| | SB1673 Engrossed | | LRB099 09842 MGM 30054 b |
|
|
1 | | AN ACT concerning safety.
|
2 | | Be it enacted by the People of the State of Illinois,
|
3 | | represented in the General Assembly:
|
4 | | Section 5. The Environmental Protection Act is amended by |
5 | | changing Section 28.5 as follows:
|
6 | | (415 ILCS 5/28.5)
|
7 | | Sec. 28.5. Clean Air Act rules; fast-track.
|
8 | | (a) This Section applies through December 31, 2019 2014 and |
9 | | applies solely to the adoption of rules proposed by
the Agency |
10 | | and required to be adopted by the State under the Clean Air Act
|
11 | | as amended by the Clean Air Act Amendments of 1990 (CAAA).
|
12 | | (b) For purposes of this Section, a "fast-track" rulemaking |
13 | | proceeding
is a proceeding to promulgate a rule that the CAAA |
14 | | requires to be adopted. For the purposes of this Section, |
15 | | "requires to be adopted" refers only to those
regulations or |
16 | | parts of regulations for which the United States Environmental
|
17 | | Protection Agency is empowered to impose sanctions against the |
18 | | State for failure to adopt such rules. All fast-track rules |
19 | | must be adopted under
procedures set forth in this Section, |
20 | | unless another provision of this Act
specifies the method for |
21 | | adopting a specific rule.
|
22 | | (c) When the CAAA requires rules other than identical in |
23 | | substance rules
to be adopted, upon request by the Agency, the |
|
| | SB1673 Engrossed | - 2 - | LRB099 09842 MGM 30054 b |
|
|
1 | | Board must adopt rules under
fast-track rulemaking |
2 | | requirements.
|
3 | | (d) The Agency must submit its fast-track rulemaking |
4 | | proposal in the
following form:
|
5 | | (1) The Agency must file the rule in a form that meets |
6 | | the
requirements of the Illinois Administrative Procedure |
7 | | Act and regulations
promulgated thereunder.
|
8 | | (2) The cover sheet of the proposal shall prominently |
9 | | state that the
rule is being proposed under this Section.
|
10 | | (3) The proposal shall clearly identify the provisions |
11 | | and portions of
the federal statute, regulations, |
12 | | guidance, policy statement, or other
documents upon which |
13 | | the rule is based.
|
14 | | (4) The supporting documentation for the rule shall |
15 | | summarize the basis of the rule.
|
16 | | (5) The Agency must describe in general the alternative |
17 | | selected
and the basis for the alternative.
|
18 | | (6) The Agency must file a summary of economic and |
19 | | technical data
upon which it relied in drafting the rule.
|
20 | | (7) The Agency must provide a list of any documents |
21 | | upon which it
directly relied in drafting the rule or upon |
22 | | which it intends to rely at
the hearings and must provide |
23 | | such documents to the Board. Additionally,
the Agency must |
24 | | make such documents available at an appropriate
location |
25 | | for inspection and copying at the expense of the interested |
26 | | party.
|
|
| | SB1673 Engrossed | - 3 - | LRB099 09842 MGM 30054 b |
|
|
1 | | (8) The Agency must include in its submission a |
2 | | description of the
geographical area to which the rule is |
3 | | intended to apply, a description of
the process or |
4 | | processes affected, an identification by classes of the
|
5 | | entities expected to be affected, and a list of sources |
6 | | expected to be affected
by the rule to the extent known to |
7 | | the Agency.
|
8 | | (e) Within 14 days of receipt of the proposal, the Board |
9 | | must file the
rule for first notice under the Illinois |
10 | | Administrative Procedure Act and must
schedule all required |
11 | | hearings on the proposal and cause public notice to be
given in |
12 | | accordance with the Illinois Administrative Procedure Act and |
13 | | the
CAAA.
|
14 | | (f) The Board must set 3 hearings on the proposal, each of |
15 | | which shall
be scheduled to continue from day to day, excluding |
16 | | weekends and State and
federal holidays, until completed. The |
17 | | Board must
require the written submission of all testimony at |
18 | | least 10 days before a
hearing, with simultaneous service to |
19 | | all participants of record in the
proceeding as of 15 days |
20 | | prior to hearing, unless a waiver is granted by
the Board for |
21 | | good cause. In order to further expedite the hearings,
|
22 | | presubmitted testimony shall be accepted into the record |
23 | | without the reading of
the testimony at hearing, provided that |
24 | | the witness swears to the testimony and
is available for |
25 | | questioning, and the Board must make every effort to conduct
|
26 | | the proceedings expeditiously and avoid duplication and |
|
| | SB1673 Engrossed | - 4 - | LRB099 09842 MGM 30054 b |
|
|
1 | | extraneous material.
|
2 | | (1) The first hearing shall be held within 55 days of |
3 | | receipt of the
rule and shall be confined to testimony by |
4 | | and questions of the Agency's
witnesses concerning the |
5 | | scope, applicability, and basis of the rule.
Within 7 days |
6 | | after the first hearing, any person may request that the
|
7 | | second hearing be held.
|
8 | | (A) If, after the first hearing, the Agency and |
9 | | affected entities are
in agreement on the rule, the |
10 | | United States Environmental Protection Agency
has not |
11 | | informed the Board of any unresolved objection to the |
12 | | rule, and no
other interested party contests the rule |
13 | | or asks for the opportunity to present
additional |
14 | | evidence, the Board may cancel the additional |
15 | | hearings. When the
Board adopts the final order under |
16 | | these circumstances, it shall be based on
the Agency's |
17 | | proposal as agreed to by the parties.
|
18 | | (B) If, after the first hearing, the Agency and |
19 | | affected entities are in
agreement upon a portion of |
20 | | the rule, the United States Environmental
Protection |
21 | | Agency has not informed the Board of any unresolved |
22 | | objections
to that agreed portion of the rule, and no |
23 | | other interested party contests
that agreed portion of |
24 | | the rule or asks for the opportunity to present
|
25 | | additional evidence, the Board must proceed to the |
26 | | second hearing, as
provided in paragraph (2) of |
|
| | SB1673 Engrossed | - 5 - | LRB099 09842 MGM 30054 b |
|
|
1 | | subsection (g) of this Section, but the
hearing shall |
2 | | be limited in scope to the unresolved portion of the |
3 | | proposal.
When the Board adopts the final order under |
4 | | these circumstances, it shall
be based on such portion |
5 | | of the Agency's proposal as agreed to by the parties.
|
6 | | (2) The second hearing shall be scheduled to commence |
7 | | within 30 days
of the first day of the first hearing and |
8 | | shall be devoted to presentation of
testimony, documents, |
9 | | and comments by affected entities and all other
interested |
10 | | parties.
|
11 | | (3) The third hearing shall be scheduled to commence |
12 | | within 14 days
after the first day of the second hearing |
13 | | and shall be devoted solely to any
Agency response to the |
14 | | material submitted at the second hearing and to any
|
15 | | response by other parties. The third hearing shall be |
16 | | cancelled if the Agency
indicates to the Board that it does |
17 | | not intend to introduce any additional
material.
|
18 | | (g) In any fast-track rulemaking proceeding, the Board must |
19 | | accept
evidence and comments on the economic impact of any |
20 | | provision of the rule
and must consider the economic impact of |
21 | | the rule based on the record.
The Board may order an economic |
22 | | impact study in a manner that will not
prevent adoption of the |
23 | | rule within the time required by subsection (n)
of this |
24 | | Section.
|
25 | | (h) In all fast-track rulemakings under this Section, the |
26 | | Board must
take into account factors set forth in subsection |
|
| | SB1673 Engrossed | - 6 - | LRB099 09842 MGM 30054 b |
|
|
1 | | (a) of Section 27 of
this Act.
|
2 | | (i) The Board must adopt rules in the fast-track rulemaking |
3 | | docket
under the requirements of this Section that the CAAA |
4 | | requires to be
adopted, and may consider a non-required rule in |
5 | | a second docket that shall
proceed under Title VII of this Act.
|
6 | | (j) The Board is directed to take whatever measures are |
7 | | available to it
to complete fast-track rulemaking as |
8 | | expeditiously as possible consistent
with the need for careful |
9 | | consideration. These measures shall include, but
not be limited |
10 | | to, having hearings transcribed on an expedited basis.
|
11 | | (k) Following the hearings, the Board must close the record |
12 | | 14 days
after the availability of the transcript.
|
13 | | (l) The Board must not revise or otherwise change an Agency |
14 | | fast-track
rulemaking proposal without agreement of the Agency |
15 | | until after the end
of the hearing and comment period. Any |
16 | | revisions to an Agency
proposal shall be based on the record of |
17 | | the proceeding.
|
18 | | (m) All rules adopted by the Board under this Section shall |
19 | | be based
solely on the record before it.
|
20 | | (n) The Board must complete a fast-track rulemaking by |
21 | | adopting
a second notice order no later than 130 days after |
22 | | receipt of the proposal if
no third hearing is held and no |
23 | | later than 150 days if the third hearing is
held. If the order |
24 | | includes a rule, the Illinois Board must file the rule for
|
25 | | second notice under the Illinois Administrative Procedure Act |
26 | | within 5 days
after adoption of the order.
|