Illinois General Assembly - Full Text of HB2851
Illinois General Assembly

  Bills & Resolutions  
  Compiled Statutes  
  Public Acts  
  Legislative Reports  
  IL Constitution  
  Legislative Guide  
  Legislative Glossary  

 Search By Number
 (example: HB0001)
Search Tips

Search By Keyword

Full Text of HB2851  103rd General Assembly

HB2851 103RD GENERAL ASSEMBLY


 


 
103RD GENERAL ASSEMBLY
State of Illinois
2023 and 2024
HB2851

 

Introduced 2/16/2023, by Rep. Dave Severin

 

SYNOPSIS AS INTRODUCED:
 
New Act
20 ILCS 3855/1-129 new
30 ILCS 105/5.990 new

    Creates the Illinois Regional Generation Reliability Task Force Act. Sets forth findings of the General Assembly Creates the Illinois Regional Generation Reliability Task Force. Provides that the Task Force shall monitor the reliability of the Illinois power grid. Contains provisions concerning: the membership of the Task Force; duties of the Task Force; administrative support; and an annual report. Amends the Illinois Power Agency Act. Provides that the Carbon Capture Infrastructure Fund is created as a special fund in the State treasury and shall be administered by the Illinois Power Agency. Provides that $10,000,000 shall be transferred from the Illinois Power Agency Renewable Energy Resources Fund to the Carbon Capture Infrastructure Fund. Provides that the Agency shall award grants from the fund to carbon producing power plants for the construction of new carbon capture storage systems. Amends the State Finance Act to create the Carbon Capture Infrastructure Fund. Effective immediately.


LRB103 28362 AMQ 54742 b

 

 

A BILL FOR

 

HB2851LRB103 28362 AMQ 54742 b

1    AN ACT concerning State government.
 
2    Be it enacted by the People of the State of Illinois,
3represented in the General Assembly:
 
4    Section 1. Short title. This Act may be cited as the
5Illinois Regional Generation Reliability Task Force Act.
 
6    Section 5. Findings. The General Assembly hereby finds,
7determines, and declares the following:
8        (1) The reliability of the electricity grid of the
9    State is critically important to the consumers,
10    businesses, and all residents of this State and should not
11    be compromised.
12        (2) The State has taken definitive steps toward
13    redefining the generation mix in Illinois.
14        (3) The Midcontinent Independent System Operator, Inc.
15    ("MISO") is an independent, not-for-profit, member-based
16    organization responsible for operating the power grid
17    across 15 states and the Canadian province of Manitoba,
18    serving 42 million people.
19        (4) The PJM Interconnection LLC ("PJM"), is an
20    independent not-for-profit, member-based Regional
21    Transmission Organization ("RTO") that manages the
22    operations, supply, and movement of power across 13 states
23    and the District of Columbia, serving 65 million people.

 

 

HB2851- 2 -LRB103 28362 AMQ 54742 b

1        (5) The State is served by both PJM and MISO, which
2    collectively ensure that sufficient electric power
3    generation supply and transmission are available to meet
4    electric demand every minute of every day for over 107
5    million people across 28 states and 2 countries. Wholesale
6    electric power generation is regulated by the Federal
7    Energy Regulatory Commission due to the interstate and
8    international nature of the transmission grid operated by
9    PJM and MISO. As such, policy changes at the State level
10    can affect the reliability, availability, and cost of
11    power for seniors, families, businesses, municipalities,
12    universities, and hospitals across the region.
13        (6) When natural disasters occur, such as ice storms,
14    blizzards, tornadoes, and hurricanes, states participating
15    in PJM and MISO have provided support to each other
16    through power generation restoration missions. The
17    inability to deliver power generation in critical times
18    can have a huge economic impact and can also result in
19    death across the PJM and MISO regional transmission
20    organizations.
21        (7) PJM and MISO have multiple markets in which power
22    suppliers participate. The capacity market, day-ahead
23    energy market, and frequency market are markets that power
24    generators participate in to ensure over 107,000,000
25    people across 28 states and 2 countries receive the right
26    amount of electricity every minute of every day.

 

 

HB2851- 3 -LRB103 28362 AMQ 54742 b

1            (A) Capacity markets are used in wholesale
2        electricity markets to pay resources for being
3        available to meet peak electricity demand. Capacity is
4        not actual electricity, but rather the ability to
5        produce electricity when called upon. Capacity is
6        procured, sometimes multiple years in advance of when
7        it is needed, based on projections of future energy
8        needs using historical demand requirements.
9            (B) The day-ahead energy market lets market
10        participants commit to buy or sell wholesale
11        electricity one day before the power is needed, to
12        help avoid price volatility. The real-time energy
13        market balances the differences between day-ahead
14        commitments and the actual real-time demand for and
15        production of electricity.
16            (C) The power grid operates, and shall be
17        maintained, at a constant frequency of 60 hertz.
18        Significant deviation from this level can result in
19        catastrophic damage to the power grid as well as
20        household appliances. Frequency is maintained when
21        electric generators automatically add or remove power
22        from the grid. For example, a large power plant
23        suddenly tripping offline reduces the total amount of
24        available kinetic energy, leading the rotating
25        generators on the system to start rotating less
26        rapidly and thereby decreasing the alternating current

 

 

HB2851- 4 -LRB103 28362 AMQ 54742 b

1        frequency across the grid system. Since a generator
2        turbine's rotational velocity is directly coupled to
3        the grid frequency, the generator's control systems
4        can sense this frequency decline as an indicator of
5        insufficient energy provision. The control system
6        within each power plant, which usually has been in the
7        form of a governor, can then automatically increase
8        the plant's power output. This process is autonomous
9        because the governor does not have to wait for a
10        central dispatcher to send a signal, thus bypassing
11        communications system delays.
12        (8) The shifting generation mix in PJM and MISO will
13    require optimum performance and an increased focus on the
14    need to retain reliability as certain existing generators
15    shut down operations and new, intermittent generators are
16    added. Additionally, increased power generation
17    consumption due to increased electric vehicles and
18    charging stations, along with increased electrification of
19    building heating needs, will undoubtedly place greater
20    demand on the power system.
21        (9) The State has a responsibility to ensure the
22    performance of State and regional power grids are safe,
23    reliable, and maintain the necessary capacity to meet the
24    power demands of residents of this State. Additionally,
25    the State has an obligation to do its part to ensure the
26    regional power grid is safe and reliable for its

 

 

HB2851- 5 -LRB103 28362 AMQ 54742 b

1    partnering states. As part of the regional power grid,
2    this State should be concerned that shuttered facilities
3    in this State will be replaced by higher cost, higher
4    emissions resources from other states.
 
5    Section 10. Illinois Regional Generation Reliability Task
6Force.
7    (a) The Illinois Regional Generation Reliability Task
8Force is created. The Task Force shall monitor the reliability
9of the power grid of this State. The Task Force should consider
10the present and future needs of consumers of this State while
11simultaneously addressing any issues related to the
12performance and reliability of power generation and
13transmission and being mindful of the ultimate cost to
14consumers.
15    (b) The duties and responsibilities of the Task Force
16include the following:
17        (1) identifying and assessing policies, rules, and
18    laws that have the potential to significantly affect the
19    reliability of the State and regional power grids;
20        (2) developing a set of standards and conditions that
21    will ensure optimal performance of the State and regional
22    power grids based on new and emerging technologies;
23        (3) identifying opportunities to improve the power
24    supply mix in this State through existing and new laws to
25    ensure continued power reliability at affordable rates for

 

 

HB2851- 6 -LRB103 28362 AMQ 54742 b

1    consumers of this State;
2        (4) compiling research and best practices from other
3    states and countries on how to deploy technology to
4    benefit the performance and reliability of the power grid;
5        (5) developing tools to assess the impact of proposed
6    policies and evaluate their costs and benefits on
7    families, employers, the public, this State, and other
8    states as part of the Illinois and regional power grids;
9        (6) identifying data, reports, and relevant
10    information on the performance of the power grid to ensure
11    reliability and that pricing of power generation is in the
12    best interest of families, businesses, and communities in
13    this State;
14        (7) providing its findings and recommendations for
15    policy changes and any revisions to policies, rules, and
16    laws that will facilitate the stability and reliability of
17    the State and regional power grids on an annual basis to
18    the General Assembly; and
19        (8) developing and proposing legislative concepts to
20    ensure the future stability and reliability of the power
21    grid.
 
22    Section 15. Membership; meetings.
23    (a) The members of the Illinois Regional Generation
24Reliability Task Force shall be composed of the following:
25        (1) three Senators appointed by the President of the

 

 

HB2851- 7 -LRB103 28362 AMQ 54742 b

1    Senate, one of whom shall be designated by the President
2    as the co-chair of the Task Force;
3        (2) three Representatives appointed by the Speaker of
4    the House of Representatives, one of whom shall be
5    designated by the Speaker as the co-chair of the Task
6    Force;
7        (3) three Senators appointed by the Minority Leader of
8    the Senate;
9        (4) three Representatives appointed by the Minority
10    Leader of the House of Representatives;
11        (5) one member appointed by the Governor whose sole
12    role is dedicated to energy policy for the State;
13        (6) one member of a State or local labor organization
14    appointed by the President of the Senate;
15        (7) one member of a State or local labor organization
16    appointed by the Speaker of the House of Representatives;
17        (8) one representative from PJM RTO designated by PJM;
18        (9) one representative from the PJM Independent Market
19    Monitor organization designated by the PJM Independent
20    Market Monitor organization;
21        (10) one representative from MISO RTO designated by
22    MISO;
23        (11) one representative from the MISO Independent
24    Market Monitor organization designated by the MISO
25    Independent Market Monitor organization;
26        (12) six representatives from 6 different power

 

 

HB2851- 8 -LRB103 28362 AMQ 54742 b

1    generation companies that operate in the PJM or MISO
2    regional transmission organization, 2 appointed by the
3    President of the Senate, 2 appointed by the Speaker of the
4    House of Representatives, one appointed by the Minority
5    Leader in the Senate, and one appointed by the Minority
6    Leader in the House of Representatives;
7        (13) one representative from a statewide organization
8    representing retail merchants appointed by the President
9    of the Senate;
10        (14) one representative from a statewide organization
11    representing manufacturers appointed by the Speaker of the
12    House of Representatives;
13        (15) one representative from a statewide organization
14    representing retired people appointed by the Speaker of
15    the House of Representatives;
16        (16) one representative from a minority-owned
17    geothermal group appointed by the President of the Senate;
18        (17) one representative from a statewide organization
19    representing business appointed by the Speaker of the
20    House of Representatives;
21        (18) two representatives from environmental law
22    groups, one appointed by the President of the Senate and
23    one appointed by the Speaker of the House of
24    Representatives;
25        (19) the Director of the Illinois Power Agency, or the
26    Director's designee;

 

 

HB2851- 9 -LRB103 28362 AMQ 54742 b

1        (20) the Director of the Environmental Protection
2    Agency, or the Director's designee; and
3        (21) the Chair of the Illinois Commerce Commission, or
4    the Chair's designee.
5    (b) Appointments for the Task Force shall be made by
6November 1, 2023. The Task Force shall hold 7 meetings
7annually, either remotely or in person, and the first meeting
8shall be held within 30 days after appointments are made.
9    (c) Members of the Task Force shall serve without
10compensation.
11    (d) The Illinois Commerce Commission shall provide
12administrative support to the Task Force in conjunction with
13the independent market monitors for the MISO and PJM regional
14transmission organizations.
 
15    Section 20. Annual report.
16    (a) The Illinois Regional Generation Reliability Task
17Force shall issue an annual report based upon its findings in
18the course of performing its duties and responsibilities. The
19report shall be written by the administrative staff of the
20Task Force and with staff assistance from the independent
21market monitors from the MISO and PJM regional transmission
22organizations.
23    (b) The Illinois Regional Generation Reliability Task
24Force shall submit its first report on April 1, 2024, and each
25April 1 thereafter to the General Assembly upon the completion

 

 

HB2851- 10 -LRB103 28362 AMQ 54742 b

1of its meeting schedule and shall continue to issue annual
2reports each year.
 
3    Section 900. The Illinois Power Agency Act is amended by
4adding Section 1-129 as follows:
 
5    (20 ILCS 3855/1-129 new)
6    Sec. 1-129. Carbon Capture Infrastructure Fund.
7    (a) The Carbon Capture Infrastructure Fund is created as a
8special fund in the State treasury.
9    (b) The Carbon Capture Infrastructure Fund shall be
10administered by the Agency to award grants for the
11construction of new carbon capture storage systems.
12    (c) As soon as practicable after the effective date of
13this amendatory Act of the 103rd General Assembly, $10,000,000
14shall be transferred from the Illinois Power Agency Renewable
15Energy Resources Fund to the Carbon Capture Infrastructure
16Fund.
17    (d) The Agency shall award grants from the Carbon Capture
18Infrastructure Fund to carbon producing power plants in this
19State for the construction of new carbon capture storage
20systems.
21    (e) The Agency shall adopt rules to implement this
22Section.
 
23    Section 905. The State Finance Act is amended by adding

 

 

HB2851- 11 -LRB103 28362 AMQ 54742 b

1Section 5.990 as follows:
 
2    (30 ILCS 105/5.990 new)
3    Sec. 5.990. The Carbon Capture Infrastructure Fund.
 
4    Section 999. Effective date. This Act takes effect upon
5becoming law.