Sen. Don Harmon
Filed: 5/26/2016
| | 09900SB0584sam002 | | LRB099 02983 MLM 49274 a |
|
|
1 | | AMENDMENT TO SENATE BILL 584
|
2 | | AMENDMENT NO. ______. Amend Senate Bill 584, AS AMENDED, |
3 | | with reference to page and line numbers of Senate Amendment No. |
4 | | 1, as follows:
|
5 | | on page 7, line 15, by deleting "35-5, 35-30,"; and
|
6 | | on page 7, line 17, by deleting "20-51,"; and
|
7 | | on page 25, line 16, after " program. ", by inserting |
8 | | " "Construction support" does not include construction-related |
9 | | services. "; and
|
10 | | on page 30, line 3, by replacing " 15 " with " 14 "; and
|
11 | | on page 30, line 16, by replacing " 15-day " with " 14-day "; and
|
12 | | on page 43, line 21, after " agency ", by inserting " as needs are |
|
| | 09900SB0584sam002 | - 2 - | LRB099 02983 MLM 49274 a |
|
|
1 | | determined by the State agency "; and
|
2 | | on page 43, line 22, after " pool ", by inserting " following the |
3 | | procedures in this subsection (h) "; and
|
4 | | on page 48, line 21, after " agency ", by inserting " as needs are |
5 | | determined by the State agency "; and
|
6 | | on page 48, line 22, after " pool ", by inserting " following the |
7 | | procedures in this subsection (h) "; and
|
8 | | on page 53, line 4, after " pool ", by inserting " following the |
9 | | procedures in this subsection (h) "; and
|
10 | | on page 53, line 15, after "Section.", by inserting " Any |
11 | | procurement of construction not exceeding $100,000 may be made |
12 | | by an alternative competitive source selection. The |
13 | | construction agency shall establish rules for an alternative |
14 | | competitive source selection process. This Section does not |
15 | | apply to construction-related professional services contracts |
16 | | awarded in accordance with the provisions of the Architectural, |
17 | | Engineering, and Land Surveying Qualifications Based Selection |
18 | | Act. "; and
|
19 | | on page 57, lines 11 and 12, by deleting " or requiring the |
20 | | purchasing agency to file "; and
|
|
| | 09900SB0584sam002 | - 3 - | LRB099 02983 MLM 49274 a |
|
|
1 | | on page 58, line 19, after " proposal .", by inserting " This |
2 | | Section shall not apply to construction contracts that are |
3 | | subject to the requirements of Sections 30-20 and 33-10 of this |
4 | | Code. The pre-qualification requirements of Sections 30-20 and |
5 | | 33-10 of this Code shall include the requirement that the |
6 | | bidder be registered with the Secretary of State. "; and
|
7 | | by deleting line 21 on page 58 through line 26 on page 59; and
|
8 | | on page 67, line 2, after " Board ", by inserting " or his or her |
9 | | designee "; and
|
10 | | by replacing line 19 on page 68 through line 9 on page 71 with |
11 | | the following:
|
12 | | "(30 ILCS 500/25-85 new) |
13 | | Sec. 25-85. Best value procurement. |
14 | | (a) This Section shall apply only to purchases of heavy |
15 | | mobile fleet vehicles and off-road construction equipment |
16 | | procured by or on behalf of: |
17 | | (1) institutions of higher education; |
18 | | (2) the Department of Agriculture; |
19 | | (3) the Department of Transportation; and |
20 | | (4) the Department of Natural Resources. |
21 | | (b) As used in this Section, "best value procurement" means |
|
| | 09900SB0584sam002 | - 4 - | LRB099 02983 MLM 49274 a |
|
|
1 | | a contract award determined by objective criteria related to |
2 | | price, features, functions, and life-cycle costs that may |
3 | | include the following: |
4 | | (1) total cost of ownership, including warranty, under |
5 | | which all repair costs are borne solely by the warranty |
6 | | provider; repair costs; maintenance costs; fuel |
7 | | consumption; and salvage value; |
8 | | (2) product performance, productivity, and safety |
9 | | standards; |
10 | | (3) the supplier's ability to perform to the contract |
11 | | requirements; and |
12 | | (4) environmental benefits, including reduction of |
13 | | greenhouse gas emissions, reduction of air pollutant |
14 | | emissions, or reduction of toxic or hazardous materials. |
15 | | (c) The department or institution may enter into a contract |
16 | | for heavy mobile fleet vehicles and off-road construction |
17 | | equipment for use by the department or institution by means of |
18 | | best value procurement, using specifications and criteria |
19 | | developed in consultation with the Chief Procurement Officer of |
20 | | each designated department or institution and conducted in |
21 | | accordance with Section 20-15 of this Code. |
22 | | (d) In addition to disclosure of the minimum requirements |
23 | | for qualification, the solicitation document shall specify |
24 | | which business performance measures, in addition to price, |
25 | | shall be given a weighted value. The solicitation shall include |
26 | | a scoring method based on those factors and price in |
|
| | 09900SB0584sam002 | - 5 - | LRB099 02983 MLM 49274 a |
|
|
1 | | determining the successful offeror. Any evaluation and scoring |
2 | | method shall ensure substantial weight is given to the contract |
3 | | price. |
4 | | (e) Upon written request of any person who has submitted an |
5 | | offer, notice of the award shall be posted in a public place in |
6 | | the offices of the department or institution at least 24 hours |
7 | | before executing the contract or purchase order. If, before |
8 | | making an award, any offeror who has submitted a bid files a |
9 | | protest with the department or institution against the awarding |
10 | | of the contract or purchase order on the ground that his or her |
11 | | offer should have been selected in accordance with the |
12 | | selection criteria in the solicitation document, the contract |
13 | | or purchase order shall not be awarded until either the protest |
14 | | has been withdrawn or the appropriate Chief Procurement Officer |
15 | | has made a final decision as to the action to be taken relative |
16 | | to the protest. Within 10 days after filing a protest, the |
17 | | protesting offeror shall file with the Chief Procurement |
18 | | Officer a full and complete written statement specifying in |
19 | | detail the ground of the protest and the facts in support |
20 | | thereof. |
21 | | (f) The total annual value of vehicles and equipment |
22 | | purchased through best value procurement pursuant to this |
23 | | Section shall be limited to $20,000,000 per each department of |
24 | | institution. |
25 | | (g) Best value procurement shall only be used on |
26 | | procurements first solicited on or before June 30, 2019. |
|
| | 09900SB0584sam002 | - 6 - | LRB099 02983 MLM 49274 a |
|
|
1 | | (h) On or before January 1, 2020, the Chief Procurement |
2 | | Officer of each designated department or institution shall |
3 | | prepare an evaluation of the best value procurement pilot |
4 | | program authorized by this Section, including a recommendation |
5 | | on whether or not the process should be continued. The |
6 | | evaluation shall be posted in the applicable volume or volumes |
7 | | of the Illinois Procurement Bulletin on or before January 1, |
8 | | 2020. |
9 | | (i) This Section is repealed on January 1, 2020. "; and |
10 | | by deleting line 10 on page 71 through line 2 on page 75; and
|
11 | | on page 101, line 20, after " award ", by inserting " or prior to |
12 | | bid opening for State contracts for construction or |
13 | | construction-related services ".
|