Bill Status of HB4792  103rd General Assembly


Short Description:  CLOSED-LOOP WELL SETBACKS

House Sponsors
Rep. Dave Vella and Joyce Mason

Last Action
DateChamber Action
  4/5/2024HouseRule 19(a) / Re-referred to Rules Committee

Statutes Amended In Order of Appearance
415 ILCS 30/9.3 new


Synopsis As Introduced
Amends the Illinois Water Well Construction Code. Provides that the minimum lateral setback distance between a closed-loop well and a storm sewer, sanitary sewer, combined sewer, or any other potential source of contamination is 5 feet. Specifies that setbacks from footing drains and pits, crawl spaces, and basements do not apply to closed-loop wells.

Actions 
DateChamber Action
  2/5/2024HouseFiled with the Clerk by Rep. Dave Vella
  2/6/2024HouseFirst Reading
  2/6/2024HouseReferred to Rules Committee
  2/14/2024HouseAssigned to Energy & Environment Committee
  3/27/2024HouseAdded Co-Sponsor Rep. Joyce Mason
  4/5/2024HouseRule 19(a) / Re-referred to Rules Committee