Full Text of HB0372 96th General Assembly
HB0372sam001 96TH GENERAL ASSEMBLY
|
Sen. Jeffrey M. Schoenberg
Filed: 4/28/2009
|
|
09600HB0372sam001 |
|
LRB096 04520 JAM 25442 a |
|
| 1 |
| AMENDMENT TO HOUSE BILL 372
| 2 |
| AMENDMENT NO. ______. Amend House Bill 372 on page 1, by | 3 |
| replacing lines 4 and 5 with the following:
| 4 |
| "Section 5. The Design-Build
Procurement Act is amended by | 5 |
| changing Sections 30 and 90 as follows: | 6 |
| (30 ILCS 537/30) | 7 |
| (Section scheduled to be repealed on July 1, 2009)
| 8 |
| Sec. 30. Procedures for Selection.
| 9 |
| (a) The State construction agency must use a two-phase | 10 |
| procedure for the
selection of the
successful design-build | 11 |
| entity. Phase I of the procedure will evaluate and
shortlist | 12 |
| the design-build entities based on qualifications, and Phase II
| 13 |
| will
evaluate the technical and cost proposals.
| 14 |
| (b) The State construction agency shall include in the | 15 |
| request for proposal
the
evaluating factors to be used in Phase | 16 |
| I. These factors are in addition to any
prequalification |
|
|
|
09600HB0372sam001 |
- 2 - |
LRB096 04520 JAM 25442 a |
|
| 1 |
| requirements of design-build entities that the agency has set
| 2 |
| forth. Each request for proposal shall establish the relative | 3 |
| importance
assigned to each evaluation factor and subfactor, | 4 |
| including any weighting of
criteria to be employed by the State | 5 |
| construction agency. The State
construction agency must | 6 |
| maintain a
record of the evaluation scoring to be disclosed in | 7 |
| event of a protest
regarding the solicitation.
| 8 |
| The State construction agency shall include the following | 9 |
| criteria in every
Phase I
evaluation of design-build entities: | 10 |
| (1) experience of personnel; (2)
successful
experience with | 11 |
| similar project types; (3) financial capability; (4) | 12 |
| timeliness
of past performance; (5) experience with similarly | 13 |
| sized projects; (6)
successful reference checks of the firm; | 14 |
| (7) commitment to assign personnel
for the duration of the | 15 |
| project and qualifications of the entity's consultants; and (8) | 16 |
| ability or past performance in meeting or exhausting good faith | 17 |
| efforts to meet the utilization goals for business enterprises | 18 |
| established in the Business Enterprise for Minorities, | 19 |
| Females, and Persons with Disabilities Act and with Section | 20 |
| 2-105 of the Illinois Human Rights Act.
The State construction | 21 |
| agency may include any additional relevant criteria in
Phase I | 22 |
| that
it deems necessary for a proper qualification review.
| 23 |
| The State construction agency may not consider any | 24 |
| design-build entity for
evaluation or
award if the entity has | 25 |
| any pecuniary interest in the project or has other
| 26 |
| relationships or circumstances, including but not limited to, |
|
|
|
09600HB0372sam001 |
- 3 - |
LRB096 04520 JAM 25442 a |
|
| 1 |
| long-term
leasehold, mutual performance, or development | 2 |
| contracts with the State
construction agency,
that may give the | 3 |
| design-build entity a financial or tangible advantage over
| 4 |
| other design-build entities in the preparation, evaluation, or | 5 |
| performance of
the
design-build contract or that create the | 6 |
| appearance of impropriety.
No proposal shall be considered that | 7 |
| does not include an entity's plan to comply with the | 8 |
| requirements established in the Business Enterprise for | 9 |
| Minorities, Females, and Persons with Disabilities Act , for | 10 |
| both the design and construction areas of performance, and with | 11 |
| Section 2-105 of the Illinois Human Rights Act.
| 12 |
| Upon completion of the qualifications evaluation, the | 13 |
| State construction
agency shall
create a shortlist of the most | 14 |
| highly qualified design-build entities. The
State
construction | 15 |
| agency, in its discretion, is not required to shortlist the
| 16 |
| maximum number of
entities as identified for Phase II | 17 |
| evaluation, provided however, no less than
2
design-build | 18 |
| entities nor more than 6 are selected to submit Phase II
| 19 |
| proposals.
| 20 |
| The State construction agency shall notify the entities | 21 |
| selected for the
shortlist in
writing. This notification shall | 22 |
| commence the period for the preparation of the
Phase II | 23 |
| technical and cost evaluations. The State construction agency | 24 |
| must
allow sufficient
time for the shortlist entities to | 25 |
| prepare their Phase II submittals
considering
the scope and | 26 |
| detail requested by the State agency.
|
|
|
|
09600HB0372sam001 |
- 4 - |
LRB096 04520 JAM 25442 a |
|
| 1 |
| (c) The State construction agency shall include in the | 2 |
| request for proposal
the
evaluating factors to be used in the | 3 |
| technical and cost submission components
of Phase II. Each | 4 |
| request for proposal shall establish, for both the technical
| 5 |
| and cost submission components of Phase II, the relative | 6 |
| importance assigned to
each evaluation factor and subfactor, | 7 |
| including any weighting of criteria to be
employed by the State | 8 |
| construction agency. The State construction agency must
| 9 |
| maintain a record of the
evaluation scoring to be disclosed in | 10 |
| event of a protest regarding the
solicitation.
| 11 |
| The State construction agency shall include the following | 12 |
| criteria in every
Phase II
technical evaluation of design-build | 13 |
| entities: (1) compliance with objectives
of
the
project; (2) | 14 |
| compliance of proposed services to the request for proposal
| 15 |
| requirements; (3) quality of products or materials proposed; | 16 |
| (4) quality of
design parameters; (5) design concepts; (6) | 17 |
| innovation in meeting the scope and
performance criteria; and | 18 |
| (7) constructability of the
proposed project. The State | 19 |
| construction agency may include any additional
relevant
| 20 |
| technical evaluation factors it deems necessary for proper | 21 |
| selection.
| 22 |
| The State construction agency shall include the following | 23 |
| criteria in every
Phase II cost
evaluation: the total project | 24 |
| cost, the construction costs, and the time of
completion. The | 25 |
| State construction agency may include any additional relevant
| 26 |
| technical
evaluation factors it deems necessary for proper |
|
|
|
09600HB0372sam001 |
- 5 - |
LRB096 04520 JAM 25442 a |
|
| 1 |
| selection. The total project cost criteria weighing factor | 2 |
| shall be 25%.
| 3 |
| The State construction agency shall directly employ or | 4 |
| retain a licensed
design
professional to evaluate the technical | 5 |
| and cost submissions to determine if the
technical submissions | 6 |
| are in accordance with generally
accepted industry standards.
| 7 |
| Upon completion of the technical submissions and cost | 8 |
| submissions evaluation,
the State construction agency may | 9 |
| award the design-build contract to the
highest
overall ranked | 10 |
| entity.
| 11 |
| (Source: P.A. 94-716, eff. 12-13-05.)".
|
|