| 4 | | Section 5. The Environmental Protection Act is amended by | 5 | | changing Section 22.38 as follows:
| 6 | | (415 ILCS 5/22.38)
| 7 | | Sec. 22.38. Facilities accepting exclusively general | 8 | | construction or
demolition debris
for transfer, storage, or | 9 | | treatment.
| 10 | | (a) Facilities accepting exclusively general construction | 11 | | or demolition
debris for
transfer, storage, or treatment shall | 12 | | be subject to local zoning, ordinance,
and
land use | 13 | | requirements.
Those facilities shall be located in accordance | 14 | | with local zoning requirements
or, in the absence of local | 15 | | zoning requirements, shall be located so that no
part of the | 16 | | facility boundary is closer than 1,320 feet from the nearest
| 17 | | property zoned for primarily residential use.
| 18 | | (b) An owner or operator of a facility accepting | 19 | | exclusively general
construction or demolition debris for | 20 | | transfer, storage, or treatment shall:
| 21 | | (1) Within 48 hours after of receipt of the general | 22 | | construction or demolition
debris at the facility, sort the | 23 | | general construction or demolition debris to
separate the
|
| | | SB1929 Enrolled | - 2 - | LRB097 09577 JDS 49714 b |
|
| 1 | | recyclable general construction or demolition debris , and | 2 | | recovered wood that is processed for use as fuel , and | 3 | | general construction or demolition debris that is | 4 | | processed for use at a landfill from the non-recyclable
| 5 | | general construction or demolition debris that is to be | 6 | | disposed of or discarded.
| 7 | | (2) Transport off site for disposal , in accordance with | 8 | | all applicable federal, State, and local requirements | 9 | | within 72 hours after its receipt at the facility, all | 10 | | non-usable or non-recyclable general
construction or | 11 | | demolition debris that is not neither recyclable general | 12 | | construction or demolition debris , nor recovered wood that | 13 | | is processed for use as fuel , or general construction or | 14 | | demolition debris that is processed for use at a landfill | 15 | | in
accordance with all applicable federal, State, and local | 16 | | requirements within 72
hours of its receipt at the | 17 | | facility .
| 18 | | (3) Limit the percentage of incoming non-recyclable | 19 | | general construction
or demolition debris to 25% or
less of | 20 | | the total incoming general construction or demolition | 21 | | debris ,
as calculated on a daily basis , so that 75% or more | 22 | | of the general construction or demolition debris accepted , | 23 | | as calculated monthly on a rolling 12-month average, on a | 24 | | daily basis consists of recyclable general construction or | 25 | | demolition debris, recovered wood that is processed for use | 26 | | as fuel, or general construction or demolition debris that |
| | | SB1929 Enrolled | - 3 - | LRB097 09577 JDS 49714 b |
|
| 1 | | is processed for use at a landfill except that general | 2 | | construction or demolition debris processed for use at a | 3 | | landfill shall not exceed 35% of the general construction | 4 | | or demolition debris accepted on a rolling 12-month average | 5 | | basis both . The percentages in this paragraph (3) of | 6 | | subsection (b) shall be calculated by weight, using scales | 7 | | located at the facility that are certified under the | 8 | | Weights and Measures Act.
| 9 | | (4) Within 6 months after its receipt at the facility, | 10 | | transport: | 11 | | (A) Transport all non-putrescible recyclable | 12 | | general construction or
demolition debris
for | 13 | | recycling or disposal ; and | 14 | | (B) all non-putrescible general construction or | 15 | | demolition debris that is processed for use at a | 16 | | landfill to a MSWLF unit for use or disposal within 6 | 17 | | months of its receipt at the facility .
| 18 | | (5) Within 45 days after of its receipt at the | 19 | | facility, transport : | 20 | | (A) (i) all putrescible or combustible recyclable | 21 | | general
construction or demolition debris
(excluding | 22 | | recovered wood that is processed for use as fuel) for | 23 | | recycling or disposal ; and | 24 | | (B) (ii) all recovered wood that is processed for | 25 | | use as fuel to an intermediate processing facility for | 26 | | sizing, to a combustion facility for use as fuel, or to |
| | | SB1929 Enrolled | - 4 - | LRB097 09577 JDS 49714 b |
|
| 1 | | a disposal facility ; and | 2 | | (C) all putrescible general construction or | 3 | | demolition debris that is processed for use at a | 4 | | landfill to a MSWLF unit for use or disposal .
| 5 | | (6) Employ tagging and recordkeeping procedures to (i) | 6 | | demonstrate
compliance
with this Section and (ii) identify | 7 | | the source and transporter of material
accepted by the | 8 | | facility.
| 9 | | (7) Control odor, noise, combustion of materials, | 10 | | disease vectors, dust,
and litter.
| 11 | | (8) Control, manage, and dispose of any storm water | 12 | | runoff and leachate
generated at the facility in accordance | 13 | | with applicable federal, State, and
local requirements.
| 14 | | (9) Control access to the facility.
| 15 | | (10) Comply with all applicable federal, State, or | 16 | | local requirements for
the handling, storage, | 17 | | transportation, or disposal of asbestos-containing
| 18 | | material or other material accepted at the
facility that is | 19 | | not general construction or demolition debris.
| 20 | | (11) Prior to August 24, 2009 (the effective date of | 21 | | Public Act 96-611), submit to the Agency at least 30 days | 22 | | prior to the initial acceptance
of general construction or | 23 | | demolition debris at the facility, on forms provided
by the | 24 | | Agency, the following information:
| 25 | | (A) the name, address, and telephone number of both | 26 | | the facility owner
and operator;
|
| | | SB1929 Enrolled | - 5 - | LRB097 09577 JDS 49714 b |
|
| 1 | | (B) the street address and location of the | 2 | | facility;
| 3 | | (C) a description of facility operations;
| 4 | | (D) a description of the tagging and recordkeeping | 5 | | procedures the
facility will employ to (i) demonstrate | 6 | | compliance with this Section and (ii)
identify the | 7 | | source and transporter of any material accepted by the | 8 | | facility;
| 9 | | (E) the name and location of the disposal sites to | 10 | | be used for the
disposal of any general construction or | 11 | | demolition debris received at the facility that must be | 12 | | disposed of;
| 13 | | (F) the name and location of an individual, | 14 | | facility, or business to
which recyclable materials | 15 | | will be transported;
| 16 | | (G) the name and location of intermediate | 17 | | processing facilities or combustion facilities to | 18 | | which recovered wood that is processed for use as fuel | 19 | | will be transported; and
| 20 | | (H) other information as specified on the form | 21 | | provided by the Agency.
| 22 | | (12) On or after August 24, 2009 (the effective date of | 23 | | Public Act 96-611), obtain a permit issued by the Agency | 24 | | prior to the initial acceptance of general construction or | 25 | | demolition debris at the facility.
| 26 | | When any of the information contained or processes |
| | | SB1929 Enrolled | - 6 - | LRB097 09577 JDS 49714 b |
|
| 1 | | described in the initial
notification form submitted to the | 2 | | Agency under paragraph (11) of subsection (b) of this | 3 | | Section changes, the owner and operator shall
submit an | 4 | | updated form within 14 days of the change.
| 5 | | (c) For purposes of this Section, the term "recyclable | 6 | | general
construction or demolition debris" means general | 7 | | construction or demolition
debris that has been rendered | 8 | | reusable and is reused or that would otherwise
be disposed of | 9 | | or discarded but is collected, separated, or processed and
| 10 | | returned to the economic mainstream in the form of raw | 11 | | materials or products.
"Recyclable general construction or | 12 | | demolition debris" does not include (i) general
construction or | 13 | | demolition debris processed for use as fuel, incinerated,
| 14 | | burned, buried, or otherwise used as fill material or (ii) | 15 | | general construction or demolition debris that is processed for | 16 | | use at a landfill .
| 17 | | (d) For purposes of this Section, "treatment" means | 18 | | processing
designed to alter the physical nature of the general | 19 | | construction or
demolition debris, including but not limited to | 20 | | size reduction, crushing,
grinding, or
homogenization, but | 21 | | does not include processing designed to change the chemical
| 22 | | nature of the general construction or demolition debris.
| 23 | | (e) For purposes of this Section, "recovered wood that is | 24 | | processed for use as fuel" means wood that has been salvaged | 25 | | from general construction or demolition debris and processed | 26 | | for use as fuel, as authorized by the applicable state or |
| | | SB1929 Enrolled | - 7 - | LRB097 09577 JDS 49714 b |
|
| 1 | | federal environmental regulatory authority, and supplied only | 2 | | to intermediate processing facilities for sizing, or to | 3 | | combustion facilities for use as fuel, that have obtained all | 4 | | necessary waste management and air permits for handling and | 5 | | combustion of the fuel. | 6 | | (f) For purposes of this Section, "non-recyclable general | 7 | | construction or demolition debris" does not include " recovered | 8 | | wood that is processed for use as fuel " or general construction | 9 | | or demolition debris that is processed for use at a landfill . | 10 | | (g) Recyclable general construction or demolition debris , | 11 | | or recovered wood that is processed for use as fuel , and | 12 | | general construction or demolition debris that is processed for | 13 | | use at a landfill that is sent for disposal at the end of the | 14 | | applicable retention period shall not be considered as meeting | 15 | | the 75% diversion requirement for purposes of subdivision | 16 | | (b)(3) of this Section if sent for disposal at the end of the | 17 | | applicable retention period . | 18 | | (h) For the purposes of this Section, "general construction | 19 | | or demolition debris that is processed for use at a landfill" | 20 | | means general construction or demolition debris that is | 21 | | processed for use at a MSWLF unit as alternative daily cover, | 22 | | road building material, or drainage structure building | 23 | | material in accordance with the MSWLF unit's waste disposal | 24 | | permit issued by the Agency under this Act. | 25 | | (Source: P.A. 96-235, eff. 8-11-09; 96-611, eff. 8-24-09; | 26 | | 96-1000, eff. 7-2-10.)
|
| | | SB1929 Enrolled | - 8 - | LRB097 09577 JDS 49714 b |
|
| 1 | | Section 99. Effective date. This Act takes effect upon | 2 | | becoming law.
|
|