98TH GENERAL ASSEMBLY
State of Illinois
HB3618
Introduced , by Rep. Michael J. Madigan - Fred Crespo
SYNOPSIS AS INTRODUCED:
Makes appropriations and reappropriations for the fiscal year beginning July 1, 2013.
OMB098 00153 KAM 30153 b
|
|
|
AN ACT concerning appropriations.
Be it enacted by the People of the State of Illinois, represented in the General Assembly:
ARTICLE 1
ARCHITECT OF THE CAPITOL
Section 5. The amount of $3,883, or so much of thereof as may be necessary and remains unexpended on June 30, 2013, from a reappropriation heretofore made for such purpose in Section 5 of Article 8 of Public Act 97-0725, is reappropriated from the Capital Development Fund to the Office of the Architect of the Capitol for plans, specifications, and continuation of work pursuant to the report and recommendations of the architectural, structural, and mechanical surveys of the State Capitol Building. This is for the continuation of the rehabilitation of the Capitol Building.
Section 10. The sum of $548,180, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purposes in Section 10 of Article 8 of Public Act 97-0725, is reappropriated from the Capital Development Fund to the Office of the Architect of the Capitol for remodeling, planning, relocation, permanent equipment, and other related expenses, including architectural and engineering fees associated with construction, for the remodeling of office space and other support areas under the jurisdiction of the House of Representatives and the Senate.
Section 15. The sum of $43,091,520, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 8, Section 15 of Public Act 97-0725, as amended, is reappropriated from the Capital Development Fund to the Office of the Architect of the Capitol for all costs associated with capital upgrades and improvements.
Section 20. The following named amounts, or so much thereof as may be necessary, and remain unexpended at the close of business on June 30, 2013, from reappropriations heretofore made for such purposes in Article 8, Section 20 of Public Act 97-0725, as amended, are reappropriated from the Capital Development Fund to the Office of the Architect of the Capitol for the projects hereinafter enumerated:
CAPITOL BUILDING - SPRINGFIELD
(From Article 1, Section 20 of Public Act 97-0725)
For upgrading the HVAC systems
and for renovations to meet
compliance with ADA, in addition
to funds previously appropriated............. 25,591,156
For upgrades to life safety
protection systems in addition
to funds previously appropriated................ 799,120
For equipment, remodeling and all other
costs related to the maintenance, renovation
or restoration of areas located in the
Capitol Building................................ 220,763
For all costs related to asbestos and
environmental abatement in the
Capitol Building................................ 118,292
Total $26,729,331
Section 25. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from reappropriations heretofore made for such purposes in Article 8, Section 25 of Public Act 97-0725, as amended, are reappropriated from the Capital Development Fund to the Office of the Architect of the Capitol for the projects hereinafter enumerated:
CAPITOL BUILDING - SPRINGFIELD
(From Article 1, Section 25 of Public Act 97-0725)
For capital upgrades......................... 250,000,000
For completing the stone restoration, in
addition to funds previously appropriated....... 323,373
For demolition of 222 S. College,
and landscaping of Capitol Complex
in addition to funds previously
appropriated.................................... 963,567
For demolition of 222 South College
Building and landscaping of
Capitol Complex................................. 585,151
WILLIAM G. STRATTON BUILDING - SPRINGFIELD
For the planning, design, reconstruction,
and construction to renovate or replace
the Stratton Office Building, in addition
to funds previously appropriated............. 6,685,662
Total $258,557,753
Section 30. No contract shall be entered into or obligation incurred for any expenditures from appropriations in this Article until after the purposes and amounts have been approved in writing by the Governor.
Total, this Article $328,930,667
ARTICLE 2
SECRETARY OF STATE
Section 5. The sum of $50,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 9, Section 5 of Public Act 97-0725, is reappropriated from the Build Illinois Bond Fund to the Secretary of State for capital grants to public libraries for permanent improvements.
Section 10. No contract shall be entered into or obligation incurred or any expenditures made from appropriations in this Article until after the purposes and amounts have been approved in writing by the Governor.
Total, this Article $50,000,000
ARTICLE 3
DEPARTMENT OF AGRICULTURE
Section 5. The following named amounts, or so much thereof as may be necessary, are appropriated to the Department of Agriculture for repairs, maintenance, and capital improvements including construction, reconstruction, improvement, repair and installation of capital facilities, cost of planning, supplies, materials, equipment, services and all other expenses required to complete the work:
Payable from Agricultural Premium Fund:
For various projects at the Illinois
State Fairgrounds............................. 1,800,000
For various projects at the DuQuoin
State Fairgrounds............................... 750,000
Section 10. The amount of $2,612,500, or so much thereof as may be necessary, is appropriated from the Partners for Conservation Projects Fund to the Department of Agriculture for the Conservation Practices Cost-Share program.
Total, this Article $5,162,500
ARTICLE 4
CENTRAL MANAGEMENT SERVICES
Section 5. The sum of $3,483,998, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 11, Section 5 of Public Act 97-0725, is reappropriated from the Capital Development Fund to the Department of Central Management Services for Information Technology infrastructure expenses including but not limited to related hardware and equipment.
Section 10. The amount of $6,759,511, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purposes in Section 10 of Article 11 of Public Act 97-0725, is reappropriated from the Capital Development Fund to the Department of Central Management Services for infrastructure improvement, hardware and related costs.
Section 15. The sum of $11,574,033, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 11, Section 15 of Public Act 97-0725, as amended, is reappropriated from the Capital Development Fund to the Department of Central Management Services for the Illinois Century Network.
Section 20. No contract shall be entered into or obligation incurred or any expenditures made from appropriations in this Article until after the purposes and amounts have been approved in writing by the Governor.
Total, this Article $21,817,542
ARTICLE 5
DEPARTMENT OF COMMERCE AND ECONOMIC OPPORTUNITY
Section 5. The sum of $3,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purposes in Section 5 of Article 12 of Public Act 97-0725, from the Port Development Revolving Loan Fund to the Department of Commerce and Economic Opportunity for grants and loans associated with the Port Development Revolving Loan Program pursuant to 30 ILCS 750/9-11.
Section 10. The amount of $17,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purposes in Section 10 of Article 12 of Public Act 97-0725, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants associated with the redevelopment of brownfield sites.
Section 15. The sum of $50,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 12, Section 15 of Public Act 97-0725, is reappropriated from the Coal Development Fund to the Department of Commerce and Economic Opportunity for grants pursuant to 20 ILCS 605/605-332 – Coal Revival Program.
Section 20. The sum of $1,975,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 12, Section 20 of Public Act 97-0725, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants associated with the Illinois Renewable Fuels Development Act.
Section 25. The sum of $9,750,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 12, Section 25 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to Argonne National Laboratory for bondable infrastructure improvements to match federal and private funds of equal or greater value.
Section 30. The amount of $2,517,468, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 12, Section 30 of Public Act 97-0725, is reappropriated from the Coal Development Fund to the Department of Commerce and Economic Opportunity for the specific purposes of acquisition, development, construction, reconstruction, improvement, financing, architectural and technical planning and installation of capital facilities consisting of buildings, structures, durable equipment, and land for the purpose of capital development of coal resources within the State.
Section 35. The amount of $5,250,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 12, Section 35 of Public Act 97-0725, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to Argonne National Laboratory for the Advanced Protein Crystallization Facility.
Section 40. The amount of $15,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 12, Section 40 of Public Act 97-0725, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant for the Illinois Science and Technology Park.
Section 45. The amount of $20,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 12, Section 45 of Public Act 97-0725, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants associated with the Illinois Renewable Fuels Development Act.
Section 50. The amount of $6,000,001, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 12, Section 50 of Public Act 97-0725, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants associated with the redevelopment of brownfield sites.
Section 55. The amount of $16,200,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 55 of Public Act 97-0725, as amended, is reappropriated from the Coal Development Fund to the Department of Commerce and Economic Opportunity for the specific purpose of acquisition, development, construction, reconstruction, improvement, financing, architectural and technical planning and installation of capital facilities consisting of buildings, structures, durable equipment, and land for the purpose of capital development of coal resources within the State, including but not limited, to a grant for a commercial scale, low emissions project that produces electric power, synthesizes natural gas or chemicals and demonstrates underground storage of at least 1 million metric tons annually of carbon dioxide.
Section 60. The sum of $3,980,704, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 12, Section 60 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans pursuant but not limited to Article 8, Article 9, or Article 10 of the Build Illinois Act.
Section 65. The sum of $3,130,040, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 65 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans pursuant but not limited to Article 8 or Article 10 of the Build Illinois Act.
Section 70. The sum of $2,600,251, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 70 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans pursuant but not limited to Article 8, Article 9, or Article 10 of the Build Illinois Act.
Section 75. The sum of $5,567,122, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 75 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans pursuant but not limited to Article 8, Article 9, or Article 10 of the Build Illinois Act.
Section 80. The sum of $4,524,172, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 80 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans pursuant but not limited to Article 8, Article 9, or Article 10 of the Build Illinois Act.
Section 85. The sum of $145,508,634, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 85 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for the purpose of making grants and loans to local governments for planning, engineering, acquisition, construction, reconstruction, development, improvement and extension of the public infrastructure, and for any other purposes authorized in subsection (a) of Section 4 of the Build Illinois Bond Act and for grants to State agencies for such purposes.
Section 90. The sum of $47,500,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 90 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for the purpose of fostering economic development and increased employment and the well being of the citizens of Illinois, and for any other purposes authorized in subsection (b) of Section 4 of the Build Illinois Bond Act and for grants to State agencies for such purposes.
Section 95. The sum of $11,532,167, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 95 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for the development and improvement of educational, scientific, technical and vocational programs and facilities and the expansion of health and human services, and for any other purposes authorized in subsection (c) of Section 4 of the Build Illinois Bond Act and for grants to State agencies for such purposes.
Section 100. The sum of $29,961,223, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 100 of Public Act 97-0725, as amended, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for open spaces, recreational and conservation purposes and the protection of land and for deposits into the Partners for Conservation Projects Fund as authorized by subsection (c) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.
Section 105. The sum of $30,454,926, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 105 of Public Act 97-0725, as amended, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for grants to local governments for the acquisition, financing, architectural planning, development, alteration, installation, and construction of capital facilities consisting of buildings, structures, durable equipment, and land as authorized by subsection (l) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.
Section 110. The amount of $10,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 110 of Public Act 97-0725, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for grants to local governments for the acquisition, financing, architectural planning, development, alteration, installation, and construction of capital facilities consisting of buildings, structures, durable equipment, and land as authorized by subsection (l) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.
Section 115. The amount of $24,250,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 115 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants pursuant but not limited to Article 8, Article 9, or Article 10 of the Build Illinois Act.
Section 120. The sum of $13,645,450, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 120 of Public Act 97-0725, as amended, is reappropriated from the Fund for Illinois’ Future to the Department of Commerce and Economic Opportunity for grants to units of government, educational facilities and not-for-profit organizations for education and training, infrastructure improvements and other capital projects including but not limited to planning, construction, reconstruction, equipment, utilities and vehicles, and all costs associated with economic development programs, community service programs, public health programs, public safety programs, other programs and activities, and for grants to other State agencies for any capital or operating purposes.
Section 125. The amount of $22,380,861, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 125 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants to local governments for capital improvements to civic centers for the projects hereinafter enumerated:
Quad Cities Metropolitan
Exposition and Auditorium
Authority..................... 4,000,000
Peoria Metropolitan Exposition
Authority..................... 4,000,000
Springfield Metropolitan
Exposition and Auditorium
Authority..................... 3,000,000
Rockford Metropolitan Exposition,
Auditorium and Office Building
Authority..................... 2,905,861
Will County Metropolitan Exposition,
Auditorium and Office Building
Authority..................... 2,200,000
Aurora Metropolitan Exposition,
Auditorium and Office Building
Authority..................... 1,575,000
Decatur Metropolitan Exposition,
Auditorium and Office Building
Authority..................... 2,100,000
Vermilion County Exposition,
Auditorium and Office Building
Authority....................... 850,000
Collinsville Metropolitan Exposition,
Auditorium and Office Building
Authority....................... 625,000
LaSalle County Metropolitan Exposition,
Auditorium and Office Building
Authority....................... 250,000
Quincy Metropolitan Exposition,
Auditorium and Office Building
Authority....................... 800,000
Section 130. The sum of $1,247,471, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 130 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to the Chicago Zoological Society for capital improvements.
Section 135. The sum of $4,141,114, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 135 of Public Act 97-0725, as amended, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for a grant to the Chicago Housing Authority for LeClaire Courts.
Section 140. The sum of $9,711,584, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 140 of Public Act 97-0725, as amended, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for a grant to the Medical District Commission for capital improvements, including previously incurred costs.
Section 150. The sum of $420,292,664, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 150 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants awarded under the Urban Weatherization Initiative Act.
Section 155. The amount of $8,392,710, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 155 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans including but not limited to broadband deployment to expand and strengthen existing broadband network infrastructure, health information technology, telemedicine, distance learning, and public safety.
Section. 156. The amount of $5,913,314, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from an appropriation heretofore made for such purpose in Article 12, Section 156 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans including but not limited to broadband deployment to expand and strengthen existing broadband network infrastructure, health information technology, telemedicine, distance learning, and public safety.
Section 160. The amount of $9,319,729, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 160 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans for transportation electrification infrastructure projects; including, but not limited to grants and loans for the purpose of encouraging electric car manufacturing and infrastructure for electric vehicles.
Section 165. The amount of $25,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 165 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for infrastructure projects that lead directly to private sector expansion or retention activities including but not limited to public infrastructure construction and renovation, financing for the purchase of land and buildings, construction or renovation of fixed assets, site preparation and purchase of machinery and equipment.
Section 170. The sum of $5,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 170 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to BMI, Inc for a biodiesel plant in Mapleton.
Section 175. The sum of $5,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 175 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to Robbins Community Power for a biomass to energy project.
Section 180. The amount of $15,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 180 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity to provide loans and grants for the modification, alteration, or retrofitting of renewable fuel plants in Illinois in order to encourage the implementation of technologies that increase the overall efficiency of the renewable fuel production process or reduce the life-cycle greenhouse gas emissions of the renewable fuel produced including, but not limited to: (i) improved water conservation; (ii) improved energy conservation; (iii) added value to bio-fuel co-products and bi-products; (iv) utilization of renewable energy resources; (v) utilization of fractionation; or (vi) utilization of cellulosic or other biomass conversion.
Section 185. The sum of $28,205,383, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 185 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for the requirements necessary to leverage capital-related American Recovery and Reinvestment Act of 2009 funds of equal or greater value in order to make Illinois or Illinois applicants more competitive and/or for costs associated with bondable improvements to match federal, local, private or other funds.
Section 190. The sum of $1,157,306, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 190 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to the Phoenix Foundation of Southern Illinois for hospital renovation and equipment.
Section 195. The sum of $11,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 195 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for costs associated with the redevelopment of brownfield sites.
Section 200. The sum of $43,299,637, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 200 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to the United Neighborhood Organization for the acquisition, construction, rehabilitation, renovation and equipping facilities, to a silver certification from the United States Green Building Council’s Leadership in Energy and Environmental Design Green Building Rating System, to assist in alleviating school overcrowding in the state.
Section 205. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from reappropriations heretofore made for such purposes in Article 12, Section 205 of Public Act 97-0725, as amended, are reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to the Rockford District 205 for the projects hereinafter enumerated:
GREENTEK CARVER ACADEMY
For the acquisition, construction,
rehabilitation, renovation and
equipping to a silver certification
from the United States Green
Building Council’s Leadership in
Energy and Environmental Design
Green Building Rating System.......................... 0
CICS ROCKFORD CHARTER PATRIOTS CENTER
For the acquisition, construction,
rehabilitation, renovation and
equipping to a silver certification
from the United States Green
Building Council’s Leadership in
Energy and Environmental Design
Green Building Rating System.................. 1,000,000
SIGMA BETA LEADERSHIP SCHOOL
For the acquisition, construction,
rehabilitation, renovation and
equipping to a silver certification
from the United States Green
Building Council’s Leadership in
Energy and Environmental Design
Green Building Rating System.................. 1,000,000
Total 2,000,000
Section 210. The sum of $12,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 210 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants for acquisition, construction, renovation and equipping new charter schools, to a silver certification from the United States Green Building Council’s Leadership in Energy and Environmental Design Green Building Rating System as approximated below:
For Instituto Del Progresso Latino............ 12,000,000
Section 215. The sum of $10,188,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 215 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity to provide grants, loans, and other investments to emerging technology enterprises to support and encourage: (i) commercialization of technology based products and services; (ii) technology transfer projects involving the promotion of new or innovative technologies; or (iii) research and development projects to respond to unique, advanced technology projects and which foster the development of Illinois’ economy through the advancement of the State’s economic, scientific, and technological assets.
Section 220. The sum of $8,625,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 220 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity to provide grants for land acquisition, infrastructure, equipment and other permissible capital expenditures to businesses that will encourage new investment and the creation or retention of jobs in economically depressed areas of the state.
Section 222. The sum of $2,500,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from an appropriation heretofore made for such purpose in Article 12, Section 222 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity to provide grants for land acquisition, infrastructure, equipment and other permissible capital expenditures to businesses within a city located in both St. Clair and Madison Counties having a population of 5,000 people or less that will encourage new investment and the creation or retention of jobs in economically depressed areas of the state.
Section 230. The sum of $3,748,050, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 230 of Public Act 97-0725, as amended, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for a grant to the University of Chicago Medical Center for costs associated with Provident Hospital.
Section 235. The sum of $1,798,133, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 235 of Public Act 97-0725, as amended, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for a grant to the Illinois Masonic Hospital for capital improvements.
Section 250. The sum of $2,250,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 12, Section 250 of Public Act 97-0725, as amended, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for a grant to Community Health and Emergency Services, Inc. for the construction of a hospital wing at the Cairo Megaclinic.
Section 260. The amount of $1,500,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from an appropriation heretofore made for such purpose in Article 12, Section 260 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to the Cook County Health and Hospital System for costs associated with medical equipment and capital improvements at Provident Hospital.
Section 280. The amount of $265,437, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 12, Section 280 of Public Act 97-0725, as amended, is reappropriated from the Coal Development Fund to the Department of Commerce and Economic Opportunity for the purpose of facility cost reports prepared for not more than one facility pursuant to Section 1-56 of the Illinois Power Agency Act.
Section 285. The amount of $4,900,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 12, Section 285 of Public Act 97-0725, as amended, is reappropriated from the Coal Development Fund to the Department of Commerce and Economic Opportunity for the purpose of development costs pursuant to Section 8.1 of the Energy Conservation and Coal Development Act.
Section 290. This Article is not subject to limitations under Section 5 of Article 48 of Public Act 95-734 or any similar limitation.
Section 295. No contract shall be entered into or obligation incurred or any expenditure made from any appropriation herein made in Sections 5 through 290 of this Article until after the purpose and amounts have been approved in writing by the Governor.
Total, this Article $1,144,183,551
ARTICLE 6
DEPARTMENT OF NATURAL RESOURCES
Section 5. The sum of $725,000, or so much thereof as may be necessary, is appropriated from the State Boating Act Fund to the Department of Natural Resources for the administration and payment of grants to local governmental units for the construction, maintenance, and improvement of boat access areas.
Section 10. The sum of $120,000, or so much thereof as may be necessary, is appropriated from the State Boating Act Fund to the Department of Natural Resources for the purposes of the Snowmobile Registration and Safety Act and for the administration and payment of grants to local governmental units for the construction, land acquisition, lease, maintenance and improvement of snowmobile trails and access areas.
Section 15. To the extent federal funds including reimbursements are available for such purposes, the sum of $75,000, or so much thereof as may be necessary, is appropriated from the State Boating Act Fund to the Department of Natural Resources for all costs for construction and development of facilities for transient, non-trailerable recreational boats, including grants for such purposes and authorized under the Boating Infrastructure Grant Program.
Section 20. The sum of $150,000, or so much thereof as may be necessary, is appropriated from the State Boating Act Fund to the Department of Natural Resources for a grant to the Chain O’Lakes – Fox River Waterway Management Agency for the Agency’s operational expenses.
Section 25. The following named sums, or so much thereof as may be necessary, respectively, for the objects and purposes hereinafter named, are appropriated to the Department of Natural Resources:
Payable from State Boating Act Fund:
For multiple use facilities and programs
for boating purposes provided by the
Department of Natural Resources,
including construction and development,
all costs for supplies, materials,
labor, land acquisition, services, studies
and all other expenses required to comply
with the intent of this appropriation......... 1,500,000
Payable from State Parks Fund:
For multiple use facilities and programs
for park and trail purposes provided by
the Department of Natural Resources, including
construction and development, all costs
for supplies, materials, labor, land
acquisition, services, studies, and
all other expenses required to comply with
the intent of this appropriation................ 150,000
Section 30. The sum of $100,000, or so much thereof as may be necessary, is appropriated from the Wildlife and Fish Fund to the Department of Natural Resources for acquisition and development, including grants, for the implementation of the North American Waterfowl Management Plan within the Dominion of Canada or the United States which specifically provides waterfowl for the Mississippi Flyway.
Section 35. To the extent federal funds including reimbursements are available for such purposes, the sum of $100,000, or so much thereof as may be necessary, is appropriated from the Wildlife and Fish Fund to the Department of Natural Resources for construction and renovation of waste reception facilities for recreational boaters, including grants for such purposes authorized under the Clean Vessel Act.
Section 40. The following named sums, or so much thereof as may be necessary, respectively, herein made either independently or in cooperation with the Federal Government or any agency thereof, any municipal corporation, or political subdivision of the State, or with any public or private corporation, organization, or individual, are appropriated to the Department of Natural Resources for refunds and the purposes stated:
Payable from Forest Reserve Fund:
For U.S. Forest Service Program.................. 500,000
Section 45. The sum of $110,000, or so much thereof as may be necessary, is appropriated from the Plugging and Restoration Fund to the Department of Natural Resources, Office of Mines and Minerals for the Landowner Grant Program authorized under the Oil and Gas Act, as amended by Public Act 90-0260.
Section 50. The sum of $1,500,000, or so much thereof as may be necessary, is appropriated from the Abandoned Mined Lands Reclamation Set Aside Fund to the Department of Natural Resources for grants and contracts to conduct research, planning and construction to eliminate hazards created by abandoned mines and any other expenses necessary for emergency response.
Section 55. The sum of $100,000, or so much thereof as may be necessary, is appropriated from the State Furbearer Fund to the Department of Natural Resources for the conservation of fur bearing mammals in accordance with the provisions of Section 5/1.32 of the "Wildlife Code", as now or hereafter amended.
Section 60. The following named sums, new appropriations, or so much thereof as may be necessary, respectively, for the objects and purposes hereinafter named, are appropriated to the Department of Natural Resources:
Payable from Natural Areas Acquisition Fund:
For the acquisition, preservation and
stewardship of natural areas, including habitats
for endangered and threatened species, high
quality natural communities, wetlands
and other areas with unique or unusual
natural heritage qualities.................... 3,000,000
Section 65. The sum of $14,000,000, or so much thereof as may be necessary, is appropriated from the Open Space Lands Acquisition and Development Fund to the Department of Natural Resources for expenses connected with and to make grants to local governments and to distressed communities as provided in the "Open Space Lands Acquisition and Development Act".
Section 70. The sum of $550,000, or so much thereof as may be necessary, is appropriated from the State Pheasant Fund to the Department of Natural Resources for the conservation of pheasants in accordance with the provisions of Section 5/1.31 of the "Wildlife Code", as now or hereafter amended.
FOR ILLINOIS HABITAT FUND PROGRAM
Section 75. The sum of $1,350,000, or so much thereof as may be necessary, is appropriated from the Illinois Habitat Fund to the Department of Natural Resources for the preservation and maintenance of high quality habitat lands in accordance with the provisions of the "Habitat Endowment Act", as now or hereafter amended.
Section 80. The sum of $250,000, or so much thereof as may be necessary, is appropriated from the Illinois Habitat Fund to the Department of Natural Resources for the preservation and maintenance of a high quality fish and wildlife habitat and to promote the heritage of outdoor sports in Illinois from revenue derived from the sale of Sportsmen Series license plates.
Section 85. The sum of $900,000, or so much thereof as may be necessary, is appropriated to the Department of Natural Resources for expenditure by the Office of Water Resources from the Flood Control Land Lease Fund for disbursement of monies received pursuant to Act of Congress dated September 3, 1954 (68 Statutes 1266, same as appears in Section 701c-3, Title 33, United States Code Annotated), provided such disbursement shall be in compliance with 15 ILCS 515/1 Illinois Compiled Statutes.
Section 90. The following named sums, or so much thereof as may be necessary, respectively, herein made either independently or in cooperation with the Federal Government or any agency thereof, any municipal corporation, or political subdivision of the State, or with any public or private corporation, organization, or individual, are appropriated to the Department of Natural Resources for refunds and the purposes stated:
Payable from Land and Water Recreation Fund:
For Outdoor Recreation Programs ............... 2,500,000
Section 95. The sum of $400,000, or so much thereof as may be necessary, is appropriated from the Off-Highway Vehicle Trails Fund to the Department of Natural Resources for grants to units of local governments, not-for-profit organizations, and other groups to operate, maintain and acquire land for off-highway vehicle trails and parks as provided for in the Recreational Trails of Illinois Act, including administration, enforcement, planning and implementation of this Act.
Section 100. The following named sums, or so much thereof as may be necessary, respectively, herein made either independently or in cooperation with the Federal Government or any agency thereof, any municipal corporation, or political subdivision of the State, or with any public or private corporation, organization, or individual, are appropriated to the Department of Natural Resources for refunds and the purposes stated:
Payable from Federal Title IV Fire
Protection Assistance Fund:
For Rural Community Fire Protection Programs..... 325,000
Section 105. The sum of $140,000, or so much thereof as may be necessary, is appropriated from the Snowmobile Trail Establishment Fund to the Department of Natural Resources for
the administration and payment of grants to nonprofit snowmobile clubs and organizations for construction, maintenance, and rehabilitation of snowmobile trails and areas for the use of snowmobiles.
Section 110. The sum of $625,000, or so much thereof as may be necessary, is appropriated from the Illinois Forestry Development Fund to the Department of Natural Resources for the payment of grants to timber growers for implementation of
acceptable forestry management practices as provided in the "Illinois Forestry Development Act" as now or hereafter amended.
Section 115. To the extent Federal Funds including reimbursements are made available for such purposes, the sum of $300,000, or so much thereof as may be necessary, is appropriated from the Illinois Forestry Development Fund to the Department of Natural Resources for Forest Stewardship Technical Assistance.
Section 120. The sum of $250,000, or so much thereof as may be necessary, is appropriated from the State Migratory Waterfowl Stamp Fund to the Department of Natural Resources for the payment of grants for the implementation of the North American Waterfowl Management Plan within the Dominion of Canada or the United States which specifically provides waterfowl to the Mississippi Flyway as provided in the "Wildlife Code", as amended.
Section 125. The sum of $250,000, or so much thereof as may be necessary, is appropriated from the State Migratory Waterfowl Stamp Fund to the Department of Natural Resources for the payment of grants for the development of waterfowl propagation areas within the Dominion of Canada or the United States which specifically provide waterfowl for the Mississippi Flyway as provided in the "Wildlife Code", as amended.
Section 130. The sum of $300,000, or so much thereof as may be necessary, is appropriated from the State Migratory Waterfowl Stamp Fund to the Department of Natural Resources for the purpose of attracting waterfowl and improving public migratory waterfowl areas within the State.
Section 135. The sum of $1,000,000, or so much thereof as may be necessary, is appropriated from the Park and Conservation Fund to the Department of Natural Resources for grants to units of local government for the acquisition and development of bike paths.
Section 140. The sum of $750,000, or so much thereof as may be necessary, is appropriated from the Park and Conservation Fund to the Department of Natural Resources for land acquisition, development and maintenance of bike paths and all other related expenses connected with the acquisition, development and maintenance of bike paths.
Section 145. The sum of $2,000,000, or so much thereof as may be necessary, is appropriated from the Park and Conservation Fund to the Department of Natural Resources for the development and maintenance, and other related expenses of recreational trails and trail-related projects authorized under the Intermodal Surface Transportation Efficiency Act of 1991, provided such amount shall not exceed funds to be made available for such purposes from State or federal sources.
Section 150. The following named sum, new appropriation, or so much thereof as may be necessary, for the object and purpose hereinafter named, is appropriated to the Department of Natural Resources:
Payable from the Park and Conservation Fund:
For multiple use facilities and programs
for park and trail purposes provided by
the Department of Natural Resources, including
construction and development, all costs
for supplies, materials, labor, land
acquisition, services, studies, and
all other expenses required to comply with
the intent of this appropriation ............. 1,000,000
Section 155. The following named sums, new appropriations, or so much thereof as may be necessary, respectively, for the objects and purposes hereinafter named, are appropriated to the Department of Natural Resources:
Payable from the Adeline Jay Geo-Karis
Illinois Beach Marina Fund:
For rehabilitation, reconstruction, repair,
replacing, fixed assets, and improvement
of facilities at North Point Marina at
Winthrop Harbor................................. 375,000
Section 160. The sum of $6,000,000, or so much thereof as may be necessary, is appropriated to the Department of Natural Resources from the Abandoned Mined Lands Reclamation Council Federal Trust Fund for grants and contracts to conduct research, planning and construction to eliminate hazards created by abandoned mines, and any other expenses necessary for emergency response.
Section 165. The sum of $10,000,000, or so much thereof as may be necessary, is appropriated from the Park and Conservation Fund to the Department of Natural Resources for construction and maintenance of State owned, leased, and managed sites.
Section 170. The sum of $10,000,000, or so much thereof as may be necessary, is appropriated from the Wildlife and Fish Fund to the Department of Natural Resources for the acquisition, engineering, and rehabilitation of dedicated hunting and fishing lands in conjunction with the Illinois Hunting Heritage Protection Act.
Total, this Article $61,395,000
ARTICLE 7
DEPARTMENT OF NATURAL RESOURCES
Section 5. The sum of $44,561,606, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 15, Section 5 of Public Act 97-0725 as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for the non-federal cost share of a Conservation Reserve Enhancement Program to establish long-term contracts and permanent conservation easements in Illinois; to fund cost-share assistance to landowners to encourage approved conservation practices in environmentally sensitive and highly erodible areas of Illinois; and to fund the monitoring of long-term improvements of these conservation practices as required in the Memorandum of Agreement between the State of Illinois and the United States Department of Agriculture.
Section 10. The sum of $38,456,036, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from an appropriation heretofore made in Article 15, Section 10 of Public Act 97-0725 as amended is reappropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources for water development projects at the approximate cost set forth below:
Ashland – Cass County – For
construction of a flood
control project to relieve flooding............. 580,000
County Stormwater Improvements –
For funding to assist County
Stormwater Programs with
implementation of flood relief
projects........................................ 650,000
Crystal Creek – Cook County –
To design and construct multi-phase
Crystal Creek Flood Control Projects
in Schiller Park and Franklin Park............ 2,182,059
Des Plaines River Watershed - Lake
and Cook County – For non-federal
cost sharing requirements for the
implementation of flood reduction
measures...................................... 9,501,656
East St. Louis Ecosystem and
IFC - Madison & St. Clair
Counties - For the non-federal
funding to design and construct
this multipurpose ecosystem project........... 1,200,000
Flood Hazard Mitigation – Statewide –
For cost sharing to acquire flood
prone structures, to implement
flood hazard mitigation plans, and
to acquire mitigation sites
associated with flood control projects....... 10,264,456
Hickory Hills Reservoir –
Cook County – For costs associated
With construction of the
Hickory Hills flood detention
Reservoir........................................ 40,208
Hickory/Spring Creek – Will County –
For implementation of Hickory/Spring
Creeks flood control project in
cooperation with the City of Joliet.......... 11,641,657
Village of Union - McHenry County -
For the implementation of flood
damage relief measures........................ 1,282,000
Flood Control at 88th Ave & 99th St –
City of Palos Heights – Cook County.............. 71,000
Urban Flood Control Projects –
Statewide – to fund flood damage
reduction projects in partnership
with units of local government................ 1,043,000
Total $38,456,036
Section 15. The sum of $39,415,567, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 15, Section 15 of Public Act 97-0725 as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources for improvements needed at publicly-owned Dams for upgrading and rehabilitation of dams, spillways and supporting facilities, including dam removals and the required geotechnical investigations, preparation of plans and specifications, and the construction of the proposed rehabilitation to ensure reduced risk of injury to the public, and for needed repairs and improvements on and to waterways and infrastructure.
Section 20. The sum of $12,785,984, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 15, Section 20 of Public Act 97-0725 as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for planning, design and construction of ecosystem rehabilitation, habitat restoration and associated development in cooperation with the U.S. Army Corps of Engineers.
Section 25. The sum of $150,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 15, Section 25 of Public Act 97-0725 as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Natural Resources for capital grants to parks or recreational units for permanent improvements.
Section 30. The sum of $46,336,959, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 15, Section 30 of Public Act 97-0725 as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for capital grants to public museums for permanent improvements.
Section 35. The sum of $1,500,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 15, Section 35 of Public Act 97-0725 as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Natural Resources for capital grants to the Museum of Broadcast Communications for permanent improvements.
Section 45. The amount of $5,684,618, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 15, Section 45 of Public Act 97-0725 as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Natural Resources for the Mud to Parks dredging Illinois rivers and sediment reuse.
Section 50. The sum of $9,446,147, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 15, Section 50 of Public Act 97-0725, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources for improvements needed at publicly-owned Dams for upgrading and rehabilitation of dams, spillways and supporting facilities, including dam removals and the required geotechnical investigations, preparation of plans and specifications, and the construction of the proposed rehabilitation to ensure reduced risk of injury to the public, and for needed repairs and improvements on and to waterways and infrastructure.
Section 55. The sum of $2,596,723, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 15, Section 55 of Public Act 97-0725, as amended, is reappropriated from the State Boating Act Fund to the Department of Natural Resources for the administration and payment of grants to local governmental units for the construction, maintenance, and improvement of boat access areas.
Section 60. The sum of $1,379,100, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2013, from appropriations heretofore made in Article 14, Section 5 of Public Act 97-0725 and Article 15, Section 60, of Public Act 97-0725 is reappropriated from the State Boating Act Fund to the Department of Natural Resources for the administration and payment of grants to local governmental units for the construction, maintenance, and improvement of boat access areas.
Section 65. The sum of $370,011, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2013, from appropriations heretofore made in Article 14, Section 10 of Public Act 97-0725 and Article 15, Section 65, of Public Act 97-0725, as amended, is reappropriated from the State Boating Act Fund to the Department of Natural Resources for the purposes of the Snowmobile Registration and Safety Act and for the administration and payment of grants to local governmental units for the construction, land acquisition, lease, maintenance and improvement of snowmobile trails and access areas.
Section 70. To the extent federal funds including reimbursements are available for such purposes, the sum of $5,988,900, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from appropriations heretofore made in Article 14, Section 15 of Public Act 97-0725 and Article 15, Section 70, of Public Act 97-0725, as amended, are reappropriated from the State Boating Act Fund to the Department of Natural Resources for all costs for construction and development of facilities for transient, non-trailerable recreational boats, including grants for such purposes and authorized under the Boating Infrastructure Grant Program.
Section 75. The following named sum, or so much thereof as may be necessary, respectively, and as remains unexpended at the close of business on June 30, 2013, from appropriations heretofore made for such purpose, are reappropriated to the Department of Natural Resources for the objects and purposes set forth below:
Payable from State Boating Act Fund:
(From Article 14, Section 25 of
Public Act 97-0725 and Article 15, Section 75,
of Public Act 97-0725, as amended)
For multiple use facilities and programs
for boating purposes provided by the
Department of Natural Resources including
construction and development, all costs
for supplies, materials, labor, land
acquisition, services, studies and all
other expenses required to comply with
the intent of this appropriation.............. 5,793,920
Section 80. The following named sums, or so much thereof as may be necessary, respectively, and as remain unexpended at the close of business on June 30, 2013, from appropriations heretofore made for such purposes, are reappropriated to the Department of Natural Resources for the objects and purposes set forth below:
Payable from the State Parks Fund:
(From Article 15, Section 80,
of Public Act 97-0725, as amended)
For multiple use facilities and programs
for park and trail purposes provided
by the Department of Natural Resources, including
construction and development, all costs
for supplies, materials, labor, land
acquisition, services, studies, and
all other expenses required to comply with
the intent of this appropriation................ 996,396
(From Article 15, Section 80,
of Public Act 97-0725, as amended)
For multiple use facilities and
purposes provided by the
Department of Natural Resources, including
construction and development, all costs
for supplies, materials, labor, land
acquisition, services, studies, and
all other expenses required to comply with
the intent of this appropriation................ 244,857
(From Article 14, Section 25,
of Public Act 97-0725, as amended)
For multiple use facilities and programs
for park and trail purposes provided
by the Department of Natural Resources,
including construction and development, all
costs for supplies, materials, labor,
land acquisition, services, studies, and
all other expenses required to comply with
the intent of this appropriation................ 150,000
Section 85. The sum of $1,971,218, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from an appropriation heretofore made in Article 15, Section 85, of Public Act 97-0725, as amended, is reappropriated from the State Parks Fund to the Department of Natural Resources, in coordination with the Capital Development Board, for the development of the World Shooting and Recreation Complex including all construction and debt service expenses required to comply with this appropriation. Provided further, to the extent that revenues are received for such purposes, said revenues must come from non-State sources.
Section 95. The sum of $298,941, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 15, Section 95, of Public Act 97-0725, as amended, is reappropriated from the Wildlife and Fish Fund to the Department of Natural Resources for wildlife conservation and restoration plans and programs from federal and/or state funds provided for such purposes.
Section 100. To the extent federal funds including reimbursements are available for such purposes, the sum of $995,019, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2013, from appropriations heretofore made Article 14, Section 35 of Public Act 97-0725 and Article 15, Section 100, of Public Act 97-0725, as amended, is reappropriated from the Wildlife and Fish Fund to the Department of Natural Resources for construction and renovation of waste reception facilities for recreational boaters, including grants for such purposes authorized under the Clean Vessel Act.
Section 105. The sum of $285,712, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 15, Section 105, of Public Act 97-0725 is reappropriated from the Capital Development Fund to the Department of Natural Resources for planning, design and construction of ecosystem rehabilitation, habitat restoration and associated development in cooperation with the U.S. Army Corps of Engineers.
Section 110. The sum of $1,068,104, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 15, Section 110, of Public Act 97-0725 is reappropriated from the Capital Development Fund to the Department of Natural Resources for planning, design and construction of ecosystem rehabilitation, habitat restoration and associated development in cooperation with the U.S. Army Corps of Engineers.
Section 115. The sum of $357,787, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 15, Section 115, of Public Act 97-0725 is reappropriated from the Capital Development Fund to the Department of Natural Resources to acquire, protect and preserve open space and natural lands.
Section 120. The sum of $951,495, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 15, Section 120, of Public Act 97-0725 is reappropriated from the Capital Development Fund to the Department of Natural Resources for the non-federal cost share of a Conservation Reserve Enhancement Program to establish long-term contracts and permanent conservation easements in Illinois; to fund cost-share assistance to landowners to encourage approved conservation practices in environmentally sensitive and highly erodible areas of Illinois; and to fund the monitoring of long term improvements of these conservation practices as required in the Memorandum of Agreement between the State of Illinois and the United States Department of Agriculture.
Section 125. The sum of $503,341, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 15, Section 125, of Public Act 97-0725 is reappropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources for the acquisition of lands, buildings, and structures, including easements and other property interests, located in the 100-year floodplain in counties or portions of counties authorized to prepare stormwater management plans and for removing such buildings and structures and preparing the site for open space use.
Section 130. The sum of $8,079,294, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 15, Section 130, of Public Act 97-0725 is reappropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources for water development projects at the approximate cost set forth below:
Flood Hazard Mitigation - For implementation
of flood hazard mitigation plans, and
acquisition of wetland and tree mitigation
sites for state and local joint
flood control projects in
cooperation with federal agencies, state
agencies, and units of local government,
in various counties............................. 7,850,000
Fox Chain of Lakes - Lake and McHenry
Counties - For the state cost share in
implementation of the comprehensive
Dredging and Disposal Plan, including
beneficial use of dredge material and
island creation, for the Fox River and
Chain of Lakes.................................... 229,294
Total $8,079,294
FOR WATERWAY IMPROVEMENTS
Section 135. The sum of $8,984,304, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 15, Section 135, of Public Act 97-0725 is reappropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources for the following projects at the approximate costs set forth below:
Addison Creek Watershed - Cook
and DuPage Counties................................ 10,000
Crisenberry Dam - Jackson County:
For complete rehabilitation of the
dam and spillway, including the
required geotechnical investigation,
the preparation of plans and
specifications, and the construction
of the proposed rehabilitation..................... 20,000
East St. Louis and Vicinity Flood Control -
Madison and St. Clair Counties - For
partial payment of the non-federal cost
requirements of an interior flood protection
project and ecosystem restoration at
East St. Louis and Vicinity area.................. 350,000
Flood Mitigation - Disaster
Declaration Areas............................... 3,252,877
Fox Chain O'Lakes - Lake and McHenry
Counties ...................................... 1,252,450
Fox River Dams - Kane, Kendall
and McHenry Counties.............................. 691,577
Prairie/Farmers Creek - Cook County.............. 3,202,500
Village of Lemont – Flood Control Reservoir........ 100,000
Village of Bluffs – Flood Control Channel.......... 100,000
Union - McHenry County............................... 5,000
Total $8,984,404
Section 140. The sum of $219,073, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2013, from appropriations heretofore made in Article 14, Section 55 of Public Act 97-0725 and Article 15, Section 140, of Public Act 97-0725, as amended, is reappropriated to the Department of Natural Resources from the State Furbearer Fund for the conservation of fur bearing mammals in accordance with the provisions of Section 5/1.32 of the "Wildlife Code", as now or hereafter amended.
Section 145. The following named sum, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2013, from appropriations heretofore made for such purposes, is reappropriated to the Department of Natural Resources for the objects and purposes set forth below:
Payable from Natural Areas Acquisition Fund:
(From Article 14, Section 60 of Public Act 97-0725 and Article 15, Section 145, of Public Act 97-0725 as amended)
For the acquisition, preservation and
stewardship of natural areas,
including habitats for endangered and
threatened species, high quality natural
communities, wetlands and other areas
with unique or unusual natural
heritage qualities........................... 11,388,318
Section 150. The sum of $81,524,315, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2013, from appropriations heretofore made in Article 14, Section 65 of Public Act 97-0725 and Article 15, Section 150, of Public Act 97-0725, as amended, is reappropriated from the Open Space Lands Acquisition and Development Fund to the Department of Natural Resources for expenses connected with and to make grants to local governments as provided in the "Open Space Lands Acquisition and Development Act".
FOR STATE PHEASANT PROGRAM
Section 155. The sum of $1,962,557, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2013, from appropriations heretofore made in Article 14, Section 70 of Public Act 97-0725 and Article 15, Section 155, of Public Act 97-0725, as amended, is reappropriated from the State Pheasant Fund to the Department of Natural Resources for the conservation of pheasants in accordance with the provisions of Section 5/1.31 of the "Wildlife Code", as now or hereafter amended.
Section 160. The sum of $5,269,804, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2013, from appropriations heretofore made in Article 14, Section 75 of Public Act 97-0725 and Article 15, Section 160, of Public Act 97-0725, as amended, is reappropriated from the Illinois Habitat Fund to the Department of Natural Resources for the preservation and maintenance of high quality habitat lands in accordance with the provisions of the "Habitat Endowment Act", as now or hereafter amended.
Section 165. The sum of $1,902,843, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2013, from appropriations heretofore made in Article 14, Section 80 of Public Act 97-0725 and Article 15, Section 165, of Public Act 97-0725, as amended, is reappropriated from the Illinois Habitat Fund to the Department of Natural Resources for the preservation and maintenance of a high quality fish and wildlife habitat and to promote the heritage of outdoor sports in Illinois from revenue derived from the sale of Sportsmen Series license plates.
Section 170. The following named sum, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2013, from appropriations heretofore made in Article 14, Section 90 of Public Act 97-0725 and Article 15, Section 170, of Public Act 97-0725, as amended, made either independently or in cooperation with the Federal Government or any agency thereof, any municipal corporation, or political subdivision of the State, or with any public or private corporation, organization, or individual, is reappropriated to the Department of Natural Resources for refunds and the purposes stated:
Payable from Land and Water Recreation Fund:
For Outdoor Recreation Programs.............. $11,774,481
Section 175. The sum of $2,829,022, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2013, from appropriations heretofore made in Article 14, Section 95 of Public Act 97-0725 and Article 15, Section 175, of Public Act 97-0725, as amended, is reappropriated from the Off-Highway Vehicle Trails Fund to the Department of Natural Resources for grants to units of local governments, not-for-profit organizations, and other groups to operate, maintain and acquire land for off-highway vehicle trails and parks as provided for in the Recreational Trails of Illinois Act, including administration, enforcement, planning and implementation of this Act.
Section 180. The sum of $1,432,515, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 15, Section 180, of Public Act 97-0725, as amended, is reappropriated from the Partners for Conservation Projects Fund to the Department of Natural Resources for the acquisition, planning and development of land and long-term easements, and cost-shared natural resource management practices for ecosystem-based management of Illinois' natural resources, including grants for such purposes.
Section 185. The sum of $1,709,943, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 15, Section 185, of Public Act 97-0725, as amended, is reappropriated from the Partners for Conservation Projects Fund to the Department of Natural Resources for the acquisition, planning and development of land and long-term easements, and cost-shared natural resource management practices for ecosystem-based management of Illinois' natural resources, including grants for such purposes.
Section 190. The following named sum, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2013, from appropriations heretofore made in Article 14, Section 100 of Public Act 97-0725 and Article 15, Section 190, of Public Act 97-0725, as amended, made either independently or in cooperation with the Federal Government or any agency thereof, any municipal corporation, or political subdivision of the State, or with any public or private corporation, organization, or individual, is reappropriated to the Department of Natural Resources for refunds and the purposes stated:
Payable from Federal Title IV Fire
Protection Assistance Fund:
For Rural Community Fire
Protection Program............................. $465,773
Section 195. The sum of $249,668, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2013, from appropriations heretofore made in Article 14, Section 110 of Public Act 97-0725 and Article 15, Section 195, of Public Act 97-0725, as amended, is reappropriated from the Snowmobile Trail Establishment Fund to the Department of Natural Resources for the administration and payment of grants to nonprofit snowmobile clubs and organizations for construction, maintenance, and rehabilitation of snowmobile trails and areas for the use of snowmobiles.
Section 200. The sum of $4,026,997, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2013, from appropriations heretofore made in Article 14, Section 115 of Public Act 97-0725 and Article 15, Section 200, of Public Act 97-0725, as amended, is reappropriated from the Illinois Forestry Development Fund to the Department of Natural Resources for the payment of grants to timber growers for implementation of acceptable forestry management practices as provided in the "Illinois Forestry Development Act" as now or hereafter amended.
Section 205. To the extent Federal Funds including reimbursements are made available for such purposes, the sum of $338,440, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2013, from appropriations heretofore made in Article 14, Section 120 of Public Act 97-0725 and Article 15, Section 205, of Public Act 97-0725, as amended, is reappropriated from the Illinois Forestry Development Fund to the Department of Natural Resources for Forest Stewardship Technical Assistance.
Section 210. The sum of $2,696,357, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2013, from appropriations heretofore made in Article 14, Section 135 of Public Act 97-0725 and Article 15, Section 210, of Public Act 97-0725, as amended, is reappropriated from the State Migratory Waterfowl Stamp Fund to the Department of Natural Resources for the purpose of attracting waterfowl and improving public migratory waterfowl areas within the State.
FOR BIKEWAYS PROGRAMS
Section 215. The sum of $10,431,532, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2013, from appropriations heretofore made in Article 14, Section 140 of Public Act 97-0725 and Article 15, Section 215, of Public Act 97-0725, as amended, is reappropriated from the Park and Conservation Fund to the Department of Natural Resources for grants to units of local government for the acquisition and development of bike paths.
Section 220. The following named sum, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from an appropriation heretofore made for such purpose in Article 14, Section 155 of Public Act 97-0725 and Article 15, Section 220, of Public Act 97-0725, as amended, is reappropriated to the Department of Natural Resources:
Payable from the Park and Conservation Fund:
For multiple use facilities and programs
for park and trail purposes provided by
the Department of Natural Resources, including
construction and development, all costs
for supplies, materials, labor, land
acquisition, services, studies, and
all other expenses required to comply with
the intent of this appropriation.............. 5,004,941
Section 225. The sum of $686,826, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 15, Section 225, of Public Act 97-0725, as amended, is reappropriated from the Park and Conservation Fund to the Department of Natural Resources for multiple use facilities and programs for conservation purposes provided by the Department of Natural Resources, including repairing, maintaining, reconstructing, rehabilitating, replacing fixed assets, construction and development, marketing and promotions, all costs for supplies, materials, labor, land acquisition and its related costs, services, studies, and all other expenses required to comply with the intent of this appropriation.
Section 230. The sum of $5,567,761, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2013, from appropriations heretofore made in Article 14, Section 145 of Public Act 97-0725 and Article 15, Section 230, of Public Act 97-0725, as amended, is reappropriated from the Park and Conservation Fund to the Department of Natural Resources for land acquisition, development and maintenance of bike paths and all other related expenses connected with the acquisition, development and maintenance of bike paths.
Section 235. The sum of $1,150,390, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 15, Section 235, of Public Act 97-0725, as amended, is reappropriated to the Department of Natural Resources from the Park and Conservation Fund for multiple use facilities and programs for conservation purposes provided by the Department of Natural Resources, including repairing, maintaining, reconstructing, rehabilitating, replacing fixed assets, construction and development, marketing and promotions, all costs for supplies, materials, labor, land acquisition and its related costs, services, studies, and all other expenses required to comply with the intent of this appropriation.
Section 240. The sum of $9,828,314, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2013, from appropriations heretofore made in Article 14, Section 150 of Public Act 97-0725 and Article 15, Section 240, of Public Act 97-0725, as amended, is reappropriated from the Park and Conservation Fund to the Department of Natural Resources for the development and maintenance of recreational trails and trail-related projects authorized under the Intermodal Surface Transportation Efficiency Act of 1991, provided such amount shall not exceed funds to be made available for such purposes from state or federal sources.
Section 245. The following named sum, or so much thereof as may be necessary, respectively, and as remains unexpended at the close of business on June 30, 2013, from appropriations heretofore made for such purposes, are reappropriated to the Department of Natural Resources for the objects and purposes set forth below:
Payable from the Adeline Jay Geo-Karis Illinois Beach Marina Fund:
(From Article 14, Section 160 of Public Act 97-0725 and Article 15, Section 245, of Public Act 97-0725, as amended)
For rehabilitation, reconstruction,
repair, replacing, fixed assets,
and improvement of facilities at
North Point Marina at Winthrop
Harbor........................................ 2,581,847
Section 250. The sum of $18,039,468, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2013, from appropriations heretofore made in Article 14, Section 165 of Public Act 97-0725 and Article 15, Section 250, of Public Act 97-0725, as amended, is reappropriated to the Department of Natural Resources from the Abandoned Mined Lands Reclamation Council Federal Trust Fund for grants and contracts to conduct research, planning and construction to eliminate hazards created by abandoned mines, and any other expenses necessary for emergency response.
Section 255. The sum of $203,973, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 15, Section 255, of Public Act 97-0725, as amended, is reappropriated from the Wildlife and Fish Fund to the Department of Natural Resources for the acquisition, engineering and rehabilitation of dedicated hunting and fishing lands in conjunction with the Illinois Hunting Heritage Protection Act; however, no more than $1,500,000 of the total appropriation may be used for engineering and rehabilitation.
Section 260. The sum of $20,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 15, Section 260, of Public Act 97-0725, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for water resource management projects as authorized by subsection (g) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.
Section 265. The sum of $4,074,481, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 15, Section 265, of Public Act 97-0725, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for grants to local governments for the acquisition, financing, architectural planning, development, alteration, installation, and construction of capital facilities consisting of buildings, structures, durable equipment, and land as authorized by subsection (l) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.
Section 270. The sum of $25,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 15, Section 270, of Public Act 97-0725, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for the Illinois Open Land Trust Program as defined by the Illinois Open Land Trust Act as authorized by subsection (m) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.
Section 275. The sum of $22,113,140, or so much thereof as may be necessary and remains unexpended at the close of business on July 13, 2012, from a reappropriation heretofore made in Article 15, Section 275, of Public Act 97-0725, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for the Open Land Trust Program.
Section 280. The sum of $4,875,561, or so much thereof as may be necessary and remains unexpended at the close of business on July 13, 2010, from an appropriation heretofore made in Article 15, Section 280, of Public Act 97-0725, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for upgrades to lodges, camps and campsites, including but not limited to previously incurred costs.
Section 285. No contract shall be entered into or obligation incurred or any expenditure made from a reappropriation herein made in Sections 5 through 50, 105 through 135, and 260 through 280 of this Article until after the purpose and amount of such expenditure has been approved in writing by the Governor.
Total, this Article $646,550,379
ARTICLE 8
DEPARTMENT OF MILITARY AFFAIRS
Section 5. The sum of $91,600, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 17, Section 5 of Public Act 97-0725, is reappropriated from the Illinois National Guard Construction Fund to the Department of Military Affairs for land acquisition and construction of parking facilities at armories.
Section 10. The amount of $499,969, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from an appropriation heretofore made for such purpose in Article 16, Section 5 of Public Act 97-0725, is reappropriated from the Illinois National Guard Construction Fund to the Department of Military Affairs for all costs associated with the construction of Illinois National Guard facilities.
Total, this Article $591,569
ARTICLE 9
DEPARTMENT OF PUBLIC HEALTH
Section 5. The sum of $64,822,728, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 18, Section 5 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Public Health for grants associated with the Hospital Capital Investment Program.
Section 10. The sum of $3,756,475, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 18, Section 10 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Illinois Department of Public Health for the CLEAR-WIN Grant Program to correct lead based paint hazards in residential buildings.
Section 15. No contract shall be entered into or obligation incurred or any expenditures made from appropriations in this Article until after the purposes and amounts have been approved in writing by the Governor.
Total, this Article $68,579,203
ARTICLE 10
DEPARTMENT OF REVENUE
Section 5. The sum of $71,634,210, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 19, Section 5 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Revenue for the Illinois Housing Development Authority for affordable housing grants, loans, and investments for low-income families, low-income senior citizens, low-income persons with disabilities and at risk displaced veterans.
Section 10. The sum of $11,003,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from an appropriation heretofore made for such purpose in Article 19, Section 10 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Revenue for the Illinois Housing Development Authority affordable housing grants, loans, and investments to provide access to affordable and supportive housing for at risk displaced veterans and low-income persons with disabilities.
Section 15. No contract shall be entered into or obligation incurred or any expenditures made from appropriations in this Article until after the purposes and amounts have been approved in writing by the Governor.
Total, this Article $82,637,210
ARTICLE 11
DEPARTMENT OF TRANSPORTATION
DIVISION OF AERONAUTICS
CONSTRUCTION
Section. 5. The sum of $62,207,897, or so much thereof as may be necessary, is appropriated from the Transportation Bond Series B Fund to the Department of Transportation for expenses associated with land acquisition for the South Suburban Airport.
Section. 10. The sum of $8,844,302, or so much thereof as may be necessary, appropriated from the Transportation Bond Series B Fund to the Department of Transportation for expenses associated with land acquisition for the South Suburban Airport.
Section 15. No contract shall be entered into or obligation incurred or any expenditures made from appropriations in this Article until after the purposes and amounts have been approved in writing by the Governor.
Total, This Article $71,052,199
ARTICLE 12
DEPARTMENT OF TRANSPORTATION
PERMANENT IMPROVEMENTS
Section 5. The sum of $10,750,000, or so much thereof as may be necessary, is appropriated from the Road Fund to the Department of Transportation for Permanent Improvements to Illinois Department of Transportation facilities, including but not limited to the purchase of land, construction, repair, alterations and improvements to maintenance and traffic facilities, district and central headquarters facilities, storage facilities, grounds, parking areas and facilities, fencing and underground drainage, including plans, specifications, utilities and fixed equipment installed and all costs and charges incident to the completion thereof at various locations.
OTHER LUMP SUMS
Section 10. The following named amounts, or so much thereof as may be necessary, are appropriated from the Road Fund to the Department of Transportation for the objects and purposes hereinafter named:
For costs associated with the identification,
corrective action, and disposal of hazardous
materials at storage facilities................. 750,000
For Maintenance, Traffic and Physical
Research Purposes (A)........................ 36,700,000
For repair of damages by motorists to highway guardrails, fencing, lighting units, bridges, underpasses, signs, traffic signals, crash attenuators, landscaping, roadside shelters, rest areas, fringe parking facilities, sanitary facilities, maintenance facilities including salt storage buildings, vehicle weight enforcement facilities including scale houses, and other highway appurtenances, provided such amount shall not exceed funds to be made available from collections from claims filed by the Department to recover the costs of such damages 5,500,000
For Maintenance, Traffic and Physical
Research Purposes (B)........................ 13,200,000
Total $56,150,000
MULTIMODAL
GRANTS AND AWARDS
HIGHWAYS
Section 15. The following named amounts, or so much thereof as may be necessary, are appropriated from the Road Fund to the Department of Transportation for the objects and purposes hereinafter named:
For apportionment to counties for construction of township bridges 20 feet or more in length as provided in Section 6-901 through 6-906 of the
"Illinois Highway Code"...................... 15,000,000
For apportionment to needy Townships and Road Districts, as determined by the Department in consultation with the County Superintendents of Highways, Township Highway Commissioners, or Road District
Highway Commissioners........................ 10,014,300
For apportionment to high-growth cities over 5,000 in population, as determined by the Department in consultation with the Illinois
Municipal League.............................. 4,000,000
For apportionment to counties under 1,000,000 in population, $8,000,000 of the total apportioned in equal amounts to each eligible county, and $13,800,000 apportioned to each eligible county in proportion to the amount of motor vehicle license fees received from the residents of eligible counties............................ 21,800,000
Total $50,814,300
AERONAUTICS
Section 20. The sum of $120,000,000, or so much thereof as may be necessary, is appropriated from the Federal/Local Airport Fund to the Department of Transportation for funding airport improvement projects, including reimbursements and/or refunds, undertaken pursuant to pertinent state or federal laws.
PUBLIC TRANSPORTATION
Section 25. The sum of $38,000,000, or so much thereof as may be necessary, is appropriated from the Federal Mass Transit Trust Fund to the Department of Transportation for the federal share of capital, operating, consultant services, and technical assistance grants, as well as state administration and interagency agreements, provided such amounts shall not exceed funds to be made available from the Federal Government.
RAIL PASSENGER AND RAIL FREIGHT
Section 30. The sum of $10,000,000, or so much thereof as may be necessary, is appropriated from the Road Fund to the Department of Transportation for grants, construction, and all other costs relating to rail projects, provided such amounts not exceed funds made available by the federal government for this purpose.
Section 35. The sum of $2,700,000, or so much thereof as may be necessary, is appropriated from the State Rail Freight Loan Repayment Fund to the Department of Transportation for funding the State Rail Freight Loan Repayment Program created by Section 49.25g-1 of the Civil Administrative Code of Illinois.
Section 40. The sum of $500,000,000, or so much thereof as may be necessary, is appropriated from the Federal High Speed Rail Trust Fund to the Department of Transportation for grants, construction, and all other costs relating to high speed rail projects, provided such amounts not exceed funds made available by the federal government for this purpose.
Section 45. The sum of $250,000, or so much thereof as may be necessary, is appropriated from the Rail Freight Loan Repayment Fund to the Department of Transportation for the Rail Freight Service Assistance Program, created by Section 49.25a through 49.25g-1 of the Civil Administrative Code of Illinois.
MULTIMODAL
CONSTRUCTION AND LAND ACQUISITION
Section 50. The sum of $591,000,000, or so much thereof as may be necessary, is appropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of State highways, arterial highways, roads, access areas, roadside shelters, rest areas fringe parking facilities and sanitary facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the Road Improvement Program as approximated below:
District 1, Schaumburg.................................. 0
District 2, Dixon....................................... 0
District 3, Ottawa...................................... 0
District 4, Peoria...................................... 0
District 5, Paris....................................... 0
District 6, Springfield................................. 0
District 7, Effingham................................... 0
District 8, Collinsville................................ 0
District 9, Carbondale.................................. 0
Statewide (including refunds)........................... 0
Engineering............................................. 0
Total $591,000,000
Section 55. The sum of $39,000,000, or so much thereof as may be necessary, is appropriated from the Grade Crossing Protection Fund to the Department of Transportation for the installation of grade crossing protection or grade separations at places where a public highway crosses a railroad at grade, as ordered by the Illinois Commerce Commission, as provided by law.
CONSTRUCTION AND LAND ACQUISTION
LUMP SUMS
Section 60. The sum of $805,985,700, or so much thereof as may be necessary, is appropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program as approximated below:
District 1, Schaumburg.................................. 0
District 2, Dixon....................................... 0
District 3, Ottawa...................................... 0
District 4, Peoria...................................... 0
District 5, Paris....................................... 0
District 6, Springfield................................. 0
District 7, Effingham................................... 0
District 8, Collinsville................................ 0
District 9, Carbondale.................................. 0
Statewide (including refunds)........................... 0
Engineering........................................ 0
Total 805,985,700
Section 65. The sum of $427,200,000, or so much thereof as may be necessary, is appropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the local portion of the Road Improvement Program as approximated below:
District 1, Schaumburg.................................. 0
District 2, Dixon....................................... 0
District 3, Ottawa...................................... 0
District 4, Peoria...................................... 0
District 5, Paris....................................... 0
District 6, Springfield................................. 0
District 7, Effingham................................... 0
District 8, Collinsville................................ 0
District 9, Carbondale.................................. 0
Statewide (including refunds)........................... 0
Total $427,200,000
Section 70. The sum of $31,703,000, or so much thereof as may be necessary, is appropriated from the Road Fund to the Department of Transportation for land acquisition, construction engineering and construction of the Milburn Bypass (US 45 from north of Milburn Road to north of Grass Lake Road) provided that such amounts do not exceed amounts reimbursed by the local agency using Lake County Challenge Bonds.
Section 75. The sum of $5,000,000, or so much thereof as may be necessary, is appropriated from the Public Private Partnerships for Transportation Fund to the Department of Transportation for costs associated with the development, financing, and operation of transportation facilities pursuant to the provisions of the Public Private Partnerships for Transportation Act, as amended.
Section 80. The sum of $5,000,000, or so much thereof as may be necessary, is appropriated from the Illiana Expressway Proceeds Fund to the Department of Transportation for costs of the Department associated with the Public Private Agreements for the Illiana Expressway Act (605 ILCS 130) provided the total amount obligated shall not exceed the amount deposited/transferred into this Fund.
Section 85. The sum of $1,300,000, or so much thereof as may be necessary, is appropriated from the Road Fund to the Department of Transportation for costs associated with the relocation of locally-owned utilities along federally-designated High Speed Rail Corridors in Illinois, provided that such amounts do not exceed funds to be made available and paid into the Road Fund pursuant to agreements executed between the Department of Transportation and the affected local governments.
Section 85. No contract shall be entered into or obligation incurred or any expenditure made from an appropriation herein made in
Section 5 Permanent Improvements
Section 35 State Rail Freight Loan Repayment
Section 45 Federal Rail Freight Loan Repayment
of this Article until after the purpose and the amount of such expenditure has been approved in writing by the Governor.
Total, this Article $2,694,853,000
ARTICLE 13
DEPARTMENT OF TRANSPORTATION
PERMANENT IMPROVEMENTS
Section 5. The sum of $39,663,722, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the appropriation and reappropriation heretofore made in Article 20, Section 5 and Article 21, Section 5 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation for Permanent Improvements to Illinois Department of Transportation facilities, including but not limited to the purchase of land, construction, repair, alterations and improvements to maintenance and traffic facilities, district and central headquarters facilities, storage facilities, grounds, parking areas and facilities, fencing and underground drainage, including plans, specifications, utilities and fixed equipment installed and all costs and charges incident to the completion thereof at various locations.
CONSULTANT AND PRELIMINARY ENGINEERING
Section 10. The sum of $4,983,121, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 10 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation for Highways Engineering and Consultant Contracts only.
Section 15. The sum of $4,831,205, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 15 of Public Act 97-0725, as amended, is reappropriated from the State Construction Account Fund to the Department of Transportation for Highway Engineering and Consultant Contracts only.
OTHER LUMP SUMS
Section 20. The sum of $9,168,964, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the appropriation and reappropriation heretofore made in Article 20, Section 10 and Article 21, Section 20 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation for costs associated with the identification, corrective action, and disposal of hazardous materials at storage facilities.
Section 25. The sum of $44,927,836, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the appropriation and reappropriation heretofore made in Article 20, Section 10 and Article 21, Section 25 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation for Highways Formal Contract Specifics Maintenance, Traffic and Physical Research Purposes (A).
Section 30. The sum of $11,141,003, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the appropriation and reappropriation heretofore made in Article 20, Section 10 and Article 21, Section 30 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation for repair of damages by motorists to highway guardrails, fencing, lighting units, bridges, underpasses, signs, traffic signals, crash attenuators, landscaping, roadside shelters, rest areas, fringe parking facilities, sanitary facilities, maintenance facilities including salt storage buildings, vehicle weight enforcement facilities including scale houses, and other highway appurtenances, provided such amount shall not exceed funds to be made available from collections from claims filed by the Department to recover the costs of such damages.
MULTI-MODAL AWARDS AND GRANTS
HIGHWAY CONSTRUCTION AND LAND ACQUISITION
Section 35. The sum of $32,544,515, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the appropriation and reappropriation heretofore made in Article 20, Section 20 and Article 21, Section 35 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation for apportionment to counties for construction of township bridges 20 feet or more in length as provided in Section 6-901 through 6-906 of the "Illinois Highway Code".
Section 40. The sum of $200,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 40 of Public Act 97-0725, as amended, is reappropriated from the Transportation Bond Series D Fund to the Department of Transportation for grants to counties, municipalities, and road districts for planning, engineering, acquisition, construction, reconstruction, development, improvement, extension, and all construction related expenses of the public infrastructure and other transportation improvement projects which are related to economic development in the State of Illinois as allocated in Article 50, Section 36 of Public Act 96-0035.
AERONAUTICS
Section 45. The sum of $618,685,670, or so much thereof as may be necessary, and remains unexpended, less $50,000,000 to be lapsed from the unpaid balance, at the close of business on June 30, 2013, from the appropriation and reappropriation heretofore made in Article 20, Section 60 and Article 21, Section 215 of Public Act 97-0725, as amended, is reappropriated from the Federal/Local Airport Fund to the Department of Transportation for funding the local or federal share of airport improvement projects, including reimbursements and/or refunds, undertaken pursuant to pertinent state or federal laws, provided such amounts shall not exceed funds available from federal and/or local sources.
Section 50. The sum of $30,293,358, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 220 of Public Act 97-0725, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for such purposes as are described Section 34 of the Illinois Aeronautics Act, as amended, and Section 72 of the Illinois Aeronautics Act, as amended, for airport improvements.
PUBLIC AND INTERMODAL TRANSPORTATION
Section 55. The sum of $368,962, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 235 of Public Act 97-0725, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for construction costs, making grants and providing project assistance to municipalities, special transportation districts, private non-profit carriers, mass transportation carriers, and the Intercity Rail Program for the acquisition, construction, extension, reconstruction, and improvement of mass transportation facilities, including rapid transit, intercity rail, bus and other equipment used in connection therewith, as provided by law, for the counties of Cook, DuPage, Kane, Lake, McHenry and Will, pursuant to Section 4(b)(2) of the General Obligation Bond Act, as amended.
Section 60. The following named sums, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriations heretofore made in Article 21, Section 235 and Section 240 of Public Act 97-0725, as amended, are reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for construction costs, making grants and providing project assistance to municipalities, special transportation districts, private non-profit carriers, mass transportation carriers, and the Intercity Rail Program for the acquisition, construction, extension, reconstruction, and improvement of mass transportation facilities, including rapid transit, intercity rail, bus and other equipment used in connection therewith, as provided by law, as follows:
Pursuant to Section 4(b)(1) of the
General Obligation Bond Act,
as amended.................................. 14,771,277
For the counties of the State outside
the counties of Cook, DuPage, Kane, McHenry,
and Will, pursuant to Section 4(b)(1)of
the General Obligation Bond
Act, as amended................................. 992,508
For the Department of Transportation's
Operation Greenlight Program pursuant to
Section 4(b)(1) of the General
Obligation Bond Act, as amended.............. 5,523,968
Total $21,287,753
Section 65. The sum of $5,000,002, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 245 of Public Act 97-0725, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation to extend the metrolink rail-line to Mid-America Airport, including but not limited to, general infrastructure improvements authorized under Section 2705-305 of the Department of Transportation Law (20 ILCS 2705/2705-305) such as parking lot infrastructure upgrades, pedestrian access improvements, ingress and egress infrastructure and construction of a pedestrian overpass at the Southwestern Illinois College metrolink station.
Section 70. The sum of $18,356,831, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 250 of Public Act 97-0725, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for construction costs, making grants and providing project assistance to municipalities, special transportation districts, private non-profit carriers, mass transportation carriers and the Intercity rail program for the acquisition, construction, extension, reconstruction, and improvement of mass transportation facilities, including rapid transit, intercity rail, bus and other equipment used in connection therewith, as provided by law, pursuant to Section 4(b)(1) of the General Obligation Bond Act, as amended.
Section 75. The sum of $900,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 255 of Public Act 97-0725, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for construction costs, making grants and providing project assistance to the Regional Transportation Authority.
Section 80. The sum of $100,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 260 of Public Act 97-0725, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for construction costs, making grants and providing project assistance to municipalities, special transportation districts, private non-profit carriers, mass transportation carriers and the Intercity rail program for the acquisition, construction, extension, reconstruction, and improvement of mass transportation facilities, including rapid transit, intercity rail, bus and other equipment used in connection therewith, as provided by law, for the purpose of downstate public transit systems.
Section 85. The sum of $1,422,237,972, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 265 of Public Act 97-0725, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for construction costs, making grants and providing project assistance to the Regional Transportation Authority.
Section 90. The sum of $193,832,136, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 270 of Public Act 97-0725, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for construction costs, making grants and providing project assistance to municipalities, special transportation districts, private non-profit carriers, mass transportation carriers and the Intercity rail program for the acquisition, construction, extension, reconstruction, and improvement of mass transportation facilities, including rapid transit, intercity rail, bus and other equipment used in connection therewith, as provided by law, for the purpose of downstate public transit systems.
Section 95. The sum of $70,623,295, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the appropriation and reappropriation heretofore made in Article 20, Section 65 and Article 21, Section 275 of Public Act 97-0725, as amended, is reappropriated from the Federal Mass Transit Trust Fund to the Department of Transportation for the federal share of capital, operating, consultant services, and technical assistance grants, as well as state administration and interagency agreements, provided such amounts shall not exceed funds to be made available from the Federal Government.
RAIL PASSENGER AND RAIL FREIGHT
Section 100. The sum of $475,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 290 of Public Act 97-0725 as amended, is reappropriated from the Road Fund to the Department of Transportation for the Quad City Track Improvements capital grant designated in the Omnibus Appropriations Act, 2009, Public Law 111-8, provided such amounts do not exceed funds made available by the federal government.
Section 105. The sum of $15,430,230, or so much thereof as may be necessary, and remains unexpended, at the close of business on June 30, 2013, from the appropriation and reappropriation heretofore made in Article 20, Section 70 and Article 21, Section 295 of Public Act 97-0725, as amended, is reappropriated from the State Rail Freight Loan Repayment Fund to the Department of Transportation for funding the State Rail Freight Loan Repayment Program created by Section 49.25g-1 of the Civil Administrative Code of Illinois.
Section 110. The sum of $599,034,903, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the appropriation and reappropriation heretofore made in Article 20, Section 75 and Article 21, Section 305 of Public Act 97-0725, as amended, is reappropriated from the Federal High Speed Rail Trust Fund to the Department of Transportation for grants, construction, and all other costs relating to high speed rail projects, provided such amounts not exceed funds made available by the federal government for this purpose.
Section 115. The sum of $22,246,189, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 310 of Public Act 97-0725, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation, pursuant to Section 4(b)(1) of the General Obligation Bond Act, for track and signal improvements, AMTRAK station improvements, rail passenger equipment, and rail freight facility improvements.
Section 120. The sum of $120,178,346, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 315 of Public Act 97-0725, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for track and signal improvements, AMTRAK station improvements, rail passenger equipment, and rail freight facility improvements.
Section 125. The sum of $285,361,830, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 320 of Public Act 97-0725, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation to leverage federal funding in accordance with the Department of Transportation’s Federal Railroad Administration’s Capital Assistance for High Speed Rail Corridors and Intercity Passenger Rail Service Program and any other federal grant programs made available for capital and operating improvements for intercity passenger rail.
Section 130. The sum of $4,262,749, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from the appropriation and reappropriation concerning the federal share of the Rail Freight Loan Repayment Program heretofore made in Article 20, Section 80 and Article 21, Section 325 of Public Act 97-0725, as amended, is reappropriated from the Rail Freight Loan Repayment Fund to the Department of Transportation for the Rail Freight Service Assistance Program, created by Section 49.25a through 49.25g-1 of the Civil Administrative Code of Illinois.
MULTI-MODAL CONSTRUCTION
HIGHWAY CONSTRUCTION AND LAND ACQUISITION
Section 135. The following named sums or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013 from the reappropriations heretofore made in Article 21, Section 45 of Public Act 97-0725, as amended, are reappropriated to the Department of Transportation from the Road Fund for the FY04 federal earmarks provided in Conference Report 108-401 which accompanies Public Law 108-199. Expenditures shall not exceed funds to be made available by the federal government.
Bridge Discretionary
North Avenue Bridge, Chicago..................... 324,335
National Corridor Planning & Development
City of Forsyth Frontage Road..................... 11,917
Ferry Boats/Terminal Facilities
Canal Corridor Association-Port of
LaSalle Project.................................. 400,000
Transportation & Community & System Preservation
Homewood, Illinois railroad station/
platform acquisition and improvement.............. 16,042
Village of Glencoe, Green Bay
Trail – North Branch Trail Connection............ 104,718
Section 115 Member Initiatives
Annie Glidden Road, DeKalb....................... 151,977
Convocation Center Roadway......................... 151,655
Great River Road in Mercer County................... 14,882
ITS – I-74 in Peoria............................... 750,000
Kaskaskia Regional Port District, access roads....... 9,586
Long Meadow Parkway Fox River Bridge
Crossing, Bolz Road................................ 125,434
Sauk Trail Reconstruction
Improvements, Park Forest........................ 330,000
Sauk Village Industrial Park Access Road........... 472,494
St. Charles, Illinois, Fox River
Crossing at Red Gate Corridor.................... 260,467
US 51, Christian/Shelby Counties................... 833,472
West Grand Avenue. (from North
Western to N. California Ave.)................... 800,000
Total $4,756,979
Section 140. The following named sums or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from the reappropriations heretofore made in Article 21, Section 50 of Public Act 97-0725, as amended, are reappropriated to the Department of Transportation from the Road Fund for the FY05 federal earmarks provided in Conference Report 108-792 which accompanies Public Law 108-447. Expenditures shall not exceed funds to be made available by the federal government.
Bridge Discretionary
North-South Wacker Drive Reconstruction
in Chicago..................................... 1,916,666
Interstate Maintenance Discretionary
I-55 South Barrier, Darien Illinois............ 1,400,000
Section 117 Member Initiatives
171st Street reconstruction, East Hazel Crest........ 6,429
67th Street Pedestrian Underpass, Chicago
Lakefront........................................ 400,000
Camp Street upgrades, East Peoria.................. 219,935
Cermak and Kenton Avenues.......................... 750,533
Cicero Avenue lighting in University Park.......... 115,269
Des Plaines, Illinois alley, sidewalk
improvements...................................... 16,073
Fulton County Highway 6............................. 51,783
I-290 Cap, Oak Park................................ 962,626
KBS Railroad Hazard Elimination, Kankakee County... 300,000
MacArthur Boulevard Extension, Springfield......... 137,583
McHenry County / Crystal Lake Road................. 157,681
Milwaukee Avenue, Grand to Gale, Chicago............ 20,091
Route 178 relocation, Phase II Engineering......... 457,032
Sheridan Road Improvements, Evanston................. 8,036
Sidewalks near Ford Heights........................ 200,000
Street improvements and streetlights, Lynnwood....... 1,831
Street improvements, Bartonville.................... 11,558
Street improvements, Village of Armington............ 8,956
Streetlights and salt dome for Markham............. 300,000
U.S. 41/I-176 Interchange improvements
Phase I study...................................... 800,000
Winfield Pedestrian Tunnel.......................... 98,400
Total $8,340,482
Section 145. The sum of $90,923,725, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 55 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations.
Section 150. The sum of $62,220, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 60 of Public Act 97-0725, is reappropriated from the Road Fund to the Department of Transportation for Pavement Preservation Programs.
Section 155. The sum of $127,991,248, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 65 of Public Act 97-0725, is reappropriated from the Road Fund to the Department of Transportation for High Priority Projects (HPP) and Transportation Improvement Projects (TI) pertaining to local governments as designated in Public Law 109-59, Title I, Subtitle G, Section 1702 and Subtitle I, Section 1934 of the federal reauthorization act entitled SAFETEA-LU; provided such amounts do not exceed funds made available by the federal government through Congressional designations, annual allocations, obligation limitations, or any other federal limitations. Specific project approximations appear in Article 101, Section 25 of Public Act 94-0798.
Section 160. The sum of $10,567,051, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 70 of Public Act 97-0725, is reappropriated from the Road Fund to the Department of Transportation for Transportation, Community and System Preservation (TCSP), Discretionary Interstate Maintenance and Surface Transportation Priorities earmarks pertaining to state and local governments as designated in the Consolidated Appropriation Act, 2008, Division K, Public Law 110-161; provided such amounts do not exceed funds made available by the federal government through Congressional designations, annual allocations, obligation limitations, or any other federal limitations, as approximated in Article 35, Section 20 of Public Act 95-0734.
Section 165. The sum of $12,703,641, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 75 of Public Act 97-0725, is reappropriated from the Road Fund to the Department of Transportation for Transportation, Community and System Preservation (TCSP), Discretionary Interstate Maintenance, Federal Lands Highway Discretionary, and Surface Transportation Priorities earmarks pertaining to state and local governments as designated in the Omnibus Appropriations Act, 2009, Public Law 111-8; provided such amounts do not exceed funds made available by the federal government through Congressional designations, annual allocations, obligation limitations, or any other federal limitations, as approximated in Article 2, Section 20 of Public Act 96-0039.
Section 170. The sum of $6,517,495, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 80 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation, for Transportation, Community and System Preservation (TCSP), Discretionary Interstate Maintenance, and Surface Transportation Priorities earmarks pertaining to state and local governments as designated in the Consolidated Appropriations Act, 2010, Public Law 111-11 117; provided such amounts do not exceed funds made available by the federal government through Congressional designations, annual allocations, obligation limitations, or any other federal limitations.
Section 175. The sum of $15,196,222, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the appropriation heretofore made in Article 20, Section 25 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation for Federal Discretionary Program Awards provided for in the “Department of Defense and Full-Year Continuing Appropriations Act, 2011” – Public Law 112-10 (H.R. 1473) provided such amounts do not exceed funds made available by the federal government through Congressional designations, annual allocations, obligation limitations, or any other federal limitations. Specific project approximations appear in Article 20, Section 25 of Public Act 97-0725.
Section 180. The sum of $10,438,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the appropriation heretofore made in Article 20, Section 30 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation for Transportation Investment Generating Economic Recovery III (TIGER III) Program awards as provided for in the “Department of Defense and Full-Year Continuing Appropriations Act, 2011” – Public Law 112-10 (H.R. 1473) provided such amounts do not exceed funds made available by the federal government.
Section 185. The sum of $204,575, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the appropriation heretofore made in Article 20, Section 35 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation for Federal Emergency Relief Program awards provided for in the FFY2012 US DOT Appropriations Bill – Public Law 112-055, provided such amounts do not exceed funds made available by the federal government for the projects listed below.
Emergency Relief
US 20 from IL 35 in East Dubuque to east edge of Galena;
IL 78 from the south edge of Stockton to 5 miles south of JoDaviess/Carroll Co. line.
Section 190. The sum of $13,453,048, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the appropriation heretofore made in Article 20, Section 26 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation for Federal Discretionary Projects identified in Article 20, Section 26 of Public Act 97-0725 provided such amounts do not exceed funds made available by the federal government through Congressional designations, annual allocations obligations limitations or any other federal limitations (These amounts are in additional to amounts appropriated elsewhere.)
Section 195. The sum of $398,240,045, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 200, of Public Act 97-0725, as amended, for statewide purposes, is reappropriated from the Transportation Bond Series A Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, and fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program.
Section 200. The sum of $2,006,675,457, or so much thereof as may be necessary and remains unexpended at the close of business on June 30 ,2013, from the reappropriation heretofore made in Article 21, Section 205 of Public Act 97-0725, as amended, for statewide purposes, is reappropriated from the Transportation Bond Series D Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, and fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program.
Section 205. The sum of $859,037, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 90 of Public Act 97-0725, as amended, are reappropriated from the State Construction Account Fund to the Department of Transportation for all expenses related to Phase II of the I-57/294 interchange in the County of Cook.
Section 210. The sum of $37,757,819, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriations heretofore made in Article 21, Section 85 and Section 95 of Public Act 97-0725, as amended, are reappropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations.
Section 215. The sum of $68,272,618, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 100 of Public Act 97-0725, as amended, are reappropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations.
Section 220. The sum of $63,383,276, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 105 of Public Act 97-0725, as amended, is reappropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations.
Section 225. The sum of $322,235,978, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 110 of Public Act 97-0725, as amended, is reappropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations.
Section 230. The sum of $551,648,563, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the appropriation heretofore made in Article 20, Section 40 of Public Act 97-0725, as amended, is reappropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations.
GRADE CROSSING PROTECTION
Section 235. The sum of $109,571,276, or so much thereof as may be necessary and remains unexpended, at the close of business on June 30, 2013, from the appropriation and reappropriation heretofore made in Article 20, Section 55 and Article 21, Section 210 of Public Act 97-0725, as amended, is reappropriated from the Grade Crossing Protection Fund to the Department of Transportation for the installation of grade crossing protection or grade separations at places where a public highway crosses a railroad at grade, as ordered by the Illinois Commerce Commission, as provided by law.
AERONAUTICS
Section 240. The sum of $30,826,870, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 225 of Public Act 97-0725, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for expenses associated with land acquisition for the South Suburban Airport.
Section 245. The sum of $4,063,086, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 230 of Public Act 97-0725, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for expenses associated with land acquisition for the South Suburban Airport.
MULTI-MODAL LUMP SUMS
HIGHWAY CONSTRUCTION AND LAND ACQUISITION
Section 250. The sum of $40,025,134, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 115 of Public Act 97-0725, is reappropriated from the Road Fund to the Department of Transportation for the local match of all other non-federally reimbursed expenses associated with the High Priority Projects (HPP) and Transportation Improvement Projects (TI) specifically identified in Article 101, Section 25 of Public Act 94-0798, provided that such amounts do not exceed funds made available and paid into the Road Fund by local governments.
Section 255. The sum of $105,968,401, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriations heretofore made in Article 21, Section 120 and Section 130 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program, including refunds.
Section 260. The sum of $8,543,526, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 150 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program, including refunds.
Section 265. The sum of $320,273,584, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 170 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program, including refunds.
Section 270. The sum of $377,735,625, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 180 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program, including refunds.
Section 275. The sum of $675,000,000, or so much thereof as may be necessary, and remains unexpended, at the close of business on June 30, 2013, from the appropriation heretofore made in Article 20, Section 46 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the State and local portions of the Road Improvement Program, including refunds.
Section 280. The sum of $15,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the appropriation heretofore made in Article 20, Section 47 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation for all costs associated with the procurement of public private agreements pursuant to the provisions of the Public Private Agreements for the Illiana Expressway Act (605 ILCS 130) as amended, that enable the Illiana Expressway to be developed, financed, constructed, managed, or operated in an entrepreneurial and business-like manner.
Section 285. The sum of $327,314,795, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriations heretofore made in Article 21, Section 125 and 135 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the local portion of the Road Improvement Program, including refunds.
Section 290. The sum of $173,537,799, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 155 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the local portion of the Road Improvement Program, including refunds.
Section 295. The sum of $142,301,364, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 175 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the local portion of the Road Improvement Program, including refunds.
Section 300. The sum of $289,837,920, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 185 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the local portion of the Road Improvement Program, including refunds.
Section 305. The sum of $290,017,036, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the appropriation heretofore made in Article 20, Section 45 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the local portion of the Road Improvement Program including refunds.
Section 310. The sum of $920,042, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 140 of Public Act 97-0725, is reappropriated from the Road Fund to the Department of Transportation for the local match of all other non-federally reimbursed expenses associated with the Transportation, Community and System Preservation (TCSP) and Discretionary Interstate Maintenance earmarks specifically identified in Article 35, Section 20a of Public Act 96-0734, provided that such amounts do not exceed funds made available and paid into the Road Fund by local governments.
Section 315. The sum of $39,805,434, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 145 of Public Act 97-0725, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations. (Emergency Repair Program)
Section 320. The sum of $2,039,729, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 160 of Public Act 97-0725, is reappropriated from the Road Fund to the Department of Transportation for the local match of all other non-federally reimbursed expenses associated with the Transportation, Community and System Preservation (TCSP) and Discretionary Interstate Maintenance earmarks specifically identified in Article 2, Section 20 of Public Act 96-0039, provided that such amounts do not exceed funds made available and paid into the Road Fund by local governments.
Section 325. The sum of $760,106, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 165 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation, for the local match of all other non-federally reimbursed expenses associated with the Transportation, Community and System Preservation (TCSP) and Discretionary Interstate Maintenance earmarks specifically identified in Article 50, Section 16 of Public Act 96-0035, provided that such amounts do not exceed funds made available and paid into the Road Fund by local governments.
Section 330. The sum of $11,617,839, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 190 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation for Transportation Investment Generating Economic Recovery II (TIGER II) awards designated in Division A of the Consolidated Appropriations Ace, 2010, Public Law 111-117 as identified and approximated in Article 10, Section 20 of Public Act 97-0076; provided such amounts do not exceed funds made available by the federal government through Congressional designations, annual allocations, obligation limitations, or any other federal limitations.
Section 335. The sum of $3,200,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 195 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation for the local match of all other non-federally reimbursed expenses associated with the Transportation Investment Generating Economic Recovery II (TIGER II) awards specifically identified in Article 10, Section 20 of Public Act 97-0076, provided such amounts do not exceed funds made available and paid in to the Road Fund by local governments.
Section 340. The sum of $624,833, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the appropriation heretofore made in Article 20, Section 50 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation for the local match of all other non-federally reimbursed expenses associated with the Federal Discretionary Program Awards provided for in the “Department of Defense and Full-Year Continuing Appropriations Act, 2011” – Public Law 112-10 (H.R. 1473) earmarks specifically identified in Article 20 Section 25 of Public Act 97-0725, provided such amounts do not exceed funds made available and paid in to the Road Fund by local governments.
Section 345. The sum of $770,066, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the appropriation heretofore made in Article 20, Section 27 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation for the local match of all other non-federally reimbursed expenses associated with the Federal Discretionary Projects (specifically identified in Article 20, Section 26 of Public Act 97-0725), provided that such amounts do not exceed funds made available and paid into the Road Fund by local governments. (These amounts are in addition to amounts appropriated elsewhere.)
PUBLIC AND INTERMODAL TRANSPORTATION
Section 350. The sum of $22,645,693, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 280 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation for grants, road construction and all other costs relating to the Chicago Region Environmental and Transportation Efficiency (CREATE) program, provided such amounts not exceed funds made available by the federal government for this program.
Section 355. The sum of $10,440,000, or so much thereof as may be necessary, and remains unexpended, at the close of business on June 30, 2013, from the appropriation heretofore made in Article 20, Section 67 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation for grants, road construction and all other costs relating to the Chicago Region Environmental and Transportation Efficiency (CREATE)program, as awarded from the Transportation Investment Generating Economic Recovery (TIGER) IV, as provided for in the “Consolidated and Further Continuing Appropriations Act of 2012” – P.L. 112-055, provided such amounts do not exceed funds made available by the Federal government
Section 360. The sum of $284,943,495, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 285 of Public Act 97-0725, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for grants, road construction and all other costs relating to the Chicago Region Environmental and Transportation Efficiency (CREATE) program.
MULTI-MODAL STIMULUS
HIGHWAY CONSTRUCTION AND LAND ACQUISITION
Section 365. The sum of $284,712,288, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 330 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the State portion, provided such amounts do not exceed federal funds made available by the American Recovery and Reinvestment Act of 2009.
Section 370. The sum of $36,474,700, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 335 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the State and Local portion, provided such amounts do not exceed federal funds made available by the American Recovery and Reinvestment Act of 2009.
Section 375. The sum of $22,390,652, or so much thereof as may be necessary, less $5,000,000 to be lapsed from the unpaid balance, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 340 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation to provide local funding for project expenses in excess of the Local portion of federal funds made available from the American Recovery and Reinvestment Act of 2009, provided such amounts do not exceed funds made available and paid into the Road Fund by the local governments.
PUBLIC TRANSIT
Section 380. The sum of $23,270,130, or so much thereof as may be necessary, less $13,000,000 to be lapsed from the unpaid balance, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 350 of Public Act 97-0725, as amended, is reappropriated from the Federal Mass Transit Trust Fund to the Department of Transportation for capital, operating, consultant services, and technical assistance grants, state administration, and intergovernmental and interagency agreements, provided such amounts do not exceed federal funds made available by the American Recovery and Reinvestment Act of 2009.
RAIL PASSENGER AND RAIL FREIGHT
Section 385. The sum of $237,732,307, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 355 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation for grants, road construction and all other costs relating to the Chicago Region Environmental and Transportation Efficiency (CREATE) program, provided such amounts do not exceed federal funds made available by the American Recovery and Reinvestment Act of 2009.
Section 390. The sum of $6,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 360 of Public Act 97-0725, as amended, is reappropriated from the Road Fund to the Department of Transportation for track and signal improvements, rail freight equipment, and rail freight facility improvements, provided such amounts do not exceed federal funds made available by the American Recovery and Reinvestment Act of 2009.
Section 395. The sum of $1,109,815,009, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from the reappropriation heretofore made in Article 21, Section 365 of Public Act 97-0725, as amended, is reappropriated from the Federal High Speed Rail Trust Fund to the Department of Transportation for grants, construction, and all other costs relating to high speed rail projects in compliance with the American Recovery and Reinvestment Act of 2009, provided such amounts do not exceed funds made available by the federal government for this purpose.
Section 400. No contract shall be entered into or obligation incurred or any expenditure made from a reappropriation herein made in:
Section 5 Permanent Improvements
Section 40 Series D – Local Govt Grants
Section 50 Series B - Aeronautics
Section 55 Series B - Transit
Section 60 Series B – Transit
Section 65 Series B - Transit
Section 70 Series B - Transit
Section 75 Series B - Transit
Section 80 Series B - Transit
Section 85 Series B - Transit
Section 90 Series B - Transit
Section 105 State Rail Freight Loan Repayment
Section 115 Series B - Rail
Section 120 Series B - Rail
Section 125 Series B - Rail
Section 130 Federal Rail Freight Loan Repayment
Section 195 Series A - Road Program
Section 200 Series D - Road Program
Section 240 Series B - Land Acquisition 3rd Airport
Section 245 Series B - Land Acquisition 3rd Airport
Section 360 Series B - Transit
of this Article until after the purpose and the amount of such expenditure has been approved in writing by the Governor.
Total, this Article $13,465,341,810
ARTICLE 14
CAPITAL DEVELOPMENT BOARD
Section 5. The sum of $35,497,060, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 22, Section 5 of Public Act 97-0725, is reappropriated from the Capital Development Fund to the Capital Development Board for grants awarded under the Community Health Center Construction Act.
Section 10. The sum of $3,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 22, Section 10 of Public Act 97-0725, is reappropriated from the Capital Development Fund to the Capital Development Board for grants to school-based health centers that are operated by a Community Health Center as defined in the federal Public Health Service Act (42 U.S.C. 254b).
Section 15. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from reappropriations heretofore made for such purposes in Article 22, Section 15 of Public Act 97-0725, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Agriculture for the projects hereinafter enumerated:
ILLINOIS STATE FAIRGROUNDS - DUQUOIN
(From Article 22, Section 15 of Public Act 97-0725)
For completing the upgrade of the
electrical distribution system, in
addition to funds previously
appropriated.................................... 100,759
For constructing a multi-purpose
building......................................... 46,410
ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
For replacing the HVAC in
the administration building................... 2,970,973
For replacing roofing systems –
Administration Building and
Lower Roof...................................... 195,361
Plan and begin electrical
system replacement............................... 30,601
For replacement of water and sewer
service to various buildings..................... 74,479
For an airlock addition to Metrology
(Weights and Measures) Lab....................... 52,791
STATEWIDE
For replacing the roof........................... 322,345
Total $3,793,719
Section 20. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from reappropriations heretofore made for such purposes in Article 22, Section 20 of Public Act 97-0725, are reappropriated from the Capital Development Fund to the Capital Development Board for the Courts of Illinois for the projects hereinafter enumerated:
SPRINGFIELD - SUPREME COURT BUILDING
(From Article 22, Section 20 of Public Act 97-0725)
Plan and begin renovation of
Supreme Court Building......................... 13,408,166
For renovating the HVAC system on
the 3rd Floor................................... 140,000
For installing humidifier and water
filtration systems............................ 1,106,855
APPELLATE COURT SECOND DISTRICT - ELGIN
For miscellaneous improvements.................... 60,520
Total $14,715,541
Section 25. The following named amount, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 22, Section 25 of Public Act 97-0725, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Courts of Illinois for the projects hereinafter enumerated:
SUPREME COURT BUILDING - SPRINGFIELD
(From Article 22, Section 25 of Public Act 97-0725)
For renovating the Library and
completing HVAC, in addition to funds
previously appropriated......................... 235,000
Section 30. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from reappropriations heretofore made in Article 22, Section 30 of Public Act 97-0725, are reappropriated from the Capital Development Fund to the Capital Development Board for the Office of the Secretary of State for the projects hereinafter enumerated:
CAPITOL COMPLEX - SPRINGFIELD
(From Article 22, Section 30 of Public Act 97-0725)
For upgrading fire alarm panels................. 726,391
Plan/begin upgrade of high voltage
distribution system.......................... 1,284,200
DRIVER SERVICES FACILITIES, NORTH, SOUTH AND
WEST - CHICAGO
For HVAC upgrades.............................. 1,927,622
To upgrade electrical systems.................... 117,144
HOWLETT BUILDING- SPRINGFIELD
For upgrading the North Patio for
public safety................................... 444,045
For installing an emergency generator............ 734,299
For replacing roofing systems.................... 206,855
ILLINOIS STATE LIBRARY- SPRINGFIELD
For replacing the roofing system.................. 35,326
MOTOR VEHICLE SERVICES FACILITY - SPRINGFIELD
For upgrading the fire alarm and
security systems................................. 16,809
Total $5,492,691
Section 35. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from reappropriations heretofore made in Article 22, Section 35 of Public Act 97-0725, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Office of the Secretary of State for the projects hereinafter enumerated:
CAPITOL COMPLEX – SPRINGFIELD
(From Article 22, Section 35 of Public Act 97-0725)
For upgrading fire alarm systems in
two buildings.................................... 17,992
Total $17,992
Section 40. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from reappropriations heretofore made for such purposes in Article 22, Section 40 of Public Act 97-0725, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Central Management Services for the projects hereinafter enumerated:
STATEWIDE
(From Article 22, Section 40 of Public Act 97-0725)
For the renovation of state-owned property....... 592,127
For renovating state owned
property........................................ 969,274
For upgrading the building security
system at the James R. Thompson Center
and the State of Illinois building
in addition to funds previously
appropriated.................................... 655,000
For renovation of State-owned
property at the following
locations: Kenneth Hall Regional
Office Building, AIG (Franklin Complex)
Building, James R. Thompson Center,
Sangamo Complex (IEPA), Champaign Regional
Office Building (IEPA), Springfield
Regional Office Building, Natural
Resource Center (DNR) and Read -
Building (Elgin Mental Health Center)........... 157,715
CHICAGO MEDICAL CENTER - OFFICE AND LAB BUILDING
For installing an emergency generator
and upgrading the electrical system........... 1,888,829
For planning and beginning the renovation
of the facility................................. 462,651
COLLINSVILLE REGIONAL OFFICE COMPLEX
For replacing the roof......................... 1,012,947
To replace an emergency generator................ 180,811
ELGIN REGIONAL OFFICE BUILDING
For upgrading the HVAC system.................. 2,373,194
ILLINOIS CENTER FOR REHABILITATION AND
EDUCATION (WOOD) - CHICAGO
For upgrading fire and safety systems............. 27,113
JAMES R. THOMPSON CENTER - CHICAGO
For the purpose of emergency stone
repair at the James R. Thompson Center........ 1,980,286
For planning and beginning electrical
system and life safety system upgrades.......... 749,823
For upgrading the HVAC system.................. 1,281,319
For installing an emergency generator.......... 3,545,000
For rehabilitating exterior columns, in
addition to funds previously appropriated........ 11,692
For upgrading mechanical systems, in
addition to funds previously appropriated........ 27,341
KENNETH HALL REGIONAL OFFICE BUILDING – EAST ST. LOUIS
For design services for emergency parapet
wall repairs..................................... 22,656
MEDICAL CENTER (DCFS DISTRICT OFFICE) - CHICAGO
For replacing roof and upgrading
mechanical and electrical systems............... 321,956
MEDICAL CENTER ( EDWARDS CENTER) - CHICAGO
For medical center (Edwards Center).............. 184,899
MICHAEL A. BILANDIC BUILDING, CHICAGO
For upgrading HVAC and domestic water
system.......................................... 697,486
ROCKFORD REGIONAL OFFICE BUILDING
For replacing Halon and upgrading
the air conditioning............................ 162,614
SPRINGFIELD - RESEARCH AND COLLECTION CENTER
For expanding surplus warehouse................... 73,584
SPRINGFIELD - COMPUTER FACILITY
For upgrading the computer room and the
electrical system................................ 23,421
SPRINGFIELD REGIONAL OFFICE BUILDING
For emergency cooling tower replacement
at 4500 S. Sixth Street Road..................... 56,864
SUBURBAN NORTH REGIONAL OFFICE FACILITY, DES PLAINES
For renovating office space....................... 92,465
Total $17,551,067
Section 45. The following named amount, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 22, Section 45, of Public Act 97-0725, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Central Management Services for the project hereinafter enumerated:
ILLINOIS CENTER FOR REHABILITATION AND EDUCATION
(ROOSEVELT) – CHICAGO
(From Article 22, Section 45 of Public Act 97-0725)
For upgrading the kitchen and plumbing........... 185,838
Total $185,838
Section 50. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from reappropriations heretofore made for such purposes in Article 22, Section 50 of Public Act 97-0725, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Natural Resources for the projects hereinafter enumerated:
BABE WOODYARD STATE NATURAL AREA -
VERMILION COUNTY
(From Article 22, Section 50 of Public Act 97-0725)
For developing the site and associated
land acquisition................................ 244,604
BIG RIVER STATE FOREST
For ADA improvements............................. 191,122
BUFFALO ROCK STATE PARK – LASALLE COUNTY
For replacing the septic system, in
addition to funds previously appropriated........ 58,023
CARLYLE LAKE STATE PARKS
For road and site improvements at
Carlyle Lake.................................. 1,477,424
For infrastructure and site
improvements at Carlyle Lake.................... 765,485
CARLYLE STATE FISH AND WILDLIFE AREA – FAYETTE COUNTY
To replace Cox Bridge at Carlyle State
Fish and Wildlife Area.......................... 550,000
FERNE CLYFFE STATE PARK - JOHNSON COUNTY
For replacing the campground
sewage treatment system......................... 365,054
GIANT CITY STATE PARK - JACKSON COUNTY
For replacing the sewer treatment system......... 458,605
GOOSE LAKE PRAIRIE NATURAL AREA - GRUNDY COUNTY
For replacing floating boardwalk.................. 24,604
HENNEPIN CANAL PARKWAY STATE PARK AND ACCESS AREA
For rehabilitating/repairing railroad
bridges, in addition to funds
previously appropriated......................... 851,685
HORSESHOE LAKE CONSERVATION AREA - ALEXANDER COUNTY
For dam rehabilitation and the State's share
to implement the ecological restoration
plan in cooperation with the U.S.
Army Corps of Engineers, and
land acquisition................................ 842,605
I & M Canal - CHANNAHON – GRUNDY COUNTY
For repair of the spillway, in addition
to funds previously appropriated................ 364,320
For replacing Lock 14 Bridge..................... 308,871
For improving the DuPage River Spillway.......... 853,884
For improving DuPage River Spillway................ 2,172
ILLINOIS BEACH STATE PARK - LAKE COUNTY
For stabilizing shoreline........................ 923,983
For replacing sanitary sewer line.................. 8,196
JAKE WOLF MEMORIAL FISH HATCHERY
For replacing or upgrading
electrical system............................... 325,005
MORAINE HILLS STATE PARK – MCHENRY COUNTY
For replacing yellow-head marshy dam culverts.... 400,000
PERE MARQUETTE STATE PARK – JERSEY COUNTY
For replacing lodge pool dehumidifier,
in addition to funds previously appropriated.... 262,838
For design services to replace a lodge
pool dehumidifier................................ 25,413
PYRAMID STATE PARK
For renovating the Galum building for a
mine rescue station............................. 808,670
RED HILLS STATE PARK – LAWRENCE COUNTY
For miscellaneous improvements.................... 44,740
RESEARCH & COLLECTIONS CENTER - SPRINGFIELD
For renovating the interior....................... 17,796
ROCK CUT STATE PARK - WINNEBAGO COUNTY
For rehabilitating water and sewer
system........................................... 11,615
SILOAM SPRINGS STATE PARK – ADAMS COUNTY
For rehabilitating office/service area......... 1,119,114
STEPHEN A. FORBES STATE PARK, MARION COUNTY
For replacing dump and fish cleaning
stations, in addition to funds
previously appropriated........................... 9,397
For design services to replace dump and
fish cleaning stations........................... 22,794
WORLD SHOOTING COMPLEX – SPARTA
For infrastructure improvements................... 45,910
SPRINGFIELD
For constructing an office building and
interpretive center............................. 166,153
STARVED ROCK STATE PARK AND LODGE
For replacing roofing systems...................... 7,457
WAYNE FITZGERRELL STATE RECREATION AREA
For replacing roofs.............................. 149,768
WHITE PINES FOREST STATE PARK - OGLE COUNTY
For completing the replacement of the
sewer system, in addition to funds
previously appropriated.......................... 10,907
WILDLIFE PRAIRIE PARK
For rehabilitating the sewage
treatment plant, or a grant to
Friends of Wildlife Prairie Park
for the same purpose............................ 683,164
For upgrading sewage treatment plant,
or a grant to Friends of Wildlife
Prairie Park for the same purpose............. 1,032,000
STATEWIDE
For replacing/repairing the roofing systems
at the following locations at the approximate
cost set forth below........................... 245,000
Clinton Lake Recreational
Area - DeWitt County............... 65,000
Ferne Clyffe State Park-
Johnson County..................... 20,000
Hennepin Canal Parkway
State Park......................... 26,000
Lake Le-Aqua-Na State Park-
Stephenson County.................. 39,000
Mermet Lake Conservation Area-
Massac County...................... 95,000
For replacing/repairing the roofing systems
at the following locations at the approximate
costs set forth below........................... 115,267
Starved Rock State Park &
Lodge-LaSalle County................ 4,726
Kaskaskia River Fish & Wildlife
Area-Randolph County............... 19,500
Pyramid State Park-
Perry County........................ 4,109
Region V Office (Benton)
Franklin County.................... 86,932
For rehabilitating dams and bridges.............. 116,946
For constructing, replacing and
renovating lodges and concession
buildings....................................... 878,761
For replacing roofs at the following locations,
at the approximate cost set forth below......... 134,931
Shabbona Lake State Park............ 40,850
Hennepin Canal Parkway State Park... 15,750
Randolph Fish & Wildlife Area....... 32,271
Dixon Springs State Park............ 46,060
For replacing and constructing vault
toilets at the following locations,
at the approximate cost set forth
below........................................... 167,772
Hennepin Canal Parkway
State Trail....................... 167,772
For rehabilitating dams at the
following locations, at the
approximate cost set forth below................. 25,034
Rock Cut State Park................. 25,034
For replacing roofs at the following
locations, at the approximate
cost set forth below............................ 206,925
Southern IL Arts & Crafts Center....... 412
Frank Holten State Park................ 412
DNR Geological Survey-Champaign........ 413
Sangchris Lake State Park............ 5,291
Illini State Park.................... 1,692
Shelbyville Fish & Wildlife Area.... 79,480
Trail of Tears State Forest.......... 3,685
Sanganois Conservation Area............ 413
Rice Lake State Park................ 28,090
Hidden Spring State Park............ 53,740
Siloam Springs State Park............ 2,417
Mississippi Palisades State Park.... 30,880
For replacing vault toilets at the
following locations, at the approximate
cost set forth below............................ 285,813
Anderson Lake Conservation Area -
Fulton/Schuyler Counties........... 71,453
Giant City State Park -
Jackson/Union Counties............. 71,453
Randolph County Conservation Area... 71,453
Silver Springs State Park -
Kendall County.................... 71,454
For constructing hazardous material storage
buildings......................................... 9,935
For constructing vault toilets at the
following locations at the approximate
cost set forth below:........................... 137,897
Apple River Canyon State Park....... 19,699
Des Plaines Conservation Area....... 19,700
Kankakee River State Park........... 19,700
Lake Le-Aqua-Na State Park.......... 19,699
Marshall County Conservation Area... 19,700
Morrison-Rockwood State Park........ 19,699
Rice Lake Conservation Area......... 19,700
For planning, construction, reconstruction,
land acquisition and related costs,
utilities, site improvements, and all other
expenses necessary for various capital
improvements at parks, conservation areas,
and other facilities under the jurisdiction
of the Department of Natural Resources.......... 415,159
Total $16,172,818
Section 55. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 22, Section 55 of Public Act 97-0725, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Natural Resources for the project hereinafter enumerated:
GOOSE LAKE PRAIRIE NATURAL AREA - GRUNDY COUNTY
(From Article 22, Section 55 of Public Act 97-0725)
For rehabilitating visitor's center exterior...... 23,345
Total $23,345
Section 60. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from reappropriations heretofore made for such purposes in Article 22, Section 60 of Public Act 97-0725, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Corrections for the projects hereinafter enumerated:
CENTRALIA CORRECTIONAL CENTER
(From Article 22, Section 60 of Public Act 97-0725)
For replacing roofing systems.................... 681,806
For replacing the cooling tower.................. 201,948
To upgrade a sewage treatment plant............... 66,918
DIXON CORRECTIONAL CENTER
For replacing the fire alarm system.............. 452,286
For planning the upgrade and expansion
of the medical care facility..................... 24,127
DWIGHT CORRECTIONAL CENTER
For renovating Housing Unit C8, in
addition to funds previously
appropriated.................................... 270,000
For renovating buildings, in addition
to funds previously appropriated................ 274,847
For renovation of buildings....................... 30,261
For repair and replacement of roofing
system........................................... 10,221
EAST MOLINE CORRECTIONAL CENTER
For upgrading the roofing system................. 426,451
For replacing windows, in addition
to funds previously appropriated................. 42,450
GRAHAM CORRECTIONAL CENTER
For upgrading the mechanical system............... 14,439
HARDIN COUNTY WORK CAMP
To upgrade a sewage treatment plant............... 23,581
ILLINOIS RIVER CORRECTIONAL CENTER – CANTON
For replacing domestic hot water
heater, in addition to
funds previously appropriated................... 239,698
ILLINOIS YOUTH CENTER - HARRISBURG
For constructing a multi-purpose medical,
vocational and confinement building and
other improvements.............................. 322,181
For utility upgrade, including gas
and sewer..................................... 4,578,404
ILLINOIS YOUTH CENTER - ST. CHARLES
For constructing an R & C building
and other improvements.......................... 587,406
JACKSONVILLE CORRECTIONAL CENTER
For upgrading the fire alarm system.............. 779,414
LINCOLN CORRECTIONAL CENTER
For upgrading the building
automation system............................. 2,036,888
For replacing doors and locks..................... 31,592
LOGAN CORRECTIONAL CENTER
For replacing housing unit roofs.................. 45,732
For planning and beginning the upgrade
of the power plant.............................. 155,805
For renovating the electrical
distribution system............................. 159,995
For constructing a medical building and
dietary building and other improvements......... 722,098
MENARD CORRECTIONAL CENTER - CHESTER
For repairs and upgrades....................... 9,308,013
For replacing the Administration Building.......... 2,398
For replacing toilets and waste lines
at E/W Cellhouse and upgrade
North Cellhouse plumbing........................ 364,351
For renovation or replacement of the
Old Hospital Building, in addition to
funds previously appropriated.................... 35,574
For planning and construction of the
Administration Building.......................... 15,338
PONTIAC CORRECTIONAL CENTER
For replacing doors and frames................. 1,620,000
SHAWNEE CORRECTIONAL CENTER
For replacing the emergency generator............. 44,867
SOUTHWESTERN CORRECTIONAL CENTER
For replacing the roofing system................. 389,750
STATEVILLE CORRECTIONAL CENTER - JOLIET
For replacing the X House locks................ 1,427,269
For the emergency compressor
failure at Stateville RNC and
other improvements.............................. 865,123
For replacing doors and locks.................... 580,000
For replacing windows in B House................. 126,480
For replacing power plant and
utility distribution system...................... 17,454
For upgrading electrical system and elevator
and installing HVAC system....................... 82,560
TAYLORVILLE CORRECTIONAL CENTER
For replacing operators and
main gates, in addition to
funds previously appropriated.................... 34,242
VANDALIA CORRECTIONAL CENTER
For an emergency generator....................... 815,000
For replacing roofing systems.................. 1,107,071
For constructing a multi-purpose program
building......................................... 90,656
For converting Administration Building and
planning construction of an Administration/
Health Care Unit and other improvements......... 308,406
For replacement of roofing system................. 37,409
VIENNA CORRECTIONAL CENTER
For replacing windows.......................... 2,118,000
For replacing roofing systems..................... 23,987
For replacing the cooler and freezer............. 356,663
For upgrading the power plant..................... 20,234
For upgrading the HVAC system and replacing
water lines in six housing units................ 423,601
For emergency roof replacement on
various buildings............................... 145,698
STATEWIDE
For the purpose of funding all
costs associated with constructing
an X-House.................................... 1,262,924
For the purpose of funding all costs
associated with constructing a
Centralized Medical and
Long-Term Care Facility....................... 4,175,151
For replacing doors and locks
at the following locations at the
approximate costs set forth below............. 1,015,137
Dixon Correctional Center.......... 991,258
Vienna Correctional Center.......... 23,879
For upgrading water towers at the following
locations at the approximate
cost set forth below.......................... 1,472,102
Dixon Correctional Center.......... 388,482
Illinois Youth Center –
St. Charles..................... 1,228,853
Illinois Youth Center -
Valley View......................... 9,530
For planning, design, construction, equipment
and all other necessary costs for a
maximum security facility.................... 74,683,197
For planning a medium security facility
and land acquisition.......................... 2,629,428
For replacing roofing systems at
the following locations at the
approximate cost set forth below................ 111,921
Menard Correctional Center........... 6,194
Vienna Correctional Center.......... 43,997
Illinois Youth Center -
Harrisburg............................. 10
Pontiac Correctional Center............. 10
Illinois Youth Center - Joliet...... 63,167
For replacing or upgrading security and
monitoring systems at the following
locations at the approximate cost set
forth below..................................... 278,707
Vienna Correctional Center......... 250,000
Joliet Correctional Center.......... 28,707
For planning and replacing windows at the
following locations at the approximate cost
set forth below............................... 2,226,942
Vienna Correctional Center....... 1,780,000
Sheridan Correctional Center....... 314,454
Illinois Youth Center - Valley View.. 8,310
Illinois Youth Center - Joliet...... 74,875
Dixon Correctional Center........... 46,073
Shawnee Correctional Center.......... 3,230
For replacing security fencing at the
following locations at the approximate
cost set forth below............................ 292,225
Hill Correctional Center............. 3,547
Western IL Correctional Center...... 30,864
Joliet Correctional Center.......... 49,119
Logan Correctional Center.......... 158,964
Dixon Correctional Center............ 8,694
Shawnee Correctional Center.......... 5,269
Graham Correctional Center.......... 24,369
Danville Correctional Center........ 11,399
For planning, design, construction, equipment
and all other necessary costs for a
female multi-security level
correctional center.......................... 55,938,782
For replacing roofing systems at the
following locations at the approximate
cost set forth below............................ 129,624
Vienna Correctional Center......... 108,867
Sheridan Correctional Center............ 10
Western Illinois Correctional
Center - Mt. Sterling.............. 21,238
For upgrading fire and safety systems at
the following locations at the approximate
costs set forth below, in addition to
funds previously appropriated................. 1,162,289
Menard Correctional Center -
Chester........................... 979,592
Sheridan Correctional Center....... 110,620
Vienna Correctional Center.......... 72,077
Total $177,917,121
Section 65. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from reappropriations heretofore made for such purpose in Article 22, Section 65, of Public Act 97-0725, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Corrections for the projects hereinafter enumerated:
BIG MUDDY CORRECTIONAL FACILITY
(From Article 22, Section 65 of Public Act 97-0725)
For replacing door locking controls
and intercom systems.......................... 2,221,298
STATEVILLE CORRECTIONAL CENTER
For installing fire alarm systems.............. 1,600,000
Total $3,821,298
Section 70. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from appropriations heretofore made in Article 22, Section 70 of Public Act 97-0725, are reappropriated from the Capital Development Fund to the Capital Development Board for the projects hereinafter enumerated:
ILLINOIS YOUTH CENTER - JOLIET
(From Article 22, Section 70 of Public Act 97-0725)
For replacing roofs, in addition
to funds previously appropriated................. 26,089
ILLINOIS YOUTH CENTER – KEWANEE
For replacing the sprinkler system............. 4,330,695
ILLINOIS YOUTH CENTER - PERE MARQUETTE
For replacing roofs.............................. 193,043
ILLINOIS YOUTH CENTER - ST. CHARLES
For upgrading HVAC system........................ 331,430
Total $4,881,257
Section 75. The sum of $174,139, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 22, Section 75 of Public Act 97-0725, is reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Emergency Management Agency for costs associated with a new State Emergency Operations Center.
Section 80. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from reappropriations heretofore made for such purposes in Article 22, Section 80 of Public Act 97-0725, are reappropriated from the Capital Development Fund to the Capital Development Board for the Historic Preservation Agency for the projects hereinafter enumerated:
BLACK HAWK STATE HISTORIC SITE – ROCK ISLAND
(From Article 22, Section 80 of Public Act 97-0725)
For renovating a retaining wall and two
shelters ....................................... 179,432
CAHOKIA MOUNDS HISTORIC SITE - COLLINSVILLE
For replacement of Monk's Mounds stairs
and other improvements.......................... 211,080
For restoration of Monk's Mound
and other improvements.......................... 606,489
For purchasing private land within historic
site boundary and other improvements............ 189,979
To create a new entrance around existing
bronze artwork doors and other improvements...... 67,301
DANA THOMAS HOUSE STATE HISTORIC SITE
To rehabilitate the interior and exterior
at Dana Thomas House State Historic Site........ 590,786
JARROT MANSION STATE HISTORICAL SITE
For restoring the mansion, site improvements
and land acquisition, in addition
to funds previously appropriated.............. 1,447,021
LINCOLN-HERNDON LAW OFFICE - SPRINGFIELD
For restoration of the Tinsley Shop............ 1,000,000
LINCOLN LOG CABIN STATE HISTORIC SITE, COLES COUNTY
To replace a sewer system at Historic Site........ 11,918
LINCOLN'S TOMB/VIETNAM MEMORIAL - SPRINGFIELD
For rehabilitating site and providing
irrigation system................................ 93,965
LINCOLN’S TOMB - SPRINGFIELD
For renovating the interior...................... 621,627
LINCOLN'S NEW SALEM HISTORIC SITE - MENARD COUNTY
For providing electrical at campgrounds.......... 110,444
LINCOLN PRESIDENTIAL CENTER - SPRINGFIELD
For constructing library and museum complex, in
addition to funds previously appropriated..... 2,505,208
OLD STATE CAPITOL - SPRINGFIELD
For repairing elevators.......................... 387,464
UNION STATION - SPRINGFIELD
For purchasing and rehabilitating................. 21,721
STATEWIDE
For statewide ISTEA 21 Match..................... 344,124
For matching ISTEA federal grant funds............ 18,146
Total $8,406,705
Section 85. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from reappropriations heretofore made in Article 22, Section 85, of Public Act 97-0725, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Historic Preservation Agency for the projects hereinafter enumerated:
MT. PULASKI COURTHOUSE HISTORIC SITE - LOGAN COUNTY
(From Article 22, Section 85 of Public Act 97-0725)
For rehabilitating interior & exterior............ 24,118
PULLMAN HISTORIC SITE
For all costs associated with the
stabilization and restoration of the
Pullman Historic Site........................... 738,209
Total $762,327
Section 90. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from reappropriations heretofore made for such purposes in Article 22, Section 90 of Public Act 97-0725, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Human Services for the projects hereinafter enumerated:
ALTON MENTAL HEALTH CENTER - MADISON COUNTY
(From Article 22, Section 90 of Public Act 97-0725)
For life/safety improvements..................... 832,914
For renovating the Forensic Complex and
constructing two building additions, in
addition to funds previously appropriated..... 3,900,000
For constructing two building additions
at the Forensic Complex....................... 6,780,876
For rehabilitation of the central dietary.......... 9,179
CHESTER MENTAL HEALTH CENTER
For completing the replacement of
smoke and heat detectors, in addition
to funds previously appropriated................ 440,000
For upgrading HVAC systems....................... 144,664
For replacing smoke/heat detectors................ 37,133
CHICAGO-READ MENTAL HEALTH CENTER - CHICAGO
For renovating Unit J-East for
forensic use, in addition to
funds previously appropriated................. 3,398,163
For replacing the emergency
generator....................................... 344,277
CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER - ANNA
For upgrading the fire alarm system............ 1,804,362
For life/safety improvements................... 7,133,453
For renovating Sycamore Hall...................... 94,930
For renovating Sycamore........................ 4,385,000
ELGIN MENTAL HEALTH CENTER - KANE COUNTY
For converting the Read Building
for office space, in addition
to funds previously appropriated................ 503,813
For replacing power plant and engineering
building...................................... 4,925,502
For renovating the central dietary
and kitchen................................... 3,704,073
For construction of roads, parking lots
and street lights............................... 133,664
FOX DEVELOPMENTAL CENTER - DWIGHT
For upgrading fire/life safety systems........... 224,168
For replacing and repairing interior doors,
flooring and walls, in addition to funds
previously appropriated......................... 249,122
For planning and beginning replacement
of interior doors and flooring
and repairing walls in the Main and
Administration Buildings......................... 35,888
HOWE DEVELOPMENTAL CENTER - TINLEY PARK
For completing upgrade of tunnels,
Phase II, in addition to funds previously
appropriated.................................... 366,920
For renovating residences, in addition to
funds previously appropriated.................... 85,209
ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
For replacing the roof on the main
building and renovating the bathrooms
in three dormitories.......................... 1,846,086
For installing sprinkler systems
in the dormitories and elementary
buildings..................................... 2,678,193
For renovating the High School Building
Phase II........................................ 135,066
For renovating High School Building............... 96,859
ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE
For replacing roofs............................... 69,156
For renovating auditorium, classroom
and administration buildings.................. 2,026,155
For renovating classrooms in Building 17....... 1,250,724
For renovations to the powerhouse,
boilers and associated coal and ash
equipment........................................ 37,501
For renovating the power house................... 656,458
JACKSONVILLE DEVELOPMENTAL CENTER - MORGAN COUNTY
For upgrading fire/life safety systems............ 36,636
For planning and beginning the renovation
of the power house............................... 37,297
KILEY DEVELOPMENTAL CENTER - WAUKEGAN
For improving power reliability and
installing emergency lighting, in
addition to funds previously appropriated....... 385,141
For upgrading Building C ceiling................. 164,629
For converting the facility to natural
gas, in addition to funds previously
appropriated.................................... 112,391
For renovating homes, Phase II, in
addition to funds previously appropriated........ 77,343
LINCOLN DEVELOPMENTAL CENTER - LOGAN
For various capital improvements,
including planning and construction
of four ten-bed transitional or
residential homes............................... 527,150
LUDEMAN DEVELOPMENTAL CENTER - PARK FOREST
For upgrading the electrical panel............... 175,717
For repairing and replacing furnaces and
duct work, in addition to funds previously
appropriated..................................... 41,569
For renovating residential and neighborhood
homes, in addition to funds previously
appropriated..................................... 45,810
For replacing plumbing, HVAC and boiler systems... 47,586
For renovation of residential buildings,
in addition to funds previously appropriated..... 73,252
MABLEY DEVELOPMENTAL CENTER - DIXON
For replacing mechanicals and upgrading
the fire alarm systems........................... 38,440
MADDEN MENTAL HEALTH CENTER - HINES
For renovating residential pavilions,
in addition to funds previously appropriated.... 531,642
For renovating pavilions and
administration building for safety/
security, in addition to
funds previously appropriated................... 577,002
For renovating dietary........................... 729,885
For renovation of pavilions, in addition
to funds previously appropriated................. 60,833
MCFARLAND MENTAL HEALTH CENTER - SPRINGFIELD
For upgrading fire alarm system................ 1,670,183
For replacing roofs – Kennedy and
Administration Building......................... 773,136
MURRAY DEVELOPMENTAL CENTER - CENTRALIA
For completing the renovation of
the boiler house, in addition to
funds previously appropriated................. 2,991,120
SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
For replacing the sewer system in
south campus.................................. 2,056,004
For planning and beginning renovation
of dietary...................................... 203,263
For work necessary to remedy fire
damper deficiencies............................. 117,020
For replacing water mains and valves,
in addition to funds previously appropriated.... 210,015
SINGER MENTAL HEALTH CENTER - ROCKFORD
For upgrading fire alarm systems.................. 47,651
For renovating dietary and stores................. 55,334
For renovating mechanicals and
residential areas............................... 691,943
TINLEY PARK MENTAL HEALTH CENTER – COOK COUNTY
For completing the upgrade of fire
and life/safety issues in Oak Hall,
in addition to funds previously appropriated.... 600,000
STATEWIDE
For replacing roofing systems at
the following locations, at the
approximate costs set forth below............... 244,866
Chicago-Read Mental
Health Center – Cook County....... 148,645
Fox Developmental
Center - Dwight.................... 11,932
Kiley Developmental Center -
Waukegan........................... 84,289
For replacing and repairing roofing systems
at the following locations, at the
approximate cost set forth below................. 35,240
Alton Mental Health Center -
Madison............................. 5,873
Shapiro Developmental Center -
Kankakee............................ 5,873
Ludeman Developmental Center -
Park Forest......................... 5,873
Madden Mental Health Center -
Hines............................... 5,873
Murray Developmental Center -
Centralia........................... 5,874
Kiley Developmental Center -
Waukegan............................ 5,874
For replacing and repairing roofing
systems at the following locations, at
the approximate cost set forth below............ 558,859
Chicago-Read Mental Health
Center............................. 13,767
Howe Developmental Center -
Tinley Park....................... 488,032
Shapiro Developmental Center -
Kankakee........................... 42,392
Illinois School for the
Deaf - Jacksonville................ 12,087
Kiley Developmental
Center - Waukegan................... 2,581
For repairing or replacing roofs
at the following locations, at
the approximate cost set forth below............ 188,248
Illinois School for the
Visually Impaired -
Jacksonville....................... 37,624
Jacksonville Developmental
Center - Morgan County............. 60,000
Lincoln Developmental Center -
Logan County........................ 2,039
Murray Developmental Center -
Centralia........................... 2,039
Shapiro Developmental Center -
Kankakee........................... 86,546
For replacing and repairing roofing systems
at the following locations at the approximate
cost set forth below............................. 58,410
Chicago-Read Mental Health Center....... 32
Tinley Park Mental Health Center.... 12,974
Illinois School for the Visually
Impaired - Jacksonville............ 19,414
Shapiro Developmental Center -
Kankakee........................... 25,955
Kiley Developmental Center -
Waukegan................................ 3
Ludeman Developmental Center -
Park Forest............................ 32
For replacement of roofing systems at the
following locations at the approximate costs
set forth below:................................ 118,670
Lincoln Development Center.......... 29,667
Murray Developmental Center......... 29,667
Elgin Developmental Center.......... 29,667
Shapiro Developmental Center........ 29,669
Total $62,611,793
Section 95. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from reappropriations heretofore made for such purposes in Article 22, Section 95 of Public Act 97-0725, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Human Services for the project hereinafter enumerated:
ILLINOIS SCHOOL FOR THE DEAF – JACKSONVILLE
(From Article 22, Section 95 of Public Act 97-0725)
For replacing dorm doors....................... 1,945,671
JACKSONVILLE DEVELOPMENTAL CENTER – MORGAN
For upgrading the mechanicals in the
power plant, in addition to funds
previously appropriated.......................... 45,582
SINGER MENTAL HEALTH CENTER
For repair and/or replacement of roofs............ 61,150
FOX DEVELOPMENTAL CENTER - DWIGHT
For renovating the water treatment plant......... 678,331
Total $2,730,734
Section 100. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from reappropriations heretofore made in Article 22, Section 100 of Public Act 97-0725, are reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Medical District Commission for the projects hereinafter enumerated:
ILLINOIS MEDICAL DISTRICT COMMISSION - CHICAGO
(From Article 22, Section 100 of Public Act 97-0725)
For upgrading utility and infrastructure,
in addition to funds previously appropriated.... 412,685
For upgrading core utilities..................... 101,289
For upgrading research center.................... 346,714
Total $860,688
Section 105. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from reappropriations heretofore made for such purposes in Article 22, Section 105 of Public Act 97-0725, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Military Affairs for the projects hereinafter enumerated:
BLOOMINGTON ARMORY - McLEAN COUNTY
(From Article 22, Section 105 of Public Act 97-0725)
For rehabilitating the mechanical/electrical
systems and renovating the interior.............. 17,260
CAMP LINCOLN - SPRINGFIELD
For construction of a military academy
facility......................................... 39,188
ELGIN ARMORY - KANE COUNTY
For upgrading the interior and exterior........... 32,395
MACOMB ARMORY - McDONOUGH
For replacing the mechanical and electrical
systems and installing a kitchen................. 73,371
NORTH RIVERSIDE ARMORY
For rehabilitating the interior and
exterior......................................... 14,648
NORTHWEST ARMORY - CHICAGO
For upgrading the electrical system............ 2,377,448
For replacing the mechanical systems.............. 46,187
SYCAMORE ARMORY
For replacing the electrical system,
renovating the interior and installing
air conditioning................................. 22,310
STATEWIDE
For capital improvements to the
Lincoln’s ChalleNGe Academy.................. 37,398,550
For constructing an army aviation
support facility.............................. 5,823,663
To complete construction and
Purchase equipment for the Shiloh,
Mt. Vernon, and Carbondale Readiness
Center.......................................... 246,707
Total $46,091,727
Section 110. The following named amount, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 22, Section 110 of Public Act 97-0725, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Military Affairs for the project hereinafter enumerated:
LAWRENCEVILLE ARMORY
(From Article 22, Section 110 of Public Act 97-0725)
For rehabilitating the exterior and
replacing roofing systems...................... 176,837
Total $176,837
Section 115. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from reappropriations heretofore made for such purposes in Article 22, Section 115 of Public Act 97-0725, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Revenue for the projects hereinafter enumerated:
WILLARD ICE BUILDING - SPRINGFIELD
(From Article 22, Section 115 of Public Act 97-0725)
For repairing emergency generator................ 108,285
For renovation of the parking ramp............. 2,649,042
For completing the upgrade of
building management controls,
in addition to funds
previously appropriated......................... 400,000
For replacing the dock exhaust system............ 172,722
For upgrading building management
Controls and other improvements............... 3,495,466
For upgrading the plumbing system................ 908,359
For renovating the interior and
upgrading HVAC and other improvements......... 2,847,517
Total $10,581,391
Section 120. The following named amount, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 22, Section 120 of Public Act 97-0725, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Revenue for the project hereinafter enumerated:
WILLARD ICE BUILDING – SPRINGFIELD
(From Article 22, Section 120 of Public Act 97-0725)
For completing the upgrade of the
Plumbing System................................. 600,000
Total $600,000
Section 125. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from reappropriations heretofore made for such purposes in Article 22, Section 125 of Public Act 97-0725, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of State Police for the projects hereinafter enumerated:
AMERICAN GENERAL BUILDING - SPRINGFIELD
(From Article 22, Section 125 of Public Act 97-0725)
For installing an emergency generator
and various improvements...................... 2,261,948
METRO-EAST FORENSIC LAB - BELLEVILLE
For constructing a new forensic
lab in Belleville, in addition
to funds previously appropriated............. 29,001,537
For constructing new forensic lab, in
addition to funds previously appropriated..... 1,611,248
For planning and beginning the
construction of a Metro East
forensic laboratory, in addition to
funds previously appropriated................... 750,000
EFFINGHAM DISTRICT 12
For Effingham District 12 Firing Range............ 61,586
CHICAGO FORENSIC LABORATORY
For planning and beginning the
construction of an addition
to the Chicago Forensic Laboratory............ 1,129,393
SPRINGFIELD ARMORY
For planning and design of the rehabilitation
and site improvements of the Springfield
Armory, in addition to funds previously
appropriated.................................... 352,523
STATE POLICE TRAINING ACADEMY - SPRINGFIELD
For planning and beginning the
construction of an addition to the
CODIS Laboratory and other improvements......... 277,750
ULLIN DISTRICT 22
For emergency roof and interior and
exterior repairs................................. 71,651
STATEWIDE
For replacing communications towers
equipment and tower buildings................... 539,005
For replacing radio communication towers,
equipment buildings and installing emergency
power generators at the following
locations at the approximate costs
set forth below................................. 250,000
Harlem & Irving – Cook County....... 62,500
Savanna – Carroll County............ 62,500
Fairfield – Wayne County............ 62,500
Niota – Hancock County.............. 62,500
Total $36,306,641
Section 130. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from reappropriations heretofore made for such purposes in Article 22, Section 130 of Public Act 97-0725, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Veterans' Affairs for the projects hereinafter enumerated:
ANNA VETERAN’S HOME
(From Article 22, Section 130 of Public Act 97-0725)
To plan and begin the construction
of a 40-50 bed addition......................... 467,333
LASALLE VETERAN’S HOME – LASALLE COUNTY
For the replacement of the galvanized water
piping........................................... 87,600
MANTENO VETERANS' HOME - KANKAKEE COUNTY
For replacing air conditioner chillers............ 26,537
For replacing condensing units.................... 65,237
For upgrading or construction of roads
and parking lots................................. 28,785
For planning and constructing additional
storage and support areas........................ 73,248
For upgrading storm sewer......................... 97,768
QUINCY VETERANS' HOME - ADAMS COUNTY
For repairs and upgrades....................... 3,293,015
For planning and beginning
renovation of Kent, Shapers
and Elmore, in addition
to funds previously appropriated................ 876,371
For constructing a bus and
ambulance garage and other improvements......... 324,001
For improvements to various buildings
and replacement of Fletcher Building
to meet licensure standards................... 1,464,941
To replace a chimney stack and ash handling
system.......................................... 257,833
STATEWIDE
For the construction of a 200-bed
veterans’ home facility, in addition
to funds previously appropriated............. 48,500,000
For planning and beginning the
Construction of a skilled care
Veterans’ home................................ 2,000,000
For the construction of a 200-bed
veterans’ home facility, in addition
to funds previously appropriated............. 12,005,734
Total $69,568,403
Section 135. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from reappropriations heretofore made for such purposes in Article 22, Section 135 of Public Act 97-0725, are reappropriated from the Capital Development Fund to the Capital Development Board for the Office of the Attorney General for the projects hereinafter enumerated:
ATTORNEY GENERAL BUILDING - SPRINGFIELD
(From Article 22, Section 135 of Public Act 97-0725)
For renovating and waterproofing terrace......... 173,995
For replacing electronic ballasts................ 915,729
For replacing the roof........................... 102,814
Total $1,192,538
Section 140. The amount of $2,282,202, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 22, Section 140 of Public Act 97-0725, to the Capital Development Board for the Department of Corrections for the Illinois Youth Center – Rushville for planning, design, construction, equipment and all other necessary costs to add a cellhouse, is reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Human Services for the same purpose.
Section 145. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from appropriations and reappropriations heretofore made for such purposes in Article 22, Section 145 of Public Act 97-0725, are reappropriated from the Capital Development Fund to the Capital Development Board for the projects hereinafter enumerated:
CHICAGO
(From Article 22, Section 145 of Public Act 97-0725)
For expanding and renovating the
Bio-Safety 3 Laboratory for the
Department of Public Health..................... 160,356
ATTORNEY GENERAL BUILDING - SPRINGFIELD
For upgrading the snow melt system at
the Attorney General Building.................... 66,116
For upgrading environmental equipment
and HVAC, in addition to funds previously
appropriated - Archives Building................. 35,633
STATEWIDE
For American with Disabilities Act
(ADA) upgrades at the following
locations at the approximate
cost set forth below.......................... 2,946,788
DNR – I & M Canal Corridor.. 1,614,200
IBHE – Eastern Illinois
University.................. 1,819,039
For providing construction contingency
for the following projects at
the approximate cost set forth below,
in addition to funds
previously appropriated......................... 773,500
LINCOLN’S TOMB HISTORIC SITE -
Rehab site/Provide irrigation
system......................... 85,600
MICHAEL BILANDIC BUILDING -
Upgrade HVAC and Domestic Water
System......................... 184,700
SUBURBAN NORTH REGIONAL OFFICE FACILITY -
Renovate for Office Space...... 300,200
SECRETARY OF STATE -
Upgrade Electrical Systems at three
Motor Vehicle Facilities....... 203,000
For all costs associated with
a timekeeping and payroll system,
including prior year costs.................... 8,301,122
For emergencies and abatement of
hazardous materials, in
addition to funds previously appropriated..... 4,409,149
For escalation costs for state
facility projects, in addition
to funds previously appropriated............. 15,774,702
For escalation and emergencies for
higher education projects, in
addition to funds previously appropriated.... 23,353,319
For improving energy efficiency................... 56,107
For Emergency Repairs and Hazardous
Material Abatement at State-Owned
Facilities, State Universities, and
Community Colleges.............................. 345,743
For the purposes of capital planning
and condition assessment and analysis
of State capital facilities, to be
expended only upon the direction of
the Director of the Governor’s Office
of Management and Budget......................... 15,326
For abating hazardous materials.................... 7,731
For retrofitting or upgrading mechanized
refrigeration equipment (CFCs).................. 650,000
For surveys and modifications to buildings
to meet requirements of the federal
Americans with Disabilities Act (ADA)............ 21,797
For retrofitting or upgrading mechanized
refrigeration equipment (CFCs).................. 606,472
For surveys and modifications to buildings
to meet requirements of the federal
Americans with Disabilities Act.................. 52,282
For upgrading and remediating
aboveground and underground storage tanks....... 906,710
For surveys and modifications to
buildings to meet requirements of the
federal Americans with Disabilities Act.......... 81,823
For surveys and modifications to buildings
to meet requirements of the federal
Americans with Disabilities Act.................. 31,148
Total $58,595,824
Section 150. The amount of $48,467, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 22, Section 150 of Public Act 97-0725, is reappropriated from the Asbestos Abatement Fund to the Capital Development Board for surveying and abating asbestos-containing materials statewide.
Section 155. The amount of $83,812, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 22, Section 155 of Public Act 97-0725, is reappropriated from the Asbestos Abatement Fund to the Capital Development Board for asbestos surveys and emergency abatement in relation to asbestos abatement in state governmental buildings or higher education residential and auxiliary enterprise buildings.
Section 160. The sum of $930,774,571, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 22, Section 160 of Public Act 97-0725, is reappropriated from the School Construction Fund to the Capital Development Board for grants to school districts for school construction projects authorized by the School Construction Law.
Section 165. The amount of $15,721,469, or so much
of that amount as may be necessary and remains unexpended at the close of
business on June 30, 2013, from a reappropriation heretofore made in Article
22, Section 165 of Public Act 97-0725, is reappropriated from the School
Construction Fund to the Capital Development Board for Fiscal Year 2002 School
Construction Program grant recipients as follows:
East St. Louis School District 189............. 3,569,787
Silvis School District 34...................... 5,662,558
Community Consolidated School Dist. 93
Carol Stream.................................. 1,554,822
DuQuoin Community Unit School District 300..... 1,092,386
Bethalto Community School District 8........... 2,624,916
Westmont Community Unit School District 201.... 1,217,000
Section 175. The sum of $3,683,589, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 22, Section 175 of Public Act 97-0725, is reappropriated from the School Construction Fund to the Capital Development Board for school construction grants pursuant to the School Construction Law, in addition to amounts previously appropriated for such purposes.
Section 185. The sum of $18,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 22, Section 185 of Public Act 97-0725, is reappropriated from the School Construction Fund to the Capital Development Board for grants to school districts for school improvement projects authorized by the School Construction Law.
Section 190. The sum of $475,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 22, Section 190 of Public Act 97-0725, is reappropriated from the Capital Development Fund to the Capital Development Board for water resource management projects as authorized by subsection (g) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.
Section 195. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from reappropriations heretofore made for such purposes in Article 22, Section 195 of Public Act 97-0725, are reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for the projects hereinafter enumerated:
CITY COLLEGES OF CHICAGO
(From Article 22, Section 195 of Public Act 97-0725)
For various bondable capital improvements........ 570,171
CITY COLLEGES OF CHICAGO/KENNEDY KING
For remodeling for Workforce Preparation
Centers....................................... 3,575,930
For remodeling for a culinary arts
educational facility......................... 10,875,000
CITY COLLEGES OF CHICAGO - MALCOLM X COLLEGE
For remodeling the Allied Health
program facilities............................ 4,298,223
COLLEGE OF DUPAGE
or Installation of the
Instructional Center Noise Abatement.......... 1,544,600
COLLEGE OF LAKE COUNTY
For Construction of a Student
Service Building............................. 35,927,000
ELGIN COMMUNITY COLLEGE
For Spartan Drive Extension.................... 2,244,800
IECC – LINCOLN TRAIL COLLEGE
For Construction of a Center
for Technology................................ 7,569,800
ILLINOIS VALLEY COMMUNITY COLLEGE
For Construction of a Community
Technology Center ............................ 5,040,905
JOLIET JUNIOR COLLEGE
For renovation of Utilities.................... 4,212,486
KANKAKEE COMMUNITY COLLEGE
For constructing a laboratory/classroom
facility........................................ 226,567
KASKASKIA COLLEGE
For all costs associated with
construction of new facilities as
part of Phase Two of the Vandalia Campus...... 5,600,000
LAKE LAND COLLEGE
For renovating and expanding
Student Services Building Addition............ 2,361,100
For Construction of a Rural
Development Technology Center................. 7,524,100
For Student Services Building addition......... 6,498,007
LEWIS AND CLARK COLLEGE
For construction and infrastructure
improvements to the National Great
Rivers Research and Education Center.......... 1,658,841
MCHENRY COUNTY COLLEGE
For constructing classrooms and a
student services building and remodeling
space, in addition to funds previously
appropriated.................................... 473,076
MORAINE VALLEY COMMUNITY COLLEGE - PALOS HILLS
For constructing a classroom/administration
building, providing site improvements and
purchasing equipment, in addition to
funds previously appropriated.................... 41,635
MORTON COLLEGE
For costs associated with capital
improvements.................................. 4,500,000
PARKLAND COLLEGE
For renovating and expanding
the Student Services Center Addition.......... 7,673,589
PRAIRIE STATE COLLEGE - CHICAGO HEIGHTS
For costs associated with capital
improvements at Prairie State College......... 4,285,099
For constructing an addition to the Adult
Training/Outreach Center, in addition to
funds previously appropriated................... 811,858
REND LAKE COLLEGE
For Art Program Addition
and minor remodeling............................ 429,267
RICHLAND COMMUNITY COLLEGE
For Renovation of the Student
Success Center and Construction
of an Addition to the Student
Success Center................................ 3,524,000
ROCK VALLEY COLLEGE
For Construction of an
Arts Instructional Center and
remodeling of existing classroom buildings... 26,711,900
SOUTH SUBURBAN COLLEGE
For improving flood retention.................... 437,000
TRITON COMMUNITY COLLEGE - RIVER GROVE
For renovating and expanding
the Technology Building...................... 10,402,114
For rehabilitating the Liberal Arts
Building...................................... 1,536,546
For rehabilitating the potable water
distribution system.............................. 70,146
TRUMAN COLLEGE
For costs associated with capital
improvements.................................. 5,000,000
WILBUR WRIGHT COLLEGE
For costs associated with capital
improvements to the Humboldt Park
Vocational Education Center
at Wilbur Wright College...................... 5,000,000
WILLIAM RAINEY HARPER COLLEGE
For Engineering and Technology
Center Renovations........................... 19,049,819
For Construction of a One
Stop/Admissions and Campus/
Student Life Center.......................... 40,520,082
STATEWIDE
For the Illinois Community College Board
miscellaneous capital improvements including
construction, capital facilities, cost of
planning, supplies, equipment, materials,
services and all other expenses required to
complete the work at the various community
Colleges. This appropriated amount shall be
in addition to any other appropriated amounts
which can be expended for this purpose........ 1,406,085
For miscellaneous capital improvements
including construction, capital facilities,
cost of planning, supplies, equipment,
materials, services and all other expenses
required to complete the work at the
various community colleges. This appropriated
amount shall be in addition to any other
appropriated amounts which can be
expended for these purposes................... 4,837,570
For miscellaneous capital improvements
including construction, capital facilities,
cost of planning, supplies, equipment,
materials, services and all other expenses
required to complete the work at the
various community colleges. This appropriated
amount shall be in addition to any other
appropriated amounts which can be
expended for these purposes................... 3,563,951
Total $240,001,267
Section 205. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from reappropriations heretofore made for such purpose in Article 22, Section 205 of Public Act 97-0725, are reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for the Temporary Facility Replacement Program for the projects hereinafter enumerated:
COLLEGE OF DUPAGE
(From Article 22, Section 205 of Public Act 97-0725)
For Temporary Facilities Replacement.......... 24,946,128
COLLEGE OF LAKE COUNTY
For Construction of a Classroom Building
at the Grayslake Campus...................... 17,172,536
IECC – LINCOLN TRAIL COLLEGE
For Construction of an AC/Refrigeration
and Sheet Metal Technology Building........... 1,495,500
IECC – OLNEY CENTRAL
For Construction of the Collision
Repair Technology Center...................... 1,076,211
IECC – WABASH VALLEY
For Construction of a Student Center........... 4,029,400
ILLINOIS CENTRAL COLLEGE
For Renovation and Additions to
Dirksen Hall.................................. 2,633,700
ILLINOIS VALLEY COMMUNITY COLLEGE
For Construction of a Community
. Technology Center............................. 4,451,368
JOLIET JUNIOR COLLEGE
For Temporary Facilities Replacement............. 445,568
LAKE LAND COLLEGE
For repair, renovation, and miscellaneous
capital improvements including construction,
reconstruction, remodeling, improvement,
repair and installation of capital facilities,
costs of planning, supplies, equipment,
materials, services, and all expenses on the
Workforce Relocation Center, the Student
Services Center, and other college buildings.
This appropriation shall be in addition to
funds previously appropriated................. 9,881,700
LEWIS & CLARK COMMUNITY COLLEGE
For Construction of a Daycare
and Montessori................................ 1,663,000
For Construction of an Engineering Annex....... 1,536,600
LINCOLN LAND COMMUNITY COLLEGE
For Renovations to Sangamon Hall South......... 2,991,200
MCHENRY COUNTY COLLEGE
For Construction of a Greenhouse................. 671,600
For Construction of a Pumphouse.................. 115,900
OLIVE HARVEY COLLEGE
For Construction of a New Building............ 30,671,600
PARKLAND COLLEGE
For Construction of an Applied
Technology Addition............................. 210,257
SPOON RIVER COLLEGE
For Construction of a Multi-Purpose
Building...................................... 4,027,100
WAUBONSEE COMMUNITY COLLEGE
To Replace Building “A”
Temporary Building............................ 2,615,200
WILLIAM RAINEY HARPER COLLEGE
To Replace the Hospitality Facility............ 3,944,800
Total $114,579,368
Section 230. The sum of $25,121,399, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 22, Section 230 of Public Act 97-0725, is reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Board of Higher Education for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete work at the various higher education institutions. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for such purposes.
Section 235. The following named amount, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 22, Section 235 of Public Act 97-0725, are reappropriated from the Capital Development Fund to the Capital Development Board for the Board of Higher Education for the project hereinafter enumerated:
ILLINOIS MATHEMATICS AND SCIENCE ACADEMY - AURORA
(From Article 22, Section 235 of Public Act 97-0725)
To plan and begin construction of a
space for the delivery of teacher
training and development and student
enrichment programs............................. 108,843
Section 240. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from reappropriations heretofore made in Article 22, Section 240 of Public Act 97-0725, are reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Board of Higher Education for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete work at the various higher education institutions. These appropriated amounts shall be in addition to any other appropriated amounts which can be expended for such purposes
Chicago State University....................... 1,024,348
Eastern Illinois University.................... 1,803,587
Governors State University....................... 827,380
Illinois State University...................... 4,236,958
Northeastern Illinois University............... 1,726,500
Northern Illinois University................... 4,672,660
Western Illinois University.................... 3,107,287
Southern Illinois University - Carbondale...... 5,756,455
Southern Illinois University - Edwardsville.... 3,359,670
University of Illinois - Chicago.............. 12,291,816
University of Illinois - Springfield........... 1,008,947
University of Illinois - Urbana/Champaign..... 16,019,276
Total $55,834,884
Section 245. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from reappropriations heretofore made in Article 22, Sections 210, 215, 220, 225, 245, and 250 of Public Act 97-0725, are reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Board of Higher Education for miscellaneous capital improvements, including construction, reconstruction, remodeling, improvement, repair, and installation of capital facilities, cost of planning, supplies, equipment, materials, services, and all other expenses required to complete the work at the various colleges and universities as set forth below. These appropriated amounts shall be in addition to any other appropriated amounts which can be expended for these purposes.
Chicago State University......................... 299,601
Eastern Illinois University.................... 2,432,638
Governors State University........................ 75,332
Illinois State University...................... 1,147,072
Northeastern Illinois University................. 839,586
Northern Illinois University................... 5,160,836
Western Illinois University...................... 370,858
Southern Illinois University - Carbondale...... 1,057,824
Southern Illinois University - Edwardsville...... 775,052
Southern Illinois University - Statewide......... 118,119
University of Illinois - Chicago............... 7,848,866
University of Illinois - Springfield............. 649,038
University of Illinois - Urbana/Champaign...... 9,334,693
University of Illinois - Statewide............... 284,330
Statewide........................................ 109,850
Illinois Community College Board.............. 17,437,870
Total $47,941,565
Section 255. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from reappropriations heretofore made in Article 22, Sections 200, 255, 260, 265, 275, 285, 290, and 295 of Public Act 97-0725, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Board of Higher Education for miscellaneous capital improvements, including construction, reconstruction, remodeling, improvement, repair, and installation of capital facilities, cost of planning, supplies, equipment, materials, services, and all other expenses required to complete the work at the various colleges and universities as set forth below. These appropriated amounts shall be in addition to any other appropriated amounts which can be expended for these purposes.
Chicago State University......................... 119,814
Eastern Illinois University...................... 855,685
Governors State University....................... 188,650
Illinois State University........................ 648,351
Northeastern Illinois University................. 503,848
Northern Illinois University................... 2,414,423
Western Illinois University...................... 105,442
Southern Illinois University - Carbondale........ 598,665
Southern Illinois University - Edwardsville...... 464,253
University of Illinois - Chicago............... 3,854,475
University of Illinois - Springfield............. 336,118
University of Illinois - Urbana/Champaign...... 5,665,447
University of Illinois - Statewide................ 73,780
Illinois Community College Board.............. 47,656,303
Total 63,485,254
Section 270. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2013, from reappropriations heretofore made in Article 22, Sections 270 and 380 of Public Act 97-0725, are reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Board of Higher Education for the projects hereinafter enumerated:
CHICAGO STATE UNIVERSITY
(From Article 22, Section 270 of Public Act 97-0725)
For a grant for the construction
of a Westside campus......................... 39,000,000
For renovating Douglas Hall, in
addition to funds previously appropriated.... 13,125,000
For Construction of an Early
Childhood Development Center.................. 3,000,000
For Remediation of the Convocation
Building, in addition to funds
previously appropriated....................... 5,000,000
For replacing primary electrical
feeder cable.................................... 115,049
For the construction of a conference
Center, Daycare Facility,
renovating Building K (Robinson
Center) and Financial Outreach
Building in addition to funds
previously appropriated....................... 4,835,310
For the construction of a day care facility.... 4,863,999
For the construction of a student
financial outreach building................... 4,718,864
For constructing a new library facility,
site improvements, utilities, and
purchasing equipment, in addition
to funds previously appropriated................. 56,133
For technology improvements and
deferred maintenance............................ 497,372
For remodeling Building K, in addition
to funds previously appropriated.............. 8,473,251
For planning and beginning to remodel
Building K and improving site................... 595,058
For upgrades and improvements to
Electrical systems............................ 6,500,000
EASTERN ILLINOIS UNIVERSITY
For remodeling of the HVAC in the
Life Science Building and Coleman Hall........ 4,757,100
For upgrading the electrical
distribution system.............................. 59,282
For renovating and expanding the
Fine Arts Center, in addition to
funds previously appropriated.................... 46,796
For planning and beginning to renovate
and expand the Fine Arts Center -
Phase 1, in addition to funds
previously appropriated......................... 133,604
For upgrading campus buildings for health,
safety and environmental improvements............. 9,809
GOVERNORS STATE UNIVERSITY
For renovation of a Teaching/Learning
Complex, in addition to funds
previously appropriated....................... 2,250,844
For replacing roadways and sidewalks........... 2,028,000
For constructing addition and
remodeling the teaching & learning
complex, in addition to funds
previously appropriated...................... 12,893,263
ILLINOIS STATE UNIVERSITY
For renovations of the Fine Arts
Complex...................................... 54,250,100
For renovating Stevenson and Turner
Halls for life/safety........................... 702,608
For the upgrade and remodeling
of Schroeder Hall............................. 1,869,102
For remodeling Julian and Moulton Halls.......... 376,727
NORTHEASTERN ILLINOIS UNIVERSITY
For costs associated with renovations
to the facility for the construction
of a Latino Cultural Center .................. 1,500,000
For constructing an education building........ 72,977,200
For renovating Building "C" and
remodeling and expanding Building "E"
and Building "F".............................. 6,233,200
For planning and beginning to remodel
Buildings A, B and E............................ 126,409
For remodeling in the Science Building
to upgrade heating, ventilating and air
conditioning systems.......................... 2,021,400
For replacing fire alarm systems, lighting
and ceilings.................................... 116,081
NORTHERN ILLINOIS UNIVERSITY
For the renovation of Cole Hall
and expanding/renovating Stevens Building..... 2,132,380
For renovating and expanding
Stevens Building............................. 21,928,656
For planning Computer Sciences
Technology Center............................. 2,787,400
For renovating the Founders Library
basement, in addition to funds previously
appropriated.................................... 626,578
For planning a classroom building and
developing site in Hoffman Estates............ 1,314,500
For completing the construction of the
Engineering Building, in addition to
amounts previously appropriated for
such purpose..................................... 12,488
For renovating Altgeld Hall and
purchasing equipment............................. 94,434
SOUTHERN ILLINOIS UNIVERSITY - EDWARDSVILLE
For renovating and constructing
a Science Laboratory, in addition
to funds previously appropriated............. 37,479,882
SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE
For constructing a Transportation
Education Center, in addition
to funds previously appropriated.............. 4,359,069
For planning and beginning
Communications Building....................... 4,255,400
For renovating and constructing an
addition to the Morris Library, in
addition to funds previously
appropriated..................................... 13,826
SIU SCHOOL OF MEDICINE - SPRINGFIELD
For constructing and for equipment for
an addition to the combined laboratory,
in addition to funds previously
appropriated...................................... 5,470
UNIVERSITY OF ILLINOIS AT CHICAGO
For upgrading the campus infrastructure
and renovating campus buildings.............. 20,476,218
Plan, construct, and equip the Chemical
Sciences Building............................ 57,600,000
For planning, construction and equipment
for a chemical sciences building.............. 3,549,048
To plan and begin construction of
a medical imaging research/clinical
facility......................................... 49,753
For remodeling the Clinical
Sciences Building............................... 854,132
For the renovation of the court area and
Lecture Center, in addition to funds
previously appropriated.......................... 54,793
UNIVERSITY OF ILLINOIS AT CHAMPAIGN-URBANA
For renovating Lincoln Hall, in
addition to funds previously appropriated.... 11,449,728
For constructing a Post Harvest
Crop Processing and Research
Laboratory, in addition to
funds previously appropriated................ 20,034,000
For constructing an Electrical
and Computer Engineering Building,
in addition to funds previously appropriated. 22,176,076
Expansion of Microelectronics Lab................. 41,764
For planning, construction and equipment
for a biotechnology genomic facility............ 434,265
For planning, construction and equipment
for a supercomputing application facility........ 88,416
UNIVERSITY OF ILLINOIS - SPRINGFIELD
For renovation and construction
of the Public Safety Building................. 3,950,927
UNIVERSITY CENTER OF LAKE COUNTY
For constructing a university center and
purchasing equipment, in addition to
funds previously appropriated..................... 1,197
For land, planning, remodeling, construction
and all costs necessary to construct a
facility.......................................... 1,129
WESTERN ILLINOIS UNIVERSITY - MACOMB
For constructing a performing arts
center, in addition to funds
previously appropriated...................... 66,672,778
Plan and construct performing arts center........ 791,665
For improvements to Memorial
Hall............................................ 222,384
WESTERN ILLINOIS UNIVERSITY - QUAD CITIES
For renovation and construction of a
Riverfront Campus, in addition to
funds previously appropriated................ 40,301,018
For the renovation and construction
of a Riverfront Campus,
in addition to funds
previously appropriated....................... 1,218,116
ILLINOIS MATH AND SCIENCE ACADEMY
For residence hall rehabilitation
and main building addition.................... 6,260,000
For “A” wing laboratories remodeling........... 3,600,000
Total $587,969,051
Section 280. The following named amount, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 22, Section 280 of Public Act 97-0725, is reappropriated from the Capital Development Fund to the Capital Development Board for the project hereinafter enumerated:
EAST ST. LOUIS COLLEGE CENTER
(From Article 22, Section 280 of Public Act 97-0725)
For construction of facilities, remodeling,
site improvements, utilities and other
costs necessary for adapting the former
campus of Metropolitan Community College
for a Community College Center and Southern
Illinois University, in addition to funds
previously appropriated....................... 1,724,679
Section 300. The sum of $3,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 22, Section 300 of Public Act 97-0725, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for a grant to Northwestern University for planning, construction, and equipment for a Nanofabrication and Molecular Center. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 305. The sum of $6,445, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 22, Section 305 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for miscellaneous capital improvements to state facilities including construction, reconstruction, remodeling, improvement, repair and installation of capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete the work at the facilities. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 310. The sum of $50,548,203, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 22, Section 310 of Public Act 97-0725, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the development and improvement of educational, scientific, technical and vocational programs and facilities and the expansion of health and human services, and for any other purposes authorized in subsection (c) of Section 4 of the Build Illinois Bond Act and for grants to State agencies for such purposes.
Section 315. The sum of $104,385,984, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 22, Section 315 of Public Act 97-0725, is reappropriated from the Capital Development Fund to the Capital Development Board for educational purposes by State universities and colleges, the Illinois Community College Board created by the Public Community College Act and for grants to public community colleges as authorized by Sections 5-11 and 5-12 of the Public Community College Act as authorized by subsection (a) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.
Section 320. The sum of $190,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 22, Section 320 of Public Act 97-0725, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Board of Higher Education for grants to various private colleges and universities.
Section 325. The amount of $2,476,501, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 22, Section 325 of Public Act 97-0725, is reappropriated from the Capital Development Fund to the Capital Development Board for grants to units of local government and other eligible entities for all costs associated with land acquisition, construction and rehabilitation projects.
Section 330. The sum of $2,517,200, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 22, Section 330 of Public Act 97-0725, is reappropriated from the Capital Development Fund to the Capital Development Board for child care facilities, mental and public health facilities, and facilities for the care of disabled veterans and their spouses as authorized by subsection (d) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.
Section 335. The sum of $77,028,128, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 22, Section 335 of Public Act 97-0725, is reappropriated from the Capital Development Fund to the Capital Development Board for correctional purposes at State prison and correctional centers as authorized by subsection (b) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.
Section 340. The sum of $24,118,357, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 22, Section 340 of Public Act 97-0725, is reappropriated from the Capital Development Fund to the Capital Development Board for open spaces, recreational and conservation purposes and the protection of land and for deposits into the Partners for Conservation Projects Fund as authorized by subsection (c) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.
Section 345. The sum of $4,759,151, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 22, Section 345 of Public Act 97-0725, is reappropriated from the Capital Development Fund to the Capital Development Board for child care facilities, mental and public health facilities, and facilities for the care of disabled veterans and their spouses as authorized by subsection (d) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.
Section 350. The sum of $79,401,608, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 22, Section 350 of Public Act 97-0725, is reappropriated from the Capital Development Fund to the Capital Development Board for use by the State, its departments, authorities, public corporations, commissions and agencies as authorized by subsection (e) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.
Section 355. The sum of $45,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 22, Section 355 of Public Act 97-0725, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for early childhood construction grants to school districts and not-for-profit providers of early childhood services for children ages birth to 5 years of age for construction or renovation of early childhood facilities, with priority given to projects located in those communities in this State with the greatest underserved population of young children, as identified by the Capital Development Board, in consultation with the State Board of Education, using census data and other reliable local early childhood service date.
Section 360. The sum of $23,258,697, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 22, Section 360 of Public Act 97-0725, is reappropriated from the Capital Development Fund to the Capital Development Board for the State Board of Education for grants to school districts for energy efficiency projects.
Section 365. The sum of $75,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 22, Section 365 of Public Act 97-0725, is reappropriated from the Capital Development Fund to the Capital Development Board for the Chicago Board of Education for costs associated with school renovation and construction for the purposes of providing vocational education.
Section 370. This Article is not subject to limitations under Section 5 of Article 48 of Public Act 95-734 or any similar limitation.
Section 375. No contract shall be entered into or obligation incurred for any expenditure in this Article until after the purpose and amounts have been approved in writing by the Governor.
Total, this Article $3,371,300,188
ARTICLE 15
ILLINOIS EMERGENCY MANAGEMENT AGENCY
Section 5. The sum of $25,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 23, Section 5 of Public Act 97-0725, is reappropriated from the Build Illinois Bond Fund to the Illinois Emergency Management Agency for safety and security improvements at various public universities, private colleges or universities and community colleges or elementary or secondary schools.
Section 10. No contract shall be entered into or obligation incurred for any expenditures from appropriations in Section 5 of this Article until after the purposes and amounts have been approved in writing by the Governor.
Total, this Article $25,000,000
ARTICLE 16
ILLINOIS STATE BOARD OF EDUCATION
Section 5. The sum of $67,285,147, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 24, Section 5 of Public Act 97-0725, as amended, is reappropriated from the School Construction Fund to the Illinois State Board of Education for school districts for maintenance projects authorized by School Construction Law.
Section 10. The sum of $409,619, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 24, Section 10 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Illinois State Board of Education to fund all costs associated with the Technology Immersion Project.
Section 15. The sum of $25,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 24, Section 15 of Public Act 97-0725, as amended, is reappropriated from the Capital Development Fund to the Illinois State Board of Education for grants to school districts for school construction projects pursuant to 105 ILCS 5/2-3.146.
Section 20. No contract shall be entered into or obligation incurred or any expenditures made from appropriations in this Article until after the purposes and amounts have been approved in writing by the Governor.
Total, this Article $92,694,766
ARTICLE 17
EASTERN ILLINOIS UNIVERSITY
Section 5. The sum of $1,551,914, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 25, Section 10 of Public Act 97-0725, is reappropriated from the Capital Development Fund to the Board of Trustees of Eastern Illinois University for all costs associated with renovation and expansion of the Doudna Fine Arts Center. This appropriation is in addition to funds previously appropriated.
Section 10. No contract shall be entered into or obligation incurred for any expenditures from appropriations in this Article until after the purposes and amounts have been approved in writing by the Governor.
Total, this Article $1,551,914
ARTICLE 18
SOUTHERN ILLINOIS UNIVERSITY
Section 5. The sum of $16,560,755, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 26, Section 5 of Public Act 97-0725, is reappropriated from the Capital Development Fund to the Board of Trustees of Southern Illinois University for construction and equipment expenses to complete the renovation and expansion of the Morris Library. This appropriation is in addition to funds previously appropriated.
Section 10. No contract shall be entered into or obligation incurred for any expenditures from appropriations in Section 5 of this Article until after the purposes and amounts have been approved in writing by the Governor.
Total, this Article $16,560,755
ARTICLE 19
ILLINOIS COMMERCE COMMISSION
Section 5. The sum of $52,857, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 27, Section 5 of Public Act 97-0725, is reappropriated from the Capital Development Fund to the Illinois Commerce Commission for train whistle abatement in counties with over 3,000,000 in population, where a public highway crosses a railroad at grade.
Section 10. No contract shall be entered into or obligation incurred for any expenditure in this Article until after the purpose and amounts have been approved in writing by the Governor.
Total, this Article $52,857
ARTICLE 20
ENVIRONMENTAL PROTECTION AGENCY
Section 5. The sum of $350,000,000, or so much thereof as may be necessary, is appropriated from the Water Revolving Fund to the Environmental Protection Agency for financial assistance to units of local government for sewer systems and wastewater treatment facilities pursuant to rules defining the Water Pollution Control Revolving Loan program and for transfer of funds to establish reserve accounts, construction accounts or any other necessary funds or accounts in order to implement a leveraged loan program.
Section 10. The sum of $150,000,000, or so much thereof as may be necessary, is appropriated from the Water Revolving Fund to the Environmental Protection Agency for financial assistance to units of local government and privately owned community water supplies for drinking water infrastructure projects pursuant to the Safe Drinking Water Act, as amended, and for transfer of funds to establish reserve accounts, construction accounts or any other necessary funds or accounts in order to implement a leveraged loan program.
Section 15. The sum of $2,000,000, or so much thereof as may be necessary, is appropriated from the Water Revolving Fund to the Environmental Protection Agency for a small community water supply financial assistance program to address compliance problems.
Section 20. The sum of $5,000,000, or so much thereof as may be necessary, is appropriated from the Water Revolving Fund to the Environmental Protection Agency for a green infrastructure financial assistance program to address water quality issues.
Total, this Article $507,000,000
ARTICLE 21
ENVIRONMENTAL PROTECTION AGENCY
Section 5. The sum of $591,895,728, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from appropriations heretofore made in Article 28, Section 1 of Public Act 97-0725 and Article 30, Section 5 of Public Act 97-0725, as amended, is reappropriated from the Water Revolving Fund to the Environmental Protection Agency for financial assistance to units of local government for sewer systems and wastewater treatment facilities pursuant to rules defining the Water Pollution Control Revolving Loan program and for transfer of funds to establish reserve accounts, construction accounts or any other necessary funds or accounts in order to implement a leveraged loan program.
Section 10. The sum of $420,452,887, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from appropriations heretofore made in Article 28, Section 5 of Public Act 97-0725 and Article 30, Section 10 of Public Act 97-0725, as amended, is reappropriated from the Water Revolving Fund to the Environmental Protection Agency for financial assistance to units of local government and privately owned community water supplies for drinking water infrastructure projects pursuant to the Safe Drinking Water Act, as amended, and for transfer of funds to establish reserve accounts, construction accounts or any other necessary funds or accounts in order to implement a leveraged loan program.
Section 15. The sum of $54,170,078, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 30, Section 15 of Public Act 97-0725, is reappropriated from the Anti-Pollution Fund to the Environmental Protection Agency for deposit into the Water Revolving Fund.
Section 20. The sum of $5,176,618, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 30, Section 20 of Public Act 97-0725, is reappropriated from the Capital Development Fund to the Environmental Protection Agency for financial assistance to municipalities with designated River Edge Redevelopment Zones for brownfields redevelopment in accordance with Section 58.13 of the Environmental Protection Act, including costs in prior years.
Section 25. The sum of $43,000,260, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 30, Section 25 of Public Act 97-0725, is reappropriated from the Anti-Pollution Fund to the Environmental Protection Agency for reimbursements to eligible owners/operators of Leaking Underground Storage Tanks, including claims submitted in prior years and for costs associated with site remediation.
Section 30. The sum of $2,506,388, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 30, Section 30 of Public Act 97-0725, as amended, is reappropriated from the Anti-Pollution Fund to the Environmental Protection Agency for grants to units of local government for wastewater facilities, pursuant to provisions of the "Anti-Pollution Bond Act."
Section 35. The sum of $4,480,943, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 30, Section 35 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for wastewater compliance grants to units of local government or sewer systems and wastewater treatment facilities pursuant to procedures and rules established under the Anti-Pollution Bond Act. These grants are limited to projects for which the local government provides at least 30% of the project cost. There is an approved project compliance plan, and there is an enforceable compliance schedule prior to the grant award. The grant award will be based on eligible project cost contained in the approved compliance plan.
Section 40. The sum of $2,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 30, Section 40 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for deposit into the Brownfields Redevelopment Fund for use pursuant to Sections 58.13 and 58.15 of the Environmental Protection Act.
Section 45. The sum of $2,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 30, Section 45 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for deposit into the Brownfields Redevelopment Fund for use pursuant to Sections 58.13 and 58.15 of the Environmental Protection Act.
Section 50. The sum of $9,500,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 30, Section 50 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for deposit into the Hazardous Waste Fund for use pursuant to Section 22.2 of the Environmental Protection Act.
Section 55. The sum of $471,885, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 30, Section 55 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for grants and contracts for public drinking water infrastructure, including design and construction, where private drinking water wells have been contaminated by a hazardous substance.
Section 60. The sum of $4,776,725, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 30, Section 60 of Public Act 97-0725, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for financial assistance to municipalities with designated River Edge Redevelopment Zones for brownfields redevelopment in accordance with Section 58.13 of the Environmental Protection Act, including costs in prior years.
Section 65. The sum of $40,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 30, Section 65 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for grants to units of local government and privately owned community water supplies for sewer systems, wastewater treatment facilities and drinking water infrastructure projects.
Section 70. The sum of $8,942,400, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 30, Section 70 of Public Act 97-0725, as amended, is reappropriated from the Anti-Pollution Fund to the Environmental Protection Agency for deposit into the Water Revolving Fund.
Section 75. The sum of $1,407,069, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 30, Section 75 of Public Act 97-0725, as amended, is reappropriated from the Anti-Pollution Fund to the Environmental Protection Agency for deposit into the Water Revolving Fund.
Section 80. The sum of $7,858,247, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 30, Section 80 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for the protection, preservation, restoration and conservation of environmental and natural resources, for deposits into the Water Revolving Fund, and for any other purposes authorized in subsection (d) of Section 4 of the Build Illinois Bond Act and for grants to State agencies for such purposes.
Section 85. The sum of $16,600,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 30, Section 85 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for the protection, preservation, restoration and conservation of environmental and natural resources, for deposits into the Water Revolving Fund, and for any other purposes authorized in subsection (d) of Section 4 of the Build Illinois Bond Act and for grants to State Agencies for such purposes.
Section 90. The sum of $8,754,849, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 30, Section 100 of Public Act 97-0725, is reappropriated from the Water Revolving Fund to the Environmental Protection Agency for a green infrastructure financial assistance program to address water quality issues.
Section 95. The sum of $186,872, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 30, Section 105 of Public Act 97-0725, is reappropriated from the Water Revolving Fund to the Environmental Protection Agency for a small community water supply financial assistance program to address compliance problems.
Section 100. No contract shall be entered into or obligation incurred for any expenditure made in Sections 15 through 85 of this Article until after the purpose and amounts have been approved in writing by the Governor.
Total, this Article $1,224,180,949
ARTICLE 22
HISTORIC PRESERVATION AGENCY
Section 5. The sum of $143,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made in Article 31, Section 5 of Public Act 97-0725, as amended, is reappropriated from the Capital Development Fund to the Historic Preservation Agency for support facilities, acquisition or improvements for Sugar Loaf and/or Fox Mounds or other properties within the Cahokia Mounds National Historic Landmark Boundary.
Section 10. No contract shall be entered into or obligation incurred for any expenditures from appropriations in Section 5 of this Article until after the purposes and amounts have been approved in writing by the Governor.
Total, this Article $143,000
ARTICLE 23
ILLINOIS FINANCE AUTHORITY
Section 5. The sum of $2,383,342, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from appropriations heretofore made in Article 33, Section 5 of Public Act 97-0725, as amended, is reappropriated from the Fire Truck Revolving Loan Fund to the Illinois Finance Authority for the purpose of making loans to fire departments, fire protection districts, and township fire departments as successor in interest to the Illinois Rural Bond Bank, pursuant to Section 845-75 of Public Act 93-0205.
Section 10. The sum of $7,006,800, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from appropriations heretofore made in Article 33, Section 10 of Public Act 97-0725, amended, is reappropriated from the Ambulance Revolving Loan Fund to the Illinois Finance Authority for the purpose of making loans to fire departments, fire protection districts, township fire departments or non-profit ambulance services as successor in interest to the Illinois Rural Bond Bank.
Total, this Article $9,390,142
ARTICLE 24
ILLINOIS COMMUNITY COLLEGE BOARD
Section 5. The sum of $314,597, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2013, from a reappropriation heretofore made for such purpose in Article 34, Section 5 of Public Act 97-0725, as amended, is reappropriated from the Build Illinois Bond Fund for the Illinois Community College Board for remodeling of facilities for compliance with the Americans with Disabilities Act. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 10. No contract shall be entered into or obligation incurred for any expenditures from appropriations in Section 5 of this Article until after the purposes and amounts have been approved in writing by the Governor.
Total, this Article $314,597
ARTICLE 25