State of Illinois
90th General Assembly
Legislation

   [ Search ]   [ Legislation ]   [ Bill Summary ]
[ Home ]   [ Back ]   [ Bottom ]


[ Introduced ][ House Amendment 002 ]

90_HB1959ham001

                                          HDS90HB1959KSa515js
 1                    AMENDMENT TO HOUSE BILL 1959
 2        AMENDMENT NO.     .  Amend House Bill 1959,
 3    on page 1, line 22, by changing "169,400" to "84,700"; and
 4    on page 4, line 15, by changing "6,111,100"  to  "5,111,100";
 5    and
 6    on  page  4,  line  24, by changing "locations" to "location.
 7    However, no funds shall be expended for land acquisition that
 8    is transferred to the Illinois State Toll  Highway  Authority
 9    unless  all  of  the  fair  market value is reimbursed to the
10    department"; and
11    page 5, line 26, by changing "117,000" to "58,000"; and
12    on page 9, line 25, by changing "32,000" to "16,000"; and
13    on page 10, line 14, by changing "2,979,900" to  "1,490,000";
14    and
15    on page 11, line 1, by changing "1,115,800" to "557,900"; and
16    on  page  11,  line 21, by changing "1,127,600" to "563,800";
17    and
18    on page 12, line 9, by changing "900,000" to "450,000"; and
19    on page 12, line 29, by changing "612,000" to "306,000"; and
20    on page 13, line 17, by changing "993,500" to "496,800"; and
21    on page 14, line 4, by changing "874,500" to "437,300"; and
22    on page 14, line 24, by changing "1,179,600" to "89,800"; and
23    on page 15, line 12, by changing "896,900" to "448,500";
24    on  page  16,  line  19,  by  changing  "sum"  to   "sum   of
                            -2-           HDS90HB1959KSa515js
 1    $341,600,000"; and
 2    on page 17, by replacing line 2 with the following:
 3    "applicable  laws  and  regulations with allocations, but not
 4    limited to, the following:
 5      District 1................................... $105,000,000
 6      District 2...................................    8,000,000
 7      District 3...................................    9,200,000
 8      District 4...................................    9,500,000
 9      District 5...................................   10,400,000
10      District 6...................................   15,500,000
11      District 7...................................    7,600,000
12      District 8...................................   10,000,000
13      District 9...................................    7,800,000
14      Statewide....................................  103,600,000
15      Engineering..................................   55,000,000
16        Total                                       $341,600,000
17    For reconstruction and resurfacing
18      on Pecatonica Road between IL Rte 75
19      and U.S. 20..................................   $1,500,000
20    For resurfacing on 31st from
21      Western to Kedzie............................    2,000,000
22    For sewer and flood control along
23      IL Rte 53 for the Village of
24      Elwood in Will County........................      535,000
25    For resurfacing on 39th (Pershing)
26      between Martin Luther King Drive
27      to Lake Park.................................      750,000
                            -3-           HDS90HB1959KSa515js
 1    For resurfacing on Drexel Blvd.
 2      between 44th Street to 51st Street...........      750,000
 3    For resurfacing on Pulaski Road
 4      between Devon Ave. to IL Rte 64..............      825,000
 5    For curb, gutters, and sidewalks
 6      on North Roger Avenue........................      250,000
 7    For intersection improvements at
 8      West Peterson and Rogers Avenue..............      100,000
 9    For intersection improvements at
10      West Peterson and Pulaski Road...............      250,000
11    For matching funds for planning
12      developments on Montrose/Ravenswood
13      Avenue Park and Ride.........................      400,000
14    For necessary costs for the first phase on IL
15      Route 159 between Edwardsville and I-270 ....  $10,000,000
16    For land acquisition on IL Route 159 between
17      Edwardsville and I-64 .......................   $1,803,000
18    For resurfacing on IL Route 50 between
19      Marquette Road to US 12/20 ..................   $1,030,000
20    For sidewalks on 151st and on Central
21      Avenue ......................................      $54,000
22    For sewer and flood control development
23      in Bluecrest in addition to other funds
24      that may have been previously allocated .....     $150,000
                            -4-           HDS90HB1959KSa515js
 1    For sewer and flood control development
 2      in Midlothian ...............................   $1,000,000
 3    For state match to add turn lanes at
 4      North Avenue and Waukegan Road in
 5      Deerfield ...................................     $162,500
 6    For necessary studies for sound barriers
 7      along I-80/94 in Lansing ....................     $200,000
 8    For development of Metro Link Rail at
 9      Belleville Area College .....................     $500,000
10    For sound barriers along the I-94
11      Edens Expressway from Devon Avenue
12      to Skokie ...................................   $5,000,000
13    For additional lanes, land acquisition,
14      or miscellaneous developments on
15      143rd Street between U.S. 45 to Illinois
16      Route 43 in Orland Park .....................  $11,124,000
17    For Pan-Asian street signs in Chicago .........      $25,000
18    For bridge development in Morris on
19      West Gore Road ..............................     $350,000
20    For resurfacing, grading, new shoulders,
21      bridge/culvert/and utility replacement
22      on IL Route 47 between US 52 and I-80 .......   $4,249,000
23    For state match for bridge construction
24      on IL Route 47 over the Illinois River
25      in Morris ...................................   $6,000,000
                            -5-           HDS90HB1959KSa515js
 1    For intersection reconstruction on IL
 2      Route 1 at Monee Road in Will County ........     $773,000
 3    For road development on IL Route 1
 4      between US 30 and Union Avenue ..............   $5,665,000
 5    For resurfacing on US 12/20 between
 6      IL Route 1 to Stony Island Avenue ...........   $2,060,000
 7    For resurfacing on US 12/20 between
 8      IL Route 1 to Western Avenue ................   $1,030,000
 9    For resurfacing on State Street between
10      79th and 95th in Cook County ................   $1,500,000
11    For feasibility studies for sound barriers
12      along the I-90/94 Dan Ryan Expressway between
13      35th and 95th ............................... $500,000"; and
14    on  page  17,  line  3,  by  changing  "sum"   to   "sum   of
15    $680,000,000"; and
16    on  page  17,  by  replacing  line  20  with "regulations, as
17    follows:
18      District 1................................... $270,000,000
19      District 2...................................   75,000,000
20      District 3...................................   49,800,000
21      District 4...................................   46,500,000
22      District 5...................................   32,400,000
23      District 6...................................   70,000,000
24      District 7...................................   24,900,000
25      District 8...................................   53,200,000
26      District 9...................................   28,200,000
27      Statewide....................................   30,000,000
                            -6-           HDS90HB1959KSa515js
 1        Total                                       $680,000,000";
 2    and on page 18, line 31, by changing "15,500" to "7,800"; and
 3    on page 19,  by  inserting  between  lines  10  and  11,  the
 4    following:
 5        "Section  18aa.  The sum of $1 shall be reappropriated or
 6    appropriated for all expenditures related to the  development
 7    of a south suburban airport near Peotone, Illinois."; and
 8    on  page 20, line 3, by changing "$1,401,700" to "1,321,700";
 9    and
10    on  page  21,  line   12,   by   changing   "20,000,000"   to
11    "40,000,000"; and
12    on  page 25, line 14, by changing "8,000,000" to "7,000,000";
13    and
14    on  page  25,  line  19,  by   changing   "improvements"   to
15    "improvements.    This   sum   may   not   be  spent  on  the
16    Chicago-Milwaukee intercity rail line"; and
17    on page 33, by deleting lines 19 through 31; and
18    on page 34, by deleting lines 1 through 5; and
19    on page 47, line 17, by changing "purposes" to  "purposes  in
20    which $1 shall be reappropriated for all expenditures related
21    to  the development of a south suburban airport near Peotone,
22    Illinois".

[ Top ]