97TH GENERAL ASSEMBLY

 

State of Illinois

 

2011 and 2012   

SB3872

 

Introduced 2/24/2012, by Sen. Dan Kotowski

 

SYNOPSIS AS INTRODUCED:

 

Makes appropriations and reappropriations for the fiscal year beginning July 1, 2012.

 

 

OMB097 00389 KAM 40389 b

 

 

 

 

 

  $FY13 CAPITAL

 

 

 


    AN ACT concerning appropriations.

 

        Be it enacted by the People of the State of Illinois, represented in the General Assembly:

 

ARTICLE 1

 

ARCHITECT OF THE CAPITOL

    Section 5.  The amount of $3,883, or so much of thereof as may be necessary and remains unexpended on June 30, 2012, from a reappropriation heretofore made for such purpose in Section 5 of Article 1 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Office of the Architect of the Capitol for plans, specifications, and continuation of work pursuant to the report and recommendations of the architectural, structural, and mechanical surveys of the State Capitol Building.  This is for the continuation of the rehabilitation of the Capitol Building.

 

    Section 10.  The sum of $548,180, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purposes in Section 10 of Article 1 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Office of the Architect of the Capitol for remodeling, planning, relocation, permanent equipment, and other related expenses, including architectural and engineering fees associated with construction, for the remodeling of office space and other support areas under the jurisdiction of the House of Representatives and the Senate.

 

    Section 15.  The sum of $45,031,178, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 1, Section 15 of Public Act 97-0076, as amended, is reappropriated from the Capital Development Fund to the Office of the Architect of the Capitol for all costs associated with capital upgrades and improvements.

 

    Section 16.  The following named amounts, or so much thereof as may be necessary, and remain unexpended at the close of business on June 30, 2012, from reappropriations heretofore made for such purposes in Article 1, Section 16 of Public Act 97-0076, as amended, are reappropriated from the Capital Development Fund to the Office of the Architect of the Capitol for the projects hereinafter enumerated:

CAPITOL BUILDING - SPRINGFIELD

(From Article 1, Section 16 of Public Act 97-0076)

  For upgrading the HVAC systems

   and for renovations to meet

   compliance with ADA, in addition

   to funds previously appropriated............. 42,831,177

  For upgrades to life safety

   protection systems in addition

   to funds previously appropriated.............. 6,000,000

  For equipment, remodeling and all other

   costs related to the maintenance, renovation

   or restoration of areas located in the

   Capitol Building................................ 766,429

  For all costs related to asbestos and

   environmental abatement in the

   Capitol Building................................ 223,176

    Total                                       $49,820,782

 

    Section 17.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from reappropriations heretofore made for such purposes in Article 1, Section 17 of Public Act 97-0076, as amended, are reappropriated from the Capital Development Fund to the Office of the Architect of the Capitol for the projects hereinafter enumerated:

CAPITOL BUILDING - SPRINGFIELD

(From Article 1, Section 17 of Public Act 97-0076)

  For all costs related to the planning

   and design of life safety and fire

   protection system improvements, hazardous

   material abatement, historical restoration

   and construction in the Capitol Building........ 103,453

  For capital upgrades......................... 250,000,000

  For completing the stone restoration, in

   addition to funds previously appropriated....... 323,373

  For demolition of 222 S. College,

   and landscaping of Capitol Complex

   in addition to funds previously

   appropriated.................................... 963,567

  For demolition of 222 South College

   Building and landscaping of

   Capitol Complex................................. 585,151

WILLIAM G. STRATTON BUILDING - SPRINGFIELD

  For the planning, design, reconstruction,

    and construction to renovate or replace

    the Stratton Office Building, in addition

    to funds previously appropriated............. 6,733,361

  Total                                        $258,708,905

 

    Section 20.  No contract shall be entered into or obligation incurred for any expenditures from appropriations in this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, this Article                        $354,112,928

 

ARTICLE 2

 

SECRETARY OF STATE

    Section 5.  The sum of $50,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 2, Section 5 of Public Act 97-0076, is reappropriated from the Build Illinois Bond Fund to the Secretary of State for capital grants to public libraries for permanent improvements.

 

    Section 10.  No contract shall be entered into or obligation incurred or any expenditures made from appropriations in this Article until after the purposes and amounts have been approved in writing by the Governor.

    Total, this Article                         $50,000,000

 

ARTICLE 3

 

DEPARTMENT OF AGRICULTURE

    Section 5.  The amount of $2,612,500, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Department of Agriculture for grants to soil and water conservation districts for capital projects.

 

    Section 10.  No contract shall be entered into or obligation incurred for any expenditures from appropriations this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, this Article                          $2,612,500

 

ARTICLE 4

DEPARTMENT OF AGRICULTURE

    Section 1.  The following named amounts, or so much thereof as may be necessary, are appropriated to the Department of Agriculture for repairs, maintenance, and capital improvements including construction, reconstruction, improvement, repair and installation of capital facilities, cost of planning, supplies, materials, equipment, services and all other expenses required to complete the work:

Payable from Agricultural Premium Fund:

  For various projects at the Illinois

   State Fairgrounds............................. 1,500,000

  For various projects at the DuQuoin

   State Fairgrounds............................... 600,000

 

    Section 5.  The amount of $2,612,500, or so much thereof as may be necessary, is appropriated from the Partners for Conservation Projects Fund to the Department of Agriculture for the Conservation Practices Cost-Share program.

 

    Total, this Article                          $4,712,500

 

ARTICLE 5

 

DEPARTMENT OF CENTRAL MANAGEMENT SERVICES

    Section 5.  The sum of $20,000,000, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Department of Central Management Services for the Department of Corrections for Offender Tracking System conversion.

 

    Section 10.  The sum of $10,000,000, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Department of Central Management Services for capital costs relating to a pilot program to develop centralized citizen servicing centers; including, but not limited to renovation of facilities.

 

    Section 15.  The sum of $19,000,000, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Department of Central Management Services for the Illinois Century Network.

 

    Section 20.  The sum of $50,000,000, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Department of Central Management Services for a Healthcare/Medicaid information technology system.

 

    Section 25.  No contract shall be entered into or obligation incurred or any expenditures made from appropriations in this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, this Article                         $99,000,000

 

ARTICLE 6

 

CENTRAL MANAGEMENT SERVICES

    Section 5.  The sum of $6,387,671, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 3, Section 5 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Department of Central Management Services for Information Technology infrastructure expenses including but not limited to related hardware and equipment.

 

    Section 10.  The amount of $13,500,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purposes in Section 10 of Article 3 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Department of Central Management Services for infrastructure improvement, hardware and related costs.

 

    Section 15.  The sum of $26,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 3, Section 15 of Public Act 97-0076, as amended, is reappropriated from the Capital Development Fund to the Department of Central Management Services for the Illinois Century Network.

 

    Section 20.  No contract shall be entered into or obligation incurred or any expenditures made from appropriations in this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, this Article                         $45,887,671

 

ARTICLE 7

 

DEPARTMENT OF COMMERCE AND ECONOMIC OPPORTUNITY

    Section 5.  The sum of $30,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to Argonne National Laboratory for an Energy Storage Hub.

 

    Section 10.  No contract shall be entered into or obligation incurred or any expenditure made from any appropriation herein made in this Article until after the purposes and amounts have been approved in writing by the Governor.

    Total, this Article                         $30,000,000

 

ARTICLE 8

 

DEPARTMENT OF COMMERCE AND ECONOMIC OPPORTUNITY

    Section 1.  The sum of $3,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purposes in Section 1 of Article 4 of Public Act 97-0076, from the Port Development Revolving Loan Fund to the Department of Commerce and Economic Opportunity for grants and loans associated with the Port Development Revolving Loan Program pursuant to 30 ILCS 750/9-11.

 

    Section 20.  The amount of $25,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purposes in Section 20 of Article 4 of Public Act 97-0076, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants associated with the redevelopment of brownfield sites.

 

    Section 25.  The sum of $50,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 4, Section 25 of Public Act 97-0076, is reappropriated from the Coal Development Fund to the Department of Commerce and Economic Opportunity for grants pursuant to 20 ILCS 605/605-332 – Coal Revival Program.

 

    Section 30.  The sum of $1,975,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 4, Section 30 of Public Act 97-0076, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants associated with the Illinois Renewable Fuels Development Act.

 

    Section 35.  The sum of $13,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 4, Section 35 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to Argonne National Laboratory for bondable infrastructure improvements to match federal and private funds of equal or greater value.

 

    Section 40.  The amount of $5,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 4, Section 40 of Public Act 97-0076, is reappropriated from the Coal Development Fund to the Department of Commerce and Economic Opportunity for the specific purposes of acquisition, development, construction, reconstruction, improvement, financing, architectural and technical planning and installation of capital facilities consisting of buildings, structures, durable equipment, and land for the purpose of capital development of coal resources within the State.

 

    Section 50.  The amount of $7,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 4, Section 50 of Public Act 97-0076, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to Argonne National Laboratory for the Advanced Protein Crystallization Facility.

 

    Section 55.  The amount of $15,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 4, Section 55 of Public Act 97-0076, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant for the Illinois Science and Technology Park.

 

    Section 65.  The amount of $20,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 4, Section 65 of Public Act 97-0076, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants associated with the Illinois Renewable Fuels Development Act.

 

    Section 70.  The amount of $6,750,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 4, Section 70 of Public Act 97-0076, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants associated with the redevelopment of brownfield sites.

 

    Section 75.  The amount of $17,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from an appropriation heretofore made for such purpose in Article 4, Section 75 of Public Act 97-0076, as amended, is reappropriated from the Coal Development Fund to the Department of Commerce and Economic Opportunity for the specific purpose of acquisition, development, construction, reconstruction, improvement, financing, architectural and technical planning and installation of capital facilities consisting of buildings, structures, durable equipment, and land for the purpose of capital development of coal resources within the State, including but not limited, to a grant for a commercial scale, low emissions project that produces electric power, synthesizes natural gas or chemicals and demonstrates underground storage of at least 1 million metric tons annually of carbon dioxide.

 

    Section 80.  The sum of $3,980,704, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 4, Section 80 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans pursuant but not limited to Article 8, Article 9, or Article 10 of the Build Illinois Act.

 

    Section 85.  The sum of $3,130,040, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 85 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans pursuant but not limited to Article 8 or Article 10 of the Build Illinois Act.

 

    Section 90.  The sum of $2,600,251, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 90 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans pursuant but not limited to Article 8, Article 9, or Article 10 of the Build Illinois Act.

 

    Section 95.  The sum of $5,567,122, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 95 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans pursuant but not limited to Article 8, Article 9, or Article 10 of the Build Illinois Act.

 

    Section 100.  The sum of $4,524,172, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 100 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans pursuant but not limited to Article 8, Article 9, or Article 10 of the Build Illinois Act.

 

    Section 105.  The sum of $150,600,695, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 105 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for the purpose of making grants and loans to local governments for planning, engineering, acquisition, construction, reconstruction, development, improvement and extension of the public infrastructure, and for any other purposes authorized in subsection (a) of Section 4 of the Build Illinois Bond Act and for grants to State agencies for such purposes.

 

    Section 110.  The sum of $47,500,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 110 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for the purpose of fostering economic development and increased employment and the well being of the citizens of Illinois, and for any other purposes authorized in subsection (b) of Section 4 of the Build Illinois Bond Act and for grants to State agencies for such purposes.

 

    Section 115.  The sum of $19,567,094, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 115 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for the development and improvement of educational, scientific, technical and vocational programs and facilities and the expansion of health and human services, and for any other purposes authorized in subsection (c) of Section 4 of the Build Illinois Bond Act and for grants to State agencies for such purposes.

 

    Section 120.  The sum of $30,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 120 of Public Act 97-0076, as amended, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for open spaces, recreational and conservation purposes and the protection of land and for deposits into the Partners for Conservation Projects Fund as authorized by subsection (c) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 125.  The sum of $33,199,978, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 125 of Public Act 97-0076, as amended, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for grants to local governments for the acquisition, financing, architectural planning, development, alteration, installation, and construction of capital facilities consisting of buildings, structures, durable equipment, and land as authorized by subsection (l) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 130.  The amount of $10,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 130 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for grants to local governments for the acquisition, financing, architectural planning, development, alteration, installation, and construction of capital facilities consisting of buildings, structures, durable equipment, and land as authorized by subsection (l) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 135.  The amount of $24,750,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 135 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants pursuant but not limited to Article 8, Article 9, or Article 10 of the Build Illinois Act.

 

    Section 140.  The sum of $13,745,450, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 140 of Public Act 97-0076, as amended, is reappropriated from the Fund for Illinois’ Future to the Department of Commerce and Economic Opportunity for grants to units of government, educational facilities and not-for-profit organizations for education and training, infrastructure improvements and other capital projects including but not limited to planning, construction, reconstruction, equipment, utilities and vehicles, and all costs associated with economic development programs, community service programs, public health programs, public safety programs, other programs and activities, and for grants to other State agencies for any capital or operating purposes.

 

    Section 145.  The amount of $25,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 145 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants to local governments for capital improvements to civic centers for the projects hereinafter enumerated:

Quad Cities Metropolitan

  Exposition and Auditorium

  Authority..................... 4,000,000

Peoria Metropolitan Exposition

  Authority..................... 4,000,000

Springfield Metropolitan

  Exposition and Auditorium

  Authority..................... 4,000,000

Rockford Metropolitan Exposition,

  Auditorium and Office Building

  Authority..................... 4,000,000

Will County Metropolitan Exposition,

  Auditorium and Office Building

  Authority..................... 2,200,000

Aurora Metropolitan Exposition,

  Auditorium and Office Building

  Authority..................... 2,100,000

Decatur Metropolitan Exposition,

  Auditorium and Office Building

  Authority..................... 2,100,000

Vermilion County Exposition,

  Auditorium and Office Building

  Authority....................... 850,000

Collinsville Metropolitan Exposition,

  Auditorium and Office Building

  Authority....................... 625,000

LaSalle County Metropolitan Exposition,

  Auditorium and Office Building

  Authority....................... 250,000

Quincy Metropolitan Exposition,

  Auditorium and Office Building

  Authority....................... 800,000

 

    Section 150.  The sum of $6,257,938, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 150 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to the Chicago Zoological Society for capital improvements.

 

    Section 155.  The sum of $6,214,493, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 155 of Public Act 97-0076, as amended, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for a grant to the Chicago Housing Authority for LeClaire Courts.

 

    Section 160.  The sum of $15,118,220, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 160 of Public Act 97-0076, as amended, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for a grant to the Medical District Commission for capital improvements, including previously incurred costs.

 

    Section 165.  The sum of $7,623,956, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 165 of Public Act 97-0076, as amended, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for a grant to Southwestern Illinois Community College for campus and building improvements.

 

    Section 170.  The sum of $424,021,880, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 170 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants awarded under the Urban Weatherization Initiative Act.

 

    Section 175. The amount of $27,596,345, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 175 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans including but not limited to broadband deployment to expand and strengthen existing broadband network infrastructure, health information technology, telemedicine, distance learning, and public safety.

 

    Section 180. The amount of $9,739,250, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 180 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans for transportation electrification infrastructure projects; including, but not limited to grants and loans for the purpose of encouraging electric car manufacturing and infrastructure for electric vehicles.

 

    Section 185. The amount of $25,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 185 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for infrastructure projects that lead directly to private sector expansion or retention activities including but not limited to public infrastructure construction and renovation, financing for the purchase of land and buildings, construction or renovation of fixed assets, site preparation and purchase of machinery and equipment.

 

    Section 195.  The sum of $5,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 195 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to BMI, Inc for a biodiesel plant in Mapleton.

 

    Section 200.  The sum of $5,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 200 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to Robbins Community Power for a biomass to energy project.

 

    Section 205.  The amount of $15,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 205 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity to provide loans and grants for the modification, alteration, or retrofitting of renewable fuel plants in Illinois in order to encourage the implementation of technologies that increase the overall efficiency of the renewable fuel production process or reduce the life-cycle greenhouse gas emissions of the renewable fuel produced including, but not limited to: (i) improved water conservation; (ii) improved energy conservation; (iii) added value to bio-fuel co-products and bi-products; (iv) utilization of renewable energy resources; (v) utilization of fractionation; or (vi) utilization of cellulosic or other biomass conversion.

 

    Section 210.  The sum of $34,809,738, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 210 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for the requirements necessary to leverage capital-related American Recovery and Reinvestment Act of 2009 funds of equal or greater value in order to make Illinois or Illinois applicants more competitive.

 

    Section 215.  The sum of $1,660,289, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 215 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to the Phoenix Foundation of Southern Illinois for hospital renovation and equipment.

 

    Section 220.  The sum of $13,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 220 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for costs associated with the redevelopment of brownfield sites.

 

    Section 221.  The sum of $61,000,001, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 221 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to the United Neighborhood Organization for the acquisition, construction, rehabilitation, renovation and equipping facilities, to a silver certification from the United States Green Building Council’s Leadership in Energy and Environmental Design Green Building Rating System, to assist in alleviating school overcrowding in the state.

 

    Section 225.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from reappropriations heretofore made for such purposes in Article 4, Section 225 of Public Act 97-0076, as amended, are reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to the Rockford District 205 for the projects hereinafter enumerated:

GREENTEK CARVER ACADEMY

  For the acquisition, construction,

   rehabilitation, renovation and

   equipping to a silver certification

   from the United States Green

   Building Council’s Leadership in

   Energy and Environmental Design

   Green Building Rating System.................... 500,000

 CICS ROCKFORD CHARTER PATRIOTS CENTER

  For the acquisition, construction,

   rehabilitation, renovation and

   equipping to a silver certification

   from the United States Green

   Building Council’s Leadership in

   Energy and Environmental Design

   Green Building Rating System.................... 500,000

SIGMA BETA LEADERSHIP SCHOOL

  For the acquisition, construction,

   rehabilitation, renovation and

   equipping to a silver certification

   from the United States Green

   Building Council’s Leadership in

   Energy and Environmental Design

   Green Building Rating System.................. 1,000,000

    Total                                         2,000,000

 

    Section 230.  The sum of $12,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 230 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants for acquisition, construction, renovation and equipping new charter schools, to a silver certification from the United States Green Building Council’s Leadership in Energy and Environmental Design Green Building Rating System as approximated below:

  For Instituto Del Progresso Latino............ 12,000,000

 

    Section 235.  The sum of $15,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 235 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity to provide grants, loans, and other investments to emerging technology enterprises to support and encourage: (i) commercialization of technology based products and services; (ii) technology transfer projects involving the promotion of new or innovative technologies; or (iii) research and development projects to respond to unique, advanced technology projects and which foster the development of Illinois’ economy through the advancement of the State’s economic, scientific, and technological assets.

 

    Section 240.  The sum of $15,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 240 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity to provide grants for land acquisition, infrastructure, equipment and other permissible capital expenditures to businesses that will encourage new investment and the creation or retention of jobs in economically depressed areas of the state.

 

    Section 245.  The sum of $1,080,369, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 245 of Public Act 97-0076, as amended, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for a grant to the South Shore Hospital for costs associated with infrastructure improvements at the facility.

 

    Section 255.  The sum of $3,750,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 255 of Public Act 97-0076, as amended, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for a grant to the University of Chicago Medical Center for costs associated with Provident Hospital.

 

    Section 265.  The sum of $1,875,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 265 of Public Act 97-0076, as amended, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for a grant to the Illinois Masonic Hospital for capital improvements.

 

    Section 270.  The sum of $1, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 270 of Public Act 97-0076, as amended, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for a grant to Rush University Medical Center.

 

    Section 275.  The sum of $80,013, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 275 of Public Act 97-0076, as amended, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for a grant to Sacred Heart Hospital in Chicago.

 

    Section 280.  The sum of $2,250,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 280 of Public Act 97-0076, as amended, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for a grant to Community Health and Emergency Services, Inc. for the construction of a hospital wing at the Cairo Megaclinic.

 

    Section 285.  The sum of $3,112,950, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 285 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to Northwestern University to purchase equipment for the Science and Technology Center, as well as other bondable infrastructure improvements to match federal funds of equal or greater value.

 

    Section 300.  The amount of $1,500,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 300 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to the University of Chicago Center for costs associated with medical equipment and capital improvements at Provident Hospital.

 

    Section 305.  The amount of $200,829, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 305 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a capital grant to The Hope Institute for Children and Families.

 

    Section 325.  The amount of $1,404,833, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 325 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to the Ruth M. Rothstein CORE Center for capital improvement projects to modify space to increase patient capacity.

 

    Section 330.  The amount of $10,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 4, Section 330 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity to provide loans and grants for capital-related projects for qualified grocery stores statewide located in underserved communities.

 

    Section 345.  The amount of $3,052,727, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 4, Section 345 of Public Act 97-0076, as amended, is reappropriated from the Coal Development Fund to the Department of Commerce and Economic Opportunity for the purpose of facility cost reports prepared for not more than one facility pursuant to Section 1-56 of the Illinois Power Agency Act.

 

    Section 350.  The amount of $5,285,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 4, Section 350 of Public Act 97-0076, as amended, is reappropriated from the Coal Development Fund to the Department of Commerce and Economic Opportunity for the purpose of development costs pursuant to Section 8.1 of the Energy Conservation and Coal Development Act.

 

    Section 355.  This Article is not subject to limitations under Section 5 of Article 48 of Public Act 95-734 or any similar limitation.

 

    Section 360.  No contract shall be entered into or obligation incurred or any expenditure made from any appropriation herein made in Sections 20 through 355 of this Article until after the purpose and amounts have been approved in writing by the Governor.

 

    Total, this Article                      $1,272,524,338

 

ARTICLE 9

 

DEPARTMENT OF COMMERCE AND ECONOMIC OPPORTUNITY

    Section 5.  The amount of $1,500,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 26, Section 5 of Public Act 97-0076, as amended, is reappropriated from the Coal Development Fund to the Department of Commerce and Economic Opportunity for a grant to the owner of a generating station located in Williamson County, Illinois using Illinois coal to generate electricity for rural Southern Illinois communities for the purposes specified in the Illinois Coal and Energy Development Bond Act and Section 8.1 of the Energy Conservation and Coal Development Bond Act.

 

    Section 10.  The amount of $5,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 26, Section 10 of Public Act 97-0076, as amended, is reappropriated from the Coal Development Fund to the Department of Commerce and Economic Opportunity for a grant to the owner of a generating station located in Sangamon County, Illinois using Illinois coal to generate electricity for the purposes specified in the Illinois Coal and Energy Development Bond Act and Section 8.1 of the Energy Conservation and Coal Development Bond Act.

 

    Section 15.  The amount of $5,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 26, Section 15 of Public Act 97-0076, as amended, is reappropriated from the Coal Development Fund to the Department of Commerce and Economic Opportunity for a grant to the owner of a generating station located in Washington County, Illinois using Illinois coal to generate electricity for the purposes specified in the Illinois Coal and Energy Development Bond Act and Section 8.1 of the Energy Conservation and Coal Development Bond Act.

 

    Section 20.  No contract shall be entered into or obligation incurred or any expenditure made from any appropriation herein made in this Article until after the purpose and amounts have been approved in writing by the Governor.

 

    Total, this Article                         $11,500,000

 

ARTICLE 10

 

DEPARTMENT NATURAL RESOURCES

    Section 5.  The sum of $100,000,000, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Department of Natural Resources for the Flood Control Water Initiative.

 

    Section 10.  No contract shall be entered into or obligation incurred or any expenditure made from any appropriation herein made in this Article until after the purposes and amounts have been approved in writing by the Governor.

    Total, this Article                        $100,000,000

 

ARTICLE 11

 

DEPARTMENT OF NATURAL RESOURCES

    Section 10.  The sum of $725,000, or so much thereof as may be necessary, is appropriated from the State Boating Act Fund to the Department of Natural Resources for the administration and payment of grants to local governmental units for the construction, maintenance, and improvement of boat access areas.

 

    Section 15.  The sum of $120,000, or so much thereof as may be necessary, is appropriated from the State Boating Act Fund to the Department of Natural Resources for the purposes of the Snowmobile Registration and Safety Act and for the administration and payment of grants to local governmental units for the construction, land acquisition, lease, maintenance and improvement of snowmobile trails and access areas.

 

    Section 20.  To the extent federal funds including reimbursements are available for such purposes, the sum of $75,000, or so much thereof as may be necessary, is appropriated from the State Boating Act Fund to the Department of Natural Resources for all costs for construction and development of facilities for transient, non-trailerable recreational boats, including grants for such purposes and authorized under the Boating Infrastructure Grant Program.

 

    Section 25.  The sum of $150,000, new appropriation, is appropriated from the State Boating Act Fund to the Department of Natural Resources for a grant to the Chain O’Lakes – Fox River Waterway Management Agency for the Agency’s operational expenses.

 

    Section 30.  The following named sums, new appropriations, or so much thereof as may be necessary, respectively, for the objects and purposes hereinafter named, are appropriated to the Department of Natural Resources:

Payable from State Boating Act Fund:

  For multiple use facilities and programs

   for boating purposes provided by the

   Department of Natural Resources,

   including construction and development,

   all costs for supplies, materials,

   labor, land acquisition, services, studies

   and all other expenses required to comply

   with the intent of this appropriation......... 1,500,000

Payable from State Parks Fund:

  For multiple use facilities and programs

   for park and trail purposes provided by

   the Department of Natural Resources, including

   construction and development, all costs

   for supplies, materials, labor, land

   acquisition, services, studies, and

   all other expenses required to comply with

   the intent of this appropriation................ 150,000

 

    Section 35.  The sum of $100,000, or so much thereof as may be necessary, is appropriated from the Wildlife and Fish Fund to the Department of Natural Resources for acquisition and development, including grants, for the implementation of the North American Waterfowl Management Plan within the Dominion of Canada or the United States which specifically provides waterfowl for the Mississippi Flyway.

 

    Section 40.  To the extent federal funds including reimbursements are available for such purposes, the sum of $100,000, or so much thereof as may be necessary, is appropriated from the Wildlife and Fish Fund to the Department of Natural Resources for construction and renovation of waste reception facilities for recreational boaters, including grants for such purposes authorized under the Clean Vessel Act.

 

    Section 50.  The following named sums, or so much thereof as may be necessary, respectively, herein made either independently or in cooperation with the Federal Government or any agency thereof, any municipal corporation, or political subdivision of the State, or with any public or private corporation, organization, or individual, are appropriated to the Department of Natural Resources for refunds and the purposes stated:

Payable from Forest Reserve Fund:

  For U.S. Forest Service Program.................. 500,000

 

    Section 55.  The sum of $110,000, or so much thereof as may be necessary, is appropriated from the Plugging and Restoration Fund to the Department of Natural Resources, Office of Mines and Minerals for the Landowner Grant Program authorized under the Oil and Gas Act, as amended by Public Act 90-0260.

 

    Section 60.  The sum of $1,500,000, or so much thereof as may be necessary, is appropriated to the Department of Natural Resources from the Abandoned Mined Lands Reclamation Set Aside Fund for grants and contracts to conduct research, planning and construction to eliminate hazards created by abandoned mines and any other expenses necessary for emergency response.

 

    Section 65.  The sum of $110,000, or so much thereof as may be necessary, is appropriated to the Department of Natural Resources from the State Furbearer Fund for the conservation of fur bearing mammals in accordance with the provisions of Section 5/1.32 of the "Wildlife Code", as now or hereafter amended.

 

    Section 70.  The following named sums, new appropriations, or so much thereof as may be necessary, respectively, for the objects and purposes hereinafter named, are appropriated to the Department of Natural Resources:

Payable from Natural Areas Acquisition Fund:

  For the acquisition, preservation and

   stewardship of natural areas, including habitats

   for endangered and threatened species, high

   quality natural communities, wetlands

   and other areas with unique or unusual

   natural heritage qualities.................... 2,000,000

 

    Section 75.  The sum of $14,000,000, or so much thereof as may be necessary, is appropriated from the Open Space Lands Acquisition and Development Fund to the Department of Natural Resources for expenses connected with and to make grants to local governments and to distressed communities as provided in the "Open Space Lands Acquisition and Development Act".

 

    Section 80.  The sum of $550,000, or so much thereof as may be necessary, is appropriated from the State Pheasant Fund to the Department of Natural Resources for the conservation of pheasants in accordance with the provisions of Section 5/1.31 of the "Wildlife Code", as now or hereafter amended.

 

FOR ILLINOIS HABITAT FUND PROGRAM

    Section 85.  The sum of $1,350,000, or so much thereof as may be necessary, is appropriated from the Illinois Habitat Fund to the Department of Natural Resources for the preservation and maintenance of high quality habitat lands in accordance with the provisions of the "Habitat Endowment Act", as now or hereafter amended.

 

    Section 90.  The sum of $250,000, or so much thereof as may be necessary, is appropriated from the Illinois Habitat Fund to the Department of Natural Resources for the preservation and maintenance of a high quality fish and wildlife habitat and to promote the heritage of outdoor sports in Illinois from revenue derived from the sale of Sportsmen Series license plates.

 

    Section 95.  The sum of $900,000, or so much thereof as may be necessary, is appropriated to the Department of Natural Resources for expenditure by the Office of Water Resources from the Flood Control Land Lease Fund for disbursement of monies received pursuant to Act of Congress dated September 3, 1954 (68 Statutes 1266, same as appears in Section 701c-3, Title 33, United States Code Annotated), provided such disbursement shall be in compliance with 15 ILCS 515/1 Illinois Compiled Statutes.

 

    Section 100.  The following named sums, or so much thereof as may be necessary, respectively, herein made either independently or in cooperation with the Federal Government or any agency thereof, any municipal corporation, or political subdivision of the State, or with any public or private corporation, organization, or individual, are appropriated to the Department of Natural Resources for refunds and the purposes stated:

Payable from Land and Water Recreation Fund:

  For Outdoor Recreation Programs ............... 2,500,000

 

    Section 105.  The sum of $400,000, or so much thereof as may be necessary, is appropriated from the Off-Highway Vehicle Trails Fund to the Department of Natural Resources for grants to units of local governments, not-for-profit organizations, and other groups to operate, maintain and acquire land for off-highway vehicle trails and parks as provided for in the Recreational Trails of Illinois Act, including administration, enforcement, planning and implementation of this Act.

 

    Section 110.  The following named sums, or so much thereof as may be necessary, respectively, herein made either independently or in cooperation with the Federal Government or any agency thereof, any municipal corporation, or political subdivision of the State, or with any public or private corporation, organization, or individual, are appropriated to the Department of Natural Resources for refunds and the purposes stated:

Payable from Federal Title IV Fire

 Protection Assistance Fund:

  For Rural Community Fire Protection Programs..... 325,000

 

    Section 115.  The sum of $100,000, or so much thereof as may be necessary, is appropriated from the Snowmobile Trail Establishment Fund to the Department of Natural Resources for

the administration and payment of grants to nonprofit snowmobile clubs and organizations for construction, maintenance, and rehabilitation of snowmobile trails and areas for the use of snowmobiles.

 

    Section 120.  The sum of $625,000, or so much thereof as may be necessary, is appropriated from the Illinois Forestry Development Fund to the Department of Natural Resources for the payment of grants to timber growers for implementation of

acceptable forestry management practices as provided in the "Illinois Forestry Development Act" as now or hereafter amended.

 

    Section 125.  To the extent Federal Funds including reimbursements are made available for such purposes, the sum of $300,000, is appropriated from the Illinois Forestry Development Fund to the Department of Natural Resources for Forest Stewardship Technical Assistance.

 

    Section 130.  The sum of $160,000, or so much thereof as may be necessary, is appropriated from the State Migratory Waterfowl Stamp Fund to the Department of Natural Resources for the payment of grants for the implementation of the North American Waterfowl Management Plan within the Dominion of Canada or the United States which specifically provides waterfowl to the Mississippi Flyway as provided in the "Wildlife Code", as amended.

 

    Section 135.  The sum of $160,000, or so much thereof as may be necessary, is appropriated from the State Migratory Waterfowl Stamp Fund to the Department of Natural Resources for the payment of grants for the development of waterfowl propagation areas within the Dominion of Canada or the United States which specifically provide waterfowl for the Mississippi Flyway as provided in the "Wildlife Code", as amended.

 

    Section 140.  The sum of $750,000, or so much thereof as may be necessary, is appropriated from the State Migratory Waterfowl Stamp Fund to the Department of Natural Resources for the purpose of attracting waterfowl and improving public migratory waterfowl areas within the State.

 

    Section 145.  The sum of $1,000,000, or so much thereof as may be necessary, is appropriated from the Park and Conservation Fund to the Department of Natural Resources for grants to units of local government for the acquisition and development of bike paths.

 

    Section 150.  The sum of $750,000, or so much thereof as may be necessary, is appropriated from the Park and Conservation Fund to the Department of Natural Resources for land acquisition, development and maintenance of bike paths and all other related expenses connected with the acquisition, development and maintenance of bike paths.

 

    Section 155.  The sum of $2,000,000, or so much thereof as may be necessary, is appropriated from the Park and Conservation Fund to the Department of Natural Resources for the development and maintenance, and other related expenses of recreational trails and trail-related projects authorized under the Intermodal Surface Transportation Efficiency Act of 1991, provided such amount shall not exceed funds to be made available for such purposes from State or federal sources.

 

    Section 160. The following named sum, new appropriation, or so much thereof as may be necessary, for the object and purpose hereinafter named, is appropriated to the Department of Natural Resources:

Payable from the Park and Conservation Fund:

  For multiple use facilities and programs

   for park and trail purposes provided by

   the Department of Natural Resources, including

   construction and development, all costs

   for supplies, materials, labor, land

   acquisition, services, studies, and

   all other expenses required to comply with

   the intent of this appropriation ............. 1,000,000

 

    Section 165. The following named sums, new appropriations, or so much thereof as may be necessary, respectively, for the objects and purposes hereinafter named, are appropriated to the Department of Natural Resources:

Payable from the Adeline Jay Geo-Karis

 Illinois Beach Marina Fund:

  For rehabilitation, reconstruction, repair,

   replacing, fixed assets, and improvement

   of facilities at North Point Marina at

   Winthrop Harbor................................. 375,000

 

    Section 170.  The sum of $6,000,000, or so much thereof as may be necessary, is appropriated to the Department of Natural Resources from the Abandoned Mined Lands Reclamation Council Federal Trust Fund for grants and contracts to conduct research, planning and construction to eliminate hazards created by abandoned mines, and any other expenses necessary for emergency response.

 

    Total, this Article                         $40,635,000

 

ARTICLE 12

 

DEPARTMENT OF NATURAL RESOURCES

    Section 1.  The sum of $44,890,705, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 6, Section 1 of Public Act 97-0076 as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for the non-federal cost share of a Conservation Reserve Enhancement Program to establish long-term contracts and permanent conservation easements in Illinois; to fund cost-share assistance to landowners to encourage approved conservation practices in environmentally sensitive and highly erodible areas of Illinois; and to fund the monitoring of long-term improvements of these conservation practices as required in the Memorandum of Agreement between the State of Illinois and the United States Department of Agriculture.

 

    Section 5.  The sum of $40,145,293, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from an appropriation heretofore made in Article 6, Section 5 of Public Act 97-0076 as amended is reappropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources for water development projects at the approximate cost set forth below:

 

  Ashland – Cass County – For

   construction of a flood

   control project to relieve flooding............. 780,000

  County Stormwater Improvements –

   For funding to assist County

   Stormwater Programs with

   implementation of flood relief

   projects........................................ 900,000

  Crystal Creek – Cook County –

   To design and construct multi-phase

   Crystal Creek Flood Control Projects

   in Schiller Park and Franklin Park............ 3,409,280

  Des Plaines River Phase 1 Big

   Bend Lake - Cook County –

   For non-federal cost sharing

   requirements of the Upper

   Des Plaines Flood Control Project,

   Phase 1....................................... 9,501,656

  East St. Louis Ecosystem and

   IFC - Madison & St. Clair

   Counties - For the non-federal

   funding to design and construct

   this multipurpose ecosystem project........... 1,200,000

  Flood Hazard Mitigation –

   Statewide - For cost sharing

   to acquire repetitive and

   severely damaged flood prone

   structures.................................... 9,500,000

  Granite City Groundwater Pumping –

   To implement the pilot project

   to reduce flood damages associated

   with high groundwater........................... 600,000

  Hickory/Spring Creek – Will County –

   For implementation of Stage IIIb-2

   of channel construction of

   Hickory/Spring Creeks flood

   control project in cooperation

   with the City of Joliet....................... 4,765,800

  Hickory/Spring Creek – Will County –

   For implementation of Stage IV-A

   of channel construction of

   Hickory/Spring Creeks flood

   control project in  cooperation

   with the City of Joliet....................... 7,275,857

  Mattoon - Coles County – For

   implementation of local

   improvements to reduce

   flood damages................................. 1,000,000

  Village of Union - McHenry County -

   For the implementation of flood

   damage relief measures........................ 1,125,000

  Small Drainage and Flood

   Control Projects - to fund

   flood damage reduction projects

   in partnership with local

   units of government............................. 670,000

    Total                                       $40,727,593

 

    Section 10.  The sum of $40,314,573, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 6, Section 10 of Public Act 97-0076 as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources for improvements needed at State-owned Dams for upgrading and rehabilitation of dams, spillways and supporting facilities, including dam removals and the required geotechnical investigations, preparation of plans and specifications, and the construction of the proposed rehabilitation to ensure reduced risk of injury to the public.

 

    Section 15.  The sum of $12,790,910, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 6, Section 15 of Public Act 97-0076 as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for planning, design and construction of ecosystem rehabilitation, habitat restoration and associated development in cooperation with the U.S. Army Corps of Engineers.

 

    Section 20.  The sum of $150,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 6, Section 20 of Public Act 97-0076 as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Natural Resources for capital grants to parks or recreational units for permanent improvements.

 

    Section 25.  The sum of $49,225,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 6, Section 25 of Public Act 97-0076 as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for capital grants to public museums for permanent improvements.

 

    Section 30.  The sum of $1,750,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 6, Section 30 of Public Act 97-0076 as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Natural Resources for capital grants to the Museum of Broadcast Communications for permanent improvements.

 

    Section 35.  The sum of $2,500,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 6, Section 35 of Public Act 97-0076 as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Natural Resources for capital grants to Peoria County for costs associated with construction and development of the Peoria Riverfront Museum.

 

    Section 40.  The amount of $7,619,030, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 6, Section 40 of Public Act 97-0076 as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Natural Resources for the Mud to Parks dredging Illinois rivers and sediment reuse.

 

    Section 45.  The sum of $9,720,232, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 6, Section 45 of Public Act 97-0076 as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources for improvements needed at State-owned Dams for upgrading and rehabilitation of dams, spillways and supporting facilities, including dam removals and the required geotechnical investigations, preparation of plans and specifications, and the construction of the proposed rehabilitation to ensure reduced risk of injury to the public, and for needed repairs and improvements on and to waterways and infrastructure.

 

    Section 50.  The sum of $2,877,026, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 6, Section 50 of Public Act 97-0076, as amended, is reappropriated from the State Boating Act Fund to the Department of Natural Resources for the administration and payment of grants to local governmental units for the construction, maintenance, and improvement of boat access areas.

 

    Section 51.  The sum of $725,000, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2012, from an appropriation heretofore made in Article 5, Section 10 of Public Act 97-0076, is reappropriated from the State Boating Act Fund to the Department of Natural Resources for the administration and payment of grants to local governmental units for the construction, maintenance, and improvement of boat access areas.

 

    Section 55.  The sum of $329,223, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2012, from appropriations heretofore made in Article 5, Section 15 of Public Act 97-0076 and Article 6, Section 55 of Public Act 97-0076, as amended, is reappropriated from the State Boating Act Fund to the Department of Natural Resources for the purposes of the Snowmobile Registration and Safety Act and for the administration and payment of grants to local governmental units for the construction, land acquisition, lease, maintenance and improvement of snowmobile trails and access areas.

 

    Section 60.  To the extent federal funds including reimbursements are available for such purposes, the sum of $5,913,900, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from appropriations heretofore made in Article 5, Section 20 of Public Act 97-0076, and Article 6, Section 60 of Public Act 97-0076, as amended, are reappropriated from the State Boating Act Fund to the Department of Natural Resources for all costs for construction and development of facilities for transient, non-trailerable recreational boats, including grants for such purposes and authorized under the Boating Infrastructure Grant Program.

 

    Section 65.  The following named sum, or so much thereof as may be necessary, respectively, and as remains unexpended at the close of business on June 30, 2012, from appropriations heretofore made for such purpose, are reappropriated to the Department of Natural Resources for the objects and purposes set forth below:

Payable from State Boating Act Fund:

 

  (From Article 5, Section 30 of P.A.

   97-0076 and Article 6, Section 65 of

   P.A. 97-0076, as amended)

  For multiple use facilities and programs

   for boating purposes provided by the

   Department of Natural Resources including

   construction and development, all costs

   for supplies, materials, labor, land

   acquisition, services, studies and all

   other expenses required to comply with

   the intent of this appropriation.............. 5,070,666

 

    Section 70.  The following named sums, or so much thereof as may be necessary, respectively, and as remain unexpended at the close of business on June 30, 2012, from appropriations heretofore made for such purposes, are reappropriated to the Department of Natural Resources for the objects and purposes set forth below:

Payable from the State Parks Fund:

 

  (From Article 5, Section 30 of

   P.A. 97-0076 and Article 6,

   Section 70 of P.A. 97-0076, as amended)

  For multiple use facilities and programs

   for park and trail purposes provided

   by the Department of Natural Resources, including

   construction and development, all costs

   for supplies, materials, labor, land

   acquisition, services, studies, and

   all other expenses required to comply with

   the intent of this appropriation.............. 1,077,669

 

  (From Article 6, Section 70 of

   P.A. 97-0076, as amended)

  For multiple use facilities and

   purposes provided by the

   Department of Natural Resources, including

   construction and development, all costs

   for supplies, materials, labor, land

   acquisition, services, studies, and

   all other expenses required to comply with

   the intent of this appropriation................ 244,857

 

    Section 75.  The sum of $2,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from an appropriation heretofore made in Article 5, Section 210 of Public Act 97-0076, as amended, is reappropriated from the State Parks Fund to the Department of Natural Resources, in coordination with the Capital Development Board, for the development of the World Shooting and Recreation Complex including all construction and debt service expenses required to comply with this appropriation.  Provided further, to the extent that revenues are received for such purposes, said revenues must come from non-State sources.

 

    Section 76.  The sum of $373,637, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 6, Section 75 of Public Act 97-0076, as amended, is reappropriated from the State Parks Fund to the Department of Natural Resources, in coordination with the Capital Development Board, for the development of the World Shooting and Recreation Complex including all construction and debt service expenses required to comply with this appropriation.  Provided further, to the extent that revenues are received for such purposes, said revenues must come from non-State sources.

 

    Section 80.  The sum of $750,308, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 6, Section 80 of Public Act 97-0076, as amended, is reappropriated from the Wildlife and Fish Fund to the Department of Natural Resources for wildlife conservation and restoration plans and programs from federal and/or state funds provided for such purposes.

 

    Section 85.  To the extent federal funds including reimbursements are available for such purposes, the sum of $895,183, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2012, from appropriations heretofore made Article 5, Section 40 of Public Act 97-0076 and in Article 6, Section 85 of Public Act 97-0076, as amended, is reappropriated from the Wildlife and Fish Fund to the Department of Natural Resources for construction and renovation of waste reception facilities for recreational boaters, including grants for such purposes authorized under the Clean Vessel Act.

 

    Section 90.  The sum of $286,785, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 6, Section 90 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Department of Natural Resources for planning, design and construction of ecosystem rehabilitation, habitat restoration and associated development in cooperation with the U.S. Army Corps of Engineers.

 

    Section 95.  The sum of $1,778,854, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 6, Section 95 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Department of Natural Resources for planning, design and construction of ecosystem rehabilitation, habitat restoration and associated development in cooperation with the U.S. Army Corps of Engineers.

 

    Section 100.  The sum of $364,343, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 6, Section 100 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Department of Natural Resources to acquire, protect and preserve open space and natural lands.

 

    Section 105.  The sum of $987,516, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 6, Section 105 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Department of Natural Resources for the non-federal cost share of a Conservation Reserve Enhancement Program to establish long-term contracts and permanent conservation easements in Illinois; to fund cost-share assistance to landowners to encourage approved conservation practices in environmentally sensitive and highly erodible areas of Illinois; and to fund the monitoring of long term improvements of these conservation practices as required in the Memorandum of Agreement between the State of Illinois and the United States Department of Agriculture.

 

    Section 110.  The sum of $503,341, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 6, Section 110 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources for the acquisition of lands, buildings, and structures, including easements and other property interests, located in the 100-year floodplain in counties or portions of counties authorized to prepare stormwater management plans and for removing such buildings and structures and preparing the site for open space use.

 

    Section 115.  The sum of $8,079,294, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 6, Section 115 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources for water development projects at the approximate cost set forth below:

Union - McHenry County - for flood control

 and drainage improvement of unnamed

 Kishwaukee River tributary........................ 200,000

Flood Hazard Mitigation - For implementation

 of flood hazard mitigation plans, and

 acquisition of wetland and tree mitigation

 sites for state and local joint

 flood control projects in

 cooperation with federal agencies, state

 agencies, and units of local government,

 in various counties............................. 3,250,000

Fox Chain of Lakes - Lake and McHenry

 Counties - For the state cost share in

 implementation of the comprehensive

 Dredging and Disposal Plan, including

 beneficial use of dredge material and

 island creation, for the Fox River and

 Chain of Lakes.................................... 229,294

Fox River Dams - Kane County - For

 rehabilitation, modification, and

 reconstruction of Batavia

 and Yorkville Dams.............................. 2,600,000

East St. Louis & Vicinity Flood Control -

 Madison and St. Clair Counties - For

 partial payment of the non-federal cost

 requirement of an interior flood protection

 project and ecosystem restoration at East

 St. Louis and Vicinity area..................... 1,800,000

    Total                                        $8,079,294

 

FOR WATERWAY IMPROVEMENTS

    Section 120.  The sum of $9,227,185, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 6, Section 120 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources for the following projects at the approximate costs set forth below:

Addison Creek Watershed - Cook

 and DuPage Counties............................... 214,700

Crisenberry Dam - Jackson County:

 For complete rehabilitation of the

 dam and spillway, including the

 required geotechnical investigation,

 the preparation of plans and

 specifications, and the construction

 of the proposed rehabilitation..................... 20,000

East St. Louis and Vicinity Flood Control -

 Madison and St. Clair Counties - For

 partial payment of the non-federal cost

 requirements of an interior flood protection

 project and ecosystem restoration at

 East St. Louis and Vicinity area.................. 350,422

Flood Mitigation - Disaster

 Declaration Areas............................... 5,914,098

Fox Chain O'Lakes - Lake and McHenry

 Counties  ...................................... 1,252,450

Fox River Dams - Kane, Kendall

 and McHenry Counties.............................. 935,206

Granite City - Area Groundwater-

 Madison County..................................... 10,000

Prairie/Farmers Creek - Cook County................ 343,384

Village of Lemont – Flood Control Reservoir........ 100,000

Village of Bluffs – Flood Control Channel.......... 100,000

Union - McHenry County.............................. 30,000

    Total                                        $9,270,260

 

    Section 135.  The sum of $213,062, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2012, from appropriations heretofore made Article 5, Section 65 of Public Act 97-0076, and Article 6, Section 135 of Public Act 97-0076, as amended, is reappropriated to the Department of Natural Resources from the State Furbearer Fund for the conservation of fur bearing mammals in accordance with the provisions of Section 5/1.32 of the "Wildlife Code", as now or hereafter amended.

 

    Section 145.  The following named sum, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2012, from appropriations heretofore made for such purposes, is reappropriated to the Department of Natural Resources for the objects and purposes set forth below:

Payable from Natural Areas Acquisition Fund:

  (From Article 5, Section 70 of P.A. 97-0076

   and Article 6, Section 140 of P.A. 97-0076,

   as amended)

  For the acquisition, preservation and

   stewardship of natural areas,

   including habitats for endangered and

   threatened species, high quality natural

   communities, wetlands and other areas

   with unique or unusual natural

   heritage qualities............................ 9,880,890

 

    Section 150.  The sum of $83,926,241, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2012, from appropriations heretofore made Article 5, Section 75 of Public Act 97-0076 and Article 6, Section 145 of Public Act 97-0076, as amended, is reappropriated from the Open Space Lands Acquisition and Development Fund to the Department of Natural Resources for expenses connected with and to make grants to local governments as provided in the "Open Space Lands Acquisition and Development Act".

 

FOR STATE PHEASANT PROGRAM

    Section 160.  The sum of $1,643,442, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2012, from appropriations heretofore made in Article 5, Section 80 of Public Act 97-0076 and Article 6, Section 150 of Public Act 97-0076, as amended, is reappropriated from the State Pheasant Fund to the Department of Natural Resources for the conservation of pheasants in accordance with the provisions of Section 5/1.31 of the "Wildlife Code", as now or hereafter amended.

 

    Section 170.  The sum of $4,367,757, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2012, from appropriations heretofore made in Article 5, Section 85 of Public Act 97-0076 and Article 6, Section 155 of Public Act 97-0076, as amended, is reappropriated from the Illinois Habitat Fund to the Department of Natural Resources for the preservation and maintenance of high quality habitat lands in accordance with the provisions of the "Habitat Endowment Act", as now or hereafter amended.

 

    Section 180.  The sum of $1,738,744, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2012, from appropriations heretofore made in Article 5, Section 90 of Public Act 97-0076 and Article 6, Section 160 of Public Act 97-0076, as amended, is reappropriated from the Illinois Habitat Fund to the Department of Natural Resources for the preservation and maintenance of a high quality fish and wildlife habitat and to promote the heritage of outdoor sports in Illinois from revenue derived from the sale of Sportsmen Series license plates.

 

    Section 190.  The following named sum, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2012, from appropriations heretofore made in Article 5, Section 100 of Public Act 97-0076 and Article 6, Section 165 of Public Act 97-0076, as amended, made either independently or in cooperation with the Federal Government or any agency thereof, any municipal corporation, or political subdivision of the State, or with any public or private corporation, organization, or individual, is reappropriated to the Department of Natural Resources for refunds and the purposes stated:

Payable from Land and Water Recreation Fund:

  For Outdoor Recreation Programs.............. $11,149,481

 

    Section 195.  The sum of $2,453,953, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2012, from appropriations heretofore made in Article 5, Section 105 of Public Act 97-0076 and Article 6, Section 170 of Public Act 97-0076, as amended, is reappropriated from the Off Highway Vehicle Trails Fund to the Department of Natural Resources for grants to units of local governments, not-for-profit organizations, and other groups to operate, maintain and acquire land for off-highway vehicle trails and parks as provided for in the Recreational Trails of Illinois Act, including administration, enforcement, planning and implementation of this Act.

 

    Section 205.  The sum of $1,432,515, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 6, Section 175 of Public Act 97-0076, as amended, is reappropriated from the Partners for Conservation Projects Fund to the Department of Natural Resources for the acquisition, planning and development of land and long-term easements, and cost-shared natural resource management practices for ecosystem-based management of Illinois' natural resources, including grants for such purposes.

 

    Section 210.  The sum of $1,709,943, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 6, Section 180 of Public Act 97-0076, as amended, is reappropriated from the Partners for Conservation Projects Fund to the Department of Natural Resources for the acquisition, planning and development of land and long-term easements, and cost-shared natural resource management practices for ecosystem-based management of Illinois' natural resources, including grants for such purposes.

 

    Section 215.  The following named sum, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2012, from appropriations heretofore made in Article 5, Section 110 of Public Act 97-0076 and Article 6, Section 185 of Public Act 97-0076, as amended, made either independently or in cooperation with the Federal Government or any agency thereof, any municipal corporation, or political subdivision of the State, or with any public or private corporation, organization, or individual, is reappropriated to the Department of Natural Resources for refunds and the purposes stated:

Payable from Federal Title IV Fire

 Protection Assistance Fund:

  For Rural Community Fire

   Protection Program............................. $894,166

 

    Section 225.  The sum of $209,576, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2012, from appropriations heretofore made in Article 5, Section 115 of Public Act 97-0076 and Article 6, Section 190 of Public Act 97-0076, as amended, is reappropriated from the Snowmobile Trail Establishment Fund to the Department of Natural Resources for the administration and payment of grants to nonprofit snowmobile clubs and organizations for construction, maintenance, and rehabilitation of snowmobile trails and areas for the use of snowmobiles.

 

    Section 235.  The sum of $3,491,972, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2012, from appropriations heretofore made in Article 5, Section 120 of Public Act 97-0076 and Article 6, Section 195 of Public Act 97-0076, as amended, is reappropriated from the Illinois Forestry Development Fund to the Department of Natural Resources for the payment of grants to timber growers for implementation of acceptable forestry management practices as provided in the "Illinois Forestry Development Act" as now or hereafter amended.

 

    Section 245.  To the extent Federal Funds including reimbursements are made available for such purposes, the sum of $509,168, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2012, from appropriations heretofore made in Article 5, Section 125 of Public Act 97-0076 and Article 6, Section 200 of Public Act 97-0076, as amended, is reappropriated from the Illinois Forestry Development Fund to the Department of Natural Resources for Forest Stewardship Technical Assistance.

 

    Section 260.  The sum of $2,596,068, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2012, from appropriations heretofore made in Article 5, Section 140 of Public Act 97-0076 and Article 6, Section 205 of Public Act 97-0076, as amended, is reappropriated from the State Migratory Waterfowl Stamp Fund to the Department of Natural Resources for the purpose of attracting waterfowl and improving public migratory waterfowl areas within the State.

 

FOR BIKEWAYS PROGRAMS

    Section 280.  The sum of $9,795,344, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2012, from appropriations heretofore made in Article 5, Section 145 of Public Act 97-0076 and Article 6, Section 210 of Public Act 97-0076, as amended, is reappropriated from the Park and Conservation Fund to the Department of Natural Resources for grants to units of local government for the acquisition and development of bike paths.

 

    Section 285.  The following named sum, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from an appropriation heretofore made for such purpose in Article 5, Section 160 of Public Act 97-0076 and Article 6, Section 215 of Public Act 97-0076, as amended, is reappropriated to the Department of Natural Resources:

Payable from the Park and Conservation Fund:

  For multiple use facilities and programs

   for park and trail purposes provided by

   the Department of Natural Resources, including

   construction and development, all costs

   for supplies, materials, labor, land

   acquisition, services, studies, and

   all other expenses required to comply with

   the intent of this appropriation.............. 4,236,178

 

    Section 300.  The sum of $686,826, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 6, Section 220 of Public Act 97-0076, as amended, is reappropriated from the Park and Conservation Fund to the Department of Natural Resources for multiple use facilities and programs for conservation purposes provided by the Department of Natural Resources, including repairing, maintaining, reconstructing, rehabilitating, replacing fixed assets, construction and development, marketing and promotions, all costs for supplies, materials, labor, land acquisition and its related costs, services, studies, and all other expenses required to comply with the intent of this appropriation.

 

    Section 305.  The sum of $4,969,849, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2012, from appropriations heretofore made in Article 5, Section 150 of Public Act 97-0076 and Article 6, Section 225 of Public Act 97-0076, as amended, is reappropriated from the Park and Conservation Fund to the Department of Natural Resources for land acquisition, development and maintenance of bike paths and all other related expenses connected with the acquisition, development and maintenance of bike paths.

 

    Section 310.  The sum of $1,167,418 , or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 6, Section 230 of Public Act 97-0076, as amended, is reappropriated to the Department of Natural Resources from the Park and Conservation Fund for multiple use facilities and programs for conservation purposes provided by the Department of Natural Resources, including repairing, maintaining, reconstructing, rehabilitating, replacing fixed assets, construction and development, marketing and promotions, all costs for supplies, materials, labor, land acquisition and its related costs, services, studies, and all other expenses required to comply with the intent of this appropriation.

 

    Section 320.  The sum of $9,150,079, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2012, from appropriations heretofore made in Article 5, Section 155 of Public Act 97-0076 and Article 6, Section 235 of Public Act 97-0076, as amended, is reappropriated from the Park and Conservation Fund to the Department of Natural Resources for the development and maintenance of recreational trails and trail-related projects authorized under the Intermodal Surface Transportation Efficiency Act of 1991, provided such amount shall not exceed funds to be made available for such purposes from state or federal sources.

 

    Section 385.  The following named sum, or so much thereof as may be necessary, respectively, and as remains unexpended at the close of business on June 30, 2012, from appropriations heretofore made for such purposes, are reappropriated to the Department of Natural Resources for the objects and purposes set forth below:

Payable from the Adeline Jay Geo-Karis Illinois Beach Marina Fund:

  (From Article 5, Section 165 of P.A.

   97-0076 and Article 6, Section 240

   of P.A. 97-0076, as amended,)

  For rehabilitation, reconstruction,

   repair, replacing, fixed assets,

   and improvement of facilities at

   North Point Marina at Winthrop

   Harbor........................................ 2,206,908

 

    Section 395.  The sum of $17,817,175, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2012, from appropriations heretofore made in Article 5, Section 170 of Public Act 97-0076 and Article 6, Section 245 of Public Act 97-0076, as amended, is reappropriated to the Department of Natural Resources from the Abandoned Mined Lands Reclamation Council Federal Trust Fund for grants and contracts to conduct research, planning and construction to eliminate hazards created by abandoned mines, and any other expenses necessary for emergency response.

 

    Section 410.  The sum of $203,973, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 6, Section 250 of Public Act 97-0076, as amended, is reappropriated from the Wildlife and Fish Fund to the Department of Natural Resources for the acquisition, engineering and rehabilitation of dedicated hunting and fishing lands in conjunction with the Illinois Hunting Heritage Protection Act; however, no more than $1,500,000 of the total appropriation may be used for engineering and rehabilitation.

 

    Section 415.  The sum of $20,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 6, Section 255 of Public Act 97-0076, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for water resource management projects as authorized by subsection (g) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 420.  The sum of $4,430,156, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 6, Section 260 of Public Act 97-0076, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for grants to local governments for the acquisition, financing, architectural planning, development, alteration, installation, and construction of capital facilities consisting of buildings, structures, durable equipment, and land as authorized by subsection (l) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 425.  The sum of $25,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 6, Section 265 of Public Act 97-0076, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for the Illinois Open Land Trust Program as defined by the Illinois Open Land Trust Act as authorized by subsection (m) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 430.  The sum of $25,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on July 13, 2012, from a reappropriation heretofore made in Article 6, Section 270 of Public Act 97-0076, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for the Open Land Trust Program.

 

    Section 435.  The sum of $4,919,843, or so much thereof as may be necessary and remains unexpended at the close of business on July 13, 2010, from an appropriation heretofore made in Article 6, Section 275 of Public Act 97-0076, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for upgrades to lodges, camps and campsites, including but not limited to previously incurred costs.

 

    Section 440.  No contract shall be entered into or obligation incurred or any expenditure made from a reappropriation herein made in Sections:

1 through 45, 75, 80, 90 through 120, 205, 210, and 410 through 435

of this Article until after the purpose and amount of such expenditure has been approved in writing by the Governor.

 

    Total, this Article....................... $656,241,257

 

ARTICLE 13

 

DEPARTMENT OF MILITARY AFFAIRS

    Section 5.  The amount of $500,000, or so much thereof as may be necessary, is appropriated from the Illinois National Guard Armory Construction Fund to the Department of Military Affairs for all costs associated with the construction of Illinois Air National Guard facilities.

 

    Total, this Article                            $500,000

 

ARTICLE 14

 

DEPARTMENT OF MILITARY AFFAIRS

    Section 5.  The sum of $91,600, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 7, Section 5 of Public Act 97-0076, is reappropriated from the Illinois National Guard Armory Construction Fund to the Department of Military Affairs for land acquisition and construction of parking facilities at armories.

 

    Total, this Article                             $91,600

 

ARTICLE 15

 

DEPARTMENT OF PUBLIC HEALTH

    Section 5.  The sum of $139,500,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 8, Section 5 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Public Health for grants associated with the Hospital Capital Investment Program.

 

    Section 10.  The sum of $4,694,461, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 8, Section 10 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Illinois Department of Public Health for the CLEAR-WIN Grant Program to correct lead based paint hazards in residential buildings.

 

    Section 15.  No contract shall be entered into or obligation incurred or any expenditures made from appropriations in this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, this Article                        $144,194,461

 

ARTICLE 16

 

DEPARTMENT OF REVENUE

    Section 5.  The sum of $95,100,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 9, Section 5 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Revenue for the Illinois Housing Development Authority for affordable housing grants, loans, and investments for low-income families, low-income senior citizens, low-income persons with disabilities and at risk displaced veterans.

 

    Section 10.  The sum of $23,603,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from an appropriation heretofore made for such purpose in Article 9, Section 10 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Revenue for the Illinois Housing Development Authority affordable housing grants, loans, and investments to provide access to affordable and supportive housing for at risk displaced veterans and low-income persons with disabilities.

 

    Section 15.  No contract shall be entered into or obligation incurred or any expenditures made from appropriations in this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, this Article                        $118,703,000

 

ARTICLE 17

 

ILLINOIS STATE POLICE

    Section 5.  The sum of $9,000,000, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Illinois State Police for Law Enforcement Agency Data System (LEADS) upgrade.

 

    Section 10.  The sum of $12,900,000, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Illinois State Police for Statewide Communications Consolidation.

 

    Section 15.  The sum of $5,000,000, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Illinois State Police for the Firearm Owner’s Identification (FOID) System upgrade.

 

    Section 20.  No contract shall be entered into or obligation incurred or any expenditures made from appropriations in this Article until after the purposes and amounts have been approved in writing by the Governor.

 

Total, this Article                             $26,900,000

 

ARTICLE 18

DEPARTMENT OF TRANSPORTATION

 

PERMANENT IMPROVEMENTS

    Section 5.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Department of Transportation for the projects hereinafter enumerated:

 

HANLEY BUILDING

For the Radiant Heat and Geothermal Project..... 17,500,000

For HVAC and Water Infiltration Projects at the

  Hanley Building, including prior incurred costs 1,000,000

DISTRICT 3

For a Super Salt Dome............................ 3,000,000

For HVAC upgrades, including prior incurred costs 1,500,000

DISTRICT 6

For Upgrades to the Materials Lab................ 1,300,000

DISTRICT 7

For Parking Garage Tuckpointing and

  Roof Replacement............................... 1,000,000

STATEWIDE

For Lighting Upgrades............................ 4,000,000

For Roofing Repairs.............................. 1,000,000

For Salt Storage................................. 3,000,000

For Cold Storage................................. 3,000,000

For HVAC Repairs and Upgrades.................... 3,000,000

For Ready Room Renovations....................... 3,000,000

For the Eisenhower Expressway Maintenance Yard... 6,000,000

For Wind Turbine Construction.................... 1,000,000

    Total                                       $49,300,000

 

    Section 10.  No contract shall be entered into or obligation incurred or any expenditure made from an appropriation herein made in this Article until after the purpose and the amount of such expenditure has been approved in writing by the Governor.

 

    Total, this Article                         $49,300,000

 

ARTICLE 19

 

DEPARTMENT OF TRANSPORTATION

PERMANENT IMPROVEMENTS

    Section 5.  The sum of $10,750,000, or so much thereof as may be necessary, is appropriated from the Road Fund to the Department of Transportation for Permanent Improvements to Illinois Department of Transportation facilities, including but not limited to the purchase of land, construction, repair, alterations and improvements to maintenance and traffic facilities, district and central headquarters facilities, storage facilities, grounds, parking areas and facilities, fencing and underground drainage, including plans, specifications, utilities and fixed equipment installed and all costs and charges incident to the completion thereof at various locations.

 

OTHER LUMP SUMS

    Section 10.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Road Fund to the Department of Transportation for the objects and purposes hereinafter named:

  For costs associated with the identification,

   corrective action, and disposal of hazardous

   materials at storage facilities................. 750,000

  For Maintenance, Traffic and Physical

   Research Purposes (A)........................ 36,700,000

  For repair of damages by motorists to

    highway guardrails, fencing,

    lighting units, bridges, underpasses,

    signs, traffic signals, crash

    attenuators, landscaping, roadside

    shelters, rest areas, fringe parking

    facilities, sanitary facilities,

    maintenance facilities including salt

    storage buildings, vehicle weight enforcement

    facilities including scale houses, and other

    highway appurtenances, provided such

    amount shall not exceed funds to be made

    available from collections from claims filed

    by the Department to recover the costs

    of such damages.............................. 5,500,000

  For Maintenance, Traffic and Physical

   Research Purposes (B)........................ 13,150,000

    Total                                       $56,100,000

 

    Section 15. The sum of $5,000,000, or so much thereof as may be necessary, is appropriated from the Illiana Expressway Proceeds Fund to the Department of Transportation for costs of the Department associated with the Public Private Agreements for the Illiana Expressway Act (605 ILCS 130) provided the total amount obligated shall not exceed the amount deposited/transferred into this Fund during FY2013.

 

HIGHWAY CONSTRUCTION AND LAND ACQUISITION

GRANTS AND AWARDS

    Section 20.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Road Fund to the Department of Transportation for the objects and purposes hereinafter named:

  For apportionment to counties for

   construction of township bridges

   20 feet or more in length as provided

   in Section 6-901 through 6-906 of the

   "Illinois Highway Code"...................... 15,000,000

  For apportionment to needy Townships

   and Road Districts, as determined by

   the Department in consultation

   with the County Superintendents of

   Highways, Township Highway Commissioners,

   or Road District Highway Commissioners....... 10,014,300

  For apportionment to high-growth

   cities over 5,000 in population,

   as determined by the Department in

   consultation with the

   Illinois Municipal League..................... 4,000,000

  For apportionment to counties

   under 1,000,000 in population,

   $8,000,000 of the total apportioned

   in equal amounts to each eligible

   county, and $13,800,000 apportioned

   to each eligible county in proportion

   to the amount of motor vehicle license

   fees received from the residents of

   eligible counties............................ 21,800,000

    Total                                       $50,814,300

 

HIGHWAY CONSTRUCTION AND LAND ACQUISITION

CONSTRUCTION

    Section 25. The sum of $15,200,578, or so much thereof as may be necessary, is appropriated from the Road Fund to the Department of Transportation for Federal Discretionary Program Awards provided for in the “Department of Defense and Full-Year Continuing Appropriations Act, 2011” – Public Law 112-10 (H.R. 1473) provided such amounts do not exceed funds made available by the federal government through Congressional designations, annual allocations, obligation limitations, or any other federal limitations, as approximated below:

DELTA REGION TRANSPORTATION DEVELOPMENT PROGRAM

I-66 Phase I study............................... 3,600,000

FERRY BOAT DISCRETIONARY

Grafton Ferry Landing Improvements................. 119,000

INTERSTATE MAINTENANCE DISCRETIONARY

I-57 Reconstruction from Union/Pulaski

  County Line to Illinois 146.................... 3,750,000

NATIONAL HISTORIC COVERED BRIDGE PRESERVATION

Red Covered Bridge Preservation in Princeton....... 145,248

Sugar Creek Covered Bridge Rehab in Sangamon County. 52,000

Thompson Mill Covered Bridge in Cowden............... 4,000

TRANSPORTATION, COMMUNITY, AND SYSTEM PRESERVATION

Oak Forest Station Facility Redevelopment........ 1,304,400

Veterans Memorial Trail Phase II Engineering....... 652,000

Troy North Main Street Reconstruction.............. 163,050

State St. from Burnham Ave. to State

  Line Road in Calumet City........................ 260,880

RAIL HIGHWAY HAZARD CROSSING ELIMINATION IN HSR CORRIDORS

East Alton Ave./Evans Ave. Crossing Closure........ 750,000

Safety Improvements for pedestrian

  grade crossing at 78 crossings................. 2,700,000

Lake Cook Road Metra Station Pedestrian Underpass 1,700,000

 

    Section 30.  The sum of $10,438,000, or so much thereof as may be necessary, is appropriated from the Road Fund to the Department of Transportation for Transportation Investment Generating Economic Recovery III (TIGER III) Program awards as provided for in the “Department of Defense and Full-Year Continuing Appropriations Act, 2011” – Public Law 112-10 (H.R. 1473) provided such amounts do not exceed funds made available by the federal government.

 

    Section 35.  The sum of $480,000, or so much thereof as may be necessary, is appropriated from the Road Fund to the Department of Transportation for Federal Emergency Relief Program awards provided for in the FFY2012 US DOT Appropriations Bill” –Public Law 112-055, provided such amounts do not exceed funds made available by the federal government.

EMERGENCY RELIEF

US 20 from IL 35 in East Dubuque to east edge of Galena; IL 78 from the south edge of Stockton to 5 miles south of JoDaviess/Carroll Co. line

 

    Section 40.  The sum of $585,000,000, or so much thereof as may be necessary, is appropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of State highways, arterial highways, roads, access areas, roadside shelters, rest areas fringe parking facilities and sanitary facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the Road Improvement Program as approximated below:

 

 District 1, Schaumburg.................................. 0

 District 2, Dixon....................................... 0

 District 3, Ottawa...................................... 0

 District 4, Peoria...................................... 0

 District 5, Paris....................................... 0

 District 6, Springfield................................. 0

 District 7, Effingham................................... 0

 District 8, Collinsville................................ 0

 District 9, Carbondale.................................. 0

 Statewide (including refunds)........................... 0

 Engineering............................................. 0

    Total..................................... $585,000,000

 

HIGHWAY CONSTRUCTION AND LAND ACQUISITION

LUMP SUMS

    Section 45.  The sum of $299,185,700, or so much thereof as may be necessary, is appropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the local portion of the Road Improvement Program as approximated below:

 

 District 1, Schaumburg.................................. 0

 District 2, Dixon....................................... 0

 District 3, Ottawa...................................... 0

 District 4, Peoria...................................... 0

 District 5, Paris....................................... 0

 District 6, Springfield................................. 0

 District 7, Effingham................................... 0

 District 8, Collinsville................................ 0

 District 9, Carbondale.................................. 0

 Statewide (including refunds)........................... 0

    Total                                      $299,185,700

 

    Section 50.  The sum of $624,833, or so much thereof as may be necessary, is appropriated from the Road Fund to the Department of Transportation for the local match of all other non-federally reimbursed expenses associated with the Federal Discretionary Program Awards provided for in the “Department of Defense and Full-Year Continuing Appropriations Act, 2011” – Public Law 112-10 (H.R. 1473) earmarks specifically identified in Section 20 of this Article of this Act, provided such amounts do not exceed funds made available and paid in to the Road Fund by local governments.

 

GRADE CROSSING PROTECTION

CONSTRUCTION

    Section 55.  The sum of $39,000,000, or so much thereof as may be necessary, is appropriated from the Grade Crossing Protection Fund to the Department of Transportation for the installation of grade crossing protection or grade separations at places where a public highway crosses a railroad at grade, as ordered by the Illinois Commerce Commission, as provided by law.

 

DIVISION OF AERONAUTICS

AWARDS AND GRANTS

    Section 60.  The sum of $130,000,000, or so much thereof as may be necessary, is appropriated from the Federal/Local Airport Fund to the Department of Transportation for funding airport improvement projects, including reimbursements and/or refunds, undertaken pursuant to pertinent state or federal laws.

 

DIVISION OF PUBLIC AND INTERMODAL TRANSPORTATION

AWARDS AND GRANTS

    Section 80.  The sum of $38,000,000, or so much thereof as may be necessary, is appropriated from the Federal Mass Transit Trust Fund to the Department of Transportation for the federal share of capital, operating, consultant services, and technical assistance grants, as well as state administration and interagency agreements, provided such amounts shall not exceed funds to be made available from the Federal Government.

 

RAIL PASSENGER AND RAIL FREIGHT

AWARDS AND GRANTS

    Section 85.  The sum of $2,700,000, or so much thereof as may be necessary, is appropriated from the State Rail Freight Loan Repayment Fund to the Department of Transportation for funding the State Rail Freight Loan Repayment Program created by Section 49.25g-1 of the Civil Administrative Code of Illinois.

 

    Section 90.  The sum of $400,000,000, or so much thereof as may be necessary, is appropriated from the Federal High Speed Rail Trust Fund to the Department of Transportation for grants, construction, and all other costs relating to high speed rail projects, provided such amounts not exceed funds made available by the federal government for this purpose.

 

    Section 95.  The sum of $500,000, or so much thereof as may be necessary, is appropriated from the Rail Freight Loan Repayment Fund to the Department of Transportation for the Rail Freight Service Assistance Program, created by Section 49.25a through 49.25g-1 of the Civil Administrative Code of Illinois.

 

    Section 100.  No contract shall be entered into or obligation incurred or any expenditure made from an appropriation herein made in

 

Section 5   Permanent Improvements

Section 85  State Rail Freight Loan Repayment

Section 95 Federal Rail Freight Loan Repayment

 

of this Article until after the purpose and the amount of such expenditure has been approved in writing by the Governor.

 

    Total, this Article                      $1,643,793,411

 

ARTICLE 20

 

DEPARTMENT OF TRANSPORTATION

PERMANENT IMPROVEMENTS

    Section 5.  The sum of $36,333,463, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the appropriation and reappropriation concerning Permanent Improvements heretofore made in Article 10, Section 5 and Article 11, Section 5 of Public Act 97-0076, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.

 

CONSULTANT AND PRELIMINARY ENGINEERING

 

    Section 10.  The sum of $5,651,003, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 10 of Public Act 97-0076, as amended, for Engineering and Consultant Contracts only, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.

 

    Section 15.  The sum of $5,141,720, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 15 of Public Act 97-0076, as amended, for Engineering and Consultant Contracts only, is reappropriated from the State Construction Account Fund to the Department of Transportation for the same purposes.

 

OTHER LUMP SUMS

 

    Section 20.  The sum of $9,206,254, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the appropriation and reappropriation concerning hazardous materials made in Article 10, Section 10 and Article 11, Section 20 of Public Act 97-0076, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.

 

    Section 25.  The sum of $40,396,562, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the appropriation and reappropriation made for Formal Contracts in the line item, “For Maintenance, Traffic and Physical Research Purposes (A)” for the Central Offices, Division of Highways, in Article 10, Section 10 and Article 11, Section 25 of Public Act 97-0076, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.

 

    Section 30.  The sum of $10,727,104, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the appropriation and reappropriation concerning Highway Damage Claims heretofore made in Article 10, Section 10 and Article 11, Section 30 of Public Act 97-0076, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.

 

HIGHWAY CONSTRUCTION AND LAND ACQUISITION

AWARDS AND GRANTS

 

    Section 35.  The sum of $30,692,997, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the appropriation and reappropriation heretofore made for township bridges in Article 10, Section 15 and Article 11, Section 35 of Public Act 97-0076, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.

 

    Section 40.  The sum of $300,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 40 of Public Act 97-0076, as amended, is reappropriated from the Transportation Bond Series D Fund to the Department of Transportation for grants to counties, municipalities, and road districts for planning, engineering, acquisition, construction, reconstruction, development, improvement, extension, and all construction related expenses of the public infrastructure and other transportation improvement projects which are related to economic development in the State of Illinois as allocated in Article 50, Section 36 of Public Act 96-0035.

 

HIGHWAY CONSTRUCTION AND LAND ACQUISITION

CONSTRUCTION

 

    Section 45.  The following named sums or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012 from the reappropriations heretofore made in Article 11, Section 50 of Public Act 97-0076, as amended, are reappropriated to the Department of Transportation from the Road Fund for the FY04 federal earmarks provided in Conference Report 108-401 which accompanies Public Law 108-199.  Expenditures shall not exceed funds to be made available by the federal government.

 

Bridge Discretionary

  North Avenue Bridge, Chicago..................... 324,335

National Corridor Planning & Development

  City of Forsyth Frontage Road..................... 11,917

Ferry Boats/Terminal Facilities

  Canal Corridor Association-Port of

  LaSalle Project.................................. 400,000

Transportation & Community & System Preservation

  Homewood, Illinois railroad station/

  platform acquisition and improvement.............. 16,042

Village of Glencoe, Green Bay

  Trail – North Branch Trail Connection............ 104,718

Section 115 Member Initiatives

  Annie Glidden Road, DeKalb....................... 151,977

Convocation Center Roadway......................... 151,655

Great River Road in Mercer County................... 14,882

ITS – I-74 in Peoria............................... 750,000

Kaskaskia Regional Port District, access roads ...... 9,586

Long Meadow Parkway Fox River Bridge

  Crossing, Bolz Road.............................. 125,434

Sauk Trail Reconstruction

  Improvements, Park Forest........................ 330,000

Sauk Village Industrial Park Access Road........... 472,494

St. Charles, Illinois, Fox River

  Crossing at Red Gate Corridor.................... 260,467

US 51, Christian/Shelby Counties................... 846,091

West Grand Avenue. (from North

  Western to N. California Ave.)................... 800,000

    Total                                        $4,769,598

 

    Section 50.  The following named sums or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from the reappropriations heretofore made in Article 11, Section 55 of Public Act 97-0076, as amended, are reappropriated to the Department of Transportation from the Road Fund for the FY05 federal earmarks provided in Conference Report 108-792 which accompanies Public Law 108-447.  Expenditures shall not exceed funds to be made available by the federal government.

Bridge Discretionary

  North-South Wacker Drive Reconstruction

  in Chicago..................................... 1,916,666

Interstate Maintenance Discretionary

  I-55 South Barrier, Darien Illinois............ 1,400,000

  Section 117 Member Initiatives

  171st Street reconstruction,

  East Hazel Crest................................... 6,429

67th Street Pedestrian Underpass, Chicago

  Lakefront........................................ 400,000

Camp Street upgrades, East Peoria.................. 219,935

Cermak and Kenton Avenues.......................... 750,533

Cicero Avenue lighting in University Park.......... 137,725

Des Plaines, Illinois alley, sidewalk

  improvements...................................... 16,073

Fulton County Highway 6............................. 51,783

I-290 Cap, Oak Park................................ 968,799

KBS Railroad Hazard Elimination, Kankakee

  County........................................... 300,000

MacArthur Boulevard Extension, Springfield......... 170,040

McHenry County / Crystal Lake Road................. 157,681

Milwaukee Avenue, Grand to Gale, Chicago............ 20,091

Route 178 relocation, Phase II Engineering......... 457,032

Sheridan Road Improvements, Evanston................. 8,036

Sidewalks near Ford Heights........................ 200,000

Street improvements and

  streetlights, Lynnwood ............................ 1,831

Street improvements, Bartonville.................... 57,586

Street improvements, Village of Armington............ 8,956

Streetlights and salt dome for Markham............. 300,000

U.S. 41/I-176 Interchange improvements

  Phase I study.................................... 800,000

Winfield Pedestrian Tunnel.......................... 98,400

    Total                                        $8,447,596

 

    Section 55.  The sum of $120,976,683, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 60 of Public Act 97-0076, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations.

 

    Section 60.  The sum of $154,260, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 65 of Public Act 97-0076, is reappropriated from the Road Fund to the Department of Transportation for Pavement Preservation Programs.

 

    Section 65.  The sum of $152,699,639, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 70 of Public Act 97-0076, is reappropriated from the Road Fund to the Department of Transportation for High Priority Projects (HPP) and Transportation Improvement Projects (TI) pertaining to local governments as designated in Public Law 109-59, Title I, Subtitle G, Section 1702 and Subtitle I, Section 1934 of the federal reauthorization act entitled SAFETEA-LU; provided such amounts do not exceed funds made available by the federal government through Congressional designations, annual allocations, obligation limitations, or any other federal limitations.  Specific project approximations appear in Article 101, Section 25 of Public Act 94-0798.

 

    Section 70.  The sum of $11,629,151, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 75 of Public Act 97-0076, is reappropriated from the Road Fund to the Department of Transportation for Transportation, Community and System Preservation (TCSP), Discretionary Interstate Maintenance and Surface Transportation Priorities earmarks pertaining to state and local governments as designated in the Consolidated Appropriation Act, 2008, Division K, Public Law 110-161; provided such amounts do not exceed funds made available by the federal government through Congressional designations, annual allocations, obligation limitations, or any other federal limitations, as approximated in Article 35, Section 20 of Public Act 95-0734.

 

    Section 75.  The sum of $14,553,898, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 80 of Public Act 97-0076, is reappropriated from the Road Fund to the Department of Transportation for Transportation, Community and System Preservation (TCSP), Discretionary Interstate Maintenance, Federal Lands Highway Discretionary, and Surface Transportation Priorities earmarks pertaining to state and local governments as designated in the Omnibus Appropriations Act, 2009, Public Law 111-8; provided such amounts do not exceed funds made available by the federal government through Congressional designations, annual allocations, obligation limitations, or any other federal limitations, as approximated in Article 2, Section 20 of Public Act 96-0039.

 

    Section 80.  The sum of $7,973,523, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 85 of Public Act 97-0076, as amended, is reappropriated from the Road Fund to the Department of Transportation, for Transportation, Community and System Preservation (TCSP), Discretionary Interstate Maintenance, and Surface Transportation Priorities earmarks pertaining to state and local governments as designated in the Consolidated Appropriations Act, 2010, Public Law 111-11 117; provided such amounts do not exceed funds made available by the federal government through Congressional designations, annual allocations, obligation limitations, or any other federal limitations.

 

    Section 85.  The sum of $55,814,264, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriations heretofore made in Article 11, Section 90 and Section 95 of Public Act 97-0076, as amended, are reappropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations.

 

    Section 90.  The sum of $4,475,291, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 100 of Public Act 97-0076, as amended, are reappropriated from the State Construction Account Fund to the Department of Transportation for all expenses related to Phase II of the I-57/294 interchange in the County of Cook.

 

    Section 95.  The sum of $16,021,220, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 105 of Public Act 97-0076, as amended, are reappropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations.

 

    Section 100.  The sum of $142,487,791, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 110 of Public Act 97-0076, as amended, are reappropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations.

 

    Section 105.  The sum of $264,177,308, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 115 of Public Act 97-0076, as amended, is reappropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations.

 

    Section 110.  The sum of $662,336,504, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the appropriation heretofore made in Article 10, Section 25 of Public Act 97-0076, as amended, is reappropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations.

 

HIGHWAY CONSTRUCTION AND LAND ACQUISITION

LUMP SUMS

 

     Section 115.  The sum of $42,512,019, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 130 of Public Act 97-0076, is reappropriated from the Road Fund to the Department of Transportation for the local match of all other non-federally reimbursed expenses associated with the High Priority Projects (HPP) and Transportation Improvement Projects (TI) specifically identified in Article 101, Section 25 of Public Act 94-0798, provided that such amounts do not exceed funds made available and paid into the Road Fund by local governments.

 

    Section 120.  The sum of $78,118,263, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriations heretofore made in Article 11, Section 120 and Section 135 of Public Act 97-0076, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program, including refunds.

 

    Section 125.  The sum of $161,702,022, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriations heretofore made in Article 11, Section 125 and Section 140 of Public Act 97-0076, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the local portion of the Road Improvement Program, including refunds.

 

    Section 130.  The sum of $96,874,048, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 145 of Public Act 97-0076, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program, including refunds.

 

    Section 135.  The sum of $260,965,125, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 150 of Public Act 97-0076, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the local portion of the Road Improvement Program, including refunds.

 

    Section 140.  The sum of $1,467,769, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 155 of Public Act 97-0076, is reappropriated from the Road Fund to the Department of Transportation for the local match of all other non-federally reimbursed expenses associated with the Transportation, Community and System Preservation (TCSP) and Discretionary Interstate Maintenance earmarks specifically identified in Article 35, Section 20a of Public Act 96-0734, provided that such amounts do not exceed funds made available and paid into the Road Fund by local governments.

 

    Section 145.  The sum of $55,421,744, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 160 of Public Act 97-0076, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations.  (Emergency Repair Program)

 

    Section 150.  The sum of $15,211,955, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 165 of Public Act 97-0076, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program, including refunds.

 

    Section 155.  The sum of $195,487,520, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 170 of Public Act 97-0076, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the local portion of the Road Improvement Program, including refunds.

 

    Section 160.  The sum of $2,103,897, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 175 of Public Act 97-0076, is reappropriated from the Road Fund to the Department of Transportation for the local match of all other non-federally reimbursed expenses associated with the Transportation, Community and System Preservation (TCSP) and Discretionary Interstate Maintenance earmarks specifically identified in Article 2, Section 20 of Public Act 96-0039, provided that such amounts do not exceed funds made available and paid into the Road Fund by local governments.

 

    Section 165. The sum of $895,900, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 180 of Public Act 97-0076, as amended, is reappropriated from the Road Fund to the Department of Transportation, for the local match of all other non-federally reimbursed expenses associated with the Transportation, Community and System Preservation (TCSP) and Discretionary Interstate Maintenance earmarks specifically identified in Article 50, Section 16 of Public Act 96-0035, provided that such amounts do not exceed funds made available and paid into the Road Fund by local governments.

 

    Section 170.  The sum of $610,610,616, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 185 of Public Act 97-0076, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program, including refunds.

 

    Section 175.  The sum of $246,972,223, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 190 of Public Act 97-0076, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the local portion of the Road Improvement Program, including refunds.

 

    Section 180.  The sum of $585,810,562, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the appropriation heretofore made in Article 10, Section 30 of Public Act 97-0076, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program, including refunds.

 

    Section 185.  The sum of $467,925,422, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the appropriation heretofore made in Article 10, Section 35 of Public Act 97-0076, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the local portion of the Road Improvement Program, including refunds.

 

    Section 190.  The sum of $12,800,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the appropriation heretofore made in Article 10, Section 20 of Public Act 97-0076, as amended, is reappropriated from the Road Fund to the Department of Transportation for Transportation Investment Generating Economic Recovery II ( TIGER II) earmarks designated in Division A of the Consolidated Appropriations Ace, 2010, Public Law 111-117 as identified and approximated in Article 11, Section 20 of Public Act 97-0076; provided such amounts do not exceed funds made available by the federal government through Congressional designations, annual allocations, obligation limitations, or any other federal limitations.

 

    Section 195.  The sum of $3,200,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the appropriation heretofore made in Article 10, Section 40 of Public Act 97-0076, as amended, is reappropriated from the Road Fund to the Department of Transportation for the local match of all other non-federally reimbursed expenses associated with the Transportation Investment Generating Economic Recovery II (TIGER II) earmarks specifically identified in Section 20 of Article 11 in Public Act 97-0076, provided such amounts do not exceed funds made available and paid in to the Road Fund by local governments.

 

BOND FUND

CONSTRUCTION

 

    Section 200.  The sum of $761,570,762, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from the appropriation and the reappropriations heretofore made in Article 11, Section 195, of Public Act 97-0076, as amended, for statewide purposes, is reappropriated from the Transportation Bond Series A Fund to the Department of Transportation for the same purposes.

 

    Section 205.  The sum of $2,382,848,822, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 200 of Public Act 97-0076, as amended, for statewide purposes, is reappropriated from the Transportation Bond Series D Fund to the Department of Transportation for the same purposes.

 

GRADE CROSSING PROTECTION

CONSTRUCTION

 

    Section 210.  The sum of $103,207,097, or so much thereof as may be necessary and remains unexpended, at the close of business on June 30, 2012, from the appropriation and reappropriation heretofore made for grade crossing protection or grade separation in Article 10, Section 50 and Article 11, Section 205 of Public Act 97-0076, as amended, is reappropriated from the Grade Crossing Protection Fund to the Department of Transportation for the same purpose.

 

DIVISION OF AERONAUTICS

AWARDS AND GRANTS

 

    Section 215.  The sum of $613,545,390, or so much thereof as may be necessary, less $35,000,000 to be lapsed from the unpaid balance, and remains unexpended at the close of business on June 30, 2012, from the appropriation and reappropriation heretofore made in Article 10, Section 55 and Article 11, Section 210 of Public Act 97-0076, as amended, is reappropriated from the Federal/Local Airport Fund to the Department of Transportation for funding the local or federal share of airport improvement projects, including reimbursements and/or refunds, undertaken pursuant to pertinent state or federal laws, provided such amounts shall not exceed funds available from federal and/or local sources.

 

    Section 220.  The sum of $32,623,709, or so much thereof as may be necessary, and remains unexpended, at the close of business on June 30, 2012, from the appropriation heretofore made in Article 10, Section 60 of Public Act 97-0076, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for such purposes as are described Section 34 of the Illinois Aeronautics Act, as amended, and Section 72 of the Illinois Aeronautics Act, as amended, for airport improvements.

 

DIVISION OF AERONAUTICS

CONSTRUCTION

 

    Section 225.  The sum of $96,336,099, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 220 of Public Act 97-0076, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for expenses associated with land acquisition for the South Suburban Airport.

 

    Section 230.  The sum of $13,684,302, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 225 of Public Act 97-0076, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for expenses associated with land acquisition for the South Suburban Airport.

 

DIVISION OF PUBLIC AND INTERMODAL TRANSPORTATION

AWARDS AND GRANTS

 

    Section 235.  The following named sums, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriations heretofore made in Article 11, Section 230 of Public Act 97-0076, as amended, are reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for the same purposes as follows:

 

  Pursuant to Section 4(b)(1) of the

    General Obligation Bond Act, as amended......... 17,818

  For the counties of Cook, DuPage,

    Kane, Lake, McHenry and Will,

    pursuant to Section 4(b)(2) of

    the General Obligation Bond Act,

    as amended..................................... 368,962

  For the counties of the State

    outside the counties of Cook,

    DuPage, Kane, Lake, McHenry and

    Will, pursuant to Section

    4(b)(3) of the General Obligation

    Bond Act, as amended............................. 1,355

    Total                                          $388,135

 

    Section 240.  The following named sums, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriations heretofore made in Article 11, Section 235 of Public Act 97-0076, as amended, are reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for the same purposes as follows:

 

  Pursuant to Section 4(b)(1) of

    the General Obligation Bond Act,

    as amended.................................. 15,434,896

  For the counties of the State

    outside the counties of Cook,

    DuPage, Kane, McHenry, and Will,

    pursuant to Section 4(b)(1)

    of the General Obligation Bond

    Act, as amended.............................. 2,052,019

  For the Department of Transportation's

    Greenlight Program pursuant to

    Section 4(b)(1) of the General

    Obligation Bond Act, as amended.............. 5,522,613

    Total                                       $23,009,528

 

    Section 245. The sum of $5,000,002, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 240 of Public Act 97-0076, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation to extend the metrolink rail-line to Mid-America Airport, including but not limited to, general infrastructure improvements authorized under Section 2705-305 of the Department of Transportation Law (20 ILCS 2705/2705-305) such as parking lot infrastructure upgrades, pedestrian access improvements, ingress and egress infrastructure and construction of a pedestrian overpass at the Southwestern Illinois College metrolink station.

 

    Section 250. The sum of $38,785,793, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 245 of Public Act 97-0076, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for construction costs, making grants and providing project assistance to municipalities, special transportation districts, private non-profit carriers, mass transportation carriers and the Intercity rail program for the acquisition, construction, extension, reconstruction, and improvement of mass transportation facilities, including rapid transit, intercity rail, bus and other equipment used in connection therewith, as provided by law, pursuant to Section 4(b)(1) of the General Obligation Bond Act, as amended.

 

    Section 255. The sum of $900,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 250 of Public Act 97-0076, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for construction costs, making grants and providing project assistance to the Regional Transportation Authority.

 

    Section 260. The sum of $100,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 255 of Public Act 97-0076, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for construction costs, making grants and providing project assistance to municipalities, special transportation districts, private non-profit carriers, mass transportation carriers and the Intercity rail program for the acquisition, construction, extension, reconstruction, and improvement of mass transportation facilities, including rapid transit, intercity rail, bus and other equipment used in connection therewith, as provided by law, for the purpose of downstate public transit systems.

 

    Section 265. The sum of $1,573,577,963, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 260 of Public Act 97-0076, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for construction costs, making grants and providing project assistance to the Regional Transportation Authority.

 

    Section 270. The sum of $198,912,432, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 265 of Public Act 97-0076, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for construction costs, making grants and providing project assistance to municipalities, special transportation districts, private non-profit carriers, mass transportation carriers and the Intercity rail program for the acquisition, construction, extension, reconstruction, and improvement of mass transportation facilities, including rapid transit, intercity rail, bus and other equipment used in connection therewith, as provided by law, for the purpose of downstate public transit systems.

 

    Section 275. The sum of $60,585,390, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the appropriation and reappropriation heretofore made in Article 10, Section 80 and Article 11, Section 270 of Public Act 97-0076, as amended, is reappropriated from the Federal Mass Transit Trust Fund to the Department of Transportation for the federal share of capital, operating, consultant services, and technical assistance grants, as well as state administration and interagency agreements, provided such amounts shall not exceed funds to be made available from the Federal Government.

 

DIVISION OF PUBLIC AND INTERMODAL TRANSPORTATION

LUMP SUMS

 

    Section 280.  The sum of $30,638,736, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 275 of Public Act 97-0076, as amended, is reappropriated from the Road Fund to the Department of Transportation for grants, road construction and all other costs relating to the Chicago Region Environmental and Transportation Efficiency (CREATE) program, provided such amounts not exceed funds made available by the federal government for this program.

 

    Section 285.  The sum of $292,534,731, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 280 of Public Act 97-0076, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for grants, road construction and all other costs relating to the Chicago Region Environmental and Transportation Efficiency (CREATE) program.

 

RAIL PASSENGER AND RAIL FREIGHT

AWARDS AND GRANTS

 

    Section 290.  The sum of $475,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 285 of Public Act 97-0076 as amended, is reappropriated from the Road Fund to the Department of Transportation for the Quad City Track Improvements capital grant designated in the Omnibus Appropriations Act, 2009, Public Law 111-8, provided such amounts do not exceed funds made available by the federal government.

 

    Section 295.  The sum of $14,069,134, or so much thereof as may be necessary, and remains unexpended, less $500,000 to be lapsed from the unpaid balance, at the close of business on June 30, 2012, from the appropriation and reappropriation heretofore made in Article 10, Section 95 and Article 11, Section 290 of Public Act 97-0076, as amended, is reappropriated from the State Rail Freight Loan Repayment Fund to the Department of Transportation for the same purposes.

 

    Section 300.  The sum of $10,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 295 of Public Act 97-0076, as amended, is reappropriated from the Federal High Speed Rail Trust Fund to the Department of Transportation for the federal share of the High Speed Rail Project.

 

    Section 305.  The sum of $200,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 300 of Public Act 97-0076, as amended, is reappropriated from the Federal High Speed Rail Trust Fund to the Department of Transportation for grants, construction, and all other costs relating to high speed rail projects, provided such amounts not exceed funds made available by the federal government for this purpose.

 

    Section 310.  The sum of $25,463,226, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 305 of Public Act 97-0076, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for the same purposes.

 

    Section 315.  The sum of $145,612,340, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 310 of Public Act 97-0076, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for track and signal improvements, AMTRAK station improvements, rail passenger equipment, and rail freight facility improvements.

 

    Section 320.  The sum of $290,289,485, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 315 of Public Act 97-0076, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation to leverage federal funding in accordance with the Department of Transportation’s Federal Railroad Administration’s Capital Assistance for High Speed Rail Corridors and Intercity Passenger Rail Service Program and any other federal grant programs made available for capital and operating improvements for intercity passenger rail.

 

    Section 325.  The sum of $4,849,414, or so much thereof as may be necessary and remains unexpended, less $1,000,000 to be lapsed from the unpaid balance, at the close of business on June 30, 2012, from the appropriation and reappropriation concerning the federal share of the Rail Freight Loan Repayment Program heretofore made in Article 10, Section 105 and Article 11, Section 320 of Public Act 97-0076, as amended, is reappropriated from the Rail Freight Loan Repayment Fund to the Department of Transportation for the same purposes.

 

STIMULUS

HIGHWAY CONSTRUCTION AND LAND ACQUISITION

LUMP SUMS

 

    Section 330.  The sum of $297,819,789, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 325 of Public Act 97-0076, as amended, is reappropriated from the Road Fund to the Department of Transportation for  preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the State portion, provided such amounts not exceed federal funds made available by the American Recovery and Reinvestment Act of 2009.

 

    Section 335.  The sum of $72,059,052, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 330 of Public Act 97-0076, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the State and Local portion, provided such amounts not exceed federal funds made available by the American Recovery and Reinvestment Act of 2009.

 

  Section 340.  The sum of $23,722,133, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 335 of Public Act 97-0076, as amended, is reappropriated from the Road Fund to the Department of Transportation to provide local funding for project expenses in excess of the Local portion of federal funds made available from the American Recovery and Reinvestment Act of 2009, provided such amounts do not exceed funds made available and paid into the Road Fund by the local governments.

 

STIMULUS

DIVISION OF AERONAUTICS

LUMP SUM

 

    Section 345.  The sum of $118,853,395, or so much thereof as may be necessary, and remains unexpended less $115,000,000 to be lapsed from the unpaid balance, at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 340 of Public Act 97-0076, as amended, is reappropriated from the Federal/Local Airport Fund to the Department of Transportation for funding the federal share of airport improvement projects, including reimbursements and/or refunds, undertaken pursuant to pertinent state and federal laws, provided such amounts not exceed federal funds made available by the American Recovery and Reinvestment Act of 2009.

 

STIMULUS

DIVISION OF PUBLIC AND INTERMODAL TRANSPORTATION

LUMP SUMS

 

    Section 350.  The sum of $26,143,983 , or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 345 of Public Act 97-0076, as amended, is reappropriated from the Federal Mass Transit Trust Fund to the Department of Transportation for capital, operating, consultant services, and technical assistance grants, state administration, and intergovernmental and interagency agreements, provided such amounts not exceed federal funds made available by the American Recovery and Reinvestment Act of 2009.

 

    Section 355.  The sum of $272,932,771, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 350 of Public Act 97-0076, as amended, is reappropriated from the Road Fund to the Department of Transportation for grants, road construction and all other costs relating to the Chicago Region Environmental and Transportation Efficiency (CREATE) program, provided such amounts not exceed federal funds made available by the American Recovery and Reinvestment Act of 2009.

 

STIMULUS

RAIL PASSENGER AND RAIL FREIGHT

LUMP SUMS

 

    Section 360.  The sum of $6,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 360 of Public Act 97-0076, as amended, is reappropriated from the Road Fund to the Department of Transportation for track and signal improvements, rail freight equipment, and rail freight facility improvements, provided such amounts not exceed federal funds made available by the American Recovery and Reinvestment Act of 2009.

 

    Section 365. The sum of  $1,214,142,642  or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from the reappropriation heretofore made in Article 11, Section 370 of Public Act 97-0076, as amended, is reappropriated from the Federal High Speed Rail Trust Fund to the Department of Transportation for grants, construction, and all other costs relating to high speed rail projects in compliance with the American Recovery and Reinvestment Act of 2009, provided such amounts not exceed funds made available by the federal government for this purpose.

 

    Section 370. No contract shall be entered into or obligation incurred or any expenditure made from a reappropriation herein made in:

 

Section 5   Permanent Improvements                        

Section 40   Series D – Local Govt Grants                 

Section 200  Series A - Road Program                      

Section 205  Series D - Road Program                      

Section 220  Series B - Aeronautics                       

Section 225  Series B - Land Acquisition 3rd Airport      

Section 230  Series B - Land Acquisition 3rd Airport      

Section 235  Series B - Transit                           

Section 240  Series B - Transit                           

Section 245  Series B - Transit                           

Section 250  Series B - Transit                           

Section 255  Series B - Transit                           

Section 260  Series B - Transit                           

Section 265  Series B - Transit                           

Section 270  Series B - Transit                           

Section 285  Series B - Transit                           

Section 295  State Rail Freight Loan Repayment            

Section 300 FHSRTF High Speed Rail-Federal                

Section 310  Series B - Rail                              

Section 315  Series B - Rail                              

Section 320  Series B - Rail                              

Section 325  Federal Rail Freight Loan Repayment          

 

of this Article until after the purpose and the amount of such expenditure has been approved in writing by the Governor.

 

    Total, this Article                     $14,539,943,696

 

ARTICLE 21

CAPITAL DEVELOPMENT BOARD

 

    Section 5.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Agriculture for the projects hereinafter enumerated:

 

ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD

For Upgrading the Electrical System,

  in addition to funds previously

  appropriated.................................. 11,300,000

For Replacing Roofing Systems

  on various buildings........................... 2,268,000

For providing life safety improvements

  throughout the fairgrounds..................... 3,000,000

ILLINOIS STATE FAIRGROUNDS - DUQUOIN

For providing life safety improvements

  throughout the fairgrounds..................... 3,000,000

    Total                                       $19,568,000

 

    Section 10.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Central Management Services for the projects hereinafter enumerated:

 

CENTRAL COMPUTING FACILITY - SPRINGFIELD

For upgrading the HVAC and Electrical

  Systems........................................ 5,382,000

JAMES R. THOMPSON CENTER - CHICAGO

For upgrading and renovating elevators........... 7,000,000

For repairing the exterior....................... 3,500,000

For planning and beginning the renovation

  of the HVAC system............................. 2,500,000

STATEWIDE

For Renovating State Owned property.............. 4,000,000

For repairing or replacing roofs,

  windows and exterior façades................... 4,000,000

For upgrading and replacing HVAC systems......... 8,000,000

    Total                                       $34,382,000

 

    Section 15.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Courts of Illinois for the projects hereinafter enumerated:

 

SECOND DISTRICT APPELLATE COURT - ELGIN

For replacing the roofing systems.................. 245,000

THIRD DISTRICT APPELLATE COURT - OTTAWA

For upgrading security and

  providing ADA improvements....................... 227,000

FIFTH DISTRICT APPELLATE COURT – MT. VERNON

For renovating the courthouse.................... 1,057,000

    Total                                        $1,529,000

 

    Section 20.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Human Services for the projects hereinafter enumerated:

 

ELGIN MENTAL HEALTH CENTER – KANE COUNTY

For renovating the central dietary,

  in addition to funds

  previously appropriated........................ 4,454,000

FOX DEVELOPMENTAL CENTER – DWIGHT

For renovating the power plant................... 4,000,000

KILEY DEVELOPMENTAL CENTER – WAUKEGAN

For upgrading the fire alarm

  system and replacing sprinkler heads............. 525,000

MADDEN MENTAL HEALTH CENTER – HINES

For providing life safety improvements............. 700,000

MCFARLAND MENTAL HEALTH CENTER – SPRINGFIELD

For upgrading the electrical system.............. 3,250,000

RUSHVILLE

For constructing an addition or

  new treatment and detention facility.......... 16,500,000

SHAPIRO DEVELOPMENTAL CENTER – KANKAKEE

For upgrading steam and condensate lines......... 9,867,000

STATEWIDE

For replacing roofing systems.................... 9,000,000

For HVAC repairs and improvements................ 5,000,000

For providing life safety improvements.......... 15,000,000

    Total                                       $68,296,000

 

    Section 21.  The sum of $30,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Children and Family Services for grants for construction or renovation of facilities.

 

    Section 25.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Juvenile Justice for the projects hereinafter enumerated:

ILLINOIS YOUTH CENTER – ST. CHARLES

For renovating or replacing the

  old intake building............................ 5,000,000

STATEWIDE

For replacing windows............................ 9,000,000

For replacing roofing systems.................... 9,000,000

For upgrading HVAC and utility systems........... 7,500,000

For upgrading security systems................... 5,000,000

    Total                                       $35,500,000

 

    Section 30.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Corrections for the projects hereinafter enumerated:

 

DIXON CORRECTIONAL CENTER

For replacing the fire alarm

  system in addition to funds

  previously appropriated........................ 6,300,000

STATEVILLE CORRECTIONAL CENTER

For constructing an X-House..................... 23,000,000

STATEWIDE

For replacing windows........................... 13,000,000

For renovating and replacing kitchens,

  coolers, and freezers.......................... 5,000,000

For providing life safety improvements.......... 20,000,000

For replacing roofing systems................... 10,000,000

For security systems and locks.................. 10,000,000

For upgrading HVAC and utility systems.......... 20,000,000

    Total                                      $107,300,000

 

    Section 35.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for Department of Natural Resources for the projects hereinafter enumerated:

 

SPARTA WORLD SHOOTING AND RECREATIONAL COMPLEX

For repairing light poles at the Sparta World

  Shooting and Recreational Complex................ 800,000

STATEWIDE

For upgrading and rehabilitating campground

  Facilities and utilities....................... 7,000,000

For replacing and repairing roofing systems...... 3,500,000

For renovating and replacing lodge,

  concession and site office buildings........... 7,000,000

For upgrading and rehabilitating

  trails and trail facilities.................... 4,814,000

For rehabilitating and replacing roads and bridges 5,000,000

For providing life safety improvements........... 6,000,000

For renovating sanitation systems................ 1,800,000

Total                                           $35,914,000

 

    Section 40.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of State Police for the projects hereinafter enumerated:

 

ILLINOIS STATE POLICE CENTRAL HEADQUARTERS – SPRINGFIELD

For upgrading the HVAC system.................... 3,956,000

For upgrading elevators and emergency generators. 5,200,000

ILLINOIS STATE POLICE ACADEMY

For upgrading the HVAC system.................... 7,684,000

STATEWIDE

For roofing system repairs, HVAC

  upgrades, and life safety improvements........... 536,000

    Total                                       $17,376,000

 

    Section 45.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Historic Preservation Agency for the projects hereinafter enumerated:

OLD STATE CAPITOL - SPRINGFIELD

For replacing elevators and

  restoring the interior and exterior............ 4,270,000

STATEWIDE

For structural repairs and facility upgrades..... 3,300,000

For matches for landmark grants.................... 247,000

For HVAC and utility repairs and upgrades........ 3,000,000

For repairing, renovating and

  restoring Lincoln Historic Sites............... 9,000,000

    Total                                       $19,817,000

 

    Section 50.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Veterans’ Affairs for the projects hereinafter enumerated:

 

CHICAGO VETERANS HOME

For constructing a new 200 bed facility,

  in addition to funds previously appropriated .. 9,000,000

QUINCY VETERANS HOME

For planning and beginning

  cemetery renovation.............................. 100,000

For renovating the Kent Building................ 17,500,000

For Life Safety Improvements/Upgrade HVAC,

  Utilities & Roofing Systems.................... 8,000,000

MANTENO VETERANS HOME

For planning and beginning

  cemetery renovation............................... 80,000

For improving life safety

  and upgrading HVAC and utility

  systems........................................ 6,000,000

LASALLE VETERANS HOME

For improving life safety

  and upgrading HVAC and utility

  systems........................................ 4,000,000

ANNA VETERANS HOME

For Life Safety Improvements, HVAC Upgrades,

  Utility Upgrades, and Roofing System repairs... 2,970,000

STATEWIDE

For installing fire suppression

  sprinkler systems.............................. 1,000,000

    Total                                       $48,650,000

 

    Section 55.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Office of the Attorney General for the projects hereinafter enumerated:

For renovating elevators........................... 135,000

For upgrading HVAC.................................. 67,000

    Total                                           202,000

 

    Section 60.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Revenue for the projects hereinafter enumerated:

 

STATEWIDE

For planning and beginning

  security upgrades.............................. 5,000,000

WILLARD ICE BUILDING - SPRINGFIELD

For upgrading and renovating

  building systems.............................. 15,000,000

    Total                                       $20,000,000

 

    Section 70.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Secretary of State for the projects hereinafter enumerated:

 

STATEWIDE

For upgrades to HVAC, roofing systems

  and life safety improvements.................. 10,000,000

 

    Section 75.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Military Affairs for the projects hereinafter enumerated:

 

CAMP LINCOLN – SPRINGFIELD

For land acquisition............................. 3,000,000

KANKAKEE

For constructing an aviation support

  and readiness center........................... 3,748,000

NORMAL

For constructing a maneuver

  enhancement brigade facility................... 8,000,000

STATEWIDE

For upgrading mechanical and

  utility systems and interior

  and exterior renovations...................... 10,000,000

    Total                                       $24,748,000

 

  Section 76.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Public Health for the projects hereinafter enumerated:

For planning and beginning renovation

  and construction of a public health

  laboratory.................................... 15,000,000

 

    Section 77.  The sum of $5,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Public Health for grants associated with the nursing home capital grant program.

 

    Section 80.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the projects hereinafter enumerated:

 

EXECUTIVE MANSION - SPRINGFIELD

For capital upgrades............................ 13,000,000

STATEWIDE

For providing surveys and

  modifications to buildings

  to meet requirements of

  the federal Americans with

  Disabilities Act............................... 5,000,000

For energy efficiency upgrades................... 5,000,000

For tuckpointing, exterior repairs,

  roads, and parking lots........................ 3,000,000

For upgrading elevators.......................... 5,000,000

For repairs and emergencies..................... 12,000,000

For upgrading power plants for EPA regulations... 5,000,000

For abatement of hazardous materials............. 5,000,000

    Total                                       $53,000,000

 

    Section 85.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Illinois Board of Higher Education for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete work at the various higher education institutions.  These appropriated amounts shall be in addition to any other appropriated amounts which can be expended for such purposes:

 

  Chicago State University....................... 3,075,000

  Eastern Illinois University................... .4,922,300

  Governors State University..................... 1,811,500

  Northeastern Illinois University............... 3,663,200

  Western Illinois University.................... 7,563,900

  Illinois State University...................... 9,751,700

  Northern Illinois University.................. 11,066,100

  Southern Illinois University – Carbondale..... 15,515,500

  Southern Illinois University – Edwardsville.... 7,285,700

  University of Illinois – Chicago.............. 26,517,300

  University of Illinois – Springfield........... 2,187,700

  University of Illinois – Urbana/Champaign..... 39,626,700

  Illinois Community College Board.............. 57,972,900

    Total                                      $190,959,500

 

    Section 90.  The sum of $144,000,000, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for all costs associated with equipment, upgrades, construction, renovation and other capital improvements for the 21st Century Schools Program.

 

    Section 95.  The sum of $240,000,000, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Capital Development Board for the Illinois Board of Higher Education for all costs associated with grants, equipment, upgrades, construction, renovation and other capital improvements for the 21st Century Schools Program.

 

    Section 100.  The sum of $50,000,000, or so much thereof as may be necessary, is appropriated from the School Construction Fund to the Capital Development Board for the Illinois State Board of Education for Early Childhood Construction Grants for the 21st Century Schools Program.

 

    Section 105.  The sum of $566,000,000, or so much thereof as may be necessary, is appropriated from the School Construction Fund to the Capital Development Board for the Illinois State Board of Education for all costs associated with grants, equipment, technology upgrades, facility improvements, construction, and other capital improvements for the 21st Century Schools Program.

 

    Section 110.  No contract shall be entered into or obligation incurred for any expenditure from appropriations made in this Article until after the purpose and amounts have been approved in writing by the Governor.

 

    Total, this Article                      $1,737,241,500

 

ARTICLE 22

 

CAPITAL DEVELOPMENT BOARD

    Section 1.  The sum of $42,157,039, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 12, Section 1 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Capital Development Board for grants awarded under the Community Health Center Construction Act.

 

    Section 2.  The sum of $3,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 12, Section 2 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Capital Development Board for grants to school-based health centers that are operated by a Community Health Center as defined in the federal Public Health Service Act (42 U.S.C. 254b).

 

    Section 5.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from reappropriations heretofore made for such purposes in Article 12, Section 5 of Public Act 97-0076, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Agriculture for the projects hereinafter enumerated:

ILLINOIS STATE FAIRGROUNDS - DUQUOIN

(From Article 12, Section 5 of Public Act 97-0076)

  For completing the upgrade of the

   electrical distribution system, in

   addition to funds previously

   appropriated.................................... 100,759

  For constructing a multi-purpose

   building......................................... 61,710

  For Emergency Roof Replacement....................... 909

ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD

  For replacing the HVAC in

   the administration building................... 2,994,393

  For replacing roofing systems –

   Administration Building and

   Lower Roof...................................... 932,004

  Plan and begin electrical

   system replacement............................... 42,140

  For replacement of water and sewer

   service to various buildings..................... 76,977

  For an airlock addition to Metrology

   (Weights and Measures) Lab....................... 52,791

STATEWIDE

  For replacing the roof......................................... 341,648

    Total                                        $4,603,331

 

    Section 20.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from reappropriations heretofore made for such purposes in Article 12, Section 20 of Public Act 97-0076, are reappropriated from the Capital Development Fund to the Capital Development Board for the Courts of Illinois for the projects hereinafter enumerated:

SPRINGFIELD - SUPREME COURT BUILDING

(From Article 12, Section 20 of Public Act 97-0076)

 Plan and begin renovation of

 Supreme Court Building......................... 14,050,584

  For renovating the HVAC system on

   the 3rd Floor................................... 140,000

  For installing humidifier and water

   filtration systems............................ 1,108,655

APPELLATE COURT SECOND DISTRICT - ELGIN

  For miscellaneous improvements.................... 60,520

    Total                                       $15,359,759

 

    Section 30.  The following named amount, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 12, Section 30 of Public Act 97-0076, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Courts of Illinois for the projects hereinafter enumerated:

SUPREME COURT BUILDING - SPRINGFIELD

(From Article 12, Section 30 of Public Act 97-0076)

  For renovating the Library and

   completing HVAC, in addition to funds

   previously appropriated......................... 235,000

 

    Section 40.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from reappropriations heretofore made in Article 12, Section 40 of Public Act 97-0076, are reappropriated from the Capital Development Fund to the Capital Development Board for the Office of the Secretary of State for the projects hereinafter enumerated:

CAPITOL COMPLEX - SPRINGFIELD

(From Article 12, Section 40 of Public Act 97-0076)

   For upgrading fire alarm panels................. 739,959

   Plan/begin upgrade of high voltage

    distribution system.......................... 1,315,170

  To upgrade a high voltage monitoring

   system........................................... 13,051

DRIVER SERVICES FACILITIES, NORTH, SOUTH AND

WEST - CHICAGO

  For HVAC upgrades.............................. 2,074,000

  To upgrade electrical systems.................... 117,144

HOWLETT BUILDING- SPRINGFIELD

  For upgrading the North Patio for

   public safety................................... 461,000

  For installing an emergency generator............ 766,130

  For replacing roofing systems.................... 421,666

ILLINOIS STATE LIBRARY- SPRINGFIELD

  For replacing the roofing system.................. 35,326

MOTOR VEHICLE SERVICES FACILITY - SPRINGFIELD

  For upgrading the fire alarm and

   security systems................................. 16,809

    Total                                        $5,960,255

 

    Section 45.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from reappropriations heretofore made in Article 12, Section 45 of Public Act 97-0076, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Office of the Secretary of State for the projects hereinafter enumerated:

CAPITOL COMPLEX – SPRINGFIELD

(From Article 12, Section 45 of Public Act 97-0076)

  For upgrading fire alarm systems in

   two buildings................................... 17,992

    Total                                           $17,992

 

    Section 50.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from reappropriations heretofore made for such purposes in Article 12, Section 50 of Public Act 97-0076, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Central Management Services for the projects hereinafter enumerated:

STATEWIDE

(From Article 12, Section 50 of Public Act 97-0076)

  For the renovation of state-owned property..... 1,443,503

  For renovating state owned

   property...................................... 1,075,868

  For upgrading the building security

   system at the James R. Thompson Center

   and the State of Illinois building

   in addition to funds previously

   appropriated.................................... 655,000

  For renovation of State-owned

   property at the following

   locations:  Kenneth Hall Regional

   Office Building, AIG (Franklin Complex)

   Building, James R. Thompson Center,

   Sangamo Complex (IEPA), Champaign Regional

   Office Building (IEPA), Springfield

   Regional Office Building, Natural

   Resource Center (DNR) and Read -

   Building (Elgin Mental Health Center)........... 362,215

CHICAGO MEDICAL CENTER - OFFICE AND LAB BUILDING

  For installing an emergency generator

   and upgrading the electrical system........... 1,965,380

  For planning and beginning the renovation

   of the facility................................. 462,651

COLLINSVILLE REGIONAL OFFICE COMPLEX

  For replacing the roof......................... 1,077,364

  To replace an emergency generator................ 180,811

ELGIN REGIONAL OFFICE BUILDING

  For upgrading the HVAC system.................. 2,444,241

ILLINOIS CENTER FOR REHABILITATION AND

EDUCATION (WOOD) - CHICAGO

  For upgrading fire and safety systems............. 27,113

JAMES R. THOMPSON CENTER - CHICAGO

  For the purpose of emergency stone

   repair at the James R. Thompson Center........ 1,986,586

  For planning and beginning electrical

   system and life safety system upgrades.......... 917,990

  For upgrading the HVAC system.................. 3,922,086

  For installing an emergency generator.......... 3,545,000

  For rehabilitating exterior columns, in

   addition to funds previously appropriated........ 11,692

  For upgrading mechanical systems, in

   addition to funds previously appropriated........ 27,341

KENNETH HALL REGIONAL OFFICE BUILDING – EAST ST. LOUIS

  For design services for emergency parapet

   wall repairs..................................... 22,656

MEDICAL CENTER (DCFS DISTRICT OFFICE) - CHICAGO

  For replacing roof and upgrading

   mechanical and electrical systems............... 321,956

MEDICAL CENTER (EDWARDS CENTER) - CHICAGO

  For medical center (Edwards Center).............. 184,899

MICHAEL A. BILANDIC BUILDING, CHICAGO

  For upgrading HVAC and domestic water

   system.......................................... 697,486

ROCKFORD REGIONAL OFFICE BUILDING

  For replacing Halon and upgrading

   the air conditioning............................ 162,614

SPRINGFIELD - RESEARCH AND COLLECTION CENTER

  For expanding surplus warehouse................... 73,584

SPRINGFIELD - COMPUTER FACILITY

  For upgrading the computer room and the

   electrical system................................ 23,421

SPRINGFIELD REGIONAL OFFICE BUILDING

  For emergency cooling tower replacement

   at 4500 S. Sixth Street Road..................... 56,864

SUBURBAN NORTH REGIONAL OFFICE FACILITY, DES PLAINES

  For renovating office space....................... 92,465

    Total                                       $21,740,786

 

    Section 60.  The following named amount, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 12, Section 60, of Public Act 97-0076, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Central Management Services for the project hereinafter enumerated:

ILLINOIS CENTER FOR REHABILITATION AND EDUCATION

(ROOSEVELT) – CHICAGO

(From Article 12, Section 60 of Public Act 97-0076)

  For upgrading the kitchen and plumbing........... 185,838

    Total                                          $185,838

 

    Section 65.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from reappropriations heretofore made for such purposes in Article 12, Section 65 of Public Act 97-0076, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Natural Resources for the projects hereinafter enumerated:

BABE WOODYARD STATE NATURAL AREA -

VERMILION COUNTY

(From Article 12, Section 65 of Public Act 97-0076)

  For developing the site and associated

   land acquisition................................ 244,604

BIG RIVER STATE FOREST

  For ADA improvements............................. 191,122

BUFFALO ROCK STATE PARK – LASALLE COUNTY

  For replacing the septic system, in

   addition to funds previously appropriated....... 239,860

CARLYLE LAKE STATE PARKS

  For road and site improvements at

   Carlyle Lake.................................. 1,477,424

  For infrastructure and site

   improvements at Carlyle Lake.................... 765,485

CARLYLE STATE FISH AND WILDLIFE AREA – FAYETTE COUNTY

  To replace Cox Bridge at Carlyle State

   Fish and Wildlife Area.......................... 550,000

EAGLE CREEK STATE PARK - SHELBY COUNTY

  For constructing lake access boat

   docks at resort................................. 219,303

FERNE CLYFFE STATE PARK - JOHNSON COUNTY

  For replacing the campground

   sewage treatment system......................... 365,054

GIANT CITY STATE PARK - JACKSON COUNTY

  For replacing the sewer treatment system......... 460,166

GOOSE LAKE PRAIRIE NATURAL AREA - GRUNDY COUNTY

  For replacing floating boardwalk.................. 24,604

HENNEPIN CANAL PARKWAY STATE PARK AND ACCESS AREA

  For rehabilitating/repairing railroad

   bridges, in addition to funds

   previously appropriated......................... 851,685

HORSESHOE LAKE CONSERVATION AREA - ALEXANDER COUNTY

  For dam rehabilitation and the State's share

   to implement the ecological restoration

   plan in cooperation with the U.S.

   Army Corps of Engineers, and

   land acquisition................................ 842,605

I & M Canal - CHANNAHON – GRUNDY COUNTY

  For repair of the spillway, in addition

   to funds previously appropriated................ 364,320

  For replacing Lock 14 Bridge..................... 308,871

  For improving the DuPage River Spillway.......... 853,884

  For improving DuPage River Spillway................ 2,172

ILLINOIS BEACH STATE PARK - LAKE COUNTY

  For stabilizing shoreline........................ 980,900

  For replacing sanitary sewer line.................. 8,196

JAKE WOLF MEMORIAL FISH HATCHERY

  For replacing or upgrading

   electrical system............................... 328,514

MORAINE HILLS STATE PARK – MCHENRY COUNTY

  For replacing yellow-head marshy dam culverts.... 400,000

NAUVOO STATE PARK

  For ADA improvements............................. 306,889

PERE MARQUETTE STATE PARK – JERSEY COUNTY

  For replacing lodge pool dehumidifier,

   in addition to funds previously appropriated.... 272,910

  For design services to replace a lodge

   pool dehumidifier................................ 31,526

   

    For emergency replacement of a sewage

    treatment plant................................. 27,988

PYRAMID STATE PARK

  For renovating the Galum building for a

   mine rescue station............................. 808,670

RED HILLS STATE PARK – LAWRENCE COUNTY

  For miscellaneous improvements.................... 44,740

RESEARCH & COLLECTIONS CENTER - SPRINGFIELD

  For renovating the interior....................... 17,796

ROCK CUT STATE PARK - WINNEBAGO COUNTY

  For rehabilitating water and sewer

   system.......................................... 184,599

SILOAM SPRINGS STATE PARK – ADAMS COUNTY

  For rehabilitating office/service area......... 1,119,114

STEPHEN A. FORBES STATE PARK, MARION COUNTY

  For replacing dump and fish cleaning

   stations, in addition to funds

   previously appropriated........................... 9,397

  For design services to replace dump and

   fish cleaning stations........................... 22,794

WORLD SHOOTING COMPLEX – SPARTA

  For infrastructure improvements................... 48,960

SPRINGFIELD

  For constructing an office building and

   interpretive center............................. 166,153

STARVED ROCK STATE PARK AND LODGE

  For replacing roofing systems..................... 24,729

WAYNE FITZGERRELL STATE RECREATION AREA

  For replacing roofs.............................. 149,768

WHITE PINES FOREST STATE PARK - OGLE COUNTY

  For completing the replacement of the

   sewer system, in addition to funds

   previously appropriated.......................... 10,907

WILDLIFE PRAIRIE PARK

  For rehabilitating the sewage

   treatment plant................................. 683,164

  For upgrading sewage treatment plant........... 1,032,000

STATEWIDE

  For replacing/repairing the roofing systems

   at the following locations at the approximate

   cost set forth below........................... 245,000

    Clinton Lake Recreational

     Area - DeWitt County............... 65,000

    Ferne Clyffe State Park-

    Johnson County..................... 20,000

    Hennepin Canal Parkway

    State Park......................... 26,000

    Lake Le-Aqua-Na State Park-

     Stephenson County.................. 39,000

    Mermet Lake Conservation Area-

     Massac County...................... 95,000

  For replacing/repairing the roofing systems

   at the following locations at the approximate

   costs set forth below........................... 115,267

    Starved Rock State Park &

     Lodge-LaSalle County................ 4,726

    Kaskaskia River Fish & Wildlife

    Area-Randolph County............... 19,500

    Pyramid State Park-

    Perry County........................ 4,109

    Region V Office (Benton)

    Franklin County.................... 86,932

  For rehabilitating dams and bridges.............. 116,946

  For constructing, replacing and

   renovating lodges and concession

   buildings....................................... 878,761

  For replacing roofs at the following locations,

   at the approximate cost set forth below......... 134,931

    Shabbona Lake State Park............ 40,850

    Hennepin Canal Parkway State Park... 15,750

    Randolph Fish & Wildlife Area....... 32,271

    Dixon Springs State Park............ 46,060

  For replacing and constructing vault

   toilets at the following locations,

   at the approximate cost set forth

   below........................................... 167,772

   Hennepin Canal Parkway

    State Trail....................... 167,772

  For rehabilitating dams at the

   following locations, at the

   approximate cost set forth below................. 34,828

   Rock Cut State Park................. 34,828

  For replacing roofs at the following

   locations, at the approximate

   cost set forth below............................ 206,925

   Southern IL Arts & Crafts Center....... 412

   Frank Holten State Park................ 412

    DNR Geological Survey-Champaign........ 413

   Sangchris Lake State Park............ 5,291

   Illini State Park.................... 1,692

   Shelbyville Fish & Wildlife Area.... 79,480

   Trail of Tears State Forest.......... 3,685

   Sanganois Conservation Area............ 413

   Rice Lake State Park................ 28,090

   Hidden Spring State Park............ 53,740

   Siloam Springs State Park............ 2,417

   Mississippi Palisades State Park.... 30,880

  For replacing vault toilets at the

   following locations, at the approximate

   cost set forth below............................ 285,813

    Anderson Lake Conservation Area -

     Fulton/Schuyler Counties........... 71,453

    Giant City State Park -

     Jackson/Union Counties............. 71,453

    Randolph County Conservation Area... 71,453

    Silver Springs State Park -

      Kendall County.................... 71,454

  For constructing hazardous material storage

   buildings......................................... 9,935

  For constructing vault toilets at the

   following locations at the approximate

   cost set forth below:........................... 137,897

   Apple River Canyon State Park....... 19,699

   Des Plaines Conservation Area....... 19,700

   Kankakee River State Park........... 19,700

   Lake Le-Aqua-Na State Park.......... 19,699

   Marshall County Conservation Area... 19,700

   Morrison-Rockwood State Park........ 19,699

    Rice Lake Conservation Area......... 19,700

  For planning, construction, reconstruction,

   land acquisition and related costs,

   utilities, site improvements, and all other

   expenses necessary for various capital

   improvements at parks, conservation areas,

   and other facilities under the jurisdiction

   of the Department of Natural Resources.......... 415,159

    Total                                       $17,190,107

 

    Section 75.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 12, Section 75 of Public Act 97-0076, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Natural Resources for the project hereinafter enumerated:

GOOSE LAKE PRAIRIE NATURAL AREA - GRUNDY COUNTY

(From Article 12, Section 75 of Public Act 97-0076)

  For rehabilitating visitor's center exterior...... 23,345

    Total                                           $23,345

 

    Section 80.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from reappropriations heretofore made for such purposes, Article 12, Section 80 of Public Act 97-0076, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Corrections for the projects hereinafter enumerated:

CENTRALIA CORRECTIONAL CENTER

(From Article 12, Section 80 of Public Act 97-0076)

  For replacing roofing systems.................. 3,174,634

  For replacing the cooling tower.................. 201,948

  To upgrade a sewage treatment plant............... 66,918

DIXON CORRECTIONAL CENTER

  For replacing the fire alarm system.............. 452,286

  For planning the upgrade and expansion

   of the medical care facility..................... 24,127

DWIGHT CORRECTIONAL CENTER

  For renovating Housing Unit C8, in

   addition to funds previously

   appropriated.................................... 270,000

  For renovating buildings, in addition

   to funds previously appropriated................ 274,847

  For renovation of buildings....................... 30,261

  For repair and replacement of roofing

   system........................................... 10,221

EAST MOLINE CORRECTIONAL CENTER

  For upgrading the roofing system................. 439,642

  For replacing windows, in addition

   to funds previously appropriated................. 42,450

GRAHAM CORRECTIONAL CENTER

  For upgrading the mechanical system............... 14,439

HARDIN COUNTY WORK CAMP

  To upgrade a sewage treatment plant............... 23,581

ILLINOIS RIVER CORRECTIONAL CENTER – CANTON

  For replacing domestic hot water

   heater, in addition to

   funds previously appropriated................... 239,698

ILLINOIS YOUTH CENTER - HARRISBURG

  For constructing a multi-purpose medical,

   vocational and confinement building............. 322,181

  For utility upgrade, including gas

   and sewer..................................... 4,682,876

ILLINOIS YOUTH CENTER - ST. CHARLES

  For constructing an R & C building

   and other improvements........................ 1,957,557

JACKSONVILLE CORRECTIONAL CENTER

  For upgrading the fire alarm system............ 1,507,701

LINCOLN CORRECTIONAL CENTER

  For upgrading the building

   automation system............................. 2,036,888

  For replacing doors and locks..................... 31,592

LOGAN CORRECTIONAL CENTER

  For replacing housing unit roofs................. 372,953

  For planning and beginning the upgrade

   of the power plant.............................. 155,805

  For renovating the electrical

   distribution system............................. 159,995

  For constructing a medical building

   and dietary building............................ 722,098

MENARD CORRECTIONAL CENTER - CHESTER

  For repairs and upgrades...................... 10,096,436

  For replacing the Administration Building.......... 6,478

  For replacing toilets and waste lines

   at E/W Cellhouse and upgrade

   North Cellhouse plumbing........................ 364,351

  For renovation or replacement of the

   Old Hospital Building, in addition to

   funds previously appropriated.................... 35,574

  For planning and construction of the

   Administration Building......................... 101,949

PONTIAC CORRECTIONAL CENTER

  For replacing doors and frames................. 1,620,000

SHAWNEE CORRECTIONAL CENTER

  For replacing the emergency generator............. 44,867

SOUTHWESTERN CORRECTIONAL CENTER

  For replacing the roofing system................. 431,052

STATEVILLE CORRECTIONAL CENTER - JOLIET

  For replacing the X House locks................ 1,511,568

  For the emergency compressor

   failure at Stateville RNC....................... 865,123

  For replacing doors and locks.................... 580,000

  For replacing windows in B House................. 126,480

  For replacing power plant and

   utility distribution system...................... 17,454

  For upgrading electrical system and elevator

   and installing HVAC system...................... 122,956

TAYLORVILLE CORRECTIONAL CENTER

  For replacing operators and

   main gates, in addition to

   funds previously appropriated.................... 55,969

  For design services to replace operators

   and main gates.................................... 6,879

VANDALIA CORRECTIONAL CENTER

  For an emergency generator....................... 815,000

  For replacing roofing systems.................. 2,233,957

  For constructing a multi-purpose program

   building......................................... 90,656

  For converting Administration Building and

   planning construction of an Administration/

   Health Care Unit................................ 308,406

  For replacement of roofing system................. 37,409

VIENNA CORRECTIONAL CENTER

  For replacing windows.......................... 2,118,000

  For replacing roofing systems.................... 285,076

  For replacing the cooler and freezer............. 356,663

  For upgrading the power plant..................... 20,234

  For upgrading the HVAC system and replacing

   water lines in six housing units................ 423,601

  For emergency roof replacement on

   various buildings............................... 145,698

STATEWIDE

  For the purpose of funding all

   costs associated with constructing

   an X-House.................................... 1,673,600

  For the purpose of funding all costs

   associated with constructing a

   Centralized Medical and

   Long-Term Care Facility....................... 4,618,284

  For replacing doors and locks

   at the following locations at the

   approximate costs set forth below............. 1,015,137

   Dixon Correctional Center.......... 991,258

   Vienna Correctional Center.......... 23,879

  For upgrading water towers at the following

   locations at the approximate

   cost set forth below.......................... 1,626,865

    Dixon Correctional Center.......... 388,482

   Illinois Youth Center –

     St. Charles..................... 1,228,853

   Illinois Youth Center -

     Valley View......................... 9,530

  For planning, design, construction, equipment

   and all other necessary costs for a

   maximum security facility.................... 77,469,151

  For planning a medium security facility

   and land acquisition.......................... 2,629,428

  For replacing roofing systems at

   the following locations at the

   approximate cost set forth below................ 113,380

   Menard Correctional Center........... 6,194

   Vienna Correctional Center.......... 43,997

   Illinois Youth Center -

     Harrisburg............................. 10

   Pontiac Correctional Center............. 10

   Illinois Youth Center - Joliet...... 63,167

  For replacing or upgrading security and

   monitoring systems at the following

   locations at the approximate cost set

   forth below..................................... 278,707

   Vienna Correctional Center......... 250,000

   Joliet Correctional Center.......... 28,707

  For planning and replacing windows at the

   following locations at the approximate cost

   set forth below............................... 2,226,942

   Vienna Correctional Center....... 1,780,000

   Sheridan Correctional Center....... 314,454

   Illinois Youth Center - Valley View.. 8,310

   Illinois Youth Center - Joliet...... 74,875

   Dixon Correctional Center........... 46,073

    Shawnee Correctional Center.......... 3,230

  For replacing security fencing at the

   following locations at the approximate

   cost set forth below............................ 292,225

   Hill Correctional Center............. 3,547

    Western IL Correctional Center...... 30,864

   Joliet Correctional Center.......... 49,119

    Logan Correctional Center.......... 158,964

   Dixon Correctional Center............ 8,694

   Shawnee Correctional Center.......... 5,269

    Graham Correctional Center.......... 24,369

   Danville Correctional Center........ 11,399

  For planning, design, construction, equipment

   and all other necessary costs for a

   female multi-security level

   correctional center.......................... 55,938,782

  For replacing roofing systems at the

   following locations at the approximate

   cost set forth below............................ 130,115

    Vienna Correctional Center......... 108,867

    Sheridan Correctional Center............ 10

    Western Illinois Correctional

     Center - Mt. Sterling.............. 21,238

  For upgrading fire and safety systems at

   the following locations at the approximate

   costs set forth below, in addition to

   funds previously appropriated................. 1,162,289

    Menard Correctional Center -

     Chester........................... 979,592

    Sheridan Correctional Center....... 110,620

    Vienna Correctional Center.......... 72,077

    Total                                      $189,211,439

 

    Section 85.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from reappropriations heretofore made for such purpose in Article 12, Section 85, of Public Act 97-0076, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Corrections for the projects hereinafter enumerated:

BIG MUDDY CORRECTIONAL FACILITY

(From Article 12, Section 85 of Public Act 97-0076)

  For replacing door locking controls

   and intercom systems.......................... 2,221,298

STATEVILLE CORRECTIONAL CENTER

  For installing fire alarm systems.............. 1,600,000

    Total                                        $3,821,298

 

    Section 86.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from appropriations heretofore made in Article 12, Section 86 of Public Act 97-0076, are reappropriated from the Capital Development Fund to the Capital Development Board for the projects hereinafter enumerated:

ILLINOIS YOUTH CENTER - JOLIET

(From Article 12, Section 86 of Public Act 97-0076)

  For replacing roofs, in addition

   to funds previously appropriated................ 114,950

ILLINOIS YOUTH CENTER – KEWANEE

  For replacing the sprinkler system............. 6,259,450

ILLINOIS YOUTH CENTER - PERE MARQUETTE

  For replacing roofs.............................. 217,495

ILLINOIS YOUTH CENTER - ST. CHARLES

  For upgrading HVAC system........................ 594,325

    Total                                        $7,186,220

 

    Section 90.  The sum of $176,562, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 12, Section 90 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Emergency Management Agency for costs associated with a new State Emergency Operations Center.

 

    Section 95.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from reappropriations heretofore made for such purposes in Article 12, Section 95 of Public Act 97-0076, are reappropriated from the Capital Development Fund to the Capital Development Board for the Historic Preservation Agency for the projects hereinafter enumerated:

BLACK HAWK STATE HISTORIC SITE – ROCK ISLAND

(From Article 12, Section 95 of Public Act 97-0076)

  For renovating a retaining wall and two

   shelters ....................................... 179,432

CAHOKIA MOUNDS HISTORIC SITE - COLLINSVILLE

  For replacement of Monk's Mounds stairs.......... 211,080

  For restoration of Monk's Mound.................. 606,489

  For purchasing private land within historic

   site boundary................................... 189,979

  To create a new entrance around existing

   bronze artwork doors............................. 67,301

DANA THOMAS HOUSE STATE HISTORIC SITE

  To rehabilitate the interior and exterior

   at Dana Thomas House State Historic Site........ 892,019

JARROT MANSION STATE HISTORICAL SITE

  For restoring the mansion, site improvements

   and land acquisition, in addition

   to funds previously appropriated.............. 1,447,021

LINCOLN-HERNDON LAW OFFICE - SPRINGFIELD

  For purchase and restoration

   of the Tinsley Shop........................... 1,000,000

LINCOLN LOG CABIN STATE HISTORIC SITE, COLES COUNTY

  To replace a sewer system at Historic Site........ 11,918

LINCOLN'S TOMB/VIETNAM MEMORIAL - SPRINGFIELD

  For rehabilitating site and providing

   irrigation system............................... 110,011

LINCOLN’S TOMB - SPRINGFIELD

  For renovating the interior...................... 664,600

LINCOLN'S NEW SALEM HISTORIC SITE - MENARD COUNTY

  For providing electrical at campgrounds.......... 110,444

LINCOLN PRESIDENTIAL CENTER - SPRINGFIELD

  For constructing library and museum complex, in

   addition to funds previously appropriated..... 2,505,208

OLD STATE CAPITOL - SPRINGFIELD

  For repairing elevators.......................... 387,464

UNION STATION - SPRINGFIELD

  For purchasing and rehabilitating................. 21,721

STATEWIDE

  For statewide ISTEA 21 Match..................... 384,589

  For matching ISTEA federal grant funds........... 130,615

    Total                                        $8,919,891

 

    Section 105.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from reappropriations heretofore made in Article 12, Section 105, of Public Act 97-0076, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Historic Preservation Agency for the projects hereinafter enumerated:

MT. PULASKI COURTHOUSE HISTORIC SITE - LOGAN COUNTY

(From Article 12, Section 105 of Public Act 97-0076)

  For rehabilitating interior & exterior............ 24,118

PULLMAN HISTORIC SITE

  For all costs associated with the

   stabilization and restoration of the

   Pullman Historic Site......................... 1,132,661

    Total                                        $1,156,779

 

    Section 110.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from reappropriations heretofore made for such purposes in Article 12, Section 110 of Public Act 97-0076, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Human Services for the projects hereinafter enumerated:

ALTON MENTAL HEALTH CENTER - MADISON COUNTY

(From Article 12, Section 110 of Public Act 97-0076)

  For life/safety improvements..................... 868,573

  For renovating the Forensic Complex and

   constructing two building additions, in

   addition to funds previously appropriated..... 3,900,000

  For constructing two building additions

   at the Forensic Complex....................... 6,780,876

  For rehabilitation of the central dietary.......... 9,179

CHESTER MENTAL HEALTH CENTER

  For completing the replacement of

   smoke and heat detectors, in addition

   to funds previously appropriated................ 440,000

  For upgrading HVAC systems....................... 144,664

  For replacing smoke/heat detectors................ 37,133

CHICAGO-READ MENTAL HEALTH CENTER - CHICAGO

  For renovating Unit J-East for

   forensic use, in addition to

   funds previously appropriated................. 3,500,000

  For replacing the emergency

   generator..................................... 1,312,574

  For design services to renovate Unit

   J-East for forensic use.......................... 47,560

CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER - ANNA

  For upgrading the fire alarm system............ 1,957,758

  For life/safety improvements................... 7,191,111

  For renovating Sycamore Hall...................... 94,930

  For renovating Sycamore........................ 4,385,000

ELGIN MENTAL HEALTH CENTER - KANE COUNTY

  For converting the Read Building

   for office space, in addition

   to funds previously appropriated.............. 1,655,581

  For replacing power plant and engineering

   building...................................... 4,925,502

  For renovating the central dietary

   and kitchen................................... 3,704,073

  For construction of roads, parking lots

   and street lights............................... 133,664

FOX DEVELOPMENTAL CENTER - DWIGHT

  For upgrading fire/life safety systems........... 322,241

  For replacing and repairing interior doors,

   flooring and walls, in addition to funds

   previously appropriated......................... 249,122

  For planning and beginning replacement

   of interior doors and flooring

   and repairing walls in the Main and

   Administration Buildings......................... 35,888

HOWE DEVELOPMENTAL CENTER - TINLEY PARK

  For completing upgrade of tunnels,

   Phase II, in addition to funds previously

   appropriated.................................... 366,920

  For renovating residences, in addition to

   funds previously appropriated.................... 85,209

ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE

  For replacing the roof on the main

   building and renovating the bathrooms

   in three dormitories.......................... 3,581,451

  For installing sprinkler systems

   in the dormitories and elementary

   buildings..................................... 3,702,528

  For renovating the High School Building

   Phase II........................................ 135,066

  For renovating High School Building............... 96,859

ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE

  For replacing roofs............................... 71,186

  For renovating auditorium, classroom

   and administration buildings.................. 2,026,155

  For renovating classrooms in Building 17....... 1,250,724

  For renovations to the powerhouse,

   boilers and associated coal and ash

   equipment........................................ 37,501

  For renovating the power house................... 656,458

JACKSONVILLE DEVELOPMENTAL CENTER - MORGAN COUNTY

  For upgrading fire/life safety systems........... 134,214

  For planning and beginning the renovation

   of the power house............................... 37,297

KILEY DEVELOPMENTAL CENTER - WAUKEGAN

  For improving power reliability and

   installing emergency lighting, in

   addition to funds previously appropriated....... 803,494

  For upgrading Building C ceiling................. 418,702

  For converting the facility to natural

   gas, in addition to funds previously

   appropriated.................................... 112,391

  For renovating homes, Phase II, in

   addition to funds previously appropriated........ 77,343

LINCOLN DEVELOPMENTAL CENTER - LOGAN

  For various capital improvements,

   including planning and construction

   of four ten-bed transitional or

   residential homes............................... 582,596

LUDEMAN DEVELOPMENTAL CENTER - PARK FOREST

  For upgrading the electrical panel............... 175,717

  For repairing and replacing furnaces and

   duct work, in addition to funds previously

   appropriated..................................... 41,569

  For renovating residential and neighborhood

   homes, in addition to funds previously

   appropriated..................................... 45,810

  For replacing plumbing, HVAC and boiler systems... 47,586

  For renovation of residential buildings,

   in addition to funds previously appropriated..... 73,252

MABLEY DEVELOPMENTAL CENTER - DIXON

  For replacing mechanicals and upgrading

   the fire alarm systems........................... 38,440

MADDEN MENTAL HEALTH CENTER - HINES

  For renovating residential pavilions,

   in addition to funds previously appropriated.... 550,000

  For renovating pavilions and

   administration building for safety/

   security, in addition to

   funds previously appropriated................... 621,882

  For renovating dietary........................... 729,885

  For renovation of pavilions, in addition

   to funds previously appropriated................. 60,833

MCFARLAND MENTAL HEALTH CENTER - SPRINGFIELD

  For upgrading fire alarm system................ 2,666,230

  For replacing roofs – Kennedy and

   Administration Building......................... 867,354

MURRAY DEVELOPMENTAL CENTER - CENTRALIA

  For completing the renovation of

   the boiler house, in addition to

   funds previously appropriated................. 2,991,120

SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE

  For replacing the sewer system in

   south campus.................................. 2,056,004

  For planning and beginning renovation

   of dietary...................................... 203,263

  For work necessary to remedy fire

   damper deficiencies............................. 117,020

  For replacing water mains and valves,

   in addition to funds previously appropriated.... 210,015

SINGER MENTAL HEALTH CENTER - ROCKFORD

  For upgrading fire alarm systems.................. 47,651

  For renovating dietary and stores................. 55,334

  For renovating mechanicals and

   residential areas............................... 691,943

TINLEY PARK MENTAL HEALTH CENTER – COOK COUNTY

  For completing the upgrade of fire

   and life/safety issues in Oak Hall,

   in addition to funds previously appropriated.... 600,000

STATEWIDE

  For replacing roofing systems at

   the following locations, at the

   approximate costs set forth below............... 244,866

   Chicago-Read Mental

     Health Center – Cook County....... 148,645

   Fox Developmental

     Center - Dwight.................... 11,932

    Kiley Developmental Center -

     Waukegan........................... 84,289

  For replacing and repairing roofing systems

   at the following locations, at the

   approximate cost set forth below................. 35,240

    Alton Mental Health Center -

     Madison............................. 5,873

    Shapiro Developmental Center -

     Kankakee............................ 5,873

    Ludeman Developmental Center -

     Park Forest......................... 5,873

    Madden Mental Health Center -

     Hines............................... 5,873

    Murray Developmental Center -

     Centralia........................... 5,874

    Kiley Developmental Center -

     Waukegan............................ 5,874

  For replacing and repairing roofing

   systems at the following locations, at

   the approximate cost set forth below............ 558,859

   Chicago-Read Mental Health

     Center............................. 13,767

   Howe Developmental Center -

     Tinley Park....................... 488,032

   Shapiro Developmental Center -

     Kankakee........................... 42,392

   Illinois School for the

     Deaf - Jacksonville................ 12,087

   Kiley Developmental

     Center - Waukegan................... 2,581

  For repairing or replacing roofs

   at the following locations, at

   the approximate cost set forth below............ 188,248

   Illinois School for the

     Visually Impaired -

     Jacksonville....................... 37,624

   Jacksonville Developmental

     Center - Morgan County............. 60,000

   Lincoln Developmental Center -

     Logan County........................ 2,039

   Murray Developmental Center -

     Centralia........................... 2,039

   Shapiro Developmental Center -

     Kankakee........................... 86,546

  For replacing and repairing roofing systems

   at the following locations at the approximate

   cost set forth below............................. 58,410

    Chicago-Read Mental Health Center....... 32

    Tinley Park Mental Health Center.... 12,974

    Illinois School for the Visually

     Impaired - Jacksonville............ 19,414

    Shapiro Developmental Center -

     Kankakee........................... 25,955

    Kiley Developmental Center -

     Waukegan................................ 3

    Ludeman Developmental Center -

     Park Forest............................ 32

  For replacement of roofing systems at the

   following locations at the approximate costs

   set forth below:................................ 118,670

    Lincoln Development Center.......... 29,667

    Murray Developmental Center......... 29,667

    Elgin Developmental Center.......... 29,667

    Shapiro Developmental Center........ 29,669

    Total                                       $69,966,724

 

    Section 125.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from reappropriations heretofore made for such purposes in Article 12, Section 125 of Public Act 97-0076, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Human Services for the project hereinafter enumerated:

ILLINOIS SCHOOL FOR THE DEAF – JACKSONVILLE

(From Article 12, Section 125 of Public Act 97-0076)

  For replacing dorm doors....................... 1,945,671

JACKSONVILLE DEVELOPMENTAL CENTER – MORGAN

  For upgrading the mechanicals in the

   power plant, in addition to funds

   previously appropriated.......................... 45,582

SINGER MENTAL HEALTH CENTER

  For repair and/or replacement of roofs............ 61,150

FOX DEVELOPMENTAL CENTER - DWIGHT

  For renovating the water treatment plant......... 678,331

    Total                                        $2,730,734

 

    Section 130.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from reappropriations heretofore made in Article 12, Section 130 of Public Act 97-0076, are reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Medical District Commission for the projects hereinafter enumerated:

ILLINOIS MEDICAL DISTRICT COMMISSION - CHICAGO

(From Article 12, Section 130 of Public Act 97-0076)

  For upgrading utility and infrastructure,

   in addition to funds previously appropriated.... 412,685

  For upgrading core utilities..................... 101,289

  For upgrading research center.................... 346,714

    Total                                          $860,688

 

    Section 140.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from reappropriations heretofore made for such purposes in Article 12, Section 140 of Public Act 97-0076, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Military Affairs for the projects hereinafter enumerated:

BLOOMINGTON ARMORY - McLEAN COUNTY

(From Article 12, Section 140 of Public Act 97-0076)

  For rehabilitating the mechanical/electrical

   systems and renovating the interior.............. 17,260

CAMP LINCOLN - SPRINGFIELD

  For construction of a military academy

   facility........................................ 142,417

ELGIN ARMORY - KANE COUNTY

  For upgrading the interior and exterior........... 32,395

MACOMB ARMORY - McDONOUGH

  For replacing the mechanical and electrical

   systems and installing a kitchen................. 73,371

NORTH RIVERSIDE ARMORY

  For rehabilitating the interior and

   exterior......................................... 14,648

NORTHWEST ARMORY - CHICAGO

  For upgrading the electrical system............ 2,443,344

  For replacing the mechanical systems.............. 46,187

SYCAMORE ARMORY

  For replacing the electrical system,

   renovating the interior and installing

   air conditioning................................. 22,310

STATEWIDE

  For capital improvements to the

   Lincoln’s ChalleNGe Academy.................. 37,850,666

  For constructing an army aviation

   support facility.............................. 5,895,312

  To complete construction and

   Purchase equipment for the Shiloh,

   Mt. Vernon, and Carbondale Readiness

   Center.......................................... 400,000

    Total                                       $46,937,910

 

    Section 145.  The following named amount, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 12, Section 145 of Public Act 97-0076, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Military Affairs for the project hereinafter enumerated:

LAWRENCEVILLE ARMORY

(From Article 12, Section 145 of Public Act 97-0076)

  For rehabilitating the exterior and

   replacing roofing systems...................... 176,837

    Total                                          $176,837

 

    Section 150.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from reappropriations heretofore made for such purposes in Article 12, Section 150 of Public Act 97-0076, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Revenue for the projects hereinafter enumerated:

WILLARD ICE BUILDING - SPRINGFIELD

(From Article 12, Section 150 of Public Act 97-0076)

  For repairing emergency generator................ 120,000

  For renovation of the parking ramp............. 2,678,267

  For completing the upgrade of

   building management controls,

   in addition to funds

   previously appropriated......................... 400,000

  For replacing the dock exhaust system............ 172,722

  For upgrading building management

   controls...................................... 3,495,466

  For upgrading the plumbing system................ 908,359

  For renovating the interior and

   upgrading HVAC................................ 2,847,517

    Total                                       $10,622,331

 

    Section 160.  The following named amount, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 12, Section 160 of Public Act 97-0076, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Revenue for the project hereinafter enumerated:

WILLARD ICE BUILDING – SPRINGFIELD

(From Article 12, Section 160 of Public Act 97-0076)

  For completing the upgrade of the

   Plumbing System................................. 600,000

    Total                                          $600,000

 

    Section 165.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from reappropriations heretofore made for such purposes in Article 12, Section 165 of Public Act 97-0076, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of State Police for the projects hereinafter enumerated:

AMERICAN GENERAL BUILDING - SPRINGFIELD

(From Article 12, Section 165 of Public Act 97-0076)

  For installing an emergency generator

   and various improvements...................... 2,986,883

METRO-EAST FORENSIC LAB - BELLEVILLE

  For constructing a new forensic

   lab in Belleville, in addition

   to funds previously appropriated............. 37,000,000

  For constructing new forensic lab, in

   addition to funds previously appropriated..... 1,919,299

  For planning and beginning the

   construction of a Metro East

   forensic laboratory, in addition to

   funds previously appropriated................... 750,000

EFFINGHAM DISTRICT 12

  For Effingham District 12 Firing Range............ 61,586

CHICAGO FORENSIC LABORATORY

  For planning and beginning the

   construction of an addition

   to the Chicago Forensic Laboratory............ 1,129,393

SPRINGFIELD ARMORY

  For planning and design of the rehabilitation

   and site improvements of the Springfield

   Armory, in addition to funds previously

   appropriated.................................... 352,523

STATE POLICE TRAINING ACADEMY - SPRINGFIELD

  For planning and beginning the

   construction of an addition to the

   CODIS Laboratory................................ 277,750

ULLIN DISTRICT 22

  For emergency roof and interior and

   exterior repairs................................. 71,651

STATEWIDE

  For replacing communications towers

   equipment and tower buildings................... 539,005

  For replacing radio communication towers,

   equipment buildings and installing emergency

   power generators at the following

   locations at the approximate costs

   set forth below................................. 250,000

    Harlem & Irving – Cook County....... 62,500

    Savanna – Carroll County............ 62,500

    Fairfield – Wayne County............ 62,500

    Niota – Hancock County.............. 62,500

    Total                                       $45,338,090

 

    Section 175.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from reappropriations heretofore made for such purposes in Article 12, Section 175 of Public Act 97-0076, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Veterans' Affairs for the projects hereinafter enumerated:

ANNA VETERAN’S HOME

(From Article 12, Section 175 of Public Act 97-0076)

  To plan and begin the construction

   of a 40-50 bed addition......................... 598,998

LASALLE VETERAN’S HOME – LASALLE COUNTY

  For the replacement of the galvanized water

   piping........................................... 87,600

MANTENO VETERANS' HOME - KANKAKEE COUNTY

  For replacing air conditioner chillers............ 26,537

  For replacing condensing units.................... 65,237

  For upgrading or construction of roads

   and parking lots................................. 28,785

  For planning and constructing additional

   storage and support areas........................ 73,248

  For upgrading storm sewer......................... 97,768

QUINCY VETERANS' HOME - ADAMS COUNTY

  For repairs and upgrades....................... 3,355,998

  For planning and beginning

   renovation of Kent, Shapers

   and Elmore, in addition

   to funds previously appropriated................ 876,371

  For constructing a bus and

   ambulance garage................................ 345,555

  For improvements to various buildings

   and replacement of Fletcher Building

   to meet licensure standards................... 1,804,023

  To replace a chimney stack and ash handling

   system.......................................... 713,227

STATEWIDE

  For the construction of a 200-bed

   veterans’ home facility, in addition

   to funds previously appropriated............. 48,500,000

  For planning and beginning the

   Construction of a skilled care

   Veterans’ home................................ 2,000,000

  For the construction of a 200-bed

   veterans’ home facility, in addition

   to funds previously appropriated............. 13,089,276

    Total                                       $71,662,623

 

    Section 186.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from reappropriations heretofore made for such purposes in Article 12, Section 186 of Public Act 97-0076, are reappropriated from the Capital Development Fund to the Capital Development Board for the Office of the Attorney General for the projects hereinafter enumerated:

ATTORNEY GENERAL BUILDING - SPRINGFIELD

(From Article 12, Section 186 of Public Act 97-0076)

  For renovating and waterproofing terrace......... 190,000

  For replacing electronic ballasts................ 959,000

  For replacing the roof........................... 357,023

    Total                                        $1,506,023

 

    Section 187.  The amount of $2,282,202, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 12, Section 187 of Public Act 97-0076, to the Capital Development Board for the Department of Corrections for the Illinois Youth Center – Rushville for planning, design, construction, equipment and all other necessary costs to add a cellhouse, is reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Human Services for the same purpose.

 

    Section 190.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from appropriations and reappropriations heretofore made for such purposes in Article 12, Section 190 of Public Act 97-0076, are reappropriated from the Capital Development Fund to the Capital Development Board for the projects hereinafter enumerated:

CHICAGO

(From Article 12, Section 190 of Public Act 97-0076)

  For expanding and renovating the

   Bio-Safety 3 Laboratory for the

   Department of Public Health..................... 160,356

ATTORNEY GENERAL BUILDING - SPRINGFIELD

  For upgrading the snow melt system at

   the Attorney General Building.................... 66,116

  For upgrading environmental equipment

   and HVAC, in addition to funds previously

   appropriated - Archives Building................. 35,633

STATEWIDE

  For American with Disabilities Act

   (ADA) upgrades at the following

   locations at the approximate

   cost set forth below.......................... 3,433,239

    DNR – I & M Canal Corridor.. 1,614,200

    IBHE – Eastern Illinois

    University.................. 1,819,039

  For providing construction contingency

   for the following projects at

   the approximate cost set forth below,

   in addition to funds

   previously appropriated......................... 773,500

    LINCOLN’S TOMB HISTORIC SITE -

     Rehab site/Provide irrigation

     system......................... 85,600

    MICHAEL BILANDIC BUILDING -

     Upgrade HVAC and Domestic Water

     System......................... 184,700

    SUBURBAN NORTH REGIONAL OFFICE FACILITY -

     Renovate for Office Space...... 300,200

    SECRETARY OF STATE -

     Upgrade Electrical Systems at three

     Motor Vehicle Facilities....... 203,000

  For all costs associated with

   a timekeeping and payroll system,

   including prior year costs.................... 8,301,122

  For emergencies and abatement of

   hazardous materials, in

   addition to funds previously appropriated..... 6,470,001

  For escalation costs for state

   facility projects, in addition

   to funds previously appropriated............. 16,648,000

  For escalation and emergencies for

   higher education projects, in

   addition to funds previously appropriated.... 23,355,744

  For improving energy efficiency................... 56,107

  For Emergency Repairs and Hazardous

   Material Abatement at State-Owned

   Facilities, State Universities, and

   Community Colleges.............................. 531,095

  For the purposes of capital planning

   and condition assessment and analysis

   of State capital facilities, to be

   expended only upon the direction of

   the Director of the Governor’s Office

   of Management and Budget......................... 15,326

  For abating hazardous materials.................... 7,731

  For retrofitting or upgrading mechanized

   refrigeration equipment (CFCs).................. 650,000

  For surveys and modifications to buildings

   to meet requirements of the federal

   Americans with Disabilities Act (ADA)............ 44,004

  For surveys and modifications to buildings

   to meet requirements of the federal

   Americans with Disabilities Act (ADA)........... 185,423

  For retrofitting or upgrading mechanized

   refrigeration equipment (CFCs).................. 820,918

  For surveys and modifications to buildings

   to meet requirements of the federal

   Americans with Disabilities Act................. 194,914

  For upgrading and remediating

   aboveground and underground storage tanks....... 953,921

  For surveys and modifications to

   buildings to meet requirements of the

   federal Americans with Disabilities Act......... 115,979

  For surveys and modifications to buildings

   to meet requirements of the federal

   Americans with Disabilities Act.................. 31,148

    Total                                       $62,850,277

 

    Section 195.  The amount of $49,728, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 12, Section 195 of Public Act 97-0076, is reappropriated from the Asbestos Abatement Fund to the Capital Development Board for surveying and abating asbestos-containing materials statewide.

 

    Section 200.  The amount of $83,812, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 12, Section 200 of Public Act 97-0076, is reappropriated from the Asbestos Abatement Fund to the Capital Development Board for asbestos surveys and emergency abatement in relation to asbestos abatement in state governmental buildings or higher education residential and auxiliary enterprise buildings.

 

    Section 201.  The sum of $1,192,315,833, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 12, Section 201 of Public Act 97-0076, is reappropriated from the School Construction Fund to the Capital Development Board for grants to school districts for school construction projects authorized by the School Construction Law.

 

    Section 202.  The amount of $40,047,718, or so much of that amount as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 12, Section 202 of Public Act 97-0076, is reappropriated from the School Construction Fund to the Capital Development Board for Fiscal Year 2002 School Construction Program grant recipients as follows:

  Fairfield Public School District 112........... 2,637,353

  Johnston City Community Unit School

   District 1....................................... 52,883

  East St. Louis School District 189............ 14,646,391

  Silvis School District 34...................... 8,621,988

  Community Consolidated School Dist. 93

   Carol Stream.................................. 1,554,822

  DuQuoin Community Unit School District 300..... 6,857,534

  Benton Community Consolidated School

   District 47................................... 1,100,669

  Westchester School District 92 1/2................. 4,913

  Bethalto Community School District 8........... 3,354,165

  Westmont Community Unit School District 201.... 1,217,000

 

    Section 210.  The following named amount or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 12, Section 210 of Public Act 97-0076, is reappropriated from the School Construction Fund to the Capital Development Board for the State Board of Education for the project hereinafter enumerated:

STATEWIDE

(From Article 12, Section 210 of Public Act 97-0076)

  Grants for facility construction............... 2,724,785

 

    Section 215.  The sum of $7,376,493, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 12, Section 215 of Public Act 97-0076, is reappropriated from the School Construction Fund to the Capital Development Board for school construction grants pursuant to the School Construction Law, in addition to amounts previously appropriated for such purposes.

 

    Section 220.  The sum of $3,224,584, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 12, Section 220 of Public Act 97-0076, is reappropriated from the School Construction Fund to the Capital Development Board for school construction grants pursuant to the School Construction Law, in addition to amounts previously appropriated for such purposes.

 

    Section 245.  The sum of $18,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 12, Section 245 of Public Act 97-0076, is reappropriated from the School Construction Fund to the Capital Development Board for grants to school districts for school improvement projects authorized by the School Construction Law.

 

    Section 270.  The sum of $475,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 12, Section 270 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Capital Development Board for water resource management projects as authorized by subsection (g) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 275.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from reappropriations heretofore made for such purposes in Article 12, Section 275 of Public Act 97-0076, are reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for the projects hereinafter enumerated:

CITY COLLEGES OF CHICAGO

(From Article 12, Section 275 of Public Act 97-0076)

  For various bondable capital improvements........ 570,171

CITY COLLEGES OF CHICAGO/KENNEDY KING

  For remodeling for Workforce Preparation

   Centers....................................... 3,575,930

  For remodeling for a culinary arts

   educational facility......................... 10,875,000

CITY COLLEGES OF CHICAGO - MALCOLM X COLLEGE

  For remodeling the Allied Health

   program facilities............................ 4,298,223

COLLEGE OF DUPAGE

  or Installation of the

   Instructional Center Noise Abatement.......... 1,544,600

COLLEGE OF LAKE COUNTY

  For Construction of a Student

   Service Building............................. 35,927,000

ELGIN COMMUNITY COLLEGE

  For Spartan Drive Extension.................... 2,244,800

IECC – LINCOLN TRAIL COLLEGE

  For Construction of a Center

   for Technology................................ 7,569,800

ILLINOIS VALLEY COMMUNITY COLLEGE

  For Construction of a Community

   Technology Center ........................... 16,138,287

JOLIET JUNIOR COLLEGE

  For renovation of Utilities.................... 4,386,460

KANKAKEE COMMUNITY COLLEGE

  For constructing a laboratory/classroom

   facility........................................ 226,567

KASKASKIA COLLEGE

  For all costs associated with

   construction of new facilities as

   part of Phase Two of the Vandalia Campus...... 5,600,000

LAKE LAND COLLEGE

  For renovating and expanding

   Student Services Building Addition............ 2,361,100

  For Construction of a Rural

   Development Technology Center................. 7,524,100

  For Student Services Building addition......... 6,498,007

LEWIS AND CLARK COLLEGE

  For construction and infrastructure

   improvements to the National Great

   Rivers Research and Education Center.......... 2,306,486

MCHENRY COUNTY COLLEGE

  For constructing classrooms and a

   student services building and remodeling

   space, in addition to funds previously

   appropriated.................................... 473,076

MORAINE VALLEY COMMUNITY COLLEGE - PALOS HILLS

  For constructing a classroom/administration

   building, providing site improvements and

   purchasing equipment, in addition to

   funds previously appropriated.................... 41,635

MORTON COLLEGE

  For costs associated with capital

   improvements.................................. 4,500,000

PARKLAND COLLEGE

  For renovating and expanding

   the Student Services Center Addition......... 14,351,075

PRAIRIE STATE COLLEGE - CHICAGO HEIGHTS

  For costs associated with capital

   improvements at Prairie State College......... 4,504,205

  For constructing an addition to the Adult

   Training/Outreach Center, in addition to

   funds previously appropriated................... 811,858

REND LAKE COLLEGE

  For Art Program Addition

   and minor remodeling............................ 451,300

RICHLAND COMMUNITY COLLEGE

  For Renovation of the Student

   Success Center and Construction

   of an Addition to the Student

   Success Center................................ 3,524,000

ROCK VALLEY COLLEGE

  For Construction of an

   Arts Instructional Center and

   remodeling of existing classroom buildings... 26,711,900

SOUTH SUBURBAN COLLEGE

  For improving flood retention.................... 437,000

TRITON COMMUNITY COLLEGE - RIVER GROVE

  For renovating and expanding

   the Technology Building...................... 10,616,621

  For rehabilitating the Liberal Arts

   Building...................................... 1,536,546

  For rehabilitating the potable water

   distribution system.............................. 70,146

TRUMAN COLLEGE

  For costs associated with capital

   improvements.................................. 5,000,000

WILBUR WRIGHT COLLEGE

  For costs associated with capital

   improvements to the Humboldt Park

   Vocational Education Center

   at Wilbur Wright College...................... 5,000,000

WILLIAM RAINEY HARPER COLLEGE

  For Engineering and Technology

   Center Renovations........................... 19,738,351

  For Construction of a One

   Stop/Admissions and Campus/

   Student Life Center.......................... 40,653,900

STATEWIDE

  For the Illinois Community College Board

   miscellaneous capital improvements including

   construction, capital facilities, cost of

   planning, supplies, equipment, materials,

   services and all other expenses required to

   complete the work at the various community

   Colleges.  This appropriated amount shall be

   in addition to any other appropriated amounts

   which can be expended for this purpose........ 1,406,085

  For miscellaneous capital improvements

   including construction, capital facilities,

   cost of planning, supplies, equipment,

   materials, services and all other expenses

   required to complete the work at the

   various community colleges.  This appropriated

   amount shall be in addition to any other

   appropriated amounts which can be

   expended for these purposes................... 4,837,570

  For miscellaneous capital improvements

   including construction, capital facilities,

   cost of planning, supplies, equipment,

   materials, services and all other expenses

   required to complete the work at the

   various community colleges.  This appropriated

   amount shall be in addition to any other

   appropriated amounts which can be

   expended for these purposes................... 3,563,951

    Total                                      $259,875,750

 

    Section 280.  The amount of $400,281, or so much thereof as may be necessary, and remains unexpended on June 30, 2012, from a reappropriation heretofore made for such purposes in Article 12, Section 280 of Public Act 97-0076, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Community College Board for grants to community colleges repair, renovation, and miscellaneous capital improvements including construction, reconstruction, remodeling, improvement, repair and installation of capital facilities, costs of planning, supplies, equipment, materials, services, and all other expenses required to complete the work.  This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 281.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from appropriations heretofore made for such purpose in Article 12, Section 281 of Public Act 97-0076, are reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for the Temporary Facility Replacement Program for the projects hereinafter enumerated:

COLLEGE OF DUPAGE

(From Article 12, Section 281 of Public Act 97-0076)

  For Temporary Facilities Replacement.......... 25,000,000

COLLEGE OF LAKE COUNTY

  For Construction of a Classroom Building

   at the Grayslake Campus...................... 17,569,200

IECC – LINCOLN TRAIL COLLEGE

  For Construction of an AC/Refrigeration

   and Sheet Metal Technology Building........... 1,495,500

IECC – OLNEY CENTRAL

  For Construction of the Collision

   Repair Technology Center...................... 1,122,800

IECC – WABASH VALLEY

  For Construction of a Student Center........... 4,029,400

ILLINOIS CENTRAL COLLEGE

  For Renovation and Additions to

   Dirksen Hall.................................. 2,633,700

ILLINOIS VALLEY COMMUNITY COLLEGE

  For Construction of a Community

.  Technology Center............................. 6,521,700

JOLIET JUNIOR COLLEGE

  For Temporary Facilities Replacement........... 1,095,464

LAKE LAND COLLEGE

  For Construction of a Workforce

   Relocation Center and Construction

   of a Student Services Center in

   Addition to Funds Previously Appropriated..... 9,881,700

LEWIS & CLARK COMMUNITY COLLEGE

  For Construction of a Daycare

   and Montessori................................ 1,663,000

  For Construction of an Engineering Annex....... 1,536,600

LINCOLN LAND COMMUNITY COLLEGE

  For Renovations to Sangamon Hall South......... 2,991,200

MCHENRY COUNTY COLLEGE

  For Construction of a Greenhouse................. 671,600

  For Construction of a Pumphouse.................. 115,900

OLIVE HARVEY COLLEGE

  For Construction of a New Building............ 30,671,600

PARKLAND COLLEGE

  For Construction of an Applied

   Technology Addition........................... 1,854,844

SPOON RIVER COLLEGE

  For Construction of a Multi-Purpose

   Building...................................... 4,027,100

WAUBONSEE COMMUNITY COLLEGE

  To Replace Building “A”

   Temporary Building............................ 2,615,200

WILLIAM RAINEY HARPER COLLEGE

  To Replace the Hospitality Facility............ 3,944,800

    Total                                      $119,441,308

 

    Section 285.  The sum of $1,324,346, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 12, Section 285 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete the work at the various community colleges.  This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 290.  The sum of $1,660,227, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purposes in Article 12, Section 290 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, reconstruction, remodeling, improvement, repair and installation of capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete the work at the various community colleges.  This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 295.  The sum of $2,528,831, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purposes in Article 12, Section 295 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, reconstruction, remodeling, improvement, repair and installation of capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete the work at the various community colleges.  This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 300.  The sum of $668,166, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purposes in Article 12, Section 300 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for grants to community colleges for miscellaneous capital improvements including construction, reconstruction, remodeling, improvements, repair and installation of capital facilities, cost of planning, supplies, equipment, materials, services, and all other expenses required to complete the work. This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 306.  The sum of $26,785,239, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 12, Section 306 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Board of Higher Education for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete work at the various higher education institutions.  This appropriated amount shall be in addition to any other appropriated amounts which can be expended for such purposes.

 

    Section 310.  The following named amount, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 12, Section 310 of Public Act 97-0076, are reappropriated from the Capital Development Fund to the Capital Development Board for the Board of Higher Education for the project hereinafter enumerated:

ILLINOIS MATHEMATICS AND SCIENCE ACADEMY - AURORA

(From Article 12, Section 310 of Public Act 97-0076)

  To plan and begin construction of a

   space for the delivery of teacher

   training and development and student

   enrichment programs............................. 108,843

 

    Section 314.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from reappropriations heretofore made in Article 12, Section 314 of Public Act 97-0076, are reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Board of Higher Education for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete work at the various higher education institutions. These appropriated amounts shall be in addition to any other appropriated amounts which can be expended for such purposes

  Chicago State University....................... 1,024,348

  Eastern Illinois University.................... 1,896,946

  Governors State University....................... 853,800

  Illinois State University...................... 4,512,725

  Northeastern Illinois University............... 1,726,500

  Northern Illinois University................... 5,171,710

  Western Illinois University.................... 3,543,760

  Southern Illinois University - Carbondale...... 7,187,290

  Southern Illinois University - Edwardsville.... 3,395,559

  University of Illinois - Chicago.............. 12,385,656

  University of Illinois - Springfield........... 1,031,100

  University of Illinois - Urbana/Champaign..... 18,482,367

  Total                                         $61,211,761

 

    Section 315.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from reappropriations heretofore made in Article 12, Section 315 of Public Act 97-0076, are reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Board of Higher Education for the projects hereinafter enumerated:

STATEWIDE

(From Article 12, Section 315 of Public Act 97-0076)

  For miscellaneous capital improvements

   including construction, capital facilities,

   cost of planning, supplies, equipment,

   materials, services and all other expenses

   required to complete the work at the various

   universities.  This appropriated amount

   shall be in addition to any other appropriated

   amounts which can be expended for these

   purposes..................................... 16,827,341

   Chicago State University........... 322,100

    Eastern Illinois University........ 515,500

   Governors State University........... 2,533

   Illinois State University.......... 984,871

   Northeastern Illinois University... 383,700

   Northern Illinois University..... 1,159,000

   Western Illinois University........ 219,551

   Southern Illinois University -

     Carbondale........................ 801,859

   Southern Illinois University -

     Edwardsville...................... 763,100

   University of Illinois -

     Chicago......................... 2,777,300

    University of Illinois -

     Springfield....................... 227,400

    University of Illinois -

     Urbana/Champaign................ 3,485,827

   Illinois Community

     College Board................... 5,184,600

  For miscellaneous capital improvements

   including construction, capital

   facilities, cost of planning, supplies,

   equipment, materials, services and

   all other expenses required to complete

   the work at the various universities.

   This appropriated amount shall be in

   addition to any other appropriated amounts

   which can be expended for these purposes..... 15,085,916

   Chicago State University............ 32,666

   Eastern Illinois University........ 515,500

   Governors State University........... 1,001

     Illinois State University.......... 28,948

   Northeastern Illinois

     University........................ 383,700

   Northern Illinois University..... 1,159,000

   Southern Illinois University -

     Carbondale......................... 31,277

   Southern Illinois University -

     Edwardsville.......................... 712

   University of Illinois -

     Chicago......................... 2,777,300

    University of Illinois -

     Springfield....................... 212,512

   University of Illinois -

     Urbana/Champaign................ 3,871,600

   Illinois Community

     College Board................... 6,071,700

  For miscellaneous capital improvements

   including construction, capital

   facilities, cost of planning, supplies,

   equipment, materials, services and

   all other expenses required to complete

   the work at the various universities

   This appropriated amount shall be in

   addition to any other appropriated amounts

   which can be expended for these purposes...... 4,102,538

   Eastern Illinois University........ 515,500

   Illinois State University............ 1,007

   Northern Illinois University....... 510,002

   Western Illinois University........ 138,442

   Southern Illinois University -

     Carbondale........................ 131,311

   University of Illinois -

     Chicago......................... 2,049,066

    University of Illinois -

     Springfield....................... 209,126

   University of Illinois -

     Urbana/Champaign.................. 548,084

  For miscellaneous capital improvements,

   including construction, capital

   facilities, cost of planning,

   supplies, equipment, materials, services

   and all other expenses required to

   complete the work at the various universities.

   This appropriated amount shall be in

   addition to any other appropriated

   amounts which can be expended

   for these purposes............................ 2,793,330

   Eastern Illinois University........ 475,768

   Illinois State University........... 77,206

   Northern Illinois University..... 1,207,568

   Southern Illinois University -

     Carbondale......................... 71,189

   University of Illinois -

     Chicago........................... 245,200

   University of Illinois -

     Urbana/Champaign.................. 716,399

  For miscellaneous capital improvements

   including construction, reconstruction

   remodeling, improvements, repair

   and installation of capital

   facilities, cost of planning, supplies,

   equipment, materials, services and all

   other expenses required to complete

   the work at the various universities set

   forth below.  This appropriated amount

   shall be in addition to any other

   appropriated amounts which can

   be expended for these purposes................ 1,094,808

    Chicago State University........... 118,057

    Eastern Illinois University......... 42,140

    Northeastern Illinois University.... 32,560

    Northern Illinois University....... 690,260

    Western Illinois University......... 12,865

    University of Illinois -

    Champaign/Urbana Campus........... 198,926

  For miscellaneous capital improvements

   including construction, capital

   facilities, cost of planning, supplies,

   equipment, materials, services and

   all other expenses required to

   complete the work at the various

   universities set forth below.  This

   appropriation shall be in addition

   to any other appropriated amounts

   which can be expended for these purposes........ 744,297

  For Eastern Illinois University...... 217,850

  For Northeastern Illinois University .. 3,449

  For Northern Illinois University...... 58,820

  For University of Illinois -

   Urbana-Champaign.................... 464,178

  For miscellaneous capital improvements,

   including construction, reconstruction,

   remodeling, improvement, repair and

   installation of capital facilities, cost of

   planning, supplies, equipment, materials,

   services and all other expenses

   required to complete the work at the various

   universities set forth below.  This

   appropriation shall be in addition to

   any other appropriated amounts which

   can be expended for these purposes.............. 234,399

    For Northern Illinois University... 151,292

    For Southern Illinois University -

    Carbondale......................... 22,188

    For Southern Illinois University -

    Edwardsville....................... 11,240

    For University of Illinois -

    Urbana-Champaign.................... 49,679

  For miscellaneous capital improvements

   including construction, reconstruction,

   remodeling, improvement, repair and

   installation of capital facilities,

   cost of planning, supplies, equipment,

   materials, services and all other expenses

   required to complete the work at the

   various universities set forth below.

   This appropriation shall be in addition

   to any other appropriated amounts which

   can be expended for these purposes.............. 715,448

    For Eastern Illinois University.... 150,380

    For Governors State University...... 71,798

    For Illinois State University....... 55,040

    For Northeastern Illinois University 36,177

    For Northern Illinois University... 207,446

    For University of Illinois......... 194,607

SOUTHERN ILLINOIS UNIVERSITY

  For Southern Illinois University

   for miscellaneous capital improvements

   including construction, reconstruction,

   remodeling, improvements, repair and

   installation of capital facilities, cost

   of planning, supplies, equipment, materials

   services and all other expenses

   required to complete the work.  This

   appropriation shall be in addition to any

   other appropriated amounts which can

   be expended for these purposes.................. 118,119

UNIVERSITY OF ILLINOIS

  For the Board of Trustees of the University of

   Illinois for miscellaneous capital

   improvements including construction,

   reconstruction, remodeling, improvement,

   repair and installation of capital

   facilities, cost of planning, supplies,

   equipment, materials, services and

   all other expenses required for completing

   the work at the colleges and

   universities.  This appropriation shall

   be in addition to any other

   appropriated amounts which can be

   expended for these purposes...................... 89,723

  For the Board of Higher Education for

   miscellaneous capital improvements,

   including construction, reconstruction,

   remodeling, improvements, repair and

   installation of capital facilities, cost

   of planning, supplies, equipment,

   materials, services, and all other

   expenses required to complete the

   work at the colleges and universities

   hereinafter enumerated.  This appropriation

   shall be in addition to any other

   appropriated amounts which can be

   expended for these purposes:

  Northern Illinois University...................... 17,448

    Total                                       $41,823,367

 

    Section 320.  The sum of $109,850, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purposes in Article 12, Section 320 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Capital Development Board for the Board of Higher Education for miscellaneous capital improvements, including construction, reconstruction, remodeling, improvement, repair and installation of capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required for completing the work at the colleges and universities.  This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 325.  The following named amounts, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from reappropriations heretofore made for such purposes in Article 12, Section 325 of Public Act 97-0076, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Board of Higher Education for the projects hereinafter enumerated:

(From Article 12, Section 325 of Public Act 97-0076)

  For miscellaneous capital improvements

   including construction, capital

   facilities, cost of planning, supplies,

   equipment, materials, services and

   all other expenses required to complete

   the work at the various universities.

   This appropriated amount shall be in

   addition to any other appropriated amounts

   which can be expended for these purposes.

    Chicago State University....................... 119,814

    Eastern Illinois University.................... 257,800

    Governors State University...................... 94,900

    Illinois State University...................... 510,700

    Northeastern Illinois University............... 191,800

    Northern Illinois University................... 579,500

    Western Illinois University..................... 96,101

    Southern Illinois University - Carbondale...... 560,973

    Southern Illinois University - Edwardsville ... 381,500

    University of Illinois - Chicago............. 1,388,600

    University of Illinois - Springfield........... 114,600

    University of Illinois - Urbana/Champaign.... 2,075,100

    Illinois Community College Board............. 2,888,562

    Total                                        $9,259,950

  For miscellaneous capital improvements

   including construction, capital

   facilities, cost of planning, supplies,

   equipment, materials, services and

   all other expenses required to complete

   the work at the various universities.

   This appropriated amount shall be in

   addition to any other appropriated amounts

   which can be expended for these purposes.

    Eastern Illinois University.................... 255,993

    Governors State University...................... 21,306

    Northeastern Illinois University............... 191,800

    Northern Illinois University................... 579,500

    Southern Illinois University - Carbondale....... 22,934

    Southern Illinois University - Edwardsville..... 82,753

    University of Illinois - Chicago............. 1,388,600

    University of Illinois - Springfield........... 114,600

    University of Illinois - Urbana/Champaign.... 1,878,827

    Illinois Community College Board............. 2,805,684

    Total                                        $7,341,997

  For miscellaneous capital improvements

   including construction, capital

   facilities, cost of planning, supplies,

   equipment, materials, services and

   all other expenses required to complete

   the work at the various universities.

   This appropriated amount shall be in

   addition to any other appropriated amounts

   which can be expended for these purposes.

    Eastern Illinois University.................... 185,800

    Governors State University...................... 45,618

    Illinois State University....................... 27,182

    Northern Illinois University................... 579,500

    Western Illinois University...................... 9,341

    Southern Illinois University - Carbondale....... 14,758

    University of Illinois - Chicago............... 974,174

    University of Illinois - Springfield............ 76,866

    University of Illinois - Urbana/Champaign.... 1,539,425

    Total                                        $3,452,664

  For miscellaneous capital improvements

   including construction, capital

   facilities, cost of planning, supplies,

   equipment, materials, services and

   all other expenses required to complete

   the work at the various universities.

   This appropriated amount shall be in

   addition to any other appropriated amounts

   which can be expended for these purposes.

    Eastern Illinois University..................... 21,618

    Governors State University...................... 26,826

    Illinois State University...................... 110,469

    Northeastern Illinois University................ 87,701

    Northern Illinois University................... 335,923

    University of Illinois - Chicago............... 103,101

    University of Illinois - Springfield............ 30,052

    University of Illinois - Urbana/Champaign...... 117,891

    Total                                          $833,581

  For miscellaneous capital improvements

   including construction, capital

   facilities, cost of planning, supplies,

   equipment, materials, services and

   all other expenses required to complete

   the work at the various universities.

   This appropriated amount shall be in

   addition to any other appropriated amounts

    which can be expended for these purposes.

  Eastern Illinois University...................... 134,474

  Northeastern Illinois University.................. 32,547

  Northern Illinois University..................... 340,000

  University of Illinois- Champaign/Urbana.......... 54,204

    Total                                          $561,225

 

    Section 330.  The sum of $1,598,774, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 12, Section 330 of Public Act 97-0076, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete the work at the various community colleges. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 335.  The sum of $1,253,180, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 12, Section 335 of Public Act 97-0076, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete the work at the various community colleges. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 340.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2012, from reappropriations heretofore made in Article 12, Section 340 of Public Act 97-0076, are reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Board of Higher Education for the projects hereinafter enumerated:

CHICAGO STATE UNIVERSITY

(From Article 12, Section 340 of Public Act 97-0076)

  For a grant for the construction

   of a Westside campus......................... 39,000,000

  For renovating Douglas Hall, in

   addition to funds previously appropriated.... 17,000,000

  For Construction of an Early

   Childhood Development Center.................. 3,000,000

  For Remediation of the Convocation

   Building, in addition to funds

   previously appropriated....................... 5,000,000

  For replacing primary electrical

   feeder cable.................................... 115,049

  For the construction of a conference

   Center, Daycare Facility,

   renovating Building K (Robinson

   Center) and Financial Outreach

   Building in addition to funds

   previously appropriated....................... 4,835,310

  For the construction of a day care facility.... 4,863,999

  For the construction of a student

   financial outreach building................... 4,719,982

  For constructing a new library facility,

   site improvements, utilities, and

   purchasing equipment, in addition

   to funds previously appropriated................ 126,147

  For technology improvements and

   deferred maintenance............................ 817,757

  For remodeling Building K, in addition

   to funds previously appropriated.............. 8,473,432

  For planning and beginning to remodel

   Building K and improving site................... 927,735

  For upgrading campus infrastructure,

   in addition to the funds

   previously appropriated.......................... 26,643

  For renovating buildings and upgrading

   Mechanical systems............................... 28,077

EASTERN ILLINOIS UNIVERSITY

  For remodeling of the HVAC in the

   Life Science Building and Coleman Hall........ 4,757,100

  For upgrading the electrical

   distribution system.............................. 61,931

  For renovating and expanding the

   Fine Arts Center, in addition to

   funds previously appropriated.................... 46,796

  For planning and beginning to renovate

   and expand the Fine Arts Center -

   Phase 1, in addition to funds

   previously appropriated......................... 133,604

  For upgrading campus buildings for health,

   safety and environmental improvements............. 9,809

GOVERNORS STATE UNIVERSITY

  For renovation of a Teaching/Learning

   Complex, in addition to funds

   previously appropriated....................... 8,000,000

  For replacing roadways and sidewalks........... 2,028,000

  For constructing addition and

   remodeling the teaching & learning

   complex, in addition to funds

   previously appropriated...................... 13,604,037

ILLINOIS STATE UNIVERSITY

  For renovations of the Fine Arts

   Complex...................................... 54,250,100

  For renovating Stevenson and Turner

   Halls for life/safety........................... 702,608

  For the upgrade and remodeling

   of Schroeder Hall............................. 1,918,544

  For remodeling Julian and Moulton Halls.......... 376,727

NORTHEASTERN ILLINOIS UNIVERSITY

  For costs associated with renovations

   to the facility for the construction

   of a Latino Cultural Center .................. 1,500,000

  For constructing an education building........ 72,977,200

  For renovating Building "C" and

   remodeling and expanding Building "E"

   and Building "F".............................. 6,233,200

  For planning and beginning to remodel

   Buildings A, B and E............................ 126,409

  For remodeling in the Science Building

   to upgrade heating, ventilating and air

   conditioning systems.......................... 2,021,400

  For replacing fire alarm systems, lighting

   and ceilings.................................... 116,081

NORTHERN ILLINOIS UNIVERSITY

  For the renovation of Cole Hall

   and expanding/renovating Stevens Building..... 6,070,715

  For renovating and expanding

   Stevens Building............................. 22,086,985

  For planning Computer Sciences

   Technology Center............................. 2,787,400

  For renovating the Founders Library

   basement, in addition to funds previously

   appropriated.................................... 626,578

  For planning a classroom building and

   developing site in Hoffman Estates............ 1,314,500

  For completing the construction of the

   Engineering Building, in addition to

   amounts previously appropriated for

   such purpose..................................... 12,488

  For renovating Altgeld Hall and

   purchasing equipment............................. 94,434

SOUTHERN ILLINOIS UNIVERSITY - EDWARDSVILLE

  For renovating and constructing

   a Science Laboratory, in addition

   to funds previously appropriated............. 55,805,490

SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE

  For constructing a Transportation

   Education Center, in addition

   to funds previously appropriated............. 25,707,020

  For planning and beginning

   Communications Building....................... 4,255,400

  For renovating and constructing an

   addition to the Morris Library, in

   addition to funds previously

   appropriated..................................... 13,826

SIU SCHOOL OF MEDICINE - SPRINGFIELD

  For constructing and for equipment for

   an addition to the combined laboratory,

   in addition to funds previously

   appropriated...................................... 5,470

UNIVERSITY OF ILLINOIS AT CHICAGO

  For upgrading the campus infrastructure

   and renovating campus buildings.............. 20,800,000

  Plan, construct, and equip the Chemical

   Sciences Building............................ 57,600,000

  For planning, construction and equipment

   for a chemical sciences building.............. 3,549,048

  To plan and begin construction of

   a medical imaging research/clinical

   facility......................................... 49,753

  For remodeling the Clinical

   Sciences Building............................... 854,132

  For the renovation of the court area and

   Lecture Center, in addition to funds

   previously appropriated.......................... 54,793

UNIVERSITY OF ILLINOIS AT CHAMPAIGN-URBANA

  For renovating Lincoln Hall, in

   addition to funds previously appropriated.... 21,029,409

  For constructing a Post Harvest

   Crop Processing and Research

   Laboratory, in addition to

   funds previously appropriated................ 20,034,000

  For constructing an Electrical

   and Computer Engineering Building,

   in addition to funds previously appropriated. 44,260,199

  Expansion of Microelectronics Lab................. 41,764

  For planning, construction and equipment

   for a biotechnology genomic facility............ 434,265

  For planning, construction and equipment

   for a supercomputing application facility........ 88,416

UNIVERSITY OF ILLINOIS - SPRINGFIELD

  For renovation and construction

   of the Public Safety Building................. 4,000,000

UNIVERSITY CENTER OF LAKE COUNTY

  For constructing a university center and

   purchasing equipment, in addition to

   funds previously appropriated..................... 7,803

  For land, planning, remodeling, construction

   and all costs necessary to construct a

   facility.......................................... 1,504

WESTERN ILLINOIS UNIVERSITY - MACOMB

  For constructing a performing arts

   center, in addition to funds

   previously appropriated...................... 67,835,768

  Plan and construct performing arts center...... 1,148,428

  For improvements to Memorial

   Hall............................................ 467,764

WESTERN ILLINOIS UNIVERSITY - QUAD CITIES

  For renovation and construction of a

   Riverfront Campus, in addition to

   funds previously appropriated................ 41,262,012

  For the renovation and construction

   of a Riverfront Campus,

   in addition to funds

   previously appropriated....................... 2,817,723

ILLINOIS MATH AND SCIENCE ACADEMY

  For residence hall rehabilitation

   and main building addition.................... 6,260,000

  For “A” wing laboratories remodeling........... 3,600,000

    Total                                      $672,774,764

 

    Section 360.  The amount of $73,780, or so much thereof as may be necessary, and remains unexpended on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 12, Section 360 of Public Act 97-0076, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the University of Illinois for miscellaneous capital improvements including construction, reconstruction, remodeling, improvement, repair and installation of capital facilities, costs of planning, supplies, equipment, materials, services, and all other expenses required to complete the work.  This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 370.  The following named amount, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 12, Section 370 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Capital Development Board for the project hereinafter enumerated:

EAST ST. LOUIS COLLEGE CENTER

(From Article 12, Section 370 of Public Act 97-0076)

  For construction of facilities, remodeling,

   site improvements, utilities and other

   costs necessary for adapting the former

   campus of Metropolitan Community College

   for a Community College Center and Southern

   Illinois University, in addition to funds

   previously appropriated....................... 1,724,679

 

    Section 375.  The sum of $13,384,149, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 12, Section 375 of Public Act 97-0076, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials and all other expenses required to complete the work at the various community colleges.  This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 380.  The sum of $21,145,480, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 12, Section 380 of Public Act 97-0076, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials and all other expenses required to complete the work at the various community colleges.  This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 385.  The sum of $4,180,303, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 12, Section 385 of Public Act 97-0076, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials and all other expenses required to complete the work at the various community colleges.  This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 390.  The sum of $3,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 12, Section 390 of Public Act 97-0076, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for a grant to Northwestern University for planning, construction, and equipment for a Nanofabrication and Molecular Center.  This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 400.  The sum of $6,445, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 12, Section 400 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for miscellaneous capital improvements to state facilities including construction, reconstruction, remodeling, improvement, repair and installation of capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete the work at the facilities.  This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 405.  The sum of $53,565,935, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 12, Section 405 of Public Act 97-0076, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the development and improvement of educational, scientific, technical and vocational programs and facilities and the expansion of health and human services, and for any other purposes authorized in subsection (c) of Section 4 of the Build Illinois Bond Act and for grants to State agencies for such purposes.

 

    Section 410.  The sum of $104,410,024, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 12, Section 410 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Capital Development Board for educational purposes by State universities and colleges, the Illinois Community College Board created by the Public Community College Act and for grants to public community colleges as authorized by Sections 5-11 and 5-12 of the Public Community College Act as authorized by subsection (a) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 425.  The sum of $265,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 12, Section 425 of Public Act 97-0076, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Board of Higher Education for grants to various private colleges and universities.

 

    Section 430.  The amount of $2,476,501, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 12, Section 430 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Capital Development Board for grants to units of local government and other eligible entities for all costs associated with land acquisition, construction and rehabilitation projects.

 

    Section 435.  The sum of $2,517,200, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 12, Section 435 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Capital Development Board for child care facilities, mental and public health facilities, and facilities for the care of disabled veterans and their spouses as authorized by subsection (d) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 440.  The sum of $77,429,245, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 12, Section 440 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Capital Development Board for correctional purposes at State prison and correctional centers as authorized by subsection (b) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 445.  The sum of $24,167,555, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 12, Section 445 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Capital Development Board for open spaces, recreational and conservation purposes and the protection of land and for deposits into the Partners for Conservation Projects Fund as authorized by subsection (c) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 450.  The sum of $4,856,264, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 12, Section 450 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Capital Development Board for child care facilities, mental and public health facilities, and facilities for the care of disabled veterans and their spouses as authorized by subsection (d) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 455.  The sum of $92,709,394, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 12, Section 455 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Capital Development Board for use by the State, its departments, authorities, public corporations, commissions and agencies as authorized by subsection (e) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 460.  The sum of $45,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 12, Section 460 of Public Act 97-0076, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for early childhood construction grants to school districts and not-for-profit providers of early childhood services for children ages birth to 5 years of age for construction or renovation of early childhood facilities, with priority given to projects located in those communities in this State with the greatest underserved population of young children, as identified by the Capital Development Board, in consultation with the State Board of Education, using census data and other reliable local early childhood service date.

 

    Section 470.  The sum of $23,258,697, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 12, Section 470 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Capital Development Board for the State Board of Education for grants to school districts for energy efficiency projects.

 

    Section 485.  The sum of $75,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 12, Section 485 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Capital Development Board for the Chicago Board of Education for costs associated with school renovation and construction for the purposes of providing vocational education.

 

    Section 490.  This Article is not subject to limitations under Section 5 of Article 48 of Public Act 95-734 or any similar limitation.

 

    Section 495.  No contract shall be entered into or obligation incurred for any expenditure in this Article until after the purpose and amounts have been approved in writing by the Governor.

 

    Total, this Article                      $3,927,697,788

 

ARTICLE 23

 

GOVERNOR’S OFFICE OF MANAGEMENT AND BUDGET

    Section 5.  The sum of $50,000,000, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Governor’s Office of Management and Budget for an accounting information technology system.

 

    Section 10.  No contract shall be entered into or obligation incurred or any expenditures made from appropriations in this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, this Article                         $50,000,000

 

ARTICLE 24

 

ILLINOIS EMERGENCY MANAGEMENT AGENCY

    Section 5.  The sum of $25,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 13, Section 5 of Public Act 97-0076, is reappropriated from the Build Illinois Bond Fund to the Illinois Emergency Management Agency for safety and security improvements at various public universities, private colleges or universities and community colleges.

 

    Section 10.  No contract shall be entered into or obligation incurred for any expenditures from appropriations in Section 5 of this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, this Article                         $25,000,000

 

ARTICLE 25

 

ILLINOIS STATE BOARD OF EDUCATION

    Section 5.  The sum of $100,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 14, Section 5 of Public Act 97-0076, as amended, is reappropriated from the School Construction Fund to the Illinois State Board of Education for school districts for maintenance projects authorized by School Construction Law.

 

    Section 10.  The sum of $419,619, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 14, Section 10 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Illinois State Board of Education to fund all costs associated with the Technology Immersion Project.

 

    Section 15.  The sum of $25,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 14, Section 15 of Public Act 97-0076, as amended, is reappropriated from the Capital Development Fund to the Illinois State Board of Education for grants to school districts for school construction projects pursuant to 105 ILCS 5/2-3.146.

 

    Section 20.  No contract shall be entered into or obligation incurred or any expenditures made from appropriations in this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, this Article                        $125,419,619

 

ARTICLE 26

 

EASTERN ILLINOIS UNIVERSITY

    Section 10.  The sum of $1,551,914, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 15, Section 10 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Board of Trustees of Eastern Illinois University for all costs associated with renovation and expansion of the Doudna Fine Arts Center.  This appropriation is in addition to funds previously appropriated.

 

    Section 15.  No contract shall be entered into or obligation incurred for any expenditures from appropriations in this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, this Article                          $1,551,914

 

ARTICLE 27

 

SOUTHERN ILLINOIS UNIVERSITY

    Section 5.  The sum of $17,564,400, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 16, Section 5 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Board of Trustees of Southern Illinois University for construction and equipment expenses to complete the renovation and expansion of the Morris Library.  This appropriation is in addition to funds previously appropriated.

 

    Section 10.  No contract shall be entered into or obligation incurred for any expenditures from appropriations in Section 5 of this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, this Article                         $17,564,400

 

ARTICLE 28

 

ILLINOIS COMMERCE COMMISSION

    Section 5.  The sum of $52,857, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 19, Section 5 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Illinois Commerce Commission for train whistle abatement in counties with over 3,000,000 in population, where a public highway crosses a railroad at grade.

 

    Section 10.  No contract shall be entered into or obligation incurred for any expenditure in this Article until after the purpose and amounts have been approved in writing by the Governor.

 

    Total, this Article                             $52,857

 

ARTICLE 29

 

ENVIRONMENTAL PROTECTION AGENCY

    Section 5.  The sum of $500,000,000, or so much thereof as may be necessary, is appropriated from the Anti-Pollution Fund to the Environmental Protection Agency for the Drinking Water Quality Initiative.

 

    Section 10.  The sum of $400,000,000, or so much thereof as may be necessary, is appropriated from the Anti-Pollution Fund to the Environmental Protection Agency for the Wastewater Quality Initiative.

 

    Section 20.  No contract shall be entered into or obligation incurred or any expenditures made from appropriations in this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, this Article                        $900,000,000

 

ARTICLE 30

 

ENVIRONMENTAL PROTECTION AGENCY

    Section 1.  The sum of $200,000,000, or so much thereof as may be necessary, is appropriated from the Water Revolving Fund to the Environmental Protection Agency for financial assistance to units of local government for sewer systems and wastewater treatment facilities pursuant to rules defining the Water Pollution Control Revolving Loan program and for transfer of funds to establish reserve accounts, construction accounts or any other necessary funds or accounts in order to implement a leveraged loan program.

 

    Section 5.  The sum of $78,500,000, or so much thereof as may be necessary, is appropriated from the Water Revolving Fund to the Environmental Protection Agency for financial assistance to units of local government and privately owned community water supplies for drinking water infrastructure projects pursuant to the Safe Drinking Water Act, as amended, and for transfer of funds to establish reserve accounts, construction accounts or any other necessary funds or accounts in order to implement a leveraged loan program.

 

    Total, this Article                        $278,500,000

 

ARTICLE 31

 

ENVIRONMENTAL PROTECTION AGENCY

  Section 5.  The amount of $29,400,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from an appropriation heretofore made in Article 20, Section 5 of Public Act 97-0076, as amended, is reappropriated from the Water Revolving Fund to the Environmental Protection Agency for state matching purposes.

 

    Section 10.  No contract shall be entered into or obligation incurred for any expenditures from appropriations in this Article until after the purposes and amounts have been approved in writing by the Governor.

 

     Total, this Article                        $29,400,000

 

ARTICLE 32

 

ENVIRONMENTAL PROTECTION AGENCY

    Section 5.  The sum of $732,769,798, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from appropriations heretofore made in Article 21, Section 1 of Public Act 97-0076 and Article 22, Section 5 of Public Act 97-0076, as amended, is reappropriated from the Water Revolving Fund to the Environmental Protection Agency for financial assistance to units of local government for sewer systems and wastewater treatment facilities pursuant to rules defining the Water Pollution Control Revolving Loan program and for transfer of funds to establish reserve accounts, construction accounts or any other necessary funds or accounts in order to implement a leveraged loan program.

 

    Section 10.  The sum of $431,388,082, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from appropriations heretofore made in Article 21, Section 5 of Public Act 97-0076 and Article 22, Section 10 of Public Act 97-0076, as amended, is  reappropriated from the Water Revolving Fund to the Environmental Protection Agency for financial assistance to units of local government and privately owned community water supplies for drinking water infrastructure projects pursuant to the Safe Drinking Water Act, as amended, and for transfer of funds to establish reserve accounts, construction accounts or any other necessary funds or accounts in order to implement a leveraged loan program.

 

    Section 15.  The sum of $72,030,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 22, Section 15 of Public Act 97-0076, is reappropriated from the Anti-Pollution Fund to the Environmental Protection Agency for deposit into the Water Revolving Fund.

 

    Section 20.  The sum of $5,300,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 22, Section 20 of Public Act 97-0076, is reappropriated from the Capital Development Fund to the Environmental Protection Agency for financial assistance to municipalities with designated River Edge Redevelopment Zones for brownfields redevelopment in accordance with Section 58.13 of the Environmental Protection Act, including costs in prior years.

 

    Section 25.  The sum of $75,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 22, Section 25 of Public Act 97-0076, is reappropriated from the Anti-Pollution Fund to the Environmental Protection Agency for reimbursements to eligible owners/operators of Leaking Underground Storage Tanks, including claims submitted in prior years and for costs associated with site remediation.

 

    Section 30.  The sum of $2,506,388, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 22, Section 30 of Public Act 97-0076, as amended, is reappropriated from the Anti-Pollution Fund to the Environmental Protection Agency for grants to units of local government for wastewater facilities, pursuant to provisions of the "Anti-Pollution Bond Act."

 

    Section 35.  The amount of $6,123,949, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 22, Section 35 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for wastewater compliance grants to units of local government or sewer systems and wastewater treatment facilities pursuant to procedures and rules established under the Anti-Pollution Bond Act.  These grants are limited to projects for which the local government provides at least 30% of the project cost.  There is an approved project compliance plan, and there is an enforceable compliance schedule prior to the grant award.  The grant award will be based on eligible project cost contained in the approved compliance plan.

 

    Section 40.  The sum of $2,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 22, Section 40 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for deposit into the Brownfields Redevelopment Fund for use pursuant to Sections 58.13 and 58.15 of the Environmental Protection Act.

 

    Section 45.  The sum of $2,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 22, Section 45 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for deposit into the Brownfields Redevelopment Fund for use pursuant to Sections 58.13 and 58.15 of the Environmental Protection Act.

 

    Section 50.  The sum of $10,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 22, Section 50 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for deposit into the Hazardous Waste Fund for use pursuant to Section 22.2 of the Environmental Protection Act.

 

    Section 55.  The sum of $471,885, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 22, Section 55 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for grants and contracts for public drinking water infrastructure, including design and construction, where private drinking water wells have been contaminated by a hazardous substance.

 

    Section 60.  The sum of $4,776,725, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 22, Section 60 of Public Act 97-0076, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for financial assistance to municipalities with designated River Edge Redevelopment Zones for brownfields redevelopment in accordance with Section 58.13 of the Environmental Protection Act, including costs in prior years.

 

    Section 65.  The sum of $50,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 22, Section 65 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for grants to units of local government and privately owned community water supplies for sewer systems, wastewater treatment facilities and drinking water infrastructure projects.

 

    Section 70.  The sum of $8,942,400, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 22, Section 70 of Public Act 97-0076, as amended, is reappropriated from the Anti-Pollution Fund to the Environmental Protection Agency for deposit into the Water Revolving Fund.

 

    Section 75.  The sum of $1,407,069, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 22, Section 75 of Public Act 97-0076, as amended, is reappropriated from the Anti-Pollution Fund to the Environmental Protection Agency for deposit into the Water Revolving Fund.

 

    Section 80.  The sum of $7,858,247, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 22, Section 80 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for the protection, preservation, restoration and conservation of environmental and natural resources, for deposits into the Water Revolving Fund, and for any other purposes authorized in subsection (d) of Section 4 of the Build Illinois Bond Act and for grants to State agencies for such purposes.

 

    Section 85.  The sum of $16,600,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 22, Section 85 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for the protection, preservation, restoration and conservation of environmental and natural resources, for deposits into the Water Revolving Fund, and for any other purposes authorized in subsection (d) of Section 4 of the Build Illinois Bond Act and for grants to State Agencies for such purposes.

 

  Section 90.  The sum of $2,841,548, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 22, Section 90 of Public Act 97-0076, as amended, is reappropriated from the Water Revolving Fund to the Environmental Protection Agency for financial assistance to units of local government for sewer systems and wastewater treatment facilities pursuant to the American Recovery and Reinvestment Act of 2009.

 

  Section 95.  The sum of $662,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore Public Act made for such purpose in Article 22, Section 95 of Public Act 97-0076, as amended, is reappropriated from the Water Revolving Fund to the Environmental Protection Agency for financial assistance to local governments and privately owned community water supplies for drinking water infrastructure projects pursuant to the American Recovery and Reinvestment Act of 2009.

 

  Section 100.  The sum of $10,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a appropriations heretofore made for such purpose in Article 21, Section 10 of Public Act 97-0076 and Article 22, Section 100 of Public Act 97-0076, is reappropriated from the Water Revolving Fund to the Environmental Protection Agency for a green infrastructure financial assistance program to address water quality issues.

 

    Section 105.  The sum of $186,872, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from an appropriation heretofore made for such purpose in Article 22, Section 105 of Public Act 97-0076, is reappropriated from the Water Revolving Fund to the Environmental Protection Agency for a small community water supply financial assistance program to address compliance problems.

 

    Section 110.  No contract shall be entered into or obligation incurred for any expenditure made in Sections 15 through 85 of this Article until after the purpose and amounts have been approved in writing by the Governor.

 

    Total, this Article                      $1,442,864,963

 

ARTICLE 33

 

HISTORIC PRESERVATION AGENCY

    Section 5.  The sum of $143,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made in Article 23, Section 5 of Public Act 97-0076, as amended, is reappropriated from the Capital Development Fund to the Historic Preservation Agency for support facilities, acquisition or improvements for Sugar Loaf and/or Fox Mounds or other properties within the Cahokia Mounds National Historic Landmark Boundary.

 

    Section 10.  No contract shall be entered into or obligation incurred for any expenditures from appropriations in Section 5 of this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, this Article                            $143,000

 

ARTICLE 34

 

ILLINOIS FINANCE AUTHORITY

    Section 5.  The amount of $11,300,000, or so much thereof as may be necessary, is appropriated from the Fire and Ambulance Services Revolving Loan Fund to the Illinois Finance Authority for Loans to Fire Departments, Fire Protection Districts, Township Fire Departments, or Non-Profit Ambulance Services.

 

    Total, this Article                         $11,300,000

 

ARTICLE 35

 

ILLINOIS FINANCE AUTHORITY

    Section 5.  The sum of $6,003,342, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from appropriations heretofore made in Article 24, Section 5 of Public Act 97-0076, as amended, is reappropriated from the Fire Truck Revolving Loan Fund to the Illinois Finance Authority for the purpose of making loans to fire departments, fire protection districts, and township fire departments as successor in interest to the Illinois Rural Bond Bank, pursuant to Section 845-75 of Public Act 93-0205.

 

    Section 10.  The sum of $7,006,800, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from appropriations heretofore made in Article 24, Section 10 of Public Act 97-0076, amended, is reappropriated from the Ambulance Revolving Loan Fund to the Illinois Finance Authority for the purpose of making loans to fire departments, fire protection districts, township fire departments or non-profit ambulance services as successor in interest to the Illinois Rural Bond Bank.

 

    Total, this Article                         $13,010,142

 

ARTICLE 36

 

ILLINOIS COMMUNITY COLLEGE BOARD

    Section 5.  The sum of $314,597, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2012, from a reappropriation heretofore made for such purpose in Article 25, Section 5 of Public Act 97-0076, as amended, is reappropriated from the Build Illinois Bond Fund for the Illinois Community College Board for remodeling of facilities for compliance with the Americans with Disabilities Act.  This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 10.  No contract shall be entered into or obligation incurred for any expenditures from appropriations in Section 5 of this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, this Article                            $314,597

 

Section 99. Effective date. This Act takes effect July 1, 2012.