| 20 ILCS 3855/1-10 | | 20 ILCS 3855/1-20 | | 20 ILCS 3855/1-76 new | |
| Amends the Illinois Power Agency Act. Defines "eligible retail customers", "municipal brownfield site", "qualified solar power purchase agreement", and "qualified solar remediation facility". Provides that the Illinois Power Agency shall have the authority to review and approve qualified solar power purchase agreements. Provides that the Agency shall accept applications from proposed operators of proposed qualified solar remediation facilities to approve qualified solar power purchase agreements. Sets forth the requirements for each qualified solar power purchase agreement. Provides that the Agency shall review an application within 90 days after receiving the application or before the next submission of the Agency's procurement plan to the Commission, whichever is earlier, and the Agency may assess a fee to review the application. Sets forth general conditions of a qualified solar power purchase agreement by the Illinois Commerce Commission and the Agency. Provides that nothing in the provision shall be construed to prohibit the electric utility from recovering prudently incurred costs from its delivery service customers or bundled service customers. Effective immediately.
|
| |
| | | FISCAL NOTE ACT MAY APPLY | |
| | A BILL FOR |
|
|
| | HB1141 | | LRB098 05955 AMC 35994 b |
|
|
1 | | AN ACT concerning State government.
|
2 | | Be it enacted by the People of the State of Illinois,
|
3 | | represented in the General Assembly:
|
4 | | Section 5. The Illinois Power Agency Act is amended by |
5 | | changing Sections 1-10 and 1-20 and by adding Section 1-76 as |
6 | | follows:
|
7 | | (20 ILCS 3855/1-10)
|
8 | | Sec. 1-10. Definitions. |
9 | | "Agency" means the Illinois Power Agency. |
10 | | "Agency loan agreement" means any agreement pursuant to |
11 | | which the Illinois Finance Authority agrees to loan the |
12 | | proceeds of revenue bonds issued with respect to a project to |
13 | | the Agency upon terms providing for loan repayment installments |
14 | | at least sufficient to pay when due all principal of, interest |
15 | | and premium, if any, on those revenue bonds, and providing for |
16 | | maintenance, insurance, and other matters in respect of the |
17 | | project. |
18 | | "Authority" means the Illinois Finance Authority. |
19 | | "Clean coal facility" means an electric generating |
20 | | facility that uses primarily coal as a feedstock and that |
21 | | captures and sequesters carbon dioxide emissions at the |
22 | | following levels: at least 50% of the total carbon dioxide |
23 | | emissions that the facility would otherwise emit if, at the |
|
| | HB1141 | - 2 - | LRB098 05955 AMC 35994 b |
|
|
1 | | time construction commences, the facility is scheduled to |
2 | | commence operation before 2016, at least 70% of the total |
3 | | carbon dioxide emissions that the facility would otherwise emit |
4 | | if, at the time construction commences, the facility is |
5 | | scheduled to commence operation during 2016 or 2017, and at |
6 | | least 90% of the total carbon dioxide emissions that the |
7 | | facility would otherwise emit if, at the time construction |
8 | | commences, the facility is scheduled to commence operation |
9 | | after 2017. The power block of the clean coal facility shall |
10 | | not exceed allowable emission rates for sulfur dioxide, |
11 | | nitrogen oxides, carbon monoxide, particulates and mercury for |
12 | | a natural gas-fired combined-cycle facility the same size as |
13 | | and in the same location as the clean coal facility at the time |
14 | | the clean coal facility obtains an approved air permit. All |
15 | | coal used by a clean coal facility shall have high volatile |
16 | | bituminous rank and greater than 1.7 pounds of sulfur per |
17 | | million btu content, unless the clean coal facility does not |
18 | | use gasification technology and was operating as a conventional |
19 | | coal-fired electric generating facility on June 1, 2009 (the |
20 | | effective date of Public Act 95-1027). |
21 | | "Clean coal SNG brownfield facility" means a facility that |
22 | | (1) has commenced construction by July 1, 2015 on an urban |
23 | | brownfield site in a municipality with at least 1,000,000 |
24 | | residents; (2) uses a gasification process to produce |
25 | | substitute natural gas; (3) uses coal as at least 50% of the |
26 | | total feedstock over the term of any sourcing agreement with a |
|
| | HB1141 | - 3 - | LRB098 05955 AMC 35994 b |
|
|
1 | | utility and the remainder of the feedstock may be either |
2 | | petroleum coke or coal, with all such coal having a high |
3 | | bituminous rank and greater than 1.7 pounds of sulfur per |
4 | | million Btu content unless the facility reasonably determines
|
5 | | that it is necessary to use additional petroleum coke to
|
6 | | deliver additional consumer savings, in which case the
facility |
7 | | shall use coal for at least 35% of the total
feedstock over the |
8 | | term of any sourcing agreement; and (4) captures and sequesters |
9 | | at least 85% of the total carbon dioxide emissions that the |
10 | | facility would otherwise emit. |
11 | | "Clean coal SNG facility" means a facility that uses a |
12 | | gasification process to produce substitute natural gas, that |
13 | | sequesters at least 90% of the total carbon dioxide emissions |
14 | | that the facility would otherwise emit, that uses at least 90% |
15 | | coal as a feedstock, with all such coal having a high |
16 | | bituminous rank and greater than 1.7 pounds of sulfur per |
17 | | million btu content, and that has a valid and effective permit |
18 | | to construct emission sources and air pollution control |
19 | | equipment and approval with respect to the federal regulations |
20 | | for Prevention of Significant Deterioration of Air Quality |
21 | | (PSD) for the plant pursuant to the federal Clean Air Act; |
22 | | provided, however, a clean coal SNG brownfield facility shall |
23 | | not be a clean coal SNG facility. |
24 | | "Commission" means the Illinois Commerce Commission. |
25 | | "Costs incurred in connection with the development and |
26 | | construction of a facility" means: |
|
| | HB1141 | - 4 - | LRB098 05955 AMC 35994 b |
|
|
1 | | (1) the cost of acquisition of all real property, |
2 | | fixtures, and improvements in connection therewith and |
3 | | equipment, personal property, and other property, rights, |
4 | | and easements acquired that are deemed necessary for the |
5 | | operation and maintenance of the facility; |
6 | | (2) financing costs with respect to bonds, notes, and |
7 | | other evidences of indebtedness of the Agency; |
8 | | (3) all origination, commitment, utilization, |
9 | | facility, placement, underwriting, syndication, credit |
10 | | enhancement, and rating agency fees; |
11 | | (4) engineering, design, procurement, consulting, |
12 | | legal, accounting, title insurance, survey, appraisal, |
13 | | escrow, trustee, collateral agency, interest rate hedging, |
14 | | interest rate swap, capitalized interest, contingency, as |
15 | | required by lenders, and other financing costs, and other |
16 | | expenses for professional services; and |
17 | | (5) the costs of plans, specifications, site study and |
18 | | investigation, installation, surveys, other Agency costs |
19 | | and estimates of costs, and other expenses necessary or |
20 | | incidental to determining the feasibility of any project, |
21 | | together with such other expenses as may be necessary or |
22 | | incidental to the financing, insuring, acquisition, and |
23 | | construction of a specific project and starting up, |
24 | | commissioning, and placing that project in operation. |
25 | | "Department" means the Department of Commerce and Economic |
26 | | Opportunity. |
|
| | HB1141 | - 5 - | LRB098 05955 AMC 35994 b |
|
|
1 | | "Director" means the Director of the Illinois Power Agency. |
2 | | "Demand-response" means measures that decrease peak |
3 | | electricity demand or shift demand from peak to off-peak |
4 | | periods. |
5 | | "Distributed renewable energy generation device" means a |
6 | | device that is: |
7 | | (1) powered by wind, solar thermal energy, |
8 | | photovoltaic cells and panels, biodiesel, crops and |
9 | | untreated and unadulterated organic waste biomass, tree |
10 | | waste, and hydropower that does not involve new |
11 | | construction or significant expansion of hydropower dams; |
12 | | (2) interconnected at the distribution system level of |
13 | | either an electric utility as defined in this Section, an |
14 | | alternative retail electric supplier as defined in Section |
15 | | 16-102 of the Public Utilities Act, a municipal utility as |
16 | | defined in Section 3-105 of the Public Utilities Act, or a |
17 | | rural electric cooperative as defined in Section 3-119 of |
18 | | the Public Utilities Act; |
19 | | (3) located on the customer side of the customer's |
20 | | electric meter and is primarily used to offset that |
21 | | customer's electricity load; and |
22 | | (4) limited in nameplate capacity to no more than 2,000 |
23 | | kilowatts. |
24 | | "Eligible retail customers" has the same definition as |
25 | | found in Section 16-111.5 of the Public Utilities Act. |
26 | | "Energy efficiency" means measures that reduce the amount |
|
| | HB1141 | - 6 - | LRB098 05955 AMC 35994 b |
|
|
1 | | of electricity or natural gas required to achieve a given end |
2 | | use. |
3 | | "Electric utility" has the same definition as found in |
4 | | Section 16-102 of the Public Utilities Act. |
5 | | "Facility" means an electric generating unit or a |
6 | | co-generating unit that produces electricity along with |
7 | | related equipment necessary to connect the facility to an |
8 | | electric transmission or distribution system. |
9 | | "Governmental aggregator" means one or more units of local |
10 | | government that individually or collectively procure |
11 | | electricity to serve residential retail electrical loads |
12 | | located within its or their jurisdiction. |
13 | | "Local government" means a unit of local government as |
14 | | defined in Section 1 of Article VII of the Illinois |
15 | | Constitution. |
16 | | "Municipal brownfield site" means a site (1) that is owned |
17 | | by a municipality and conveyed or leased to a person proposing |
18 | | to operate a qualified solar remediation facility on such site |
19 | | and (2) that is the subject of a Superfund alternative approach |
20 | | agreement between the United States Environmental Protection |
21 | | Agency and potentially responsible parties in accordance with |
22 | | the federal Comprehensive Environmental Response, |
23 | | Compensation, and Liability Act of 1980, as amended, requiring |
24 | | remedial clean up of such site. |
25 | | "Municipality" means a city, village, or incorporated |
26 | | town. |
|
| | HB1141 | - 7 - | LRB098 05955 AMC 35994 b |
|
|
1 | | "Person" means any natural person, firm, partnership, |
2 | | corporation, either domestic or foreign, company, association, |
3 | | limited liability company, joint stock company, or association |
4 | | and includes any trustee, receiver, assignee, or personal |
5 | | representative thereof. |
6 | | "Project" means the planning, bidding, and construction of |
7 | | a facility. |
8 | | "Public utility" has the same definition as found in |
9 | | Section 3-105 of the Public Utilities Act. |
10 | | "Qualified solar power purchase agreement" means an |
11 | | agreement between the operator of a qualified solar remediation |
12 | | facility and an electric utility that has terms and conditions |
13 | | meeting the requirements of subsection (c) of Section 1-76 of |
14 | | this Act and is consistent with the utility's applicable |
15 | | tariffs. |
16 | | "Qualified solar remediation facility" means an electric |
17 | | generating facility: |
18 | | (1) that uses photovoltaic cells and panels to produce |
19 | | energy; |
20 | | (2) that is located at a municipal brownfield site; |
21 | | (3) that has a nameplate capacity of no more than 20 |
22 | | megawatts; and |
23 | | (4) where construction of the electric generating |
24 | | facility structure has not commenced on or before the date |
25 | | the application to approve a qualified solar power purchase |
26 | | agreement for such facility is submitted to the Agency in |
|
| | HB1141 | - 8 - | LRB098 05955 AMC 35994 b |
|
|
1 | | accordance with Section 1-76 of this Act. |
2 | | "Real property" means any interest in land together with |
3 | | all structures, fixtures, and improvements thereon, including |
4 | | lands under water and riparian rights, any easements, |
5 | | covenants, licenses, leases, rights-of-way, uses, and other |
6 | | interests, together with any liens, judgments, mortgages, or |
7 | | other claims or security interests related to real property. |
8 | | "Renewable energy credit" means a tradable credit that |
9 | | represents the environmental attributes of a certain amount of |
10 | | energy produced from a renewable energy resource. |
11 | | "Renewable energy resources" includes energy and its |
12 | | associated renewable energy credit or renewable energy credits |
13 | | from wind, solar thermal energy, photovoltaic cells and panels, |
14 | | biodiesel, anaerobic digestion, crops and untreated and |
15 | | unadulterated organic waste biomass, tree waste, hydropower |
16 | | that does not involve new construction or significant expansion |
17 | | of hydropower dams, and other alternative sources of |
18 | | environmentally preferable energy. For purposes of this Act, |
19 | | landfill gas produced in the State is considered a renewable |
20 | | energy resource. "Renewable energy resources" does not include |
21 | | the incineration or burning of tires, garbage, general |
22 | | household, institutional, and commercial waste, industrial |
23 | | lunchroom or office waste, landscape waste other than tree |
24 | | waste, railroad crossties, utility poles, or construction or |
25 | | demolition debris, other than untreated and unadulterated |
26 | | waste wood. |
|
| | HB1141 | - 9 - | LRB098 05955 AMC 35994 b |
|
|
1 | | "Revenue bond" means any bond, note, or other evidence of |
2 | | indebtedness issued by the Authority, the principal and |
3 | | interest of which is payable solely from revenues or income |
4 | | derived from any project or activity of the Agency. |
5 | | "Sequester" means permanent storage of carbon dioxide by |
6 | | injecting it into a saline aquifer, a depleted gas reservoir, |
7 | | or an oil reservoir, directly or through an enhanced oil |
8 | | recovery process that may involve intermediate storage, |
9 | | regardless of whether these activities are conducted by a clean |
10 | | coal facility, a clean coal SNG facility, a clean coal SNG |
11 | | brownfield facility, or a party with which a clean coal |
12 | | facility, clean coal SNG facility, or clean coal SNG brownfield |
13 | | facility has contracted for such purposes. |
14 | | "Sourcing agreement" means (i) in the case of an electric |
15 | | utility, an agreement between the owner of a clean coal |
16 | | facility and such electric utility, which agreement shall have |
17 | | terms and conditions meeting the requirements of paragraph (3) |
18 | | of subsection (d) of Section 1-75, (ii) in the case of an |
19 | | alternative retail electric supplier, an agreement between the |
20 | | owner of a clean coal facility and such alternative retail |
21 | | electric supplier, which agreement shall have terms and |
22 | | conditions meeting the requirements of Section 16-115(d)(5) of |
23 | | the Public Utilities Act, and (iii) in case of a gas utility, |
24 | | an agreement between the owner of a clean coal SNG brownfield |
25 | | facility and the gas utility, which agreement shall have the |
26 | | terms and conditions meeting the requirements of subsection |
|
| | HB1141 | - 10 - | LRB098 05955 AMC 35994 b |
|
|
1 | | (h-1) of Section 9-220 of the Public Utilities Act. |
2 | | "Substitute natural gas" or "SNG" means a gas manufactured |
3 | | by gasification of hydrocarbon feedstock, which is |
4 | | substantially interchangeable in use and distribution with |
5 | | conventional natural gas. |
6 | | "Total resource cost test" or "TRC test" means a standard |
7 | | that is met if, for an investment in energy efficiency or |
8 | | demand-response measures, the benefit-cost ratio is greater |
9 | | than one. The benefit-cost ratio is the ratio of the net |
10 | | present value of the total benefits of the program to the net |
11 | | present value of the total costs as calculated over the |
12 | | lifetime of the measures. A total resource cost test compares |
13 | | the sum of avoided electric utility costs, representing the |
14 | | benefits that accrue to the system and the participant in the |
15 | | delivery of those efficiency measures, as well as other |
16 | | quantifiable societal benefits, including avoided natural gas |
17 | | utility costs, to the sum of all incremental costs of end-use |
18 | | measures that are implemented due to the program (including |
19 | | both utility and participant contributions), plus costs to |
20 | | administer, deliver, and evaluate each demand-side program, to |
21 | | quantify the net savings obtained by substituting the |
22 | | demand-side program for supply resources. In calculating |
23 | | avoided costs of power and energy that an electric utility |
24 | | would otherwise have had to acquire, reasonable estimates shall |
25 | | be included of financial costs likely to be imposed by future |
26 | | regulations and legislation on emissions of greenhouse gases.
|
|
| | HB1141 | - 11 - | LRB098 05955 AMC 35994 b |
|
|
1 | | (Source: P.A. 96-33, eff. 7-10-09; 96-159, eff. 8-10-09; |
2 | | 96-784, eff. 8-28-09; 96-1000, eff. 7-2-10; 97-96, eff. |
3 | | 7-13-11; 97-239, eff. 8-2-11; 97-491, eff. 8-22-11; 97-616, |
4 | | eff. 10-26-11; 97-813, eff. 7-13-12.)
|
5 | | (20 ILCS 3855/1-20)
|
6 | | Sec. 1-20. General powers of the Agency. |
7 | | (a) The Agency is authorized to do each of the following: |
8 | | (1) Develop electricity procurement plans to ensure |
9 | | adequate, reliable, affordable, efficient, and |
10 | | environmentally sustainable electric service at the lowest |
11 | | total cost over time, taking into account any benefits of |
12 | | price stability, for electric utilities that on December |
13 | | 31, 2005 provided electric service to at least 100,000 |
14 | | customers in Illinois and for small multi-jurisdictional |
15 | | electric utilities that (A) on December 31, 2005 served |
16 | | less than 100,000 customers in Illinois and (B) request a |
17 | | procurement plan for their Illinois jurisdictional load. |
18 | | The procurement plans shall be updated on an annual basis |
19 | | and shall include electricity generated from renewable |
20 | | resources sufficient to achieve the standards specified in |
21 | | this Act. |
22 | | (2) Conduct competitive procurement processes to |
23 | | procure the supply resources identified in the procurement |
24 | | plan, pursuant to Section 16-111.5 of the Public Utilities |
25 | | Act. |
|
| | HB1141 | - 12 - | LRB098 05955 AMC 35994 b |
|
|
1 | | (3) Develop electric generation and co-generation |
2 | | facilities that use indigenous coal or renewable |
3 | | resources, or both, financed with bonds issued by the |
4 | | Illinois Finance Authority. |
5 | | (4) Supply electricity from the Agency's facilities at |
6 | | cost to one or more of the following: municipal electric |
7 | | systems, governmental aggregators, or rural electric |
8 | | cooperatives in Illinois. |
9 | | (b) Except as otherwise limited by this Act, the Agency has |
10 | | all of the powers necessary or convenient to carry out the |
11 | | purposes and provisions of this Act, including without |
12 | | limitation, each of the following: |
13 | | (1) To have a corporate seal, and to alter that seal at |
14 | | pleasure, and to use it by causing it or a facsimile to be |
15 | | affixed or impressed or reproduced in any other manner. |
16 | | (2) To use the services of the Illinois Finance |
17 | | Authority necessary to carry out the Agency's purposes. |
18 | | (3) To negotiate and enter into loan agreements and |
19 | | other agreements with the Illinois Finance Authority. |
20 | | (4) To obtain and employ personnel and hire consultants |
21 | | that are necessary to fulfill the Agency's purposes, and to |
22 | | make expenditures for that purpose within the |
23 | | appropriations for that purpose. |
24 | | (5) To purchase, receive, take by grant, gift, devise, |
25 | | bequest, or otherwise, lease, or otherwise acquire, own, |
26 | | hold, improve, employ, use, and otherwise deal in and with, |
|
| | HB1141 | - 13 - | LRB098 05955 AMC 35994 b |
|
|
1 | | real or personal property whether tangible or intangible, |
2 | | or any interest therein, within the State. |
3 | | (6) To acquire real or personal property, whether |
4 | | tangible or intangible, including without limitation |
5 | | property rights, interests in property, franchises, |
6 | | obligations, contracts, and debt and equity securities, |
7 | | and to do so by the exercise of the power of eminent domain |
8 | | in accordance with Section 1-21; except that any real |
9 | | property acquired by the exercise of the power of eminent |
10 | | domain must be located within the State. |
11 | | (7) To sell, convey, lease, exchange, transfer, |
12 | | abandon, or otherwise dispose of, or mortgage, pledge, or |
13 | | create a security interest in, any of its assets, |
14 | | properties, or any interest therein, wherever situated. |
15 | | (8) To purchase, take, receive, subscribe for, or |
16 | | otherwise acquire, hold, make a tender offer for, vote, |
17 | | employ, sell, lend, lease, exchange, transfer, or |
18 | | otherwise dispose of, mortgage, pledge, or grant a security |
19 | | interest in, use, and otherwise deal in and with, bonds and |
20 | | other obligations, shares, or other securities (or |
21 | | interests therein) issued by others, whether engaged in a |
22 | | similar or different business or activity. |
23 | | (9) To make and execute agreements, contracts, and |
24 | | other instruments necessary or convenient in the exercise |
25 | | of the powers and functions of the Agency under this Act, |
26 | | including contracts with any person, including personal |
|
| | HB1141 | - 14 - | LRB098 05955 AMC 35994 b |
|
|
1 | | service contracts, or with any local government, State |
2 | | agency, or other entity; and all State agencies and all |
3 | | local governments are authorized to enter into and do all |
4 | | things necessary to perform any such agreement, contract, |
5 | | or other instrument with the Agency. No such agreement, |
6 | | contract, or other instrument shall exceed 40 years. |
7 | | (10) To lend money, invest and reinvest its funds in |
8 | | accordance with the Public Funds Investment Act, and take |
9 | | and hold real and personal property as security for the |
10 | | payment of funds loaned or invested. |
11 | | (11) To borrow money at such rate or rates of interest |
12 | | as the Agency may determine, issue its notes, bonds, or |
13 | | other obligations to evidence that indebtedness, and |
14 | | secure any of its obligations by mortgage or pledge of its |
15 | | real or personal property, machinery, equipment, |
16 | | structures, fixtures, inventories, revenues, grants, and |
17 | | other funds as provided or any interest therein, wherever |
18 | | situated. |
19 | | (12) To enter into agreements with the Illinois Finance |
20 | | Authority to issue bonds whether or not the income |
21 | | therefrom is exempt from federal taxation. |
22 | | (13) To procure insurance against any loss in |
23 | | connection with its properties or operations in such amount |
24 | | or amounts and from such insurers, including the federal |
25 | | government, as it may deem necessary or desirable, and to |
26 | | pay any premiums therefor. |
|
| | HB1141 | - 15 - | LRB098 05955 AMC 35994 b |
|
|
1 | | (14) To negotiate and enter into agreements with |
2 | | trustees or receivers appointed by United States |
3 | | bankruptcy courts or federal district courts or in other |
4 | | proceedings involving adjustment of debts and authorize |
5 | | proceedings involving adjustment of debts and authorize |
6 | | legal counsel for the Agency to appear in any such |
7 | | proceedings. |
8 | | (15) To file a petition under Chapter 9 of Title 11 of |
9 | | the United States Bankruptcy Code or take other similar |
10 | | action for the adjustment of its debts. |
11 | | (16) To enter into management agreements for the |
12 | | operation of any of the property or facilities owned by the |
13 | | Agency. |
14 | | (17) To enter into an agreement to transfer and to |
15 | | transfer any land, facilities, fixtures, or equipment of |
16 | | the Agency to one or more municipal electric systems, |
17 | | governmental aggregators, or rural electric agencies or |
18 | | cooperatives, for such consideration and upon such terms as |
19 | | the Agency may determine to be in the best interest of the |
20 | | citizens of Illinois. |
21 | | (18) To enter upon any lands and within any building |
22 | | whenever in its judgment it may be necessary for the |
23 | | purpose of making surveys and examinations to accomplish |
24 | | any purpose authorized by this Act. |
25 | | (19) To maintain an office or offices at such place or |
26 | | places in the State as it may determine. |
|
| | HB1141 | - 16 - | LRB098 05955 AMC 35994 b |
|
|
1 | | (20) To request information, and to make any inquiry, |
2 | | investigation, survey, or study that the Agency may deem |
3 | | necessary to enable it effectively to carry out the |
4 | | provisions of this Act. |
5 | | (21) To accept and expend appropriations. |
6 | | (22) To engage in any activity or operation that is |
7 | | incidental to and in furtherance of efficient operation to |
8 | | accomplish the Agency's purposes, including hiring |
9 | | employees that the Director deems essential for the |
10 | | operations of the Agency. |
11 | | (23) To adopt, revise, amend, and repeal rules with |
12 | | respect to its operations, properties, and facilities as |
13 | | may be necessary or convenient to carry out the purposes of |
14 | | this Act, subject to the provisions of the Illinois |
15 | | Administrative Procedure Act and Sections 1-22 and 1-35 of |
16 | | this Act. |
17 | | (24) To establish and collect charges and fees as |
18 | | described in this Act.
|
19 | | (25) To conduct competitive gasification feedstock |
20 | | procurement processes to procure the feedstocks for the |
21 | | clean coal SNG brownfield facility in accordance with the |
22 | | requirements of Section 1-78 of this Act. |
23 | | (26) To review, revise, and approve sourcing |
24 | | agreements and mediate and resolve disputes between gas |
25 | | utilities and the clean coal SNG brownfield facility |
26 | | pursuant to subsection (h-1) of Section 9-220 of the Public |
|
| | HB1141 | - 17 - | LRB098 05955 AMC 35994 b |
|
|
1 | | Utilities Act. |
2 | | (27) To review and approve qualified solar power |
3 | | purchase agreements pursuant to Section 1-76 of this Act. |
4 | | (Source: P.A. 96-784, eff. 8-28-09; 96-1000, eff. 7-2-10; |
5 | | 97-96, eff. 7-13-11; 97-325, eff. 8-12-11; 97-618, eff. |
6 | | 10-26-11; 97-813, eff. 7-13-12.) |
7 | | (20 ILCS 3855/1-76 new) |
8 | | Sec. 1-76. Qualified solar power purchase agreements. |
9 | | (a) The General Assembly finds that encouraging the |
10 | | development and use of solar energy is in the public interest |
11 | | and consistent with the renewable energy goals of the State. |
12 | | The General Assembly further finds that repurposing and |
13 | | redeveloping brownfield sites owned by municipalities, |
14 | | including in particular those sites that are in need of |
15 | | remedial clean up due to prior contamination, to host solar |
16 | | energy producing facilities is in the economic and |
17 | | environmental interests of the State, those municipalities, |
18 | | and the public. |
19 | | (b) For a period of one year after the effective date of |
20 | | this amendatory Act of the 98th General Assembly, the Agency |
21 | | shall accept applications from proposed operators of proposed |
22 | | qualified solar remediation facilities to approve a qualified |
23 | | solar power purchase agreement. The Agency shall accept only |
24 | | one application that meets the criteria set forth in this |
25 | | Section. The Agency shall not accept an application that does |
|
| | HB1141 | - 18 - | LRB098 05955 AMC 35994 b |
|
|
1 | | not meet the criteria set forth in this Section. The |
2 | | application shall include a proposed qualified solar power |
3 | | purchase agreement between the applicant and an electric |
4 | | utility. |
5 | | (c) Each qualified solar power purchase agreement shall: |
6 | | (1) include provisions governing the prices paid for |
7 | | electricity generated by the qualified solar remediation |
8 | | facility and for renewable energy credits purchased in |
9 | | connection with the electricity, which prices in aggregate |
10 | | (for both electricity and renewable energy credits) shall: |
11 | | (A) not exceed 23 cents per kilowatt hour in the |
12 | | first year of the sale of electricity pursuant to such |
13 | | qualified solar power purchase agreement; |
14 | | (B) not increase during the term of the qualified |
15 | | solar power purchase agreement by more than 1.5% per |
16 | | year; and |
17 | | (C) be reduced by an amount, if necessary, such |
18 | | that the annual estimated average prices paid by |
19 | | alternative retail electric suppliers in connection |
20 | | with electric service do not incur a net increase due |
21 | | to the costs of the renewable energy resources procured |
22 | | under such qualified solar power purchase agreement by |
23 | | more than the greater of 2.015% of the amount paid per |
24 | | kilowatt hour by those alternative retail electric |
25 | | suppliers during the year ending May 31, 2007 or the |
26 | | incremental amount per kilowatt hour paid for |
|
| | HB1141 | - 19 - | LRB098 05955 AMC 35994 b |
|
|
1 | | renewable energy resources in 2011. |
2 | | (2) specify a term of no more than 20 years, commencing |
3 | | on the commercial operation date of the facility; |
4 | | (3) require the facility to be constructed on the |
5 | | specified municipal brownfield site and to achieve the |
6 | | commercial operation date within 5 years after the approval |
7 | | of the qualified solar power purchase agreement by the |
8 | | Agency; |
9 | | (4) include a representation by the applicant that, |
10 | | from and after the execution of the qualified solar power |
11 | | purchase agreement, any costs incurred in the |
12 | | environmental remediation of the municipal brownfield |
13 | | site, other than for the construction of the qualified |
14 | | solar remediation facility, shall not cause an increase in |
15 | | the prices paid for electricity generated by the qualified |
16 | | solar remediation facility in excess of the prices stated |
17 | | in the proposed qualified solar power purchase agreement; |
18 | | (5) provide for purchase and sale of the full output of |
19 | | a qualified solar remediation facility consistent with the |
20 | | electric utility's tariffs and practice, but not to exceed |
21 | | a nameplate capacity of 20 megawatts; |
22 | | (6) require the qualified solar remediation facility |
23 | | to provide to the electric utility, on a day-prior basis, |
24 | | an estimate of the integrated hourly output from the |
25 | | facility and, on a monthly basis, the actual integrated |
26 | | hourly output from the facility; and |
|
| | HB1141 | - 20 - | LRB098 05955 AMC 35994 b |
|
|
1 | | (7) provide that the effectiveness of such agreement is |
2 | | contingent upon (i) approval by the Agency pursuant to this |
3 | | Section and (ii) inclusion in a procurement plan that is |
4 | | submitted by the Agency and approved by the Commission. |
5 | | (d) The Agency shall promptly review an application |
6 | | submitted pursuant to this Section. The Agency shall approve a |
7 | | qualified solar power purchase agreement within 90 days after |
8 | | the Agency has received such an application or before the next |
9 | | submission of the Agency's procurement plan to the Commission, |
10 | | whichever is earlier, unless the Agency finds that the |
11 | | agreement does not conform to the requirements of subsection |
12 | | (c) of this Section. Immediately following the approval of the |
13 | | qualified solar power purchase agreement by the Agency, the |
14 | | Agency shall include and incorporate the qualified solar power |
15 | | purchase agreement and the proposed output in the Agency's |
16 | | procurement plan. |
17 | | (e) The Commission shall approve the inclusion of the |
18 | | qualified solar power purchase agreement in the Agency's |
19 | | procurement plan, unless the Commission finds that any |
20 | | projected rate increases to eligible retail electric customers |
21 | | attributable solely to costs incurred by an electric utility |
22 | | pursuant to the qualified solar power purchase agreement |
23 | | violate the requirements of paragraph (2) of subsection (c) of |
24 | | Section 1-75 of this Act. Upon approval of a qualified solar |
25 | | power purchase agreement by the Commission, such qualified |
26 | | solar power purchase agreement shall be executed by the parties |
|
| | HB1141 | - 21 - | LRB098 05955 AMC 35994 b |
|
|
1 | | and become effective subject to the electric utility's |
2 | | applicable tariffs. |
3 | | (f) The Agency may assess a fee to the applicant to recover |
4 | | the costs incurred in reviewing the application pursuant to |
5 | | this Section. |
6 | | (g) All costs incurred by an electric utility pursuant to a |
7 | | qualified solar power purchase agreement approved by the Agency |
8 | | pursuant to this Section, including costs for renewable energy |
9 | | credits purchased in connection with electricity generated by |
10 | | that qualified solar remediation facility and costs incurred in |
11 | | negotiating the agreement and seeking approval by the Agency in |
12 | | accordance with this Section, shall be deemed prudently |
13 | | incurred and reasonable in amount, and the electric utility |
14 | | shall be entitled to full cost recovery pursuant to the tariffs |
15 | | filed with the Commission. |
16 | | (h) Any renewable energy credits purchased by an electric |
17 | | utility pursuant to a qualified solar power purchase agreement |
18 | | approved by the Agency pursuant to this Section shall count |
19 | | towards the required percentages for solar photovoltaic energy |
20 | | for the purposes of subsection (c) of Section 1-75 of this Act. |
21 | | (i) The electric utility shall include purchases under the |
22 | | qualified solar power purchase agreement in its portfolio of |
23 | | purchases associated with eligible retail customers, at a value |
24 | | equal to the total of the per-kilowatt-hour cost of on-peak |
25 | | energy, capacity, and solar renewable energy credits |
26 | | associated with renewable energy procured in the most recent |
|
| | HB1141 | - 22 - | LRB098 05955 AMC 35994 b |
|
|
1 | | power procurement event conducted under Section 1-75 of this |
2 | | Act that included executed contracts for solar renewable energy |
3 | | credits. The value of purchases under the qualified solar power |
4 | | purchase agreement shall be recovered under tariffs approved by |
5 | | the Commission pursuant to subsection (l) of Section 16-111.5 |
6 | | of the Public Utilities Act. |
7 | | The electric utility shall estimate the kilowatt-hour |
8 | | quantity of qualified solar power purchase agreement energy |
9 | | expected to be acquired in a procurement plan year. The over or |
10 | | under cost recovery mechanism contained in the tariff approved |
11 | | by the Commission pursuant to subsection (l) of Section |
12 | | 16-111.5 of the Public Utilities Act shall reconcile the |
13 | | estimated costs with the actual costs allocated to eligible |
14 | | retail customers by multiplying the per-kilowatt-hour cost |
15 | | established in this Section by the difference between the |
16 | | estimated kilowatt-hour quantity and the actual kilowatt-hour |
17 | | quantity generated by the qualified solar remediation |
18 | | facility. |
19 | | (j) If the price established by the qualified solar power |
20 | | purchase agreement in conformance with subsection (c) of this |
21 | | Section is different than the value of the purchases under the |
22 | | qualified solar power purchase agreement as determined by |
23 | | subsection (i) of this Section, the difference shall be |
24 | | collected equally from, or credited equally to, all of the |
25 | | electric utility's delivery service customers through a cents |
26 | | per-kilowatt-hour tariff mechanism approved by the Commission. |
|
| | HB1141 | - 23 - | LRB098 05955 AMC 35994 b |
|
|
1 | | Such tariff mechanism shall be established outside the context |
2 | | of a general rate case or formula rate proceeding. The tariff |
3 | | mechanism each year shall establish an estimated amount to |
4 | | collect or credit and shall contain provisions that ensure that |
5 | | its application does not result in over or under recovery, |
6 | | including, but not limited to, changes in qualified solar |
7 | | remediation facility production or customer usage or demand |
8 | | patterns. |
9 | | The application of subsections (i) and (j) of this Section |
10 | | together shall be construed to permit the electric utility to |
11 | | recover all of its costs incurred to comply with this Section. |
12 | | (k) Nothing in this Section shall be construed to prohibit |
13 | | the electric utility from recovering prudently incurred costs |
14 | | under this Section from its delivery service customers or |
15 | | bundled service customers.
|
16 | | Section 99. Effective date. This Act takes effect upon |
17 | | becoming law.
|