Illinois Compiled Statutes
ILCS Listing
Public
Acts Search
Guide
Disclaimer
Information maintained by the Legislative
Reference Bureau
Updating the database of the Illinois Compiled Statutes (ILCS) is an ongoing process.
Recent laws may not yet be included in the ILCS database, but they are found on this site as Public
Acts soon after they become law. For information concerning the relationship between statutes and Public Acts, refer to the
Guide.
Because the statute database is maintained primarily for legislative drafting purposes,
statutory changes are sometimes included in the statute database before they take effect.
If the source note at the end of a Section of the statutes includes a Public Act that has
not yet taken effect, the version of the law that is currently in effect may have already
been removed from the database and you should refer to that Public Act to see the changes
made to the current law.
65 ILCS 5/11-74.6-10
(65 ILCS 5/11-74.6-10)
Sec. 11-74.6-10. Definitions.
(a) "Environmentally contaminated area" means any improved or vacant area
within
the boundaries
of a redevelopment project area located within the corporate limits of
a municipality when,
(i) there has been a determination of release or substantial threat of release
of
a hazardous substance or pesticide, by the United States Environmental
Protection Agency or the Illinois Environmental Protection Agency, or the
Illinois Pollution Control Board, or any court, or a release or substantial
threat of release which is addressed as part of the Pre-Notice Site Cleanup
Program under Section 22.2(m) of the Illinois Environmental Protection Act, or
a release or substantial threat of release of petroleum under Section 22.12 of
the Illinois Environmental Protection Act, and (ii) which release or threat of
release presents an imminent and substantial danger to public health or welfare
or presents a significant threat to public health or the environment, and (iii)
which release or threat of release would have a significant impact on the cost
of redeveloping the area.
(b) "Department" means the Department of Commerce and Economic Opportunity.
(c) "Industrial park" means an area in a redevelopment project
area suitable for use by any manufacturing, industrial, research, or
transportation enterprise, of facilities, including but not limited to
factories, mills, processing plants, assembly plants, packing plants,
fabricating plants, distribution centers, warehouses, repair
overhaul or service facilities, freight terminals, research facilities,
test facilities or railroad facilities. An industrial park may contain
space for commercial and other use as long as the expected principal use of the
park is
industrial and
is reasonably expected to result in the creation of a significant number of new
permanent full time jobs. An
industrial park may also contain related operations and facilities including,
but not
limited to, business and office support services such as centralized
computers, telecommunications, publishing, accounting, photocopying and
similar activities and employee services such as child care, health care,
food service and similar activities. An industrial park may also include
demonstration projects, prototype development, specialized training on
developing technology, and pure research in any field related or adaptable
to business and industry.
(d) "Research park" means an area in a redevelopment project area
suitable for development of a facility or complex that includes
research laboratories and related operations. These related operations may
include, but are not limited to, business and office support services
such as centralized computers, telecommunications, publishing,
accounting, photocopying and similar activities, and employee services
such as child care, health care, food service and similar activities.
A research park may include demonstration projects, prototype development,
specialized training on developing technology, and pure research
in any field related or adaptable to business and industry.
(e) "Industrial park conservation area" means an area within the
boundaries of a redevelopment project area located within the corporate
limits of a municipality or within 1 1/2 miles of the corporate limits of a
municipality if the area is to be annexed to the municipality, if the area is
zoned as industrial no later than the date on which the municipality by
ordinance designates the redevelopment project area, and if the area
includes improved or vacant land suitable for use as an industrial park or
a research park, or both. To be designated as an industrial park
conservation area, the area shall also satisfy one of the following standards:
(1) Standard One: The municipality must be a labor | | surplus municipality and the area must be served by adequate public and or road transportation for access by the unemployed and for the movement of goods or materials and the redevelopment project area shall contain no more than 2% of the most recently ascertained equalized assessed value of all taxable real properties within the corporate limits of the municipality after adjustment for all annexations associated with the establishment of the redevelopment project area or be located in the vicinity of a waste disposal site or other waste facility. The project plan shall include a plan for and shall establish a marketing program to attract appropriate businesses to the proposed industrial park conservation area and shall include an adequate plan for financing and construction of the necessary infrastructure. No redevelopment projects may be authorized by the municipality under Standard One of subsection (e) of this Section unless the project plan also provides for an employment training project that would prepare unemployed workers for work in the industrial park conservation area, and the project has been approved by official action of or is to be operated by the local community college district, public school district or state or locally designated private industry council or successor agency, or
|
|
(2) Standard Two: The municipality must be a
| | substantial labor surplus municipality and the area must be served by adequate public and or road transportation for access by the unemployed and for the movement of goods or materials and the redevelopment project area shall contain no more than 2% of the most recently ascertained equalized assessed value of all taxable real properties within the corporate limits of the municipality after adjustment for all annexations associated with the establishment of the redevelopment project area. No redevelopment projects may be authorized by the municipality under Standard Two of subsection (e) of this Section unless the project plan also provides for an employment training project that would prepare unemployed workers for work in the industrial park conservation area, and the project has been approved by official action of or is to be operated by the local community college district, public school district or state or locally designated private industry council or successor agency.
|
|
(f) "Vacant industrial buildings conservation area" means an area containing
one or more industrial buildings located within the corporate limits of the
municipality that has been zoned industrial for at least 5 years before the
designation of that area as a redevelopment project area by the
municipality and is planned for reuse principally for industrial purposes.
For the area to be designated as a vacant industrial buildings conservation
area, the area shall also satisfy one of the following standards:
(1) Standard One: The area shall consist of one or
| | more industrial buildings totaling at least 50,000 net square feet of industrial space, with a majority of the total area of all the buildings having been vacant for at least 18 months; and (A) the area is located in a labor surplus municipality or a substantial labor surplus municipality, or (B) the equalized assessed value of the properties within the area during the last 2 years is at least 25% lower than the maximum equalized assessed value of those properties during the immediately preceding 10 years.
|
|
(2) Standard Two: The area exclusively consists of
| | industrial buildings or a building complex operated by a user or related users (A) that has within the immediately preceding 5 years either (i) employed 200 or more employees at that location, or (ii) if the area is located in a municipality with a population of 12,000 or less, employed more than 50 employees at that location and (B) either is currently vacant, or the owner has: (i) directly notified the municipality of the user's intention to terminate operations at the facility or (ii) filed a notice of closure under the Worker Adjustment and Retraining Notification Act.
|
|
(g) "Labor surplus municipality" means a municipality in which,
during the 4 calendar years immediately preceding the date
the municipality by
ordinance designates an industrial park conservation area, the average
unemployment rate was 1% or more over the State average
unemployment
rate for
that same period of time as published in the United States Department of
Labor Bureau of Labor Statistics publication entitled "The Employment
Situation" or its successor publication. For the purpose of this
subsection (g), if unemployment rate statistics for the municipality are
not available, the unemployment rate in the municipality shall be deemed to
be: (i) for a municipality that is not in an urban county, the same as the
unemployment rate in the principal county where the municipality is located or
(ii) for a municipality in an urban county at that municipality's option,
either the unemployment rate certified for the municipality by the Department
after consultation with the Illinois
Department of Labor or the federal Bureau of Labor Statistics, or the
unemployment rate of the municipality as determined by the most recent federal
census if that census was not dated more than 5 years prior to the date on
which the determination is made.
(h) "Substantial labor surplus municipality" means a municipality in
which, during the 5 calendar years immediately preceding the date the
municipality by
ordinance
designates an industrial park conservation area, the average unemployment rate
was 2% or more over the State average unemployment rate for
that
same period of time as published in the United States Department of Labor
Statistics publication entitled "The Employment Situation" or its successor
publication. For the purpose of this subsection (h), if unemployment rate
statistics for the municipality are not available, the unemployment rate in the
municipality shall be deemed to be: (i) for a municipality that is not in an
urban county, the same as the unemployment rate in the principal county in
which the municipality is located; or (ii) for a municipality in an urban
county, at that municipality's option, either the unemployment rate certified
for the municipality by the Department after
consultation with the Illinois Department of Labor or the federal Bureau of
Labor Statistics, or the unemployment rate of the municipality as determined by
the most recent federal census if that census was not dated more than 5 years
prior to the date on which the determination is made.
(i) "Municipality" means a city, village or incorporated town.
(j) "Obligations" means bonds, loans, debentures, notes, special
certificates or other evidence of indebtedness issued by the municipality
to carry out a redevelopment project or to refund outstanding obligations.
(k) "Payment in lieu of taxes" means those estimated tax revenues from
real property in a redevelopment project area derived from real property that
has been acquired by a municipality,
which according to the redevelopment project or plan are to be used for a
private use, that taxing districts would have received had a municipality
not acquired the real property and adopted tax increment allocation
financing and that would result from
levies made after the time of the adoption of tax increment allocation
financing until the time the current equalized assessed value of real
property in the redevelopment project area exceeds the total initial
equalized assessed value of real property in that area.
(l) "Redevelopment plan" means the comprehensive program of the
municipality for development or redevelopment intended by the payment of
redevelopment project costs to reduce or eliminate the conditions that
qualified the redevelopment project area or redevelopment planning area, or
both, as an environmentally contaminated
area or industrial
park conservation area, or vacant industrial buildings
conservation area, or combination thereof, and thereby to enhance
the tax bases of the taxing districts that extend into the redevelopment
project area or redevelopment planning area.
On and after the effective date of this amendatory Act of the 91st General
Assembly, no
redevelopment plan may be approved or amended to include the development of
vacant land (i) with a golf course and related clubhouse and other facilities
or (ii) designated by federal, State, county, or municipal government as public
land for outdoor recreational activities or for nature preserves and used for
that purpose within 5
years prior to the adoption of the redevelopment plan. For the purpose of
this subsection, "recreational activities" is limited to mean camping and
hunting.
Each redevelopment plan must set forth in writing the
bases for the municipal findings required in this subsection, the
program to be undertaken to accomplish the objectives, including
but not limited to: (1) an itemized list of estimated redevelopment project
costs,
(2) evidence indicating that the redevelopment project area or the
redevelopment planning area, or both, on the whole has
not
been subject to growth and development through investment by private
enterprise,
(3) (i) in the case of an environmentally contaminated area, industrial park
conservation
area, or a vacant industrial buildings conservation area classified under
either Standard One, or Standard Two of subsection (f) where the building is
currently vacant, evidence that implementation of the redevelopment plan is
reasonably expected to create a significant number of permanent full time jobs,
(ii) in
the case of a vacant industrial buildings conservation area classified under
Standard Two (B)(i) or (ii) of subsection (f), evidence that implementation of
the redevelopment plan is reasonably expected to retain a significant number of
existing permanent full time jobs, and (iii) in the case of a
combination of
an environmentally contaminated area, industrial park conservation area, or
vacant industrial
buildings conservation area, evidence that the standards concerning the
creation or retention of jobs for each area set forth in (i) or (ii)
above are met,
(4) an assessment of the financial impact of the redevelopment
project area or the redevelopment planning area, or both,
on
the overlapping taxing bodies or any increased demand for services from any
taxing district affected by the
plan and any program to address such financial impact or increased demand, (5)
the sources of
funds to pay costs, (6) the nature and term of the obligations to be issued,
(7)
the most recent equalized assessed valuation of the redevelopment project
area or the redevelopment planning area, or both, (8) an estimate of the
equalized assessed valuation after redevelopment
and the general land uses that are applied in the redevelopment project area
or the redevelopment planning area, or both,
(9) a
commitment to fair employment practices and an affirmative action plan,
(10) if it includes an industrial park conservation area, the following: (i) a
general description of any proposed developer, (ii) user and tenant of any
property, (iii) a description of the type, structure and general character of
the facilities to be developed, and (iv) a description of the type, class and
number of new employees to be employed in the operation of the facilities to be
developed,
(11) if it includes an environmentally contaminated area, the following:
either (i) a determination of release or substantial threat of release of a
hazardous substance or pesticide or of petroleum by the United States
Environmental Protection Agency or the Illinois Environmental Protection
Agency, or the Illinois Pollution Control Board or any court; or (ii) both an
environmental audit report by a nationally recognized independent
environmental auditor having a reputation for expertise in these matters and a
copy of the signed Review and Evaluation Services Agreement indicating
acceptance of the site by the Illinois Environmental Protection Agency into the
Pre-Notice Site Cleanup Program,
(12) if it includes a vacant industrial buildings conservation area, the
following: (i) a
general description of any proposed developer, (ii) user and tenant of any
building or buildings, (iii) a description of the type, structure and general
character of
the building or buildings to be developed, and (iv) a description of the type,
class and
number of new employees to be employed or existing employees to be retained in
the operation of the building or buildings to be
redeveloped,
and (13) if property is to be annexed to the municipality, the
terms
of the annexation agreement.
No redevelopment plan shall be adopted by a
municipality without findings that:
(1) the redevelopment project area or redevelopment
| | planning area, or both, on the whole has not been subject to growth and development through investment by private enterprise and would not reasonably be anticipated to be developed in accordance with public goals stated in the redevelopment plan without the adoption of the redevelopment plan;
|
|
(2) the redevelopment plan and project conform to the
| | comprehensive plan for the development of the municipality as a whole, or, for municipalities with a population of 100,000 or more, regardless of when the redevelopment plan and project was adopted, the redevelopment plan and project either: (i) conforms to the strategic economic development or redevelopment plan issued by the designated planning authority of the municipality or (ii) includes land uses that have been approved by the planning commission of the municipality;
|
|
(3) that the redevelopment plan is reasonably
| | expected to create or retain a significant number of permanent full time jobs as set forth in paragraph (3) of subsection (l) above;
|
|
(4) the estimated date of completion of the
| | redevelopment project and retirement of obligations incurred to finance redevelopment project costs is not later than December 31 of the year in which the payment to the municipal treasurer as provided in subsection (b) of Section 11-74.6-35 is to be made with respect to ad valorem taxes levied in the twenty-third calendar year after the year in which the ordinance approving the redevelopment project area is adopted; a municipality may by municipal ordinance amend an existing redevelopment plan to conform to this paragraph (4) as amended by this amendatory Act of the 91st General Assembly concerning ordinances adopted on or after January 15, 1981, which municipal ordinance may be adopted without further hearing or notice and without complying with the procedures provided in this Law pertaining to an amendment to or the initial approval of a redevelopment plan and project and designation of a redevelopment project area;
|
|
(5) in the case of an industrial park conservation
| | area, that the municipality is a labor surplus municipality or a substantial labor surplus municipality and that the implementation of the redevelopment plan is reasonably expected to create a significant number of permanent full time new jobs and, by the provision of new facilities, significantly enhance the tax base of the taxing districts that extend into the redevelopment project area;
|
|
(6) in the case of an environmentally contaminated
| | area, that the area is subject to a release or substantial threat of release of a hazardous substance, pesticide or petroleum which presents an imminent and substantial danger to public health or welfare or presents a significant threat to public health or environment, that such release or threat of release will have a significant impact on the cost of redeveloping the area, that the implementation of the redevelopment plan is reasonably expected to result in the area being redeveloped, the tax base of the affected taxing districts being significantly enhanced thereby, and the creation of a significant number of permanent full time jobs; and
|
|
(7) in the case of a vacant industrial buildings
| | conservation area, that the area is located within the corporate limits of a municipality that has been zoned industrial for at least 5 years before its designation as a project redeveloped area, that it contains one or more industrial buildings, and whether the area has been designated under Standard One or Standard Two of subsection (f) and the basis for that designation.
|
|
(m) "Redevelopment project" means any public or private development
project in furtherance of the objectives of a redevelopment plan.
On and after the effective date of this amendatory Act of the 91st General
Assembly, no
redevelopment plan may be approved or amended to include the development
of vacant land (i) with a golf course and related clubhouse and other
facilities
or (ii) designated by federal, State, county, or municipal government as public
land for outdoor recreational activities or for nature preserves and used for
that purpose within 5
years prior to the adoption of the redevelopment plan. For the purpose of
this subsection, "recreational activities" is limited to mean camping and
hunting.
(n) "Redevelopment project area" means a contiguous area
designated
by the municipality that is not less in the aggregate than 1 1/2 acres,
and for which the municipality has made a finding that there exist
conditions that cause the area to be classified as an industrial park
conservation area, a vacant industrial building conservation area,
an environmentally contaminated area or a combination of these
types of areas. For purposes of this Division, parcels are contiguous if they touch or join one another in a reasonably substantial physical sense or if they meet the criteria for annexation to a municipality under Section 7-1-1 of this Code.
The changes made by this amendatory Act of the 102nd General Assembly, are declarative of existing law and shall be applied retroactively when substantively applicable, including all pending actions without regard to when the cause of action accrued; however, this amendatory Act of the 102nd General Assembly does not affect the rights of any party that is subject to a final judgment entered pursuant to the opinion of the September 23, 2021 Illinois Supreme Court in Board of Education of Richland School District 88A v. City of Crest Hill, 2021 IL 126444.
(o) "Redevelopment project costs" means the sum total of all
reasonable or necessary costs incurred or estimated to be incurred by
the municipality, and
any of those costs incidental to a redevelopment plan and a redevelopment
project. These costs include, without limitation, the following:
(1) Costs of studies, surveys, development of plans,
| | and specifications, implementation and administration of the redevelopment plan, staff and professional service costs for architectural, engineering, legal, marketing, financial, planning, or other services, but no charges for professional services may be based on a percentage of the tax increment collected; except that on and after the effective date of this amendatory Act of the 91st General Assembly, no contracts for professional services, excluding architectural and engineering services, may be entered into if the terms of the contract extend beyond a period of 3 years. In addition, "redevelopment project costs" shall not include lobbying expenses. After consultation with the municipality, each tax increment consultant or advisor to a municipality that plans to designate or has designated a redevelopment project area shall inform the municipality in writing of any contracts that the consultant or advisor has entered into with entities or individuals that have received, or are receiving, payments financed by tax increment revenues produced by the redevelopment project area with respect to which the consultant or advisor has performed, or will be performing, service for the municipality. This requirement shall be satisfied by the consultant or advisor before the commencement of services for the municipality and thereafter whenever any other contracts with those individuals or entities are executed by the consultant or advisor;
|
|
(1.5) After July 1, 1999, annual administrative costs
| | shall not include general overhead or administrative costs of the municipality that would still have been incurred by the municipality if the municipality had not designated a redevelopment project area or approved a redevelopment plan;
|
|
(1.6) The cost of marketing sites within the
| | redevelopment project area to prospective businesses, developers, and investors.
|
|
(2) Property assembly costs within a redevelopment
| | project area, including but not limited to acquisition of land and other real or personal property or rights or interests therein.
|
|
(3) Site preparation costs, including but not limited
| | to clearance of any area within a redevelopment project area by demolition or removal of any existing buildings, structures, fixtures, utilities and improvements and clearing and grading; and including installation, repair, construction, reconstruction, or relocation of public streets, public utilities, and other public site improvements within or without a redevelopment project area which are essential to the preparation of the redevelopment project area for use in accordance with a redevelopment plan.
|
|
(4) Costs of renovation, rehabilitation,
| | reconstruction, relocation, repair or remodeling of any existing public or private buildings, improvements, and fixtures within a redevelopment project area; and the cost of replacing an existing public building if pursuant to the implementation of a redevelopment project the existing public building is to be demolished to use the site for private investment or devoted to a different use requiring private investment.
|
|
(5) Costs of construction within a redevelopment
| | project area of public improvements, including but not limited to, buildings, structures, works, utilities or fixtures, except that on and after the effective date of this amendatory Act of the 91st General Assembly, redevelopment project costs shall not include the cost of constructing a new municipal public building principally used to provide offices, storage space, or conference facilities or vehicle storage, maintenance, or repair for administrative, public safety, or public works personnel and that is not intended to replace an existing public building as provided under paragraph (4) unless either (i) the construction of the new municipal building implements a redevelopment project that was included in a redevelopment plan that was adopted by the municipality prior to the effective date of this amendatory Act of the 91st General Assembly or (ii) the municipality makes a reasonable determination in the redevelopment plan, supported by information that provides the basis for that determination, that the new municipal building is required to meet an increase in the need for public safety purposes anticipated to result from the implementation of the redevelopment plan.
|
|
(6) Costs of eliminating or removing contaminants and
| | other impediments required by federal or State environmental laws, rules, regulations, and guidelines, orders or other requirements or those imposed by private lending institutions as a condition for approval of their financial support, debt or equity, for the redevelopment projects, provided, however, that in the event (i) other federal or State funds have been certified by an administrative agency as adequate to pay these costs during the 18 months after the adoption of the redevelopment plan, or (ii) the municipality has been reimbursed for such costs by persons legally responsible for them, such federal, State, or private funds shall, insofar as possible, be fully expended prior to the use of any revenues deposited in the special tax allocation fund of the municipality and any other such federal, State or private funds received shall be deposited in the fund. The municipality shall seek reimbursement of these costs from persons legally responsible for these costs and the costs of obtaining this reimbursement.
|
|
(7) Costs of job training and retraining projects.
(8) Financing costs, including but not limited to all
| | necessary and incidental expenses related to the issuance of obligations and which may include payment of interest on any obligations issued under this Act including interest accruing during the estimated period of construction of any redevelopment project for which the obligations are issued and for not exceeding 36 months thereafter and including reasonable reserves related to those costs.
|
|
(9) All or a portion of a taxing district's capital
| | costs resulting from the redevelopment project necessarily incurred or to be incurred in furtherance of the objectives of the redevelopment plan and project, to the extent the municipality by written agreement accepts and approves those costs.
|
|
(10) Relocation costs to the extent that a
| | municipality determines that relocation costs shall be paid or is required to make payment of relocation costs by federal or State law.
|
|
(11) Payments in lieu of taxes.
(12) Costs of job training, retraining, advanced
| | vocational education or career education, including but not limited to courses in occupational, semi-technical or technical fields leading directly to employment, incurred by one or more taxing districts, if those costs are: (i) related to the establishment and maintenance of additional job training, advanced vocational education or career education programs for persons employed or to be employed by employers located in a redevelopment project area; and (ii) are incurred by a taxing district or taxing districts other than the municipality and are set forth in a written agreement by or among the municipality and the taxing district or taxing districts, which agreement describes the program to be undertaken, including but not limited to the number of employees to be trained, a description of the training and services to be provided, the number and type of positions available or to be available, itemized costs of the program and sources of funds to pay for the same, and the term of the agreement. These costs include, specifically, the payment by community college districts of costs under Sections 3-37, 3-38, 3-40 and 3-40.1 of the Public Community College Act and by school districts of costs under Sections 10-22.20a and 10-23.3a of the School Code.
|
|
(13) The interest costs incurred by redevelopers or
| | other nongovernmental persons in connection with a redevelopment project, and specifically including payments to redevelopers or other nongovernmental persons as reimbursement for such costs incurred by such redeveloper or other nongovernmental person, provided that:
|
|
(A) interest costs shall be paid or reimbursed by
| | a municipality only pursuant to the prior official action of the municipality evidencing an intent to pay or reimburse such interest costs;
|
|
(B) such payments in any one year may not exceed
| | 30% of the annual interest costs incurred by the redeveloper with regard to the redevelopment project during that year;
|
|
(C) except as provided in subparagraph (E), the
| | aggregate amount of such costs paid or reimbursed by a municipality shall not exceed 30% of the total (i) costs paid or incurred by the redeveloper or other nongovernmental person in that year plus (ii) redevelopment project costs excluding any property assembly costs and any relocation costs incurred by a municipality pursuant to this Act;
|
|
(D) interest costs shall be paid or reimbursed by
| | a municipality solely from the special tax allocation fund established pursuant to this Act and shall not be paid or reimbursed from the proceeds of any obligations issued by a municipality;
|
|
(E) if there are not sufficient funds available
| | in the special tax allocation fund in any year to make such payment or reimbursement in full, any amount of such interest cost remaining to be paid or reimbursed by a municipality shall accrue and be payable when funds are available in the special tax allocation fund to make such payment.
|
|
(14) The costs of construction of new privately owned
| | buildings shall not be an eligible redevelopment project cost.
|
|
If a special service area has been established under the Special Service
Area Tax Act, then any tax increment revenues derived from the tax imposed
thereunder to the Special Service Area Tax Act may be used within the
redevelopment project area for the purposes permitted by
that Act as well as the purposes permitted by this Act.
(p) "Redevelopment Planning Area" means an area so designated by a
municipality after the municipality has complied with all the findings and
procedures required to establish a redevelopment project area, including
the existence of conditions that qualify the area as an industrial park
conservation area, or an environmentally contaminated area, or a vacant
industrial
buildings
conservation area, or a combination of these types of
areas, and adopted a redevelopment plan and project for the planning area and
its included redevelopment project areas. The
area shall not be designated as a redevelopment planning area for more than
5
years, or 10 years in the case of a redevelopment planning area in the City of Rockford. At any time in the
5 years, or 10 years in the case of the City of Rockford, following that designation of the
redevelopment planning area, the municipality may designate the
redevelopment planning area, or any portion of the redevelopment
planning area,
as a redevelopment project area without making additional findings or
complying with additional procedures required for the creation of a
redevelopment project area.
An amendment of a redevelopment plan and project in accordance with the
findings and procedures of this Act after the designation of a redevelopment
planning area at any time within the
5 years after the designation of the
redevelopment planning area, or 10 years after the designation of the redevelopment planning area in the City of Rockford, shall not require new qualification of findings for
the redevelopment project area to be designated within the redevelopment
planning area.
The terms "redevelopment plan", "redevelopment project", and
"redevelopment project area" have the definitions set out in subsections (l),
(m), and (n), respectively.
(q) "Taxing districts" means counties, townships, municipalities, and
school, road, park, sanitary, mosquito abatement, forest preserve, public
health, fire protection, river conservancy, tuberculosis sanitarium and any
other municipal corporations or districts with the power to levy taxes.
(r) "Taxing districts' capital costs" means those costs of taxing districts
for capital improvements that are found by the municipal corporate authorities
to be necessary and a direct result of the redevelopment project.
(s) "Urban county" means a county with 240,000 or more inhabitants.
(t) "Vacant area", as used in subsection (a) of this Section,
means any parcel or combination of parcels of real property without
industrial, commercial and residential buildings that has not been used for
commercial agricultural purposes within 5 years before the designation of
the redevelopment project area, unless that parcel is included in an
industrial park conservation area.
(Source: P.A. 102-818, eff. 5-13-22.)
|
|