Illinois General Assembly - Full Text of SB2105
Illinois General Assembly

Previous General Assemblies

Full Text of SB2105  94th General Assembly

SB2105 94TH GENERAL ASSEMBLY


 


 
94TH GENERAL ASSEMBLY
State of Illinois
2005 and 2006
SB2105

 

Introduced 2/25/2005, by Sen. Chris Lauzen

 

SYNOPSIS AS INTRODUCED:
 
605 ILCS 5/4-510   from Ch. 121, par. 4-510

    Amends the Illinois Highway Code. Establishes procedures to be followed by the Department of Transportation before, during, and after a hearing on a proposed protected corridor through which a proposed roadway is to be constructed. Effective immediately.


LRB094 10989 DRH 41592 b

FISCAL NOTE ACT MAY APPLY

 

 

A BILL FOR

 

SB2105 LRB094 10989 DRH 41592 b

1     AN ACT concerning transportation.
 
2     Be it enacted by the People of the State of Illinois,
3 represented in the General Assembly:
 
4     Section 5. The Illinois Highway Code is amended by changing
5 Section 4-510 as follows:
 
6     (605 ILCS 5/4-510)  (from Ch. 121, par. 4-510)
7     Sec. 4-510. The Department may establish presently the
8 approximate locations and widths of rights of way for future
9 additions to the State highway system to inform the public and
10 prevent costly and conflicting development of the land
11 involved.
12     The Department shall hold a public hearing whenever
13 approximate locations and widths of rights of way for future
14 highway additions are to be established. Before the public
15 hearing for corridor protection, the Department shall prepare
16 an assessment of current and future traffic needs in the area
17 of the proposed highway addition and an analysis of the
18 alternatives for meeting those needs. The hearing shall be held
19 in or near the county or counties where the land to be used is
20 located and notice of the hearing shall be published in a
21 newspaper or newspapers of general circulation in the county or
22 counties involved. The Department shall notify by registered
23 mail each property owner affected by the proposed corridor,
24 informing the owner of the location of the corridor and the
25 time and place of the hearing. Any interested person or his
26 representative may be heard. The Department shall evaluate the
27 testimony given at the hearing. The hearing shall include a
28 period for questions and comments from interested persons in a
29 town hall format, before an audience of those attending. If
30 modifications are made in the proposed corridor prior to
31 recording, the Department shall notify by registered mail
32 owners of property affected by the proposed changes and by

 

 

SB2105 - 2 - LRB094 10989 DRH 41592 b

1 notices published in a newspaper or newspapers of general
2 circulation in the county or counties affected. Interested
3 persons shall have at least 30 days to comment on the proposed
4 revisions, and the Department shall evaluate the comments.
5     The Department shall make a survey and prepare a map
6 showing the location and approximate widths of the rights of
7 way needed for future additions to the highway system. The map
8 shall show existing highways in the area involved and the
9 property lines and owners of record of all land that will be
10 needed for the future additions and all other pertinent
11 information. Approval of the map with any changes resulting
12 from the hearing shall be indicated in the record of the
13 hearing, and a notice of the approval, and a copy of the map,
14 and an environmental impact study shall be filed in the office
15 of the recorder for all counties in which the land needed for
16 future additions is located.
17     Public notice of the approval and filing shall be given in
18 newspapers of general circulation in all counties where the
19 land is located and shall be served by registered mail within
20 60 days thereafter on all owners of record of the land needed
21 for future additions.
22     The Department may approve changes in the map from time to
23 time. The changes shall be filed and notice given in the manner
24 provided for an original map.
25     After the map is filed and notice thereof given to the
26 owners of record of the land needed for future additions, no
27 one shall incur development costs or place improvements in,
28 upon or under the land involved nor rebuild, alter or add to
29 any existing structure without first giving 60 days notice by
30 registered mail to the Department. This prohibition shall not
31 apply to any normal or emergency repairs to existing
32 structures. The Department shall have 45 days after receipt of
33 that notice to inform the owner of the Department's intention
34 to acquire the land involved; after which, it shall have the
35 additional time of 120 days to acquire such land by purchase or
36 to initiate action to acquire said land through the exercise of

 

 

SB2105 - 3 - LRB094 10989 DRH 41592 b

1 the right of eminent domain. When the right of way is acquired
2 by the State no damages shall be allowed for any construction,
3 alteration or addition in violation of this Section unless the
4 Department has failed to acquire the land by purchase or has
5 abandoned an eminent domain proceeding initiated pursuant to
6 the provisions of this paragraph.
7     Any right of way needed for additions to the highway system
8 may be acquired at any time by the State or by the county or
9 municipality in which it is located. The time of determination
10 of the value of the property to be taken under this Section for
11 additions to the highway system shall be the date of the actual
12 taking, if the property is acquired by purchase, or the date of
13 the filing of a complaint for condemnation, if the property is
14 acquired through the exercise of the right of eminent domain,
15 rather than the date when the map of the proposed right-of-way
16 was filed of record. The rate of compensation to be paid for
17 farm land acquired hereunder by the exercise of the right of
18 eminent domain shall be in accordance with Section 4-501 of
19 this Code.
20     Not more than 10 years after a protected corridor is
21 established under this Section, and not later than the
22 expiration of each succeeding 10 year period, the Department
23 shall hold public hearings to discuss the viability and
24 feasibility of the protected corridor. The Department shall
25 give due consideration to the information obtained at the
26 hearing and, if construction of the roadway is no longer
27 feasible, shall abolish the protected corridor.
28 (Source: P.A. 91-357, eff. 7-29-99.)
 
29     Section 99. Effective date. This Act takes effect upon
30 becoming law.