(70 ILCS 1205/8-55) Sec. 8-55. Small design-build projects. In any case where the total overall cost of the project is estimated to be less than $12,000,000, the park district may combine the two-phase procedure for design-build selection described in Section 8-50 into one combined step, provided that all the requirements of evaluation are performed in accordance with Section 8-50.
(Source: P.A. 97-349, eff. 8-12-11.) |