
26        (P.A. 89-0501, Art. 47, Sec. 56 new)
27        Sec.  56.  The  amount of $50,000,000, or so much thereof
28    as  may  be  necessary,  is  appropriated  to  the   Illinois
29    Environmental  Protection Agency from the Anti-Pollution Bond
30    Fund  for  payment  of  claims  submitted,  including  claims
31    submitted in prior years,  to  the  state  and  approved  for
32    payment  under  the  Leaking Underground Storage Tank Program
                            -47-               SRA90S0011MWcb
 1    established in Title XVI of the Environmental Protection Act.
 2        Section  7.  This  Act  takes  effect  immediately   upon
 3    becoming law.

[ Top ]