| |||||||||||||||||||||||||||
| |||||||||||||||||||||||||||
| |||||||||||||||||||||||||||
| |||||||||||||||||||||||||||
| |||||||||||||||||||||||||||
1 | AN ACT concerning regulation.
| ||||||||||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois,
| ||||||||||||||||||||||||||
3 | represented in the General Assembly:
| ||||||||||||||||||||||||||
4 | Section 5. The Public Utilities Act is amended by changing | ||||||||||||||||||||||||||
5 | Sections 8-406.1 and 8-509 as follows: | ||||||||||||||||||||||||||
6 | (220 ILCS 5/8-406.1) | ||||||||||||||||||||||||||
7 | Sec. 8-406.1. Certificate of public convenience and | ||||||||||||||||||||||||||
8 | necessity; expedited procedure. | ||||||||||||||||||||||||||
9 | (a) A public utility may apply for a certificate of public | ||||||||||||||||||||||||||
10 | convenience and necessity pursuant to this Section for the | ||||||||||||||||||||||||||
11 | construction of any new high voltage electric service line that | ||||||||||||||||||||||||||
12 | does not exceed 25 miles in length across privately owned real | ||||||||||||||||||||||||||
13 | estate and related facilities (Project). For purposes of this | ||||||||||||||||||||||||||
14 | Section, "privately owned real estate" shall not include a | ||||||||||||||||||||||||||
15 | right-of-way owned in fee simple, subject to an easement, or | ||||||||||||||||||||||||||
16 | controlled by a public utility. To facilitate the expedited | ||||||||||||||||||||||||||
17 | review process of an application filed pursuant to this | ||||||||||||||||||||||||||
18 | Section, an application shall include all of the following: | ||||||||||||||||||||||||||
19 | (1) Information in support of the application that | ||||||||||||||||||||||||||
20 | shall include the following: | ||||||||||||||||||||||||||
21 | (A) A detailed description of the Project, | ||||||||||||||||||||||||||
22 | including location maps and plot plans to scale showing | ||||||||||||||||||||||||||
23 | all major components. |
| |||||||
| |||||||
1 | (B) The following engineering data: | ||||||
2 | (i) a detailed Project description including: | ||||||
3 | (I) name and destination of the Project; | ||||||
4 | (II) design voltage rating (kV); | ||||||
5 | (III) operating voltage rating (kV); and | ||||||
6 | (IV) normal peak operating current rating; | ||||||
7 | (ii) a conductor, structures, and substations | ||||||
8 | description including: | ||||||
9 | (I) conductor size and type; | ||||||
10 | (II) type of structures; | ||||||
11 | (III) height of typical structures; | ||||||
12 | (IV) an explanation why these structures | ||||||
13 | were selected; | ||||||
14 | (V) dimensional drawings of the typical | ||||||
15 | structures to be used in the Project; and | ||||||
16 | (VI) a list of the names of all new (and | ||||||
17 | existing if applicable) substations or | ||||||
18 | switching stations that will be associated | ||||||
19 | with the proposed new high voltage electric | ||||||
20 | service line; | ||||||
21 | (iii) the location of the site and | ||||||
22 | right-of-way including: | ||||||
23 | (I) miles of right-of-way; | ||||||
24 | (II) miles of circuit; | ||||||
25 | (III) width of the right-of-way; and | ||||||
26 | (IV) a brief description of the area |
| |||||||
| |||||||
1 | traversed by the proposed high voltage | ||||||
2 | electric service line, including a description | ||||||
3 | of the general land uses in the area and the | ||||||
4 | type of terrain crossed by the proposed line; | ||||||
5 | (iv) assumptions, bases, formulae, and methods | ||||||
6 | used in the development and preparation of the | ||||||
7 | diagrams and accompanying data, and a technical | ||||||
8 | description providing the following information: | ||||||
9 | (I) number of circuits, with | ||||||
10 | identification as to whether the circuit is | ||||||
11 | overhead or underground; | ||||||
12 | (II) the operating voltage and frequency; | ||||||
13 | and | ||||||
14 | (III) conductor size and type and number | ||||||
15 | of conductors per phase; | ||||||
16 | (v) if the proposed interconnection is an | ||||||
17 | overhead line, the following additional | ||||||
18 | information also must be provided: | ||||||
19 | (I) the wind and ice loading design | ||||||
20 | parameters; | ||||||
21 | (II) a full description and drawing of a | ||||||
22 | typical supporting structure, including | ||||||
23 | strength specifications; | ||||||
24 | (III) structure spacing with typical | ||||||
25 | ruling and maximum spans; | ||||||
26 | (IV) conductor (phase) spacing; and |
| |||||||
| |||||||
1 | (V) the designed line-to-ground and | ||||||
2 | conductor-side clearances; | ||||||
3 | (vi) if an underground or underwater | ||||||
4 | interconnection is proposed, the following | ||||||
5 | additional information also must be provided: | ||||||
6 | (I) burial depth; | ||||||
7 | (II) type of cable and a description of any | ||||||
8 | required supporting equipment, such as | ||||||
9 | insulation medium pressurizing or forced | ||||||
10 | cooling; | ||||||
11 | (III) cathodic protection scheme; and | ||||||
12 | (IV) type of dielectric fluid and | ||||||
13 | safeguards used to limit potential spills in | ||||||
14 | waterways; | ||||||
15 | (vii) technical diagrams that provide | ||||||
16 | clarification of any item under this item (1) | ||||||
17 | should be included; and | ||||||
18 | (viii) applicant shall provide and identify a | ||||||
19 | primary right-of-way and one or more alternate | ||||||
20 | rights-of-way for the Project as part of the | ||||||
21 | filing. To the extent applicable, for each | ||||||
22 | right-of-way, an applicant shall provide the | ||||||
23 | information described in this subsection (a). Upon | ||||||
24 | a showing of good cause in its filing, an applicant | ||||||
25 | may be excused from providing and identifying | ||||||
26 | alternate rights-of-way. |
| |||||||
| |||||||
1 | (2) An application fee of $100,000, which shall be paid | ||||||
2 | into the Public Utility Fund at the time the Chief Clerk of | ||||||
3 | the Commission deems it complete and accepts the filing. | ||||||
4 | (3) Information showing that the utility has held a | ||||||
5 | minimum of 3 pre-filing public meetings to receive public | ||||||
6 | comment concerning the Project in each county where the | ||||||
7 | Project is to be located, no earlier than 6 months prior to | ||||||
8 | the filing of the application. Notice of the public meeting | ||||||
9 | shall be published in a newspaper of general circulation | ||||||
10 | within the affected county once a week for 3 consecutive | ||||||
11 | weeks, beginning no earlier than one month prior to the | ||||||
12 | first public meeting. If the Project traverses 2 contiguous | ||||||
13 | counties and where in one county the transmission line | ||||||
14 | mileage and number of landowners over whose property the | ||||||
15 | proposed route traverses is 1/5 or less of the transmission | ||||||
16 | line mileage and number of such landowners of the other | ||||||
17 | county, then the utility may combine the 3 pre-filing | ||||||
18 | meetings in the county with the greater transmission line | ||||||
19 | mileage and affected landowners. All other requirements | ||||||
20 | regarding pre-filing meetings shall apply in both | ||||||
21 | counties. Notice of the public meeting, including a | ||||||
22 | description of the Project, must be provided in writing to | ||||||
23 | the clerk of each county where the Project is to be | ||||||
24 | located. A representative of the Commission shall be | ||||||
25 | invited to each pre-filing public meeting. | ||||||
26 | (b) At the first status hearing the administrative law |
| |||||||
| |||||||
1 | judge shall set a schedule for discovery that shall take into | ||||||
2 | consideration the expedited nature of the proceeding. | ||||||
3 | (c) Nothing in this Section prohibits a utility from | ||||||
4 | requesting, or the Commission from approving, protection of | ||||||
5 | confidential or proprietary information under applicable law. | ||||||
6 | The public utility may seek confidential protection of any of | ||||||
7 | the information provided pursuant to this Section, subject to | ||||||
8 | Commission approval. | ||||||
9 | (d) The public utility shall publish notice of its | ||||||
10 | application in the official State newspaper within 10 days | ||||||
11 | following the date of the application's filing. | ||||||
12 | (e) The public utility shall establish a dedicated website | ||||||
13 | for the Project 3 weeks prior to the first public meeting and | ||||||
14 | maintain the website until construction of the Project is | ||||||
15 | complete. The website address shall be included in all public | ||||||
16 | notices. | ||||||
17 | (f) The Commission shall, after notice and hearing, grant a | ||||||
18 | certificate of public convenience and necessity filed in | ||||||
19 | accordance with the requirements of this Section if, based upon | ||||||
20 | the application filed with the Commission and the evidentiary | ||||||
21 | record, it finds the Project will promote the public | ||||||
22 | convenience and necessity and that all of the following | ||||||
23 | criteria are satisfied: | ||||||
24 | (1) That the Project is necessary to provide adequate, | ||||||
25 | reliable, and efficient service to the public utility's | ||||||
26 | customers and is the least-cost means of satisfying the |
| |||||||
| |||||||
1 | service needs of the public utility's customers or that the | ||||||
2 | Project will promote the development of an effectively | ||||||
3 | competitive electricity market that operates efficiently, | ||||||
4 | is equitable to all customers, and is the least cost means | ||||||
5 | of satisfying those objectives. | ||||||
6 | (2) That the public utility is capable of efficiently | ||||||
7 | managing and supervising the construction process and has | ||||||
8 | taken sufficient action to ensure adequate and efficient | ||||||
9 | construction and supervision of the construction. | ||||||
10 | (3) That the public utility is capable of financing the | ||||||
11 | proposed construction without significant adverse | ||||||
12 | financial consequences for the utility or its customers. | ||||||
13 | (g) The Commission shall issue its decision with findings | ||||||
14 | of fact and conclusions of law granting or denying the | ||||||
15 | application no later than 150 days after the application is | ||||||
16 | filed. The Commission may extend the 150-day deadline upon | ||||||
17 | notice by an additional 75 days if, on or before the 30th day | ||||||
18 | after the filing of the application, the Commission finds that | ||||||
19 | good cause exists to extend the 150-day period. | ||||||
20 | (h) In the event the Commission grants a public utility's | ||||||
21 | application for a certificate pursuant to this Section, the | ||||||
22 | public utility shall pay a one-time construction fee to each | ||||||
23 | county in which the Project is constructed within 30 days after | ||||||
24 | the completion of construction. The construction fee shall be | ||||||
25 | $20,000 per mile of high voltage electric service line | ||||||
26 | constructed in that county, or a proportionate fraction of that |
| |||||||
| |||||||
1 | fee. The fee shall be in lieu of any permitting fees that | ||||||
2 | otherwise would be imposed by a county. Counties receiving a | ||||||
3 | payment under this subsection (h) may distribute all or | ||||||
4 | portions of the fee to local taxing districts in that county. | ||||||
5 | (i) Notwithstanding any other provisions of this Act, a | ||||||
6 | decision granting a certificate under this Section shall | ||||||
7 | include an order pursuant to Section 8-503 of this Act | ||||||
8 | authorizing or directing the construction of the high voltage | ||||||
9 | electric service line and related facilities as approved by the | ||||||
10 | Commission, in the manner and within the time specified in said | ||||||
11 | order.
| ||||||
12 | (j) The changes made to this Section by this amendatory Act | ||||||
13 | of the 99th General Assembly shall apply to all applications | ||||||
14 | filed on or after the effective date of this amendatory Act. | ||||||
15 | (Source: P.A. 96-1348, eff. 7-28-10.) | ||||||
16 | (220 ILCS 5/8-509) (from Ch. 111 2/3, par. 8-509) | ||||||
17 | Sec. 8-509. When necessary for the construction of any | ||||||
18 | alterations,
additions, extensions or improvements ordered or | ||||||
19 | authorized under Section 8-406.1,
8-503, or 12-218 of this Act, | ||||||
20 | any public utility may enter upon, take or
damage private | ||||||
21 | property in the manner provided for by the law of eminent | ||||||
22 | domain. If a public utility seeks relief under this Section in | ||||||
23 | the same proceeding in which it seeks a certificate of public | ||||||
24 | convenience and necessity under Section 8-406.1 of this Act, | ||||||
25 | the Commission shall enter its order under this Section either |
| |||||||
| |||||||
1 | as part of the Section 8-406.1 order or at the same time it | ||||||
2 | enters the Section 8-406.1 order. If a public utility seeks | ||||||
3 | relief under this Section after the Commission enters its order | ||||||
4 | in the Section 8-406.1 proceeding, the Commission shall issue | ||||||
5 | its order under this Section within 365 45 days after the | ||||||
6 | utility files its petition under this Section. | ||||||
7 | This Section applies to the exercise of eminent domain | ||||||
8 | powers by
telephone companies or telecommunications carriers | ||||||
9 | only when the facilities
to be constructed are intended to be | ||||||
10 | used in whole or in part for providing
one or more intrastate | ||||||
11 | telecommunications services classified as
"noncompetitive" | ||||||
12 | under Section 13-502 in a tariff filed by the condemnor.
The | ||||||
13 | exercise of eminent domain powers by telephone companies or
| ||||||
14 | telecommunications carriers in all other cases shall be | ||||||
15 | governed solely by
"An Act relating to the powers, duties and | ||||||
16 | property of telephone
companies", approved May 16, 1903, as now | ||||||
17 | or hereafter amended. | ||||||
18 | (Source: P.A. 96-1348, eff. 7-28-10.)
| ||||||
19 | Section 99. Effective date. This Act takes effect upon | ||||||
20 | becoming law.
|