| |||||||||||||||||||||||||||
| |||||||||||||||||||||||||||
| |||||||||||||||||||||||||||
| |||||||||||||||||||||||||||
| |||||||||||||||||||||||||||
1 | AN ACT concerning local government.
| ||||||||||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois,
| ||||||||||||||||||||||||||
3 | represented in the General Assembly:
| ||||||||||||||||||||||||||
4 | Section 5. The Counties Code is amended by changing | ||||||||||||||||||||||||||
5 | Sections 5-1062 and 5-1062.2 as follows:
| ||||||||||||||||||||||||||
6 | (55 ILCS 5/5-1062) (from Ch. 34, par. 5-1062)
| ||||||||||||||||||||||||||
7 | Sec. 5-1062. Stormwater management.
| ||||||||||||||||||||||||||
8 | (a) The purpose of this Section is to allow management and | ||||||||||||||||||||||||||
9 | mitigation of the
effects of urbanization on stormwater | ||||||||||||||||||||||||||
10 | drainage in metropolitan counties located
in the area served by | ||||||||||||||||||||||||||
11 | the Northeastern Illinois Planning Commission, and
references | ||||||||||||||||||||||||||
12 | to "county" in this Section shall apply only to those counties.
| ||||||||||||||||||||||||||
13 | This Section shall not apply to any county with a population in | ||||||||||||||||||||||||||
14 | excess of
1,500,000, except as provided in subsection (c). The | ||||||||||||||||||||||||||
15 | purpose of this Section
shall be achieved by:
| ||||||||||||||||||||||||||
16 | (1) consolidating the existing stormwater management | ||||||||||||||||||||||||||
17 | framework into a
united, countywide structure;
| ||||||||||||||||||||||||||
18 | (2) setting minimum standards for floodplain and | ||||||||||||||||||||||||||
19 | stormwater management;
and
| ||||||||||||||||||||||||||
20 | (3) preparing a countywide plan for the management of | ||||||||||||||||||||||||||
21 | stormwater runoff,
including the management of natural and | ||||||||||||||||||||||||||
22 | man-made drainageways. The countywide
plan may incorporate | ||||||||||||||||||||||||||
23 | watershed plans.
|
| |||||||
| |||||||
1 | (b) A stormwater management planning committee shall be | ||||||
2 | established by
county board resolution, with its membership | ||||||
3 | consisting of equal numbers of
county board and municipal | ||||||
4 | representatives from each county board
district, and such other | ||||||
5 | members as may be determined by the county and
municipal | ||||||
6 | members. However, if the county has more than 6 county board
| ||||||
7 | districts, the county board may by ordinance divide the county | ||||||
8 | into not
less than 6 areas of approximately equal population, | ||||||
9 | to be used instead of
county board districts for the purpose of | ||||||
10 | determining representation on the
stormwater management | ||||||
11 | planning committee.
| ||||||
12 | The county board members shall be appointed by the chairman | ||||||
13 | of the county
board. Municipal members from each county board | ||||||
14 | district or other
represented area shall be appointed by a | ||||||
15 | majority vote of the mayors of
those municipalities which have | ||||||
16 | the greatest percentage of their respective
populations | ||||||
17 | residing in such county board district or other represented
| ||||||
18 | area. All municipal and county board representatives shall be | ||||||
19 | entitled
to a vote; the other members shall be nonvoting | ||||||
20 | members, unless authorized
to vote by the unanimous consent of | ||||||
21 | the municipal and county board
representatives. A municipality | ||||||
22 | that is located in more than one county may
choose, at the time | ||||||
23 | of formation of the stormwater management planning
committee | ||||||
24 | and based on watershed boundaries, to participate in the
| ||||||
25 | stormwater management planning program of either or both of the | ||||||
26 | counties.
Subcommittees of the stormwater management planning |
| |||||||
| |||||||
1 | committee may be
established to serve a portion of the county | ||||||
2 | or a particular drainage basin
that has similar stormwater | ||||||
3 | management needs. The stormwater management
planning committee | ||||||
4 | shall adopt by-laws, by a majority vote of the county and
| ||||||
5 | municipal members, to govern the functions of the committee and | ||||||
6 | its
subcommittees. Officers of the committee shall include a | ||||||
7 | chair and vice chair,
one of whom shall be a county | ||||||
8 | representative and one a municipal
representative.
| ||||||
9 | The principal duties of the committee shall be to develop a | ||||||
10 | stormwater
management plan for presentation to and approval by | ||||||
11 | the county board, and
to direct the plan's implementation and | ||||||
12 | revision. The committee may retain
engineering, legal and | ||||||
13 | financial advisors and inspection personnel. The
committee | ||||||
14 | shall meet at least quarterly and shall hold at least one | ||||||
15 | public
meeting during the preparation of the plan and prior to | ||||||
16 | its submittal to the
county board.
| ||||||
17 | (c) In the preparation of a stormwater management plan, a | ||||||
18 | county
stormwater management planning committee shall | ||||||
19 | coordinate the planning
process with each adjoining county to | ||||||
20 | ensure that recommended stormwater
projects will have no | ||||||
21 | significant impact on the levels or flows of
stormwaters in | ||||||
22 | inter-county watersheds or on the capacity of existing and
| ||||||
23 | planned stormwater retention facilities. An adopted stormwater | ||||||
24 | management
plan shall identify steps taken by the county to | ||||||
25 | coordinate the development
of plan recommendations with | ||||||
26 | adjoining counties.
|
| |||||||
| |||||||
1 | (d) Before the stormwater management planning committee | ||||||
2 | recommends to the
county board a stormwater management plan for | ||||||
3 | the county or a portion thereof,
it shall submit the plan to | ||||||
4 | the Office of Water Resources of the Department of Natural | ||||||
5 | Resources and to the Northeastern Illinois Planning
Commission | ||||||
6 | for review and recommendations. The Office
and the Commission, | ||||||
7 | in reviewing the plan, shall consider such factors as
impacts | ||||||
8 | on the levels or flows in rivers and streams and the cumulative | ||||||
9 | effects
of stormwater discharges on flood levels. The Office of | ||||||
10 | Water Resources shall determine whether the
plan or ordinances | ||||||
11 | enacted to implement the plan complies with the requirements
of | ||||||
12 | subsection (f). Within a period not to exceed 60 days, the | ||||||
13 | review comments
and recommendations shall be submitted to the | ||||||
14 | stormwater management planning
committee for consideration. | ||||||
15 | Any amendments to the plan shall be
submitted to the Office and | ||||||
16 | the Commission for review.
| ||||||
17 | (e) Prior to recommending the plan to the county board, the | ||||||
18 | stormwater
management planning committee shall hold at least | ||||||
19 | one public hearing thereon
and shall afford interested persons | ||||||
20 | an opportunity to be heard. The hearing
shall be held in the | ||||||
21 | county seat. Notice of the hearing shall be published at
least | ||||||
22 | once no less than 15 days in advance thereof in a newspaper of | ||||||
23 | general
circulation published in the county. The notice shall | ||||||
24 | state the time and place
of the hearing and the place where | ||||||
25 | copies of the proposed plan will be
accessible for examination | ||||||
26 | by interested parties. If an affected municipality
having a |
| |||||||
| |||||||
1 | stormwater management plan adopted by ordinance wishes to | ||||||
2 | protest the
proposed county plan provisions, it shall appear at | ||||||
3 | the hearing and submit in
writing specific proposals to the | ||||||
4 | stormwater management planning committee.
After consideration | ||||||
5 | of the matters raised at the hearing, the committee may
amend | ||||||
6 | or approve the plan and recommend it to the county board for | ||||||
7 | adoption.
| ||||||
8 | The county board may enact the proposed plan by ordinance. | ||||||
9 | If the
proposals for modification of the plan made by an | ||||||
10 | affected municipality having
a stormwater management plan are | ||||||
11 | not included in the proposed county plan,
and the municipality | ||||||
12 | affected by the plan opposes adoption of the county
plan by | ||||||
13 | resolution of its corporate authorities, approval of
the county | ||||||
14 | plan shall require an affirmative vote of at least two-thirds | ||||||
15 | of the
county board members present and voting. If the county | ||||||
16 | board wishes to
amend the county plan, it shall submit in | ||||||
17 | writing specific proposals to the
stormwater management | ||||||
18 | planning committee. If the proposals are not
approved by the | ||||||
19 | committee, or are opposed by resolution of the corporate
| ||||||
20 | authorities of an affected municipality having a municipal | ||||||
21 | stormwater
management plan, amendment of the plan shall require | ||||||
22 | an affirmative vote of
at least two-thirds of the county board | ||||||
23 | members present and voting.
| ||||||
24 | (f) The county board may prescribe by ordinance reasonable | ||||||
25 | rules and
regulations for floodplain management and for | ||||||
26 | governing the location,
width, course and release rate of all |
| |||||||
| |||||||
1 | stormwater runoff channels, streams
and basins in the county, | ||||||
2 | in accordance with the adopted stormwater
management plan. | ||||||
3 | These rules and regulations shall, at a minimum, meet
the | ||||||
4 | standards for floodplain management established by the Office | ||||||
5 | of Water Resources and
the requirements of the Federal | ||||||
6 | Emergency Management Agency for participation
in the National | ||||||
7 | Flood Insurance Program.
| ||||||
8 | (g) For the purposes of implementing this Section and for | ||||||
9 | the development, design, planning, construction, operation, | ||||||
10 | and maintenance of stormwater facilities provided for in In | ||||||
11 | accordance with, and if recommended in, the adopted stormwater
| ||||||
12 | management plan, a the county board that has established a | ||||||
13 | stormwater management planning committee pursuant to this | ||||||
14 | Section or has participated in a stormwater management planning | ||||||
15 | process may adopt a schedule of fees
applicable to all real | ||||||
16 | property within the county which benefits from the county's | ||||||
17 | stormwater management facilities and activities, and as may be | ||||||
18 | necessary to mitigate the effects of increased stormwater | ||||||
19 | runoff
resulting from new development. The total amount of the | ||||||
20 | fees assessed must bear a reasonable relationship to the actual | ||||||
21 | costs of the county in the preparation, administration, and | ||||||
22 | implementation of the shall not exceed the cost of
satisfying | ||||||
23 | the onsite stormwater retention or detention requirements of | ||||||
24 | the adopted stormwater management plan , construction and | ||||||
25 | maintenance of stormwater facilities, and other activities | ||||||
26 | related to the management of the runoff from the property . The |
| |||||||
| |||||||
1 | individual fees must be specifically and uniquely attributable | ||||||
2 | to the portion of the actual cost to the county of managing the | ||||||
3 | runoff from the property. The fees shall be used to finance
| ||||||
4 | activities undertaken by the county or its included | ||||||
5 | municipalities to
mitigate the effects of urban stormwater | ||||||
6 | runoff by providing and maintaining regional
stormwater | ||||||
7 | collection, retention , or detention , and treatment facilities | ||||||
8 | and improving water bodies impacted by stormwater runoff , as | ||||||
9 | identified in the county
plan. In establishing, maintaining, or | ||||||
10 | replacing the facilities, the county shall not duplicate | ||||||
11 | facilities operated by other governmental bodies within its | ||||||
12 | corporate boundaries. The schedule of fees established by the | ||||||
13 | county board shall include a procedure for a full or partial | ||||||
14 | fee waiver for property owners who have taken actions or put in | ||||||
15 | place facilities that reduce or eliminate the cost to the | ||||||
16 | county of providing stormwater management services to their | ||||||
17 | property, including but not limited to facilities that reduce | ||||||
18 | the volume, temperature, velocity, and pollutant load of the | ||||||
19 | stormwater managed by the county, such as systems that | ||||||
20 | infiltrate, evapotranspirate, or harvest stormwater for reuse, | ||||||
21 | known as "green infrastructure". The county board may also | ||||||
22 | offer tax or fee rebates or incentive payments to property | ||||||
23 | owners who construct, maintain, and use approved green | ||||||
24 | infrastructure stormwater management devices or any other | ||||||
25 | methods that reduce or eliminate the cost to the county of | ||||||
26 | providing stormwater management services to the property. In |
| |||||||
| |||||||
1 | exercising this authority, the county shall provide notice to | ||||||
2 | the municipalities within their jurisdictions of any fees | ||||||
3 | proposed under this Section and seek the input of each | ||||||
4 | municipality with respect to the calculation of the fees. The | ||||||
5 | county shall also give property owners at least 2 years' notice | ||||||
6 | of the fee during which time the county shall provide education | ||||||
7 | on green infrastructure practices and an opportunity to take | ||||||
8 | action to reduce or eliminate the fee. All such fees collected | ||||||
9 | by the county shall be held in a separate fund,
and shall be | ||||||
10 | expended only in the watershed within which they were | ||||||
11 | collected. The county may enter into intergovernmental | ||||||
12 | agreements with other government bodies for the joint | ||||||
13 | administration of stormwater management and the collection of | ||||||
14 | the fees authorized in this Section.
| ||||||
15 | A fee schedule authorized by this subsection must have the | ||||||
16 | same limit as the lesser of the 0.20% property value provided | ||||||
17 | for in subsection (h) of this Section and the maximum tax | ||||||
18 | currently allowable in the county under State law. The fee | ||||||
19 | schedule shall not be adopted unless (i) at least part of the | ||||||
20 | county has been declared by a presidential proclamation after | ||||||
21 | July 1, 1986 and before December 31, 1987, to be a disaster | ||||||
22 | area as a result of flooding; (ii) a referendum has been passed | ||||||
23 | approving a stormwater tax as provided in subsection (h) of | ||||||
24 | this Section; or (iii) the question of the adoption of a fee | ||||||
25 | schedule with the same limit as the authorized stormwater tax | ||||||
26 | has been approved in a referendum by a majority of those voting |
| |||||||
| |||||||
1 | on the question. | ||||||
2 | (h) In the alternative, the For the purpose of implementing | ||||||
3 | this Section and for the
development, design, planning, | ||||||
4 | construction, operation and maintenance of
stormwater | ||||||
5 | facilities provided for in the stormwater management plan, a
| ||||||
6 | county board that has established a stormwater management | ||||||
7 | planning
committee pursuant to this Section may cause an annual | ||||||
8 | tax of not to exceed
0.20% of the value, as equalized or | ||||||
9 | assessed by the Department of Revenue,
of all taxable property | ||||||
10 | in the county to be levied upon all the taxable
property in the | ||||||
11 | county. The tax shall be in addition to all other taxes
| ||||||
12 | authorized by law to be levied and collected in the county and | ||||||
13 | shall be in
addition to the maximum tax rate authorized by law | ||||||
14 | for general county
purposes. The 0.20% limitation provided in | ||||||
15 | this Section may be increased
or decreased by referendum in | ||||||
16 | accordance with the provisions of Sections
18-120, 18-125, and | ||||||
17 | 18-130 of the Property Tax Code.
| ||||||
18 | Any revenues generated as a result of ownership or | ||||||
19 | operation of facilities
or land acquired with the tax funds | ||||||
20 | collected pursuant to this subsection
(h) shall be held in a | ||||||
21 | separate fund and be used either to abate such
property tax or | ||||||
22 | for implementing this Section.
| ||||||
23 | If a county adopts a fee schedule pursuant to this Section | ||||||
24 | it may not also levy a tax under this subsection, except that | ||||||
25 | if the county has existing debt repayments to make on a | ||||||
26 | stormwater project, the remainder of that debt may be paid in |
| |||||||
| |||||||
1 | the same manner as all earlier payments. | ||||||
2 | However, unless at least part of the county has been | ||||||
3 | declared after
July 1, 1986 by presidential proclamation to be | ||||||
4 | a disaster area as a result
of flooding, the tax authorized by | ||||||
5 | this subsection (h) shall not be levied
until the question of | ||||||
6 | its adoption, either for a specified period or
indefinitely, | ||||||
7 | has been submitted to the electors thereof and approved by a
| ||||||
8 | majority of those voting on the question. This question may be | ||||||
9 | submitted
at any election held in the county after the adoption | ||||||
10 | of a resolution by
the county board providing for the | ||||||
11 | submission of the question to the
electors of the county. The | ||||||
12 | county board shall certify the resolution and
proposition to | ||||||
13 | the proper election officials, who shall submit the
proposition | ||||||
14 | at an election in accordance with the general election law. If
| ||||||
15 | a majority of the votes cast on the question is in favor of the | ||||||
16 | levy of
the tax, it may thereafter be levied in the county for | ||||||
17 | the specified
period or indefinitely, as provided in the | ||||||
18 | proposition. The question shall
be put in substantially the | ||||||
19 | following form:
| ||||||
20 | -------------------------------------------------------------
| ||||||
21 | Shall an annual tax be levied
| ||||||
22 | for stormwater management purposes YES
| ||||||
23 | (for a period of not more than
| ||||||
24 | ...... years) at a rate not exceeding ------------------
| ||||||
25 | .....% of the equalized assessed
| ||||||
26 | value of the taxable property of NO
|
| |||||||
| |||||||
1 | ........ County?
| ||||||
2 | -------------------------------------------------------------
| ||||||
3 | The following question may be submitted at any election | ||||||
4 | held in the county after the adoption of a resolution by the | ||||||
5 | county board providing for the submission of the question to | ||||||
6 | the electors of the county to authorize adoption of a schedule | ||||||
7 | of fees applicable to all real property within the county: | ||||||
8 | Shall the county board be authorized to adopt a | ||||||
9 | schedule of fees, at a rate not exceeding that of the | ||||||
10 | stormwater management tax, applicable to all real property | ||||||
11 | for preparation, administration, and implementation of an | ||||||
12 | adopted stormwater management plan, construction and | ||||||
13 | maintenance of related facilities, and management of the | ||||||
14 | runoff from the property? | ||||||
15 | Votes shall be recorded as Yes or No. | ||||||
16 | (i) Upon the creation and implementation of a county | ||||||
17 | stormwater management
plan, the county may petition the circuit | ||||||
18 | court to dissolve any or all drainage
districts created | ||||||
19 | pursuant to the Illinois Drainage Code or predecessor Acts
| ||||||
20 | which are located entirely within the area of the county | ||||||
21 | covered by the plan.
| ||||||
22 | However, any active drainage district implementing a plan | ||||||
23 | that is
consistent with and at least as stringent as the county | ||||||
24 | stormwater
management plan may petition the stormwater | ||||||
25 | management planning committee
for exception from dissolution. | ||||||
26 | Upon filing of the petition, the committee
shall set a date for |
| |||||||
| |||||||
1 | hearing not less than 2 weeks, nor more than 4 weeks,
from the | ||||||
2 | filing thereof, and the committee shall give at least one | ||||||
3 | week's
notice of the hearing in one or more newspapers of | ||||||
4 | general circulation
within the district, and in addition shall | ||||||
5 | cause a copy of the notice to be
personally served upon each of | ||||||
6 | the trustees of the district. At the
hearing, the committee | ||||||
7 | shall hear the district's petition and allow the
district | ||||||
8 | trustees and any interested parties an opportunity to present | ||||||
9 | oral
and written evidence. The committee shall render its | ||||||
10 | decision upon the
petition for exception from dissolution based | ||||||
11 | upon the best interests of
the residents of the district. In | ||||||
12 | the event that the exception is not
allowed, the district may | ||||||
13 | file a petition within 30 days of the decision
with the circuit | ||||||
14 | court. In that case, the notice and hearing requirements
for | ||||||
15 | the court shall be the same as herein provided for the | ||||||
16 | committee.
The court shall likewise render its decision of | ||||||
17 | whether to dissolve the
district based upon the best interests | ||||||
18 | of residents of the district.
| ||||||
19 | The dissolution of any drainage district shall not affect | ||||||
20 | the obligation
of any bonds issued or contracts entered into by | ||||||
21 | the district nor
invalidate the levy, extension or collection | ||||||
22 | of any taxes or special
assessments upon the property in the | ||||||
23 | former drainage district. All property
and obligations of the | ||||||
24 | former drainage district shall be assumed and
managed by the | ||||||
25 | county, and the debts of the former drainage district shall
be | ||||||
26 | discharged as soon as practicable.
|
| |||||||
| |||||||
1 | If a drainage district lies only partly within a county | ||||||
2 | that adopts a
county stormwater management plan, the county may | ||||||
3 | petition the circuit
court to disconnect from the drainage | ||||||
4 | district that portion of the district
that lies within that | ||||||
5 | county. The property of the drainage district within the
| ||||||
6 | disconnected area shall be assumed and managed by the county. | ||||||
7 | The county shall
also assume a portion of the drainage | ||||||
8 | district's debt at the time of
disconnection, based on the | ||||||
9 | portion of the value of the taxable property of the
drainage | ||||||
10 | district which is located within the area being disconnected.
| ||||||
11 | The operations of any drainage district that continues to | ||||||
12 | exist in a
county that has adopted a stormwater management plan | ||||||
13 | in accordance with
this Section shall be in accordance with the | ||||||
14 | adopted plan.
| ||||||
15 | (j) Any county that has adopted a county stormwater | ||||||
16 | management plan
under this Section may, after 10 days written | ||||||
17 | notice to the owner or
occupant, enter upon any lands or waters | ||||||
18 | within the county for the purpose
of inspecting stormwater | ||||||
19 | facilities or causing the removal of any
obstruction to an | ||||||
20 | affected watercourse. The county shall be responsible
for any | ||||||
21 | damages occasioned thereby.
| ||||||
22 | (k) Upon petition of the municipality, and based on a | ||||||
23 | finding of the
stormwater management planning committee, the | ||||||
24 | county shall not enforce
rules and regulations adopted by the | ||||||
25 | county in any municipality located
wholly or partly within the | ||||||
26 | county that has a municipal stormwater
management ordinance |
| |||||||
| |||||||
1 | that is consistent with and at least as stringent as
the county | ||||||
2 | plan and ordinance, and is being enforced by the municipal
| ||||||
3 | authorities.
| ||||||
4 | (l) A county may issue general obligation bonds for | ||||||
5 | implementing any
stormwater plan adopted under this Section in | ||||||
6 | the manner prescribed in
Section 5-1012; except that the | ||||||
7 | referendum requirement of Section 5-1012 shall
not apply to | ||||||
8 | bonds issued pursuant to this Section on which the principal | ||||||
9 | and
interest are to be paid entirely out of funds generated by | ||||||
10 | the taxes and fees
authorized by this Section.
| ||||||
11 | (m) The powers authorized by this Section may be | ||||||
12 | implemented by the
county board for a portion of the county | ||||||
13 | subject to similar stormwater
management needs.
| ||||||
14 | (n) The powers and taxes authorized by this Section are in | ||||||
15 | addition to the
powers and taxes authorized by Division 5-15; | ||||||
16 | in exercising its powers
under this Section, a county shall not | ||||||
17 | be subject to the restrictions and
requirements of that | ||||||
18 | Division.
| ||||||
19 | (o) Pursuant to paragraphs (g) and (i) of Section 6 of | ||||||
20 | Article VII of
the Illinois Constitution, this Section | ||||||
21 | specifically denies and limits the
exercise of any power which | ||||||
22 | is inconsistent herewith by home rule units in
any county with | ||||||
23 | a population of less than 1,500,000 in the area served by
the | ||||||
24 | Northeastern Illinois Planning Commission. This Section does | ||||||
25 | not
prohibit the concurrent exercise of powers consistent | ||||||
26 | herewith.
|
| |||||||
| |||||||
1 | (Source: P.A. 88-670, eff. 12-2-94; 89-445, eff. 2-7-96 .)
| ||||||
2 | (55 ILCS 5/5-1062.2) | ||||||
3 | Sec. 5-1062.2. Stormwater management. | ||||||
4 | (a) The purpose of this Section is to allow management and | ||||||
5 | mitigation of the effects of urbanization on stormwater | ||||||
6 | drainage in the metropolitan counties of Madison, St. Clair, | ||||||
7 | Monroe, Kankakee, Grundy, LaSalle, DeKalb, Kendall, and Boone | ||||||
8 | and references to "county" in this Section apply only to those | ||||||
9 | counties , except that the counties of Champaign, Macon, McLean, | ||||||
10 | Peoria, Rock Island, Sangamon, Tazewell, Vermilion, and | ||||||
11 | Winnebago are authorized to adopt a schedule of fees as | ||||||
12 | outlined in subsection (h) of this Section . This Section does | ||||||
13 | not apply to any other counties in the State, including those | ||||||
14 | located in the area served by the Northeastern Illinois | ||||||
15 | Planning Commission that are granted authorities in Section | ||||||
16 | 5-1062. The purpose of this Section shall be achieved by: | ||||||
17 | (1) Consolidating the existing stormwater management
| ||||||
18 | framework into a united, countywide structure. | ||||||
19 | (2) Setting minimum standards for floodplain and
| ||||||
20 | stormwater management. | ||||||
21 | (3) Preparing a countywide plan for the management
of | ||||||
22 | stormwater runoff, including the management of natural and | ||||||
23 | man-made drainageways. The countywide plan may incorporate | ||||||
24 | watershed plans. | ||||||
25 | (b) A stormwater management planning committee may be |
| |||||||
| |||||||
1 | established by county board resolution, with its membership | ||||||
2 | consisting of equal numbers of county board and municipal | ||||||
3 | representatives from each county board district, and such other | ||||||
4 | members as may be determined by the county and municipal | ||||||
5 | members. If the county has more than 6 county board districts, | ||||||
6 | however, the county board may by ordinance divide the county | ||||||
7 | into not less than 6 areas of approximately equal population, | ||||||
8 | to be used instead of county board districts for the purpose of | ||||||
9 | determining representation on the stormwater management | ||||||
10 | planning committee. | ||||||
11 | The county board members shall be appointed by the chairman | ||||||
12 | of the county board. Municipal members from each county board | ||||||
13 | district or other represented area shall be appointed by a | ||||||
14 | majority vote of the mayors of those municipalities that have | ||||||
15 | the greatest percentage of their respective populations | ||||||
16 | residing in that county board district or other represented | ||||||
17 | area. All municipal and county board representatives shall be | ||||||
18 | entitled to a vote; the other members shall be nonvoting | ||||||
19 | members, unless authorized to vote by the unanimous consent of | ||||||
20 | the municipal and county board representatives. A municipality | ||||||
21 | that is located in more than one county may choose, at the time | ||||||
22 | of formation of the stormwater management planning committee | ||||||
23 | and based on watershed boundaries, to participate in the | ||||||
24 | stormwater management planning program of either or both of the | ||||||
25 | counties. Subcommittees of the stormwater management planning | ||||||
26 | committee may be established to serve a portion of the county |
| |||||||
| |||||||
1 | or a particular drainage basin that has similar stormwater | ||||||
2 | management needs. The stormwater management planning committee | ||||||
3 | shall adopt bylaws, by a majority vote of the county and | ||||||
4 | municipal members, to govern the functions of the committee and | ||||||
5 | its subcommittees. Officers of the committee shall include a | ||||||
6 | chair and vice chair, one of whom shall be a county | ||||||
7 | representative and one a municipal representative. | ||||||
8 | The principal duties of the committee shall be to develop a | ||||||
9 | stormwater management plan for presentation to and approval by | ||||||
10 | the county board, and to direct the plan's implementation and | ||||||
11 | revision. The committee may retain engineering, legal, and | ||||||
12 | financial advisors and inspection personnel. The committee | ||||||
13 | shall meet at least quarterly and shall hold at least one | ||||||
14 | public meeting during the preparation of the plan and prior to | ||||||
15 | its submittal to the county board. The committee may make | ||||||
16 | grants to units of local government that have adopted an | ||||||
17 | ordinance requiring actions consistent with the stormwater | ||||||
18 | management plan and to landowners for the purposes of | ||||||
19 | stormwater management, including special projects; use of the | ||||||
20 | grant money must be consistent with the stormwater management | ||||||
21 | plan. | ||||||
22 | The committee shall not have or exercise any power of | ||||||
23 | eminent domain.
| ||||||
24 | (c) In the preparation of a stormwater management plan, a | ||||||
25 | county stormwater management planning committee shall | ||||||
26 | coordinate the planning process with each adjoining county to |
| |||||||
| |||||||
1 | ensure that recommended stormwater projects will have no | ||||||
2 | significant impact on the levels or flows of stormwaters in | ||||||
3 | inter-county watersheds or on the capacity of existing and | ||||||
4 | planned stormwater retention facilities. An adopted stormwater | ||||||
5 | management plan shall identify steps taken by the county to | ||||||
6 | coordinate the development of plan recommendations with | ||||||
7 | adjoining counties. | ||||||
8 | (d) The stormwater management committee may not enforce any | ||||||
9 | rules or regulations that would interfere with (i) any power | ||||||
10 | granted by the Illinois Drainage Code (70 ILCS 605/) to | ||||||
11 | operate, construct, maintain, or improve drainage systems or | ||||||
12 | (ii) the ability to operate, maintain, or improve the drainage | ||||||
13 | systems used on or by land or a facility used for production | ||||||
14 | agriculture purposes, as defined in the Use Tax Act (35 ILCS | ||||||
15 | 105/), except newly constructed buildings and newly installed | ||||||
16 | impervious paved surfaces. Disputes regarding an exception | ||||||
17 | shall be determined by a mutually agreed upon arbitrator paid | ||||||
18 | by the disputing party or parties. | ||||||
19 | (e) Before the stormwater management planning committee | ||||||
20 | recommends to the county board a stormwater management plan for | ||||||
21 | the county or a portion thereof, it shall submit the plan to | ||||||
22 | the Office of Water Resources of the Department of Natural | ||||||
23 | Resources for review and recommendations. The Office, in | ||||||
24 | reviewing the plan, shall consider such factors as impacts on | ||||||
25 | the levels or flows in rivers and streams and the cumulative | ||||||
26 | effects of stormwater discharges on flood levels. The Office of |
| |||||||
| |||||||
1 | Water Resources shall determine whether the plan or ordinances | ||||||
2 | enacted to implement the plan complies with the requirements of | ||||||
3 | subsection (f). Within a period not to exceed 60 days, the | ||||||
4 | review comments and recommendations shall be submitted to the | ||||||
5 | stormwater management planning committee for consideration. | ||||||
6 | Any amendments to the plan shall be submitted to the Office for | ||||||
7 | review. | ||||||
8 | (f) Prior to recommending the plan to the county board, the | ||||||
9 | stormwater management planning committee shall hold at least | ||||||
10 | one public hearing thereon and shall afford interested persons | ||||||
11 | an opportunity to be heard. The hearing shall be held in the | ||||||
12 | county seat. Notice of the hearing shall be published at least | ||||||
13 | once no less than 15 days in advance of the hearing in a | ||||||
14 | newspaper of general circulation published in the county. The | ||||||
15 | notice shall state the time and place of the hearing and the | ||||||
16 | place where copies of the proposed plan will be accessible for | ||||||
17 | examination by interested parties. If an affected municipality | ||||||
18 | having a stormwater management plan adopted by ordinance wishes | ||||||
19 | to protest the proposed county plan provisions, it shall appear | ||||||
20 | at the hearing and submit in writing specific proposals to the | ||||||
21 | stormwater management planning committee. After consideration | ||||||
22 | of the matters raised at the hearing, the committee may amend | ||||||
23 | or approve the plan and recommend it to the county board for | ||||||
24 | adoption. | ||||||
25 | The county board may enact the proposed plan by ordinance. | ||||||
26 | If the proposals for modification of the plan made by an |
| |||||||
| |||||||
1 | affected municipality having a stormwater management plan are | ||||||
2 | not included in the proposed county plan, and the municipality | ||||||
3 | affected by the plan opposes adoption of the county plan by | ||||||
4 | resolution of its corporate authorities, approval of the county | ||||||
5 | plan shall require an affirmative vote of at least two-thirds | ||||||
6 | of the county board members present and voting. If the county | ||||||
7 | board wishes to amend the county plan, it shall submit in | ||||||
8 | writing specific proposals to the stormwater management | ||||||
9 | planning committee. If the proposals are not approved by the | ||||||
10 | committee, or are opposed by resolution of the corporate | ||||||
11 | authorities of an affected municipality having a municipal | ||||||
12 | stormwater management plan, amendment of the plan shall require | ||||||
13 | an affirmative vote of at least two-thirds of the county board | ||||||
14 | members present and voting. | ||||||
15 | (g) The county board may prescribe by ordinance reasonable | ||||||
16 | rules and regulations for floodplain management and for | ||||||
17 | governing the location, width, course, and release rate of all | ||||||
18 | stormwater runoff channels, streams, and basins in the county, | ||||||
19 | in accordance with the adopted stormwater management plan. | ||||||
20 | Land, facilities, and drainage district facilities used for | ||||||
21 | production agriculture as defined in subsection (d) shall not | ||||||
22 | be subjected to regulation by the county board or stormwater | ||||||
23 | management committee under this Section for floodplain | ||||||
24 | management and for governing location, width, course, | ||||||
25 | maintenance, and release rate of stormwater runoff channels, | ||||||
26 | streams and basins, or water discharged from a drainage |
| |||||||
| |||||||
1 | district. These rules and regulations shall, at a minimum, meet | ||||||
2 | the standards for floodplain management established by the | ||||||
3 | Office of Water Resources and the requirements of the Federal | ||||||
4 | Emergency Management Agency for participation in the National | ||||||
5 | Flood Insurance Program. The Commission may not impose more | ||||||
6 | stringent regulations regarding water quality on entities | ||||||
7 | discharging in accordance with a valid National Pollution | ||||||
8 | Discharge Elimination System permit issued under the | ||||||
9 | Environmental Protection Act. | ||||||
10 | (h) For the purpose of implementing this Section and for | ||||||
11 | the development, design, planning, construction, operation, | ||||||
12 | and maintenance of stormwater facilities provided for in In | ||||||
13 | accordance with, and if recommended in, the adopted stormwater | ||||||
14 | management plan, a the county board that has established a | ||||||
15 | stormwater management planning committee pursuant to this | ||||||
16 | Section or has participated in a stormwater management planning | ||||||
17 | process may adopt a schedule of fees applicable to all real | ||||||
18 | property within the county which receives benefit from the | ||||||
19 | county's stormwater management facilities and activities, and | ||||||
20 | as may be necessary to mitigate the effects of increased | ||||||
21 | stormwater runoff resulting from new development based on | ||||||
22 | actual costs. The total amount of the fees assessed must bear a | ||||||
23 | reasonable relationship to the actual costs of the county in | ||||||
24 | the preparation, administration, and implementation of the | ||||||
25 | shall not exceed the cost of satisfying the onsite stormwater | ||||||
26 | retention or detention requirements of the adopted stormwater |
| |||||||
| |||||||
1 | management plan , construction and maintenance of stormwater | ||||||
2 | facilities, and other activities related to the management of | ||||||
3 | the runoff from the property . The individual fees must be | ||||||
4 | specifically and uniquely attributable to the portion of the | ||||||
5 | actual cost to the county of managing the runoff from the | ||||||
6 | property. The fees shall be used to finance activities | ||||||
7 | undertaken by the county or its included municipalities to | ||||||
8 | mitigate the effects of urban stormwater runoff by providing | ||||||
9 | and maintaining regional stormwater collection, retention , or | ||||||
10 | detention , and treatment facilities and improving water bodies | ||||||
11 | impacted by stormwater runoff , as identified in the county | ||||||
12 | plan. In establishing, maintaining, or replacing such | ||||||
13 | facilities, the county shall not duplicate facilities operated | ||||||
14 | by other governmental bodies within its corporate boundaries. | ||||||
15 | The schedule of fees established by the county board shall | ||||||
16 | include a procedure for a full or partial fee waiver for | ||||||
17 | property owners who have taken actions or put in place | ||||||
18 | facilities that reduce or eliminate the cost to the county of | ||||||
19 | providing stormwater management services to their property, | ||||||
20 | including but not limited to facilities that reduce the volume, | ||||||
21 | temperature, velocity, and pollutant load of the stormwater | ||||||
22 | managed by the county, such as systems that infiltrate, | ||||||
23 | evapotranspirate, or harvest stormwater for reuse, known as | ||||||
24 | "green infrastructure". The county board may also offer tax or | ||||||
25 | fee rebates or incentive payments to property owners who | ||||||
26 | construct, maintain, and use approved green infrastructure |
| |||||||
| |||||||
1 | stormwater management devices or any other methods that reduce | ||||||
2 | or eliminate the cost to the county of providing stormwater | ||||||
3 | management services to the property. In exercising this | ||||||
4 | authority, the county shall provide notice to the | ||||||
5 | municipalities within their jurisdictions of any fees proposed | ||||||
6 | under this Section and seek the input of each municipality with | ||||||
7 | respect to the calculation of the fees. The county shall also | ||||||
8 | give property owners at least 2 years' notice of the fee during | ||||||
9 | which time the county shall provide education on green | ||||||
10 | infrastructure practices and an opportunity to take action to | ||||||
11 | reduce or eliminate the fee. The county board shall provide for | ||||||
12 | a credit or reduction in fees for any onsite retention, | ||||||
13 | detention, drainage district assessments, or other similar | ||||||
14 | stormwater facility that the developer is required to construct | ||||||
15 | consistent with the stormwater management ordinance. All these | ||||||
16 | fees collected by the county shall be held in a separate fund, | ||||||
17 | and shall be expended only in the watershed within which they | ||||||
18 | were collected. The county may enter into intergovernmental | ||||||
19 | agreements with other government bodies for the joint | ||||||
20 | administration of stormwater management and the collection of | ||||||
21 | the fees authorized in this Section. | ||||||
22 | A fee schedule authorized by this subsection must have the | ||||||
23 | same limit as the lesser of the 0.20% property value provided | ||||||
24 | for in subsection (i) of this Section and the maximum tax | ||||||
25 | currently allowable in the county under State law. The fee | ||||||
26 | schedule shall not be adopted unless (i) a referendum has been |
| |||||||
| |||||||
1 | passed approving a stormwater tax as provided in subsection (i) | ||||||
2 | of this Section; or (ii) the question of the adoption of a fee | ||||||
3 | schedule with the same limit as the authorized stormwater tax | ||||||
4 | has been approved in a referendum by a majority of those voting | ||||||
5 | on the question. | ||||||
6 | (i) In the alternative, the For the purpose of implementing | ||||||
7 | this Section and for the development, design, planning, | ||||||
8 | construction, operation, and maintenance of stormwater | ||||||
9 | facilities provided for in the stormwater management plan, a | ||||||
10 | county board that has established a stormwater management | ||||||
11 | planning committee pursuant to this Section may cause an annual | ||||||
12 | tax of not to exceed 0.20% of the value, as equalized or | ||||||
13 | assessed by the Department of Revenue, of all taxable property | ||||||
14 | in the county to be levied upon all the taxable property in the | ||||||
15 | county or occupation and use taxes of 1/10 of one cent. The | ||||||
16 | property tax shall be in addition to all other taxes authorized | ||||||
17 | by law to be levied and collected in the county and shall be in | ||||||
18 | addition to the maximum tax rate authorized by law for general | ||||||
19 | county purposes. The 0.20% limitation provided in this Section | ||||||
20 | may be increased or decreased by referendum in accordance with | ||||||
21 | the provisions of Sections 18-120, 18-125, and 18-130 of the | ||||||
22 | Property Tax Code (35 ILCS 200/). | ||||||
23 | Any revenues generated as a result of ownership or | ||||||
24 | operation of facilities or land acquired with the tax funds | ||||||
25 | collected pursuant to this subsection shall be held in a | ||||||
26 | separate fund and be used either to abate such property tax or |
| |||||||
| |||||||
1 | for implementing this Section. | ||||||
2 | If a county adopts a fee schedule pursuant to this Section | ||||||
3 | it may not also levy a tax under this subsection, except that | ||||||
4 | if that county has existing debt repayments to make on a | ||||||
5 | stormwater project, the remainder of that debt may be paid in | ||||||
6 | the same manner as all earlier payments. | ||||||
7 | However, the tax authorized by this subsection shall not be | ||||||
8 | levied until the question of its adoption, either for a | ||||||
9 | specified period or indefinitely, has been submitted to the | ||||||
10 | electors thereof and approved by a majority of those voting on | ||||||
11 | the question. This question may be submitted at any election | ||||||
12 | held in the county after the adoption of a resolution by the | ||||||
13 | county board providing for the submission of the question to | ||||||
14 | the electors of the county. The county board shall certify the | ||||||
15 | resolution and proposition to the proper election officials, | ||||||
16 | who shall submit the proposition at an election in accordance | ||||||
17 | with the general election law. If a majority of the votes cast | ||||||
18 | on the question is in favor of the levy of the tax, it may | ||||||
19 | thereafter be levied in the county for the specified period or | ||||||
20 | indefinitely, as provided in the proposition. The question | ||||||
21 | shall be put in substantially the following form: | ||||||
22 | Shall an annual tax be levied
for stormwater management | ||||||
23 | purposes (for a period of not more than ..... years) at a | ||||||
24 | rate not exceeding
.....% of the equalized assessed
value | ||||||
25 | of the taxable property of ..... County?
| ||||||
26 | Or this question may be submitted at any election held in the |
| |||||||
| |||||||
1 | county after the adoption of a resolution by the county board | ||||||
2 | providing for the submission of the question to the electors of | ||||||
3 | the county to authorize use and occupation taxes of 1/10 of one | ||||||
4 | cent: | ||||||
5 | Shall use and occupation taxes be raised for stormwater | ||||||
6 | management purposes (for a period of not more than ..... | ||||||
7 | years) at a rate of 1/10 of one cent for taxable goods in | ||||||
8 | ..... County? | ||||||
9 | Votes shall be recorded as Yes or No.
| ||||||
10 | The following question may be submitted at any election | ||||||
11 | held in the county after the adoption of a resolution by the | ||||||
12 | county board providing for the submission of the question to | ||||||
13 | the electors of the county to authorize adoption of a schedule | ||||||
14 | of fees applicable to all real property within the county: | ||||||
15 | Shall the county board be authorized to adopt a | ||||||
16 | schedule of fees, at a rate not exceeding that of the | ||||||
17 | stormwater management tax, applicable to all real property | ||||||
18 | for preparation, administration, and implementation of an | ||||||
19 | adopted stormwater management plan, construction and | ||||||
20 | maintenance of related facilities, and management of the | ||||||
21 | runoff from the property? | ||||||
22 | Votes shall be recorded as Yes or No. | ||||||
23 | (j) For those counties that adopt a property tax in | ||||||
24 | accordance with the provisions in this Section, the stormwater | ||||||
25 | management committee shall offer property tax abatements or | ||||||
26 | incentive payments to property owners who construct, maintain, |
| |||||||
| |||||||
1 | and use approved stormwater management devices. For those | ||||||
2 | counties that adopt use and occupation taxes in accordance with | ||||||
3 | the provisions of this Section, the stormwater management | ||||||
4 | committee may offer tax rebates or incentive payments to | ||||||
5 | property owners who construct, maintain, and use approved | ||||||
6 | stormwater management devices.
The stormwater management | ||||||
7 | committee is authorized to offer credits to the property tax, | ||||||
8 | if applicable, based on authorized practices consistent with | ||||||
9 | the stormwater management plan and approved by the committee. | ||||||
10 | Expenses of staff of a stormwater management committee that are | ||||||
11 | expended on regulatory project review may be no more than 20% | ||||||
12 | of the annual budget of the committee, including funds raised | ||||||
13 | under subsections (h) and (i). | ||||||
14 | (k) Any county that has adopted a county stormwater | ||||||
15 | management plan under this Section may, after 10 days written | ||||||
16 | notice receiving consent of the owner or occupant, enter upon | ||||||
17 | any lands or waters within the county for the purpose of | ||||||
18 | inspecting stormwater facilities or causing the removal of any | ||||||
19 | obstruction to an affected watercourse. If consent is denied or | ||||||
20 | cannot be reasonably obtained, the county ordinance shall | ||||||
21 | provide a process or procedure for an administrative warrant to | ||||||
22 | be obtained. The county shall be responsible for any damages | ||||||
23 | occasioned thereby. | ||||||
24 | (l) Upon petition of the municipality, and based on a | ||||||
25 | finding of the stormwater management planning committee, the | ||||||
26 | county shall not enforce rules and regulations adopted by the |
| |||||||
| |||||||
1 | county in any municipality located wholly or partly within the | ||||||
2 | county that has a municipal stormwater management ordinance | ||||||
3 | that is consistent with and at least as stringent as the county | ||||||
4 | plan and ordinance, and is being enforced by the municipal | ||||||
5 | authorities. On issues that the county ordinance is more | ||||||
6 | stringent as deemed by the committee, the county shall only | ||||||
7 | enforce rules and regulations adopted by the county on the more | ||||||
8 | stringent issues and accept municipal permits. The county shall | ||||||
9 | have no more than 60 days to review permits or the permits | ||||||
10 | shall be deemed approved. | ||||||
11 | (m) A county may issue general obligation bonds for | ||||||
12 | implementing any stormwater plan adopted under this Section in | ||||||
13 | the manner prescribed in Section 5-1012; except that the | ||||||
14 | referendum requirement of Section 5-1012 does not apply to | ||||||
15 | bonds issued pursuant to this Section on which the principal | ||||||
16 | and interest are to be paid entirely out of funds generated by | ||||||
17 | the taxes and fees authorized by this Section. | ||||||
18 | (n) The powers authorized by this Section may be | ||||||
19 | implemented by the county board for a portion of the county | ||||||
20 | subject to similar stormwater management needs. | ||||||
21 | (o) The powers and taxes authorized by this Section are in | ||||||
22 | addition to the powers and taxes authorized by Division 5-15; | ||||||
23 | in exercising its powers under this Section, a county shall not | ||||||
24 | be subject to the restrictions and requirements of that | ||||||
25 | Division.
| ||||||
26 | (Source: P.A. 94-675, eff. 8-23-05.)
|
| |||||||
| |||||||
1 | Section 99. Effective date. This Act takes effect upon | ||||||
2 | becoming law. |