| | 98TH GENERAL ASSEMBLY
State of Illinois
2013 and 2014 SB1957 Introduced 2/15/2013, by Sen. Gary Forby SYNOPSIS AS INTRODUCED: |
| 30 ILCS 535/15 | from Ch. 127, par. 4151-15 | 30 ILCS 535/37 new | |
| Amends the Architectural, Engineering, and Land Surveying Qualifications Based Selection Act. Sets forth requirements for responsible bidders on material testing contracts.
|
| |
| | A BILL FOR |
|
|
| | SB1957 | | LRB098 09805 OMW 39956 b |
|
|
1 | | AN ACT concerning finance.
|
2 | | Be it enacted by the People of the State of Illinois,
|
3 | | represented in the General Assembly:
|
4 | | Section 5. The Architectural, Engineering, and Land |
5 | | Surveying
Qualifications Based Selection Act is amended by |
6 | | changing Section 15 and by adding Section 37 as follows:
|
7 | | (30 ILCS 535/15) (from Ch. 127, par. 4151-15)
|
8 | | Sec. 15. Definitions. As used in this Act:
|
9 | | "Architectural services" means any professional service as |
10 | | defined in
Section 5 of the Illinois Architecture Practice Act |
11 | | of 1989.
|
12 | | "Engineering services" means any professional service as |
13 | | defined in
Section 4 of the Professional Engineering Practice |
14 | | Act of 1989 or Section 5
of the Structural Engineering Practice |
15 | | Act of 1989.
|
16 | | "Firm" means any individual, sole proprietorship, firm, |
17 | | partnership,
corporation, association, or other legal entity |
18 | | permitted by law to
practice the profession of architecture, |
19 | | engineering, or land surveying and
provide those services.
|
20 | | "Land surveying services" means any professional service |
21 | | as defined in
Section 5 of the Illinois Professional Land |
22 | | Surveyor Act of 1989.
|
23 | | "Material testing" means hand coring and drilling for |
|
| | SB1957 | - 2 - | LRB098 09805 OMW 39956 b |
|
|
1 | | testing of materials; field inspection of uncured concrete and |
2 | | asphalt; field inspection of welds, structural steel, |
3 | | fireproofing, masonry, soil, facade, reinforcing steel, |
4 | | formwork, cured concrete, and concrete and asphalt batch |
5 | | plants; and adjusting proportions of bituminous mixtures. |
6 | | "Project" means any capital improvement project or any |
7 | | design, study,
plan, survey, or new or existing program |
8 | | activity of a State agency,
including development of new or |
9 | | existing programs that require
architectural, engineering, or |
10 | | land surveying services.
|
11 | | "State agency" means any department, commission, council, |
12 | | board, bureau,
committee, institution, agency, university, |
13 | | government corporation,
authority, or other establishment or |
14 | | official of this State.
|
15 | | (Source: P.A. 91-91, eff. 1-1-00.)
|
16 | | (30 ILCS 535/37 new) |
17 | | Sec. 37. Material testing contracts; responsible bidder |
18 | | requirements. To be considered a responsible bidder on a |
19 | | material testing contract for purposes of this Act, a bidder |
20 | | must comply with all of the following requirements and must |
21 | | present satisfactory evidence of that compliance to the |
22 | | appropriate construction agency: |
23 | | (1) Evidence of compliance with all applicable laws |
24 | | concerning the bidder's entitlement to conduct business in |
25 | | Illinois. |
|
| | SB1957 | - 3 - | LRB098 09805 OMW 39956 b |
|
|
1 | | (2) A sworn statement of the bidder's compliance with |
2 | | all provisions of the applicable Prevailing Wage Act. |
3 | | (3) A sworn statement of the bidder's compliance with |
4 | | Subchapter VI (Equal Employment Opportunities) of Chapter |
5 | | 21 of Title 42 of the United States Code (42 U.S.C. 2000e |
6 | | and following) and with federal Executive Order No. 11246 |
7 | | as amended by federal Executive Order No. 11375. |
8 | | (4) Evidence of a valid Federal Employer |
9 | | Identification Number or, if an individual, a valid Social |
10 | | Security Number. |
11 | | (5) Evidence that the bidder and all bidder's |
12 | | subcontractors secured workers' compensation insurance for |
13 | | covered employees. If the bidder or bidder's |
14 | | subcontractors are insured with a carrier, the evidence of |
15 | | workers' compensation insurance must be a copy of the first |
16 | | page of the information page of the bidder's and bidder's |
17 | | subcontractors' workers' compensation policy, and any |
18 | | continuation attachments of that information page, and a |
19 | | certificate of liability insurance.
|
20 | | (i) The information page must include the name and |
21 | | address of the insured as well as the class codes the |
22 | | compensation premium is based on and the total |
23 | | estimated remuneration per class code.
|
24 | | (ii) The certificate of liability insurance must |
25 | | include the following information and documentation in |
26 | | order to be considered valid evidence of workers' |
|
| | SB1957 | - 4 - | LRB098 09805 OMW 39956 b |
|
|
1 | | compensation insurance coverage: |
2 | | (A) the producer section listing the |
3 | | producer's name, address, and telephone phone |
4 | | number; |
5 | | (B) the insurer's affording coverage section |
6 | | listing the name of the carrier that is providing |
7 | | workers' compensation insurance; |
8 | | (C) the name of the bidder or bidder's |
9 | | subcontractors listed as the insured; |
10 | | (D) the proper policy number or binder number |
11 | | for the workers' compensation and employers' |
12 | | liability insurance; |
13 | | (E) the dollar limits of coverage listed for |
14 | | the workers' compensation and employers' liability |
15 | | insurance; |
16 | | (F) the signature of an authorized |
17 | | representative under the certificate of liability |
18 | | insurance; |
19 | | (G) an issue date of the certificate of |
20 | | liability insurance that precedes the date the |
21 | | bidder submitted a bid for the project; and |
22 | | (H) a date or time frame under which the work |
23 | | is to be performed by the bidder and bidder's |
24 | | subcontractors that falls within the policy |
25 | | effective and policy expiration dates listed on |
26 | | the certificate of liability insurance.
|
|
| | SB1957 | - 5 - | LRB098 09805 OMW 39956 b |
|
|
1 | | (iii) The information required under items (i) and |
2 | | (ii) of this subdivision (5) must be provided by the |
3 | | bidder's or bidder's subcontractors' carrier and may |
4 | | not be provided by the bidder's or bidder's |
5 | | subcontractors' insurance agent.
|
6 | | (iv) The information required under items (i) and |
7 | | (ii) of this subdivision (5) must be preserved by the |
8 | | bidder for at least 3 years and must be made available |
9 | | to the construction agency and the public in accordance |
10 | | with the Freedom of Information Act.
|
11 | | (6) Evidence that the bidder and all bidder's |
12 | | subcontractors participate in applicable apprenticeship |
13 | | and training programs approved by and registered with the |
14 | | United States Department of Labor's Office of |
15 | | Apprenticeship, or its successor organization.
|
16 | | (7) Evidence of compliance with the requirements of the |
17 | | Public Construction Bond Act and furnishing, supplying, |
18 | | and delivering a surety bond by a surety company acceptable |
19 | | to the appropriate construction agency. It is recommended |
20 | | that the surety company issuing the bond or surety be |
21 | | listed in Best's Key Rating Guide with a rating of B or |
22 | | better, be listed in the Treasury Circular, or be listed in |
23 | | both. The bond and sureties are subject to the right of |
24 | | reasonable approval or disapproval, including suspension, |
25 | | by the appropriate construction agency.
|
26 | | (8) Evidence of any professional or trade license |
|
| | SB1957 | - 6 - | LRB098 09805 OMW 39956 b |
|
|
1 | | required by law for any trade or specialty area in which |
2 | | the bidder is seeking a contract award. Additionally, the |
3 | | bidder must disclose any suspension or revocation of such a |
4 | | license held by the bidder or by any director, officer, or |
5 | | manager employed by the bidder.
|
6 | | (9) Bidders must provide a sworn statement that |
7 | | employees to be employed on the project are properly |
8 | | classified as either (i) an employee or (ii) an independent |
9 | | contractor under all applicable state and federal laws and |
10 | | local ordinances.
|
11 | | (10) The information, documentation, and evidence |
12 | | required under this Section are a material part of the |
13 | | contract and the failure of a bidder to comply with the |
14 | | provisions of this Section shall result in the bidder's |
15 | | disqualification from being awarded the contract.
|
16 | | (11) When the award is not recommended to be given to |
17 | | the lowest bidder, a statement of the reasons for that |
18 | | recommendation must be prepared by the construction |
19 | | agency.
|
20 | | (12) The provisions of this Section do not apply to any |
21 | | federally funded construction project if application to |
22 | | that project would jeopardize the receipt or use of federal |
23 | | funds in support of that project.
|