| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
1 | AN ACT concerning safety.
| ||||||||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois,
| ||||||||||||||||||||||||
3 | represented in the General Assembly:
| ||||||||||||||||||||||||
4 | Section 5. The Environmental Protection Act is amended by | ||||||||||||||||||||||||
5 | changing Section 22.38 as follows:
| ||||||||||||||||||||||||
6 | (415 ILCS 5/22.38)
| ||||||||||||||||||||||||
7 | Sec. 22.38. Facilities accepting exclusively general | ||||||||||||||||||||||||
8 | construction or
demolition debris
for transfer, storage, or | ||||||||||||||||||||||||
9 | treatment.
| ||||||||||||||||||||||||
10 | (a) Facilities accepting exclusively general construction | ||||||||||||||||||||||||
11 | or demolition
debris for
transfer, storage, or treatment shall | ||||||||||||||||||||||||
12 | be subject to local zoning, ordinance,
and
land use | ||||||||||||||||||||||||
13 | requirements.
Those facilities shall be located in accordance | ||||||||||||||||||||||||
14 | with local zoning requirements
or, in the absence of local | ||||||||||||||||||||||||
15 | zoning requirements, shall be located so that no
part of the | ||||||||||||||||||||||||
16 | facility boundary is closer than 1,320 feet from the nearest
| ||||||||||||||||||||||||
17 | property zoned for primarily residential use.
| ||||||||||||||||||||||||
18 | (b) An owner or operator of a facility accepting | ||||||||||||||||||||||||
19 | exclusively general
construction or demolition debris for | ||||||||||||||||||||||||
20 | transfer, storage, or treatment shall:
| ||||||||||||||||||||||||
21 | (1) Within 48 hours after of receipt of the general | ||||||||||||||||||||||||
22 | construction or demolition
debris at the facility, sort the | ||||||||||||||||||||||||
23 | general construction or demolition debris to
separate the
|
| |||||||
| |||||||
1 | recyclable general construction or demolition debris , and | ||||||
2 | recovered wood that is processed for use as fuel , and | ||||||
3 | general construction or demolition debris that is | ||||||
4 | processed for use at a landfill from the non-recyclable
| ||||||
5 | general construction or demolition debris that is to be | ||||||
6 | disposed of or discarded.
| ||||||
7 | (2) Transport off site for disposal , in accordance with | ||||||
8 | all applicable federal, State, and local requirements | ||||||
9 | within 72 hours after its receipt at the facility, all | ||||||
10 | non-usable or non-recyclable general
construction or | ||||||
11 | demolition debris that is not neither recyclable general | ||||||
12 | construction or demolition debris , nor recovered wood that | ||||||
13 | is processed for use as fuel , or general construction or | ||||||
14 | demolition debris that is processed for use at a landfill | ||||||
15 | in
accordance with all applicable federal, State, and local | ||||||
16 | requirements within 72
hours of its receipt at the | ||||||
17 | facility .
| ||||||
18 | (3) Limit the percentage of incoming non-recyclable | ||||||
19 | general construction
or demolition debris to 25% or
less of | ||||||
20 | the total incoming general construction or demolition | ||||||
21 | debris ,
as calculated on a daily basis , so that 75% or more | ||||||
22 | of the general construction or demolition debris accepted , | ||||||
23 | as calculated monthly on a rolling 12-month average, on a | ||||||
24 | daily basis consists of recyclable general construction or | ||||||
25 | demolition debris, recovered wood that is processed for use | ||||||
26 | as fuel, or general construction or demolition debris that |
| |||||||
| |||||||
1 | is processed for use at a landfill except that general | ||||||
2 | construction or demolition debris processed for use at a | ||||||
3 | landfill shall not exceed 35% of the general construction | ||||||
4 | or demolition debris accepted on a rolling 12-month average | ||||||
5 | basis both . The percentages in this paragraph (3) of | ||||||
6 | subsection (b) shall be calculated by weight, using scales | ||||||
7 | located at the facility that are certified under the | ||||||
8 | Weights and Measures Act.
| ||||||
9 | (4) Within 6 months after its receipt at the facility, | ||||||
10 | transport: | ||||||
11 | (A) Transport all non-putrescible recyclable | ||||||
12 | general construction or
demolition debris
for | ||||||
13 | recycling or disposal ; and | ||||||
14 | (B) all non-putrescible general construction or | ||||||
15 | demolition debris that is processed for use at a | ||||||
16 | landfill to a MSWLF unit for use or disposal within 6 | ||||||
17 | months of its receipt at the facility .
| ||||||
18 | (5) Within 45 days after of its receipt at the | ||||||
19 | facility, transport : | ||||||
20 | (A) (i) all putrescible or combustible recyclable | ||||||
21 | general
construction or demolition debris
(excluding | ||||||
22 | recovered wood that is processed for use as fuel) for | ||||||
23 | recycling or disposal ; and | ||||||
24 | (B) (ii) all recovered wood that is processed for | ||||||
25 | use as fuel to an intermediate processing facility for | ||||||
26 | sizing, to a combustion facility for use as fuel, or to |
| |||||||
| |||||||
1 | a disposal facility ; and | ||||||
2 | (C) all putrescible general construction or | ||||||
3 | demolition debris that is processed for use at a | ||||||
4 | landfill to a MSWLF unit for use or disposal .
| ||||||
5 | (6) Employ tagging and recordkeeping procedures to (i) | ||||||
6 | demonstrate
compliance
with this Section and (ii) identify | ||||||
7 | the source and transporter of material
accepted by the | ||||||
8 | facility.
| ||||||
9 | (7) Control odor, noise, combustion of materials, | ||||||
10 | disease vectors, dust,
and litter.
| ||||||
11 | (8) Control, manage, and dispose of any storm water | ||||||
12 | runoff and leachate
generated at the facility in accordance | ||||||
13 | with applicable federal, State, and
local requirements.
| ||||||
14 | (9) Control access to the facility.
| ||||||
15 | (10) Comply with all applicable federal, State, or | ||||||
16 | local requirements for
the handling, storage, | ||||||
17 | transportation, or disposal of asbestos-containing
| ||||||
18 | material or other material accepted at the
facility that is | ||||||
19 | not general construction or demolition debris.
| ||||||
20 | (11) Prior to August 24, 2009 (the effective date of | ||||||
21 | Public Act 96-611), submit to the Agency at least 30 days | ||||||
22 | prior to the initial acceptance
of general construction or | ||||||
23 | demolition debris at the facility, on forms provided
by the | ||||||
24 | Agency, the following information:
| ||||||
25 | (A) the name, address, and telephone number of both | ||||||
26 | the facility owner
and operator;
|
| |||||||
| |||||||
1 | (B) the street address and location of the | ||||||
2 | facility;
| ||||||
3 | (C) a description of facility operations;
| ||||||
4 | (D) a description of the tagging and recordkeeping | ||||||
5 | procedures the
facility will employ to (i) demonstrate | ||||||
6 | compliance with this Section and (ii)
identify the | ||||||
7 | source and transporter of any material accepted by the | ||||||
8 | facility;
| ||||||
9 | (E) the name and location of the disposal sites to | ||||||
10 | be used for the
disposal of any general construction or | ||||||
11 | demolition debris received at the facility that must be | ||||||
12 | disposed of;
| ||||||
13 | (F) the name and location of an individual, | ||||||
14 | facility, or business to
which recyclable materials | ||||||
15 | will be transported;
| ||||||
16 | (G) the name and location of intermediate | ||||||
17 | processing facilities or combustion facilities to | ||||||
18 | which recovered wood that is processed for use as fuel | ||||||
19 | will be transported; and
| ||||||
20 | (H) other information as specified on the form | ||||||
21 | provided by the Agency.
| ||||||
22 | (12) On or after August 24, 2009 (the effective date of | ||||||
23 | Public Act 96-611), obtain a permit issued by the Agency | ||||||
24 | prior to the initial acceptance of general construction or | ||||||
25 | demolition debris at the facility.
| ||||||
26 | When any of the information contained or processes |
| |||||||
| |||||||
1 | described in the initial
notification form submitted to the | ||||||
2 | Agency under paragraph (11) of subsection (b) of this | ||||||
3 | Section changes, the owner and operator shall
submit an | ||||||
4 | updated form within 14 days of the change.
| ||||||
5 | (c) For purposes of this Section, the term "recyclable | ||||||
6 | general
construction or demolition debris" means general | ||||||
7 | construction or demolition
debris that has been rendered | ||||||
8 | reusable and is reused or that would otherwise
be disposed of | ||||||
9 | or discarded but is collected, separated, or processed and
| ||||||
10 | returned to the economic mainstream in the form of raw | ||||||
11 | materials or products.
"Recyclable general construction or | ||||||
12 | demolition debris" does not include (i) general
construction or | ||||||
13 | demolition debris processed for use as fuel, incinerated,
| ||||||
14 | burned, buried, or otherwise used as fill material or (ii) | ||||||
15 | general construction or demolition debris that is processed for | ||||||
16 | use at a landfill .
| ||||||
17 | (d) For purposes of this Section, "treatment" means | ||||||
18 | processing
designed to alter the physical nature of the general | ||||||
19 | construction or
demolition debris, including but not limited to | ||||||
20 | size reduction, crushing,
grinding, or
homogenization, but | ||||||
21 | does not include processing designed to change the chemical
| ||||||
22 | nature of the general construction or demolition debris.
| ||||||
23 | (e) For purposes of this Section, "recovered wood that is | ||||||
24 | processed for use as fuel" means wood that has been salvaged | ||||||
25 | from general construction or demolition debris and processed | ||||||
26 | for use as fuel, as authorized by the applicable state or |
| |||||||
| |||||||
1 | federal environmental regulatory authority, and supplied only | ||||||
2 | to intermediate processing facilities for sizing, or to | ||||||
3 | combustion facilities for use as fuel, that have obtained all | ||||||
4 | necessary waste management and air permits for handling and | ||||||
5 | combustion of the fuel. | ||||||
6 | (f) For purposes of this Section, "non-recyclable general | ||||||
7 | construction or demolition debris" does not include " recovered | ||||||
8 | wood that is processed for use as fuel " or general construction | ||||||
9 | or demolition debris that is processed for use at a landfill . | ||||||
10 | (g) Recyclable general construction or demolition debris , | ||||||
11 | or recovered wood that is processed for use as fuel , and | ||||||
12 | general construction or demolition debris that is processed for | ||||||
13 | use at a landfill that is sent for disposal at the end of the | ||||||
14 | applicable retention period shall not be considered as meeting | ||||||
15 | the 75% diversion requirement for purposes of subdivision | ||||||
16 | (b)(3) of this Section if sent for disposal at the end of the | ||||||
17 | applicable retention period . | ||||||
18 | (h) For the purposes of this Section, "general construction | ||||||
19 | or demolition debris that is processed for use at a landfill" | ||||||
20 | means general construction or demolition debris that is | ||||||
21 | processed for use at a MSWLF unit as alternative daily cover, | ||||||
22 | road building material, or drainage structure building | ||||||
23 | material in accordance with the MSWLF unit's waste disposal | ||||||
24 | permit issued by the Agency under this Act. | ||||||
25 | (Source: P.A. 96-235, eff. 8-11-09; 96-611, eff. 8-24-09; | ||||||
26 | 96-1000, eff. 7-2-10.)
|
| |||||||
| |||||||
1 | Section 99. Effective date. This Act takes effect upon | ||||||
2 | becoming law.
|