| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
1 | AN ACT concerning civil law.
| ||||||||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois,
| ||||||||||||||||||||||||
3 | represented in the General Assembly:
| ||||||||||||||||||||||||
4 | Section 5. The Drilling Operations Act is amended by adding | ||||||||||||||||||||||||
5 | Section 6.5 as follows: | ||||||||||||||||||||||||
6 | (765 ILCS 530/6.5 new) | ||||||||||||||||||||||||
7 | Sec. 6.5. Extraction of natural gas using hydraulic | ||||||||||||||||||||||||
8 | fracturing. | ||||||||||||||||||||||||
9 | (a) An application for a permit to extract natural gas from | ||||||||||||||||||||||||
10 | shale using well stimulation fluids must be approved by the | ||||||||||||||||||||||||
11 | Department of Natural Resources prior to the initiation of any | ||||||||||||||||||||||||
12 | such extraction activity. The Director of Natural Resources | ||||||||||||||||||||||||
13 | shall require, prior to such extraction, the owner or operator | ||||||||||||||||||||||||
14 | to perform a suitable mechanical integrity test of the casing | ||||||||||||||||||||||||
15 | or of the casing-tubing annulus or other mechanical integrity | ||||||||||||||||||||||||
16 | test methods using procedures approved by the Department of | ||||||||||||||||||||||||
17 | Natural Resources. | ||||||||||||||||||||||||
18 | (b) The owner or operator shall provide geological names, | ||||||||||||||||||||||||
19 | geological description, and the depth of the formation into | ||||||||||||||||||||||||
20 | which well stimulation fluids are to be injected. | ||||||||||||||||||||||||
21 | (c) The owner or operator shall provide detailed | ||||||||||||||||||||||||
22 | information to the Director of Natural Resources concerning the | ||||||||||||||||||||||||
23 | base stimulation fluid source. The owner, operator, or service |
| |||||||
| |||||||
1 | company shall also provide to the Director, for each stage of | ||||||
2 | the well stimulation program, the following: | ||||||
3 | (1) each stimulation fluid identified by additive | ||||||
4 | type; | ||||||
5 | (2) the chemical compound name and Chemical
Abstracts | ||||||
6 | Service (CAS) number for each additive used; | ||||||
7 | (3) the proposed rate or concentration for each
| ||||||
8 | additive; | ||||||
9 | (4) a copy of the contractor's proposed well | ||||||
10 | stimulation program design; and | ||||||
11 | (5) any other information requested by the Director of | ||||||
12 | the Environmental Protection Agency. | ||||||
13 | (d) The owner or operator shall also provide a detailed | ||||||
14 | description of the proposed well stimulation design, which | ||||||
15 | shall include: | ||||||
16 | (1) the anticipated surface treating pressure range; | ||||||
17 | (2) the maximum injection treating pressure; and | ||||||
18 | (3) the estimated or calculated fracture length and | ||||||
19 | fracture height. | ||||||
20 | (e) The Department of Natural Resources shall post the | ||||||
21 | information that it receives under subsections (c) and (d) on | ||||||
22 | its Internet website for a period of not less than 5 years. In | ||||||
23 | the interest of public health and safety, such information may | ||||||
24 | not be claimed as a trade secret under this or any other Act. | ||||||
25 | (f) The injection of volatile organic compounds, such as | ||||||
26 | benzene, toluene, ethylbenzene, and xylene, also known as BTEX |
| |||||||
| |||||||
1 | compounds, or any petroleum distillates, is prohibited without | ||||||
2 | exception. | ||||||
3 | (g) In addition to any other information that it must | ||||||
4 | provide, the owner, operator, or service company shall provide | ||||||
5 | the Director of Natural Resources the following post well | ||||||
6 | stimulation detail: | ||||||
7 | (1) the actual total well stimulation treatment volume | ||||||
8 | pumped; | ||||||
9 | (2) detail as to each fluid stage pumped, including | ||||||
10 | actual volume by fluid stage, proppant rate or | ||||||
11 | concentration, actual chemical additive name, type, | ||||||
12 | concentration or rate, and amounts; | ||||||
13 | (3) the actual surface pressure and rate at the end of
| ||||||
14 | each fluid stage and the actual flush volume, rate, and | ||||||
15 | final pump pressure; and | ||||||
16 | (4) the instantaneous shut-in pressure, and the actual
| ||||||
17 | 15-minute and 30-minute shut-in pressures when these | ||||||
18 | pressure measurements are available. | ||||||
19 | (h) During the well stimulation operation, the owner or | ||||||
20 | operator shall monitor and record the annulus pressure at the | ||||||
21 | bradenhead. If intermediate casing has been set on the well | ||||||
22 | being stimulated, the pressure in the annulus between the | ||||||
23 | intermediate casing and the production casing shall also be | ||||||
24 | monitored and recorded. A continuous record of the annulus | ||||||
25 | pressure during the well stimulation shall be submitted. | ||||||
26 | (i) If, during the stimulation, the annulus pressure
|
| |||||||
| |||||||
1 | increases by more than 500 pounds per square inch gauge (psig) | ||||||
2 | compared to the pressure immediately preceding the | ||||||
3 | stimulation, the owner or operator shall verbally notify the | ||||||
4 | Director of Natural Resources as soon as practical but no later | ||||||
5 | than 24 hours following the incident. The owner or operator | ||||||
6 | shall include a report containing all details pertaining to the | ||||||
7 | incident, including corrective actions taken. | ||||||
8 | (j) The owner or operator shall provide information to the | ||||||
9 | Director of Natural Resources as to the amounts, handling, and, | ||||||
10 | if necessary, disposal at an identified appropriate disposal | ||||||
11 | facility, or reuse of the well stimulation fluid load recovered | ||||||
12 | during flow back, swabbing, or recovery from production | ||||||
13 | facility vessels. Storage of that fluid shall be protective of | ||||||
14 | groundwater as demonstrated by the use of either tanks or lined | ||||||
15 | pits.
|