Full Text of SB2343 104th General Assembly
SB2343 104TH GENERAL ASSEMBLY | | | 104TH GENERAL ASSEMBLY
State of Illinois
2025 and 2026 SB2343 Introduced 2/7/2025, by Sen. Seth Lewis SYNOPSIS AS INTRODUCED: | | | Creates the Design Professional Self-Certification Act. Provides that the Executive Director of the Capital Development Board shall establish a self-certification program through which a qualified design professional within a participating municipality shall be permitted to: (1) take responsibility for a project's compliance with the baseline building code; and (2) self-certify that a permit application, plans, and specifications comply with the baseline building code. Requires the Executive Director to establish requirements for design professionals to qualify for the self-certification program. Sets forth program requirements; oversight; and recordkeeping. Effective January 1, 2026. |
| |
| | A BILL FOR |
| | | | SB2343 | | LRB104 10312 AAS 20386 b |
|
| 1 | | AN ACT concerning regulation. | 2 | | Be it enacted by the People of the State of Illinois, | 3 | | represented in the General Assembly: | 4 | | Section 1. Short title. This Act may be cited as the Design | 5 | | Professional Self-Certification Act. | 6 | | Section 5. Definitions. As used in this Act: | 7 | | "Architect" means a person licensed as an architect in | 8 | | this State. | 9 | | "Board" means the Capital Development Board. | 10 | | "Design professional" means an architect or a professional | 11 | | engineer. | 12 | | "Enforcing agency" means the municipal or county | 13 | | construction officials. | 14 | | "Executive Director" means the Executive Director of the | 15 | | Capital Development Board. | 16 | | "Professional engineer" means a person licensed as a | 17 | | professional engineer in this State. | 18 | | "Project" means the work identified in a construction | 19 | | permit application and accompanying plans. | 20 | | "Qualified design professional" means a design | 21 | | professional who satisfies the requirements established by the | 22 | | Board and who has not been excluded, suspended, or otherwise | 23 | | sanctioned by the Board. |
| | | SB2343 | - 2 - | LRB104 10312 AAS 20386 b |
|
| 1 | | "Qualified design professional of record" means the | 2 | | qualified design professional who prepared or supervised the | 3 | | preparation of an application for a construction permit, and | 4 | | the associated plans and specifications, filed with the | 5 | | enforcing agency under the self-certification program | 6 | | established by the Board. | 7 | | "Self-certification" or "self-certified" means a qualified | 8 | | design professional's submission of a permit application, | 9 | | plans, specifications, and design professional of record | 10 | | self-certification form to an enforcing agency. | 11 | | "Self-certification program" or "program" means the | 12 | | program established by the Board, requiring an enforcing | 13 | | agency to accept an application for a construction permit, and | 14 | | the associated plans and specifications, that have been | 15 | | self-certified by a qualified design professional. | 16 | | "Supervisory check" means the enforcing agency's | 17 | | acknowledgment of receipt of all materials required to support | 18 | | issuance of a construction permit under the baseline building | 19 | | code. | 20 | | Section 10. Self-certification program. | 21 | | (a) The Executive Director of the Capital Development | 22 | | Board shall establish a self-certification program through | 23 | | which a qualified design professional within a participating | 24 | | municipality shall be permitted to: | 25 | | (1) take responsibility for a project's compliance |
| | | SB2343 | - 3 - | LRB104 10312 AAS 20386 b |
|
| 1 | | with the baseline building code; and | 2 | | (2) self-certify that a permit application, plans, and | 3 | | specifications comply with the baseline building code and | 4 | | the requirements of any applicable laws. | 5 | | (b) Self-certification shall be available for repair and | 6 | | alteration projects, as defined by the baseline building code, | 7 | | in the following use groups with the following square footage | 8 | | limitations: | 9 | | (1) Group B occupancies up to 9,000 square feet; | 10 | | (2) Group F-1 occupancies up to 8,500 square feet; | 11 | | (3) Group F-2 occupancies up to 13,000 square feet; | 12 | | (4) Group M occupancies up to 9,000 square feet; | 13 | | (5) Group R-1 occupancies up to 7,000 square feet; | 14 | | (6) Group R-2 occupancies up to 7,000 square feet; | 15 | | (7) Group R-3 occupancies up to 4,800 square feet; | 16 | | (8) Group R-4 occupancies up to 7,000 square feet; | 17 | | (9) Group S-1 occupancies up to 9,000 square feet; and | 18 | | (10) Group S-2 occupancies up to 13,500 square feet. | 19 | | (c) The Executive Director, by rule, may extend | 20 | | authorization to participate in the self-certification program | 21 | | to projects in addition to those specified in subsection (b), | 22 | | including, but not limited to, projects involving additional | 23 | | categories of work, additional use groups, more extensive | 24 | | square footage limitations, and projects and submittals | 25 | | specified in subsection (d). | 26 | | (d) Self-certification shall not be available for any of |
| | | SB2343 | - 4 - | LRB104 10312 AAS 20386 b |
|
| 1 | | the following types of projects and submittals, unless the | 2 | | Executive Director extends authorization for that type of | 3 | | project or submittal in the self-certification program by | 4 | | rule: | 5 | | (1) projects that include a new commercial kitchen; | 6 | | (2) projects that include new electrical service | 7 | | exceeding 400 amps; | 8 | | (3) projects that include structural alterations | 9 | | involving lateral design; | 10 | | (4) any project that requires a special inspection | 11 | | under the baseline building code; and | 12 | | (5) prototype plan submittals. | 13 | | (e) The enforcing agency of a participating municipality | 14 | | shall, no later than 5 calendar days after receipt of a | 15 | | self-certified construction permit application and | 16 | | accompanying plans and specifications, conduct a supervisory | 17 | | check of the application materials to ascertain receipt of all | 18 | | materials necessary to support issuance of the construction | 19 | | permit, and upon acknowledgment of receipt of those materials, | 20 | | issue a construction permit. | 21 | | A permit issued under the self-certification program shall | 22 | | have the same force and effect as a permit issued by an | 23 | | enforcing agency after full examination and approval of the | 24 | | construction documents. Except as otherwise provided in the | 25 | | baseline building code, or rules adopted by the Board, an | 26 | | approved application for a construction permit, plans or |
| | | SB2343 | - 5 - | LRB104 10312 AAS 20386 b |
|
| 1 | | specifications, or the approval of similar construction | 2 | | documents, shall be deemed to refer to accepted, | 3 | | self-certified construction documents or to the acceptance of | 4 | | construction documents, as applicable. | 5 | | (f) The Executive Director shall establish requirements | 6 | | for design professionals to qualify to participate in the | 7 | | self-certification program, including, but not be limited to: | 8 | | (1) current licensure as a design professional; | 9 | | (2) current licensure by the Board to inspect | 10 | | high-rise and hazardous structures for the applicable | 11 | | baseline building code; | 12 | | (3) authorization granted by the Board; and | 13 | | (4) proof of or a certificate demonstrating | 14 | | professional liability insurance coverage, issued by an | 15 | | insurer authorized to provide insurance coverage in this | 16 | | State, that provides coverage with limits that are no less | 17 | | than $500,000 per claim, and $1,000,000 in the aggregate, | 18 | | for all claims made during the policy period. | 19 | | (g) The self-certification program shall include a | 20 | | condition that the qualified design professional of record | 21 | | remain with the project until the enforcing agency signs off | 22 | | on the project through the issuance of a letter of completion | 23 | | or certificate of approval. If the qualified design | 24 | | professional of record withdraws from a project before the | 25 | | enforcing agency's issuance of a letter of completion or | 26 | | certificate of approval, all work shall cease and no permit, |
| | | SB2343 | - 6 - | LRB104 10312 AAS 20386 b |
|
| 1 | | letter of completion, or certificate of approval shall be | 2 | | issued until: | 3 | | (1) a successor qualified design professional is | 4 | | designated as the qualified design professional of record | 5 | | and satisfies the requirements set forth in this Section; | 6 | | and | 7 | | (2) the successor qualified design professional | 8 | | submits a professional certification confirming the | 9 | | qualified design professional's concurrence with the | 10 | | construction documents accepted by the enforcing agency; | 11 | | or | 12 | | (3) new construction documents are approved or | 13 | | accepted by the enforcing agency. | 14 | | (h) A permit issuing municipality may elect to become a | 15 | | participating municipality under this Act by ordinance. | 16 | | Section 15. Self-certification form. | 17 | | (a) The Executive Director shall adopt rules to implement | 18 | | a design professional of record self-certification form and | 19 | | shall provide online access to the form through the Board's | 20 | | website. A qualified design professional of record shall | 21 | | complete and submit the form, permit application, plans, and | 22 | | specifications to the enforcing agency. The form shall | 23 | | include: | 24 | | (1) a design professional of record self-certification | 25 | | statement; and |
| | | SB2343 | - 7 - | LRB104 10312 AAS 20386 b |
|
| 1 | | (2) the qualified design professional of record's | 2 | | certification and attestation that: | 3 | | (A) the qualified design professional of record | 4 | | shall take all measures necessary to correct a false | 5 | | or inaccurate statement provided to the enforcing | 6 | | agency in the permit application, plans, and | 7 | | specifications immediately after the qualified design | 8 | | professional of record becomes aware of the false or | 9 | | inaccurate statement, regardless of whether the false | 10 | | or inaccurate statement was made by the qualified | 11 | | design professional of record or the design | 12 | | professional's agent or employee; | 13 | | (B) the qualified design professional of record | 14 | | acknowledges that the enforcing agency's issuance of a | 15 | | permit under the self-certification program is reliant | 16 | | upon the truth and accuracy of the design | 17 | | professional's certifications set forth in the design | 18 | | professional of record self-certification; | 19 | | (C) the qualified design professional of record | 20 | | agrees that if the enforcing agency determines that a | 21 | | submitted permit application, plans, and | 22 | | specifications do not conform to the requirements of | 23 | | the baseline building code or other applicable law, | 24 | | the qualified design professional of record, in a | 25 | | timely manner, shall bring the submitted permit | 26 | | application, plans, and specifications and all |
| | | SB2343 | - 8 - | LRB104 10312 AAS 20386 b |
|
| 1 | | construction into conformance with the requirements of | 2 | | the baseline building code and other applicable law, | 3 | | and shall take all remedial measures within the | 4 | | qualified design professional of record's control; | 5 | | (D) the qualified design professional of record | 6 | | acknowledges that failure to bring the submitted | 7 | | permit application, plans, and specifications and all | 8 | | construction into conformity with the requirements of | 9 | | the baseline building code and other applicable law, | 10 | | and failure to take all reasonably necessary remedial | 11 | | measures, within the design professional's control, to | 12 | | do so may result in revocation of the qualified design | 13 | | professional of record's privileges under the | 14 | | self-certification program and may result in | 15 | | notification of the revocation to the appropriate | 16 | | State professional licensing Board; and | 17 | | (E) the qualified design professional agrees to | 18 | | comply with additional certification requirements | 19 | | imposed by rule adopted by the Executive Director. | 20 | | (b) In order to support issuance of a construction permit | 21 | | under the self-certification program, at the time of | 22 | | submission of a design professional of record | 23 | | self-certification form and a self-certified construction | 24 | | permit application, plans, and specifications to the enforcing | 25 | | agency, the qualified design professional of record shall | 26 | | submit a design professional of record self-certification |
| | | SB2343 | - 9 - | LRB104 10312 AAS 20386 b |
|
| 1 | | statement certifying that: | 2 | | (1) the qualified design professional has been a | 3 | | licensed architect or professional engineer for at least 3 | 4 | | years and is licensed in this State; | 5 | | (2) within the preceding 5-year period, the qualified | 6 | | design professional has not been convicted or found liable | 7 | | of: | 8 | | (A) knowingly making a false statement of material | 9 | | fact on, or in connection with, a construction permit | 10 | | application; | 11 | | (B) knowingly submitting, in support of a | 12 | | construction permit application, a document containing | 13 | | false or fraudulent information; or | 14 | | (C) knowingly affixing a false signature to a | 15 | | construction permit application; | 16 | | (3) submission to an enforcing agency of a permit | 17 | | application, plans, and specifications, upon which the | 18 | | stamp of the qualified design professional has been | 19 | | affixed, indicates that each page of the application: | 20 | | (A) was prepared by, under the direct supervision | 21 | | of or reviewed by the qualified design professional of | 22 | | record; | 23 | | (B) is complete; and | 24 | | (C) as of the date of submission, the permit | 25 | | application, plans, and specifications comply with the | 26 | | requirements of the baseline building code and other |
| | | SB2343 | - 10 - | LRB104 10312 AAS 20386 b |
|
| 1 | | applicable law; | 2 | | (4) the permit application, plans, and specifications, | 3 | | and all technical submissions made by the qualified design | 4 | | professional of record in connection with the | 5 | | self-certified project, were prepared in accordance with | 6 | | and meet the standard of care required of the profession; | 7 | | and | 8 | | (5) all information and assertions made in support of | 9 | | a permit application by the qualified design professional | 10 | | of record in the permit application, plans, and | 11 | | specifications are true and correct. | 12 | | (c) The Executive Director shall create and make publicly | 13 | | accessible on the Board's website, an owner certification | 14 | | statement, that, for each project, the owner responsible for | 15 | | the work identified in the permit application, shall certify | 16 | | that the owner: | 17 | | (1) authorized the work of all professionals and | 18 | | consultants named in the permit application and | 19 | | accompanying plans; and | 20 | | (2) shares joint responsibility for ensuring | 21 | | compliance with the baseline building code. | 22 | | (d) The Executive Director shall create and make publicly | 23 | | available the Board's website, an owner hold harmless letter, | 24 | | that for each project, the owner shall sign, date, and agree | 25 | | to, and furnish to the qualified design professional of | 26 | | record, who shall submit the letter to the enforcing agency, |
| | | SB2343 | - 11 - | LRB104 10312 AAS 20386 b |
|
| 1 | | and which shall provide that the owner agrees: | 2 | | (1) to protect, defend, indemnify, and hold harmless | 3 | | the municipality and this State, and their officers, | 4 | | representatives, managers, agents, and employees, against | 5 | | any and all claims, liabilities, judgments, costs, | 6 | | expenses, delays, demands, or injuries arising out of or | 7 | | in any way connected with the design, construction, | 8 | | baseline building code compliance review, or issuance of a | 9 | | permit for the project identified in the permit | 10 | | application; and | 11 | | (2) that if any component of construction is found to | 12 | | not conform to the requirements of the baseline building | 13 | | code, any other applicable law, or any permit issued under | 14 | | the self-certification program, the owner shall, without | 15 | | undue delay, remove or modify, at the owner's own expense, | 16 | | the nonconforming component or components of construction. | 17 | | Section 20. Oversight by the Board. | 18 | | (a) The Board may review any action performed by an | 19 | | enforcing agency to ensure reasonable oversight of a project. | 20 | | (b) All qualified design professionals shall be subject to | 21 | | random audits by the Board to determine whether the | 22 | | application, plans, and specifications for projects comply | 23 | | with the requirements of the baseline building code, the | 24 | | provisions of this Act, and other applicable laws. The Board | 25 | | shall design and implement audits to measure the efficiency of |
| | | SB2343 | - 12 - | LRB104 10312 AAS 20386 b |
|
| 1 | | the self-certification program and compliance with the | 2 | | provisions of this Act. | 3 | | The Board shall provide written notice of the results of | 4 | | an audit to the qualified design professional of record. The | 5 | | notification shall provide a summary of the audit results and | 6 | | direct the qualified design professional to address all | 7 | | violations of the baseline building code found in the audit by | 8 | | a specific date. The specified date shall be reasonable based | 9 | | upon the type of violations and the nature of the corrections | 10 | | that need to be made. Failure to submit required corrections | 11 | | may result in actions specified in subsection (c). | 12 | | The Executive Director may assess a reasonable fee to | 13 | | cover the costs associated with the performance of the audit. | 14 | | (c) The Executive Director may exclude, suspend, or | 15 | | otherwise sanction a qualified design professional for cause, | 16 | | after providing the opportunity for a hearing, for failure to | 17 | | submit required corrections as described in subsection (b). A | 18 | | qualified design professional shall not be eligible to | 19 | | participate in the self-certification program during any | 20 | | period of probation imposed as a sanction by the Architecture | 21 | | Licensing Board or the State Board of Professional Engineers. | 22 | | The Executive Director, after providing a qualified design | 23 | | professional the opportunity for an administrative hearing, | 24 | | shall exclude or suspend a qualified design professional from | 25 | | participating in the self-certification program or otherwise | 26 | | condition the professional's eligibility to participate in the |
| | | SB2343 | - 13 - | LRB104 10312 AAS 20386 b |
|
| 1 | | program, upon determining that the professional: | 2 | | (1) knowingly or negligently submitted a | 3 | | self-certified permit application or construction document | 4 | | that contains false information or is not in compliance | 5 | | with all applicable provisions of law; or | 6 | | (2) submitted 2 self-certified permit applications or | 7 | | construction documents within a 12-month period that | 8 | | contained material errors that resulted in revocation of | 9 | | construction permits or otherwise demonstrate incompetence | 10 | | or a lack of knowledge of applicable laws. | 11 | | (d) A qualified design professional who is excluded from | 12 | | the program under this Section may apply for reinstatement no | 13 | | earlier than one year after the date of exclusion. An | 14 | | applicant who the Executive Director determines is qualified | 15 | | to resume participation in the program shall be on probation | 16 | | for a period of not less than 6 months after reinstatement and, | 17 | | during that time, as a condition of reinstatement, shall | 18 | | attend one or more trainings or continuing education courses | 19 | | approved by the Board and related to compliance with the | 20 | | baseline building code and related laws and rules. The design | 21 | | professional shall submit satisfactory proof of the successful | 22 | | completion of the training or continuing education courses to | 23 | | the Board. | 24 | | The Executive Director shall revoke, after the opportunity | 25 | | for an administrative hearing, for a period of not less than 5 | 26 | | years, the self-certification privileges of a qualified design |
| | | SB2343 | - 14 - | LRB104 10312 AAS 20386 b |
|
| 1 | | professional who, while on probation, professionally certifies | 2 | | an application, plan, construction documents, or other | 3 | | document that contains materially false information or is not | 4 | | in material compliance with all applicable provisions of law, | 5 | | or who otherwise demonstrates gross negligence or | 6 | | incompetence, or a total disregard of applicable laws or | 7 | | standards. | 8 | | Nothing in this Section shall be construed to limit the | 9 | | Executive Director's power to adopt rules that include | 10 | | additional grounds to limit the self-certification privileges | 11 | | of, or otherwise sanction, a qualified design professional, | 12 | | after affording the professional an opportunity for a hearing, | 13 | | when the Executive Director determines that the design | 14 | | professional knowingly or negligently submitted permit | 15 | | applications or other documents to the enforcing agency that | 16 | | contained materially false information or were not in material | 17 | | compliance with all applicable provisions of law, or that | 18 | | otherwise demonstrate gross negligence or incompetence, or a | 19 | | total disregard of applicable law or standards. | 20 | | (e) The Board shall create and maintain a searchable | 21 | | database on the Board's website of all qualified design | 22 | | professionals who have been excluded, suspended, or otherwise | 23 | | sanctioned by the Board. No later than 7 business days after | 24 | | the date a sanction is imposed, the Board shall post on its | 25 | | website and shall make available upon request, the name of the | 26 | | qualified design professional, a description of the sanction, |
| | | SB2343 | - 15 - | LRB104 10312 AAS 20386 b |
|
| 1 | | the initial date of the sanction, the reinstatement date, if | 2 | | applicable, the address of the premises for which the | 3 | | application associated with the sanction was submitted, and | 4 | | whether the sanction was imposed after a hearing or through a | 5 | | settlement. The Board shall provide requested information | 6 | | concerning the exclusion, suspension, or other sanction of a | 7 | | specific qualified design professional within 30 days after | 8 | | receiving the request. | 9 | | (f) No later than 10 business days after the Board's | 10 | | adverse determination or sanction of a professional engineer | 11 | | under the self-certification program, the Board shall provide | 12 | | written notice of the adverse determination or sanction to the | 13 | | State Board of Professional Engineers and Land Surveyors, | 14 | | including the name and business firm name and address of the | 15 | | professional engineer, as well as supporting documentation for | 16 | | the sanction imposed. | 17 | | (g) No later than 10 business days after the Board's | 18 | | adverse determination or sanction of a registered architect | 19 | | under the self-certification program, the Board shall provide | 20 | | written notice of the adverse determination or sanction to the | 21 | | Architecture Licensing Board including, the name, business | 22 | | firm name, and address of the registered architect, as well as | 23 | | supporting documentation for the sanction imposed. | 24 | | (h) The Board shall not assess an adverse determination or | 25 | | sanction against until all of a design professional's rights | 26 | | to appeal are exhausted or have expired. |
| | | SB2343 | - 16 - | LRB104 10312 AAS 20386 b |
|
| 1 | | Section 25. Study and report. | 2 | | (a) The Board shall conduct a study to determine | 3 | | construction activity that may be added to the | 4 | | self-certification program. The Board may retain a third party | 5 | | or consultant to conduct this study. | 6 | | (b) No later than January 1, 2029, the Board shall submit a | 7 | | report to the Governor and the General Assembly concerning the | 8 | | self-certification program and the results of the study | 9 | | conducted under subsection (a). | 10 | | Section 30. Rulemaking. The Executive Director may adopt | 11 | | rules as necessary to implement and administer this Act. | 12 | | Section 99. Effective date. This Act takes effect January | 13 | | 1, 2026. |
|