Updating the database of the Illinois Compiled Statutes (ILCS) is an ongoing process.
Recent laws may not yet be included in the ILCS database, but they are found on this site as
Public
Acts soon after they become law. For information concerning the relationship between statutes and Public Acts, refer to the
Guide.
Because the statute database is maintained primarily for legislative drafting purposes,
statutory changes are sometimes included in the statute database before they take effect.
If the source note at the end of a Section of the statutes includes a Public Act that has
not yet taken effect, the version of the law that is currently in effect may have already
been removed from the database and you should refer to that Public Act to see the changes
made to the current law.
(65 ILCS 5/11-135.5-60) Sec. 11-135.5-60. Procedures for selection. (a) The commission must use a two-phase procedure for the selection of the successful design-build entity. Phase I of the procedure will evaluate and shortlist the design-build entities based on qualifications, and Phase II will evaluate the technical and cost proposals. (b) The commission shall include in the request for proposal the evaluating factors to be used in Phase I. These factors are in addition to any prequalification requirements of design-build entities that the commission has set forth. Each request for proposal shall establish the relative importance assigned to each evaluation factor and subfactor, including any weighting of criteria to be employed by the commission. The commission must maintain a record of the evaluation scoring to be disclosed in event of a protest regarding the solicitation. The commission shall include the following criteria in every Phase I evaluation of design-build entities: (i) experience of personnel; (ii) successful experience with similar project types; (iii) financial capability; (iv) timeliness of past performance; (v) experience with similarly sized projects; (vi) successful reference checks of the firm; and (vii) commitment to assign personnel for the duration of the project and qualifications of the entity's consultants. The commission may include any additional relevant criteria in Phase I that it deems necessary for a proper qualification review. The commission may not consider any design-build entity for evaluation or award if the entity has any pecuniary interest in the project or has other relationships or circumstances, including, but not limited to, long-term leasehold, mutual performance, or development contracts with the commission, that may give the design-build entity a financial or tangible advantage over other design-build entities in the preparation, evaluation, or performance of the design-build contract or that create the appearance of impropriety. Upon completion of the qualifications evaluation, the commission shall create a shortlist of the most highly qualified design-build entities. The commission, in its discretion, is not required to shortlist the maximum number of entities as identified for Phase II evaluation, provided that no less than 2 design-build entities nor more than 6 are selected to submit Phase II proposals. The commission shall notify the entities selected for the shortlist in writing. This notification shall commence the period for the preparation of the Phase II technical and cost evaluations. The commission must allow sufficient time for the shortlist entities to prepare their Phase II submittals considering the scope and detail requested by the commission. (c) The commission shall include in the request for proposal the evaluating factors to be used in the technical and cost submission components of Phase II. Each request for proposal shall establish, for both the technical and cost submission components of Phase II, the relative importance assigned to each evaluation factor and subfactor, including any weighting of criteria to be employed by the commission. The commission must maintain a record of the evaluation scoring to be disclosed in event of a protest regarding the solicitation. The commission shall include the following criteria in every Phase II technical evaluation of design-build entities: (i) compliance with objectives of the project; (ii) compliance of proposed services to the request for proposal requirements; (iii) quality of products or materials proposed; (iv) quality of design parameters; (v) design concepts; (vi) innovation in meeting the scope and performance criteria; and (vii) constructability of the proposed project. The commission may include any additional relevant technical evaluation factors it deems necessary for proper selection. The commission shall include the following criteria in every Phase II cost evaluation: the total project cost; the construction costs; and the time of completion. The commission may include any additional relevant technical evaluation factors it deems necessary for proper selection. The total project cost criteria weighting factor shall not exceed 30%. The commission shall directly employ or retain a licensed design professional or a public art designer to evaluate the technical and cost submissions to determine if the technical submissions are in accordance with generally accepted industry standards. Upon completion of the technical submissions and cost submissions evaluation, the commission may award the design-build contract to the highest overall ranked entity.
(Source: P.A. 102-1134, eff. 2-10-23.) |