| | 97TH GENERAL ASSEMBLY
State of Illinois
2011 and 2012 HB5212 Introduced 2/8/2012, by Rep. Mr. Charles W. Krezwick SYNOPSIS AS INTRODUCED: |
|
820 ILCS 130/4 | from Ch. 48, par. 39s-4 |
|
Amends the Prevailing Wage Act. Provides that a public body may make required notifications regarding revisions in the prevailing rate of hourly wages by publishing an ordinance or resolution stating the public body's adherence to the prevailing wage requirements and posting a link with the revised rate schedule on the public body's official website.
|
| |
| | A BILL FOR |
|
|
| | HB5212 | | LRB097 19755 JLS 65018 b |
|
|
1 | | AN ACT concerning wages.
|
2 | | Be it enacted by the People of the State of Illinois,
|
3 | | represented in the General Assembly:
|
4 | | Section 5. The Prevailing Wage Act is amended by changing |
5 | | Section 4 as follows:
|
6 | | (820 ILCS 130/4) (from Ch. 48, par. 39s-4)
|
7 | | Sec. 4. Ascertaining prevailing wage. |
8 | | (a) The public body awarding any contract for public work |
9 | | or
otherwise undertaking any public works, shall ascertain the |
10 | | general
prevailing rate of hourly wages in the locality in |
11 | | which the work is to
be performed, for each craft or type of |
12 | | worker or mechanic needed to
execute the contract, and where |
13 | | the public body performs the work
without letting a contract |
14 | | therefor, shall ascertain the prevailing rate
of wages on a per |
15 | | hour basis in the locality, and such public body shall
specify |
16 | | in the resolution or ordinance and in the call for bids for the
|
17 | | contract, that the general prevailing rate of wages in the |
18 | | locality for
each craft or type of worker or mechanic needed to |
19 | | execute the contract
or perform such work, also the general |
20 | | prevailing rate for legal holiday
and overtime work, as |
21 | | ascertained by the public body or by the
Department of Labor |
22 | | shall be paid for each craft or type of worker
needed to |
23 | | execute the contract or to perform such work, and it shall be
|
|
| | HB5212 | - 2 - | LRB097 19755 JLS 65018 b |
|
|
1 | | mandatory upon the contractor to whom the contract is awarded |
2 | | and upon
any subcontractor under him, and where the public body |
3 | | performs the
work, upon the public body, to pay not less than |
4 | | the specified rates to
all laborers, workers and mechanics |
5 | | employed by them in the execution of
the contract or such work; |
6 | | provided, however, that if the public body
desires that the |
7 | | Department of Labor ascertain the prevailing rate of
wages, it |
8 | | shall notify the Department of Labor to ascertain the general
|
9 | | prevailing rate of hourly wages for work under contract, or for |
10 | | work
performed by a public body without letting a contract as |
11 | | required in the
locality in which the work is to be performed, |
12 | | for each craft or type of
worker or mechanic needed to execute |
13 | | the contract or project or work to
be performed. Upon such |
14 | | notification the Department of Labor shall
ascertain such |
15 | | general prevailing rate of wages, and certify the
prevailing |
16 | | wage to such public body. |
17 | | (a-1) The public body or other entity awarding the
contract |
18 | | shall cause to be inserted in the project specifications and |
19 | | the
contract a stipulation to the
effect that not less than the |
20 | | prevailing rate of wages as found by the
public body or |
21 | | Department of Labor or determined by the court on review
shall |
22 | | be paid to all laborers, workers and mechanics performing work
|
23 | | under the contract.
|
24 | | (a-2) When a public body or other entity covered by this |
25 | | Act has awarded work to a contractor without a public bid, |
26 | | contract or project specification, such public body or other |
|
| | HB5212 | - 3 - | LRB097 19755 JLS 65018 b |
|
|
1 | | entity shall comply with subsection (a-1) by providing the |
2 | | contractor with written notice on the purchase order related to |
3 | | the work to be done or on a separate document indicating that |
4 | | not less than the prevailing rate of wages as found by the |
5 | | public body or Department of Labor or determined by the court |
6 | | on review shall be paid to all laborers, workers, and mechanics |
7 | | performing work on the project. |
8 | | (a-3) Where a complaint is made and the Department of Labor |
9 | | determines that a violation occurred, the Department of Labor |
10 | | shall determine if proper written notice under this Section 4 |
11 | | was given. If proper written notice was not provided to the |
12 | | contractor by the public body or other entity, the Department |
13 | | of Labor shall order the public body or other entity to pay any |
14 | | interest, penalties or fines that would have been owed by the |
15 | | contractor if proper written notice were provided. The failure |
16 | | by a public body or other entity to provide written notice does |
17 | | not relieve the contractor of the duty to comply with the |
18 | | prevailing wage rate, nor of the obligation to pay any back |
19 | | wages, as determined under this Act. For the purposes of this |
20 | | subsection, back wages shall be limited to the difference |
21 | | between the actual amount paid and the prevailing rate of wages |
22 | | required to be paid for the project. The failure of a public |
23 | | body or other entity to provide written notice under this |
24 | | Section 4 does not diminish the right of a laborer, worker, or |
25 | | mechanic to the prevailing rate of wages as determined under |
26 | | this Act. |
|
| | HB5212 | - 4 - | LRB097 19755 JLS 65018 b |
|
|
1 | | (b) It shall also be mandatory upon the contractor to whom |
2 | | the contract is
awarded
to insert into each subcontract and |
3 | | into the project specifications for each
subcontract a written |
4 | | stipulation to the effect that not less than the
prevailing
|
5 | | rate of wages shall be paid to all laborers, workers, and |
6 | | mechanics performing
work under the contract. It shall also be |
7 | | mandatory upon each subcontractor to
cause to be inserted into |
8 | | each lower tiered subcontract
and into the project |
9 | | specifications for each lower tiered subcontract a
stipulation |
10 | | to the effect that not less
than the prevailing rate of wages |
11 | | shall be paid to all laborers, workers, and
mechanics |
12 | | performing work under the contract. A contractor or |
13 | | subcontractor who
fails to comply with this subsection (b) is |
14 | | in violation of this Act.
|
15 | | (b-1) When a contractor has awarded work to a subcontractor |
16 | | without a contract or contract specification, the contractor |
17 | | shall comply with subsection (b) by providing a subcontractor |
18 | | with a written statement indicating that not less than the |
19 | | prevailing rate of wages shall be paid to all laborers, |
20 | | workers, and mechanics performing work on the project. A |
21 | | contractor or subcontractor who fails to comply with this |
22 | | subsection (b-1) is in violation of this Act. |
23 | | (b-2) Where a complaint is made and the Department of Labor |
24 | | determines that a violation has occurred, the Department of |
25 | | Labor shall determine if proper written notice under this |
26 | | Section 4 was given. If proper written notice was not provided |
|
| | HB5212 | - 5 - | LRB097 19755 JLS 65018 b |
|
|
1 | | to the subcontractor by the contractor, the Department of Labor |
2 | | shall order the contractor to pay any interest, penalties, or |
3 | | fines that would have been owed by the subcontractor if proper |
4 | | written notice were provided. The failure by a contractor to |
5 | | provide written notice to a subcontractor does not relieve the |
6 | | subcontractor of the duty to comply with the prevailing wage |
7 | | rate, nor of the obligation to pay any back wages, as |
8 | | determined under this Act. For the purposes of this subsection, |
9 | | back wages shall be limited to the difference between the |
10 | | actual amount paid and the prevailing rate of wages required |
11 | | for the project. However, if proper written notice was not |
12 | | provided to the contractor by the public body or other entity |
13 | | under this Section 4, the Department of Labor shall order the |
14 | | public body or other entity to pay any interest, penalties, or |
15 | | fines that would have been owed by the subcontractor if proper |
16 | | written notice were provided. The failure by a public body or |
17 | | other entity to provide written notice does not relieve the |
18 | | subcontractor of the duty to comply with the prevailing wage |
19 | | rate, nor of the obligation to pay any back wages, as |
20 | | determined under this Act. For the purposes of this subsection, |
21 | | back wages shall be limited to the difference between the |
22 | | actual amount paid and the prevailing rate of wages required |
23 | | for the project. The failure to provide written notice by a |
24 | | public body, other entity, or contractor does not diminish the |
25 | | right of a laborer, worker, or mechanic to the prevailing rate |
26 | | of wages as determined under this Act. |
|
| | HB5212 | - 6 - | LRB097 19755 JLS 65018 b |
|
|
1 | | (c) A public body or other entity shall also require in all |
2 | | contractor's and subcontractor's bonds
that the contractor or |
3 | | subcontractor include such provision as will guarantee the
|
4 | | faithful performance of such prevailing wage clause as provided |
5 | | by
contract or other written instrument. All bid specifications |
6 | | shall list the specified rates to all
laborers, workers and |
7 | | mechanics in the locality for each craft or type of
worker or |
8 | | mechanic needed to execute the contract.
|
9 | | (d) If the Department of Labor
revises the prevailing rate |
10 | | of hourly wages to be paid by the public body, the
revised rate |
11 | | shall apply to such contract, and the public body shall be
|
12 | | responsible to notify the contractor and each subcontractor, of |
13 | | the revised
rate.
|
14 | | A public body may make the notification required under this |
15 | | subsection by passing and publishing an ordinance or resolution |
16 | | setting forth the public body's adherence to the ascertained |
17 | | prevailing wage requirements and posting a link with the |
18 | | revised rate schedule on the public body's official website. |
19 | | (e) Two or more investigatory hearings under this Section |
20 | | on the issue
of establishing a new prevailing wage |
21 | | classification for a particular craft
or type of worker shall |
22 | | be consolidated in a single hearing before the
Department. Such |
23 | | consolidation shall occur whether each separate investigatory
|
24 | | hearing is conducted by a public body or the Department. The |
25 | | party requesting
a consolidated investigatory hearing shall |
26 | | have the burden of establishing that
there is no existing |
|
| | HB5212 | - 7 - | LRB097 19755 JLS 65018 b |
|
|
1 | | prevailing wage classification for the particular craft or
type |
2 | | of worker in any of the localities under consideration.
|
3 | | (f) It shall be mandatory upon the contractor or |
4 | | construction manager
to whom a contract for public works is |
5 | | awarded to post, at a
location on the project site of the |
6 | | public works that is
easily accessible to the workers engaged |
7 | | on the project,
the prevailing wage rates for each craft or |
8 | | type of worker
or mechanic needed to execute the contract or |
9 | | project or
work to be performed. In lieu of posting on the |
10 | | project site of the public works, a contractor which has a |
11 | | business location where laborers, workers, and mechanics |
12 | | regularly visit may: (1) post in a conspicuous location at that |
13 | | business the current prevailing wage rates for each county in |
14 | | which the contractor is performing work; or (2) provide such |
15 | | laborer, worker, or mechanic engaged on the public works |
16 | | project a written notice indicating the prevailing wage rates |
17 | | for the public works project. A failure to post or provide a |
18 | | prevailing wage
rate as required by this Section is a violation |
19 | | of this Act.
|
20 | | (Source: P.A. 95-331, eff. 8-21-07; 96-437, eff. 1-1-10.)
|