Rep. Brandon W. Phelps

Filed: 3/26/2012

 

 


 

 


 
09700HB5503ham001LRB097 15518 PJG 67897 a

1
AMENDMENT TO HOUSE BILL 5503

2    AMENDMENT NO. ______. Amend House Bill 5503 by replacing
3everything after the enacting clause with the following:
 
4    "Section 1. Short title. This Act may be cited as the
5Energy Efficiency Program for State Government Buildings Act.
 
6    Section 5. Purpose. The General Assembly finds and declares
7it to be the public policy of the State to maximize the use of
8energy efficiency measures in the construction, renovation,
9and maintenance of buildings owned by the State. In furtherance
10of this policy, the Capital Development Board and the
11Department of Central Management Services shall administer an
12energy efficiency program, to be known as the Energy Efficiency
13Program for State Government Buildings.
 
14    Section 10. Definitions. As used in this Act, unless the
15context requires otherwise:

 

 

09700HB5503ham001- 2 -LRB097 15518 PJG 67897 a

1    "Aggregate simple payback period" means the simple payback
2period of a set of energy efficiency measures taken together
3for a building.
4    "Building" means all contiguous land, together with
5structures, appurtenances, and improvements thereon that use
6energy.
7    "Board" means the Capital Development Board.
8    "Capital cost avoidance" means savings generated when
9expenditures of appropriated capital construction or
10appropriated capital outlay funds are avoided because the
11budgeted capital improvements or items of equipment are
12contained within the energy efficiency measures provided by a
13guaranteed energy savings performance contract.
14    "Department" means the Department of Central Management
15Services.
16    "Director" means the Director of Central Management
17Services.
18    "Energy audit" means examination of a building's
19energy-using systems, energy consumption and costs, occupancy
20patterns, and operation and maintenance procedures.
21    "Energy efficiency measure" means any improvement, repair,
22alteration, or betterment of any building or facility owned or
23operated by a State agency or any equipment, fixture, or
24furnishing to be added to or used in any such building or
25facility that is designed to reduce energy consumption or
26operating costs and may include, without limitation, one or

 

 

09700HB5503ham001- 3 -LRB097 15518 PJG 67897 a

1more of the following:
2        (1) insulation of the building structure or systems
3    within the building;
4        (2) storm windows or doors, caulking or
5    weather-stripping, multiglazed windows or doors, heat
6    absorbing or heat reflective glazed and coated window or
7    door systems, additional glazing, reductions in glass
8    area, or other window and door system modifications that
9    reduce energy consumption;
10        (3) automated or computerized energy control systems;
11        (4) heating, ventilating, or air conditioning system
12    modifications or replacements;
13        (5) replacement or modification of lighting fixtures
14    to increase the energy efficiency of the lighting system
15    without increasing the overall illumination of a facility,
16    unless an increase in illumination is necessary to conform
17    to the applicable State or local building code for the
18    lighting system after the proposed modifications are made;
19        (6) energy recovery systems; and
20        (7) energy conservation measures that provide
21    long-term operating cost reductions.
22    "ENERGY STAR" means the voluntary program administered by
23the United States Environmental Protection Agency and the
24United States Department of Energy that is designed to protect
25the environment through the promotion of energy-efficient
26products and practices.

 

 

09700HB5503ham001- 4 -LRB097 15518 PJG 67897 a

1    "Engineering analysis" means a detailed cost-benefit
2analysis of energy efficiency investments, including a review
3of potential cost savings through operation and maintenance
4changes.
5    "Executive Director" means the Executive Director of the
6Capital Development Board.
7    "Guaranteed energy savings performance contract" means an
8agreement for the provision of energy services or equipment,
9including energy efficiency measures, energy conservation
10measures and alternate energy technologies for State
11government buildings, in which a person agrees to design,
12construct, install, maintain, operate, or manage energy
13systems or equipment to improve energy efficiency of, or
14produce energy in connection with, a State government building.
15Payments for a guaranteed energy savings performance contract
16shall be made from measured and verified savings generated from
17implementation of the energy efficiency measures financed by
18the contract. The term of a guaranteed energy savings
19performance contract shall not exceed 5 years. If the measured
20and verified savings are not sufficient to pay the financial
21obligations under the contract, the contractor is liable for
22the contract payments.
23    "High-performance building" means a State government
24building that is designed, constructed, and capable of being
25operated in a manner that:
26        (1) increases environmental performance and economic

 

 

09700HB5503ham001- 5 -LRB097 15518 PJG 67897 a

1    value over time;
2        (2) safeguards the health of occupants;
3        (3) enhances satisfaction and productivity of workers
4    through energy-efficient systems;
5        (4) incorporates environmentally friendly materials
6    and products; and
7        (5) reduces waste.
8    "Life-cycle cost analysis" means a method for estimating
9the total cost of an energy-using component or building over
10its useful life, including cost factors such as purchase price
11or construction, renovation, or leasing costs, energy use,
12maintenance, interest, and inflation.
13    "Low cost/no cost energy conservation measures" means
14those energy saving practices and energy efficiency measures,
15usually involving operation and maintenance practices, that
16can be accomplished by existing personnel within existing
17operating budgets.
18    "Operating costs" means expenditures associated with
19operating and maintaining a properly functioning building and
20its systems including but not limited to the heating,
21ventilation, cooling, lighting, plumbing, water heating,
22electrical, and laundry systems and their controls.
23    "Qualified provider" means a person or business whose
24employees are experienced and trained in the design,
25implementation, or installation of energy conservation
26measures.

 

 

09700HB5503ham001- 6 -LRB097 15518 PJG 67897 a

1    "Request for proposals" means a competitive selection
2achieved by negotiated procurement.
3    "Simple payback period" means the number of years it takes
4to pay back, from estimated savings, the initial cost of an
5energy efficiency measure with the simple payback period equal
6to the initial cost divided by the estimated annual savings.
7    "Savings" means the reduction in expenditures, excluding
8any State government and university personnel expenditures,
9that are measured and verified, including but not limited to
10energy usage, operating costs, and capital cost avoidance that
11occur as a result of the implementation of energy efficiency
12measures.
13    "State agency" means the Department of Central Management
14Services.
 
15    Section 15. Authority of the Capital Development Board.
16The Capital Development board shall have the authority to act
17on behalf of any State agency in accordance with this Act.
 
18    Section 20. Energy Efficiency Program for State Government
19Buildings.
20    (a) The Energy Efficiency Program for State Government
21Buildings shall provide for implementation of low cost/no cost
22energy conservation measures, engineering analyses, energy
23efficiency measures, building improvements, and monitoring of
24results for State-owned buildings.

 

 

09700HB5503ham001- 7 -LRB097 15518 PJG 67897 a

1    (b) Any engineering analysis conducted on a State-owned
2building shall assess the energy efficiency of the building and
3make recommendations for improving the efficient use of energy
4within the building. The analyses shall be performed by
5individuals licensed under the Illinois Architecture Practice
6Act of 1989, the Professional Engineering Practice Act of 1989
7or the Structural Engineering Practice Act of 1989.
8    (c) Measures to improve the energy efficiency of a
9State-owned building that have an aggregate simple payback
10period of 5 years or less shall be implemented subject to
11appropriation. No more than 5% of the cost of energy efficiency
12measures for a building may be used for monitoring the results.
13    (d) If funds are appropriated for energy efficiency
14improvements, the Board shall prioritize projects among the
15various State-owned buildings to determine which projects
16shall be implemented to best use the available funding.
17    (e) The savings in reduced expenditures that are specified
18as payment sources shall be documented in the guaranteed energy
19savings performance contract. Savings shall be determined by
20using one of the measurement and verification methodologies
21listed in the United States Department of Energy's
22"International Performance Measurement and Verification
23Protocol". If specific data limitations or documented unique
24characteristics of the project prevent use of the
25"International Performance Measurement and Verification
26Protocol", an alternative method that is compatible shall be

 

 

09700HB5503ham001- 8 -LRB097 15518 PJG 67897 a

1adopted upon documentation and approval of the Director.
 
2    Section 25. Energy audit training program. The Department
3shall institute an energy audit training program to identify
4energy saving techniques for State-owned building maintenance
5staff. Additional programs shall be developed to educate State
6employees and other building occupants on energy awareness and
7practices to reduce energy use in State-owned buildings. Local
8government employees may be included in training and
9educational programs.
 
10    Section 30. Life-cycle energy cost analyses. The Board
11shall require persons submitting bids or plans for State-owned
12buildings to be constructed or substantially renovated after
13July 15, 2013, to include within those bids or plans life-cycle
14energy cost analyses. The Board shall consider those life-cycle
15cost analyses when evaluating competing bids or plans.
 
16    Section 35. Report on energy efficiency measures in State
17government. The Department shall report on or before October
1815, 2013, and on or before every October 15 thereafter to the
19Legislative Research Unit and the Commission on Government
20Forecasting and Accountability on progress made to maximize the
21use of energy efficiency measures in State government. The
22Commission on Government Forecasting and Accountability shall
23transmit the report to the Speaker of the House of

 

 

09700HB5503ham001- 9 -LRB097 15518 PJG 67897 a

1Representatives, the Minority Leader of the House of
2Representatives, the President of the Senate, and the Minority
3Leader of the Senate. The report shall include but not be
4limited to:
5        (1) a summary of initiatives undertaken by the Board
6    during the reporting period to promote adoption of low
7    cost/no cost energy efficiency measures, including
8    employee training efforts;
9        (2) a summary of energy efficiency measures installed
10    and energy improvements made during the reporting period;
11        (3) energy consumption and expenditure data for
12    facilities owned by State government and any documented
13    savings made as a result of energy efficiency measures and
14    improvements;
15        (4) a status report on the number of buildings newly
16    constructed or renovated in accordance with the
17    high-performance building standards required under this
18    Act and the amount of savings realized based upon a
19    life-cycle cost analysis;
20        (5) any efforts made during the reporting period to
21    promote acquisition of energy efficient products pursuant
22    to this Act and the amount of savings expected to be
23    realized in the first year of operation from the purchase
24    of ENERGY STAR-qualified products pursuant to this Act;
25        (6) any recommendations for future funding of energy
26    improvements or other measures needed to assure energy

 

 

09700HB5503ham001- 10 -LRB097 15518 PJG 67897 a

1    efficiency in State government; and
2        (7) any improvements in energy efficiency planned or
3    realized through the use of ENERGY STAR-qualified products
4    and guaranteed energy savings performance contracts.
 
5    Section 40. Energy Efficiency in State Government
6Buildings Fund.
7    (a) A special fund in the State treasury is hereby created
8which shall be known as the Energy Efficiency in State
9Government Buildings Fund. The Fund shall be used to provide
10financial assistance to State government agencies for the
11purposes of this Act. Notwithstanding any other law to the
12contrary, the Energy Efficiency in State Government Buildings
13Fund is not subject to sweeps, administrative charge-backs, or
14any other fiscal or budgetary maneuver that would in any way
15transfer any amounts from the Energy Efficiency in State
16Government Buildings Fund into any other fund of the State.
17    (b) The Fund may receive State appropriations, gifts,
18grants, and federal funds and shall include earnings from the
19investment of moneys in the Fund.
20    (c) Administration of this Fund shall be the responsibility
21of the Board. The Board shall establish terms and conditions
22for the operation of the Fund including the application
23process. The Board shall establish and implement fiscal
24controls and accounting periods for projects that receive
25financial assistance from the Fund.
 

 

 

09700HB5503ham001- 11 -LRB097 15518 PJG 67897 a

1    Section 45. Administrative rules. The Board may implement
2the provisions of this Act through the promulgation of
3administrative rules pursuant to the Illinois Administrative
4Procedure Act.
 
5    Section 50. Prequalification; qualified providers.
6    (a) The Capital Development Board shall establish
7procedures to prequalify firms or entities seeking to provide
8services under performance and guaranteed energy savings
9performance contracts and ensure such firms are qualified
10providers of such services.
11    (b) The minimum training required for a qualified provider
12under this Section shall be the satisfactory completion of at
13least 40 hours of course instruction dealing with energy
14conservation measures. A qualified provider to whom the
15contract is awarded shall give a sufficient bond to the State
16agency or area vocational center for its faithful performance.
17All design services shall be procured in accordance with the
18Architectural, Engineering, and Land Surveying Qualifications
19Based Selection Act.
 
20    Section 55. Request for proposals. The request for
21proposals shall be administered by the Capital Development
22Board and notification of the procurement will be accordance
23with the Illinois Procurement Code, but in no case shall the

 

 

09700HB5503ham001- 12 -LRB097 15518 PJG 67897 a

1Board provide less than a 30-day notice of the request for
2proposals. Proposals submitted shall be sealed. The request for
3proposals shall include all of the following:
4        (1) the name and address of the proposed project;
5        (2) the name, address, title, and phone number of a
6    contact person;
7        (3) notice indicating that the State agency is
8    requesting qualified providers to propose energy
9    conservation measures through a performance or guaranteed
10    energy savings performance contract;
11        (4) the date, time, and place where proposals must be
12    received;
13        (5) the evaluation criteria for assessing the
14    proposals; and
15        (6) any other stipulations and clarifications the
16    State agency may require.
 
17    Section 60. Evaluation of proposals. Before entering into a
18performance or guaranteed energy savings performance contract,
19a State agency shall submit a request for proposals. The
20Capital Development Board shall evaluate any sealed proposal
21from a qualified provider on behalf of the State agency. The
22evaluation shall analyze the estimates of all costs of
23installations, modifications, or remodeling, including,
24without limitation, costs of a pre-installation energy audit or
25analysis, design, engineering, installation, maintenance,

 

 

09700HB5503ham001- 13 -LRB097 15518 PJG 67897 a

1repairs, debt service, conversions to a different energy or
2fuel source, or post-installation project monitoring, data
3collection, and reporting. The evaluation shall include a
4detailed analysis of whether either the energy consumed or the
5operating costs, or both, will be reduced. The evaluation of
6the proposal shall be done by a licensed professional engineer
7or architect who is retained by the Capital Development Board
8and selected in accordance with the Architectural,
9Engineering, and Land Surveying Qualifications Based Selection
10Act. A licensed architect or registered professional engineer
11evaluating a proposal under this Section must not have any
12financial or contractual relationship with a qualified
13provider or other source that would constitute a conflict of
14interest.
 
15    Section 65. Award of contract.
16    (a) Sealed proposals must be opened by the Capital
17Development Board at a public opening at which the contents of
18the proposals must be announced. Each person or entity
19submitting a sealed proposal must receive at least 14 days
20notice of the time and place of the opening. The Capital
21Development Board shall select the qualified provider that best
22meets the needs of the State agency. After evaluating the
23proposals under Section 60, the Capital Development Board may
24enter into a guaranteed energy savings performance contract
25with a qualified provider if it finds that the amount it would

 

 

09700HB5503ham001- 14 -LRB097 15518 PJG 67897 a

1spend on the energy conservation measures recommended in the
2proposal would not exceed the amount to be saved in either
3energy or operational costs, or both, within a 5-year period
4from the date of installation, if the recommendations in the
5proposal are followed. Contracts let or awarded must be
6published in the Illinois Procurement Bulletin.
7    (b) The request for proposals and any contracts awarded to
8a qualified provider shall require that any subsequent need for
9architectural, engineering, or land surveying services that
10arises after the submittal of the request for qualifications,
11the request for proposals, or contract award shall be procured
12by the provider using a qualifications based selection process
13consisting of publication of notice of availability of such
14services, a statement of desired qualifications, an evaluation
15based on such desired qualifications, and the development of a
16shortlist ranking the firms in order of qualifications, and
17then negotiations with such ranked firms for a fair and
18reasonable fee. Compliance with the Architectural,
19Engineering, and Land Surveying Qualifications Based Selection
20Act shall be deemed prima facie compliance with this
21subsection. Every performance or guaranteed energy savings
22performance contract shall incorporate the requirements of
23this subsection.
24    (c) The request for proposals shall require that each and
25every contractor, subcontractor, and architectural,
26engineering, and land surveying firm or entity shall be listed

 

 

09700HB5503ham001- 15 -LRB097 15518 PJG 67897 a

1and the quotation or price for such services shall also be
2listed. If, prior to or after the award of the contract, any of
3the listed firms shall have a reduction in their listed price,
4the performance or guaranteed energy savings performance
5contract shall be modified and such savings shall be for the
6benefit of the State agency with a corresponding reduction in
7the contract amount. The information in the request for
8proposals shall be considered confidential and only for the use
9of the State agency.
 
10    Section 70. Guarantee. A guaranteed energy savings
11performance contract shall include a written guarantee by the
12qualified provider that either the energy or operational cost
13savings, or both, will meet or exceed, within 5 years, the
14costs of the energy conservation measures. The qualified
15provider shall reimburse the State agency for any shortfall of
16guaranteed energy savings projected in the contract. A
17qualified provider shall provide a sufficient bond to the State
18agency for the installation and the faithful performance of all
19the measures included in the contract. The guaranteed energy
20savings performance contract may provide for payments over a
21period of time not to exceed 5 years from the date of final
22installation of the measures.
 
23    Section 75. Disclosures. A State agency may not withhold
24the disclosure of information related to (i) the State agency's

 

 

09700HB5503ham001- 16 -LRB097 15518 PJG 67897 a

1consumption of energy, (ii) the physical condition of the State
2agency's facilities, and (iii) any limitations prescribed by
3the State agency.
4    In accordance with Section 50-10.5 of the Illinois
5Procurement Code, no contractor that participated in the
6preparation of the specifications issued by the State agency
7shall be permitted to respond to the solicitation or be awarded
8a performance or guaranteed energy savings performance
9contract. The solicitation must include a written disclosure
10that no energy services contractor participated in the
11preparation of the specifications. The written disclosure
12shall be published in the Capital Development Board's volume of
13the Illinois Procurement Bulletin with the request for
14proposal.
 
15    Section 80. Operational and energy cost savings. The
16Department shall document the operational and energy cost
17savings specified in the guaranteed energy savings performance
18contract. If the annual energy savings are less than projected
19under the guaranteed energy savings performance contract the
20qualified provider shall pay the difference in accordance with
21Section 70.
 
22    Section 85. Bonding. A qualified provider shall provide a
23sufficient bond to the State agency for the installation and
24the faithful performance of all the measures included in the

 

 

09700HB5503ham001- 17 -LRB097 15518 PJG 67897 a

1contract in accordance with the Public Construction Bond Act.
2Such bond shall be in effect for the entire term of the
3contract.
 
4    Section 90. Applicable laws. Other State laws and related
5administrative requirements apply to this Act, including, but
6not limited to, the following laws and related administrative
7requirements: the Illinois Human Rights Act, the Business
8Enterprise for Minorities, Females, and Persons with
9Disabilities Act, the Prevailing Wage Act, the Employment of
10Illinois Workers on Public Works Act, the Freedom of
11Information Act, the Open Meetings Act, the Illinois
12Architecture Practice Act of 1989, the Professional
13Engineering Practice Act of 1989, the Structural Engineering
14Practice Act of 1989, the Architectural, Engineering, and Land
15Surveying Qualifications Based Selection Act, the Contractor
16Unified License and Permit Bond Act, the Procurement of
17Domestic Products Act, the Public Purchases in Other States
18Act, the Governmental Joint Purchasing Act, the Design-Build
19Procurement Act, the State Prompt Payment Act, the Public
20Contract Fraud Act, the Public Construction Contract Act, the
21Airport and Correctional Facility Land Disclosure Act, the
22State Real Property Leasing Act, the Real Estate Leasing Act,
23the Project Labor Agreements Act, and the provisions of Article
2450 of the Illinois Procurement Code.
 

 

 

09700HB5503ham001- 18 -LRB097 15518 PJG 67897 a

1    Section 95. The State Finance Act is amended by adding
2Section 5.811 as follows:
 
3    (30 ILCS 105/5.811 new)
4    Sec. 5.811. Energy Efficiency in State Government
5Buildings Fund.
 
6    Section 100. The Illinois Procurement Code is amended by
7changing Section 30-45 as follows:
 
8    (30 ILCS 500/30-45)
9    Sec. 30-45. Other Acts. This Article is subject to
10applicable provisions of the following Acts:
11        (1) the Prevailing Wage Act;
12        (2) the Public Construction Bond Act;
13        (3) the Public Works Employment Discrimination Act;
14        (4) the Public Works Preference Act (repealed on June
15    16, 2010 by Public Act 96-929);
16        (5) the Employment of Illinois Workers on Public Works
17    Act;
18        (6) the Public Contract Fraud Act;
19        (7) the Illinois Construction Evaluation Act; and
20        (8) the Project Labor Agreements Act; and .
21        (9) the Energy Efficiency Program for State Government
22    Buildings Act.
23(Source: P.A. 97-199, eff. 7-27-11; 97-333, eff. 8-12-11.)
 

 

 

09700HB5503ham001- 19 -LRB097 15518 PJG 67897 a

1    Section 999. Effective date. This Act takes effect upon
2becoming law.".