Updating the database of the Illinois Compiled Statutes (ILCS) is an ongoing process. Recent laws may not yet be included in the ILCS database, but they are found on this site as Public Acts soon after they become law. For information concerning the relationship between statutes and Public Acts, refer to the Guide.
Because the statute database is maintained primarily for legislative drafting purposes, statutory changes are sometimes included in the statute database before they take effect. If the source note at the end of a Section of the statutes includes a Public Act that has not yet taken effect, the version of the law that is currently in effect may have already been removed from the database and you should refer to that Public Act to see the changes made to the current law.
(415 ILCS 5/59) Sec. 59. Definitions. As used in this Title: "Carbon dioxide capture project" mean a project or facility that: (1) uses equipment to capture a significant quantity | ||
| ||
(2) produces a concentrated fluid of carbon dioxide. "Carbon dioxide stream" means carbon dioxide, any incidental associated substances derived from the source materials and process of producing or capturing carbon dioxide, and any substance added to the stream to enable or improve the injection process or the detection of a leak or rupture. "Carbon sequestration activity" means the injection of one or more carbon dioxide streams into underground geologic formations under at least one Class VI well permit for long-term sequestration. "Criteria pollutants" means the 6 pollutants for which the United States Environmental Protection Agency has set National Ambient Air Quality Standards under Section 109 of the Clean Air Act, together with recognized precursors to those pollutants. "Injection" means the placement of materials into the subsurface from a well. "Project labor agreement" means a prehire collective bargaining agreement that covers all terms and conditions of employment on a specific construction project and must include the following: (1) provisions establishing the minimum hourly wage | ||
| ||
(2) provisions establishing the benefits and other | ||
| ||
(3) provisions establishing that no strike or | ||
| ||
(4) provisions establishing that no lockout or | ||
| ||
(5) provisions for minorities and women, as defined | ||
| ||
"Project labor agreement" includes other terms and conditions a labor organization or general contractor building the project deems necessary. "Sequestration facility" means the carbon dioxide sequestration reservoir, underground equipment, including, but not limited to, well penetrations, and surface facilities and equipment used or proposed to be used in a carbon sequestration activity. "Sequestration facility" includes each injection well and equipment used to connect surface activities to the carbon dioxide sequestration reservoir and underground equipment. "Sequestration facility" does not include pipelines used to transport carbon dioxide to a sequestration facility. "Sole source aquifer" means an aquifer designated as a sole source or principal aquifer by the United States Environmental Protection Agency under the Safe Drinking Water Act, which, for purposes of this definition, consists of the Sole Source Aquifer Area, as designated by the United States Environmental Protection Agency on March 19, 2015. (Source: P.A. 103-651, eff. 7-18-24; 104-119, eff. 1-1-26.) |