| | 09800HB0163ham003 | - 2 - | LRB098 04212 OMW 42562 a |
|
|
1 | | proposed location, a site plan, and an elevation that |
2 | | sufficiently describes a proposed wireless facility location. |
3 | | (b) The county shall have 7 days to review the facility |
4 | | proposal and contact the telecommunications carrier in writing |
5 | | via e-mail or other written means as specified by the |
6 | | telecommunications carrier. This written communication shall |
7 | | either approve the proposed location or request a meeting to |
8 | | review other possible alternative locations. If requested, the |
9 | | meeting shall take place within 7 days after the date of the |
10 | | written communication. |
11 | | (c) At the meeting, the telecommunications carrier shall |
12 | | provide the county documentation consisting of radio frequency |
13 | | engineering criteria and a corresponding telecommunications |
14 | | facility search ring map, together with documentation of the |
15 | | carrier's efforts to site the proposed facility within the |
16 | | telecommunications facility search ring. |
17 | | (d) Within 21 days after receipt of the carrier's |
18 | | documentation, the county shall propose either an alternative |
19 | | site within the telecommunications facility search ring, or an |
20 | | alternative site outside of the telecommunications search ring |
21 | | that meets the radio frequency engineering criteria provided by |
22 | | the telecommunications carrier and that will not materially |
23 | | increase the construction budget beyond what was estimated on |
24 | | the original carrier proposed site. |
25 | | (e) If the county's proposed alternative site meets the |
26 | | radio frequency engineering criteria provided by the |
|
| | 09800HB0163ham003 | - 3 - | LRB098 04212 OMW 42562 a |
|
|
1 | | telecommunications carrier, and will not materially increase |
2 | | the construction budget beyond what was estimated on the |
3 | | original carrier proposed site, then the telecommunications |
4 | | carrier shall agree to build the facility at the alternative |
5 | | location, subject to the negotiation of a lease with |
6 | | commercially reasonable terms and the obtainment of the |
7 | | customary building permits. |
8 | | (f) If the telecommunications carrier can demonstrate |
9 | | that: (i) the county's proposed alternative site does not meet |
10 | | the radio frequency engineering criteria, (ii) the county's |
11 | | proposed alternative site will materially increase the |
12 | | construction budget beyond what was estimated on the original |
13 | | carrier proposed site, (iii) the county has failed to provide |
14 | | an alternate site, or (iv) after a period of 90 days after |
15 | | receipt of the alternative site the telecommunications carrier |
16 | | has failed, after acting in good faith and with due diligence, |
17 | | to obtain a lease or at a minimum, a letter of intent to lease |
18 | | the alternative site at lease rates not materially greater than |
19 | | the lease rate for the original proposed site; then the carrier |
20 | | can proceed to permit and construct the site under the |
21 | | provisions and standards of Section 5-12001.1 of this Code.
|
22 | | Section 99. Effective date. This Act takes effect upon |
23 | | becoming law.".
|