| |||||||
| |||||||
| |||||||
1 | SENATE RESOLUTION
| ||||||
2 | WHEREAS, Metra's Western Avenue Crossing, known as A-2, | ||||||
3 | located 2 miles west of the Loop at Western Avenue and Kinzie | ||||||
4 | Street, is where Union Pacific-owned tracks from the Ogilvie | ||||||
5 | Transportation Center headed west cross over Metra-owned | ||||||
6 | tracks from Union Station headed northwest; and
| ||||||
7 | WHEREAS, A-2 impacts 7 of Metra's 11 routes, as the Union | ||||||
8 | Pacific West, the Milwaukee District West, the Milwaukee North, | ||||||
9 | and North Central travel over A-2, while the empty trains for | ||||||
10 | the Union Pacific North, Union Pacific Northwest, Southwest | ||||||
11 | Service, and Heritage Corridor trains need to travel over A-2 | ||||||
12 | to access their maintenance shops for service; and
| ||||||
13 | WHEREAS, 350 trains cross paths at A-2 every day and rely | ||||||
14 | on A-2 working smoothly for on-time performance; and
| ||||||
15 | WHEREAS, A-2 was designed and built in the 1930s with | ||||||
16 | interlocking switching equipment powered by air compression | ||||||
17 | for the 3,000 switches which are now functionally obsolete; and
| ||||||
18 | WHEREAS, Cold weather is particularly damaging to the | ||||||
19 | functionality of the A-2 air compression switching system, as | ||||||
20 | the switches freeze and ice falls from trains and locks | ||||||
21 | switches in place, halting the ability of trains to move |
| |||||||
| |||||||
1 | through the crossing; and | ||||||
2 | WHEREAS, Many of Metra's winter weather delays this year | ||||||
3 | are attributable to A-2; and | ||||||
4 | WHEREAS, A-2 is like 2 interstate highways meeting at a | ||||||
5 | stoplight, as trains headed in one direction must wait for | ||||||
6 | trains to pass through headed in the other direction, which is | ||||||
7 | inherently inefficient; and | ||||||
8 | WHEREAS, The best way to solve the A-2 crossing problem is | ||||||
9 | a flyover bridge to permanently separate the tracks, similar to | ||||||
10 | the Chicago Transit Authority's plan recently released to build | ||||||
11 | a flyover bridge permanently separating the Brown Line tracks | ||||||
12 | from the Red and Purple Line tracks north of Belmont; and | ||||||
13 | WHEREAS, Other options include updating the 1930s era | ||||||
14 | switching equipment to modern standards or moving the crossing | ||||||
15 | a mile east; therefore, be it
| ||||||
16 | RESOLVED, BY THE SENATE OF THE NINETY-EIGHTH GENERAL | ||||||
17 | ASSEMBLY OF THE STATE OF ILLINOIS, that we recognize the A-2 | ||||||
18 | crossing as a major bottleneck for passenger rail service, both | ||||||
19 | for Metra and for Amtrak; and be it further
| ||||||
20 | RESOLVED, That we show our support for federal, State, and |
| |||||||
| |||||||
1 | any private investments to eliminate the delays in the A-2 | ||||||
2 | crossing and provide better Metra and Amtrak service for the | ||||||
3 | residents of Illinois.
|