Full Text of HB2787  103rd General Assembly

HB2787 103RD GENERAL ASSEMBLY

  
  

 


 
103RD GENERAL ASSEMBLY
State of Illinois
2023 and 2024
HB2787

 

Introduced 2/16/2023, by Rep. Ann M. Williams

 

SYNOPSIS AS INTRODUCED:
 
20 ILCS 3855/1-92
20 ILCS 3855/1-125
30 ILCS 500/1-10

    Amends the Illinois Power Agency Act. In provisions concerning aggregation of electrical load by municipalities, townships, and counties, provides that the report to assess how the aggregation of electrical load by municipalities, townships, and counties can be used to help meet the renewable energy goals outlined in the Act shall contain, at a minimum, an assessment of other states' utilization of load aggregation in meeting renewable energy goals, any known or expected barriers to (rather than in) utilizing load aggregation for meeting renewable energy goals, and recommendations for possible changes in State law necessary for electrical load aggregation to be a driver of new renewable energy project development. Provides that the annual report by the Illinois Power Agency shall include the number (rather than amount) of megawatt hours produced by renewable energy generation capacity physically located in Illinois for the preceding delivery year. Makes another change in the Illinois Procurement Code.


LRB103 29917 AMQ 56330 b

 

 

A BILL FOR

 

HB2787LRB103 29917 AMQ 56330 b

1    AN ACT concerning State government.
 
2    Be it enacted by the People of the State of Illinois,
3represented in the General Assembly:
 
4    Section 5. The Illinois Power Agency Act is amended by
5changing Sections 1-92 and 1-125 as follows:
 
6    (20 ILCS 3855/1-92)
7    Sec. 1-92. Aggregation of electrical load by
8municipalities, townships, and counties.
9    (a) The corporate authorities of a municipality, township
10board, or county board of a county may adopt an ordinance under
11which it may aggregate in accordance with this Section
12residential and small commercial retail electrical loads
13located, respectively, within the municipality, the township,
14or the unincorporated areas of the county and, for that
15purpose, may solicit bids and enter into service agreements to
16facilitate for those loads the sale and purchase of
17electricity and related services and equipment.
18    The corporate authorities, township board, or county board
19may also exercise such authority jointly with any other
20municipality, township, or county. Two or more municipalities,
21townships, or counties, or a combination of both, may initiate
22a process jointly to authorize aggregation by a majority vote
23of each particular municipality, township, or county as

 

 

HB2787- 2 -LRB103 29917 AMQ 56330 b

1required by this Section.
2    If the corporate authorities, township board, or the
3county board seek to operate the aggregation program as an
4opt-out program for residential and small commercial retail
5customers, then prior to the adoption of an ordinance with
6respect to aggregation of residential and small commercial
7retail electric loads, the corporate authorities of a
8municipality, the township board, or the county board of a
9county shall submit a referendum to its residents to determine
10whether or not the aggregation program shall operate as an
11opt-out program for residential and small commercial retail
12customers. Any county board that seeks to submit such a
13referendum to its residents shall do so only in unincorporated
14areas of the county where no electric aggregation ordinance
15has been adopted.
16    In addition to the notice and conduct requirements of the
17general election law, notice of the referendum shall state
18briefly the purpose of the referendum. The question of whether
19the corporate authorities, the township board, or the county
20board shall adopt an opt-out aggregation program for
21residential and small commercial retail customers shall be
22submitted to the electors of the municipality, township board,
23or county board at a regular election and approved by a
24majority of the electors voting on the question. The corporate
25authorities, township board, or county board must certify to
26the proper election authority, which must submit the question

 

 

HB2787- 3 -LRB103 29917 AMQ 56330 b

1at an election in accordance with the Election Code.
2    The election authority must submit the question in
3substantially the following form:
4        Shall the (municipality, township, or county in which
5    the question is being voted upon) have the authority to
6    arrange for the supply of electricity for its residential
7    and small commercial retail customers who have not opted
8    out of such program?
9The election authority must record the votes as "Yes" or "No".
10    If a majority of the electors voting on the question vote
11in the affirmative, then the corporate authorities, township
12board, or county board may implement an opt-out aggregation
13program for residential and small commercial retail customers.
14    A referendum must pass in each particular municipality,
15township, or county that is engaged in the aggregation
16program. If the referendum fails, then the corporate
17authorities, township board, or county board shall operate the
18aggregation program as an opt-in program for residential and
19small commercial retail customers.
20    An ordinance under this Section shall specify whether the
21aggregation will occur only with the prior consent of each
22person owning, occupying, controlling, or using an electric
23load center proposed to be aggregated. Nothing in this
24Section, however, authorizes the aggregation of electric loads
25that are served or authorized to be served by an electric
26cooperative as defined by and pursuant to the Electric

 

 

HB2787- 4 -LRB103 29917 AMQ 56330 b

1Supplier Act or loads served by a municipality that owns and
2operates its own electric distribution system. No aggregation
3shall take effect unless approved by a majority of the members
4of the corporate authority, township board, or county board
5voting upon the ordinance.
6    A governmental aggregator under this Section is not a
7public utility or an alternative retail electric supplier.
8    For purposes of this Section, "township" means the portion
9of a township that is an unincorporated portion of a county
10that is not otherwise a part of a municipality. In addition to
11such other limitations as are included in this Section, a
12township board shall only have authority to aggregate
13residential and small commercial customer loads in accordance
14with this Section if the county board of the county in which
15the township is located (i) is not also submitting a
16referendum to its residents at the same general election that
17the township board proposes to submit a referendum under this
18subsection (a), (ii) has not received authorization through
19passage of a referendum to operate an opt-out aggregation
20program for residential and small commercial retail customers
21under this subsection (a), and (iii) has not otherwise enacted
22an ordinance under this subsection (a) authorizing the
23operation of an opt-in aggregation program for residential and
24small commercial retail customers as described in this
25Section.
26    (b) Upon the applicable requisite authority under this

 

 

HB2787- 5 -LRB103 29917 AMQ 56330 b

1Section, the corporate authorities, the township board, or the
2county board, with assistance from the Illinois Power Agency,
3shall develop a plan of operation and governance for the
4aggregation program so authorized. Before adopting a plan
5under this Section, the corporate authorities, township board,
6or county board shall hold at least 2 public hearings on the
7plan. Before the first hearing, the corporate authorities,
8township board, or county board shall publish notice of the
9hearings once a week for 2 consecutive weeks in a newspaper of
10general circulation in the jurisdiction. The notice shall
11summarize the plan and state the date, time, and location of
12each hearing. Any load aggregation plan established pursuant
13to this Section shall:
14        (1) provide for universal access to all applicable
15    residential customers and equitable treatment of
16    applicable residential customers;
17        (2) describe demand management and energy efficiency
18    services to be provided to each class of customers; and
19        (3) meet any requirements established by law
20    concerning aggregated service offered pursuant to this
21    Section.
22    (c) The process for soliciting bids for electricity and
23other related services and awarding proposed agreements for
24the purchase of electricity and other related services shall
25be conducted in the following order:
26        (1) The corporate authorities, township board, or

 

 

HB2787- 6 -LRB103 29917 AMQ 56330 b

1    county board may solicit bids for electricity and other
2    related services. The bid specifications may include a
3    provision requiring the bidder to disclose the fuel type
4    of electricity to be procured or generated on behalf of
5    the aggregation program customers. The corporate
6    authorities, township board, or county board may consider
7    the proposed source of electricity to be procured or
8    generated to be put into the grid on behalf of aggregation
9    program customers in the competitive bidding process. The
10    Agency and Commission may collaborate to issue joint
11    guidance on voluntary uniform standards for bidder
12    disclosures of the source of electricity to be procured or
13    generated to be put into the grid on behalf of aggregation
14    program customers.
15        (1.5) A township board shall request from the electric
16    utility those residential and small commercial customers
17    within their aggregate area either by zip code or zip
18    codes or other means as determined by the electric
19    utility. The electric utility shall then provide to the
20    township board the residential and small commercial
21    customers, including the names and addresses of
22    residential and small commercial customers,
23    electronically. The township board shall be responsible
24    for authenticating the residential and small commercial
25    customers contained in this listing and providing edits of
26    the data to affirm, add, or delete the residential and

 

 

HB2787- 7 -LRB103 29917 AMQ 56330 b

1    small commercial customers located within its
2    jurisdiction. The township board shall provide the edited
3    list to the electric utility in an electronic format or
4    other means selected by the electric utility and certify
5    that the information is accurate.
6        (2) Notwithstanding Section 16-122 of the Public
7    Utilities Act and Section 2HH of the Consumer Fraud and
8    Deceptive Business Practices Act, an electric utility that
9    provides residential and small commercial retail electric
10    service in the aggregate area must, upon request of the
11    corporate authorities, township board, or the county board
12    in the aggregate area, submit to the requesting party, in
13    an electronic format, those account numbers, names, and
14    addresses of residential and small commercial retail
15    customers in the aggregate area that are reflected in the
16    electric utility's records at the time of the request;
17    provided, however, that any township board has first
18    provided an accurate customer list to the electric utility
19    as provided for herein.
20    Any corporate authority, township board, or county board
21receiving customer information from an electric utility shall
22be subject to the limitations on the disclosure of the
23information described in Section 16-122 of the Public
24Utilities Act and Section 2HH of the Consumer Fraud and
25Deceptive Business Practices Act, and an electric utility
26shall not be held liable for any claims arising out of the

 

 

HB2787- 8 -LRB103 29917 AMQ 56330 b

1provision of information pursuant to this item (2).
2    (d) If the corporate authorities, township board, or
3county board operate under an opt-in program for residential
4and small commercial retail customers, then the corporate
5authorities, township board, or county board shall comply with
6all of the following:
7        (1) Within 60 days after receiving the bids, the
8    corporate authorities, township board, or county board
9    shall allow residential and small commercial retail
10    customers to commit to the terms and conditions of a bid
11    that has been selected by the corporate authorities,
12    township board, or county board.
13        (2) If (A) the corporate authorities, township board,
14    or county board award proposed agreements for the purchase
15    of electricity and other related services and (B) an
16    agreement is reached between the corporate authorities,
17    township board, or county board for those services, then
18    customers committed to the terms and conditions according
19    to item (1) of this subsection (d) shall be committed to
20    the agreement.
21    (e) If the corporate authorities, township board, or
22county board operate as an opt-out program for residential and
23small commercial retail customers, then it shall be the duty
24of the aggregated entity to fully inform residential and small
25commercial retail customers in advance that they have the
26right to opt out of the aggregation program. The disclosure

 

 

HB2787- 9 -LRB103 29917 AMQ 56330 b

1shall prominently state all charges to be made and shall
2include full disclosure of the cost to obtain service pursuant
3to Section 16-103 of the Public Utilities Act, how to access
4it, and the fact that it is available to them without penalty,
5if they are currently receiving service under that Section.
6The Illinois Power Agency shall furnish, without charge, to
7any citizen a list of all supply options available to them in a
8format that allows comparison of prices and products.
9    (f) Any person or entity retained by a municipality or
10county, or jointly by more than one such unit of local
11government, to provide input, guidance, or advice in the
12selection of an electricity supplier for an aggregation
13program shall disclose in writing to the involved units of
14local government the nature of any relationship through which
15the person or entity may receive, either directly or
16indirectly, commissions or other remuneration as a result of
17the selection of any particular electricity supplier. The
18written disclosure must be made prior to formal approval by
19the involved units of local government of any professional
20services agreement with the person or entity, or no later than
21October 1, 2012 with respect to any such professional services
22agreement entered into prior to the effective date of this
23amendatory Act of the 97th General Assembly. The disclosure
24shall cover all direct and indirect relationships through
25which commissions or remuneration may result, including the
26pooling of commissions or remuneration among multiple persons

 

 

HB2787- 10 -LRB103 29917 AMQ 56330 b

1or entities, and shall identify all involved electricity
2suppliers. The disclosure requirements in this subsection (f)
3are to be liberally construed to ensure that the nature of
4financial interests are fully revealed, and these disclosure
5requirements shall apply regardless of whether the involved
6person or entity is licensed under Section 16-115C of the
7Public Utilities Act. Any person or entity that fails to make
8the disclosure required under this subsection (f) is liable to
9the involved units of local government in an amount equal to
10all compensation paid to such person or entity by the units of
11local government for the input, guidance, or advice in the
12selection of an electricity supplier, plus reasonable
13attorneys fees and court costs incurred by the units of local
14government in connection with obtaining such amount.
15    (g) The Illinois Power Agency shall provide assistance to
16municipalities, townships, counties, or associations working
17with municipalities to help complete the plan and bidding
18process.
19    (h) This Section does not prohibit municipalities or
20counties from entering into an intergovernmental agreement to
21aggregate residential and small commercial retail electric
22loads.
23    (i) No later than June 1, 2023, the Illinois Power Agency
24shall produce a report assessing how the aggregation of
25electrical load by municipalities, townships, and counties can
26be used to help meet the renewable energy goals outlined in

 

 

HB2787- 11 -LRB103 29917 AMQ 56330 b

1this Act. This report shall contain, at a minimum, an
2assessment of other states' utilization of load aggregation in
3meeting renewable energy goals, any known or expected barriers
4to in utilizing load aggregation for meeting renewable energy
5goals, and recommendations for possible changes in State law
6necessary for electrical load aggregation to be a driver of
7new renewable energy project development. This report shall be
8published on the Agency's website and delivered to the
9Governor and General Assembly. To assist with developing this
10report, the Agency may retain the services of its expert
11consulting firm used to develop its procurement plans as
12provided in paragraph (1) of subsection (a) of Section 1-75.
13(Source: P.A. 102-662, eff. 9-15-21.)
 
14    (20 ILCS 3855/1-125)
15    Sec. 1-125. Agency annual reports.
16    (a) By February 15 of each year, the Agency shall report
17annually to the Governor and the General Assembly on the
18operations and transactions of the Agency. The annual report
19shall include, but not be limited to, each of the following:
20        (1) The average quantity, price, and term of all
21    contracts for electricity procured under the procurement
22    plans for electric utilities.
23        (2) (Blank).
24        (3) The quantity, price, and rate impact of all energy
25    efficiency and demand response measures purchased for

 

 

HB2787- 12 -LRB103 29917 AMQ 56330 b

1    electric utilities, and any measures included in the
2    procurement plan pursuant to Section 16-111.5B of the
3    Public Utilities Act.
4        (4) The amount of power and energy produced by each
5    Agency facility.
6        (5) The quantity of electricity supplied by each
7    Agency facility to municipal electric systems,
8    governmental aggregators, or rural electric cooperatives
9    in Illinois.
10        (6) The revenues as allocated by the Agency to each
11    facility.
12        (7) The costs as allocated by the Agency to each
13    facility.
14        (8) The accumulated depreciation for each facility.
15        (9) The status of any projects under development.
16        (10) Basic financial and operating information
17    specifically detailed for the reporting year and
18    including, but not limited to, income and expense
19    statements, balance sheets, and changes in financial
20    position, all in accordance with generally accepted
21    accounting principles, debt structure, and a summary of
22    funds on a cash basis.
23        (11) The average quantity, price, contract type and
24    term, and rate impact of all renewable resources procured
25    under the long-term renewable resources procurement plans
26    for electric utilities.

 

 

HB2787- 13 -LRB103 29917 AMQ 56330 b

1        (12) A comparison of the costs associated with the
2    Agency's procurement of renewable energy resources to (A)
3    the Agency's costs associated with electricity generated
4    by other types of generation facilities and (B) the
5    benefits associated with the Agency's procurement of
6    renewable energy resources.
7        (13) An analysis of the rate impacts associated with
8    the Illinois Power Agency's procurement of renewable
9    resources, including, but not limited to, any long-term
10    contracts, on the eligible retail customers of electric
11    utilities. The analysis shall include the Agency's
12    estimate of the total dollar impact that the Agency's
13    procurement of renewable resources has had on the annual
14    electricity bills of the customer classes that comprise
15    each eligible retail customer class taking service from an
16    electric utility.
17        (14) (Blank).
18    (b) In addition to reporting on the transactions and
19operations of the Agency, the Agency shall also endeavor to
20report on the following items through its annual report,
21recognizing that full and accurate information may not be
22available for certain items:
23        (1) The overall nameplate capacity amount of installed
24    and scheduled renewable energy generation capacity
25    physically located in Illinois.
26        (2) The percentage of installed and scheduled

 

 

HB2787- 14 -LRB103 29917 AMQ 56330 b

1    renewable energy generation capacity as a share of overall
2    electricity generation capacity physically located in
3    Illinois.
4        (3) The number amount of megawatt hours produced by
5    renewable energy generation capacity physically located in
6    Illinois for the preceding delivery year.
7        (4) The percentage of megawatt hours produced by
8    renewable energy generation capacity physically located in
9    Illinois as a share of overall electricity generation from
10    facilities physically located in Illinois for the
11    preceding delivery year.
12        (5) The renewable portfolio standard expenditures made
13    pursuant to paragraph (1) of subsection (c) of Section
14    1-75 and the total scheduled and installed renewable
15    generation capacity expected to result from these
16    investments. This information shall include the total cost
17    of REC delivery contracts of the renewable portfolio
18    standard by project category, including, but not limited
19    to, renewable energy credits delivery contracts entered
20    into pursuant to subparagraphs (C), (G), (K), and (R) of
21    paragraph (1) of subsection (c) Section 1-75. The Agency
22    shall also report on the total amount of customer load
23    featuring renewable portfolio standard compliance
24    obligations scheduled to be met by self-direct customers
25    pursuant to subparagraph (R) of paragraph (1) of
26    subsection (c) of Section 1-75, as well as the minimum

 

 

HB2787- 15 -LRB103 29917 AMQ 56330 b

1    annual quantities of renewable energy credits scheduled to
2    be retired by those customers and amount of installed
3    renewable energy generating capacity used to meet the
4    requirements of subparagraph (R) of paragraph (1) of
5    subsection (c) of Section 1-75.
6    The Agency may seek assistance from the Illinois Commerce
7Commission in developing its annual report and may also retain
8the services of its expert consulting firm used to develop its
9procurement plans as outlined in paragraph (1) of subsection
10(a) of Section 1-75. Confidential or commercially sensitive
11business information provided by retail customers, alternative
12retail electric suppliers, or other parties shall be kept
13confidential by the Agency consistent with Section 1-120, but
14may be publicly reported in aggregate form.
15(Source: P.A. 102-662, eff. 9-15-21.)
 
16    Section 10. The Illinois Procurement Code is amended by
17changing Section 1-10 as follows:
 
18    (30 ILCS 500/1-10)
19    Sec. 1-10. Application.
20    (a) This Code applies only to procurements for which
21bidders, offerors, potential contractors, or contractors were
22first solicited on or after July 1, 1998. This Code shall not
23be construed to affect or impair any contract, or any
24provision of a contract, entered into based on a solicitation

 

 

HB2787- 16 -LRB103 29917 AMQ 56330 b

1prior to the implementation date of this Code as described in
2Article 99, including, but not limited to, any covenant
3entered into with respect to any revenue bonds or similar
4instruments. All procurements for which contracts are
5solicited between the effective date of Articles 50 and 99 and
6July 1, 1998 shall be substantially in accordance with this
7Code and its intent.
8    (b) This Code shall apply regardless of the source of the
9funds with which the contracts are paid, including federal
10assistance moneys. This Code shall not apply to:
11        (1) Contracts between the State and its political
12    subdivisions or other governments, or between State
13    governmental bodies, except as specifically provided in
14    this Code.
15        (2) Grants, except for the filing requirements of
16    Section 20-80.
17        (3) Purchase of care, except as provided in Section
18    5-30.6 of the Illinois Public Aid Code and this Section.
19        (4) Hiring of an individual as an employee and not as
20    an independent contractor, whether pursuant to an
21    employment code or policy or by contract directly with
22    that individual.
23        (5) Collective bargaining contracts.
24        (6) Purchase of real estate, except that notice of
25    this type of contract with a value of more than $25,000
26    must be published in the Procurement Bulletin within 10

 

 

HB2787- 17 -LRB103 29917 AMQ 56330 b

1    calendar days after the deed is recorded in the county of
2    jurisdiction. The notice shall identify the real estate
3    purchased, the names of all parties to the contract, the
4    value of the contract, and the effective date of the
5    contract.
6        (7) Contracts necessary to prepare for anticipated
7    litigation, enforcement actions, or investigations,
8    provided that the chief legal counsel to the Governor
9    shall give his or her prior approval when the procuring
10    agency is one subject to the jurisdiction of the Governor,
11    and provided that the chief legal counsel of any other
12    procuring entity subject to this Code shall give his or
13    her prior approval when the procuring entity is not one
14    subject to the jurisdiction of the Governor.
15        (8) (Blank).
16        (9) Procurement expenditures by the Illinois
17    Conservation Foundation when only private funds are used.
18        (10) (Blank).
19        (11) Public-private agreements entered into according
20    to the procurement requirements of Section 20 of the
21    Public-Private Partnerships for Transportation Act and
22    design-build agreements entered into according to the
23    procurement requirements of Section 25 of the
24    Public-Private Partnerships for Transportation Act.
25        (12) (A) Contracts for legal, financial, and other
26    professional and artistic services entered into by the

 

 

HB2787- 18 -LRB103 29917 AMQ 56330 b

1    Illinois Finance Authority in which the State of Illinois
2    is not obligated. Such contracts shall be awarded through
3    a competitive process authorized by the members of the
4    Illinois Finance Authority and are subject to Sections
5    5-30, 20-160, 50-13, 50-20, 50-35, and 50-37 of this Code,
6    as well as the final approval by the members of the
7    Illinois Finance Authority of the terms of the contract.
8        (B) Contracts for legal and financial services entered
9    into by the Illinois Housing Development Authority in
10    connection with the issuance of bonds in which the State
11    of Illinois is not obligated. Such contracts shall be
12    awarded through a competitive process authorized by the
13    members of the Illinois Housing Development Authority and
14    are subject to Sections 5-30, 20-160, 50-13, 50-20, 50-35,
15    and 50-37 of this Code, as well as the final approval by
16    the members of the Illinois Housing Development Authority
17    of the terms of the contract.
18        (13) Contracts for services, commodities, and
19    equipment to support the delivery of timely forensic
20    science services in consultation with and subject to the
21    approval of the Chief Procurement Officer as provided in
22    subsection (d) of Section 5-4-3a of the Unified Code of
23    Corrections, except for the requirements of Sections
24    20-60, 20-65, 20-70, and 20-160 and Article 50 of this
25    Code; however, the Chief Procurement Officer may, in
26    writing with justification, waive any certification

 

 

HB2787- 19 -LRB103 29917 AMQ 56330 b

1    required under Article 50 of this Code. For any contracts
2    for services which are currently provided by members of a
3    collective bargaining agreement, the applicable terms of
4    the collective bargaining agreement concerning
5    subcontracting shall be followed.
6        On and after January 1, 2019, this paragraph (13),
7    except for this sentence, is inoperative.
8        (14) Contracts for participation expenditures required
9    by a domestic or international trade show or exhibition of
10    an exhibitor, member, or sponsor.
11        (15) Contracts with a railroad or utility that
12    requires the State to reimburse the railroad or utilities
13    for the relocation of utilities for construction or other
14    public purpose. Contracts included within this paragraph
15    (15) shall include, but not be limited to, those
16    associated with: relocations, crossings, installations,
17    and maintenance. For the purposes of this paragraph (15),
18    "railroad" means any form of non-highway ground
19    transportation that runs on rails or electromagnetic
20    guideways and "utility" means: (1) public utilities as
21    defined in Section 3-105 of the Public Utilities Act, (2)
22    telecommunications carriers as defined in Section 13-202
23    of the Public Utilities Act, (3) electric cooperatives as
24    defined in Section 3.4 of the Electric Supplier Act, (4)
25    telephone or telecommunications cooperatives as defined in
26    Section 13-212 of the Public Utilities Act, (5) rural

 

 

HB2787- 20 -LRB103 29917 AMQ 56330 b

1    water or waste water systems with 10,000 connections or
2    less, (6) a holder as defined in Section 21-201 of the
3    Public Utilities Act, and (7) municipalities owning or
4    operating utility systems consisting of public utilities
5    as that term is defined in Section 11-117-2 of the
6    Illinois Municipal Code.
7        (16) Procurement expenditures necessary for the
8    Department of Public Health to provide the delivery of
9    timely newborn screening services in accordance with the
10    Newborn Metabolic Screening Act.
11        (17) Procurement expenditures necessary for the
12    Department of Agriculture, the Department of Financial and
13    Professional Regulation, the Department of Human Services,
14    and the Department of Public Health to implement the
15    Compassionate Use of Medical Cannabis Program and Opioid
16    Alternative Pilot Program requirements and ensure access
17    to medical cannabis for patients with debilitating medical
18    conditions in accordance with the Compassionate Use of
19    Medical Cannabis Program Act.
20        (18) This Code does not apply to any procurements
21    necessary for the Department of Agriculture, the
22    Department of Financial and Professional Regulation, the
23    Department of Human Services, the Department of Commerce
24    and Economic Opportunity, and the Department of Public
25    Health to implement the Cannabis Regulation and Tax Act if
26    the applicable agency has made a good faith determination

 

 

HB2787- 21 -LRB103 29917 AMQ 56330 b

1    that it is necessary and appropriate for the expenditure
2    to fall within this exemption and if the process is
3    conducted in a manner substantially in accordance with the
4    requirements of Sections 20-160, 25-60, 30-22, 50-5,
5    50-10, 50-10.5, 50-12, 50-13, 50-15, 50-20, 50-21, 50-35,
6    50-36, 50-37, 50-38, and 50-50 of this Code; however, for
7    Section 50-35, compliance applies only to contracts or
8    subcontracts over $100,000. Notice of each contract
9    entered into under this paragraph (18) that is related to
10    the procurement of goods and services identified in
11    paragraphs paragraph (1) through (9) of this subsection
12    shall be published in the Procurement Bulletin within 14
13    calendar days after contract execution. The Chief
14    Procurement Officer shall prescribe the form and content
15    of the notice. Each agency shall provide the Chief
16    Procurement Officer, on a monthly basis, in the form and
17    content prescribed by the Chief Procurement Officer, a
18    report of contracts that are related to the procurement of
19    goods and services identified in this subsection. At a
20    minimum, this report shall include the name of the
21    contractor, a description of the supply or service
22    provided, the total amount of the contract, the term of
23    the contract, and the exception to this Code utilized. A
24    copy of any or all of these contracts shall be made
25    available to the Chief Procurement Officer immediately
26    upon request. The Chief Procurement Officer shall submit a

 

 

HB2787- 22 -LRB103 29917 AMQ 56330 b

1    report to the Governor and General Assembly no later than
2    November 1 of each year that includes, at a minimum, an
3    annual summary of the monthly information reported to the
4    Chief Procurement Officer. This exemption becomes
5    inoperative 5 years after June 25, 2019 (the effective
6    date of Public Act 101-27).
7        (19) Acquisition of modifications or adjustments,
8    limited to assistive technology devices and assistive
9    technology services, adaptive equipment, repairs, and
10    replacement parts to provide reasonable accommodations (i)
11    that enable a qualified applicant with a disability to
12    complete the job application process and be considered for
13    the position such qualified applicant desires, (ii) that
14    modify or adjust the work environment to enable a
15    qualified current employee with a disability to perform
16    the essential functions of the position held by that
17    employee, (iii) to enable a qualified current employee
18    with a disability to enjoy equal benefits and privileges
19    of employment as are enjoyed by other similarly situated
20    employees without disabilities, and (iv) that allow a
21    customer, client, claimant, or member of the public
22    seeking State services full use and enjoyment of and
23    access to its programs, services, or benefits.
24        For purposes of this paragraph (19):
25        "Assistive technology devices" means any item, piece
26    of equipment, or product system, whether acquired

 

 

HB2787- 23 -LRB103 29917 AMQ 56330 b

1    commercially off the shelf, modified, or customized, that
2    is used to increase, maintain, or improve functional
3    capabilities of individuals with disabilities.
4        "Assistive technology services" means any service that
5    directly assists an individual with a disability in
6    selection, acquisition, or use of an assistive technology
7    device.
8        "Qualified" has the same meaning and use as provided
9    under the federal Americans with Disabilities Act when
10    describing an individual with a disability.
11        (20) Procurement expenditures necessary for the
12    Illinois Commerce Commission to hire third-party
13    facilitators pursuant to Sections 16-105.17 and 16-108.18
14    of the Public Utilities Act or an ombudsman pursuant to
15    Section 16-107.5 of the Public Utilities Act, a
16    facilitator pursuant to Section 16-105.17 of the Public
17    Utilities Act, or a grid auditor pursuant to Section
18    16-105.10 of the Public Utilities Act.
19        (21) Procurement expenditures for the purchase,
20    renewal, and expansion of software, software licenses, or
21    software maintenance agreements that support the efforts
22    of the Illinois State Police to enforce, regulate, and
23    administer the Firearm Owners Identification Card Act, the
24    Firearm Concealed Carry Act, the Firearms Restraining
25    Order Act, the Firearm Dealer License Certification Act,
26    the Law Enforcement Agencies Data System (LEADS), the

 

 

HB2787- 24 -LRB103 29917 AMQ 56330 b

1    Uniform Crime Reporting Act, the Criminal Identification
2    Act, the Uniform Conviction Information Act, and the Gun
3    Trafficking Information Act, or establish or maintain
4    record management systems necessary to conduct human
5    trafficking investigations or gun trafficking or other
6    stolen firearm investigations. This paragraph (21) applies
7    to contracts entered into on or after the effective date
8    of this amendatory Act of the 102nd General Assembly and
9    the renewal of contracts that are in effect on the
10    effective date of this amendatory Act of the 102nd General
11    Assembly.
12    Notwithstanding any other provision of law, for contracts
13with an annual value of more than $100,000 entered into on or
14after October 1, 2017 under an exemption provided in any
15paragraph of this subsection (b), except paragraph (1), (2),
16or (5), each State agency shall post to the appropriate
17procurement bulletin the name of the contractor, a description
18of the supply or service provided, the total amount of the
19contract, the term of the contract, and the exception to the
20Code utilized. The chief procurement officer shall submit a
21report to the Governor and General Assembly no later than
22November 1 of each year that shall include, at a minimum, an
23annual summary of the monthly information reported to the
24chief procurement officer.
25    (c) This Code does not apply to the electric power
26procurement process provided for under Section 1-75 of the

 

 

HB2787- 25 -LRB103 29917 AMQ 56330 b

1Illinois Power Agency Act and Section 16-111.5 of the Public
2Utilities Act.
3    (d) Except for Section 20-160 and Article 50 of this Code,
4and as expressly required by Section 9.1 of the Illinois
5Lottery Law, the provisions of this Code do not apply to the
6procurement process provided for under Section 9.1 of the
7Illinois Lottery Law.
8    (e) This Code does not apply to the process used by the
9Capital Development Board to retain a person or entity to
10assist the Capital Development Board with its duties related
11to the determination of costs of a clean coal SNG brownfield
12facility, as defined by Section 1-10 of the Illinois Power
13Agency Act, as required in subsection (h-3) of Section 9-220
14of the Public Utilities Act, including calculating the range
15of capital costs, the range of operating and maintenance
16costs, or the sequestration costs or monitoring the
17construction of clean coal SNG brownfield facility for the
18full duration of construction.
19    (f) (Blank).
20    (g) (Blank).
21    (h) This Code does not apply to the process to procure or
22contracts entered into in accordance with Sections 11-5.2 and
2311-5.3 of the Illinois Public Aid Code.
24    (i) Each chief procurement officer may access records
25necessary to review whether a contract, purchase, or other
26expenditure is or is not subject to the provisions of this

 

 

HB2787- 26 -LRB103 29917 AMQ 56330 b

1Code, unless such records would be subject to attorney-client
2privilege.
3    (j) This Code does not apply to the process used by the
4Capital Development Board to retain an artist or work or works
5of art as required in Section 14 of the Capital Development
6Board Act.
7    (k) This Code does not apply to the process to procure
8contracts, or contracts entered into, by the State Board of
9Elections or the State Electoral Board for hearing officers
10appointed pursuant to the Election Code.
11    (l) This Code does not apply to the processes used by the
12Illinois Student Assistance Commission to procure supplies and
13services paid for from the private funds of the Illinois
14Prepaid Tuition Fund. As used in this subsection (l), "private
15funds" means funds derived from deposits paid into the
16Illinois Prepaid Tuition Trust Fund and the earnings thereon.
17    (m) This Code shall apply regardless of the source of
18funds with which contracts are paid, including federal
19assistance moneys. Except as specifically provided in this
20Code, this Code shall not apply to procurement expenditures
21necessary for the Department of Public Health to conduct the
22Healthy Illinois Survey in accordance with Section 2310-431 of
23the Department of Public Health Powers and Duties Law of the
24Civil Administrative Code of Illinois.
25(Source: P.A. 101-27, eff. 6-25-19; 101-81, eff. 7-12-19;
26101-363, eff. 8-9-19; 102-175, eff. 7-29-21; 102-483, eff

 

 

HB2787- 27 -LRB103 29917 AMQ 56330 b

11-1-22; 102-558, eff. 8-20-21; 102-600, eff. 8-27-21; 102-662,
2eff. 9-15-21; 102-721, eff. 1-1-23; 102-813, eff. 5-13-22;
3102-1116, eff. 1-10-23.)