102ND GENERAL ASSEMBLY
State of Illinois
2021 and 2022
SB3037

 

Introduced 1/5/2022, by Sen. Patrick J. Joyce

 

SYNOPSIS AS INTRODUCED:
 
20 ILCS 3855/1-10
20 ILCS 3855/1-20
20 ILCS 3855/1-75

    Amends the Illinois Power Agency Act. Provides that the Illinois Power Agency is authorized to oversee the procurement by electric utilities that serve more than 3,000,000 customers in the State as of January 1, 2019 of renewable energy credits from new, newly modernized, or retooled hydroelectric facilities. Provides that the long-term renewable resources procurement plan shall prioritize compliance with the new wind, new photovoltaic, and hydroelectric procurement requirements (rather than the new wind and new photovoltaic procurement requirements). Provides that the Agency shall not comply with the annual percentage targets of the long-term renewable resources procurement plan by procuring renewable energy credits that are unlikely to lead to the development of new renewable resources or modernized or retooled hydroelectric resources (rather than the development of new renewable resources). Provides that the Agency shall consider other approaches, in addition to competitive procurements, to procure renewable energy credits from new and existing hydroelectric facilities to support the development and maintenance of these facilities. Provides that on and after the effective date of the amendatory Act, for all procurements of renewable energy credits from hydroelectric facilities, the Agency shall establish contract terms designed to optimize existing hydroelectric facilities through modernization or retooling. Provides that procurement of renewable energy credits from hydroelectric facilities shall comply with specified geographic requirements. Makes a change in provisions concerning definitions.


LRB102 22347 SPS 31484 b

 

 

A BILL FOR

 

SB3037LRB102 22347 SPS 31484 b

1    AN ACT concerning regulation.
 
2    Be it enacted by the People of the State of Illinois,
3represented in the General Assembly:
 
4    Section 5. The Illinois Power Agency Act is amended by
5changing Sections 1-10, 1-20, and 1-75 as follows:
 
6    (20 ILCS 3855/1-10)
7    Sec. 1-10. Definitions.
8    "Agency" means the Illinois Power Agency.
9    "Agency loan agreement" means any agreement pursuant to
10which the Illinois Finance Authority agrees to loan the
11proceeds of revenue bonds issued with respect to a project to
12the Agency upon terms providing for loan repayment
13installments at least sufficient to pay when due all principal
14of, interest and premium, if any, on those revenue bonds, and
15providing for maintenance, insurance, and other matters in
16respect of the project.
17    "Authority" means the Illinois Finance Authority.
18    "Brownfield site photovoltaic project" means photovoltaics
19that are either:
20        (1) interconnected to an electric utility as defined
21    in this Section, a municipal utility as defined in this
22    Section, a public utility as defined in Section 3-105 of
23    the Public Utilities Act, or an electric cooperative as

 

 

SB3037- 2 -LRB102 22347 SPS 31484 b

1    defined in Section 3-119 of the Public Utilities Act and
2    located at a site that is regulated by any of the following
3    entities under the following programs:
4            (A) the United States Environmental Protection
5        Agency under the federal Comprehensive Environmental
6        Response, Compensation, and Liability Act of 1980, as
7        amended;
8            (B) the United States Environmental Protection
9        Agency under the Corrective Action Program of the
10        federal Resource Conservation and Recovery Act, as
11        amended;
12            (C) the Illinois Environmental Protection Agency
13        under the Illinois Site Remediation Program; or
14            (D) the Illinois Environmental Protection Agency
15        under the Illinois Solid Waste Program; or
16        (2) located at the site of a coal mine that has
17    permanently ceased coal production, permanently halted any
18    re-mining operations, and is no longer accepting any coal
19    combustion residues; has both completed all clean-up and
20    remediation obligations under the federal Surface Mining
21    and Reclamation Act of 1977 and all applicable Illinois
22    rules and any other clean-up, remediation, or ongoing
23    monitoring to safeguard the health and well-being of the
24    people of the State of Illinois, as well as demonstrated
25    compliance with all applicable federal and State
26    environmental rules and regulations, including, but not

 

 

SB3037- 3 -LRB102 22347 SPS 31484 b

1    limited, to 35 Ill. Adm. Code Part 845 and any rules for
2    historic fill of coal combustion residuals, including any
3    rules finalized in Subdocket A of Illinois Pollution
4    Control Board docket R2020-019.
5    "Clean coal facility" means an electric generating
6facility that uses primarily coal as a feedstock and that
7captures and sequesters carbon dioxide emissions at the
8following levels: at least 50% of the total carbon dioxide
9emissions that the facility would otherwise emit if, at the
10time construction commences, the facility is scheduled to
11commence operation before 2016, at least 70% of the total
12carbon dioxide emissions that the facility would otherwise
13emit if, at the time construction commences, the facility is
14scheduled to commence operation during 2016 or 2017, and at
15least 90% of the total carbon dioxide emissions that the
16facility would otherwise emit if, at the time construction
17commences, the facility is scheduled to commence operation
18after 2017. The power block of the clean coal facility shall
19not exceed allowable emission rates for sulfur dioxide,
20nitrogen oxides, carbon monoxide, particulates and mercury for
21a natural gas-fired combined-cycle facility the same size as
22and in the same location as the clean coal facility at the time
23the clean coal facility obtains an approved air permit. All
24coal used by a clean coal facility shall have high volatile
25bituminous rank and greater than 1.7 pounds of sulfur per
26million btu content, unless the clean coal facility does not

 

 

SB3037- 4 -LRB102 22347 SPS 31484 b

1use gasification technology and was operating as a
2conventional coal-fired electric generating facility on June
31, 2009 (the effective date of Public Act 95-1027).
4    "Clean coal SNG brownfield facility" means a facility that
5(1) has commenced construction by July 1, 2015 on an urban
6brownfield site in a municipality with at least 1,000,000
7residents; (2) uses a gasification process to produce
8substitute natural gas; (3) uses coal as at least 50% of the
9total feedstock over the term of any sourcing agreement with a
10utility and the remainder of the feedstock may be either
11petroleum coke or coal, with all such coal having a high
12bituminous rank and greater than 1.7 pounds of sulfur per
13million Btu content unless the facility reasonably determines
14that it is necessary to use additional petroleum coke to
15deliver additional consumer savings, in which case the
16facility shall use coal for at least 35% of the total feedstock
17over the term of any sourcing agreement; and (4) captures and
18sequesters at least 85% of the total carbon dioxide emissions
19that the facility would otherwise emit.
20    "Clean coal SNG facility" means a facility that uses a
21gasification process to produce substitute natural gas, that
22sequesters at least 90% of the total carbon dioxide emissions
23that the facility would otherwise emit, that uses at least 90%
24coal as a feedstock, with all such coal having a high
25bituminous rank and greater than 1.7 pounds of sulfur per
26million btu content, and that has a valid and effective permit

 

 

SB3037- 5 -LRB102 22347 SPS 31484 b

1to construct emission sources and air pollution control
2equipment and approval with respect to the federal regulations
3for Prevention of Significant Deterioration of Air Quality
4(PSD) for the plant pursuant to the federal Clean Air Act;
5provided, however, a clean coal SNG brownfield facility shall
6not be a clean coal SNG facility.
7    "Clean energy" means energy generation that is 90% or
8greater free of carbon dioxide emissions.
9    "Commission" means the Illinois Commerce Commission.
10    "Community renewable generation project" means an electric
11generating facility that:
12        (1) is powered by wind, solar thermal energy,
13    photovoltaic cells or panels, biodiesel, crops and
14    untreated and unadulterated organic waste biomass, and
15    hydropower that does not involve new construction or
16    significant expansion of hydropower dams;
17        (2) is interconnected at the distribution system level
18    of an electric utility as defined in this Section, a
19    municipal utility as defined in this Section that owns or
20    operates electric distribution facilities, a public
21    utility as defined in Section 3-105 of the Public
22    Utilities Act, or an electric cooperative, as defined in
23    Section 3-119 of the Public Utilities Act;
24        (3) credits the value of electricity generated by the
25    facility to the subscribers of the facility; and
26        (4) is limited in nameplate capacity to less than or

 

 

SB3037- 6 -LRB102 22347 SPS 31484 b

1    equal to 5,000 kilowatts.
2    "Costs incurred in connection with the development and
3construction of a facility" means:
4        (1) the cost of acquisition of all real property,
5    fixtures, and improvements in connection therewith and
6    equipment, personal property, and other property, rights,
7    and easements acquired that are deemed necessary for the
8    operation and maintenance of the facility;
9        (2) financing costs with respect to bonds, notes, and
10    other evidences of indebtedness of the Agency;
11        (3) all origination, commitment, utilization,
12    facility, placement, underwriting, syndication, credit
13    enhancement, and rating agency fees;
14        (4) engineering, design, procurement, consulting,
15    legal, accounting, title insurance, survey, appraisal,
16    escrow, trustee, collateral agency, interest rate hedging,
17    interest rate swap, capitalized interest, contingency, as
18    required by lenders, and other financing costs, and other
19    expenses for professional services; and
20        (5) the costs of plans, specifications, site study and
21    investigation, installation, surveys, other Agency costs
22    and estimates of costs, and other expenses necessary or
23    incidental to determining the feasibility of any project,
24    together with such other expenses as may be necessary or
25    incidental to the financing, insuring, acquisition, and
26    construction of a specific project and starting up,

 

 

SB3037- 7 -LRB102 22347 SPS 31484 b

1    commissioning, and placing that project in operation.
2    "Delivery services" has the same definition as found in
3Section 16-102 of the Public Utilities Act.
4    "Delivery year" means the consecutive 12-month period
5beginning June 1 of a given year and ending May 31 of the
6following year.
7    "Department" means the Department of Commerce and Economic
8Opportunity.
9    "Director" means the Director of the Illinois Power
10Agency.
11    "Demand-response" means measures that decrease peak
12electricity demand or shift demand from peak to off-peak
13periods.
14    "Distributed renewable energy generation device" means a
15device that is:
16        (1) powered by wind, solar thermal energy,
17    photovoltaic cells or panels, biodiesel, crops and
18    untreated and unadulterated organic waste biomass, tree
19    waste, and hydropower that does not involve new
20    construction or significant expansion of hydropower dams,
21    waste heat to power systems, or qualified combined heat
22    and power systems;
23        (2) interconnected at the distribution system level of
24    either an electric utility as defined in this Section, a
25    municipal utility as defined in this Section that owns or
26    operates electric distribution facilities, or a rural

 

 

SB3037- 8 -LRB102 22347 SPS 31484 b

1    electric cooperative as defined in Section 3-119 of the
2    Public Utilities Act;
3        (3) located on the customer side of the customer's
4    electric meter and is primarily used to offset that
5    customer's electricity load; and
6        (4) (blank).
7    "Energy efficiency" means measures that reduce the amount
8of electricity or natural gas consumed in order to achieve a
9given end use. "Energy efficiency" includes voltage
10optimization measures that optimize the voltage at points on
11the electric distribution voltage system and thereby reduce
12electricity consumption by electric customers' end use
13devices. "Energy efficiency" also includes measures that
14reduce the total Btus of electricity, natural gas, and other
15fuels needed to meet the end use or uses.
16    "Electric utility" has the same definition as found in
17Section 16-102 of the Public Utilities Act.
18    "Equity investment eligible community" or "eligible
19community" are synonymous and mean the geographic areas
20throughout Illinois which would most benefit from equitable
21investments by the State designed to combat discrimination.
22Specifically, the eligible communities shall be defined as the
23following areas:
24        (1) R3 Areas as established pursuant to Section 10-40
25    of the Cannabis Regulation and Tax Act, where residents
26    have historically been excluded from economic

 

 

SB3037- 9 -LRB102 22347 SPS 31484 b

1    opportunities, including opportunities in the energy
2    sector; and
3        (2) Environmental justice communities, as defined by
4    the Illinois Power Agency pursuant to the Illinois Power
5    Agency Act, where residents have historically been subject
6    to disproportionate burdens of pollution, including
7    pollution from the energy sector.
8    "Equity eligible persons" or "eligible persons" means
9persons who would most benefit from equitable investments by
10the State designed to combat discrimination, specifically:
11        (1) persons who graduate from or are current or former
12    participants in the Clean Jobs Workforce Network Program,
13    the Clean Energy Contractor Incubator Program, the
14    Illinois Climate Works Preapprenticeship Program,
15    Returning Residents Clean Jobs Training Program, or the
16    Clean Energy Primes Contractor Accelerator Program, and
17    the solar training pipeline and multi-cultural jobs
18    program created in paragraphs (a)(1) and (a)(3) of Section
19    16-108.21 of the Public Utilities Act;
20        (2) persons who are graduates of or currently enrolled
21    in the foster care system;
22        (3) persons who were formerly incarcerated;
23        (4) persons whose primary residence is in an equity
24    investment eligible community.
25    "Equity eligible contractor" means a business that is
26majority-owned by eligible persons, or a nonprofit or

 

 

SB3037- 10 -LRB102 22347 SPS 31484 b

1cooperative that is majority-governed by eligible persons, or
2is a natural person that is an eligible person offering
3personal services as an independent contractor.
4    "Facility" means an electric generating unit or a
5co-generating unit that produces electricity along with
6related equipment necessary to connect the facility to an
7electric transmission or distribution system.
8    "General Contractor" means the entity or organization with
9main responsibility for the building of a construction project
10and who is the party signing the prime construction contract
11for the project.
12    "Governmental aggregator" means one or more units of local
13government that individually or collectively procure
14electricity to serve residential retail electrical loads
15located within its or their jurisdiction.
16    "High voltage direct current converter station" means the
17collection of equipment that converts direct current energy
18from a high voltage direct current transmission line into
19alternating current using Voltage Source Conversion technology
20and that is interconnected with transmission or distribution
21assets located in Illinois.
22    "High voltage direct current renewable energy credit"
23means a renewable energy credit associated with a renewable
24energy resource where the renewable energy resource has
25entered into a contract to transmit the energy associated with
26such renewable energy credit over high voltage direct current

 

 

SB3037- 11 -LRB102 22347 SPS 31484 b

1transmission facilities.
2    "High voltage direct current transmission facilities"
3means the collection of installed equipment that converts
4alternating current energy in one location to direct current
5and transmits that direct current energy to a high voltage
6direct current converter station using Voltage Source
7Conversion technology. "High voltage direct current
8transmission facilities" includes the high voltage direct
9current converter station itself and associated high voltage
10direct current transmission lines. Notwithstanding the
11preceding, after the effective date of this amendatory Act of
12the 102nd General Assembly, an otherwise qualifying collection
13of equipment does not qualify as high voltage direct current
14transmission facilities unless its developer entered into a
15project labor agreement, is capable of transmitting
16electricity at 525kv with an Illinois converter station
17located and interconnected in the region of the PJM
18Interconnection, LLC, and the system does not operate as a
19public utility, as that term is defined in Section 3-105 of the
20Public Utilities Act.
21    "Index price" means the real-time energy settlement price
22at the applicable Illinois trading hub, such as PJM-NIHUB or
23MISO-IL, for a given settlement period.
24    "Indexed renewable energy credit" means a tradable credit
25that represents the environmental attributes of one megawatt
26hour of energy produced from a renewable energy resource, the

 

 

SB3037- 12 -LRB102 22347 SPS 31484 b

1price of which shall be calculated by subtracting the strike
2price offered by a new utility-scale wind project or a new
3utility-scale photovoltaic project from the index price in a
4given settlement period.
5    "Indexed renewable energy credit counterparty" has the
6same meaning as "public utility" as defined in Section 3-105
7of the Public Utilities Act.
8    "Local government" means a unit of local government as
9defined in Section 1 of Article VII of the Illinois
10Constitution.
11    "Municipality" means a city, village, or incorporated
12town.
13    "Municipal utility" means a public utility owned and
14operated by any subdivision or municipal corporation of this
15State.
16    "Nameplate capacity" means the aggregate inverter
17nameplate capacity in kilowatts AC.
18    "Person" means any natural person, firm, partnership,
19corporation, either domestic or foreign, company, association,
20limited liability company, joint stock company, or association
21and includes any trustee, receiver, assignee, or personal
22representative thereof.
23    "Project" means the planning, bidding, and construction of
24a facility.
25    "Project labor agreement" means a pre-hire collective
26bargaining agreement that covers all terms and conditions of

 

 

SB3037- 13 -LRB102 22347 SPS 31484 b

1employment on a specific construction project and must include
2the following:
3        (1) provisions establishing the minimum hourly wage
4    for each class of labor organization employee;
5        (2) provisions establishing the benefits and other
6    compensation for each class of labor organization
7    employee;
8        (3) provisions establishing that no strike or disputes
9    will be engaged in by the labor organization employees;
10        (4) provisions establishing that no lockout or
11    disputes will be engaged in by the general contractor
12    building the project; and
13        (5) provisions for minorities and women, as defined
14    under the Business Enterprise for Minorities, Women, and
15    Persons with Disabilities Act, setting forth goals for
16    apprenticeship hours to be performed by minorities and
17    women and setting forth goals for total hours to be
18    performed by underrepresented minorities and women.
19    A labor organization and the general contractor building
20the project shall have the authority to include other terms
21and conditions as they deem necessary.
22    "Public utility" has the same definition as found in
23Section 3-105 of the Public Utilities Act.
24    "Qualified combined heat and power systems" means systems
25that, either simultaneously or sequentially, produce
26electricity and useful thermal energy from a single fuel

 

 

SB3037- 14 -LRB102 22347 SPS 31484 b

1source. Such systems are eligible for "renewable energy
2credits" in an amount equal to its total energy output where a
3renewable fuel is consumed or in an amount equal to the net
4reduction in nonrenewable fuel consumed on a total energy
5output basis.
6    "Real property" means any interest in land together with
7all structures, fixtures, and improvements thereon, including
8lands under water and riparian rights, any easements,
9covenants, licenses, leases, rights-of-way, uses, and other
10interests, together with any liens, judgments, mortgages, or
11other claims or security interests related to real property.
12    "Renewable energy credit" means a tradable credit that
13represents the environmental attributes of one megawatt hour
14of energy produced from a renewable energy resource.
15    "Renewable energy resources" includes energy and its
16associated renewable energy credit or renewable energy credits
17from wind, solar thermal energy, photovoltaic cells and
18panels, biodiesel, anaerobic digestion, crops and untreated
19and unadulterated organic waste biomass, and hydropower that
20does not involve new construction or significant expansion of
21hydropower dams, waste heat to power systems, or qualified
22combined heat and power systems. For purposes of this Act,
23landfill gas produced in the State is considered a renewable
24energy resource. "Renewable energy resources" does not include
25the incineration or burning of tires, garbage, general
26household, institutional, and commercial waste, industrial

 

 

SB3037- 15 -LRB102 22347 SPS 31484 b

1lunchroom or office waste, landscape waste, railroad
2crossties, utility poles, or construction or demolition
3debris, other than untreated and unadulterated waste wood.
4"Renewable energy resources" also includes high voltage direct
5current renewable energy credits and the associated energy
6converted to alternating current by a high voltage direct
7current converter station to the extent that: (1) the
8generator of such renewable energy resource contracted with a
9third party to transmit the energy over the high voltage
10direct current transmission facilities, and (2) the
11third-party contracting for delivery of renewable energy
12resources over the high voltage direct current transmission
13facilities have ownership rights over the unretired associated
14high voltage direct current renewable energy credit.
15    "Retail customer" has the same definition as found in
16Section 16-102 of the Public Utilities Act.
17    "Revenue bond" means any bond, note, or other evidence of
18indebtedness issued by the Authority, the principal and
19interest of which is payable solely from revenues or income
20derived from any project or activity of the Agency.
21    "Sequester" means permanent storage of carbon dioxide by
22injecting it into a saline aquifer, a depleted gas reservoir,
23or an oil reservoir, directly or through an enhanced oil
24recovery process that may involve intermediate storage,
25regardless of whether these activities are conducted by a
26clean coal facility, a clean coal SNG facility, a clean coal

 

 

SB3037- 16 -LRB102 22347 SPS 31484 b

1SNG brownfield facility, or a party with which a clean coal
2facility, clean coal SNG facility, or clean coal SNG
3brownfield facility has contracted for such purposes.
4    "Service area" has the same definition as found in Section
516-102 of the Public Utilities Act.
6    "Settlement period" means the period of time utilized by
7MISO and PJM and their successor organizations as the basis
8for settlement calculations in the real-time energy market.
9    "Sourcing agreement" means (i) in the case of an electric
10utility, an agreement between the owner of a clean coal
11facility and such electric utility, which agreement shall have
12terms and conditions meeting the requirements of paragraph (3)
13of subsection (d) of Section 1-75, (ii) in the case of an
14alternative retail electric supplier, an agreement between the
15owner of a clean coal facility and such alternative retail
16electric supplier, which agreement shall have terms and
17conditions meeting the requirements of Section 16-115(d)(5) of
18the Public Utilities Act, and (iii) in case of a gas utility,
19an agreement between the owner of a clean coal SNG brownfield
20facility and the gas utility, which agreement shall have the
21terms and conditions meeting the requirements of subsection
22(h-1) of Section 9-220 of the Public Utilities Act.
23    "Strike price" means a contract price for energy and
24renewable energy credits from a new utility-scale wind project
25or a new utility-scale photovoltaic project.
26    "Subscriber" means a person who (i) takes delivery service

 

 

SB3037- 17 -LRB102 22347 SPS 31484 b

1from an electric utility, and (ii) has a subscription of no
2less than 200 watts to a community renewable generation
3project that is located in the electric utility's service
4area. No subscriber's subscriptions may total more than 40% of
5the nameplate capacity of an individual community renewable
6generation project. Entities that are affiliated by virtue of
7a common parent shall not represent multiple subscriptions
8that total more than 40% of the nameplate capacity of an
9individual community renewable generation project.
10    "Subscription" means an interest in a community renewable
11generation project expressed in kilowatts, which is sized
12primarily to offset part or all of the subscriber's
13electricity usage.
14    "Substitute natural gas" or "SNG" means a gas manufactured
15by gasification of hydrocarbon feedstock, which is
16substantially interchangeable in use and distribution with
17conventional natural gas.
18    "Total resource cost test" or "TRC test" means a standard
19that is met if, for an investment in energy efficiency or
20demand-response measures, the benefit-cost ratio is greater
21than one. The benefit-cost ratio is the ratio of the net
22present value of the total benefits of the program to the net
23present value of the total costs as calculated over the
24lifetime of the measures. A total resource cost test compares
25the sum of avoided electric utility costs, representing the
26benefits that accrue to the system and the participant in the

 

 

SB3037- 18 -LRB102 22347 SPS 31484 b

1delivery of those efficiency measures and including avoided
2costs associated with reduced use of natural gas or other
3fuels, avoided costs associated with reduced water
4consumption, and avoided costs associated with reduced
5operation and maintenance costs, as well as other quantifiable
6societal benefits, to the sum of all incremental costs of
7end-use measures that are implemented due to the program
8(including both utility and participant contributions), plus
9costs to administer, deliver, and evaluate each demand-side
10program, to quantify the net savings obtained by substituting
11the demand-side program for supply resources. In calculating
12avoided costs of power and energy that an electric utility
13would otherwise have had to acquire, reasonable estimates
14shall be included of financial costs likely to be imposed by
15future regulations and legislation on emissions of greenhouse
16gases. In discounting future societal costs and benefits for
17the purpose of calculating net present values, a societal
18discount rate based on actual, long-term Treasury bond yields
19should be used. Notwithstanding anything to the contrary, the
20TRC test shall not include or take into account a calculation
21of market price suppression effects or demand reduction
22induced price effects.
23    "Utility-scale solar project" means an electric generating
24facility that:
25        (1) generates electricity using photovoltaic cells;
26    and

 

 

SB3037- 19 -LRB102 22347 SPS 31484 b

1        (2) has a nameplate capacity that is greater than
2    5,000 kilowatts.
3    "Utility-scale wind project" means an electric generating
4facility that:
5        (1) generates electricity using wind; and
6        (2) has a nameplate capacity that is greater than
7    5,000 kilowatts.
8    "Waste Heat to Power Systems" means systems that capture
9and generate electricity from energy that would otherwise be
10lost to the atmosphere without the use of additional fuel.
11    "Zero emission credit" means a tradable credit that
12represents the environmental attributes of one megawatt hour
13of energy produced from a zero emission facility.
14    "Zero emission facility" means a facility that: (1) is
15fueled by nuclear power; and (2) is interconnected with PJM
16Interconnection, LLC or the Midcontinent Independent System
17Operator, Inc., or their successors.
18(Source: P.A. 102-662, eff. 9-15-21.)
 
19    (20 ILCS 3855/1-20)
20    Sec. 1-20. General powers and duties of the Agency.
21    (a) The Agency is authorized to do each of the following:
22        (1) Develop electricity procurement plans to ensure
23    adequate, reliable, affordable, efficient, and
24    environmentally sustainable electric service at the lowest
25    total cost over time, taking into account any benefits of

 

 

SB3037- 20 -LRB102 22347 SPS 31484 b

1    price stability, for electric utilities that on December
2    31, 2005 provided electric service to at least 100,000
3    customers in Illinois and for small multi-jurisdictional
4    electric utilities that (A) on December 31, 2005 served
5    less than 100,000 customers in Illinois and (B) request a
6    procurement plan for their Illinois jurisdictional load.
7    Except as provided in paragraph (1.5) of this subsection
8    (a), the electricity procurement plans shall be updated on
9    an annual basis and shall include electricity generated
10    from renewable resources sufficient to achieve the
11    standards specified in this Act. Beginning with the
12    delivery year commencing June 1, 2017, develop procurement
13    plans to include zero emission credits generated from zero
14    emission facilities sufficient to achieve the standards
15    specified in this Act. Beginning with the delivery year
16    commencing on June 1, 2022, the Agency is authorized to
17    develop carbon mitigation credit procurement plans to
18    include carbon mitigation credits generated from
19    carbon-free energy resources sufficient to achieve the
20    standards specified in this Act.
21        (1.5) Develop a long-term renewable resources
22    procurement plan in accordance with subsection (c) of
23    Section 1-75 of this Act for renewable energy credits in
24    amounts sufficient to achieve the standards specified in
25    this Act for delivery years commencing June 1, 2017 and
26    for the programs and renewable energy credits specified in

 

 

SB3037- 21 -LRB102 22347 SPS 31484 b

1    Section 1-56 of this Act. Electricity procurement plans
2    for delivery years commencing after May 31, 2017, shall
3    not include procurement of renewable energy resources.
4        (2) Conduct competitive procurement processes to
5    procure the supply resources identified in the electricity
6    procurement plan, pursuant to Section 16-111.5 of the
7    Public Utilities Act, and, for the delivery year
8    commencing June 1, 2017, conduct procurement processes to
9    procure zero emission credits from zero emission
10    facilities, under subsection (d-5) of Section 1-75 of this
11    Act. For the delivery year commencing June 1, 2022, the
12    Agency is authorized to conduct procurement processes to
13    procure carbon mitigation credits from carbon-free energy
14    resources, under subsection (d-10) of Section 1-75 of this
15    Act.
16        (2.5) Beginning with the procurement for the 2017
17    delivery year, conduct competitive procurement processes
18    and implement programs to procure renewable energy credits
19    identified in the long-term renewable resources
20    procurement plan developed and approved under subsection
21    (c) of Section 1-75 of this Act and Section 16-111.5 of the
22    Public Utilities Act.
23        (2.10) Oversee the procurement by electric utilities
24    that served more than 300,000 customers in this State as
25    of January 1, 2019 of renewable energy credits from new
26    renewable energy facilities to be installed, along with

 

 

SB3037- 22 -LRB102 22347 SPS 31484 b

1    energy storage facilities, at or adjacent to the sites of
2    electric generating facilities that burned coal as their
3    primary fuel source as of January 1, 2016 in accordance
4    with subsection (c-5) of Section 1-75 of this Act.
5        (2.15) Oversee the procurement by electric utilities
6    that serve more than 3,000,000 customers in this State as
7    of January 1, 2019 of renewable energy credits from new,
8    newly modernized, or retooled hydroelectric facilities in
9    accordance with Section 1-75 of this Act.
10        (3) Develop electric generation and co-generation
11    facilities that use indigenous coal or renewable
12    resources, or both, financed with bonds issued by the
13    Illinois Finance Authority.
14        (4) Supply electricity from the Agency's facilities at
15    cost to one or more of the following: municipal electric
16    systems, governmental aggregators, or rural electric
17    cooperatives in Illinois.
18    (b) Except as otherwise limited by this Act, the Agency
19has all of the powers necessary or convenient to carry out the
20purposes and provisions of this Act, including without
21limitation, each of the following:
22        (1) To have a corporate seal, and to alter that seal at
23    pleasure, and to use it by causing it or a facsimile to be
24    affixed or impressed or reproduced in any other manner.
25        (2) To use the services of the Illinois Finance
26    Authority necessary to carry out the Agency's purposes.

 

 

SB3037- 23 -LRB102 22347 SPS 31484 b

1        (3) To negotiate and enter into loan agreements and
2    other agreements with the Illinois Finance Authority.
3        (4) To obtain and employ personnel and hire
4    consultants that are necessary to fulfill the Agency's
5    purposes, and to make expenditures for that purpose within
6    the appropriations for that purpose.
7        (5) To purchase, receive, take by grant, gift, devise,
8    bequest, or otherwise, lease, or otherwise acquire, own,
9    hold, improve, employ, use, and otherwise deal in and
10    with, real or personal property whether tangible or
11    intangible, or any interest therein, within the State.
12        (6) To acquire real or personal property, whether
13    tangible or intangible, including without limitation
14    property rights, interests in property, franchises,
15    obligations, contracts, and debt and equity securities,
16    and to do so by the exercise of the power of eminent domain
17    in accordance with Section 1-21; except that any real
18    property acquired by the exercise of the power of eminent
19    domain must be located within the State.
20        (7) To sell, convey, lease, exchange, transfer,
21    abandon, or otherwise dispose of, or mortgage, pledge, or
22    create a security interest in, any of its assets,
23    properties, or any interest therein, wherever situated.
24        (8) To purchase, take, receive, subscribe for, or
25    otherwise acquire, hold, make a tender offer for, vote,
26    employ, sell, lend, lease, exchange, transfer, or

 

 

SB3037- 24 -LRB102 22347 SPS 31484 b

1    otherwise dispose of, mortgage, pledge, or grant a
2    security interest in, use, and otherwise deal in and with,
3    bonds and other obligations, shares, or other securities
4    (or interests therein) issued by others, whether engaged
5    in a similar or different business or activity.
6        (9) To make and execute agreements, contracts, and
7    other instruments necessary or convenient in the exercise
8    of the powers and functions of the Agency under this Act,
9    including contracts with any person, including personal
10    service contracts, or with any local government, State
11    agency, or other entity; and all State agencies and all
12    local governments are authorized to enter into and do all
13    things necessary to perform any such agreement, contract,
14    or other instrument with the Agency. No such agreement,
15    contract, or other instrument shall exceed 40 years.
16        (10) To lend money, invest and reinvest its funds in
17    accordance with the Public Funds Investment Act, and take
18    and hold real and personal property as security for the
19    payment of funds loaned or invested.
20        (11) To borrow money at such rate or rates of interest
21    as the Agency may determine, issue its notes, bonds, or
22    other obligations to evidence that indebtedness, and
23    secure any of its obligations by mortgage or pledge of its
24    real or personal property, machinery, equipment,
25    structures, fixtures, inventories, revenues, grants, and
26    other funds as provided or any interest therein, wherever

 

 

SB3037- 25 -LRB102 22347 SPS 31484 b

1    situated.
2        (12) To enter into agreements with the Illinois
3    Finance Authority to issue bonds whether or not the income
4    therefrom is exempt from federal taxation.
5        (13) To procure insurance against any loss in
6    connection with its properties or operations in such
7    amount or amounts and from such insurers, including the
8    federal government, as it may deem necessary or desirable,
9    and to pay any premiums therefor.
10        (14) To negotiate and enter into agreements with
11    trustees or receivers appointed by United States
12    bankruptcy courts or federal district courts or in other
13    proceedings involving adjustment of debts and authorize
14    proceedings involving adjustment of debts and authorize
15    legal counsel for the Agency to appear in any such
16    proceedings.
17        (15) To file a petition under Chapter 9 of Title 11 of
18    the United States Bankruptcy Code or take other similar
19    action for the adjustment of its debts.
20        (16) To enter into management agreements for the
21    operation of any of the property or facilities owned by
22    the Agency.
23        (17) To enter into an agreement to transfer and to
24    transfer any land, facilities, fixtures, or equipment of
25    the Agency to one or more municipal electric systems,
26    governmental aggregators, or rural electric agencies or

 

 

SB3037- 26 -LRB102 22347 SPS 31484 b

1    cooperatives, for such consideration and upon such terms
2    as the Agency may determine to be in the best interest of
3    the residents of Illinois.
4        (18) To enter upon any lands and within any building
5    whenever in its judgment it may be necessary for the
6    purpose of making surveys and examinations to accomplish
7    any purpose authorized by this Act.
8        (19) To maintain an office or offices at such place or
9    places in the State as it may determine.
10        (20) To request information, and to make any inquiry,
11    investigation, survey, or study that the Agency may deem
12    necessary to enable it effectively to carry out the
13    provisions of this Act.
14        (21) To accept and expend appropriations.
15        (22) To engage in any activity or operation that is
16    incidental to and in furtherance of efficient operation to
17    accomplish the Agency's purposes, including hiring
18    employees that the Director deems essential for the
19    operations of the Agency.
20        (23) To adopt, revise, amend, and repeal rules with
21    respect to its operations, properties, and facilities as
22    may be necessary or convenient to carry out the purposes
23    of this Act, subject to the provisions of the Illinois
24    Administrative Procedure Act and Sections 1-22 and 1-35 of
25    this Act.
26        (24) To establish and collect charges and fees as

 

 

SB3037- 27 -LRB102 22347 SPS 31484 b

1    described in this Act.
2        (25) To conduct competitive gasification feedstock
3    procurement processes to procure the feedstocks for the
4    clean coal SNG brownfield facility in accordance with the
5    requirements of Section 1-78 of this Act.
6        (26) To review, revise, and approve sourcing
7    agreements and mediate and resolve disputes between gas
8    utilities and the clean coal SNG brownfield facility
9    pursuant to subsection (h-1) of Section 9-220 of the
10    Public Utilities Act.
11        (27) To request, review and accept proposals, execute
12    contracts, purchase renewable energy credits and otherwise
13    dedicate funds from the Illinois Power Agency Renewable
14    Energy Resources Fund to create and carry out the
15    objectives of the Illinois Solar for All Program in
16    accordance with Section 1-56 of this Act.
17        (28) To ensure Illinois residents and business benefit
18    from programs administered by the Agency and are properly
19    protected from any deceptive or misleading marketing
20    practices by participants in the Agency's programs and
21    procurements.
22    (c) In conducting the procurement of electricity or other
23products, beginning January 1, 2022, the Agency shall not
24procure any products or services from persons or organizations
25that are in violation of the Displaced Energy Workers Bill of
26Rights, as provided under the Energy Community Reinvestment

 

 

SB3037- 28 -LRB102 22347 SPS 31484 b

1Act at the time of the procurement event or fail to comply the
2labor standards established in subparagraph (Q) of paragraph
3(1) of subsection (c) of Section 1-75.
4(Source: P.A. 102-662, eff. 9-15-21.)
 
5    (20 ILCS 3855/1-75)
6    Sec. 1-75. Planning and Procurement Bureau. The Planning
7and Procurement Bureau has the following duties and
8responsibilities:
9    (a) The Planning and Procurement Bureau shall each year,
10beginning in 2008, develop procurement plans and conduct
11competitive procurement processes in accordance with the
12requirements of Section 16-111.5 of the Public Utilities Act
13for the eligible retail customers of electric utilities that
14on December 31, 2005 provided electric service to at least
15100,000 customers in Illinois. Beginning with the delivery
16year commencing on June 1, 2017, the Planning and Procurement
17Bureau shall develop plans and processes for the procurement
18of zero emission credits from zero emission facilities in
19accordance with the requirements of subsection (d-5) of this
20Section. Beginning on the effective date of this amendatory
21Act of the 102nd General Assembly, the Planning and
22Procurement Bureau shall develop plans and processes for the
23procurement of carbon mitigation credits from carbon-free
24energy resources in accordance with the requirements of
25subsection (d-10) of this Section. The Planning and

 

 

SB3037- 29 -LRB102 22347 SPS 31484 b

1Procurement Bureau shall also develop procurement plans and
2conduct competitive procurement processes in accordance with
3the requirements of Section 16-111.5 of the Public Utilities
4Act for the eligible retail customers of small
5multi-jurisdictional electric utilities that (i) on December
631, 2005 served less than 100,000 customers in Illinois and
7(ii) request a procurement plan for their Illinois
8jurisdictional load. This Section shall not apply to a small
9multi-jurisdictional utility until such time as a small
10multi-jurisdictional utility requests the Agency to prepare a
11procurement plan for their Illinois jurisdictional load. For
12the purposes of this Section, the term "eligible retail
13customers" has the same definition as found in Section
1416-111.5(a) of the Public Utilities Act.
15    Beginning with the plan or plans to be implemented in the
162017 delivery year, the Agency shall no longer include the
17procurement of renewable energy resources in the annual
18procurement plans required by this subsection (a), except as
19provided in subsection (q) of Section 16-111.5 of the Public
20Utilities Act, and shall instead develop a long-term renewable
21resources procurement plan in accordance with subsection (c)
22of this Section and Section 16-111.5 of the Public Utilities
23Act.
24    In accordance with subsection (c-5) of this Section, the
25Planning and Procurement Bureau shall oversee the procurement
26by electric utilities that served more than 300,000 retail

 

 

SB3037- 30 -LRB102 22347 SPS 31484 b

1customers in this State as of January 1, 2019 of renewable
2energy credits from new utility-scale solar projects to be
3installed, along with energy storage facilities, at or
4adjacent to the sites of electric generating facilities that,
5as of January 1, 2016, burned coal as their primary fuel
6source.
7        (1) The Agency shall each year, beginning in 2008, as
8    needed, issue a request for qualifications for experts or
9    expert consulting firms to develop the procurement plans
10    in accordance with Section 16-111.5 of the Public
11    Utilities Act. In order to qualify an expert or expert
12    consulting firm must have:
13            (A) direct previous experience assembling
14        large-scale power supply plans or portfolios for
15        end-use customers;
16            (B) an advanced degree in economics, mathematics,
17        engineering, risk management, or a related area of
18        study;
19            (C) 10 years of experience in the electricity
20        sector, including managing supply risk;
21            (D) expertise in wholesale electricity market
22        rules, including those established by the Federal
23        Energy Regulatory Commission and regional transmission
24        organizations;
25            (E) expertise in credit protocols and familiarity
26        with contract protocols;

 

 

SB3037- 31 -LRB102 22347 SPS 31484 b

1            (F) adequate resources to perform and fulfill the
2        required functions and responsibilities; and
3            (G) the absence of a conflict of interest and
4        inappropriate bias for or against potential bidders or
5        the affected electric utilities.
6        (2) The Agency shall each year, as needed, issue a
7    request for qualifications for a procurement administrator
8    to conduct the competitive procurement processes in
9    accordance with Section 16-111.5 of the Public Utilities
10    Act. In order to qualify an expert or expert consulting
11    firm must have:
12            (A) direct previous experience administering a
13        large-scale competitive procurement process;
14            (B) an advanced degree in economics, mathematics,
15        engineering, or a related area of study;
16            (C) 10 years of experience in the electricity
17        sector, including risk management experience;
18            (D) expertise in wholesale electricity market
19        rules, including those established by the Federal
20        Energy Regulatory Commission and regional transmission
21        organizations;
22            (E) expertise in credit and contract protocols;
23            (F) adequate resources to perform and fulfill the
24        required functions and responsibilities; and
25            (G) the absence of a conflict of interest and
26        inappropriate bias for or against potential bidders or

 

 

SB3037- 32 -LRB102 22347 SPS 31484 b

1        the affected electric utilities.
2        (3) The Agency shall provide affected utilities and
3    other interested parties with the lists of qualified
4    experts or expert consulting firms identified through the
5    request for qualifications processes that are under
6    consideration to develop the procurement plans and to
7    serve as the procurement administrator. The Agency shall
8    also provide each qualified expert's or expert consulting
9    firm's response to the request for qualifications. All
10    information provided under this subparagraph shall also be
11    provided to the Commission. The Agency may provide by rule
12    for fees associated with supplying the information to
13    utilities and other interested parties. These parties
14    shall, within 5 business days, notify the Agency in
15    writing if they object to any experts or expert consulting
16    firms on the lists. Objections shall be based on:
17            (A) failure to satisfy qualification criteria;
18            (B) identification of a conflict of interest; or
19            (C) evidence of inappropriate bias for or against
20        potential bidders or the affected utilities.
21        The Agency shall remove experts or expert consulting
22    firms from the lists within 10 days if there is a
23    reasonable basis for an objection and provide the updated
24    lists to the affected utilities and other interested
25    parties. If the Agency fails to remove an expert or expert
26    consulting firm from a list, an objecting party may seek

 

 

SB3037- 33 -LRB102 22347 SPS 31484 b

1    review by the Commission within 5 days thereafter by
2    filing a petition, and the Commission shall render a
3    ruling on the petition within 10 days. There is no right of
4    appeal of the Commission's ruling.
5        (4) The Agency shall issue requests for proposals to
6    the qualified experts or expert consulting firms to
7    develop a procurement plan for the affected utilities and
8    to serve as procurement administrator.
9        (5) The Agency shall select an expert or expert
10    consulting firm to develop procurement plans based on the
11    proposals submitted and shall award contracts of up to 5
12    years to those selected.
13        (6) The Agency shall select an expert or expert
14    consulting firm, with approval of the Commission, to serve
15    as procurement administrator based on the proposals
16    submitted. If the Commission rejects, within 5 days, the
17    Agency's selection, the Agency shall submit another
18    recommendation within 3 days based on the proposals
19    submitted. The Agency shall award a 5-year contract to the
20    expert or expert consulting firm so selected with
21    Commission approval.
22    (b) The experts or expert consulting firms retained by the
23Agency shall, as appropriate, prepare procurement plans, and
24conduct a competitive procurement process as prescribed in
25Section 16-111.5 of the Public Utilities Act, to ensure
26adequate, reliable, affordable, efficient, and environmentally

 

 

SB3037- 34 -LRB102 22347 SPS 31484 b

1sustainable electric service at the lowest total cost over
2time, taking into account any benefits of price stability, for
3eligible retail customers of electric utilities that on
4December 31, 2005 provided electric service to at least
5100,000 customers in the State of Illinois, and for eligible
6Illinois retail customers of small multi-jurisdictional
7electric utilities that (i) on December 31, 2005 served less
8than 100,000 customers in Illinois and (ii) request a
9procurement plan for their Illinois jurisdictional load.
10    (c) Renewable portfolio standard.
11        (1)(A) The Agency shall develop a long-term renewable
12    resources procurement plan that shall include procurement
13    programs and competitive procurement events necessary to
14    meet the goals set forth in this subsection (c). The
15    initial long-term renewable resources procurement plan
16    shall be released for comment no later than 160 days after
17    June 1, 2017 (the effective date of Public Act 99-906).
18    The Agency shall review, and may revise on an expedited
19    basis, the long-term renewable resources procurement plan
20    at least every 2 years, which shall be conducted in
21    conjunction with the procurement plan under Section
22    16-111.5 of the Public Utilities Act to the extent
23    practicable to minimize administrative expense. No later
24    than 120 days after the effective date of this amendatory
25    Act of the 102nd General Assembly, the Agency shall
26    release for comment a revision to the long-term renewable

 

 

SB3037- 35 -LRB102 22347 SPS 31484 b

1    resources procurement plan, updating elements of the most
2    recently approved plan as needed to comply with this
3    amendatory Act of the 102nd General Assembly, and any
4    long-term renewable resources procurement plan update
5    published by the Agency but not yet approved by the
6    Illinois Commerce Commission shall be withdrawn. The
7    long-term renewable resources procurement plans shall be
8    subject to review and approval by the Commission under
9    Section 16-111.5 of the Public Utilities Act.
10        (B) Subject to subparagraph (F) of this paragraph (1),
11    the long-term renewable resources procurement plan shall
12    attempt to meet the goals for procurement of renewable
13    energy credits at levels of at least the following overall
14    percentages: 13% by the 2017 delivery year; increasing by
15    at least 1.5% each delivery year thereafter to at least
16    25% by the 2025 delivery year; increasing by at least 3%
17    each delivery year thereafter to at least 40% by the 2030
18    delivery year, and continuing at no less than 40% for each
19    delivery year thereafter. The Agency shall attempt to
20    procure 50% by delivery year 2040. The Agency shall
21    determine the annual increase between delivery year 2030
22    and delivery year 2040, if any, taking into account energy
23    demand, other energy resources, and other public policy
24    goals. In the event of a conflict between these goals and
25    the new wind, and new photovoltaic, and hydroelectric
26    procurement requirements described in items (i) through

 

 

SB3037- 36 -LRB102 22347 SPS 31484 b

1    (iii) of subparagraph (C) of this paragraph (1), the
2    long-term plan shall prioritize compliance with the new
3    wind, and new photovoltaic, and hydroelectric procurement
4    requirements described in items (i) through (iii) of
5    subparagraph (C) of this paragraph (1) over the annual
6    percentage targets described in this subparagraph (B). The
7    Agency shall not comply with the annual percentage targets
8    described in this subparagraph (B) by procuring renewable
9    energy credits that are unlikely to lead to the
10    development of new renewable resources or modernized or
11    retooled hydroelectric resources.
12        For the delivery year beginning June 1, 2017, the
13    procurement plan shall attempt to include, subject to the
14    prioritization outlined in this subparagraph (B),
15    cost-effective renewable energy resources equal to at
16    least 13% of each utility's load for eligible retail
17    customers and 13% of the applicable portion of each
18    utility's load for retail customers who are not eligible
19    retail customers, which applicable portion shall equal 50%
20    of the utility's load for retail customers who are not
21    eligible retail customers on February 28, 2017.
22        For the delivery year beginning June 1, 2018, the
23    procurement plan shall attempt to include, subject to the
24    prioritization outlined in this subparagraph (B),
25    cost-effective renewable energy resources equal to at
26    least 14.5% of each utility's load for eligible retail

 

 

SB3037- 37 -LRB102 22347 SPS 31484 b

1    customers and 14.5% of the applicable portion of each
2    utility's load for retail customers who are not eligible
3    retail customers, which applicable portion shall equal 75%
4    of the utility's load for retail customers who are not
5    eligible retail customers on February 28, 2017.
6        For the delivery year beginning June 1, 2019, and for
7    each year thereafter, the procurement plans shall attempt
8    to include, subject to the prioritization outlined in this
9    subparagraph (B), cost-effective renewable energy
10    resources equal to a minimum percentage of each utility's
11    load for all retail customers as follows: 16% by June 1,
12    2019; increasing by 1.5% each year thereafter to 25% by
13    June 1, 2025; and 25% by June 1, 2026; increasing by at
14    least 3% each delivery year thereafter to at least 40% by
15    the 2030 delivery year, and continuing at no less than 40%
16    for each delivery year thereafter. The Agency shall
17    attempt to procure 50% by delivery year 2040. The Agency
18    shall determine the annual increase between delivery year
19    2030 and delivery year 2040, if any, taking into account
20    energy demand, other energy resources, and other public
21    policy goals.
22        For each delivery year, the Agency shall first
23    recognize each utility's obligations for that delivery
24    year under existing contracts. Any renewable energy
25    credits under existing contracts, including renewable
26    energy credits as part of renewable energy resources,

 

 

SB3037- 38 -LRB102 22347 SPS 31484 b

1    shall be used to meet the goals set forth in this
2    subsection (c) for the delivery year.
3        (C) The long-term renewable resources procurement plan
4    described in subparagraph (A) of this paragraph (1) shall
5    include the procurement of renewable energy credits from
6    new projects pursuant to in amounts equal to at least the
7    following terms:
8            (i) At least 10,000,000 renewable energy credits
9        delivered annually by the end of the 2021 delivery
10        year, and increasing ratably to reach 45,000,000
11        renewable energy credits delivered annually from new
12        wind and solar projects by the end of delivery year
13        2030 such that the goals in subparagraph (B) of this
14        paragraph (1) are met entirely by procurements of
15        renewable energy credits from new wind and
16        photovoltaic projects. Of that amount, to the extent
17        possible, the Agency shall procure 45% from wind
18        projects and 55% from photovoltaic projects. Of the
19        amount to be procured from photovoltaic projects, the
20        Agency shall procure: at least 50% from solar
21        photovoltaic projects using the program outlined in
22        subparagraph (K) of this paragraph (1) from
23        distributed renewable energy generation devices or
24        community renewable generation projects; at least 47%
25        from utility-scale solar projects; at least 3% from
26        brownfield site photovoltaic projects that are not

 

 

SB3037- 39 -LRB102 22347 SPS 31484 b

1        community renewable generation projects. For utilities
2        that serve more than 3,000,000 customers in this State
3        as of January 1, 2019, the Agency shall procure
4        additional renewable energy credits from new, newly
5        modernized, or retooled hydroelectric facilities.
6            In developing the long-term renewable resources
7        procurement plan, the Agency shall consider other
8        approaches, in addition to competitive procurements,
9        that can be used to procure renewable energy credits
10        from brownfield site photovoltaic projects and thereby
11        help return blighted or contaminated land to
12        productive use while enhancing public health and the
13        well-being of Illinois residents, including those in
14        environmental justice communities, as defined using
15        existing methodologies and findings used by the Agency
16        and its Administrator in its Illinois Solar for All
17        Program. The Agency shall also consider other
18        approaches, in addition to competitive procurements,
19        to procure renewable energy credits from new and
20        existing hydroelectric facilities to support the
21        development and maintenance of these facilities.
22            (ii) In any given delivery year, if forecasted
23        expenses are less than the maximum budget available
24        under subparagraph (E) of this paragraph (1), the
25        Agency shall continue to procure new renewable energy
26        credits until that budget is exhausted in the manner

 

 

SB3037- 40 -LRB102 22347 SPS 31484 b

1        outlined in item (i) of this subparagraph (C).
2            (iii) For purposes of this Section:
3            "New wind projects" means wind renewable energy
4        facilities that are energized after June 1, 2017 for
5        the delivery year commencing June 1, 2017.
6            "New photovoltaic projects" means photovoltaic
7        renewable energy facilities that are energized after
8        June 1, 2017. Photovoltaic projects developed under
9        Section 1-56 of this Act shall not apply towards the
10        new photovoltaic project requirements in this
11        subparagraph (C).
12            For purposes of calculating whether the Agency has
13        procured enough new wind and solar renewable energy
14        credits required by this subparagraph (C), renewable
15        energy facilities that have a multi-year renewable
16        energy credit delivery contract with the utility
17        through at least delivery year 2030 shall be
18        considered new, however no renewable energy credits
19        from contracts entered into before June 1, 2021 shall
20        be used to calculate whether the Agency has procured
21        the correct proportion of new wind and new solar
22        contracts described in this subparagraph (C) for
23        delivery year 2021 and thereafter.
24        (D) Renewable energy credits shall be cost effective.
25    For purposes of this subsection (c), "cost effective"
26    means that the costs of procuring renewable energy

 

 

SB3037- 41 -LRB102 22347 SPS 31484 b

1    resources do not cause the limit stated in subparagraph
2    (E) of this paragraph (1) to be exceeded and, for
3    renewable energy credits procured through a competitive
4    procurement event, do not exceed benchmarks based on
5    market prices for like products in the region. For
6    purposes of this subsection (c), "like products" means
7    contracts for renewable energy credits from the same or
8    substantially similar technology, same or substantially
9    similar vintage (new or existing), the same or
10    substantially similar quantity, and the same or
11    substantially similar contract length and structure.
12    Benchmarks shall reflect development, financing, or
13    related costs resulting from requirements imposed through
14    other provisions of State law, including, but not limited
15    to, requirements in subparagraphs (P) and (Q) of this
16    paragraph (1) and the Renewable Energy Facilities
17    Agricultural Impact Mitigation Act. Confidential
18    benchmarks shall be developed by the procurement
19    administrator, in consultation with the Commission staff,
20    Agency staff, and the procurement monitor and shall be
21    subject to Commission review and approval. If price
22    benchmarks for like products in the region are not
23    available, the procurement administrator shall establish
24    price benchmarks based on publicly available data on
25    regional technology costs and expected current and future
26    regional energy prices. The benchmarks in this Section

 

 

SB3037- 42 -LRB102 22347 SPS 31484 b

1    shall not be used to curtail or otherwise reduce
2    contractual obligations entered into by or through the
3    Agency prior to June 1, 2017 (the effective date of Public
4    Act 99-906).
5        (E) For purposes of this subsection (c), the required
6    procurement of cost-effective renewable energy resources
7    for a particular year commencing prior to June 1, 2017
8    shall be measured as a percentage of the actual amount of
9    electricity (megawatt-hours) supplied by the electric
10    utility to eligible retail customers in the delivery year
11    ending immediately prior to the procurement, and, for
12    delivery years commencing on and after June 1, 2017, the
13    required procurement of cost-effective renewable energy
14    resources for a particular year shall be measured as a
15    percentage of the actual amount of electricity
16    (megawatt-hours) delivered by the electric utility in the
17    delivery year ending immediately prior to the procurement,
18    to all retail customers in its service territory. For
19    purposes of this subsection (c), the amount paid per
20    kilowatthour means the total amount paid for electric
21    service expressed on a per kilowatthour basis. For
22    purposes of this subsection (c), the total amount paid for
23    electric service includes without limitation amounts paid
24    for supply, transmission, capacity, distribution,
25    surcharges, and add-on taxes.
26        Notwithstanding the requirements of this subsection

 

 

SB3037- 43 -LRB102 22347 SPS 31484 b

1    (c), the total of renewable energy resources procured
2    under the procurement plan for any single year shall be
3    subject to the limitations of this subparagraph (E). Such
4    procurement shall be reduced for all retail customers
5    based on the amount necessary to limit the annual
6    estimated average net increase due to the costs of these
7    resources included in the amounts paid by eligible retail
8    customers in connection with electric service to no more
9    than 4.25% of the amount paid per kilowatthour by those
10    customers during the year ending May 31, 2009. To arrive
11    at a maximum dollar amount of renewable energy resources
12    to be procured for the particular delivery year, the
13    resulting per kilowatthour amount shall be applied to the
14    actual amount of kilowatthours of electricity delivered,
15    or applicable portion of such amount as specified in
16    paragraph (1) of this subsection (c), as applicable, by
17    the electric utility in the delivery year immediately
18    prior to the procurement to all retail customers in its
19    service territory. The calculations required by this
20    subparagraph (E) shall be made only once for each delivery
21    year at the time that the renewable energy resources are
22    procured. Once the determination as to the amount of
23    renewable energy resources to procure is made based on the
24    calculations set forth in this subparagraph (E) and the
25    contracts procuring those amounts are executed, no
26    subsequent rate impact determinations shall be made and no

 

 

SB3037- 44 -LRB102 22347 SPS 31484 b

1    adjustments to those contract amounts shall be allowed.
2    All costs incurred under such contracts shall be fully
3    recoverable by the electric utility as provided in this
4    Section.
5        (F) If the limitation on the amount of renewable
6    energy resources procured in subparagraph (E) of this
7    paragraph (1) prevents the Agency from meeting all of the
8    goals in this subsection (c), the Agency's long-term plan
9    shall prioritize compliance with the requirements of this
10    subsection (c) regarding renewable energy credits in the
11    following order:
12            (i) renewable energy credits under existing
13        contractual obligations as of June 1, 2021;
14            (i-5) funding for the Illinois Solar for All
15        Program, as described in subparagraph (O) of this
16        paragraph (1);
17            (ii) renewable energy credits necessary to comply
18        with the new wind and new photovoltaic procurement
19        requirements described in items (i) through (iii) of
20        subparagraph (C) of this paragraph (1); and
21            (iii) renewable energy credits necessary to meet
22        the remaining requirements of this subsection (c).
23        (G) The following provisions shall apply to the
24    Agency's procurement of renewable energy credits under
25    this subsection (c):
26            (i) Notwithstanding whether a long-term renewable

 

 

SB3037- 45 -LRB102 22347 SPS 31484 b

1        resources procurement plan has been approved, the
2        Agency shall conduct an initial forward procurement
3        for renewable energy credits from new utility-scale
4        wind projects within 160 days after June 1, 2017 (the
5        effective date of Public Act 99-906). For the purposes
6        of this initial forward procurement, the Agency shall
7        solicit 15-year contracts for delivery of 1,000,000
8        renewable energy credits delivered annually from new
9        utility-scale wind projects to begin delivery on June
10        1, 2019, if available, but not later than June 1, 2021,
11        unless the project has delays in the establishment of
12        an operating interconnection with the applicable
13        transmission or distribution system as a result of the
14        actions or inactions of the transmission or
15        distribution provider, or other causes for force
16        majeure as outlined in the procurement contract, in
17        which case, not later than June 1, 2022. Payments to
18        suppliers of renewable energy credits shall commence
19        upon delivery. Renewable energy credits procured under
20        this initial procurement shall be included in the
21        Agency's long-term plan and shall apply to all
22        renewable energy goals in this subsection (c).
23            (ii) Notwithstanding whether a long-term renewable
24        resources procurement plan has been approved, the
25        Agency shall conduct an initial forward procurement
26        for renewable energy credits from new utility-scale

 

 

SB3037- 46 -LRB102 22347 SPS 31484 b

1        solar projects and brownfield site photovoltaic
2        projects within one year after June 1, 2017 (the
3        effective date of Public Act 99-906). For the purposes
4        of this initial forward procurement, the Agency shall
5        solicit 15-year contracts for delivery of 1,000,000
6        renewable energy credits delivered annually from new
7        utility-scale solar projects and brownfield site
8        photovoltaic projects to begin delivery on June 1,
9        2019, if available, but not later than June 1, 2021,
10        unless the project has delays in the establishment of
11        an operating interconnection with the applicable
12        transmission or distribution system as a result of the
13        actions or inactions of the transmission or
14        distribution provider, or other causes for force
15        majeure as outlined in the procurement contract, in
16        which case, not later than June 1, 2022. The Agency may
17        structure this initial procurement in one or more
18        discrete procurement events. Payments to suppliers of
19        renewable energy credits shall commence upon delivery.
20        Renewable energy credits procured under this initial
21        procurement shall be included in the Agency's
22        long-term plan and shall apply to all renewable energy
23        goals in this subsection (c).
24            (iii) Notwithstanding whether the Commission has
25        approved the periodic long-term renewable resources
26        procurement plan revision described in Section

 

 

SB3037- 47 -LRB102 22347 SPS 31484 b

1        16-111.5 of the Public Utilities Act, the Agency shall
2        conduct at least one subsequent forward procurement
3        for renewable energy credits from new utility-scale
4        wind projects, new utility-scale solar projects, and
5        new brownfield site photovoltaic projects within 240
6        days after the effective date of this amendatory Act
7        of the 102nd General Assembly in quantities necessary
8        to meet the requirements of subparagraph (C) of this
9        paragraph (1) through the delivery year beginning June
10        1, 2021.
11            (iv) Notwithstanding whether the Commission has
12        approved the periodic long-term renewable resources
13        procurement plan revision described in Section
14        16-111.5 of the Public Utilities Act, the Agency shall
15        open capacity for each category in the Adjustable
16        Block program within 90 days after the effective date
17        of this amendatory Act of the 102nd General Assembly
18        manner:
19                (1) The Agency shall open the first block of
20            annual capacity for the category described in item
21            (i) of subparagraph (K) of this paragraph (1). The
22            first block of annual capacity for item (i) shall
23            be for at least 75 megawatts of total nameplate
24            capacity. The price of the renewable energy credit
25            for this block of capacity shall be 4% less than
26            the price of the last open block in this category.

 

 

SB3037- 48 -LRB102 22347 SPS 31484 b

1            Projects on a waitlist shall be awarded contracts
2            first in the order in which they appear on the
3            waitlist. Notwithstanding anything to the
4            contrary, for those renewable energy credits that
5            qualify and are procured under this subitem (1) of
6            this item (iv), the renewable energy credit
7            delivery contract value shall be paid in full,
8            based on the estimated generation during the first
9            15 years of operation, by the contracting
10            utilities at the time that the facility producing
11            the renewable energy credits is interconnected at
12            the distribution system level of the utility and
13            verified as energized and in compliance by the
14            Program Administrator. The electric utility shall
15            receive and retire all renewable energy credits
16            generated by the project for the first 15 years of
17            operation. Renewable energy credits generated by
18            the project thereafter shall not be transferred
19            under the renewable energy credit delivery
20            contract with the counterparty electric utility.
21                (2) The Agency shall open the first block of
22            annual capacity for the category described in item
23            (ii) of subparagraph (K) of this paragraph (1).
24            The first block of annual capacity for item (ii)
25            shall be for at least 75 megawatts of total
26            nameplate capacity.

 

 

SB3037- 49 -LRB102 22347 SPS 31484 b

1                    (A) The price of the renewable energy
2                credit for any project on a waitlist for this
3                category before the opening of this block
4                shall be 4% less than the price of the last
5                open block in this category. Projects on the
6                waitlist shall be awarded contracts first in
7                the order in which they appear on the
8                waitlist. Any projects that are less than or
9                equal to 25 kilowatts in size on the waitlist
10                for this capacity shall be moved to the
11                waitlist for paragraph (1) of this item (iv).
12                Notwithstanding anything to the contrary,
13                projects that were on the waitlist prior to
14                opening of this block shall not be required to
15                be in compliance with the requirements of
16                subparagraph (Q) of this paragraph (1) of this
17                subsection (c). Notwithstanding anything to
18                the contrary, for those renewable energy
19                credits procured from projects that were on
20                the waitlist for this category before the
21                opening of this block 20% of the renewable
22                energy credit delivery contract value, based
23                on the estimated generation during the first
24                15 years of operation, shall be paid by the
25                contracting utilities at the time that the
26                facility producing the renewable energy

 

 

SB3037- 50 -LRB102 22347 SPS 31484 b

1                credits is interconnected at the distribution
2                system level of the utility and verified as
3                energized by the Program Administrator. The
4                remaining portion shall be paid ratably over
5                the subsequent 4-year period. The electric
6                utility shall receive and retire all renewable
7                energy credits generated by the project during
8                the first 15 years of operation. Renewable
9                energy credits generated by the project
10                thereafter shall not be transferred under the
11                renewable energy credit delivery contract with
12                the counterparty electric utility.
13                    (B) The price of renewable energy credits
14                for any project not on the waitlist for this
15                category before the opening of the block shall
16                be determined and published by the Agency.
17                Projects not on a waitlist as of the opening
18                of this block shall be subject to the
19                requirements of subparagraph (Q) of this
20                paragraph (1), as applicable. Projects not on
21                a waitlist as of the opening of this block
22                shall be subject to the contract provisions
23                outlined in item (iii) of subparagraph (L) of
24                this paragraph (1). The Agency shall strive to
25                publish updated prices and an updated
26                renewable energy credit delivery contract as

 

 

SB3037- 51 -LRB102 22347 SPS 31484 b

1                quickly as possible.
2                (3) For opening the first 2 blocks of annual
3            capacity for projects participating in item (iii)
4            of subparagraph (K) of paragraph (1) of subsection
5            (c), projects shall be selected exclusively from
6            those projects on the ordinal waitlists of
7            community renewable generation projects
8            established by the Agency based on the status of
9            those ordinal waitlists as of December 31, 2020,
10            and only those projects previously determined to
11            be eligible for the Agency's April 2019 community
12            solar project selection process.
13                The first 2 blocks of annual capacity for item
14            (iii) shall be for 250 megawatts of total
15            nameplate capacity, with both blocks opening
16            simultaneously under the schedule outlined in the
17            paragraphs below. Projects shall be selected as
18            follows:
19                    (A) The geographic balance of selected
20                projects shall follow the Group classification
21                found in the Agency's Revised Long-Term
22                Renewable Resources Procurement Plan, with 70%
23                of capacity allocated to projects on the Group
24                B waitlist and 30% of capacity allocated to
25                projects on the Group A waitlist.
26                    (B) Contract awards for waitlisted

 

 

SB3037- 52 -LRB102 22347 SPS 31484 b

1                projects shall be allocated proportionate to
2                the total nameplate capacity amount across
3                both ordinal waitlists associated with that
4                applicant firm or its affiliates, subject to
5                the following conditions.
6                        (i) Each applicant firm having a
7                    waitlisted project eligible for selection
8                    shall receive no less than 500 kilowatts
9                    in awarded capacity across all groups, and
10                    no approved vendor may receive more than
11                    20% of each Group's waitlist allocation.
12                        (ii) Each applicant firm, upon
13                    receiving an award of program capacity
14                    proportionate to its waitlisted capacity,
15                    may then determine which waitlisted
16                    projects it chooses to be selected for a
17                    contract award up to that capacity amount.
18                        (iii) Assuming all other program
19                    requirements are met, applicant firms may
20                    adjust the nameplate capacity of applicant
21                    projects without losing waitlist
22                    eligibility, so long as no project is
23                    greater than 2,000 kilowatts in size.
24                        (iv) Assuming all other program
25                    requirements are met, applicant firms may
26                    adjust the expected production associated

 

 

SB3037- 53 -LRB102 22347 SPS 31484 b

1                    with applicant projects, subject to
2                    verification by the Program Administrator.
3                    (C) After a review of affiliate
4                information and the current ordinal waitlists,
5                the Agency shall announce the nameplate
6                capacity award amounts associated with
7                applicant firms no later than 90 days after
8                the effective date of this amendatory Act of
9                the 102nd General Assembly.
10                    (D) Applicant firms shall submit their
11                portfolio of projects used to satisfy those
12                contract awards no less than 90 days after the
13                Agency's announcement. The total nameplate
14                capacity of all projects used to satisfy that
15                portfolio shall be no greater than the
16                Agency's nameplate capacity award amount
17                associated with that applicant firm. An
18                applicant firm may decline, in whole or in
19                part, its nameplate capacity award without
20                penalty, with such unmet capacity rolled over
21                to the next block opening for project
22                selection under item (iii) of subparagraph (K)
23                of this subsection (c). Any projects not
24                included in an applicant firm's portfolio may
25                reapply without prejudice upon the next block
26                reopening for project selection under item

 

 

SB3037- 54 -LRB102 22347 SPS 31484 b

1                (iii) of subparagraph (K) of this subsection
2                (c).
3                    (E) The renewable energy credit delivery
4                contract shall be subject to the contract and
5                payment terms outlined in item (iv) of
6                subparagraph (L) of this subsection (c).
7                Contract instruments used for this
8                subparagraph shall contain the following
9                terms:
10                        (i) Renewable energy credit prices
11                    shall be fixed, without further adjustment
12                    under any other provision of this Act or
13                    for any other reason, at 10% lower than
14                    prices applicable to the last open block
15                    for this category, inclusive of any adders
16                    available for achieving a minimum of 50%
17                    of subscribers to the project's nameplate
18                    capacity being residential or small
19                    commercial customers with subscriptions of
20                    below 25 kilowatts in size;
21                        (ii) A requirement that a minimum of
22                    50% of subscribers to the project's
23                    nameplate capacity be residential or small
24                    commercial customers with subscriptions of
25                    below 25 kilowatts in size;
26                        (iii) Permission for the ability of a

 

 

SB3037- 55 -LRB102 22347 SPS 31484 b

1                    contract holder to substitute projects
2                    with other waitlisted projects without
3                    penalty should a project receive a
4                    non-binding estimate of costs to construct
5                    the interconnection facilities and any
6                    required distribution upgrades associated
7                    with that project of greater than 30 cents
8                    per watt AC of that project's nameplate
9                    capacity. In developing the applicable
10                    contract instrument, the Agency may
11                    consider whether other circumstances
12                    outside of the control of the applicant
13                    firm should also warrant project
14                    substitution rights.
15                    The Agency shall publish a finalized
16                updated renewable energy credit delivery
17                contract developed consistent with these terms
18                and conditions no less than 30 days before
19                applicant firms must submit their portfolio of
20                projects pursuant to item (D).
21                    (F) To be eligible for an award, the
22                applicant firm shall certify that not less
23                than prevailing wage, as determined pursuant
24                to the Illinois Prevailing Wage Act, was or
25                will be paid to employees who are engaged in
26                construction activities associated with a

 

 

SB3037- 56 -LRB102 22347 SPS 31484 b

1                selected project.
2                (4) The Agency shall open the first block of
3            annual capacity for the category described in item
4            (iv) of subparagraph (K) of this paragraph (1).
5            The first block of annual capacity for item (iv)
6            shall be for at least 50 megawatts of total
7            nameplate capacity. Renewable energy credit prices
8            shall be fixed, without further adjustment under
9            any other provision of this Act or for any other
10            reason, at the price in the last open block in the
11            category described in item (ii) of subparagraph
12            (K) of this paragraph (1). Pricing for future
13            blocks of annual capacity for this category may be
14            adjusted in the Agency's second revision to its
15            Long-Term Renewable Resources Procurement Plan.
16            Projects in this category shall be subject to the
17            contract terms outlined in item (iv) of
18            subparagraph (L) of this paragraph (1).
19                (5) The Agency shall open the equivalent of 2
20            years of annual capacity for the category
21            described in item (v) of subparagraph (K) of this
22            paragraph (1). The first block of annual capacity
23            for item (v) shall be for at least 10 megawatts of
24            total nameplate capacity. Notwithstanding the
25            provisions of item (v) of subparagraph (K) of this
26            paragraph (1), for the purpose of this initial

 

 

SB3037- 57 -LRB102 22347 SPS 31484 b

1            block, the agency shall accept new project
2            applications intended to increase the diversity of
3            areas hosting community solar projects, the
4            business models of projects, and the size of
5            projects, as described by the Agency in its
6            long-term renewable resources procurement plan
7            that is approved as of the effective date of this
8            amendatory Act of the 102nd General Assembly.
9            Projects in this category shall be subject to the
10            contract terms outlined in item (iii) of
11            subsection (L) of this paragraph (1).
12                (6) The Agency shall open the first blocks of
13            annual capacity for the category described in item
14            (vi) of subparagraph (K) of this paragraph (1),
15            with allocations of capacity within the block
16            generally matching the historical share of block
17            capacity allocated between the category described
18            in items (i) and (ii) of subparagraph (K) of this
19            paragraph (1). The first two blocks of annual
20            capacity for item (vi) shall be for at least 75
21            megawatts of total nameplate capacity. The price
22            of renewable energy credits for the blocks of
23            capacity shall be 4% less than the price of the
24            last open blocks in the categories described in
25            items (i) and (ii) of subparagraph (K) of this
26            paragraph (1). Pricing for future blocks of annual

 

 

SB3037- 58 -LRB102 22347 SPS 31484 b

1            capacity for this category may be adjusted in the
2            Agency's second revision to its Long-Term
3            Renewable Resources Procurement Plan. Projects in
4            this category shall be subject to the applicable
5            contract terms outlined in items (ii) and (iii) of
6            subparagraph (L) of this paragraph (1).
7            (v) Upon the effective date of this amendatory Act
8        of the 102nd General Assembly, for all competitive
9        procurements and any procurements of renewable energy
10        credits credit from new utility-scale wind and new
11        utility-scale photovoltaic projects, the Agency shall
12        procure indexed renewable energy credits and direct
13        respondents to offer a strike price.
14                (1) The purchase price of the indexed
15            renewable energy credit payment shall be
16            calculated for each settlement period. That
17            payment, for any settlement period, shall be equal
18            to the difference resulting from subtracting the
19            strike price from the index price for that
20            settlement period. If this difference results in a
21            negative number, the indexed REC counterparty
22            shall owe the seller the absolute value multiplied
23            by the quantity of energy produced in the relevant
24            settlement period. If this difference results in a
25            positive number, the seller shall owe the indexed
26            REC counterparty this amount multiplied by the

 

 

SB3037- 59 -LRB102 22347 SPS 31484 b

1            quantity of energy produced in the relevant
2            settlement period.
3                (2) Parties shall cash settle every month,
4            summing up all settlements (both positive and
5            negative, if applicable) for the prior month.
6                (3) To ensure funding in the annual budget
7            established under subparagraph (E) for indexed
8            renewable energy credit procurements for each year
9            of the term of such contracts, which must have a
10            minimum tenure of 20 calendar years, the
11            procurement administrator, Agency, Commission
12            staff, and procurement monitor shall quantify the
13            annual cost of the contract by utilizing an
14            industry-standard, third-party forward price curve
15            for energy at the appropriate hub or load zone,
16            including the estimated magnitude and timing of
17            the price effects related to federal carbon
18            controls. Each forward price curve shall contain a
19            specific value of the forecasted market price of
20            electricity for each annual delivery year of the
21            contract. For procurement planning purposes, the
22            impact on the annual budget for the cost of
23            indexed renewable energy credits for each delivery
24            year shall be determined as the expected annual
25            contract expenditure for that year, equaling the
26            difference between (i) the sum across all relevant

 

 

SB3037- 60 -LRB102 22347 SPS 31484 b

1            contracts of the applicable strike price
2            multiplied by contract quantity and (ii) the sum
3            across all relevant contracts of the forward price
4            curve for the applicable load zone for that year
5            multiplied by contract quantity. The contracting
6            utility shall not assume an obligation in excess
7            of the estimated annual cost of the contracts for
8            indexed renewable energy credits. Forward curves
9            shall be revised on an annual basis as updated
10            forward price curves are released and filed with
11            the Commission in the proceeding approving the
12            Agency's most recent long-term renewable resources
13            procurement plan. If the expected contract spend
14            is higher or lower than the total quantity of
15            contracts multiplied by the forward price curve
16            value for that year, the forward price curve shall
17            be updated by the procurement administrator, in
18            consultation with the Agency, Commission staff,
19            and procurement monitors, using then-currently
20            available price forecast data and additional
21            budget dollars shall be obligated or reobligated
22            as appropriate.
23                (4) To ensure that indexed renewable energy
24            credit prices remain predictable and affordable,
25            the Agency may consider the institution of a price
26            collar on REC prices paid under indexed renewable

 

 

SB3037- 61 -LRB102 22347 SPS 31484 b

1            energy credit procurements establishing floor and
2            ceiling REC prices applicable to indexed REC
3            contract prices. Any price collars applicable to
4            indexed REC procurements shall be proposed by the
5            Agency through its long-term renewable resources
6            procurement plan.
7            (v-5) On and after the effective date of this
8        amendatory Act of the 102nd General Assembly, for all
9        procurements of renewable energy credits from
10        hydroelectric facilities, the Agency shall establish
11        contract terms designed to optimize existing
12        hydroelectric facilities through modernization or
13        retooling.
14            (vi) All procurements under this subparagraph (G),
15        including the procurement of renewable energy credits
16        from hydroelectric facilities, shall comply with the
17        geographic requirements in subparagraph (I) of this
18        paragraph (1) and shall follow the procurement
19        processes and procedures described in this Section and
20        Section 16-111.5 of the Public Utilities Act to the
21        extent practicable, and these processes and procedures
22        may be expedited to accommodate the schedule
23        established by this subparagraph (G).
24        (H) The procurement of renewable energy resources for
25    a given delivery year shall be reduced as described in
26    this subparagraph (H) if an alternative retail electric

 

 

SB3037- 62 -LRB102 22347 SPS 31484 b

1    supplier meets the requirements described in this
2    subparagraph (H).
3            (i) Within 45 days after June 1, 2017 (the
4        effective date of Public Act 99-906), an alternative
5        retail electric supplier or its successor shall submit
6        an informational filing to the Illinois Commerce
7        Commission certifying that, as of December 31, 2015,
8        the alternative retail electric supplier owned one or
9        more electric generating facilities that generates
10        renewable energy resources as defined in Section 1-10
11        of this Act, provided that such facilities are not
12        powered by wind or photovoltaics, and the facilities
13        generate one renewable energy credit for each
14        megawatthour of energy produced from the facility.
15            The informational filing shall identify each
16        facility that was eligible to satisfy the alternative
17        retail electric supplier's obligations under Section
18        16-115D of the Public Utilities Act as described in
19        this item (i).
20            (ii) For a given delivery year, the alternative
21        retail electric supplier may elect to supply its
22        retail customers with renewable energy credits from
23        the facility or facilities described in item (i) of
24        this subparagraph (H) that continue to be owned by the
25        alternative retail electric supplier.
26            (iii) The alternative retail electric supplier

 

 

SB3037- 63 -LRB102 22347 SPS 31484 b

1        shall notify the Agency and the applicable utility, no
2        later than February 28 of the year preceding the
3        applicable delivery year or 15 days after June 1, 2017
4        (the effective date of Public Act 99-906), whichever
5        is later, of its election under item (ii) of this
6        subparagraph (H) to supply renewable energy credits to
7        retail customers of the utility. Such election shall
8        identify the amount of renewable energy credits to be
9        supplied by the alternative retail electric supplier
10        to the utility's retail customers and the source of
11        the renewable energy credits identified in the
12        informational filing as described in item (i) of this
13        subparagraph (H), subject to the following
14        limitations:
15                For the delivery year beginning June 1, 2018,
16            the maximum amount of renewable energy credits to
17            be supplied by an alternative retail electric
18            supplier under this subparagraph (H) shall be 68%
19            multiplied by 25% multiplied by 14.5% multiplied
20            by the amount of metered electricity
21            (megawatt-hours) delivered by the alternative
22            retail electric supplier to Illinois retail
23            customers during the delivery year ending May 31,
24            2016.
25                For delivery years beginning June 1, 2019 and
26            each year thereafter, the maximum amount of

 

 

SB3037- 64 -LRB102 22347 SPS 31484 b

1            renewable energy credits to be supplied by an
2            alternative retail electric supplier under this
3            subparagraph (H) shall be 68% multiplied by 50%
4            multiplied by 16% multiplied by the amount of
5            metered electricity (megawatt-hours) delivered by
6            the alternative retail electric supplier to
7            Illinois retail customers during the delivery year
8            ending May 31, 2016, provided that the 16% value
9            shall increase by 1.5% each delivery year
10            thereafter to 25% by the delivery year beginning
11            June 1, 2025, and thereafter the 25% value shall
12            apply to each delivery year.
13            For each delivery year, the total amount of
14        renewable energy credits supplied by all alternative
15        retail electric suppliers under this subparagraph (H)
16        shall not exceed 9% of the Illinois target renewable
17        energy credit quantity. The Illinois target renewable
18        energy credit quantity for the delivery year beginning
19        June 1, 2018 is 14.5% multiplied by the total amount of
20        metered electricity (megawatt-hours) delivered in the
21        delivery year immediately preceding that delivery
22        year, provided that the 14.5% shall increase by 1.5%
23        each delivery year thereafter to 25% by the delivery
24        year beginning June 1, 2025, and thereafter the 25%
25        value shall apply to each delivery year.
26            If the requirements set forth in items (i) through

 

 

SB3037- 65 -LRB102 22347 SPS 31484 b

1        (iii) of this subparagraph (H) are met, the charges
2        that would otherwise be applicable to the retail
3        customers of the alternative retail electric supplier
4        under paragraph (6) of this subsection (c) for the
5        applicable delivery year shall be reduced by the ratio
6        of the quantity of renewable energy credits supplied
7        by the alternative retail electric supplier compared
8        to that supplier's target renewable energy credit
9        quantity. The supplier's target renewable energy
10        credit quantity for the delivery year beginning June
11        1, 2018 is 14.5% multiplied by the total amount of
12        metered electricity (megawatt-hours) delivered by the
13        alternative retail supplier in that delivery year,
14        provided that the 14.5% shall increase by 1.5% each
15        delivery year thereafter to 25% by the delivery year
16        beginning June 1, 2025, and thereafter the 25% value
17        shall apply to each delivery year.
18            On or before April 1 of each year, the Agency shall
19        annually publish a report on its website that
20        identifies the aggregate amount of renewable energy
21        credits supplied by alternative retail electric
22        suppliers under this subparagraph (H).
23        (I) The Agency shall design its long-term renewable
24    energy procurement plan to maximize the State's interest
25    in the health, safety, and welfare of its residents,
26    including but not limited to minimizing sulfur dioxide,

 

 

SB3037- 66 -LRB102 22347 SPS 31484 b

1    nitrogen oxide, particulate matter and other pollution
2    that adversely affects public health in this State,
3    increasing fuel and resource diversity in this State,
4    enhancing the reliability and resiliency of the
5    electricity distribution system in this State, meeting
6    goals to limit carbon dioxide emissions under federal or
7    State law, and contributing to a cleaner and healthier
8    environment for the citizens of this State. In order to
9    further these legislative purposes, renewable energy
10    credits shall be eligible to be counted toward the
11    renewable energy requirements of this subsection (c) if
12    they are generated from facilities located in this State.
13    The Agency may qualify renewable energy credits from
14    facilities located in states adjacent to Illinois or
15    renewable energy credits associated with the electricity
16    generated by a utility-scale wind energy facility or
17    utility-scale photovoltaic facility and transmitted by a
18    qualifying direct current project described in subsection
19    (b-5) of Section 8-406 of the Public Utilities Act to a
20    delivery point on the electric transmission grid located
21    in this State or a state adjacent to Illinois, if the
22    generator demonstrates and the Agency determines that the
23    operation of such facility or facilities will help promote
24    the State's interest in the health, safety, and welfare of
25    its residents based on the public interest criteria
26    described above. For the purposes of this Section,

 

 

SB3037- 67 -LRB102 22347 SPS 31484 b

1    renewable resources that are delivered via a high voltage
2    direct current converter station located in Illinois shall
3    be deemed generated in Illinois at the time and location
4    the energy is converted to alternating current by the high
5    voltage direct current converter station if the high
6    voltage direct current transmission line: (i) after the
7    effective date of this amendatory Act of the 102nd General
8    Assembly, was constructed with a project labor agreement;
9    (ii) is capable of transmitting electricity at 525kv;
10    (iii) has an Illinois converter station located and
11    interconnected in the region of the PJM Interconnection,
12    LLC; (iv) does not operate as a public utility; and (v) if
13    the high voltage direct current transmission line was
14    energized after June 1, 2023. To ensure that the public
15    interest criteria are applied to the procurement and given
16    full effect, the Agency's long-term procurement plan shall
17    describe in detail how each public interest factor shall
18    be considered and weighted for facilities located in
19    states adjacent to Illinois.
20        (J) In order to promote the competitive development of
21    renewable energy resources in furtherance of the State's
22    interest in the health, safety, and welfare of its
23    residents, renewable energy credits shall not be eligible
24    to be counted toward the renewable energy requirements of
25    this subsection (c) if they are sourced from a generating
26    unit whose costs were being recovered through rates

 

 

SB3037- 68 -LRB102 22347 SPS 31484 b

1    regulated by this State or any other state or states on or
2    after January 1, 2017. Each contract executed to purchase
3    renewable energy credits under this subsection (c) shall
4    provide for the contract's termination if the costs of the
5    generating unit supplying the renewable energy credits
6    subsequently begin to be recovered through rates regulated
7    by this State or any other state or states; and each
8    contract shall further provide that, in that event, the
9    supplier of the credits must return 110% of all payments
10    received under the contract. Amounts returned under the
11    requirements of this subparagraph (J) shall be retained by
12    the utility and all of these amounts shall be used for the
13    procurement of additional renewable energy credits from
14    new wind or new photovoltaic resources as defined in this
15    subsection (c). The long-term plan shall provide that
16    these renewable energy credits shall be procured in the
17    next procurement event.
18        Notwithstanding the limitations of this subparagraph
19    (J), renewable energy credits sourced from generating
20    units that are constructed, purchased, owned, or leased by
21    an electric utility as part of an approved project,
22    program, or pilot under Section 1-56 of this Act shall be
23    eligible to be counted toward the renewable energy
24    requirements of this subsection (c), regardless of how the
25    costs of these units are recovered. As long as a
26    generating unit or an identifiable portion of a generating

 

 

SB3037- 69 -LRB102 22347 SPS 31484 b

1    unit has not had and does not have its costs recovered
2    through rates regulated by this State or any other state,
3    HVDC renewable energy credits associated with that
4    generating unit or identifiable portion thereof shall be
5    eligible to be counted toward the renewable energy
6    requirements of this subsection (c).
7        (K) The long-term renewable resources procurement plan
8    developed by the Agency in accordance with subparagraph
9    (A) of this paragraph (1) shall include an Adjustable
10    Block program for the procurement of renewable energy
11    credits from new photovoltaic projects that are
12    distributed renewable energy generation devices or new
13    photovoltaic community renewable generation projects. The
14    Adjustable Block program shall be generally designed to
15    provide for the steady, predictable, and sustainable
16    growth of new solar photovoltaic development in Illinois.
17    To this end, the Adjustable Block program shall provide a
18    transparent annual schedule of prices and quantities to
19    enable the photovoltaic market to scale up and for
20    renewable energy credit prices to adjust at a predictable
21    rate over time. The prices set by the Adjustable Block
22    program can be reflected as a set value or as the product
23    of a formula.
24        The Adjustable Block program shall include for each
25    category of eligible projects for each delivery year: a
26    single block of nameplate capacity, a price for renewable

 

 

SB3037- 70 -LRB102 22347 SPS 31484 b

1    energy credits within that block, and the terms and
2    conditions for securing a spot on a waitlist once the
3    block is fully committed or reserved. Except as outlined
4    below, the waitlist of projects in a given year will carry
5    over to apply to the subsequent year when another block is
6    opened. Only projects energized on or after June 1, 2017
7    shall be eligible for the Adjustable Block program. For
8    each category for each delivery year the Agency shall
9    determine the amount of generation capacity in each block,
10    and the purchase price for each block, provided that the
11    purchase price provided and the total amount of generation
12    in all blocks for all categories shall be sufficient to
13    meet the goals in this subsection (c). The Agency shall
14    strive to issue a single block sized to provide for
15    stability and market growth. The Agency shall establish
16    program eligibility requirements that ensure that projects
17    that enter the program are sufficiently mature to indicate
18    a demonstrable path to completion. The Agency may
19    periodically review its prior decisions establishing the
20    amount of generation capacity in each block, and the
21    purchase price for each block, and may propose, on an
22    expedited basis, changes to these previously set values,
23    including but not limited to redistributing these amounts
24    and the available funds as necessary and appropriate,
25    subject to Commission approval as part of the periodic
26    plan revision process described in Section 16-111.5 of the

 

 

SB3037- 71 -LRB102 22347 SPS 31484 b

1    Public Utilities Act. The Agency may define different
2    block sizes, purchase prices, or other distinct terms and
3    conditions for projects located in different utility
4    service territories if the Agency deems it necessary to
5    meet the goals in this subsection (c).
6        The Adjustable Block program shall include the
7    following categories in at least the following amounts:
8            (i) At least 20% from distributed renewable energy
9        generation devices with a nameplate capacity of no
10        more than 25 kilowatts.
11            (ii) At least 20% from distributed renewable
12        energy generation devices with a nameplate capacity of
13        more than 25 kilowatts and no more than 5,000
14        kilowatts. The Agency may create sub-categories within
15        this category to account for the differences between
16        projects for small commercial customers, large
17        commercial customers, and public or non-profit
18        customers.
19            (iii) At least 30% from photovoltaic community
20        renewable generation projects. Capacity for this
21        category for the first 2 delivery years after the
22        effective date of this amendatory Act of the 102nd
23        General Assembly shall be allocated to waitlist
24        projects as provided in paragraph (3) of item (iv) of
25        subparagraph (G). Starting in the third delivery year
26        after the effective date of this amendatory Act of the

 

 

SB3037- 72 -LRB102 22347 SPS 31484 b

1        102nd General Assembly or earlier if the Agency
2        determines there is additional capacity needed for to
3        meet previous delivery year requirements, the
4        following shall apply:
5                (1) the Agency shall select projects on a
6            first-come, first-serve basis, however the Agency
7            may suggest additional methods to prioritize
8            projects that are submitted at the same time;
9                (2) projects shall have subscriptions of 25 kW
10            or less for at least 50% of the facility's
11            nameplate capacity and the Agency shall price the
12            renewable energy credits with that as a factor;
13                (3) projects shall not be colocated with one
14            or more other community renewable generation
15            projects, as defined in the Agency's first revised
16            long-term renewable resources procurement plan
17            approved by the Commission on February 18, 2020,
18            such that the aggregate nameplate capacity exceeds
19            5,000 kilowatts; and
20                (4) projects greater than 2 MW may not apply
21            until after the approval of the Agency's revised
22            Long-Term Renewable Resources Procurement Plan
23            after the effective date of this amendatory Act of
24            the 102nd General Assembly.
25            (iv) At least 15% from distributed renewable
26        generation devices or photovoltaic community renewable

 

 

SB3037- 73 -LRB102 22347 SPS 31484 b

1        generation projects installed at public schools. The
2        Agency may create subcategories within this category
3        to account for the differences between project size or
4        location. Projects located within environmental
5        justice communities or within Organizational Units
6        that fall within Tier 1 or Tier 2 shall be given
7        priority. Each of the Agency's periodic updates to its
8        long-term renewable resources procurement plan to
9        incorporate the procurement described in this
10        subparagraph (iv) shall also include the proposed
11        quantities or blocks, pricing, and contract terms
12        applicable to the procurement as indicated herein. In
13        each such update and procurement, the Agency shall set
14        the renewable energy credit price and establish
15        payment terms for the renewable energy credits
16        procured pursuant to this subparagraph (iv) that make
17        it feasible and affordable for public schools to
18        install photovoltaic distributed renewable energy
19        devices on their premises, including, but not limited
20        to, those public schools subject to the prioritization
21        provisions of this subparagraph. For the purposes of
22        this item (iv):
23            "Environmental Justice Community" shall have the
24        same meaning set forth in the Agency's long-term
25        renewable resources procurement plan;
26            "Organization Unit", "Tier 1" and "Tier 2" shall

 

 

SB3037- 74 -LRB102 22347 SPS 31484 b

1        have the meanings set for in Section 18-8.15 of the
2        School Code;
3            "Public schools" shall have the meaning set forth
4        in Section 1-3 of the School Code.
5            (v) At least 5% from community-driven community
6        solar projects intended to provide more direct and
7        tangible connection and benefits to the communities
8        which they serve or in which they operate and,
9        additionally, to increase the variety of community
10        solar locations, models, and options in Illinois. As
11        part of its long-term renewable resources procurement
12        plan, the Agency shall develop selection criteria for
13        projects participating in this category. Nothing in
14        this Section shall preclude the Agency from creating a
15        selection process that maximizes community ownership
16        and community benefits in selecting projects to
17        receive renewable energy credits. Selection criteria
18        shall include:
19                (1) community ownership or community
20            wealth-building;
21                (2) additional direct and indirect community
22            benefit, beyond project participation as a
23            subscriber, including, but not limited to,
24            economic, environmental, social, cultural, and
25            physical benefits;
26                (3) meaningful involvement in project

 

 

SB3037- 75 -LRB102 22347 SPS 31484 b

1            organization and development by community members
2            or nonprofit organizations or public entities
3            located in or serving the community;
4                (4) engagement in project operations and
5            management by nonprofit organizations, public
6            entities, or community members; and
7                (5) whether a project is developed in response
8            to a site-specific RFP developed by community
9            members or a nonprofit organization or public
10            entity located in or serving the community.
11            Selection criteria may also prioritize projects
12        that:
13                (1) are developed in collaboration with or to
14            provide complementary opportunities for the Clean
15            Jobs Workforce Network Program, the Illinois
16            Climate Works Preapprenticeship Program, the
17            Returning Residents Clean Jobs Training Program,
18            the Clean Energy Contractor Incubator Program, or
19            the Clean Energy Primes Contractor Accelerator
20            Program;
21                (2) increase the diversity of locations of
22            community solar projects in Illinois, including by
23            locating in urban areas and population centers;
24                (3) are located in Equity Investment Eligible
25            Communities;
26                (4) are not greenfield projects;

 

 

SB3037- 76 -LRB102 22347 SPS 31484 b

1                (5) serve only local subscribers;
2                (6) have a nameplate capacity that does not
3            exceed 500 kW;
4                (7) are developed by an equity eligible
5            contractor; or
6                (8) otherwise meaningfully advance the goals
7            of providing more direct and tangible connection
8            and benefits to the communities which they serve
9            or in which they operate and increasing the
10            variety of community solar locations, models, and
11            options in Illinois.
12            For the purposes of this item (v):
13            "Community" means a social unit in which people
14        come together regularly to effect change; a social
15        unit in which participants are marked by a cooperative
16        spirit, a common purpose, or shared interests or
17        characteristics; or a space understood by its
18        residents to be delineated through geographic
19        boundaries or landmarks.
20            "Community benefit" means a range of services and
21        activities that provide affirmative, economic,
22        environmental, social, cultural, or physical value to
23        a community; or a mechanism that enables economic
24        development, high-quality employment, and education
25        opportunities for local workers and residents, or
26        formal monitoring and oversight structures such that

 

 

SB3037- 77 -LRB102 22347 SPS 31484 b

1        community members may ensure that those services and
2        activities respond to local knowledge and needs.
3            "Community ownership" means an arrangement in
4        which an electric generating facility is, or over time
5        will be, in significant part, owned collectively by
6        members of the community to which an electric
7        generating facility provides benefits; members of that
8        community participate in decisions regarding the
9        governance, operation, maintenance, and upgrades of
10        and to that facility; and members of that community
11        benefit from regular use of that facility.
12            Terms and guidance within these criteria that are
13        not defined in this item (v) shall be defined by the
14        Agency, with stakeholder input, during the development
15        of the Agency's long-term renewable resources
16        procurement plan. The Agency shall develop regular
17        opportunities for projects to submit applications for
18        projects under this category, and develop selection
19        criteria that gives preference to projects that better
20        meet individual criteria as well as projects that
21        address a higher number of criteria.
22            (vi) At least 10% from distributed renewable
23        energy generation devices, which includes distributed
24        renewable energy devices with a nameplate capacity
25        under 5,000 kilowatts or photovoltaic community
26        renewable generation projects, from applicants that

 

 

SB3037- 78 -LRB102 22347 SPS 31484 b

1        are equity eligible contractors. The Agency may create
2        subcategories within this category to account for the
3        differences between project size and type. The Agency
4        shall propose to increase the percentage in this item
5        (vi) over time to 40% based on factors, including, but
6        not limited to, the number of equity eligible
7        contractors and capacity used in this item (vi) in
8        previous delivery years.
9            The Agency shall propose a payment structure for
10        contracts executed pursuant to this paragraph under
11        which, upon a demonstration of qualification or need,
12        applicant firms are advanced capital disbursed after
13        contract execution but before the contracted project's
14        energization. The amount or percentage of capital
15        advanced prior to project energization shall be
16        sufficient to both cover any increase in development
17        costs resulting from prevailing wage requirements or
18        project-labor agreements, and designed to overcome
19        barriers in access to capital faced by equity eligible
20        contractors. The amount or percentage of advanced
21        capital may vary by subcategory within this category
22        and by an applicant's demonstration of need, with such
23        levels to be established through the Long-Term
24        Renewable Resources Procurement Plan authorized under
25        subparagraph (A) of paragraph (1) of subsection (c) of
26        this Section.

 

 

SB3037- 79 -LRB102 22347 SPS 31484 b

1            Contracts developed featuring capital advanced
2        prior to a project's energization shall feature
3        provisions to ensure both the successful development
4        of applicant projects and the delivery of the
5        renewable energy credits for the full term of the
6        contract, including ongoing collateral requirements
7        and other provisions deemed necessary by the Agency,
8        and may include energization timelines longer than for
9        comparable project types. The percentage or amount of
10        capital advanced prior to project energization shall
11        not operate to increase the overall contract value,
12        however contracts executed under this subparagraph may
13        feature renewable energy credit prices higher than
14        those offered to similar projects participating in
15        other categories. Capital advanced prior to
16        energization shall serve to reduce the ratable
17        payments made after energization under items (ii) and
18        (iii) of subparagraph (L) or payments made for each
19        renewable energy credit delivery under item (iv) of
20        subparagraph (L).
21            (vii) The remaining capacity shall be allocated by
22        the Agency in order to respond to market demand. The
23        Agency shall allocate any discretionary capacity prior
24        to the beginning of each delivery year.
25        To the extent there is uncontracted capacity from any
26    block in any of categories (i) through (vi) at the end of a

 

 

SB3037- 80 -LRB102 22347 SPS 31484 b

1    delivery year, the Agency shall redistribute that capacity
2    to one or more other categories giving priority to
3    categories with projects on a waitlist. The redistributed
4    capacity shall be added to the annual capacity in the
5    subsequent delivery year, and the price for renewable
6    energy credits shall be the price for the new delivery
7    year. Redistributed capacity shall not be considered
8    redistributed when determining whether the goals in this
9    subsection (K) have been met.
10        Notwithstanding anything to the contrary, as the
11    Agency increases the capacity in item (vi) to 40% over
12    time, the Agency may reduce the capacity of items (i)
13    through (v) proportionate to the capacity of the
14    categories of projects in item (vi), to achieve a balance
15    of project types.
16        The Adjustable Block program shall be designed to
17    ensure that renewable energy credits are procured from
18    projects in diverse locations and are not concentrated in
19    a few regional areas.
20        (L) Notwithstanding provisions for advancing capital
21    prior to project energization found in item (vi) of
22    subparagraph (K), the procurement of photovoltaic
23    renewable energy credits under items (i) through (vi) of
24    subparagraph (K) of this paragraph (1) shall otherwise be
25    subject to the following contract and payment terms:
26        (i) (Blank).

 

 

SB3037- 81 -LRB102 22347 SPS 31484 b

1            (ii) For those renewable energy credits that
2        qualify and are procured under item (i) of
3        subparagraph (K) of this paragraph (1), and any
4        similar category projects that are procured under item
5        (vi) of subparagraph (K) of this paragraph (1) that
6        qualify and are procured under item (vi), the contract
7        length shall be 15 years. The renewable energy credit
8        delivery contract value shall be paid in full, based
9        on the estimated generation during the first 15 years
10        of operation, by the contracting utilities at the time
11        that the facility producing the renewable energy
12        credits is interconnected at the distribution system
13        level of the utility and verified as energized and
14        compliant by the Program Administrator. The electric
15        utility shall receive and retire all renewable energy
16        credits generated by the project for the first 15
17        years of operation. Renewable energy credits generated
18        by the project thereafter shall not be transferred
19        under the renewable energy credit delivery contract
20        with the counterparty electric utility.
21            (iii) For those renewable energy credits that
22        qualify and are procured under item (ii) and (v) of
23        subparagraph (K) of this paragraph (1) and any like
24        projects similar category that qualify and are
25        procured under item (vi), the contract length shall be
26        15 years. 15% of the renewable energy credit delivery

 

 

SB3037- 82 -LRB102 22347 SPS 31484 b

1        contract value, based on the estimated generation
2        during the first 15 years of operation, shall be paid
3        by the contracting utilities at the time that the
4        facility producing the renewable energy credits is
5        interconnected at the distribution system level of the
6        utility and verified as energized and compliant by the
7        Program Administrator. The remaining portion shall be
8        paid ratably over the subsequent 6-year period. The
9        electric utility shall receive and retire all
10        renewable energy credits generated by the project for
11        the first 15 years of operation. Renewable energy
12        credits generated by the project thereafter shall not
13        be transferred under the renewable energy credit
14        delivery contract with the counterparty electric
15        utility.
16            (iv) For those renewable energy credits that
17        qualify and are procured under items (iii) and (iv) of
18        subparagraph (K) of this paragraph (1), and any like
19        projects that qualify and are procured under item
20        (vi), the renewable energy credit delivery contract
21        length shall be 20 years and shall be paid over the
22        delivery term, not to exceed during each delivery year
23        the contract price multiplied by the estimated annual
24        renewable energy credit generation amount. If
25        generation of renewable energy credits during a
26        delivery year exceeds the estimated annual generation

 

 

SB3037- 83 -LRB102 22347 SPS 31484 b

1        amount, the excess renewable energy credits shall be
2        carried forward to future delivery years and shall not
3        expire during the delivery term. If generation of
4        renewable energy credits during a delivery year,
5        including carried forward excess renewable energy
6        credits, if any, is less than the estimated annual
7        generation amount, payments during such delivery year
8        will not exceed the quantity generated plus the
9        quantity carried forward multiplied by the contract
10        price. The electric utility shall receive all
11        renewable energy credits generated by the project
12        during the first 20 years of operation and retire all
13        renewable energy credits paid for under this item (iv)
14        and return at the end of the delivery term all
15        renewable energy credits that were not paid for.
16        Renewable energy credits generated by the project
17        thereafter shall not be transferred under the
18        renewable energy credit delivery contract with the
19        counterparty electric utility. Notwithstanding the
20        preceding, for those projects participating under item
21        (iii) of subparagraph (K), the contract price for a
22        delivery year shall be based on subscription levels as
23        measured on the higher of the first business day of the
24        delivery year or the first business day 6 months after
25        the first business day of the delivery year.
26        Subscription of 90% of nameplate capacity or greater

 

 

SB3037- 84 -LRB102 22347 SPS 31484 b

1        shall be deemed to be fully subscribed for the
2        purposes of this item (iv). For projects receiving a
3        20-year delivery contract, REC prices shall be
4        adjusted downward for consistency with the incentive
5        levels previously determined to be necessary to
6        support projects under 15-year delivery contracts,
7        taking into consideration any additional new
8        requirements placed on the projects, including, but
9        not limited to, labor standards.
10            (v) Each contract shall include provisions to
11        ensure the delivery of the estimated quantity of
12        renewable energy credits and ongoing collateral
13        requirements and other provisions deemed appropriate
14        by the Agency.
15            (vi) The utility shall be the counterparty to the
16        contracts executed under this subparagraph (L) that
17        are approved by the Commission under the process
18        described in Section 16-111.5 of the Public Utilities
19        Act. No contract shall be executed for an amount that
20        is less than one renewable energy credit per year.
21            (vii) If, at any time, approved applications for
22        the Adjustable Block program exceed funds collected by
23        the electric utility or would cause the Agency to
24        exceed the limitation described in subparagraph (E) of
25        this paragraph (1) on the amount of renewable energy
26        resources that may be procured, then the Agency may

 

 

SB3037- 85 -LRB102 22347 SPS 31484 b

1        consider future uncommitted funds to be reserved for
2        these contracts on a first-come, first-served basis.
3            (viii) Nothing in this Section shall require the
4        utility to advance any payment or pay any amounts that
5        exceed the actual amount of revenues anticipated to be
6        collected by the utility under paragraph (6) of this
7        subsection (c) and subsection (k) of Section 16-108 of
8        the Public Utilities Act inclusive of eligible funds
9        collected in prior years and alternative compliance
10        payments for use by the utility, and contracts
11        executed under this Section shall expressly
12        incorporate this limitation.
13            (ix) Notwithstanding other requirements of this
14        subparagraph (L), no modification shall be required to
15        Adjustable Block program contracts if they were
16        already executed prior to the establishment, approval,
17        and implementation of new contract forms as a result
18        of this amendatory Act of the 102nd General Assembly.
19            (x) Contracts may be assignable, but only to
20        entities first deemed by the Agency to have met
21        program terms and requirements applicable to direct
22        program participation. In developing contracts for the
23        delivery of renewable energy credits, the Agency shall
24        be permitted to establish fees applicable to each
25        contract assignment.
26        (M) The Agency shall be authorized to retain one or

 

 

SB3037- 86 -LRB102 22347 SPS 31484 b

1    more experts or expert consulting firms to develop,
2    administer, implement, operate, and evaluate the
3    Adjustable Block program described in subparagraph (K) of
4    this paragraph (1), and the Agency shall retain the
5    consultant or consultants in the same manner, to the
6    extent practicable, as the Agency retains others to
7    administer provisions of this Act, including, but not
8    limited to, the procurement administrator. The selection
9    of experts and expert consulting firms and the procurement
10    process described in this subparagraph (M) are exempt from
11    the requirements of Section 20-10 of the Illinois
12    Procurement Code, under Section 20-10 of that Code. The
13    Agency shall strive to minimize administrative expenses in
14    the implementation of the Adjustable Block program.
15        The Program Administrator may charge application fees
16    to participating firms to cover the cost of program
17    administration. Any application fee amounts shall
18    initially be determined through the long-term renewable
19    resources procurement plan, and modifications to any
20    application fee that deviate more than 25% from the
21    Commission's approved value must be approved by the
22    Commission as a long-term plan revision under Section
23    16-111.5 of the Public Utilities Act. The Agency shall
24    consider stakeholder feedback when making adjustments to
25    application fees and shall notify stakeholders in advance
26    of any planned changes.

 

 

SB3037- 87 -LRB102 22347 SPS 31484 b

1        In addition to covering the costs of program
2    administration, the Agency, in conjunction with its
3    Program Administrator, may also use the proceeds of such
4    fees charged to participating firms to support public
5    education and ongoing regional and national coordination
6    with nonprofit organizations, public bodies, and others
7    engaged in the implementation of renewable energy
8    incentive programs or similar initiatives. This work may
9    include developing papers and reports, hosting regional
10    and national conferences, and other work deemed necessary
11    by the Agency to position the State of Illinois as a
12    national leader in renewable energy incentive program
13    development and administration.
14        The Agency and its consultant or consultants shall
15    monitor block activity, share program activity with
16    stakeholders and conduct quarterly meetings to discuss
17    program activity and market conditions. If necessary, the
18    Agency may make prospective administrative adjustments to
19    the Adjustable Block program design, such as making
20    adjustments to purchase prices as necessary to achieve the
21    goals of this subsection (c). Program modifications to any
22    block price that do not deviate from the Commission's
23    approved value by more than 10% shall take effect
24    immediately and are not subject to Commission review and
25    approval. Program modifications to any block price that
26    deviate more than 10% from the Commission's approved value

 

 

SB3037- 88 -LRB102 22347 SPS 31484 b

1    must be approved by the Commission as a long-term plan
2    amendment under Section 16-111.5 of the Public Utilities
3    Act. The Agency shall consider stakeholder feedback when
4    making adjustments to the Adjustable Block design and
5    shall notify stakeholders in advance of any planned
6    changes.
7        The Agency and its program administrators for both the
8    Adjustable Block program and the Illinois Solar for All
9    Program, consistent with the requirements of this
10    subsection (c) and subsection (b) of Section 1-56 of this
11    Act, shall propose the Adjustable Block program terms,
12    conditions, and requirements, including the prices to be
13    paid for renewable energy credits, where applicable, and
14    requirements applicable to participating entities and
15    project applications, through the development, review, and
16    approval of the Agency's long-term renewable resources
17    procurement plan described in this subsection (c) and
18    paragraph (5) of subsection (b) of Section 16-111.5 of the
19    Public Utilities Act. Terms, conditions, and requirements
20    for program participation shall include the following:
21            (i) The Agency shall establish a registration
22        process for entities seeking to qualify for
23        program-administered incentive funding and establish
24        baseline qualifications for vendor approval. The
25        Agency must maintain a list of approved entities on
26        each program's website, and may revoke a vendor's

 

 

SB3037- 89 -LRB102 22347 SPS 31484 b

1        ability to receive program-administered incentive
2        funding status upon a determination that the vendor
3        failed to comply with contract terms, the law, or
4        other program requirements.
5            (ii) The Agency shall establish program
6        requirements and minimum contract terms to ensure
7        projects are properly installed and produce their
8        expected amounts of energy. Program requirements may
9        include on-site inspections and photo documentation of
10        projects under construction. The Agency may require
11        repairs, alterations, or additions to remedy any
12        material deficiencies discovered. Vendors who have a
13        disproportionately high number of deficient systems
14        may lose their eligibility to continue to receive
15        State-administered incentive funding through Agency
16        programs and procurements.
17            (iii) To discourage deceptive marketing or other
18        bad faith business practices, the Agency may require
19        direct program participants, including agents
20        operating on their behalf, to provide standardized
21        disclosures to a customer prior to that customer's
22        execution of a contract for the development of a
23        distributed generation system or a subscription to a
24        community solar project.
25            (iv) The Agency shall establish one or multiple
26        Consumer Complaints Centers to accept complaints

 

 

SB3037- 90 -LRB102 22347 SPS 31484 b

1        regarding businesses that participate in, or otherwise
2        benefit from, State-administered incentive funding
3        through Agency-administered programs. The Agency shall
4        maintain a public database of complaints with any
5        confidential or particularly sensitive information
6        redacted from public entries.
7            (v) Through a filing in the proceeding for the
8        approval of its long-term renewable energy resources
9        procurement plan, the Agency shall provide an annual
10        written report to the Illinois Commerce Commission
11        documenting the frequency and nature of complaints and
12        any enforcement actions taken in response to those
13        complaints.
14            (vi) The Agency shall schedule regular meetings
15        with representatives of the Office of the Attorney
16        General, the Illinois Commerce Commission, consumer
17        protection groups, and other interested stakeholders
18        to share relevant information about consumer
19        protection, project compliance, and complaints
20        received.
21            (vii) To the extent that complaints received
22        implicate the jurisdiction of the Office of the
23        Attorney General, the Illinois Commerce Commission, or
24        local, State, or federal law enforcement, the Agency
25        shall also refer complaints to those entities as
26        appropriate.

 

 

SB3037- 91 -LRB102 22347 SPS 31484 b

1        (N) The Agency shall establish the terms, conditions,
2    and program requirements for photovoltaic community
3    renewable generation projects with a goal to expand access
4    to a broader group of energy consumers, to ensure robust
5    participation opportunities for residential and small
6    commercial customers and those who cannot install
7    renewable energy on their own properties. Subject to
8    reasonable limitations, any plan approved by the
9    Commission shall allow subscriptions to community
10    renewable generation projects to be portable and
11    transferable. For purposes of this subparagraph (N),
12    "portable" means that subscriptions may be retained by the
13    subscriber even if the subscriber relocates or changes its
14    address within the same utility service territory; and
15    "transferable" means that a subscriber may assign or sell
16    subscriptions to another person within the same utility
17    service territory.
18        Through the development of its long-term renewable
19    resources procurement plan, the Agency may consider
20    whether community renewable generation projects utilizing
21    technologies other than photovoltaics should be supported
22    through State-administered incentive funding, and may
23    issue requests for information to gauge market demand.
24        Electric utilities shall provide a monetary credit to
25    a subscriber's subsequent bill for service for the
26    proportional output of a community renewable generation

 

 

SB3037- 92 -LRB102 22347 SPS 31484 b

1    project attributable to that subscriber as specified in
2    Section 16-107.5 of the Public Utilities Act.
3        The Agency shall purchase renewable energy credits
4    from subscribed shares of photovoltaic community renewable
5    generation projects through the Adjustable Block program
6    described in subparagraph (K) of this paragraph (1) or
7    through the Illinois Solar for All Program described in
8    Section 1-56 of this Act. The electric utility shall
9    purchase any unsubscribed energy from community renewable
10    generation projects that are Qualifying Facilities ("QF")
11    under the electric utility's tariff for purchasing the
12    output from QFs under Public Utilities Regulatory Policies
13    Act of 1978.
14        The owners of and any subscribers to a community
15    renewable generation project shall not be considered
16    public utilities or alternative retail electricity
17    suppliers under the Public Utilities Act solely as a
18    result of their interest in or subscription to a community
19    renewable generation project and shall not be required to
20    become an alternative retail electric supplier by
21    participating in a community renewable generation project
22    with a public utility.
23        (O) For the delivery year beginning June 1, 2018, the
24    long-term renewable resources procurement plan required by
25    this subsection (c) shall provide for the Agency to
26    procure contracts to continue offering the Illinois Solar

 

 

SB3037- 93 -LRB102 22347 SPS 31484 b

1    for All Program described in subsection (b) of Section
2    1-56 of this Act, and the contracts approved by the
3    Commission shall be executed by the utilities that are
4    subject to this subsection (c). The long-term renewable
5    resources procurement plan shall allocate up to
6    $50,000,000 per delivery year to fund the programs, and
7    the plan shall determine the amount of funding to be
8    apportioned to the programs identified in subsection (b)
9    of Section 1-56 of this Act; provided that for the
10    delivery years beginning June 1, 2021, June 1, 2022, and
11    June 1, 2023, the long-term renewable resources
12    procurement plan may average the annual budgets over a
13    3-year period to account for program ramp-up. For the
14    delivery years beginning June 1, 2021, June 1, 2024, June
15    1, 2027, and June 1, 2030 and additional $10,000,000 shall
16    be provided to the Department of Commerce and Economic
17    Opportunity to implement the workforce development
18    programs and reporting as outlined in Section 16-108.12 of
19    the Public Utilities Act. In making the determinations
20    required under this subparagraph (O), the Commission shall
21    consider the experience and performance under the programs
22    and any evaluation reports. The Commission shall also
23    provide for an independent evaluation of those programs on
24    a periodic basis that are funded under this subparagraph
25    (O).
26        (P) All programs and procurements under this

 

 

SB3037- 94 -LRB102 22347 SPS 31484 b

1    subsection (c) shall be designed to encourage
2    participating projects to use a diverse and equitable
3    workforce and a diverse set of contractors, including
4    minority-owned businesses, disadvantaged businesses,
5    trade unions, graduates of any workforce training programs
6    administered under this Act, and small businesses.
7        The Agency shall develop a method to optimize
8    procurement of renewable energy credits from proposed
9    utility-scale projects that are located in communities
10    eligible to receive Energy Transition Community Grants
11    pursuant to Section 10-20 of the Energy Community
12    Reinvestment Act. If this requirement conflicts with other
13    provisions of law or the Agency determines that full
14    compliance with the requirements of this subparagraph (P)
15    would be unreasonably costly or administratively
16    impractical, the Agency is to propose alternative
17    approaches to achieve development of renewable energy
18    resources in communities eligible to receive Energy
19    Transition Community Grants pursuant to Section 10-20 of
20    the Energy Community Reinvestment Act or seek an exemption
21    from this requirement from the Commission.
22        (Q) Each facility listed in subitems (i) through
23    (viii) of item (1) of this subparagraph (Q) for which a
24    renewable energy credit delivery contract is signed after
25    the effective date of this amendatory Act of the 102nd
26    General Assembly is subject to the following requirements

 

 

SB3037- 95 -LRB102 22347 SPS 31484 b

1    through the Agency's long-term renewable resources
2    procurement plan:
3            (1) Each facility shall be subject to the
4        prevailing wage requirements included in the
5        Prevailing Wage Act. The Agency shall require
6        verification that all construction performed on the
7        facility by the renewable energy credit delivery
8        contract holder, its contractors, or its
9        subcontractors relating to construction of the
10        facility is performed by construction employees
11        receiving an amount for that work equal to or greater
12        than the general prevailing rate, as that term is
13        defined in Section 3 of the Prevailing Wage Act. For
14        purposes of this item (1), "house of worship" means
15        property that is both (1) used exclusively by a
16        religious society or body of persons as a place for
17        religious exercise or religious worship and (2)
18        recognized as exempt from taxation pursuant to Section
19        15-40 of the Property Tax Code. This item (1) shall
20        apply to any the following:
21                (i) all new utility-scale wind projects;
22                (ii) all new utility-scale photovoltaic
23            projects;
24                (iii) all new brownfield photovoltaic
25            projects;
26                (iv) all new photovoltaic community renewable

 

 

SB3037- 96 -LRB102 22347 SPS 31484 b

1            energy facilities that qualify for item (iii) of
2            subparagraph (K) of this paragraph (1);
3                (v) all new community driven community
4            photovoltaic projects that qualify for item (v) of
5            subparagraph (K) of this paragraph (1);
6                (vi) all new photovoltaic distributed
7            renewable energy generation devices on schools
8            that qualify for item (iv) of subparagraph (K) of
9            this paragraph (1);
10                (vii) all new photovoltaic distributed
11            renewable energy generation devices that (1)
12            qualify for item (i) of subparagraph (K) of this
13            paragraph (1); (2) are not projects that serve
14            single-family or multi-family residential
15            buildings; and (3) are not houses of worship where
16            the aggregate capacity including collocated
17            projects would not exceed 100 kilowatts;
18                (viii) all new photovoltaic distributed
19            renewable energy generation devices that (1)
20            qualify for item (ii) of subparagraph (K) of this
21            paragraph (1); (2) are not projects that serve
22            single-family or multi-family residential
23            buildings; and (3) are not houses of worship where
24            the aggregate capacity including collocated
25            projects would not exceed 100 kilowatts.
26            (2) Renewable energy credits procured from new

 

 

SB3037- 97 -LRB102 22347 SPS 31484 b

1        utility-scale wind projects, new utility-scale solar
2        projects, and new brownfield solar projects pursuant
3        to Agency procurement events occurring after the
4        effective date of this amendatory Act of the 102nd
5        General Assembly must be from facilities built by
6        general contractors that must enter into a project
7        labor agreement, as defined by this Act, prior to
8        construction. The project labor agreement shall be
9        filed with the Director in accordance with procedures
10        established by the Agency through its long-term
11        renewable resources procurement plan. Any information
12        submitted to the Agency in this item (2) shall be
13        considered commercially sensitive information. At a
14        minimum, the project labor agreement must provide the
15        names, addresses, and occupations of the owner of the
16        plant and the individuals representing the labor
17        organization employees participating in the project
18        labor agreement consistent with the Project Labor
19        Agreements Act. The agreement must also specify the
20        terms and conditions as defined by this Act.
21            (3) It is the intent of this Section to ensure that
22        economic development occurs across Illinois
23        communities, that emerging businesses may grow, and
24        that there is improved access to the clean energy
25        economy by persons who have greater economic burdens
26        to success. The Agency shall take into consideration

 

 

SB3037- 98 -LRB102 22347 SPS 31484 b

1        the unique cost of compliance of this subparagraph (Q)
2        that might be borne by equity eligible contractors,
3        shall include such costs when determining the price of
4        renewable energy credits in the Adjustable Block
5        program, and shall take such costs into consideration
6        in a nondiscriminatory manner when comparing bids for
7        competitive procurements. The Agency shall consider
8        costs associated with compliance whether in the
9        development, financing, or construction of projects.
10        The Agency shall periodically review the assumptions
11        in these costs and may adjust prices, in compliance
12        with subparagraph (M) of this paragraph (1).
13        (R) In its long-term renewable resources procurement
14    plan, the Agency shall establish a self-direct renewable
15    portfolio standard compliance program for eligible
16    self-direct customers that purchase renewable energy
17    credits from utility-scale wind and solar projects through
18    long-term agreements for purchase of renewable energy
19    credits as described in this Section. Such long-term
20    agreements may include the purchase of energy or other
21    products on a physical or financial basis and may involve
22    an alternative retail electric supplier as defined in
23    Section 16-102 of the Public Utilities Act. This program
24    shall take effect in the delivery year commencing June 1,
25    2023.
26            (1) For the purposes of this subparagraph:

 

 

SB3037- 99 -LRB102 22347 SPS 31484 b

1            "Eligible self-direct customer" means any retail
2        customers of an electric utility that serves 3,000,000
3        or more retail customers in the State and whose total
4        highest 30-minute demand was more than 10,000
5        kilowatts, or any retail customers of an electric
6        utility that serves less than 3,000,000 retail
7        customers but more than 500,000 retail customers in
8        the State and whose total highest 15-minute demand was
9        more than 10,000 kilowatts.
10            "Retail customer" has the meaning set forth in
11        Section 16-102 of the Public Utilities Act and
12        multiple retail customer accounts under the same
13        corporate parent may aggregate their account demands
14        to meet the 10,000 kilowatt threshold. The criteria
15        for determining whether this subparagraph is
16        applicable to a retail customer shall be based on the
17        12 consecutive billing periods prior to the start of
18        the year in which the application is filed.
19            (2) For renewable energy credits to count toward
20        the self-direct renewable portfolio standard
21        compliance program, they must:
22                (i) qualify as renewable energy credits as
23            defined in Section 1-10 of this Act;
24                (ii) be sourced from one or more renewable
25            energy generating facilities that comply with the
26            geographic requirements as set forth in

 

 

SB3037- 100 -LRB102 22347 SPS 31484 b

1            subparagraph (I) of paragraph (1) of subsection
2            (c) as interpreted through the Agency's long-term
3            renewable resources procurement plan, or, where
4            applicable, the geographic requirements that
5            governed utility-scale renewable energy credits at
6            the time the eligible self-direct customer entered
7            into the applicable renewable energy credit
8            purchase agreement;
9                (iii) be procured through long-term contracts
10            with term lengths of at least 10 years either
11            directly with the renewable energy generating
12            facility or through a bundled power purchase
13            agreement, a virtual power purchase agreement, an
14            agreement between the renewable generating
15            facility, an alternative retail electric supplier,
16            and the customer, or such other structure as is
17            permissible under this subparagraph (R);
18                (iv) be equivalent in volume to at least 40%
19            of the eligible self-direct customer's usage,
20            determined annually by the eligible self-direct
21            customer's usage during the previous delivery
22            year, measured to the nearest megawatt-hour;
23                (v) be retired by or on behalf of the large
24            energy customer;
25                (vi) be sourced from new utility-scale wind
26            projects or new utility-scale solar projects; and

 

 

SB3037- 101 -LRB102 22347 SPS 31484 b

1                (vii) if the contracts for renewable energy
2            credits are entered into after the effective date
3            of this amendatory Act of the 102nd General
4            Assembly, the new utility-scale wind projects or
5            new utility-scale solar projects must comply with
6            the requirements established in subparagraphs (P)
7            and (Q) of paragraph (1) of this subsection (c)
8            and subsection (c-10).
9            (3) The self-direct renewable portfolio standard
10        compliance program shall be designed to allow eligible
11        self-direct customers to procure new renewable energy
12        credits from new utility-scale wind projects or new
13        utility-scale photovoltaic projects. The Agency shall
14        annually determine the amount of utility-scale
15        renewable energy credits it will include each year
16        from the self-direct renewable portfolio standard
17        compliance program, subject to receiving qualifying
18        applications. In making this determination, the Agency
19        shall evaluate publicly available analyses and studies
20        of the potential market size for utility-scale
21        renewable energy long-term purchase agreements by
22        commercial and industrial energy customers and make
23        that report publicly available. If demand for
24        participation in the self-direct renewable portfolio
25        standard compliance program exceeds availability, the
26        Agency shall ensure participation is evenly split

 

 

SB3037- 102 -LRB102 22347 SPS 31484 b

1        between commercial and industrial users to the extent
2        there is sufficient demand from both customer classes.
3        Each renewable energy credit procured pursuant to this
4        subparagraph (R) by a self-direct customer shall
5        reduce the total volume of renewable energy credits
6        the Agency is otherwise required to procure from new
7        utility-scale projects pursuant to subparagraph (C) of
8        paragraph (1) of this subsection (c) on behalf of
9        contracting utilities where the eligible self-direct
10        customer is located. The self-direct customer shall
11        file an annual compliance report with the Agency
12        pursuant to terms established by the Agency through
13        its long-term renewable resources procurement plan to
14        be eligible for participation in this program.
15        Customers must provide the Agency with their most
16        recent electricity billing statements or other
17        information deemed necessary by the Agency to
18        demonstrate they are an eligible self-direct customer.
19            (4) The Commission shall approve a reduction in
20        the volumetric charges collected pursuant to Section
21        16-108 of the Public Utilities Act for approved
22        eligible self-direct customers equivalent to the
23        anticipated cost of renewable energy credit deliveries
24        under contracts for new utility-scale wind and new
25        utility-scale solar entered for each delivery year
26        after the large energy customer begins retiring

 

 

SB3037- 103 -LRB102 22347 SPS 31484 b

1        eligible new utility scale renewable energy credits
2        for self-compliance. The self-direct credit amount
3        shall be determined annually and is equal to the
4        estimated portion of the cost authorized by
5        subparagraph (E) of paragraph (1) of this subsection
6        (c) that supported the annual procurement of
7        utility-scale renewable energy credits in the prior
8        delivery year using a methodology described in the
9        long-term renewable resources procurement plan,
10        expressed on a per kilowatthour basis, and does not
11        include (i) costs associated with any contracts
12        entered into before the delivery year in which the
13        customer files the initial compliance report to be
14        eligible for participation in the self-direct program,
15        and (ii) costs associated with procuring renewable
16        energy credits through existing and future contracts
17        through the Adjustable Block Program, subsection (c-5)
18        of this Section 1-75, and the Solar for All Program.
19        The Agency shall assist the Commission in determining
20        the current and future costs. The Agency must
21        determine the self-direct credit amount for new and
22        existing eligible self-direct customers and submit
23        this to the Commission in an annual compliance filing.
24        The Commission must approve the self-direct credit
25        amount by June 1, 2023 and June 1 of each delivery year
26        thereafter.

 

 

SB3037- 104 -LRB102 22347 SPS 31484 b

1            (5) Customers described in this subparagraph (R)
2        shall apply, on a form developed by the Agency, to the
3        Agency to be designated as a self-direct eligible
4        customer. Once the Agency determines that a
5        self-direct customer is eligible for participation in
6        the program, the self-direct customer will remain
7        eligible until the end of the term of the contract.
8        Thereafter, application may be made not less than 12
9        months before the filing date of the long-term
10        renewable resources procurement plan described in this
11        Act. At a minimum, such application shall contain the
12        following:
13                (i) the customer's certification that, at the
14            time of the customer's application, the customer
15            qualifies to be a self-direct eligible customer,
16            including documents demonstrating that
17            qualification;
18                (ii) the customer's certification that the
19            customer has entered into or will enter into by
20            the beginning of the applicable procurement year,
21            one or more bilateral contracts for new wind
22            projects or new photovoltaic projects, including
23            supporting documentation;
24                (iii) certification that the contract or
25            contracts for new renewable energy resources are
26            long-term contracts with term lengths of at least

 

 

SB3037- 105 -LRB102 22347 SPS 31484 b

1            10 years, including supporting documentation;
2                (iv) certification of the quantities of
3            renewable energy credits that the customer will
4            purchase each year under such contract or
5            contracts, including supporting documentation;
6                (v) proof that the contract is sufficient to
7            produce renewable energy credits to be equivalent
8            in volume to at least 40% of the large energy
9            customer's usage from the previous delivery year,
10            measured to the nearest megawatt-hour; and
11                (vi) certification that the customer intends
12            to maintain the contract for the duration of the
13            length of the contract.
14            (6) If a customer receives the self-direct credit
15        but fails to properly procure and retire renewable
16        energy credits as required under this subparagraph
17        (R), the Commission, on petition from the Agency and
18        after notice and hearing, may direct such customer's
19        utility to recover the cost of the wrongfully received
20        self-direct credits plus interest through an adder to
21        charges assessed pursuant to Section 16-108 of the
22        Public Utilities Act. Self-direct customers who
23        knowingly fail to properly procure and retire
24        renewable energy credits and do not notify the Agency
25        are ineligible for continued participation in the
26        self-direct renewable portfolio standard compliance

 

 

SB3037- 106 -LRB102 22347 SPS 31484 b

1        program.
2        (2) (Blank).
3        (3) (Blank).
4        (4) The electric utility shall retire all renewable
5    energy credits used to comply with the standard.
6        (5) Beginning with the 2010 delivery year and ending
7    June 1, 2017, an electric utility subject to this
8    subsection (c) shall apply the lesser of the maximum
9    alternative compliance payment rate or the most recent
10    estimated alternative compliance payment rate for its
11    service territory for the corresponding compliance period,
12    established pursuant to subsection (d) of Section 16-115D
13    of the Public Utilities Act to its retail customers that
14    take service pursuant to the electric utility's hourly
15    pricing tariff or tariffs. The electric utility shall
16    retain all amounts collected as a result of the
17    application of the alternative compliance payment rate or
18    rates to such customers, and, beginning in 2011, the
19    utility shall include in the information provided under
20    item (1) of subsection (d) of Section 16-111.5 of the
21    Public Utilities Act the amounts collected under the
22    alternative compliance payment rate or rates for the prior
23    year ending May 31. Notwithstanding any limitation on the
24    procurement of renewable energy resources imposed by item
25    (2) of this subsection (c), the Agency shall increase its
26    spending on the purchase of renewable energy resources to

 

 

SB3037- 107 -LRB102 22347 SPS 31484 b

1    be procured by the electric utility for the next plan year
2    by an amount equal to the amounts collected by the utility
3    under the alternative compliance payment rate or rates in
4    the prior year ending May 31.
5        (6) The electric utility shall be entitled to recover
6    all of its costs associated with the procurement of
7    renewable energy credits under plans approved under this
8    Section and Section 16-111.5 of the Public Utilities Act.
9    These costs shall include associated reasonable expenses
10    for implementing the procurement programs, including, but
11    not limited to, the costs of administering and evaluating
12    the Adjustable Block program, through an automatic
13    adjustment clause tariff in accordance with subsection (k)
14    of Section 16-108 of the Public Utilities Act.
15        (7) Renewable energy credits procured from new
16    photovoltaic projects or new distributed renewable energy
17    generation devices under this Section after June 1, 2017
18    (the effective date of Public Act 99-906) must be procured
19    from devices installed by a qualified person in compliance
20    with the requirements of Section 16-128A of the Public
21    Utilities Act and any rules or regulations adopted
22    thereunder.
23        In meeting the renewable energy requirements of this
24    subsection (c), to the extent feasible and consistent with
25    State and federal law, the renewable energy credit
26    procurements, Adjustable Block solar program, and

 

 

SB3037- 108 -LRB102 22347 SPS 31484 b

1    community renewable generation program shall provide
2    employment opportunities for all segments of the
3    population and workforce, including minority-owned and
4    female-owned business enterprises, and shall not,
5    consistent with State and federal law, discriminate based
6    on race or socioeconomic status.
7    (c-5) Procurement of renewable energy credits from new
8renewable energy facilities installed at or adjacent to the
9sites of electric generating facilities that burn or burned
10coal as their primary fuel source.
11        (1) In addition to the procurement of renewable energy
12    credits pursuant to long-term renewable resources
13    procurement plans in accordance with subsection (c) of
14    this Section and Section 16-111.5 of the Public Utilities
15    Act, the Agency shall conduct procurement events in
16    accordance with this subsection (c-5) for the procurement
17    by electric utilities that served more than 300,000 retail
18    customers in this State as of January 1, 2019 of renewable
19    energy credits from new renewable energy facilities to be
20    installed at or adjacent to the sites of electric
21    generating facilities that, as of January 1, 2016, burned
22    coal as their primary fuel source and meet the other
23    criteria specified in this subsection (c-5). For purposes
24    of this subsection (c-5), "new renewable energy facility"
25    means a new utility-scale solar project as defined in this
26    Section 1-75. The renewable energy credits procured

 

 

SB3037- 109 -LRB102 22347 SPS 31484 b

1    pursuant to this subsection (c-5) may be included or
2    counted for purposes of compliance with the amounts of
3    renewable energy credits required to be procured pursuant
4    to subsection (c) of this Section to the extent that there
5    are otherwise shortfalls in compliance with such
6    requirements. The procurement of renewable energy credits
7    by electric utilities pursuant to this subsection (c-5)
8    shall be funded solely by revenues collected from the Coal
9    to Solar and Energy Storage Initiative Charge provided for
10    in this subsection (c-5) and subsection (i-5) of Section
11    16-108 of the Public Utilities Act, shall not be funded by
12    revenues collected through any of the other funding
13    mechanisms provided for in subsection (c) of this Section,
14    and shall not be subject to the limitation imposed by
15    subsection (c) on charges to retail customers for costs to
16    procure renewable energy resources pursuant to subsection
17    (c), and shall not be subject to any other requirements or
18    limitations of subsection (c).
19        (2) The Agency shall conduct 2 procurement events to
20    select owners of electric generating facilities meeting
21    the eligibility criteria specified in this subsection
22    (c-5) to enter into long-term contracts to sell renewable
23    energy credits to electric utilities serving more than
24    300,000 retail customers in this State as of January 1,
25    2019. The first procurement event shall be conducted no
26    later than March 31, 2022, unless the Agency elects to

 

 

SB3037- 110 -LRB102 22347 SPS 31484 b

1    delay it, until no later than May 1, 2022, due to its
2    overall volume of work, and shall be to select owners of
3    electric generating facilities located in this State and
4    south of federal Interstate Highway 80 that meet the
5    eligibility criteria specified in this subsection (c-5).
6    The second procurement event shall be conducted no sooner
7    than September 30, 2022 and no later than October 31, 2022
8    and shall be to select owners of electric generating
9    facilities located anywhere in this State that meet the
10    eligibility criteria specified in this subsection (c-5).
11    The Agency shall establish and announce a time period,
12    which shall begin no later than 30 days prior to the
13    scheduled date for the procurement event, during which
14    applicants may submit applications to be selected as
15    suppliers of renewable energy credits pursuant to this
16    subsection (c-5). The eligibility criteria for selection
17    as a supplier of renewable energy credits pursuant to this
18    subsection (c-5) shall be as follows:
19            (A) The applicant owns an electric generating
20        facility located in this State that: (i) as of January
21        1, 2016, burned coal as its primary fuel to generate
22        electricity; and (ii) has, or had prior to retirement,
23        an electric generating capacity of at least 150
24        megawatts. The electric generating facility can be
25        either: (i) retired as of the date of the procurement
26        event; or (ii) still operating as of the date of the

 

 

SB3037- 111 -LRB102 22347 SPS 31484 b

1        procurement event.
2            (B) The applicant is not (i) an electric
3        cooperative as defined in Section 3-119 of the Public
4        Utilities Act, or (ii) an entity described in
5        subsection (b)(1) of Section 3-105 of the Public
6        Utilities Act, or an association or consortium of or
7        an entity owned by entities described in (i) or (ii);
8        and the coal-fueled electric generating facility was
9        at one time owned, in whole or in part, by a public
10        utility as defined in Section 3-105 of the Public
11        Utilities Act.
12            (C) If participating in the first procurement
13        event, the applicant proposes and commits to construct
14        and operate, at the site, and if necessary for
15        sufficient space on property adjacent to the existing
16        property, at which the electric generating facility
17        identified in paragraph (A) is located: (i) a new
18        renewable energy facility of at least 20 megawatts but
19        no more than 100 megawatts of electric generating
20        capacity, and (ii) an energy storage facility having a
21        storage capacity equal to at least 2 megawatts and at
22        most 10 megawatts. If participating in the second
23        procurement event, the applicant proposes and commits
24        to construct and operate, at the site, and if
25        necessary for sufficient space on property adjacent to
26        the existing property, at which the electric

 

 

SB3037- 112 -LRB102 22347 SPS 31484 b

1        generating facility identified in paragraph (A) is
2        located: (i) a new renewable energy facility of at
3        least 5 megawatts but no more than 20 megawatts of
4        electric generating capacity, and (ii) an energy
5        storage facility having a storage capacity equal to at
6        least 0.5 megawatts and at most one megawatt.
7            (D) The applicant agrees that the new renewable
8        energy facility and the energy storage facility will
9        be constructed or installed by a qualified entity or
10        entities in compliance with the requirements of
11        subsection (g) of Section 16-128A of the Public
12        Utilities Act and any rules adopted thereunder.
13            (E) The applicant agrees that personnel operating
14        the new renewable energy facility and the energy
15        storage facility will have the requisite skills,
16        knowledge, training, experience, and competence, which
17        may be demonstrated by completion or current
18        participation and ultimate completion by employees of
19        an accredited or otherwise recognized apprenticeship
20        program for the employee's particular craft, trade, or
21        skill, including through training and education
22        courses and opportunities offered by the owner to
23        employees of the coal-fueled electric generating
24        facility or by previous employment experience
25        performing the employee's particular work skill or
26        function.

 

 

SB3037- 113 -LRB102 22347 SPS 31484 b

1            (F) The applicant commits that not less than the
2        prevailing wage, as determined pursuant to the
3        Prevailing Wage Act, will be paid to the applicant's
4        employees engaged in construction activities
5        associated with the new renewable energy facility and
6        the new energy storage facility and to the employees
7        of applicant's contractors engaged in construction
8        activities associated with the new renewable energy
9        facility and the new energy storage facility, and
10        that, on or before the commercial operation date of
11        the new renewable energy facility, the applicant shall
12        file a report with the Agency certifying that the
13        requirements of this subparagraph (F) have been met.
14            (G) The applicant commits that if selected, it
15        will negotiate a project labor agreement for the
16        construction of the new renewable energy facility and
17        associated energy storage facility that includes
18        provisions requiring the parties to the agreement to
19        work together to establish diversity threshold
20        requirements and to ensure best efforts to meet
21        diversity targets, improve diversity at the applicable
22        job site, create diverse apprenticeship opportunities,
23        and create opportunities to employ former coal-fired
24        power plant workers.
25            (H) The applicant commits to enter into a contract
26        or contracts for the applicable duration to provide

 

 

SB3037- 114 -LRB102 22347 SPS 31484 b

1        specified numbers of renewable energy credits each
2        year from the new renewable energy facility to
3        electric utilities that served more than 300,000
4        retail customers in this State as of January 1, 2019,
5        at a price of $30 per renewable energy credit. The
6        price per renewable energy credit shall be fixed at
7        $30 for the applicable duration and the renewable
8        energy credits shall not be indexed renewable energy
9        credits as provided for in item (v) of subparagraph
10        (G) of paragraph (1) of subsection (c) of Section 1-75
11        of this Act. The applicable duration of each contract
12        shall be 20 years, unless the applicant is physically
13        interconnected to the PJM Interconnection, LLC
14        transmission grid and had a generating capacity of at
15        least 1,200 megawatts as of January 1, 2021, in which
16        case the applicable duration of the contract shall be
17        15 years.
18            (I) The applicant's application is certified by an
19        officer of the applicant and by an officer of the
20        applicant's ultimate parent company, if any.
21        (3) An applicant may submit applications to contract
22    to supply renewable energy credits from more than one new
23    renewable energy facility to be constructed at or adjacent
24    to one or more qualifying electric generating facilities
25    owned by the applicant. The Agency may select new
26    renewable energy facilities to be located at or adjacent

 

 

SB3037- 115 -LRB102 22347 SPS 31484 b

1    to the sites of more than one qualifying electric
2    generation facility owned by an applicant to contract with
3    electric utilities to supply renewable energy credits from
4    such facilities.
5        (4) The Agency shall assess fees to each applicant to
6    recover the Agency's costs incurred in receiving and
7    evaluating applications, conducting the procurement event,
8    developing contracts for sale, delivery and purchase of
9    renewable energy credits, and monitoring the
10    administration of such contracts, as provided for in this
11    subsection (c-5), including fees paid to a procurement
12    administrator retained by the Agency for one or more of
13    these purposes.
14        (5) The Agency shall select the applicants and the new
15    renewable energy facilities to contract with electric
16    utilities to supply renewable energy credits in accordance
17    with this subsection (c-5). In the first procurement
18    event, the Agency shall select applicants and new
19    renewable energy facilities to supply renewable energy
20    credits, at a price of $30 per renewable energy credit,
21    aggregating to no less than 400,000 renewable energy
22    credits per year for the applicable duration, assuming
23    sufficient qualifying applications to supply, in the
24    aggregate, at least that amount of renewable energy
25    credits per year; and not more than 580,000 renewable
26    energy credits per year for the applicable duration. In

 

 

SB3037- 116 -LRB102 22347 SPS 31484 b

1    the second procurement event, the Agency shall select
2    applicants and new renewable energy facilities to supply
3    renewable energy credits, at a price of $30 per renewable
4    energy credit, aggregating to no more than 625,000
5    renewable energy credits per year less the amount of
6    renewable energy credits each year contracted for as a
7    result of the first procurement event, for the applicable
8    durations. The number of renewable energy credits to be
9    procured as specified in this paragraph (5) shall not be
10    reduced based on renewable energy credits procured in the
11    self-direct renewable energy credit compliance program
12    established pursuant to subparagraph (R) of paragraph (1)
13    of subsection (c) of Section 1-75.
14        (6) The obligation to purchase renewable energy
15    credits from the applicants and their new renewable energy
16    facilities selected by the Agency shall be allocated to
17    the electric utilities based on their respective
18    percentages of kilowatthours delivered to delivery
19    services customers to the aggregate kilowatthour
20    deliveries by the electric utilities to delivery services
21    customers for the year ended December 31, 2021. In order
22    to achieve these allocation percentages between or among
23    the electric utilities, the Agency shall require each
24    applicant that is selected in the procurement event to
25    enter into a contract with each electric utility for the
26    sale and purchase of renewable energy credits from each

 

 

SB3037- 117 -LRB102 22347 SPS 31484 b

1    new renewable energy facility to be constructed and
2    operated by the applicant, with the sale and purchase
3    obligations under the contracts to aggregate to the total
4    number of renewable energy credits per year to be supplied
5    by the applicant from the new renewable energy facility.
6        (7) The Agency shall submit its proposed selection of
7    applicants, new renewable energy facilities to be
8    constructed, and renewable energy credit amounts for each
9    procurement event to the Commission for approval. The
10    Commission shall, within 2 business days after receipt of
11    the Agency's proposed selections, approve the proposed
12    selections if it determines that the applicants and the
13    new renewable energy facilities to be constructed meet the
14    selection criteria set forth in this subsection (c-5) and
15    that the Agency seeks approval for contracts of applicable
16    durations aggregating to no more than the maximum amount
17    of renewable energy credits per year authorized by this
18    subsection (c-5) for the procurement event, at a price of
19    $30 per renewable energy credit.
20        (8) The Agency, in conjunction with its procurement
21    administrator if one is retained, the electric utilities,
22    and potential applicants for contracts to produce and
23    supply renewable energy credits pursuant to this
24    subsection (c-5), shall develop a standard form contract
25    for the sale, delivery and purchase of renewable energy
26    credits pursuant to this subsection (c-5). Each contract

 

 

SB3037- 118 -LRB102 22347 SPS 31484 b

1    resulting from the first procurement event shall allow for
2    a commercial operation date for the new renewable energy
3    facility of either June 1, 2023 or June 1, 2024, with such
4    dates subject to adjustment as provided in this paragraph.
5    Each contract resulting from the second procurement event
6    shall provide for a commercial operation date on June 1
7    next occurring up to 48 months after execution of the
8    contract. Each contract shall provide that the owner shall
9    receive payments for renewable energy credits for the
10    applicable durations beginning with the commercial
11    operation date of the new renewable energy facility. The
12    form contract shall provide for adjustments to the
13    commercial operation and payment start dates as needed due
14    to any delays in completing the procurement and
15    contracting processes, in finalizing interconnection
16    agreements and installing interconnection facilities, and
17    in obtaining other necessary governmental permits and
18    approvals. The form contract shall be, to the maximum
19    extent possible, consistent with standard electric
20    industry contracts for sale, delivery, and purchase of
21    renewable energy credits while taking into account the
22    specific requirements of this subsection (c-5). The form
23    contract shall provide for over-delivery and
24    under-delivery of renewable energy credits within
25    reasonable ranges during each 12-month period and penalty,
26    default, and enforcement provisions for failure of the

 

 

SB3037- 119 -LRB102 22347 SPS 31484 b

1    selling party to deliver renewable energy credits as
2    specified in the contract and to comply with the
3    requirements of this subsection (c-5). The standard form
4    contract shall specify that all renewable energy credits
5    delivered to the electric utility pursuant to the contract
6    shall be retired. The Agency shall make the proposed
7    contracts available for a reasonable period for comment by
8    potential applicants, and shall publish the final form
9    contract at least 30 days before the date of the first
10    procurement event.
11        (9) Coal to Solar and Energy Storage Initiative
12    Charge.
13            (A) By no later than July 1, 2022, each electric
14        utility that served more than 300,000 retail customers
15        in this State as of January 1, 2019 shall file a tariff
16        with the Commission for the billing and collection of
17        a Coal to Solar and Energy Storage Initiative Charge
18        in accordance with subsection (i-5) of Section 16-108
19        of the Public Utilities Act, with such tariff to be
20        effective, following review and approval or
21        modification by the Commission, beginning January 1,
22        2023. The tariff shall provide for the calculation and
23        setting of the electric utility's Coal to Solar and
24        Energy Storage Initiative Charge to collect revenues
25        estimated to be sufficient, in the aggregate, (i) to
26        enable the electric utility to pay for the renewable

 

 

SB3037- 120 -LRB102 22347 SPS 31484 b

1        energy credits it has contracted to purchase in the
2        delivery year beginning June 1, 2023 and each delivery
3        year thereafter from new renewable energy facilities
4        located at the sites of qualifying electric generating
5        facilities, and (ii) to fund the grant payments to be
6        made in each delivery year by the Department of
7        Commerce and Economic Opportunity, or any successor
8        department or agency, which shall be referred to in
9        this subsection (c-5) as the Department, pursuant to
10        paragraph (10) of this subsection (c-5). The electric
11        utility's tariff shall provide for the billing and
12        collection of the Coal to Solar and Energy Storage
13        Initiative Charge on each kilowatthour of electricity
14        delivered to its delivery services customers within
15        its service territory and shall provide for an annual
16        reconciliation of revenues collected with actual
17        costs, in accordance with subsection (i-5) of Section
18        16-108 of the Public Utilities Act.
19            (B) Each electric utility shall remit on a monthly
20        basis to the State Treasurer, for deposit in the Coal
21        to Solar and Energy Storage Initiative Fund provided
22        for in this subsection (c-5), the electric utility's
23        collections of the Coal to Solar and Energy Storage
24        Initiative Charge in the amount estimated to be needed
25        by the Department for grant payments pursuant to grant
26        contracts entered into by the Department pursuant to

 

 

SB3037- 121 -LRB102 22347 SPS 31484 b

1        paragraph (10) of this subsection (c-5).
2        (10) Coal to Solar and Energy Storage Initiative Fund.
3            (A) The Coal to Solar and Energy Storage
4        Initiative Fund is established as a special fund in
5        the State treasury. The Coal to Solar and Energy
6        Storage Initiative Fund is authorized to receive, by
7        statutory deposit, that portion specified in item (B)
8        of paragraph (9) of this subsection (c-5) of moneys
9        collected by electric utilities through imposition of
10        the Coal to Solar and Energy Storage Initiative Charge
11        required by this subsection (c-5). The Coal to Solar
12        and Energy Storage Initiative Fund shall be
13        administered by the Department to provide grants to
14        support the installation and operation of energy
15        storage facilities at the sites of qualifying electric
16        generating facilities meeting the criteria specified
17        in this paragraph (10).
18            (B) The Coal to Solar and Energy Storage
19        Initiative Fund shall not be subject to sweeps,
20        administrative charges, or chargebacks, including, but
21        not limited to, those authorized under Section 8h of
22        the State Finance Act, that would in any way result in
23        the transfer of those funds from the Coal to Solar and
24        Energy Storage Initiative Fund to any other fund of
25        this State or in having any such funds utilized for any
26        purpose other than the express purposes set forth in

 

 

SB3037- 122 -LRB102 22347 SPS 31484 b

1        this paragraph (10).
2            (C) The Department shall utilize up to
3        $280,500,000 in the Coal to Solar and Energy Storage
4        Initiative Fund for grants, assuming sufficient
5        qualifying applicants, to support installation of
6        energy storage facilities at the sites of up to 3
7        qualifying electric generating facilities located in
8        the Midcontinent Independent System Operator, Inc.,
9        region in Illinois and the sites of up to 2 qualifying
10        electric generating facilities located in the PJM
11        Interconnection, LLC region in Illinois that meet the
12        criteria set forth in this subparagraph (C). The
13        criteria for receipt of a grant pursuant to this
14        subparagraph (C) are as follows:
15                (1) the electric generating facility at the
16            site has, or had prior to retirement, an electric
17            generating capacity of at least 150 megawatts;
18                (2) the electric generating facility burns (or
19            burned prior to retirement) coal as its primary
20            source of fuel;
21                (3) if the electric generating facility is
22            retired, it was retired subsequent to January 1,
23            2016;
24                (4) the owner of the electric generating
25            facility has not been selected by the Agency
26            pursuant to this subsection (c-5) of this Section

 

 

SB3037- 123 -LRB102 22347 SPS 31484 b

1            to enter into a contract to sell renewable energy
2            credits to one or more electric utilities from a
3            new renewable energy facility located or to be
4            located at or adjacent to the site at which the
5            electric generating facility is located;
6                (5) the electric generating facility located
7            at the site was at one time owned, in whole or in
8            part, by a public utility as defined in Section
9            3-105 of the Public Utilities Act;
10                (6) the electric generating facility at the
11            site is not owned by (i) an electric cooperative
12            as defined in Section 3-119 of the Public
13            Utilities Act, or (ii) an entity described in
14            subsection (b)(1) of Section 3-105 of the Public
15            Utilities Act, or an association or consortium of
16            or an entity owned by entities described in items
17            (i) or (ii);
18                (7) the proposed energy storage facility at
19            the site will have energy storage capacity of at
20            least 37 megawatts;
21                (8) the owner commits to place the energy
22            storage facility into commercial operation on
23            either June 1, 2023, June 1, 2024, or June 1, 2025,
24            with such date subject to adjustment as needed due
25            to any delays in completing the grant contracting
26            process, in finalizing interconnection agreements

 

 

SB3037- 124 -LRB102 22347 SPS 31484 b

1            and in installing interconnection facilities, and
2            in obtaining necessary governmental permits and
3            approvals;
4                (9) the owner agrees that the new energy
5            storage facility will be constructed or installed
6            by a qualified entity or entities consistent with
7            the requirements of subsection (g) of Section
8            16-128A of the Public Utilities Act and any rules
9            adopted under that Section;
10                (10) the owner agrees that personnel operating
11            the energy storage facility will have the
12            requisite skills, knowledge, training, experience,
13            and competence, which may be demonstrated by
14            completion or current participation and ultimate
15            completion by employees of an accredited or
16            otherwise recognized apprenticeship program for
17            the employee's particular craft, trade, or skill,
18            including through training and education courses
19            and opportunities offered by the owner to
20            employees of the coal-fueled electric generating
21            facility or by previous employment experience
22            performing the employee's particular work skill or
23            function;
24                (11) the owner commits that not less than the
25            prevailing wage, as determined pursuant to the
26            Prevailing Wage Act, will be paid to the owner's

 

 

SB3037- 125 -LRB102 22347 SPS 31484 b

1            employees engaged in construction activities
2            associated with the new energy storage facility
3            and to the employees of the owner's contractors
4            engaged in construction activities associated with
5            the new energy storage facility, and that, on or
6            before the commercial operation date of the new
7            energy storage facility, the owner shall file a
8            report with the Department certifying that the
9            requirements of this subparagraph (11) have been
10            met; and
11                (12) the owner commits that if selected to
12            receive a grant, it will negotiate a project labor
13            agreement for the construction of the new energy
14            storage facility that includes provisions
15            requiring the parties to the agreement to work
16            together to establish diversity threshold
17            requirements and to ensure best efforts to meet
18            diversity targets, improve diversity at the
19            applicable job site, create diverse apprenticeship
20            opportunities, and create opportunities to employ
21            former coal-fired power plant workers.
22            The Department shall accept applications for this
23        grant program until March 31, 2022 and shall announce
24        the award of grants no later than June 1, 2022. The
25        Department shall make the grant payments to a
26        recipient in equal annual amounts for 10 years

 

 

SB3037- 126 -LRB102 22347 SPS 31484 b

1        following the date the energy storage facility is
2        placed into commercial operation. The annual grant
3        payments to a qualifying energy storage facility shall
4        be $110,000 per megawatt of energy storage capacity,
5        with total annual grant payments pursuant to this
6        subparagraph (C) for qualifying energy storage
7        facilities not to exceed $28,050,000 in any year.
8            (D) Grants of funding for energy storage
9        facilities pursuant to subparagraph (C) of this
10        paragraph (10), from the Coal to Solar and Energy
11        Storage Initiative Fund, shall be memorialized in
12        grant contracts between the Department and the
13        recipient. The grant contracts shall specify the date
14        or dates in each year on which the annual grant
15        payments shall be paid.
16            (E) All disbursements from the Coal to Solar and
17        Energy Storage Initiative Fund shall be made only upon
18        warrants of the Comptroller drawn upon the Treasurer
19        as custodian of the Fund upon vouchers signed by the
20        Director of the Department or by the person or persons
21        designated by the Director of the Department for that
22        purpose. The Comptroller is authorized to draw the
23        warrants upon vouchers so signed. The Treasurer shall
24        accept all written warrants so signed and shall be
25        released from liability for all payments made on those
26        warrants.

 

 

SB3037- 127 -LRB102 22347 SPS 31484 b

1        (11) Diversity, equity, and inclusion plans.
2            (A) Each applicant selected in a procurement event
3        to contract to supply renewable energy credits in
4        accordance with this subsection (c-5) and each owner
5        selected by the Department to receive a grant or
6        grants to support the construction and operation of a
7        new energy storage facility or facilities in
8        accordance with this subsection (c-5) shall, within 60
9        days following the Commission's approval of the
10        applicant to contract to supply renewable energy
11        credits or within 60 days following execution of a
12        grant contract with the Department, as applicable,
13        submit to the Commission a diversity, equity, and
14        inclusion plan setting forth the applicant's or
15        owner's numeric goals for the diversity composition of
16        its supplier entities for the new renewable energy
17        facility or new energy storage facility, as
18        applicable, which shall be referred to for purposes of
19        this paragraph (11) as the project, and the
20        applicant's or owner's action plan and schedule for
21        achieving those goals.
22            (B) For purposes of this paragraph (11), diversity
23        composition shall be based on the percentage, which
24        shall be a minimum of 25%, of eligible expenditures
25        for contract awards for materials and services (which
26        shall be defined in the plan) to business enterprises

 

 

SB3037- 128 -LRB102 22347 SPS 31484 b

1        owned by minority persons, women, or persons with
2        disabilities as defined in Section 2 of the Business
3        Enterprise for Minorities, Women, and Persons with
4        Disabilities Act, to LGBTQ business enterprises, to
5        veteran-owned business enterprises, and to business
6        enterprises located in environmental justice
7        communities. The diversity composition goals of the
8        plan may include eligible expenditures in areas for
9        vendor or supplier opportunities in addition to
10        development and construction of the project, and may
11        exclude from eligible expenditures materials and
12        services with limited market availability, limited
13        production and availability from suppliers in the
14        United States, such as solar panels and storage
15        batteries, and material and services that are subject
16        to critical energy infrastructure or cybersecurity
17        requirements or restrictions. The plan may provide
18        that the diversity composition goals may be met
19        through Tier 1 Direct or Tier 2 subcontracting
20        expenditures or a combination thereof for the project.
21            (C) The plan shall provide for, but not be limited
22        to: (i) internal initiatives, including multi-tier
23        initiatives, by the applicant or owner, or by its
24        engineering, procurement and construction contractor
25        if one is used for the project, which for purposes of
26        this paragraph (11) shall be referred to as the EPC

 

 

SB3037- 129 -LRB102 22347 SPS 31484 b

1        contractor, to enable diverse businesses to be
2        considered fairly for selection to provide materials
3        and services; (ii) requirements for the applicant or
4        owner or its EPC contractor to proactively solicit and
5        utilize diverse businesses to provide materials and
6        services; and (iii) requirements for the applicant or
7        owner or its EPC contractor to hire a diverse
8        workforce for the project. The plan shall include a
9        description of the applicant's or owner's diversity
10        recruiting efforts both for the project and for other
11        areas of the applicant's or owner's business
12        operations. The plan shall provide for the imposition
13        of financial penalties on the applicant's or owner's
14        EPC contractor for failure to exercise best efforts to
15        comply with and execute the EPC contractor's diversity
16        obligations under the plan. The plan may provide for
17        the applicant or owner to set aside a portion of the
18        work on the project to serve as an incubation program
19        for qualified businesses, as specified in the plan,
20        owned by minority persons, women, persons with
21        disabilities, LGBTQ persons, and veterans, and
22        businesses located in environmental justice
23        communities, seeking to enter the renewable energy
24        industry.
25            (D) The applicant or owner may submit a revised or
26        updated plan to the Commission from time to time as

 

 

SB3037- 130 -LRB102 22347 SPS 31484 b

1        circumstances warrant. The applicant or owner shall
2        file annual reports with the Commission detailing the
3        applicant's or owner's progress in implementing its
4        plan and achieving its goals and any modifications the
5        applicant or owner has made to its plan to better
6        achieve its diversity, equity and inclusion goals. The
7        applicant or owner shall file a final report on the
8        fifth June 1 following the commercial operation date
9        of the new renewable energy resource or new energy
10        storage facility, but the applicant or owner shall
11        thereafter continue to be subject to applicable
12        reporting requirements of Section 5-117 of the Public
13        Utilities Act.
14    (c-10) Equity accountability system. It is the purpose of
15this subsection (c-10) to create an equity accountability
16system, which includes the minimum equity standards for all
17renewable energy procurements, the equity category of the
18Adjustable Block Program, and the equity prioritization for
19noncompetitive procurements, that is successful in advancing
20priority access to the clean energy economy for businesses and
21workers from communities that have been excluded from economic
22opportunities in the energy sector, have been subject to
23disproportionate levels of pollution, and have
24disproportionately experienced negative public health
25outcomes. Further, it is the purpose of this subsection to
26ensure that this equity accountability system is successful in

 

 

SB3037- 131 -LRB102 22347 SPS 31484 b

1advancing equity across Illinois by providing access to the
2clean energy economy for businesses and workers from
3communities that have been historically excluded from economic
4opportunities in the energy sector, have been subject to
5disproportionate levels of pollution, and have
6disproportionately experienced negative public health
7outcomes.
8        (1) Minimum equity standards. The Agency shall create
9    programs with the purpose of increasing access to and
10    development of equity eligible contractors, who are prime
11    contractors and subcontractors, across all of the programs
12    it manages. All applications for renewable energy credit
13    procurements shall comply with specific minimum equity
14    commitments. Starting in the delivery year immediately
15    following the next long-term renewable resources
16    procurement plan, at least 10% of the project workforce
17    for each entity participating in a procurement program
18    outlined in this subsection (c-10) must be done by equity
19    eligible persons or equity eligible contractors. The
20    Agency shall increase the minimum percentage each delivery
21    year thereafter by increments that ensure a statewide
22    average of 30% of the project workforce for each entity
23    participating in a procurement program is done by equity
24    eligible persons or equity eligible contractors by 2030.
25    The Agency shall propose a schedule of percentage
26    increases to the minimum equity standards in its draft

 

 

SB3037- 132 -LRB102 22347 SPS 31484 b

1    revised renewable energy resources procurement plan
2    submitted to the Commission for approval pursuant to
3    paragraph (5) of subsection (b) of Section 16-111.5 of the
4    Public Utilities Act. In determining these annual
5    increases, the Agency shall have the discretion to
6    establish different minimum equity standards for different
7    types of procurements and different regions of the State
8    if the Agency finds that doing so will further the
9    purposes of this subsection (c-10). The proposed schedule
10    of annual increases shall be revisited and updated on an
11    annual basis. Revisions shall be developed with
12    stakeholder input, including from equity eligible persons,
13    equity eligible contractors, clean energy industry
14    representatives, and community-based organizations that
15    work with such persons and contractors.
16            (A) At the start of each delivery year, the Agency
17        shall require a compliance plan from each entity
18        participating in a procurement program of subsection
19        (c) of this Section that demonstrates how they will
20        achieve compliance with the minimum equity standard
21        percentage for work completed in that delivery year.
22        If an entity applies for its approved vendor or
23        designee status between delivery years, the Agency
24        shall require a compliance plan at the time of
25        application.
26            (B) Halfway through each delivery year, the Agency

 

 

SB3037- 133 -LRB102 22347 SPS 31484 b

1        shall require each entity participating in a
2        procurement program to confirm that it will achieve
3        compliance in that delivery year, when applicable. The
4        Agency may offer corrective action plans to entities
5        that are not on track to achieve compliance.
6            (C) At the end of each delivery year, each entity
7        participating and completing work in that delivery
8        year in a procurement program of subsection (c) shall
9        submit a report to the Agency that demonstrates how it
10        achieved compliance with the minimum equity standards
11        percentage for that delivery year.
12            (D) The Agency shall prohibit participation in
13        procurement programs by an approved vendor or
14        designee, as applicable, or entities with which an
15        approved vendor or designee, as applicable, shares a
16        common parent company if an approved vendor or
17        designee, as applicable, failed to meet the minimum
18        equity standards for the prior delivery year. Waivers
19        approved for lack of equity eligible persons or equity
20        eligible contractors in a geographic area of a project
21        shall not count against the approved vendor or
22        designee. The Agency shall offer a corrective action
23        plan for any such entities to assist them in obtaining
24        compliance and shall allow continued access to
25        procurement programs upon an approved vendor or
26        designee demonstrating compliance.

 

 

SB3037- 134 -LRB102 22347 SPS 31484 b

1            (E) The Agency shall pursue efficiencies achieved
2        by combining with other approved vendor or designee
3        reporting.
4        (2) Equity accountability system within the Adjustable
5    Block program. The equity category described in item (vi)
6    of subparagraph (K) of subsection (c) is only available to
7    applicants that are equity eligible contractors.
8        (3) Equity accountability system within competitive
9    procurements. Through its long-term renewable resources
10    procurement plan, the Agency shall develop requirements
11    for ensuring that competitive procurement processes,
12    including utility-scale solar, utility-scale wind, and
13    brownfield site photovoltaic projects, advance the equity
14    goals of this subsection (c-10). Subject to Commission
15    approval, the Agency shall develop bid application
16    requirements and a bid evaluation methodology for ensuring
17    that utilization of equity eligible contractors, whether
18    as bidders or as participants on project development, is
19    optimized, including requiring that winning or successful
20    applicants for utility-scale projects are or will partner
21    with equity eligible contractors and giving preference to
22    bids through which a higher portion of contract value
23    flows to equity eligible contractors. To the extent
24    practicable, entities participating in competitive
25    procurements shall also be required to meet all the equity
26    accountability requirements for approved vendors and their

 

 

SB3037- 135 -LRB102 22347 SPS 31484 b

1    designees under this subsection (c-10). In developing
2    these requirements, the Agency shall also consider whether
3    equity goals can be further advanced through additional
4    measures.
5        (4) In the first revision to the long-term renewable
6    energy resources procurement plan and each revision
7    thereafter, the Agency shall include the following:
8            (A) The current status and number of equity
9        eligible contractors listed in the Energy Workforce
10        Equity Database designed in subsection (c-25),
11        including the number of equity eligible contractors
12        with current certifications as issued by the Agency.
13            (B) A mechanism for measuring, tracking, and
14        reporting project workforce at the approved vendor or
15        designee level, as applicable, which shall include a
16        measurement methodology and records to be made
17        available for audit by the Agency or the Program
18        Administrator.
19            (C) A program for approved vendors, designees,
20        eligible persons, and equity eligible contractors to
21        receive trainings, guidance, and other support from
22        the Agency or its designee regarding the equity
23        category outlined in item (vi) of subparagraph (K) of
24        paragraph (1) of subsection (c) and in meeting the
25        minimum equity standards of this subsection (c-10).
26            (D) A process for certifying equity eligible

 

 

SB3037- 136 -LRB102 22347 SPS 31484 b

1        contractors and equity eligible persons. The
2        certification process shall coordinate with the Energy
3        Workforce Equity Database set forth in subsection
4        (c-25).
5            (E) An application for waiver of the minimum
6        equity standards of this subsection, which the Agency
7        shall have the discretion to grant in rare
8        circumstances. The Agency may grant such a waiver
9        where the applicant provides evidence of significant
10        efforts toward meeting the minimum equity commitment,
11        including: use of the Energy Workforce Equity
12        Database; efforts to hire or contract with entities
13        that hire eligible persons; and efforts to establish
14        contracting relationships with eligible contractors.
15        The Agency shall support applicants in understanding
16        the Energy Workforce Equity Database and other
17        resources for pursuing compliance of the minimum
18        equity standards. Waivers shall be project-specific,
19        unless the Agency deems it necessary to grant a waiver
20        across a portfolio of projects, and in effect for no
21        longer than one year. Any waiver extension or
22        subsequent waiver request from an applicant shall be
23        subject to the requirements of this Section and shall
24        specify efforts made to reach compliance. When
25        considering whether to grant a waiver, and to what
26        extent, the Agency shall consider the degree to which

 

 

SB3037- 137 -LRB102 22347 SPS 31484 b

1        similarly situated applicants have been able to meet
2        these minimum equity commitments. For repeated waiver
3        requests for specific lack of eligible persons or
4        eligible contractors available, the Agency shall make
5        recommendations to target recruitment to add such
6        eligible persons or eligible contractors to the
7        database.
8        (5) The Agency shall collect information about work on
9    projects or portfolios of projects subject to these
10    minimum equity standards to ensure compliance with this
11    subsection (c-10). Reporting in furtherance of this
12    requirement may be combined with other annual reporting
13    requirements. Such reporting shall include proof of
14    certification of each equity eligible contractor or equity
15    eligible person during the applicable time period.
16        (6) The Agency shall keep confidential all information
17    and communication that provides private or personal
18    information.
19        (7) Modifications to the equity accountability system.
20    As part of the update of the long-term renewable resources
21    procurement plan to be initiated in 2023, or sooner if the
22    Agency deems necessary, the Agency shall determine the
23    extent to which the equity accountability system described
24    in this subsection (c-10) has advanced the goals of this
25    amendatory Act of the 102nd General Assembly, including
26    through the inclusion of equity eligible persons and

 

 

SB3037- 138 -LRB102 22347 SPS 31484 b

1    equity eligible contractors in renewable energy credit
2    projects. If the Agency finds that the equity
3    accountability system has failed to meet those goals to
4    its fullest potential, the Agency may revise the following
5    criteria for future Agency procurements: (A) the
6    percentage of project workforce, or other appropriate
7    workforce measure, certified as equity eligible persons or
8    equity eligible contractors; (B) definitions for equity
9    investment eligible persons and equity investment eligible
10    community; and (C) such other modifications necessary to
11    advance the goals of this amendatory Act of the 102nd
12    General Assembly effectively. Such revised criteria may
13    also establish distinct equity accountability systems for
14    different types of procurements or different regions of
15    the State if the Agency finds that doing so will further
16    the purposes of such programs. Revisions shall be
17    developed with stakeholder input, including from equity
18    eligible persons, equity eligible contractors, and
19    community-based organizations that work with such persons
20    and contractors.
21    (c-15) Racial discrimination elimination powers and
22process.
23        (1) Purpose. It is the purpose of this subsection to
24    empower the Agency and other State actors to remedy racial
25    discrimination in Illinois' clean energy economy as
26    effectively and expediently as possible, including through

 

 

SB3037- 139 -LRB102 22347 SPS 31484 b

1    the use of race-conscious remedies, such as race-conscious
2    contracting and hiring goals, as consistent with State and
3    federal law.
4        (2) Racial disparity and discrimination review
5    process.
6            (A) Within one year after awarding contracts using
7        the equity actions processes established in this
8        Section, the Agency shall publish a report evaluating
9        the effectiveness of the equity actions point criteria
10        of this Section in increasing participation of equity
11        eligible persons and equity eligible contractors. The
12        report shall disaggregate participating workers and
13        contractors by race and ethnicity. The report shall be
14        forwarded to the Governor, the General Assembly, and
15        the Illinois Commerce Commission and be made available
16        to the public.
17            (B) As soon as is practicable thereafter, the
18        Agency, in consultation with the Department of
19        Commerce and Economic Opportunity, Department of
20        Labor, and other agencies that may be relevant, shall
21        commission and publish a disparity and availability
22        study that measures the presence and impact of
23        discrimination on minority businesses and workers in
24        Illinois' clean energy economy. The Agency may hire
25        consultants and experts to conduct the disparity and
26        availability study, with the retention of those

 

 

SB3037- 140 -LRB102 22347 SPS 31484 b

1        consultants and experts exempt from the requirements
2        of Section 20-10 of the Illinois Procurement Code. The
3        Illinois Power Agency shall forward a copy of its
4        findings and recommendations to the Governor, the
5        General Assembly, and the Illinois Commerce
6        Commission. If the disparity and availability study
7        establishes a strong basis in evidence that there is
8        discrimination in Illinois' clean energy economy, the
9        Agency, Department of Commerce and Economic
10        Opportunity, Department of Labor, Department of
11        Corrections, and other appropriate agencies shall take
12        appropriate remedial actions, including race-conscious
13        remedial actions as consistent with State and federal
14        law, to effectively remedy this discrimination. Such
15        remedies may include modification of the equity
16        accountability system as described in subsection
17        (c-10).
18    (c-20) Program data collection.
19        (1) Purpose. Data collection, data analysis, and
20    reporting are critical to ensure that the benefits of the
21    clean energy economy provided to Illinois residents and
22    businesses are equitably distributed across the State. The
23    Agency shall collect data from program applicants in order
24    to track and improve equitable distribution of benefits
25    across Illinois communities for all procurements the
26    Agency conducts. The Agency shall use this data to, among

 

 

SB3037- 141 -LRB102 22347 SPS 31484 b

1    other things, measure any potential impact of racial
2    discrimination on the distribution of benefits and provide
3    information necessary to correct any discrimination
4    through methods consistent with State and federal law.
5        (2) Agency collection of program data. The Agency
6    shall collect demographic and geographic data for each
7    entity awarded contracts under any Agency-administered
8    program.
9        (3) Required information to be collected. The Agency
10    shall collect the following information from applicants
11    and program participants where applicable:
12            (A) demographic information, including racial or
13        ethnic identity for real persons employed, contracted,
14        or subcontracted through the program and owners of
15        businesses or entities that apply to receive renewable
16        energy credits from the Agency;
17            (B) geographic location of the residency of real
18        persons employed, contracted, or subcontracted through
19        the program and geographic location of the
20        headquarters of the business or entity that applies to
21        receive renewable energy credits from the Agency; and
22            (C) any other information the Agency determines is
23        necessary for the purpose of achieving the purpose of
24        this subsection.
25        (4) Publication of collected information. The Agency
26    shall publish, at least annually, information on the

 

 

SB3037- 142 -LRB102 22347 SPS 31484 b

1    demographics of program participants on an aggregate
2    basis.
3        (5) Nothing in this subsection shall be interpreted to
4    limit the authority of the Agency, or other agency or
5    department of the State, to require or collect demographic
6    information from applicants of other State programs.
7    (c-25) Energy Workforce Equity Database.
8        (1) The Agency, in consultation with the Department of
9    Commerce and Economic Opportunity, shall create an Energy
10    Workforce Equity Database, and may contract with a third
11    party to do so ("database program administrator"). If the
12    Department decides to contract with a third party, that
13    third party shall be exempt from the requirements of
14    Section 20-10 of the Illinois Procurement Code. The Energy
15    Workforce Equity Database shall be a searchable database
16    of suppliers, vendors, and subcontractors for clean energy
17    industries that is:
18            (A) publicly accessible;
19            (B) easy for people to find and use;
20            (C) organized by company specialty or field;
21            (D) region-specific; and
22            (E) populated with information including, but not
23        limited to, contacts for suppliers, vendors, or
24        subcontractors who are minority and women-owned
25        business enterprise certified or who participate or
26        have participated in any of the programs described in

 

 

SB3037- 143 -LRB102 22347 SPS 31484 b

1        this Act.
2        (2) The Agency shall create an easily accessible,
3    public facing online tool using the database information
4    that includes, at a minimum, the following:
5            (A) a map of environmental justice and equity
6        investment eligible communities;
7            (B) job postings and recruiting opportunities;
8            (C) a means by which recruiting clean energy
9        companies can find and interact with current or former
10        participants of clean energy workforce training
11        programs;
12            (D) information on workforce training service
13        providers and training opportunities available to
14        prospective workers;
15            (E) renewable energy company diversity reporting;
16            (F) a list of equity eligible contractors with
17        their contact information, types of work performed,
18        and locations worked in;
19            (G) reporting on outcomes of the programs
20        described in the workforce programs of the Energy
21        Transition Act, including information such as, but not
22        limited to, retention rate, graduation rate, and
23        placement rates of trainees; and
24            (H) information about the Jobs and Environmental
25        Justice Grant Program, the Clean Energy Jobs and
26        Justice Fund, and other sources of capital.

 

 

SB3037- 144 -LRB102 22347 SPS 31484 b

1        (3) The Agency shall ensure the database is regularly
2    updated to ensure information is current and shall
3    coordinate with the Department of Commerce and Economic
4    Opportunity to ensure that it includes information on
5    individuals and entities that are or have participated in
6    the Clean Jobs Workforce Network Program, Clean Energy
7    Contractor Incubator Program, Returning Residents Clean
8    Jobs Training Program, or Clean Energy Primes Contractor
9    Accelerator Program.
10    (c-30) Enforcement of minimum equity standards. All
11entities seeking renewable energy credits must submit an
12annual report to demonstrate compliance with each of the
13equity commitments required under subsection (c-10). If the
14Agency concludes the entity has not met or maintained its
15minimum equity standards required under the applicable
16subparagraphs under subsection (c-10), the Agency shall deny
17the entity's ability to participate in procurement programs in
18subsection (c), including by withholding approved vendor or
19designee status. The Agency may require the entity to enter
20into a corrective action plan. An entity that is not
21recertified for failing to meet required equity actions in
22subparagraph (c-10) may reapply once they have a corrective
23action plan and achieve compliance with the minimum equity
24standards.
25    (d) Clean coal portfolio standard.
26        (1) The procurement plans shall include electricity

 

 

SB3037- 145 -LRB102 22347 SPS 31484 b

1    generated using clean coal. Each utility shall enter into
2    one or more sourcing agreements with the initial clean
3    coal facility, as provided in paragraph (3) of this
4    subsection (d), covering electricity generated by the
5    initial clean coal facility representing at least 5% of
6    each utility's total supply to serve the load of eligible
7    retail customers in 2015 and each year thereafter, as
8    described in paragraph (3) of this subsection (d), subject
9    to the limits specified in paragraph (2) of this
10    subsection (d). It is the goal of the State that by January
11    1, 2025, 25% of the electricity used in the State shall be
12    generated by cost-effective clean coal facilities. For
13    purposes of this subsection (d), "cost-effective" means
14    that the expenditures pursuant to such sourcing agreements
15    do not cause the limit stated in paragraph (2) of this
16    subsection (d) to be exceeded and do not exceed cost-based
17    benchmarks, which shall be developed to assess all
18    expenditures pursuant to such sourcing agreements covering
19    electricity generated by clean coal facilities, other than
20    the initial clean coal facility, by the procurement
21    administrator, in consultation with the Commission staff,
22    Agency staff, and the procurement monitor and shall be
23    subject to Commission review and approval.
24        A utility party to a sourcing agreement shall
25    immediately retire any emission credits that it receives
26    in connection with the electricity covered by such

 

 

SB3037- 146 -LRB102 22347 SPS 31484 b

1    agreement.
2        Utilities shall maintain adequate records documenting
3    the purchases under the sourcing agreement to comply with
4    this subsection (d) and shall file an accounting with the
5    load forecast that must be filed with the Agency by July 15
6    of each year, in accordance with subsection (d) of Section
7    16-111.5 of the Public Utilities Act.
8        A utility shall be deemed to have complied with the
9    clean coal portfolio standard specified in this subsection
10    (d) if the utility enters into a sourcing agreement as
11    required by this subsection (d).
12        (2) For purposes of this subsection (d), the required
13    execution of sourcing agreements with the initial clean
14    coal facility for a particular year shall be measured as a
15    percentage of the actual amount of electricity
16    (megawatt-hours) supplied by the electric utility to
17    eligible retail customers in the planning year ending
18    immediately prior to the agreement's execution. For
19    purposes of this subsection (d), the amount paid per
20    kilowatthour means the total amount paid for electric
21    service expressed on a per kilowatthour basis. For
22    purposes of this subsection (d), the total amount paid for
23    electric service includes without limitation amounts paid
24    for supply, transmission, distribution, surcharges and
25    add-on taxes.
26        Notwithstanding the requirements of this subsection

 

 

SB3037- 147 -LRB102 22347 SPS 31484 b

1    (d), the total amount paid under sourcing agreements with
2    clean coal facilities pursuant to the procurement plan for
3    any given year shall be reduced by an amount necessary to
4    limit the annual estimated average net increase due to the
5    costs of these resources included in the amounts paid by
6    eligible retail customers in connection with electric
7    service to:
8            (A) in 2010, no more than 0.5% of the amount paid
9        per kilowatthour by those customers during the year
10        ending May 31, 2009;
11            (B) in 2011, the greater of an additional 0.5% of
12        the amount paid per kilowatthour by those customers
13        during the year ending May 31, 2010 or 1% of the amount
14        paid per kilowatthour by those customers during the
15        year ending May 31, 2009;
16            (C) in 2012, the greater of an additional 0.5% of
17        the amount paid per kilowatthour by those customers
18        during the year ending May 31, 2011 or 1.5% of the
19        amount paid per kilowatthour by those customers during
20        the year ending May 31, 2009;
21            (D) in 2013, the greater of an additional 0.5% of
22        the amount paid per kilowatthour by those customers
23        during the year ending May 31, 2012 or 2% of the amount
24        paid per kilowatthour by those customers during the
25        year ending May 31, 2009; and
26            (E) thereafter, the total amount paid under

 

 

SB3037- 148 -LRB102 22347 SPS 31484 b

1        sourcing agreements with clean coal facilities
2        pursuant to the procurement plan for any single year
3        shall be reduced by an amount necessary to limit the
4        estimated average net increase due to the cost of
5        these resources included in the amounts paid by
6        eligible retail customers in connection with electric
7        service to no more than the greater of (i) 2.015% of
8        the amount paid per kilowatthour by those customers
9        during the year ending May 31, 2009 or (ii) the
10        incremental amount per kilowatthour paid for these
11        resources in 2013. These requirements may be altered
12        only as provided by statute.
13        No later than June 30, 2015, the Commission shall
14    review the limitation on the total amount paid under
15    sourcing agreements, if any, with clean coal facilities
16    pursuant to this subsection (d) and report to the General
17    Assembly its findings as to whether that limitation unduly
18    constrains the amount of electricity generated by
19    cost-effective clean coal facilities that is covered by
20    sourcing agreements.
21        (3) Initial clean coal facility. In order to promote
22    development of clean coal facilities in Illinois, each
23    electric utility subject to this Section shall execute a
24    sourcing agreement to source electricity from a proposed
25    clean coal facility in Illinois (the "initial clean coal
26    facility") that will have a nameplate capacity of at least

 

 

SB3037- 149 -LRB102 22347 SPS 31484 b

1    500 MW when commercial operation commences, that has a
2    final Clean Air Act permit on June 1, 2009 (the effective
3    date of Public Act 95-1027), and that will meet the
4    definition of clean coal facility in Section 1-10 of this
5    Act when commercial operation commences. The sourcing
6    agreements with this initial clean coal facility shall be
7    subject to both approval of the initial clean coal
8    facility by the General Assembly and satisfaction of the
9    requirements of paragraph (4) of this subsection (d) and
10    shall be executed within 90 days after any such approval
11    by the General Assembly. The Agency and the Commission
12    shall have authority to inspect all books and records
13    associated with the initial clean coal facility during the
14    term of such a sourcing agreement. A utility's sourcing
15    agreement for electricity produced by the initial clean
16    coal facility shall include:
17            (A) a formula contractual price (the "contract
18        price") approved pursuant to paragraph (4) of this
19        subsection (d), which shall:
20                (i) be determined using a cost of service
21            methodology employing either a level or deferred
22            capital recovery component, based on a capital
23            structure consisting of 45% equity and 55% debt,
24            and a return on equity as may be approved by the
25            Federal Energy Regulatory Commission, which in any
26            case may not exceed the lower of 11.5% or the rate

 

 

SB3037- 150 -LRB102 22347 SPS 31484 b

1            of return approved by the General Assembly
2            pursuant to paragraph (4) of this subsection (d);
3            and
4                (ii) provide that all miscellaneous net
5            revenue, including but not limited to net revenue
6            from the sale of emission allowances, if any,
7            substitute natural gas, if any, grants or other
8            support provided by the State of Illinois or the
9            United States Government, firm transmission
10            rights, if any, by-products produced by the
11            facility, energy or capacity derived from the
12            facility and not covered by a sourcing agreement
13            pursuant to paragraph (3) of this subsection (d)
14            or item (5) of subsection (d) of Section 16-115 of
15            the Public Utilities Act, whether generated from
16            the synthesis gas derived from coal, from SNG, or
17            from natural gas, shall be credited against the
18            revenue requirement for this initial clean coal
19            facility;
20            (B) power purchase provisions, which shall:
21                (i) provide that the utility party to such
22            sourcing agreement shall pay the contract price
23            for electricity delivered under such sourcing
24            agreement;
25                (ii) require delivery of electricity to the
26            regional transmission organization market of the

 

 

SB3037- 151 -LRB102 22347 SPS 31484 b

1            utility that is party to such sourcing agreement;
2                (iii) require the utility party to such
3            sourcing agreement to buy from the initial clean
4            coal facility in each hour an amount of energy
5            equal to all clean coal energy made available from
6            the initial clean coal facility during such hour
7            times a fraction, the numerator of which is such
8            utility's retail market sales of electricity
9            (expressed in kilowatthours sold) in the State
10            during the prior calendar month and the
11            denominator of which is the total retail market
12            sales of electricity (expressed in kilowatthours
13            sold) in the State by utilities during such prior
14            month and the sales of electricity (expressed in
15            kilowatthours sold) in the State by alternative
16            retail electric suppliers during such prior month
17            that are subject to the requirements of this
18            subsection (d) and paragraph (5) of subsection (d)
19            of Section 16-115 of the Public Utilities Act,
20            provided that the amount purchased by the utility
21            in any year will be limited by paragraph (2) of
22            this subsection (d); and
23                (iv) be considered pre-existing contracts in
24            such utility's procurement plans for eligible
25            retail customers;
26            (C) contract for differences provisions, which

 

 

SB3037- 152 -LRB102 22347 SPS 31484 b

1        shall:
2                (i) require the utility party to such sourcing
3            agreement to contract with the initial clean coal
4            facility in each hour with respect to an amount of
5            energy equal to all clean coal energy made
6            available from the initial clean coal facility
7            during such hour times a fraction, the numerator
8            of which is such utility's retail market sales of
9            electricity (expressed in kilowatthours sold) in
10            the utility's service territory in the State
11            during the prior calendar month and the
12            denominator of which is the total retail market
13            sales of electricity (expressed in kilowatthours
14            sold) in the State by utilities during such prior
15            month and the sales of electricity (expressed in
16            kilowatthours sold) in the State by alternative
17            retail electric suppliers during such prior month
18            that are subject to the requirements of this
19            subsection (d) and paragraph (5) of subsection (d)
20            of Section 16-115 of the Public Utilities Act,
21            provided that the amount paid by the utility in
22            any year will be limited by paragraph (2) of this
23            subsection (d);
24                (ii) provide that the utility's payment
25            obligation in respect of the quantity of
26            electricity determined pursuant to the preceding

 

 

SB3037- 153 -LRB102 22347 SPS 31484 b

1            clause (i) shall be limited to an amount equal to
2            (1) the difference between the contract price
3            determined pursuant to subparagraph (A) of
4            paragraph (3) of this subsection (d) and the
5            day-ahead price for electricity delivered to the
6            regional transmission organization market of the
7            utility that is party to such sourcing agreement
8            (or any successor delivery point at which such
9            utility's supply obligations are financially
10            settled on an hourly basis) (the "reference
11            price") on the day preceding the day on which the
12            electricity is delivered to the initial clean coal
13            facility busbar, multiplied by (2) the quantity of
14            electricity determined pursuant to the preceding
15            clause (i); and
16                (iii) not require the utility to take physical
17            delivery of the electricity produced by the
18            facility;
19            (D) general provisions, which shall:
20                (i) specify a term of no more than 30 years,
21            commencing on the commercial operation date of the
22            facility;
23                (ii) provide that utilities shall maintain
24            adequate records documenting purchases under the
25            sourcing agreements entered into to comply with
26            this subsection (d) and shall file an accounting

 

 

SB3037- 154 -LRB102 22347 SPS 31484 b

1            with the load forecast that must be filed with the
2            Agency by July 15 of each year, in accordance with
3            subsection (d) of Section 16-111.5 of the Public
4            Utilities Act;
5                (iii) provide that all costs associated with
6            the initial clean coal facility will be
7            periodically reported to the Federal Energy
8            Regulatory Commission and to purchasers in
9            accordance with applicable laws governing
10            cost-based wholesale power contracts;
11                (iv) permit the Illinois Power Agency to
12            assume ownership of the initial clean coal
13            facility, without monetary consideration and
14            otherwise on reasonable terms acceptable to the
15            Agency, if the Agency so requests no less than 3
16            years prior to the end of the stated contract
17            term;
18                (v) require the owner of the initial clean
19            coal facility to provide documentation to the
20            Commission each year, starting in the facility's
21            first year of commercial operation, accurately
22            reporting the quantity of carbon emissions from
23            the facility that have been captured and
24            sequestered and report any quantities of carbon
25            released from the site or sites at which carbon
26            emissions were sequestered in prior years, based

 

 

SB3037- 155 -LRB102 22347 SPS 31484 b

1            on continuous monitoring of such sites. If, in any
2            year after the first year of commercial operation,
3            the owner of the facility fails to demonstrate
4            that the initial clean coal facility captured and
5            sequestered at least 50% of the total carbon
6            emissions that the facility would otherwise emit
7            or that sequestration of emissions from prior
8            years has failed, resulting in the release of
9            carbon dioxide into the atmosphere, the owner of
10            the facility must offset excess emissions. Any
11            such carbon offsets must be permanent, additional,
12            verifiable, real, located within the State of
13            Illinois, and legally and practicably enforceable.
14            The cost of such offsets for the facility that are
15            not recoverable shall not exceed $15 million in
16            any given year. No costs of any such purchases of
17            carbon offsets may be recovered from a utility or
18            its customers. All carbon offsets purchased for
19            this purpose and any carbon emission credits
20            associated with sequestration of carbon from the
21            facility must be permanently retired. The initial
22            clean coal facility shall not forfeit its
23            designation as a clean coal facility if the
24            facility fails to fully comply with the applicable
25            carbon sequestration requirements in any given
26            year, provided the requisite offsets are

 

 

SB3037- 156 -LRB102 22347 SPS 31484 b

1            purchased. However, the Attorney General, on
2            behalf of the People of the State of Illinois, may
3            specifically enforce the facility's sequestration
4            requirement and the other terms of this contract
5            provision. Compliance with the sequestration
6            requirements and offset purchase requirements
7            specified in paragraph (3) of this subsection (d)
8            shall be reviewed annually by an independent
9            expert retained by the owner of the initial clean
10            coal facility, with the advance written approval
11            of the Attorney General. The Commission may, in
12            the course of the review specified in item (vii),
13            reduce the allowable return on equity for the
14            facility if the facility willfully fails to comply
15            with the carbon capture and sequestration
16            requirements set forth in this item (v);
17                (vi) include limits on, and accordingly
18            provide for modification of, the amount the
19            utility is required to source under the sourcing
20            agreement consistent with paragraph (2) of this
21            subsection (d);
22                (vii) require Commission review: (1) to
23            determine the justness, reasonableness, and
24            prudence of the inputs to the formula referenced
25            in subparagraphs (A)(i) through (A)(iii) of
26            paragraph (3) of this subsection (d), prior to an

 

 

SB3037- 157 -LRB102 22347 SPS 31484 b

1            adjustment in those inputs including, without
2            limitation, the capital structure and return on
3            equity, fuel costs, and other operations and
4            maintenance costs and (2) to approve the costs to
5            be passed through to customers under the sourcing
6            agreement by which the utility satisfies its
7            statutory obligations. Commission review shall
8            occur no less than every 3 years, regardless of
9            whether any adjustments have been proposed, and
10            shall be completed within 9 months;
11                (viii) limit the utility's obligation to such
12            amount as the utility is allowed to recover
13            through tariffs filed with the Commission,
14            provided that neither the clean coal facility nor
15            the utility waives any right to assert federal
16            pre-emption or any other argument in response to a
17            purported disallowance of recovery costs;
18                (ix) limit the utility's or alternative retail
19            electric supplier's obligation to incur any
20            liability until such time as the facility is in
21            commercial operation and generating power and
22            energy and such power and energy is being
23            delivered to the facility busbar;
24                (x) provide that the owner or owners of the
25            initial clean coal facility, which is the
26            counterparty to such sourcing agreement, shall

 

 

SB3037- 158 -LRB102 22347 SPS 31484 b

1            have the right from time to time to elect whether
2            the obligations of the utility party thereto shall
3            be governed by the power purchase provisions or
4            the contract for differences provisions;
5                (xi) append documentation showing that the
6            formula rate and contract, insofar as they relate
7            to the power purchase provisions, have been
8            approved by the Federal Energy Regulatory
9            Commission pursuant to Section 205 of the Federal
10            Power Act;
11                (xii) provide that any changes to the terms of
12            the contract, insofar as such changes relate to
13            the power purchase provisions, are subject to
14            review under the public interest standard applied
15            by the Federal Energy Regulatory Commission
16            pursuant to Sections 205 and 206 of the Federal
17            Power Act; and
18                (xiii) conform with customary lender
19            requirements in power purchase agreements used as
20            the basis for financing non-utility generators.
21        (4) Effective date of sourcing agreements with the
22    initial clean coal facility. Any proposed sourcing
23    agreement with the initial clean coal facility shall not
24    become effective unless the following reports are prepared
25    and submitted and authorizations and approvals obtained:
26            (i) Facility cost report. The owner of the initial

 

 

SB3037- 159 -LRB102 22347 SPS 31484 b

1        clean coal facility shall submit to the Commission,
2        the Agency, and the General Assembly a front-end
3        engineering and design study, a facility cost report,
4        method of financing (including but not limited to
5        structure and associated costs), and an operating and
6        maintenance cost quote for the facility (collectively
7        "facility cost report"), which shall be prepared in
8        accordance with the requirements of this paragraph (4)
9        of subsection (d) of this Section, and shall provide
10        the Commission and the Agency access to the work
11        papers, relied upon documents, and any other backup
12        documentation related to the facility cost report.
13            (ii) Commission report. Within 6 months following
14        receipt of the facility cost report, the Commission,
15        in consultation with the Agency, shall submit a report
16        to the General Assembly setting forth its analysis of
17        the facility cost report. Such report shall include,
18        but not be limited to, a comparison of the costs
19        associated with electricity generated by the initial
20        clean coal facility to the costs associated with
21        electricity generated by other types of generation
22        facilities, an analysis of the rate impacts on
23        residential and small business customers over the life
24        of the sourcing agreements, and an analysis of the
25        likelihood that the initial clean coal facility will
26        commence commercial operation by and be delivering

 

 

SB3037- 160 -LRB102 22347 SPS 31484 b

1        power to the facility's busbar by 2016. To assist in
2        the preparation of its report, the Commission, in
3        consultation with the Agency, may hire one or more
4        experts or consultants, the costs of which shall be
5        paid for by the owner of the initial clean coal
6        facility. The Commission and Agency may begin the
7        process of selecting such experts or consultants prior
8        to receipt of the facility cost report.
9            (iii) General Assembly approval. The proposed
10        sourcing agreements shall not take effect unless,
11        based on the facility cost report and the Commission's
12        report, the General Assembly enacts authorizing
13        legislation approving (A) the projected price, stated
14        in cents per kilowatthour, to be charged for
15        electricity generated by the initial clean coal
16        facility, (B) the projected impact on residential and
17        small business customers' bills over the life of the
18        sourcing agreements, and (C) the maximum allowable
19        return on equity for the project; and
20            (iv) Commission review. If the General Assembly
21        enacts authorizing legislation pursuant to
22        subparagraph (iii) approving a sourcing agreement, the
23        Commission shall, within 90 days of such enactment,
24        complete a review of such sourcing agreement. During
25        such time period, the Commission shall implement any
26        directive of the General Assembly, resolve any

 

 

SB3037- 161 -LRB102 22347 SPS 31484 b

1        disputes between the parties to the sourcing agreement
2        concerning the terms of such agreement, approve the
3        form of such agreement, and issue an order finding
4        that the sourcing agreement is prudent and reasonable.
5        The facility cost report shall be prepared as follows:
6            (A) The facility cost report shall be prepared by
7        duly licensed engineering and construction firms
8        detailing the estimated capital costs payable to one
9        or more contractors or suppliers for the engineering,
10        procurement and construction of the components
11        comprising the initial clean coal facility and the
12        estimated costs of operation and maintenance of the
13        facility. The facility cost report shall include:
14                (i) an estimate of the capital cost of the
15            core plant based on one or more front end
16            engineering and design studies for the
17            gasification island and related facilities. The
18            core plant shall include all civil, structural,
19            mechanical, electrical, control, and safety
20            systems.
21                (ii) an estimate of the capital cost of the
22            balance of the plant, including any capital costs
23            associated with sequestration of carbon dioxide
24            emissions and all interconnects and interfaces
25            required to operate the facility, such as
26            transmission of electricity, construction or

 

 

SB3037- 162 -LRB102 22347 SPS 31484 b

1            backfeed power supply, pipelines to transport
2            substitute natural gas or carbon dioxide, potable
3            water supply, natural gas supply, water supply,
4            water discharge, landfill, access roads, and coal
5            delivery.
6            The quoted construction costs shall be expressed
7        in nominal dollars as of the date that the quote is
8        prepared and shall include capitalized financing costs
9        during construction, taxes, insurance, and other
10        owner's costs, and an assumed escalation in materials
11        and labor beyond the date as of which the construction
12        cost quote is expressed.
13            (B) The front end engineering and design study for
14        the gasification island and the cost study for the
15        balance of plant shall include sufficient design work
16        to permit quantification of major categories of
17        materials, commodities and labor hours, and receipt of
18        quotes from vendors of major equipment required to
19        construct and operate the clean coal facility.
20            (C) The facility cost report shall also include an
21        operating and maintenance cost quote that will provide
22        the estimated cost of delivered fuel, personnel,
23        maintenance contracts, chemicals, catalysts,
24        consumables, spares, and other fixed and variable
25        operations and maintenance costs. The delivered fuel
26        cost estimate will be provided by a recognized third

 

 

SB3037- 163 -LRB102 22347 SPS 31484 b

1        party expert or experts in the fuel and transportation
2        industries. The balance of the operating and
3        maintenance cost quote, excluding delivered fuel
4        costs, will be developed based on the inputs provided
5        by duly licensed engineering and construction firms
6        performing the construction cost quote, potential
7        vendors under long-term service agreements and plant
8        operating agreements, or recognized third party plant
9        operator or operators.
10            The operating and maintenance cost quote
11        (including the cost of the front end engineering and
12        design study) shall be expressed in nominal dollars as
13        of the date that the quote is prepared and shall
14        include taxes, insurance, and other owner's costs, and
15        an assumed escalation in materials and labor beyond
16        the date as of which the operating and maintenance
17        cost quote is expressed.
18            (D) The facility cost report shall also include an
19        analysis of the initial clean coal facility's ability
20        to deliver power and energy into the applicable
21        regional transmission organization markets and an
22        analysis of the expected capacity factor for the
23        initial clean coal facility.
24            (E) Amounts paid to third parties unrelated to the
25        owner or owners of the initial clean coal facility to
26        prepare the core plant construction cost quote,

 

 

SB3037- 164 -LRB102 22347 SPS 31484 b

1        including the front end engineering and design study,
2        and the operating and maintenance cost quote will be
3        reimbursed through Coal Development Bonds.
4        (5) Re-powering and retrofitting coal-fired power
5    plants previously owned by Illinois utilities to qualify
6    as clean coal facilities. During the 2009 procurement
7    planning process and thereafter, the Agency and the
8    Commission shall consider sourcing agreements covering
9    electricity generated by power plants that were previously
10    owned by Illinois utilities and that have been or will be
11    converted into clean coal facilities, as defined by
12    Section 1-10 of this Act. Pursuant to such procurement
13    planning process, the owners of such facilities may
14    propose to the Agency sourcing agreements with utilities
15    and alternative retail electric suppliers required to
16    comply with subsection (d) of this Section and item (5) of
17    subsection (d) of Section 16-115 of the Public Utilities
18    Act, covering electricity generated by such facilities. In
19    the case of sourcing agreements that are power purchase
20    agreements, the contract price for electricity sales shall
21    be established on a cost of service basis. In the case of
22    sourcing agreements that are contracts for differences,
23    the contract price from which the reference price is
24    subtracted shall be established on a cost of service
25    basis. The Agency and the Commission may approve any such
26    utility sourcing agreements that do not exceed cost-based

 

 

SB3037- 165 -LRB102 22347 SPS 31484 b

1    benchmarks developed by the procurement administrator, in
2    consultation with the Commission staff, Agency staff and
3    the procurement monitor, subject to Commission review and
4    approval. The Commission shall have authority to inspect
5    all books and records associated with these clean coal
6    facilities during the term of any such contract.
7        (6) Costs incurred under this subsection (d) or
8    pursuant to a contract entered into under this subsection
9    (d) shall be deemed prudently incurred and reasonable in
10    amount and the electric utility shall be entitled to full
11    cost recovery pursuant to the tariffs filed with the
12    Commission.
13    (d-5) Zero emission standard.
14        (1) Beginning with the delivery year commencing on
15    June 1, 2017, the Agency shall, for electric utilities
16    that serve at least 100,000 retail customers in this
17    State, procure contracts with zero emission facilities
18    that are reasonably capable of generating cost-effective
19    zero emission credits in an amount approximately equal to
20    16% of the actual amount of electricity delivered by each
21    electric utility to retail customers in the State during
22    calendar year 2014. For an electric utility serving fewer
23    than 100,000 retail customers in this State that
24    requested, under Section 16-111.5 of the Public Utilities
25    Act, that the Agency procure power and energy for all or a
26    portion of the utility's Illinois load for the delivery

 

 

SB3037- 166 -LRB102 22347 SPS 31484 b

1    year commencing June 1, 2016, the Agency shall procure
2    contracts with zero emission facilities that are
3    reasonably capable of generating cost-effective zero
4    emission credits in an amount approximately equal to 16%
5    of the portion of power and energy to be procured by the
6    Agency for the utility. The duration of the contracts
7    procured under this subsection (d-5) shall be for a term
8    of 10 years ending May 31, 2027. The quantity of zero
9    emission credits to be procured under the contracts shall
10    be all of the zero emission credits generated by the zero
11    emission facility in each delivery year; however, if the
12    zero emission facility is owned by more than one entity,
13    then the quantity of zero emission credits to be procured
14    under the contracts shall be the amount of zero emission
15    credits that are generated from the portion of the zero
16    emission facility that is owned by the winning supplier.
17        The 16% value identified in this paragraph (1) is the
18    average of the percentage targets in subparagraph (B) of
19    paragraph (1) of subsection (c) of this Section for the 5
20    delivery years beginning June 1, 2017.
21        The procurement process shall be subject to the
22    following provisions:
23            (A) Those zero emission facilities that intend to
24        participate in the procurement shall submit to the
25        Agency the following eligibility information for each
26        zero emission facility on or before the date

 

 

SB3037- 167 -LRB102 22347 SPS 31484 b

1        established by the Agency:
2                (i) the in-service date and remaining useful
3            life of the zero emission facility;
4                (ii) the amount of power generated annually
5            for each of the years 2005 through 2015, and the
6            projected zero emission credits to be generated
7            over the remaining useful life of the zero
8            emission facility, which shall be used to
9            determine the capability of each facility;
10                (iii) the annual zero emission facility cost
11            projections, expressed on a per megawatthour
12            basis, over the next 6 delivery years, which shall
13            include the following: operation and maintenance
14            expenses; fully allocated overhead costs, which
15            shall be allocated using the methodology developed
16            by the Institute for Nuclear Power Operations;
17            fuel expenditures; non-fuel capital expenditures;
18            spent fuel expenditures; a return on working
19            capital; the cost of operational and market risks
20            that could be avoided by ceasing operation; and
21            any other costs necessary for continued
22            operations, provided that "necessary" means, for
23            purposes of this item (iii), that the costs could
24            reasonably be avoided only by ceasing operations
25            of the zero emission facility; and
26                (iv) a commitment to continue operating, for

 

 

SB3037- 168 -LRB102 22347 SPS 31484 b

1            the duration of the contract or contracts executed
2            under the procurement held under this subsection
3            (d-5), the zero emission facility that produces
4            the zero emission credits to be procured in the
5            procurement.
6            The information described in item (iii) of this
7        subparagraph (A) may be submitted on a confidential
8        basis and shall be treated and maintained by the
9        Agency, the procurement administrator, and the
10        Commission as confidential and proprietary and exempt
11        from disclosure under subparagraphs (a) and (g) of
12        paragraph (1) of Section 7 of the Freedom of
13        Information Act. The Office of Attorney General shall
14        have access to, and maintain the confidentiality of,
15        such information pursuant to Section 6.5 of the
16        Attorney General Act.
17            (B) The price for each zero emission credit
18        procured under this subsection (d-5) for each delivery
19        year shall be in an amount that equals the Social Cost
20        of Carbon, expressed on a price per megawatthour
21        basis. However, to ensure that the procurement remains
22        affordable to retail customers in this State if
23        electricity prices increase, the price in an
24        applicable delivery year shall be reduced below the
25        Social Cost of Carbon by the amount ("Price
26        Adjustment") by which the market price index for the

 

 

SB3037- 169 -LRB102 22347 SPS 31484 b

1        applicable delivery year exceeds the baseline market
2        price index for the consecutive 12-month period ending
3        May 31, 2016. If the Price Adjustment is greater than
4        or equal to the Social Cost of Carbon in an applicable
5        delivery year, then no payments shall be due in that
6        delivery year. The components of this calculation are
7        defined as follows:
8                (i) Social Cost of Carbon: The Social Cost of
9            Carbon is $16.50 per megawatthour, which is based
10            on the U.S. Interagency Working Group on Social
11            Cost of Carbon's price in the August 2016
12            Technical Update using a 3% discount rate,
13            adjusted for inflation for each year of the
14            program. Beginning with the delivery year
15            commencing June 1, 2023, the price per
16            megawatthour shall increase by $1 per
17            megawatthour, and continue to increase by an
18            additional $1 per megawatthour each delivery year
19            thereafter.
20                (ii) Baseline market price index: The baseline
21            market price index for the consecutive 12-month
22            period ending May 31, 2016 is $31.40 per
23            megawatthour, which is based on the sum of (aa)
24            the average day-ahead energy price across all
25            hours of such 12-month period at the PJM
26            Interconnection LLC Northern Illinois Hub, (bb)

 

 

SB3037- 170 -LRB102 22347 SPS 31484 b

1            50% multiplied by the Base Residual Auction, or
2            its successor, capacity price for the rest of the
3            RTO zone group determined by PJM Interconnection
4            LLC, divided by 24 hours per day, and (cc) 50%
5            multiplied by the Planning Resource Auction, or
6            its successor, capacity price for Zone 4
7            determined by the Midcontinent Independent System
8            Operator, Inc., divided by 24 hours per day.
9                (iii) Market price index: The market price
10            index for a delivery year shall be the sum of
11            projected energy prices and projected capacity
12            prices determined as follows:
13                    (aa) Projected energy prices: the
14                projected energy prices for the applicable
15                delivery year shall be calculated once for the
16                year using the forward market price for the
17                PJM Interconnection, LLC Northern Illinois
18                Hub. The forward market price shall be
19                calculated as follows: the energy forward
20                prices for each month of the applicable
21                delivery year averaged for each trade date
22                during the calendar year immediately preceding
23                that delivery year to produce a single energy
24                forward price for the delivery year. The
25                forward market price calculation shall use
26                data published by the Intercontinental

 

 

SB3037- 171 -LRB102 22347 SPS 31484 b

1                Exchange, or its successor.
2                    (bb) Projected capacity prices:
3                        (I) For the delivery years commencing
4                    June 1, 2017, June 1, 2018, and June 1,
5                    2019, the projected capacity price shall
6                    be equal to the sum of (1) 50% multiplied
7                    by the Base Residual Auction, or its
8                    successor, price for the rest of the RTO
9                    zone group as determined by PJM
10                    Interconnection LLC, divided by 24 hours
11                    per day and, (2) 50% multiplied by the
12                    resource auction price determined in the
13                    resource auction administered by the
14                    Midcontinent Independent System Operator,
15                    Inc., in which the largest percentage of
16                    load cleared for Local Resource Zone 4,
17                    divided by 24 hours per day, and where
18                    such price is determined by the
19                    Midcontinent Independent System Operator,
20                    Inc.
21                        (II) For the delivery year commencing
22                    June 1, 2020, and each year thereafter,
23                    the projected capacity price shall be
24                    equal to the sum of (1) 50% multiplied by
25                    the Base Residual Auction, or its
26                    successor, price for the ComEd zone as

 

 

SB3037- 172 -LRB102 22347 SPS 31484 b

1                    determined by PJM Interconnection LLC,
2                    divided by 24 hours per day, and (2) 50%
3                    multiplied by the resource auction price
4                    determined in the resource auction
5                    administered by the Midcontinent
6                    Independent System Operator, Inc., in
7                    which the largest percentage of load
8                    cleared for Local Resource Zone 4, divided
9                    by 24 hours per day, and where such price
10                    is determined by the Midcontinent
11                    Independent System Operator, Inc.
12            For purposes of this subsection (d-5):
13                "Rest of the RTO" and "ComEd Zone" shall have
14            the meaning ascribed to them by PJM
15            Interconnection, LLC.
16                "RTO" means regional transmission
17            organization.
18            (C) No later than 45 days after June 1, 2017 (the
19        effective date of Public Act 99-906), the Agency shall
20        publish its proposed zero emission standard
21        procurement plan. The plan shall be consistent with
22        the provisions of this paragraph (1) and shall provide
23        that winning bids shall be selected based on public
24        interest criteria that include, but are not limited
25        to, minimizing carbon dioxide emissions that result
26        from electricity consumed in Illinois and minimizing

 

 

SB3037- 173 -LRB102 22347 SPS 31484 b

1        sulfur dioxide, nitrogen oxide, and particulate matter
2        emissions that adversely affect the citizens of this
3        State. In particular, the selection of winning bids
4        shall take into account the incremental environmental
5        benefits resulting from the procurement, such as any
6        existing environmental benefits that are preserved by
7        the procurements held under Public Act 99-906 and
8        would cease to exist if the procurements were not
9        held, including the preservation of zero emission
10        facilities. The plan shall also describe in detail how
11        each public interest factor shall be considered and
12        weighted in the bid selection process to ensure that
13        the public interest criteria are applied to the
14        procurement and given full effect.
15            For purposes of developing the plan, the Agency
16        shall consider any reports issued by a State agency,
17        board, or commission under House Resolution 1146 of
18        the 98th General Assembly and paragraph (4) of
19        subsection (d) of this Section, as well as publicly
20        available analyses and studies performed by or for
21        regional transmission organizations that serve the
22        State and their independent market monitors.
23            Upon publishing of the zero emission standard
24        procurement plan, copies of the plan shall be posted
25        and made publicly available on the Agency's website.
26        All interested parties shall have 10 days following

 

 

SB3037- 174 -LRB102 22347 SPS 31484 b

1        the date of posting to provide comment to the Agency on
2        the plan. All comments shall be posted to the Agency's
3        website. Following the end of the comment period, but
4        no more than 60 days later than June 1, 2017 (the
5        effective date of Public Act 99-906), the Agency shall
6        revise the plan as necessary based on the comments
7        received and file its zero emission standard
8        procurement plan with the Commission.
9            If the Commission determines that the plan will
10        result in the procurement of cost-effective zero
11        emission credits, then the Commission shall, after
12        notice and hearing, but no later than 45 days after the
13        Agency filed the plan, approve the plan or approve
14        with modification. For purposes of this subsection
15        (d-5), "cost effective" means the projected costs of
16        procuring zero emission credits from zero emission
17        facilities do not cause the limit stated in paragraph
18        (2) of this subsection to be exceeded.
19            (C-5) As part of the Commission's review and
20        acceptance or rejection of the procurement results,
21        the Commission shall, in its public notice of
22        successful bidders:
23                (i) identify how the winning bids satisfy the
24            public interest criteria described in subparagraph
25            (C) of this paragraph (1) of minimizing carbon
26            dioxide emissions that result from electricity

 

 

SB3037- 175 -LRB102 22347 SPS 31484 b

1            consumed in Illinois and minimizing sulfur
2            dioxide, nitrogen oxide, and particulate matter
3            emissions that adversely affect the citizens of
4            this State;
5                (ii) specifically address how the selection of
6            winning bids takes into account the incremental
7            environmental benefits resulting from the
8            procurement, including any existing environmental
9            benefits that are preserved by the procurements
10            held under Public Act 99-906 and would have ceased
11            to exist if the procurements had not been held,
12            such as the preservation of zero emission
13            facilities;
14                (iii) quantify the environmental benefit of
15            preserving the resources identified in item (ii)
16            of this subparagraph (C-5), including the
17            following:
18                    (aa) the value of avoided greenhouse gas
19                emissions measured as the product of the zero
20                emission facilities' output over the contract
21                term multiplied by the U.S. Environmental
22                Protection Agency eGrid subregion carbon
23                dioxide emission rate and the U.S. Interagency
24                Working Group on Social Cost of Carbon's price
25                in the August 2016 Technical Update using a 3%
26                discount rate, adjusted for inflation for each

 

 

SB3037- 176 -LRB102 22347 SPS 31484 b

1                delivery year; and
2                    (bb) the costs of replacement with other
3                zero carbon dioxide resources, including wind
4                and photovoltaic, based upon the simple
5                average of the following:
6                        (I) the price, or if there is more
7                    than one price, the average of the prices,
8                    paid for renewable energy credits from new
9                    utility-scale wind projects in the
10                    procurement events specified in item (i)
11                    of subparagraph (G) of paragraph (1) of
12                    subsection (c) of this Section; and
13                        (II) the price, or if there is more
14                    than one price, the average of the prices,
15                    paid for renewable energy credits from new
16                    utility-scale solar projects and
17                    brownfield site photovoltaic projects in
18                    the procurement events specified in item
19                    (ii) of subparagraph (G) of paragraph (1)
20                    of subsection (c) of this Section and,
21                    after January 1, 2015, renewable energy
22                    credits from photovoltaic distributed
23                    generation projects in procurement events
24                    held under subsection (c) of this Section.
25            Each utility shall enter into binding contractual
26        arrangements with the winning suppliers.

 

 

SB3037- 177 -LRB102 22347 SPS 31484 b

1            The procurement described in this subsection
2        (d-5), including, but not limited to, the execution of
3        all contracts procured, shall be completed no later
4        than May 10, 2017. Based on the effective date of
5        Public Act 99-906, the Agency and Commission may, as
6        appropriate, modify the various dates and timelines
7        under this subparagraph and subparagraphs (C) and (D)
8        of this paragraph (1). The procurement and plan
9        approval processes required by this subsection (d-5)
10        shall be conducted in conjunction with the procurement
11        and plan approval processes required by subsection (c)
12        of this Section and Section 16-111.5 of the Public
13        Utilities Act, to the extent practicable.
14        Notwithstanding whether a procurement event is
15        conducted under Section 16-111.5 of the Public
16        Utilities Act, the Agency shall immediately initiate a
17        procurement process on June 1, 2017 (the effective
18        date of Public Act 99-906).
19            (D) Following the procurement event described in
20        this paragraph (1) and consistent with subparagraph
21        (B) of this paragraph (1), the Agency shall calculate
22        the payments to be made under each contract for the
23        next delivery year based on the market price index for
24        that delivery year. The Agency shall publish the
25        payment calculations no later than May 25, 2017 and
26        every May 25 thereafter.

 

 

SB3037- 178 -LRB102 22347 SPS 31484 b

1            (E) Notwithstanding the requirements of this
2        subsection (d-5), the contracts executed under this
3        subsection (d-5) shall provide that the zero emission
4        facility may, as applicable, suspend or terminate
5        performance under the contracts in the following
6        instances:
7                (i) A zero emission facility shall be excused
8            from its performance under the contract for any
9            cause beyond the control of the resource,
10            including, but not restricted to, acts of God,
11            flood, drought, earthquake, storm, fire,
12            lightning, epidemic, war, riot, civil disturbance
13            or disobedience, labor dispute, labor or material
14            shortage, sabotage, acts of public enemy,
15            explosions, orders, regulations or restrictions
16            imposed by governmental, military, or lawfully
17            established civilian authorities, which, in any of
18            the foregoing cases, by exercise of commercially
19            reasonable efforts the zero emission facility
20            could not reasonably have been expected to avoid,
21            and which, by the exercise of commercially
22            reasonable efforts, it has been unable to
23            overcome. In such event, the zero emission
24            facility shall be excused from performance for the
25            duration of the event, including, but not limited
26            to, delivery of zero emission credits, and no

 

 

SB3037- 179 -LRB102 22347 SPS 31484 b

1            payment shall be due to the zero emission facility
2            during the duration of the event.
3                (ii) A zero emission facility shall be
4            permitted to terminate the contract if legislation
5            is enacted into law by the General Assembly that
6            imposes or authorizes a new tax, special
7            assessment, or fee on the generation of
8            electricity, the ownership or leasehold of a
9            generating unit, or the privilege or occupation of
10            such generation, ownership, or leasehold of
11            generation units by a zero emission facility.
12            However, the provisions of this item (ii) do not
13            apply to any generally applicable tax, special
14            assessment or fee, or requirements imposed by
15            federal law.
16                (iii) A zero emission facility shall be
17            permitted to terminate the contract in the event
18            that the resource requires capital expenditures in
19            excess of $40,000,000 that were neither known nor
20            reasonably foreseeable at the time it executed the
21            contract and that a prudent owner or operator of
22            such resource would not undertake.
23                (iv) A zero emission facility shall be
24            permitted to terminate the contract in the event
25            the Nuclear Regulatory Commission terminates the
26            resource's license.

 

 

SB3037- 180 -LRB102 22347 SPS 31484 b

1            (F) If the zero emission facility elects to
2        terminate a contract under subparagraph (E) of this
3        paragraph (1), then the Commission shall reopen the
4        docket in which the Commission approved the zero
5        emission standard procurement plan under subparagraph
6        (C) of this paragraph (1) and, after notice and
7        hearing, enter an order acknowledging the contract
8        termination election if such termination is consistent
9        with the provisions of this subsection (d-5).
10        (2) For purposes of this subsection (d-5), the amount
11    paid per kilowatthour means the total amount paid for
12    electric service expressed on a per kilowatthour basis.
13    For purposes of this subsection (d-5), the total amount
14    paid for electric service includes, without limitation,
15    amounts paid for supply, transmission, distribution,
16    surcharges, and add-on taxes.
17        Notwithstanding the requirements of this subsection
18    (d-5), the contracts executed under this subsection (d-5)
19    shall provide that the total of zero emission credits
20    procured under a procurement plan shall be subject to the
21    limitations of this paragraph (2). For each delivery year,
22    the contractual volume receiving payments in such year
23    shall be reduced for all retail customers based on the
24    amount necessary to limit the net increase that delivery
25    year to the costs of those credits included in the amounts
26    paid by eligible retail customers in connection with

 

 

SB3037- 181 -LRB102 22347 SPS 31484 b

1    electric service to no more than 1.65% of the amount paid
2    per kilowatthour by eligible retail customers during the
3    year ending May 31, 2009. The result of this computation
4    shall apply to and reduce the procurement for all retail
5    customers, and all those customers shall pay the same
6    single, uniform cents per kilowatthour charge under
7    subsection (k) of Section 16-108 of the Public Utilities
8    Act. To arrive at a maximum dollar amount of zero emission
9    credits to be paid for the particular delivery year, the
10    resulting per kilowatthour amount shall be applied to the
11    actual amount of kilowatthours of electricity delivered by
12    the electric utility in the delivery year immediately
13    prior to the procurement, to all retail customers in its
14    service territory. Unpaid contractual volume for any
15    delivery year shall be paid in any subsequent delivery
16    year in which such payments can be made without exceeding
17    the amount specified in this paragraph (2). The
18    calculations required by this paragraph (2) shall be made
19    only once for each procurement plan year. Once the
20    determination as to the amount of zero emission credits to
21    be paid is made based on the calculations set forth in this
22    paragraph (2), no subsequent rate impact determinations
23    shall be made and no adjustments to those contract amounts
24    shall be allowed. All costs incurred under those contracts
25    and in implementing this subsection (d-5) shall be
26    recovered by the electric utility as provided in this

 

 

SB3037- 182 -LRB102 22347 SPS 31484 b

1    Section.
2        No later than June 30, 2019, the Commission shall
3    review the limitation on the amount of zero emission
4    credits procured under this subsection (d-5) and report to
5    the General Assembly its findings as to whether that
6    limitation unduly constrains the procurement of
7    cost-effective zero emission credits.
8        (3) Six years after the execution of a contract under
9    this subsection (d-5), the Agency shall determine whether
10    the actual zero emission credit payments received by the
11    supplier over the 6-year period exceed the Average ZEC
12    Payment. In addition, at the end of the term of a contract
13    executed under this subsection (d-5), or at the time, if
14    any, a zero emission facility's contract is terminated
15    under subparagraph (E) of paragraph (1) of this subsection
16    (d-5), then the Agency shall determine whether the actual
17    zero emission credit payments received by the supplier
18    over the term of the contract exceed the Average ZEC
19    Payment, after taking into account any amounts previously
20    credited back to the utility under this paragraph (3). If
21    the Agency determines that the actual zero emission credit
22    payments received by the supplier over the relevant period
23    exceed the Average ZEC Payment, then the supplier shall
24    credit the difference back to the utility. The amount of
25    the credit shall be remitted to the applicable electric
26    utility no later than 120 days after the Agency's

 

 

SB3037- 183 -LRB102 22347 SPS 31484 b

1    determination, which the utility shall reflect as a credit
2    on its retail customer bills as soon as practicable;
3    however, the credit remitted to the utility shall not
4    exceed the total amount of payments received by the
5    facility under its contract.
6        For purposes of this Section, the Average ZEC Payment
7    shall be calculated by multiplying the quantity of zero
8    emission credits delivered under the contract times the
9    average contract price. The average contract price shall
10    be determined by subtracting the amount calculated under
11    subparagraph (B) of this paragraph (3) from the amount
12    calculated under subparagraph (A) of this paragraph (3),
13    as follows:
14            (A) The average of the Social Cost of Carbon, as
15        defined in subparagraph (B) of paragraph (1) of this
16        subsection (d-5), during the term of the contract.
17            (B) The average of the market price indices, as
18        defined in subparagraph (B) of paragraph (1) of this
19        subsection (d-5), during the term of the contract,
20        minus the baseline market price index, as defined in
21        subparagraph (B) of paragraph (1) of this subsection
22        (d-5).
23        If the subtraction yields a negative number, then the
24    Average ZEC Payment shall be zero.
25        (4) Cost-effective zero emission credits procured from
26    zero emission facilities shall satisfy the applicable

 

 

SB3037- 184 -LRB102 22347 SPS 31484 b

1    definitions set forth in Section 1-10 of this Act.
2        (5) The electric utility shall retire all zero
3    emission credits used to comply with the requirements of
4    this subsection (d-5).
5        (6) Electric utilities shall be entitled to recover
6    all of the costs associated with the procurement of zero
7    emission credits through an automatic adjustment clause
8    tariff in accordance with subsection (k) and (m) of
9    Section 16-108 of the Public Utilities Act, and the
10    contracts executed under this subsection (d-5) shall
11    provide that the utilities' payment obligations under such
12    contracts shall be reduced if an adjustment is required
13    under subsection (m) of Section 16-108 of the Public
14    Utilities Act.
15        (7) This subsection (d-5) shall become inoperative on
16    January 1, 2028.
17    (d-10) Nuclear Plant Assistance; carbon mitigation
18credits.
19    (1) The General Assembly finds:
20        (A) The health, welfare, and prosperity of all
21    Illinois citizens require that the State of Illinois act
22    to avoid and not increase carbon emissions from electric
23    generation sources while continuing to ensure affordable,
24    stable, and reliable electricity to all citizens.
25        (B) Absent immediate action by the State to preserve
26    existing carbon-free energy resources, those resources may

 

 

SB3037- 185 -LRB102 22347 SPS 31484 b

1    retire, and the electric generation needs of Illinois'
2    retail customers may be met instead by facilities that
3    emit significant amounts of carbon pollution and other
4    harmful air pollutants at a high social and economic cost
5    until Illinois is able to develop other forms of clean
6    energy.
7        (C) The General Assembly finds that nuclear power
8    generation is necessary for the State's transition to 100%
9    clean energy, and ensuring continued operation of nuclear
10    plants advances environmental and public health interests
11    through providing carbon-free electricity while reducing
12    the air pollution profile of the Illinois energy
13    generation fleet.
14        (D) The clean energy attributes of nuclear generation
15    facilities support the State in its efforts to achieve
16    100% clean energy.
17        (E) The State currently invests in various forms of
18    clean energy, including, but not limited to, renewable
19    energy, energy efficiency, and low-emission vehicles,
20    among others.
21        (F) The Environmental Protection Agency commissioned
22    an independent audit which provided a detailed assessment
23    of the financial condition of the Illinois nuclear fleet
24    to evaluate its financial viability and whether the
25    environmental benefits of such resources were at risk. The
26    report identified the risk of losing the environmental

 

 

SB3037- 186 -LRB102 22347 SPS 31484 b

1    benefits of several specific nuclear units. The report
2    also identified that the LaSalle County Generating Station
3    will continue to operate through 2026 and therefore is not
4    eligible to participate in the carbon mitigation credit
5    program.
6        (G) Nuclear plants provide carbon-free energy, which
7    helps to avoid many health-related negative impacts for
8    Illinois residents.
9        (H) The procurement of carbon mitigation credits
10    representing the environmental benefits of carbon-free
11    generation will further the State's efforts at achieving
12    100% clean energy and decarbonizing the electricity sector
13    in a safe, reliable, and affordable manner. Further, the
14    procurement of carbon emission credits will enhance the
15    health and welfare of Illinois residents through decreased
16    reliance on more highly polluting generation.
17        (I) The General Assembly therefore finds it necessary
18    to establish carbon mitigation credits to ensure decreased
19    reliance on more carbon-intensive energy resources, for
20    transitioning to a fully decarbonized electricity sector,
21    and to help ensure health and welfare of the State's
22    residents.
23    (2) As used in this subsection:
24    "Baseline costs" means costs used to establish a customer
25protection cap that have been evaluated through an independent
26audit of a carbon-free energy resource conducted by the

 

 

SB3037- 187 -LRB102 22347 SPS 31484 b

1Environmental Protection Agency that evaluated projected
2annual costs for operation and maintenance expenses; fully
3allocated overhead costs, which shall be allocated using the
4methodology developed by the Institute for Nuclear Power
5Operations; fuel expenditures; nonfuel capital expenditures;
6spent fuel expenditures; a return on working capital; the cost
7of operational and market risks that could be avoided by
8ceasing operation; and any other costs necessary for continued
9operations, provided that "necessary" means, for purposes of
10this definition, that the costs could reasonably be avoided
11only by ceasing operations of the carbon-free energy resource.
12    "Carbon mitigation credit" means a tradable credit that
13represents the carbon emission reduction attributes of one
14megawatt-hour of energy produced from a carbon-free energy
15resource.
16    "Carbon-free energy resource" means a generation facility
17that: (1) is fueled by nuclear power; and (2) is
18interconnected to PJM Interconnection, LLC.
19    (3) Procurement.
20        (A) Beginning with the delivery year commencing on
21    June 1, 2022, the Agency shall, for electric utilities
22    serving at least 3,000,000 retail customers in the State,
23    seek to procure contracts for no more than approximately
24    54,500,000 cost-effective carbon mitigation credits from
25    carbon-free energy resources because such credits are
26    necessary to support current levels of carbon-free energy

 

 

SB3037- 188 -LRB102 22347 SPS 31484 b

1    generation and ensure the State meets its carbon dioxide
2    emissions reduction goals. The Agency shall not make a
3    partial award of a contract for carbon mitigation credits
4    covering a fractional amount of a carbon-free energy
5    resource's projected output.
6        (B) Each carbon-free energy resource that intends to
7    participate in a procurement shall be required to submit
8    to the Agency the following information for the resource
9    on or before the date established by the Agency:
10            (i) the in-service date and remaining useful life
11        of the carbon-free energy resource;
12            (ii) the amount of power generated annually for
13        each of the past 10 years, which shall be used to
14        determine the capability of each facility;
15            (iii) a commitment to be reflected in any contract
16        entered into pursuant to this subsection (d-10) to
17        continue operating the carbon-free energy resource at
18        a capacity factor of at least 88% annually on average
19        for the duration of the contract or contracts executed
20        under the procurement held under this subsection
21        (d-10), except in an instance described in
22        subparagraph (E) of paragraph (1) of subsection (d-5)
23        of this Section or made impracticable as a result of
24        compliance with law or regulation;
25            (iv) financial need and the risk of loss of the
26        environmental benefits of such resource, which shall

 

 

SB3037- 189 -LRB102 22347 SPS 31484 b

1        include the following information:
2                (I) the carbon-free energy resource's cost
3            projections, expressed on a per megawatt-hour
4            basis, over the next 5 delivery years, which shall
5            include the following: operation and maintenance
6            expenses; fully allocated overhead costs, which
7            shall be allocated using the methodology developed
8            by the Institute for Nuclear Power Operations;
9            fuel expenditures; nonfuel capital expenditures;
10            spent fuel expenditures; a return on working
11            capital; the cost of operational and market risks
12            that could be avoided by ceasing operation; and
13            any other costs necessary for continued
14            operations, provided that "necessary" means, for
15            purposes of this subitem (I), that the costs could
16            reasonably be avoided only by ceasing operations
17            of the carbon-free energy resource; and
18                (II) the carbon-free energy resource's revenue
19            projections, including energy, capacity, ancillary
20            services, any other direct State support, known or
21            anticipated federal attribute credits, known or
22            anticipated tax credits, and any other direct
23            federal support.
24        The information described in this subparagraph (B) may
25    be submitted on a confidential basis and shall be treated
26    and maintained by the Agency, the procurement

 

 

SB3037- 190 -LRB102 22347 SPS 31484 b

1    administrator, and the Commission as confidential and
2    proprietary and exempt from disclosure under subparagraphs
3    (a) and (g) of paragraph (1) of Section 7 of the Freedom of
4    Information Act. The Office of the Attorney General shall
5    have access to, and maintain the confidentiality of, such
6    information pursuant to Section 6.5 of the Attorney
7    General Act.
8        (C) The Agency shall solicit bids for the contracts
9    described in this subsection (d-10) from carbon-free
10    energy resources that have satisfied the requirements of
11    subparagraph (B) of this paragraph (3). The contracts
12    procured pursuant to a procurement event shall reflect,
13    and be subject to, the following terms, requirements, and
14    limitations:
15            (i) Contracts are for delivery of carbon
16        mitigation credits, and are not energy or capacity
17        sales contracts requiring physical delivery. Pursuant
18        to item (iii), contract payments shall fully deduct
19        the value of any monetized federal production tax
20        credits, credits issued pursuant to a federal clean
21        energy standard, and other federal credits if
22        applicable.
23            (ii) Contracts for carbon mitigation credits shall
24        commence with the delivery year beginning on June 1,
25        2022 and shall be for a term of 5 delivery years
26        concluding on May 31, 2027.

 

 

SB3037- 191 -LRB102 22347 SPS 31484 b

1            (iii) The price per carbon mitigation credit to be
2        paid under a contract for a given delivery year shall
3        be equal to an accepted bid price less the sum of:
4                (I) one of the following energy price indices,
5            selected by the bidder at the time of the bid for
6            the term of the contract:
7                    (aa) the weighted-average hourly day-ahead
8                price for the applicable delivery year at the
9                busbar of all resources procured pursuant to
10                this subsection (d-10), weighted by actual
11                production from the resources; or
12                    (bb) the projected energy price for the
13                PJM Interconnection, LLC Northern Illinois Hub
14                for the applicable delivery year determined
15                according to subitem (aa) of item (iii) of
16                subparagraph (B) of paragraph (1) of
17                subsection (d-5).
18                (II) the Base Residual Auction Capacity Price
19            for the ComEd zone as determined by PJM
20            Interconnection, LLC, divided by 24 hours per day,
21            for the applicable delivery year for the first 3
22            delivery years, and then any subsequent delivery
23            years unless the PJM Interconnection, LLC applies
24            the Minimum Offer Price Rule to participating
25            carbon-free energy resources because they supply
26            carbon mitigation credits pursuant to this Section

 

 

SB3037- 192 -LRB102 22347 SPS 31484 b

1            at which time, upon notice by the carbon-free
2            energy resource to the Commission and subject to
3            the Commission's confirmation, the value under
4            this subitem shall be zero, as further described
5            in the carbon mitigation credit procurement plan;
6            and
7                (III) any value of monetized federal tax
8            credits, direct payments, or similar subsidy
9            provided to the carbon-free energy resource from
10            any unit of government that is not already
11            reflected in energy prices.
12            If the price-per-megawatt-hour calculation
13        performed under item (iii) of this subparagraph (C)
14        for a given delivery year results in a net positive
15        value, then the electric utility counterparty to the
16        contract shall multiply such net value by the
17        applicable contract quantity and remit the amount to
18        the supplier.
19            To protect retail customers from retail rate
20        impacts that may arise upon the initiation of carbon
21        policy changes, if the price-per-megawatt-hour
22        calculation performed under item (iii) of this
23        subparagraph (C) for a given delivery year results in
24        a net negative value, then the supplier counterparty
25        to the contract shall multiply such net value by the
26        applicable contract quantity and remit such amount to

 

 

SB3037- 193 -LRB102 22347 SPS 31484 b

1        the electric utility counterparty. The electric
2        utility shall reflect such amounts remitted by
3        suppliers as a credit on its retail customer bills as
4        soon as practicable.
5            (iv) To ensure that retail customers in Northern
6        Illinois do not pay more for carbon mitigation credits
7        than the value such credits provide, and
8        notwithstanding the provisions of this subsection
9        (d-10), the Agency shall not accept bids for contracts
10        that exceed a customer protection cap equal to the
11        baseline costs of carbon-free energy resources.
12            The baseline costs for the applicable year shall
13        be the following:
14                (I) For the delivery year beginning June 1,
15            2022, the baseline costs shall be an amount equal
16            to $30.30 per megawatt-hour.
17                (II) For the delivery year beginning June 1,
18            2023, the baseline costs shall be an amount equal
19            to $32.50 per megawatt-hour.
20                (III) For the delivery year beginning June 1,
21            2024, the baseline costs shall be an amount equal
22            to $33.43 per megawatt-hour.
23                (IV) For the delivery year beginning June 1,
24            2025, the baseline costs shall be an amount equal
25            to $33.50 per megawatt-hour.
26                (V) For the delivery year beginning June 1,

 

 

SB3037- 194 -LRB102 22347 SPS 31484 b

1            2026, the baseline costs shall be an amount equal
2            to $34.50 per megawatt-hour.
3            An Environmental Protection Agency consultant
4        forecast, included in a report issued April 14, 2021,
5        projects that a carbon-free energy resource has the
6        opportunity to earn on average approximately $30.28
7        per megawatt-hour, for the sale of energy and capacity
8        during the time period between 2022 and 2027.
9        Therefore, the sale of carbon mitigation credits
10        provides the opportunity to receive an additional
11        amount per megawatt-hour in addition to the projected
12        prices for energy and capacity.
13            Although actual energy and capacity prices may
14        vary from year-to-year, the General Assembly finds
15        that this customer protection cap will help ensure
16        that the cost of carbon mitigation credits will be
17        less than its value, based upon the social cost of
18        carbon identified in the Technical Support Document
19        issued in February 2021 by the U.S. Interagency
20        Working Group on Social Cost of Greenhouse Gases and
21        the PJM Interconnection, LLC carbon dioxide marginal
22        emission rate for 2020, and that a carbon-free energy
23        resource receiving payment for carbon mitigation
24        credits receives no more than necessary to keep those
25        units in operation.
26        (D) No later than 7 days after the effective date of

 

 

SB3037- 195 -LRB102 22347 SPS 31484 b

1    this amendatory Act of the 102nd General Assembly, the
2    Agency shall publish its proposed carbon mitigation credit
3    procurement plan. The Plan shall provide that winning bids
4    shall be selected by taking into consideration which
5    resources best match public interest criteria that
6    include, but are not limited to, minimizing carbon dioxide
7    emissions that result from electricity consumed in
8    Illinois and minimizing sulfur dioxide, nitrogen oxide,
9    and particulate matter emissions that adversely affect the
10    citizens of this State. The selection of winning bids
11    shall also take into account the incremental environmental
12    benefits resulting from the procurement or procurements,
13    such as any existing environmental benefits that are
14    preserved by a procurement held under this subsection
15    (d-10) and would cease to exist if the procurement were
16    not held, including the preservation of carbon-free energy
17    resources. For those bidders having the same public
18    interest criteria score, the relative ranking of such
19    bidders shall be determined by price. The Plan shall
20    describe in detail how each public interest factor shall
21    be considered and weighted in the bid selection process to
22    ensure that the public interest criteria are applied to
23    the procurement. The Plan shall, to the extent practical
24    and permissible by federal law, ensure that successful
25    bidders make commercially reasonable efforts to apply for
26    federal tax credits, direct payments, or similar subsidy

 

 

SB3037- 196 -LRB102 22347 SPS 31484 b

1    programs that support carbon-free generation and for which
2    the successful bidder is eligible. Upon publishing of the
3    carbon mitigation credit procurement plan, copies of the
4    plan shall be posted and made publicly available on the
5    Agency's website. All interested parties shall have 7 days
6    following the date of posting to provide comment to the
7    Agency on the plan. All comments shall be posted to the
8    Agency's website. Following the end of the comment period,
9    but no more than 19 days later than the effective date of
10    this amendatory Act of the 102nd General Assembly, the
11    Agency shall revise the plan as necessary based on the
12    comments received and file its carbon mitigation credit
13    procurement plan with the Commission.
14        (E) If the Commission determines that the plan is
15    likely to result in the procurement of cost-effective
16    carbon mitigation credits, then the Commission shall,
17    after notice and hearing and opportunity for comment, but
18    no later than 42 days after the Agency filed the plan,
19    approve the plan or approve it with modification. For
20    purposes of this subsection (d-10), "cost-effective" means
21    carbon mitigation credits that are procured from
22    carbon-free energy resources at prices that are within the
23    limits specified in this paragraph (3). As part of the
24    Commission's review and acceptance or rejection of the
25    procurement results, the Commission shall, in its public
26    notice of successful bidders:

 

 

SB3037- 197 -LRB102 22347 SPS 31484 b

1            (i) identify how the selected carbon-free energy
2        resources satisfy the public interest criteria
3        described in this paragraph (3) of minimizing carbon
4        dioxide emissions that result from electricity
5        consumed in Illinois and minimizing sulfur dioxide,
6        nitrogen oxide, and particulate matter emissions that
7        adversely affect the citizens of this State;
8            (ii) specifically address how the selection of
9        carbon-free energy resources takes into account the
10        incremental environmental benefits resulting from the
11        procurement, including any existing environmental
12        benefits that are preserved by the procurements held
13        under this amendatory Act of the 102nd General
14        Assembly and would have ceased to exist if the
15        procurements had not been held, such as the
16        preservation of carbon-free energy resources;
17            (iii) quantify the environmental benefit of
18        preserving the carbon-free energy resources procured
19        pursuant to this subsection (d-10), including the
20        following:
21                (I) an assessment value of avoided greenhouse
22            gas emissions measured as the product of the
23            carbon-free energy resources' output over the
24            contract term, using generally accepted
25            methodologies for the valuation of avoided
26            emissions; and

 

 

SB3037- 198 -LRB102 22347 SPS 31484 b

1                (II) an assessment of costs of replacement
2            with other carbon-free energy resources and
3            renewable energy resources, including wind and
4            photovoltaic generation, based upon an assessment
5            of the prices paid for renewable energy credits
6            through programs and procurements conducted
7            pursuant to subsection (c) of Section 1-75 of this
8            Act, and the additional storage necessary to
9            produce the same or similar capability of matching
10            customer usage patterns.
11        (F) The procurements described in this paragraph (3),
12    including, but not limited to, the execution of all
13    contracts procured, shall be completed no later than
14    December 3, 2021. The procurement and plan approval
15    processes required by this paragraph (3) shall be
16    conducted in conjunction with the procurement and plan
17    approval processes required by Section 16-111.5 of the
18    Public Utilities Act, to the extent practicable. However,
19    the Agency and Commission may, as appropriate, modify the
20    various dates and timelines under this subparagraph and
21    subparagraphs (D) and (E) of this paragraph (3) to meet
22    the December 3, 2021 contract execution deadline.
23    Following the completion of such procurements, and
24    consistent with this paragraph (3), the Agency shall
25    calculate the payments to be made under each contract in a
26    timely fashion.

 

 

SB3037- 199 -LRB102 22347 SPS 31484 b

1        (F-1) Costs incurred by the electric utility pursuant
2    to a contract authorized by this subsection (d-10) shall
3    be deemed prudently incurred and reasonable in amount, and
4    the electric utility shall be entitled to full cost
5    recovery pursuant to a tariff or tariffs filed with the
6    Commission.
7        (G) The counterparty electric utility shall retire all
8    carbon mitigation credits used to comply with the
9    requirements of this subsection (d-10).
10        (H) If a carbon-free energy resource is sold to
11    another owner, the rights, obligations, and commitments
12    under this subsection (d-10) shall continue to the
13    subsequent owner.
14        (I) This subsection (d-10) shall become inoperative on
15    January 1, 2028.
16    (e) The draft procurement plans are subject to public
17comment, as required by Section 16-111.5 of the Public
18Utilities Act.
19    (f) The Agency shall submit the final procurement plan to
20the Commission. The Agency shall revise a procurement plan if
21the Commission determines that it does not meet the standards
22set forth in Section 16-111.5 of the Public Utilities Act.
23    (g) The Agency shall assess fees to each affected utility
24to recover the costs incurred in preparation of the annual
25procurement plan for the utility.
26    (h) The Agency shall assess fees to each bidder to recover

 

 

SB3037- 200 -LRB102 22347 SPS 31484 b

1the costs incurred in connection with a competitive
2procurement process.
3    (i) A renewable energy credit, carbon emission credit,
4zero emission credit, or carbon mitigation credit can only be
5used once to comply with a single portfolio or other standard
6as set forth in subsection (c), subsection (d), or subsection
7(d-5) of this Section, respectively. A renewable energy
8credit, carbon emission credit, zero emission credit, or
9carbon mitigation credit cannot be used to satisfy the
10requirements of more than one standard. If more than one type
11of credit is issued for the same megawatt hour of energy, only
12one credit can be used to satisfy the requirements of a single
13standard. After such use, the credit must be retired together
14with any other credits issued for the same megawatt hour of
15energy.
16(Source: P.A. 101-81, eff. 7-12-19; 101-113, eff. 1-1-20;