HB4172ham002 95TH GENERAL ASSEMBLY

Rep. William B. Black

Filed: 4/10/2008

 

 


 

 


 
09500HB4172ham002 LRB095 14143 HLH 49243 a

1
AMENDMENT TO HOUSE BILL 4172

2     AMENDMENT NO. ______. Amend House Bill 4172, AS AMENDED,
3 with reference to page and line numbers of House Amendment No.
4 1, on page 2, by replacing lines 24 through 26 with "with 12
5 inches of soil, within 30 days after the final placement and
6 completion of the structural fill project or within 120 days of
7 the last placement of the structural fill in cases where
8 filling is incomplete and no filling takes place for a period
9 of 90 days,"; and
 
10 on page 3, by replacing lines 7 through 12 with the following:
11     "For each project utilizing 10,000 tons or more of CCB,
12 within 30 days after the placement of the 12 inches of cover
13 soil required under this item (8), the person using the CCB as
14 structural fill must submit to the Agency a certification
15 demonstrating that the use meets the requirements of this
16 Section. The certification shall also include the information
17 required to be submitted to the Agency under item (C) of

 

 

09500HB4172ham002 - 2 - LRB095 14143 HLH 49243 a

1 subsection (a-5) of this Section. The certification must be
2 submitted on forms and in a format prescribed by the Agency and
3 must be certified by a licensed professional engineer. For the
4 purposes of this subsection, "licensed professional engineer"
5 means a licensed professional engineer as defined in Section
6 58.2 of this Act."; and
 
7 on page 6, by replacing lines 15 and 16 with "CCB during the
8 effective period of the approval and any extension of the
9 approval,"; and
 
10 on page 6, by replacing lines 18 and 19 with "conditions."; and
 
11 on page 7, by replacing lines 12 through 25 with the following:
12 "determinations in accordance with this subsection (b). No
13 later than January 31, 2009, the Governor, in coordination with
14 the Agency, shall propose to the Board rules concerning the use
15 of CCB under item (8) of subsection (a), and, no later than
16 January 31, 2010, the Board must adopt the rules. These rules
17 must include specific rules for the use of CCB as structural
18 fill.".