Illinois General Assembly

  Bills & Resolutions  
  Compiled Statutes  
  Public Acts  
  Legislative Reports  
  IL Constitution  
  Legislative Guide  
  Legislative Glossary  

 Search By Number
 (example: HB0001)
Search Tips

Search By Keyword

Illinois Compiled Statutes

 ILCS Listing   Public Acts  Search   Guide   Disclaimer

Information maintained by the Legislative Reference Bureau
Updating the database of the Illinois Compiled Statutes (ILCS) is an ongoing process. Recent laws may not yet be included in the ILCS database, but they are found on this site as Public Acts soon after they become law. For information concerning the relationship between statutes and Public Acts, refer to the Guide.

Because the statute database is maintained primarily for legislative drafting purposes, statutory changes are sometimes included in the statute database before they take effect. If the source note at the end of a Section of the statutes includes a Public Act that has not yet taken effect, the version of the law that is currently in effect may have already been removed from the database and you should refer to that Public Act to see the changes made to the current law.

220 ILCS 5/4-602

    (220 ILCS 5/4-602)
    Sec. 4-602. Electric utility workforce study.
    (a) The Commission shall conduct a comprehensive workforce analysis study of each electric utility to determine the adequacy of the total in-house staffing in each job classification or job title critical to maintaining quality reliability and restoring service in each electric utility's service territory. Each report shall contain a yearly detailed comparison beginning with 1995 and ending in 2006 of each electric utility's ratio of:
        (1) in-house workers, commonly referred to as
    
"linemen", to customers;
        (2) customer service call-center employees to
    
customers; and
        (3) meter service or repair employees to customers.
    The ratios shall be reported from each utility's named service area, district, division, outlying area, village, municipality, reporting point, or region. The analysis shall determine the total number of contractor employees for the same time frame and shall be conducted in the same manner as the in-house analysis.
    (b) The Commission may hold public hearings while conducting the analysis to assist in the adequacy of the study. The Commission must hold public hearings on the study and present the results to the General Assembly no later than January 1, 2009.
    (c) An electric utility shall bear the costs of issuing any reports required by this Section and it shall not be entitled to recovery of any costs incurred in complying with this Section.
(Source: P.A. 95-81, eff. 8-13-07.)