AMENDMENT TO SENATE BILL 3152

2     AMENDMENT NO. ______. Amend Senate Bill 3152, AS AMENDED,
3 by replacing everything after the enacting clause with the
4 following:
 
5     "Section 5. The County Economic Development Project Area
6 Property Tax Allocation Act is amended by adding Sections 12
7 and 13 as follows:
 
8     (55 ILCS 85/12 new)
9     Sec. 12. Status report; hearing. No later than 10 years
10 after the corporate authorities of a county adopt an ordinance
11 to establish an economic development project area, the county
12 must compile a status report concerning the economic
13 development project area. The status report must detail without
14 limitation the following: (i) the amount of revenue generated
15 within the economic development project area, (ii) any
16 expenditures made by the county for the economic development

 

 

09600SB3152sam002 - 2 - LRB096 19983 RLJ 39433 a

1 project area including without limitation expenditures from
2 the special tax allocation fund, (iii) the status of planned
3 activities, goals, and objectives set forth in the economic
4 development plan including details on new or planned
5 construction within the economic development project area,
6 (iv) the amount of private and public investment within the
7 economic development project area, and (v) any other relevant
8 evaluation or performance data. Within 30 days after the county
9 compiles the status report, the county must hold at least one
10 public hearing concerning the report. The county must provide
11 20 days' public notice of the hearing.
 
12     (55 ILCS 85/13 new)
13     Sec. 13. Requirements for annual budget. Beginning in
14 fiscal year 2011 and in each fiscal year thereafter, a county
15 must detail in its annual budget (i) the amount of revenue
16 generated from economic development project areas by source and
17 (ii) the expenditures made by the county for economic
18 development project areas.
 
19     Section 10. The County Economic Development Project Area
20 Tax Increment Allocation Act of 1991 is amended by adding
21 Section 74 as follows:
 
22     (55 ILCS 90/74 new)
23     Sec. 74. Requirements for annual budget. Beginning in

 

 

09600SB3152sam002 - 3 - LRB096 19983 RLJ 39433 a

1 fiscal year 2011 and in each fiscal year thereafter, a county
2 must detail in its annual budget (i) the amount of revenue
3 generated from economic development project areas by source and
4 (ii) the expenditures made by the county for economic
5 development project areas.
 
6     Section 15. The Illinois Municipal Code is amended by
7 changing Section 11-74.4-5 as follows:
 
8     (65 ILCS 5/11-74.4-5)  (from Ch. 24, par. 11-74.4-5)
9     Sec. 11-74.4-5. Public hearing; joint review board.
10     (a) The changes made by this amendatory Act of the 91st
11 General Assembly do not apply to a municipality that, (i)
12 before the effective date of this amendatory Act of the 91st
13 General Assembly, has adopted an ordinance or resolution fixing
14 a time and place for a public hearing under this Section or
15 (ii) before July 1, 1999, has adopted an ordinance or
16 resolution providing for a feasibility study under Section
17 11-74.4-4.1, but has not yet adopted an ordinance approving
18 redevelopment plans and redevelopment projects or designating
19 redevelopment project areas under Section 11-74.4-4, until
20 after that municipality adopts an ordinance approving
21 redevelopment plans and redevelopment projects or designating
22 redevelopment project areas under Section 11-74.4-4;
23 thereafter the changes made by this amendatory Act of the 91st
24 General Assembly apply to the same extent that they apply to

 

 

09600SB3152sam002 - 4 - LRB096 19983 RLJ 39433 a

1 redevelopment plans and redevelopment projects that were
2 approved and redevelopment projects that were designated
3 before the effective date of this amendatory Act of the 91st
4 General Assembly.
5     Prior to the adoption of an ordinance proposing the
6 designation of a redevelopment project area, or approving a
7 redevelopment plan or redevelopment project, the municipality
8 by its corporate authorities, or as it may determine by any
9 commission designated under subsection (k) of Section
10 11-74.4-4 shall adopt an ordinance or resolution fixing a time
11 and place for public hearing. At least 10 days prior to the
12 adoption of the ordinance or resolution establishing the time
13 and place for the public hearing, the municipality shall make
14 available for public inspection a redevelopment plan or a
15 separate report that provides in reasonable detail the basis
16 for the eligibility of the redevelopment project area. The
17 report along with the name of a person to contact for further
18 information shall be sent within a reasonable time after the
19 adoption of such ordinance or resolution to the affected taxing
20 districts by certified mail. On and after the effective date of
21 this amendatory Act of the 91st General Assembly, the
22 municipality shall print in a newspaper of general circulation
23 within the municipality a notice that interested persons may
24 register with the municipality in order to receive information
25 on the proposed designation of a redevelopment project area or
26 the approval of a redevelopment plan. The notice shall state

 

 

09600SB3152sam002 - 5 - LRB096 19983 RLJ 39433 a

1 the place of registration and the operating hours of that
2 place. The municipality shall have adopted reasonable rules to
3 implement this registration process under Section 11-74.4-4.2.
4 The municipality shall provide notice of the availability of
5 the redevelopment plan and eligibility report, including how to
6 obtain this information, by mail within a reasonable time after
7 the adoption of the ordinance or resolution, to all residential
8 addresses that, after a good faith effort, the municipality
9 determines are located outside the proposed redevelopment
10 project area and within 750 feet of the boundaries of the
11 proposed redevelopment project area. This requirement is
12 subject to the limitation that in a municipality with a
13 population of over 100,000, if the total number of residential
14 addresses outside the proposed redevelopment project area and
15 within 750 feet of the boundaries of the proposed redevelopment
16 project area exceeds 750, the municipality shall be required to
17 provide the notice to only the 750 residential addresses that,
18 after a good faith effort, the municipality determines are
19 outside the proposed redevelopment project area and closest to
20 the boundaries of the proposed redevelopment project area.
21 Notwithstanding the foregoing, notice given after August 7,
22 2001 (the effective date of Public Act 92-263) and before the
23 effective date of this amendatory Act of the 92nd General
24 Assembly to residential addresses within 750 feet of the
25 boundaries of a proposed redevelopment project area shall be
26 deemed to have been sufficiently given in compliance with this

 

 

09600SB3152sam002 - 6 - LRB096 19983 RLJ 39433 a

1 Act if given only to residents outside the boundaries of the
2 proposed redevelopment project area. The notice shall also be
3 provided by the municipality, regardless of its population, to
4 those organizations and residents that have registered with the
5 municipality for that information in accordance with the
6 registration guidelines established by the municipality under
7 Section 11-74.4-4.2.
8     At the public hearing any interested person or affected
9 taxing district may file with the municipal clerk written
10 objections to and may be heard orally in respect to any issues
11 embodied in the notice. The municipality shall hear all
12 protests and objections at the hearing and the hearing may be
13 adjourned to another date without further notice other than a
14 motion to be entered upon the minutes fixing the time and place
15 of the subsequent hearing. At the public hearing or at any time
16 prior to the adoption by the municipality of an ordinance
17 approving a redevelopment plan, the municipality may make
18 changes in the redevelopment plan. Changes which (1) add
19 additional parcels of property to the proposed redevelopment
20 project area, (2) substantially affect the general land uses
21 proposed in the redevelopment plan, (3) substantially change
22 the nature of or extend the life of the redevelopment project,
23 or (4) increase the number of inhabited residential units to be
24 displaced from the redevelopment project area, as measured from
25 the time of creation of the redevelopment project area, to a
26 total of more than 10, shall be made only after the

 

 

09600SB3152sam002 - 7 - LRB096 19983 RLJ 39433 a

1 municipality gives notice, convenes a joint review board, and
2 conducts a public hearing pursuant to the procedures set forth
3 in this Section and in Section 11-74.4-6 of this Act. Changes
4 which do not (1) add additional parcels of property to the
5 proposed redevelopment project area, (2) substantially affect
6 the general land uses proposed in the redevelopment plan, (3)
7 substantially change the nature of or extend the life of the
8 redevelopment project, or (4) increase the number of inhabited
9 residential units to be displaced from the redevelopment
10 project area, as measured from the time of creation of the
11 redevelopment project area, to a total of more than 10, may be
12 made without further hearing, provided that the municipality
13 shall give notice of any such changes by mail to each affected
14 taxing district and registrant on the interested parties
15 registry, provided for under Section 11-74.4-4.2, and by
16 publication in a newspaper of general circulation within the
17 affected taxing district. Such notice by mail and by
18 publication shall each occur not later than 10 days following
19 the adoption by ordinance of such changes. Hearings with regard
20 to a redevelopment project area, project or plan may be held
21 simultaneously.
22     (b) Prior to holding a public hearing to approve or amend a
23 redevelopment plan or to designate or add additional parcels of
24 property to a redevelopment project area, the municipality
25 shall convene a joint review board. The board shall consist of
26 a representative selected by each community college district,

 

 

09600SB3152sam002 - 8 - LRB096 19983 RLJ 39433 a

1 local elementary school district and high school district or
2 each local community unit school district, park district,
3 library district, township, fire protection district, and
4 county that will have the authority to directly levy taxes on
5 the property within the proposed redevelopment project area at
6 the time that the proposed redevelopment project area is
7 approved, a representative selected by the municipality and a
8 public member. The public member shall first be selected and
9 then the board's chairperson shall be selected by a majority of
10 the board members present and voting.
11     For redevelopment project areas with redevelopment plans
12 or proposed redevelopment plans that would result in the
13 displacement of residents from 10 or more inhabited residential
14 units or that include 75 or more inhabited residential units,
15 the public member shall be a person who resides in the
16 redevelopment project area. If, as determined by the housing
17 impact study provided for in paragraph (5) of subsection (n) of
18 Section 11-74.4-3, or if no housing impact study is required
19 then based on other reasonable data, the majority of
20 residential units are occupied by very low, low, or moderate
21 income households, as defined in Section 3 of the Illinois
22 Affordable Housing Act, the public member shall be a person who
23 resides in very low, low, or moderate income housing within the
24 redevelopment project area. Municipalities with fewer than
25 15,000 residents shall not be required to select a person who
26 lives in very low, low, or moderate income housing within the

 

 

09600SB3152sam002 - 9 - LRB096 19983 RLJ 39433 a

1 redevelopment project area, provided that the redevelopment
2 plan or project will not result in displacement of residents
3 from 10 or more inhabited units, and the municipality so
4 certifies in the plan. If no person satisfying these
5 requirements is available or if no qualified person will serve
6 as the public member, then the joint review board is relieved
7 of this paragraph's selection requirements for the public
8 member.
9     Within 90 days of the effective date of this amendatory Act
10 of the 91st General Assembly, each municipality that designated
11 a redevelopment project area for which it was not required to
12 convene a joint review board under this Section shall convene a
13 joint review board to perform the duties specified under
14 paragraph (e) of this Section.
15     All board members shall be appointed and the first board
16 meeting shall be held at least 14 days but not more than 28
17 days after the mailing of notice by the municipality to the
18 taxing districts as required by Section 11-74.4-6(c).
19 Notwithstanding the preceding sentence, a municipality that
20 adopted either a public hearing resolution or a feasibility
21 resolution between July 1, 1999 and July 1, 2000 that called
22 for the meeting of the joint review board within 14 days of
23 notice of public hearing to affected taxing districts is deemed
24 to be in compliance with the notice, meeting, and public
25 hearing provisions of the Act. Such notice shall also advise
26 the taxing bodies represented on the joint review board of the

 

 

09600SB3152sam002 - 10 - LRB096 19983 RLJ 39433 a

1 time and place of the first meeting of the board. Additional
2 meetings of the board shall be held upon the call of any
3 member. The municipality seeking designation of the
4 redevelopment project area shall provide administrative
5 support to the board.
6     The board shall review (i) the public record, planning
7 documents and proposed ordinances approving the redevelopment
8 plan and project and (ii) proposed amendments to the
9 redevelopment plan or additions of parcels of property to the
10 redevelopment project area to be adopted by the municipality.
11 As part of its deliberations, the board may hold additional
12 hearings on the proposal. A board's recommendation shall be an
13 advisory, non-binding recommendation. The recommendation shall
14 be adopted by a majority of those members present and voting.
15 The recommendations shall be submitted to the municipality
16 within 30 days after convening of the board. Failure of the
17 board to submit its report on a timely basis shall not be cause
18 to delay the public hearing or any other step in the process of
19 designating or amending the redevelopment project area but
20 shall be deemed to constitute approval by the joint review
21 board of the matters before it.
22     The board shall base its recommendation to approve or
23 disapprove the redevelopment plan and the designation of the
24 redevelopment project area or the amendment of the
25 redevelopment plan or addition of parcels of property to the
26 redevelopment project area on the basis of the redevelopment

 

 

09600SB3152sam002 - 11 - LRB096 19983 RLJ 39433 a

1 project area and redevelopment plan satisfying the plan
2 requirements, the eligibility criteria defined in Section
3 11-74.4-3, and the objectives of this Act.
4     The board shall issue a written report describing why the
5 redevelopment plan and project area or the amendment thereof
6 meets or fails to meet one or more of the objectives of this
7 Act and both the plan requirements and the eligibility criteria
8 defined in Section 11-74.4-3. In the event the Board does not
9 file a report it shall be presumed that these taxing bodies
10 find the redevelopment project area and redevelopment plan
11 satisfy the objectives of this Act and the plan requirements
12 and eligibility criteria.
13     If the board recommends rejection of the matters before it,
14 the municipality will have 30 days within which to resubmit the
15 plan or amendment. During this period, the municipality will
16 meet and confer with the board and attempt to resolve those
17 issues set forth in the board's written report that led to the
18 rejection of the plan or amendment.
19     Notwithstanding the resubmission set forth above, the
20 municipality may commence the scheduled public hearing and
21 either adjourn the public hearing or continue the public
22 hearing until a date certain. Prior to continuing any public
23 hearing to a date certain, the municipality shall announce
24 during the public hearing the time, date, and location for the
25 reconvening of the public hearing. Any changes to the
26 redevelopment plan necessary to satisfy the issues set forth in

 

 

09600SB3152sam002 - 12 - LRB096 19983 RLJ 39433 a

1 the joint review board report shall be the subject of a public
2 hearing before the hearing is adjourned if the changes would
3 (1) substantially affect the general land uses proposed in the
4 redevelopment plan, (2) substantially change the nature of or
5 extend the life of the redevelopment project, or (3) increase
6 the number of inhabited residential units to be displaced from
7 the redevelopment project area, as measured from the time of
8 creation of the redevelopment project area, to a total of more
9 than 10. Changes to the redevelopment plan necessary to satisfy
10 the issues set forth in the joint review board report shall not
11 require any further notice or convening of a joint review board
12 meeting, except that any changes to the redevelopment plan that
13 would add additional parcels of property to the proposed
14 redevelopment project area shall be subject to the notice,
15 public hearing, and joint review board meeting requirements
16 established for such changes by subsection (a) of Section
17 11-74.4-5.
18     In the event that the municipality and the board are unable
19 to resolve these differences, or in the event that the
20 resubmitted plan or amendment is rejected by the board, the
21 municipality may proceed with the plan or amendment, but only
22 upon a three-fifths vote of the corporate authority responsible
23 for approval of the plan or amendment, excluding positions of
24 members that are vacant and those members that are ineligible
25 to vote because of conflicts of interest.
26     (c) After a municipality has by ordinance approved a

 

 

09600SB3152sam002 - 13 - LRB096 19983 RLJ 39433 a

1 redevelopment plan and designated a redevelopment project
2 area, the plan may be amended and additional properties may be
3 added to the redevelopment project area only as herein
4 provided. Amendments which (1) add additional parcels of
5 property to the proposed redevelopment project area, (2)
6 substantially affect the general land uses proposed in the
7 redevelopment plan, (3) substantially change the nature of the
8 redevelopment project, (4) increase the total estimated
9 redevelopment project costs set out in the redevelopment plan
10 by more than 5% after adjustment for inflation from the date
11 the plan was adopted, (5) add additional redevelopment project
12 costs to the itemized list of redevelopment project costs set
13 out in the redevelopment plan, or (6) increase the number of
14 inhabited residential units to be displaced from the
15 redevelopment project area, as measured from the time of
16 creation of the redevelopment project area, to a total of more
17 than 10, shall be made only after the municipality gives
18 notice, convenes a joint review board, and conducts a public
19 hearing pursuant to the procedures set forth in this Section
20 and in Section 11-74.4-6 of this Act. Changes which do not (1)
21 add additional parcels of property to the proposed
22 redevelopment project area, (2) substantially affect the
23 general land uses proposed in the redevelopment plan, (3)
24 substantially change the nature of the redevelopment project,
25 (4) increase the total estimated redevelopment project cost set
26 out in the redevelopment plan by more than 5% after adjustment

 

 

09600SB3152sam002 - 14 - LRB096 19983 RLJ 39433 a

1 for inflation from the date the plan was adopted, (5) add
2 additional redevelopment project costs to the itemized list of
3 redevelopment project costs set out in the redevelopment plan,
4 or (6) increase the number of inhabited residential units to be
5 displaced from the redevelopment project area, as measured from
6 the time of creation of the redevelopment project area, to a
7 total of more than 10, may be made without further public
8 hearing and related notices and procedures including the
9 convening of a joint review board as set forth in Section
10 11-74.4-6 of this Act, provided that the municipality shall
11 give notice of any such changes by mail to each affected taxing
12 district and registrant on the interested parties registry,
13 provided for under Section 11-74.4-4.2, and by publication in a
14 newspaper of general circulation within the affected taxing
15 district. Such notice by mail and by publication shall each
16 occur not later than 10 days following the adoption by
17 ordinance of such changes.
18     (d) After the effective date of this amendatory Act of the
19 91st General Assembly, a municipality shall submit in an
20 electronic format the following information for each
21 redevelopment project area (i) to the State Comptroller under
22 Section 8-8-3.5 of the Illinois Municipal Code and (ii) to all
23 taxing districts overlapping the redevelopment project area no
24 later than 180 days after the close of each municipal fiscal
25 year or as soon thereafter as the audited financial statements
26 become available and, in any case, shall be submitted before

 

 

09600SB3152sam002 - 15 - LRB096 19983 RLJ 39433 a

1 the annual meeting of the Joint Review Board to each of the
2 taxing districts that overlap the redevelopment project area:
3         (1) Any amendments to the redevelopment plan, the
4     redevelopment project area, or the State Sales Tax
5     Boundary.
6         (1.5) A list of the redevelopment project areas
7     administered by the municipality and, if applicable, the
8     date each redevelopment project area was designated or
9     terminated by the municipality.
10         (2) Audited financial statements of the special tax
11     allocation fund once a cumulative total of $100,000 has
12     been deposited in the fund.
13         (3) Certification of the Chief Executive Officer of the
14     municipality that the municipality has complied with all of
15     the requirements of this Act during the preceding fiscal
16     year.
17         (4) An opinion of legal counsel that the municipality
18     is in compliance with this Act.
19         (5) An analysis of the special tax allocation fund
20     which sets forth:
21             (A) the balance in the special tax allocation fund
22         at the beginning of the fiscal year;
23             (B) all amounts deposited in the special tax
24         allocation fund by source;
25             (C) an itemized list of all expenditures from the
26         special tax allocation fund by category of permissible

 

 

09600SB3152sam002 - 16 - LRB096 19983 RLJ 39433 a

1         redevelopment project cost; and
2             (D) the balance in the special tax allocation fund
3         at the end of the fiscal year including a breakdown of
4         that balance by source and a breakdown of that balance
5         identifying any portion of the balance that is
6         required, pledged, earmarked, or otherwise designated
7         for payment of or securing of obligations and
8         anticipated redevelopment project costs. Any portion
9         of such ending balance that has not been identified or
10         is not identified as being required, pledged,
11         earmarked, or otherwise designated for payment of or
12         securing of obligations or anticipated redevelopment
13         projects costs shall be designated as surplus as set
14         forth in Section 11-74.4-7 hereof.
15         (6) A description of all property purchased by the
16     municipality within the redevelopment project area
17     including:
18             (A) Street address.
19             (B) Approximate size or description of property.
20             (C) Purchase price.
21             (D) Seller of property.
22         (7) A statement setting forth all activities
23     undertaken in furtherance of the objectives of the
24     redevelopment plan, including:
25             (A) Any project implemented in the preceding
26         fiscal year.

 

 

09600SB3152sam002 - 17 - LRB096 19983 RLJ 39433 a

1             (B) A description of the redevelopment activities
2         undertaken.
3             (C) A description of any agreements entered into by
4         the municipality with regard to the disposition or
5         redevelopment of any property within the redevelopment
6         project area or the area within the State Sales Tax
7         Boundary.
8             (D) Additional information on the use of all funds
9         received under this Division and steps taken by the
10         municipality to achieve the objectives of the
11         redevelopment plan.
12             (E) Information regarding contracts that the
13         municipality's tax increment advisors or consultants
14         have entered into with entities or persons that have
15         received, or are receiving, payments financed by tax
16         increment revenues produced by the same redevelopment
17         project area.
18             (F) Any reports submitted to the municipality by
19         the joint review board.
20             (G) A review of public and, to the extent possible,
21         private investment actually undertaken to date after
22         the effective date of this amendatory Act of the 91st
23         General Assembly and estimated to be undertaken during
24         the following year. This review shall, on a
25         project-by-project basis, set forth the estimated
26         amounts of public and private investment incurred

 

 

09600SB3152sam002 - 18 - LRB096 19983 RLJ 39433 a

1         after the effective date of this amendatory Act of the
2         91st General Assembly and provide the ratio of private
3         investment to public investment to the date of the
4         report and as estimated to the completion of the
5         redevelopment project.
6         (8) With regard to any obligations issued by the
7     municipality:
8             (A) copies of any official statements; and
9             (B) an analysis prepared by financial advisor or
10         underwriter setting forth: (i) nature and term of
11         obligation; and (ii) projected debt service including
12         required reserves and debt coverage.
13         (9) For special tax allocation funds that have
14     experienced cumulative deposits of incremental tax
15     revenues of $100,000 or more, a certified audit report
16     reviewing compliance with this Act performed by an
17     independent public accountant certified and licensed by
18     the authority of the State of Illinois. The financial
19     portion of the audit must be conducted in accordance with
20     Standards for Audits of Governmental Organizations,
21     Programs, Activities, and Functions adopted by the
22     Comptroller General of the United States (1981), as
23     amended, or the standards specified by Section 8-8-5 of the
24     Illinois Municipal Auditing Law of the Illinois Municipal
25     Code. The audit report shall contain a letter from the
26     independent certified public accountant indicating

 

 

09600SB3152sam002 - 19 - LRB096 19983 RLJ 39433 a

1     compliance or noncompliance with the requirements of
2     subsection (q) of Section 11-74.4-3. For redevelopment
3     plans or projects that would result in the displacement of
4     residents from 10 or more inhabited residential units or
5     that contain 75 or more inhabited residential units, notice
6     of the availability of the information, including how to
7     obtain the report, required in this subsection shall also
8     be sent by mail to all residents or organizations that
9     operate in the municipality that register with the
10     municipality for that information according to
11     registration procedures adopted under Section 11-74.4-4.2.
12     All municipalities are subject to this provision.
13         (10) A list of all intergovernmental agreements in
14     effect during the fiscal year to which the municipality is
15     a party and an accounting of any moneys transferred or
16     received by the municipality during that fiscal year
17     pursuant to those intergovernmental agreements.
18     (d-1) Prior to the effective date of this amendatory Act of
19 the 91st General Assembly, municipalities with populations of
20 over 1,000,000 shall, after adoption of a redevelopment plan or
21 project, make available upon request to any taxing district in
22 which the redevelopment project area is located the following
23 information:
24         (1) Any amendments to the redevelopment plan, the
25     redevelopment project area, or the State Sales Tax
26     Boundary; and

 

 

09600SB3152sam002 - 20 - LRB096 19983 RLJ 39433 a

1         (2) In connection with any redevelopment project area
2     for which the municipality has outstanding obligations
3     issued to provide for redevelopment project costs pursuant
4     to Section 11-74.4-7, audited financial statements of the
5     special tax allocation fund.
6     (e) The joint review board shall meet annually 180 days
7 after the close of the municipal fiscal year or as soon as the
8 redevelopment project audit for that fiscal year becomes
9 available to review the effectiveness and status of the
10 redevelopment project area up to that date.
11     (f) (Blank).
12     (g) In the event that a municipality has held a public
13 hearing under this Section prior to March 14, 1994 (the
14 effective date of Public Act 88-537), the requirements imposed
15 by Public Act 88-537 relating to the method of fixing the time
16 and place for public hearing, the materials and information
17 required to be made available for public inspection, and the
18 information required to be sent after adoption of an ordinance
19 or resolution fixing a time and place for public hearing shall
20 not be applicable.
21     (h) On and after the effective date of this amendatory Act
22 of the 96th General Assembly, the State Comptroller must post
23 on the State Comptroller's official website the information
24 submitted by a municipality pursuant to subsection (d) of this
25 Section. The information must be posted no later than 45 days
26 after the State Comptroller receives the information from the

 

 

09600SB3152sam002 - 21 - LRB096 19983 RLJ 39433 a

1 municipality. The State Comptroller must also post a list of
2 the municipalities not in compliance with the reporting
3 requirements set forth in subsection (d) of this Section.
4     (i) No later than 10 years after the corporate authorities
5 of a municipality adopt an ordinance to establish a
6 redevelopment project area, the municipality must compile a
7 status report concerning the redevelopment project area. The
8 status report must detail without limitation the following: (i)
9 the amount of revenue generated within the redevelopment
10 project area, (ii) any expenditures made by the municipality
11 for the redevelopment project area including without
12 limitation expenditures from the special tax allocation fund,
13 (iii) the status of planned activities, goals, and objectives
14 set forth in the redevelopment plan including details on new or
15 planned construction within the redevelopment project area,
16 (iv) the amount of private and public investment within the
17 redevelopment project area, and (v) any other relevant
18 evaluation or performance data. Within 30 days after the
19 municipality compiles the status report, the municipality must
20 hold at least one public hearing concerning the report. The
21 municipality must provide 20 days' public notice of the
22 hearing.
23     (j) Beginning in fiscal year 2011 and in each fiscal year
24 thereafter, a municipality must detail in its annual budget (i)
25 the revenues generated from redevelopment project areas by
26 source and (ii) the expenditures made by the municipality for

 

 

09600SB3152sam002 - 22 - LRB096 19983 RLJ 39433 a

1 redevelopment project areas.
2 (Source: P.A. 91-357, eff. 7-29-99; 91-478, eff. 11-1-99;
3 91-900, eff. 7-6-00; 92-263, eff. 8-7-01; 92-624, eff.
4 7-11-02.)
 
5     Section 20. The Economic Development Project Area Tax
6 Increment Allocation Act of 1995 is amended by adding Sections
7 72 and 74 as follows:
 
8     (65 ILCS 110/72 new)
9     Sec. 72. Status report; hearing. No later than 10 years
10 after the corporate authorities of a municipality adopt an
11 ordinance to establish an economic development project area,
12 the municipality must compile a status report concerning the
13 economic development project area. The status report must
14 detail without limitation the following: (i) the amount of
15 revenue generated within the economic development project
16 area, (ii) any expenditures made by the municipality for the
17 economic development project area including without limitation
18 expenditures from the special tax allocation fund, (iii) the
19 status of planned activities, goals, and objectives set forth
20 in the economic development plan including details on new or
21 planned construction within the economic development project
22 area, (iv) the amount of private and public investment within
23 the economic development project area, and (v) any other
24 relevant evaluation or performance data. Within 30 days after

 

 

09600SB3152sam002 - 23 - LRB096 19983 RLJ 39433 a

1 the municipality compiles the status report, the municipality
2 must hold at least one public hearing concerning the report.
3 The municipality must provide 20 days' public notice of the
4 hearing.
 
5     (65 ILCS 110/74 new)
6     Sec. 74. Requirement for annual budget. Beginning in fiscal
7 year 2011 and in each fiscal year thereafter, a municipality
8 must detail in its annual budget (i) the revenues generated
9 from economic development project areas by source and (ii) the
10 expenditures made by the municipality for economic development
11 project areas.
 
12     Section 99. Effective date. This Act takes effect upon
13 becoming law.".