|
| | HB3371 Engrossed | | LRB097 10931 JDS 51492 b |
|
|
1 | | AN ACT concerning safety.
|
2 | | Be it enacted by the People of the State of Illinois,
|
3 | | represented in the General Assembly:
|
4 | | Section 5. The Environmental Protection Act is amended by |
5 | | changing Sections 22.51 and 22.51a as follows: |
6 | | (415 ILCS 5/22.51)
|
7 | | Sec. 22.51. Clean Construction or Demolition Debris Fill |
8 | | Operations. |
9 | | (a) No person shall conduct any clean construction or |
10 | | demolition debris fill operation in violation of this Act or |
11 | | any regulations or standards adopted by the Board. |
12 | | (b)(1)(A) Beginning August 18, 2005 but prior to July 1, |
13 | | 2008, no person shall use clean construction or demolition |
14 | | debris as fill material in a current or former quarry, mine, or |
15 | | other excavation, unless they have applied for an interim |
16 | | authorization from the Agency for the clean construction or |
17 | | demolition debris fill operation. |
18 | | (B) The Agency shall approve an interim authorization upon |
19 | | its receipt of a written application for the interim |
20 | | authorization that is signed by the site owner and the site |
21 | | operator, or their duly authorized agent, and that contains the |
22 | | following information: (i) the location of the site where the |
23 | | clean construction or demolition debris fill operation is |
|
| | HB3371 Engrossed | - 2 - | LRB097 10931 JDS 51492 b |
|
|
1 | | taking place, (ii) the name and address of the site owner, |
2 | | (iii) the name and address of the site operator, and (iv) the |
3 | | types and amounts of clean construction or demolition debris |
4 | | being used as fill material at the site. |
5 | | (C) The Agency may deny an interim authorization if the |
6 | | site owner or the site operator, or their duly authorized |
7 | | agent, fails to provide to the Agency the information listed in |
8 | | subsection (b)(1)(B) of
this Section. Any denial of an interim |
9 | | authorization shall be subject to appeal to the Board in |
10 | | accordance with the procedures of Section 40 of this Act. |
11 | | (D) No person shall use clean construction or demolition |
12 | | debris as fill material in a current or former quarry, mine, or |
13 | | other excavation for which the Agency has denied interim |
14 | | authorization under subsection (b)(1)(C) of this Section. The |
15 | | Board may stay the prohibition of this subsection (D) during |
16 | | the pendency of an appeal of the Agency's denial of the interim |
17 | | authorization brought under subsection (b)(1)(C) of this |
18 | | Section. |
19 | | (2) Beginning September 1, 2006, owners and
operators of |
20 | | clean construction or demolition debris fill operations shall, |
21 | | in accordance with a schedule prescribed by the Agency, submit |
22 | | to the Agency applications for the
permits required under this |
23 | | Section. The Agency shall notify owners and operators in |
24 | | writing of the due date for their permit application. The due |
25 | | date shall be no less than 90 days after the date of the |
26 | | Agency's written notification. Owners and operators who do not |
|
| | HB3371 Engrossed | - 3 - | LRB097 10931 JDS 51492 b |
|
|
1 | | receive a written notification from the Agency by October 1, |
2 | | 2007, shall submit a permit application to the Agency by |
3 | | January 1, 2008. The interim authorization of owners and |
4 | | operators who fail to submit a permit application to the Agency |
5 | | by the permit application's due date shall terminate on (i) the |
6 | | due
date established by the Agency if the owner or operator |
7 | | received a written notification from the Agency prior to
|
8 | | October 1, 2007, or (ii) or January 1, 2008, if the owner or |
9 | | operator did not receive a written notification from the Agency |
10 | | by October 1, 2007. |
11 | | (3) On and after July 1, 2008, no person shall use clean |
12 | | construction or demolition debris as fill material in a current |
13 | | or former quarry, mine, or other excavation (i) without a |
14 | | permit granted by the Agency for the clean construction or |
15 | | demolition debris fill operation or in violation of any |
16 | | conditions imposed by such permit, including periodic reports |
17 | | and full access to adequate records and the inspection of |
18 | | facilities, as may be necessary to assure compliance with this |
19 | | Act and with Board regulations and standards adopted under this |
20 | | Act or (ii) in violation of any regulations or standards |
21 | | adopted by the Board under this Act. |
22 | | (4) This subsection (b) does not apply to: |
23 | | (A) the use of clean construction or demolition debris |
24 | | as fill material in a current or former quarry, mine, or |
25 | | other excavation located on the site where the clean |
26 | | construction or demolition debris was generated; |
|
| | HB3371 Engrossed | - 4 - | LRB097 10931 JDS 51492 b |
|
|
1 | | (B) the use of clean construction or demolition debris |
2 | | as fill material in an excavation other than a current or |
3 | | former quarry or mine if this use complies with Illinois |
4 | | Department of Transportation specifications; or
|
5 | | (C) current or former quarries, mines, and other |
6 | | excavations that do not use clean construction or |
7 | | demolition debris as fill material.
|
8 | | (c) In accordance with Title VII of this Act, the Board may |
9 | | adopt regulations to promote the purposes of this Section. The |
10 | | Agency shall consult with the mining and construction |
11 | | industries during the development of any regulations to promote |
12 | | the purposes of this Section. |
13 | | (1) No later than December 15, 2005, the Agency shall |
14 | | propose to the Board, and no later than September 1, 2006, |
15 | | the Board shall adopt, regulations for the use of clean |
16 | | construction or demolition debris as fill material in |
17 | | current and former quarries, mines, and other excavations. |
18 | | Such regulations shall include, but shall not be limited |
19 | | to, standards for clean construction or demolition debris |
20 | | fill operations and the submission and review of permits |
21 | | required under this Section. |
22 | | (2) Until the Board adopts rules under subsection |
23 | | (c)(1) of this Section, all persons using clean |
24 | | construction or
demolition debris as fill material in a |
25 | | current or former quarry, mine, or other excavation shall: |
26 | | (A) Assure that only clean construction or |
|
| | HB3371 Engrossed | - 5 - | LRB097 10931 JDS 51492 b |
|
|
1 | | demolition debris is being used as fill material by |
2 | | screening each truckload of material received using a |
3 | | device approved by the Agency that detects volatile |
4 | | organic compounds. Such devices may include, but are |
5 | | not limited to, photo ionization detectors. All |
6 | | screening devices shall be operated and maintained in |
7 | | accordance with manufacturer's specifications. |
8 | | Unacceptable fill material shall be rejected from the |
9 | | site; and |
10 | | (B) Retain for a minimum of 3 years the following |
11 | | information: |
12 | | (i) The name of the hauler, the name of the |
13 | | generator, and place of origin of the debris or |
14 | | soil; |
15 | | (ii) The approximate weight or volume of the |
16 | | debris or soil; and |
17 | | (iii) The date the debris or soil was received. |
18 | | (d) This Section applies only to clean construction or |
19 | | demolition debris that is not considered "waste" as provided in |
20 | | Section 3.160 of this Act. |
21 | | (e) For purposes of this Section: |
22 | | (1) The term "operator" means a person responsible for |
23 | | the operation and maintenance of a clean construction or |
24 | | demolition debris fill operation. |
25 | | (2) The term "owner" means a person who has any direct |
26 | | or indirect interest in a clean construction or demolition |
|
| | HB3371 Engrossed | - 6 - | LRB097 10931 JDS 51492 b |
|
|
1 | | debris fill operation or in land on which a person operates |
2 | | and maintains a clean construction or demolition debris |
3 | | fill operation. A "direct or indirect interest" does not |
4 | | include the ownership of publicly traded stock. The "owner" |
5 | | is the "operator" if there is no other person who is |
6 | | operating and maintaining a clean construction or |
7 | | demolition debris fill operation.
|
8 | | (3) The term "clean construction or demolition debris |
9 | | fill operation" means a current or former quarry, mine, or |
10 | | other excavation where clean construction or demolition |
11 | | debris is used as fill material. |
12 | | (4) The term "uncontaminated soil" shall have the same |
13 | | meaning as uncontaminated soil under Section 3.160 of this |
14 | | Act. |
15 | | (f)(1) No later than one year after the effective date of |
16 | | this amendatory Act of the 96th General Assembly, the Agency |
17 | | shall propose to the Board, and, no later than one year after |
18 | | the Board's receipt of the Agency's proposal, the Board shall |
19 | | adopt, rules for the use of clean construction or demolition |
20 | | debris and uncontaminated soil as fill material at clean |
21 | | construction or demolition debris fill operations. The rules |
22 | | must include standards and procedures necessary to protect |
23 | | groundwater, which may include, but shall not be limited to, |
24 | | the following: requirements regarding testing and |
25 | | certification of soil used as fill material, surface water |
26 | | runoff, liners or other protective barriers, monitoring |
|
| | HB3371 Engrossed | - 7 - | LRB097 10931 JDS 51492 b |
|
|
1 | | (including, but not limited to, groundwater monitoring), |
2 | | corrective action, recordkeeping, reporting, closure and |
3 | | post-closure care, financial assurance, post-closure land use |
4 | | controls, location standards, and the modification of existing |
5 | | permits to conform to the requirements of this Act and Board |
6 | | rules. The rules may also include limits on the use of |
7 | | recyclable concrete and asphalt as fill material at clean |
8 | | construction or demolition debris fill operations, taking into |
9 | | account factors such as technical feasibility, economic |
10 | | reasonableness, and the availability of markets for such |
11 | | materials. |
12 | | (2) Until the effective date of the Board rules adopted |
13 | | under subdivision (f)(1) of this Section, and in addition to |
14 | | any other requirements, owners and operators of clean |
15 | | construction or demolition debris fill operations must do all |
16 | | of the following in subdivisions (f)(2)(A) through (f)(2)(D) of |
17 | | this Section for all clean construction or demolition debris |
18 | | and uncontaminated soil accepted for use as fill material. The |
19 | | requirements in subdivisions (f)(2)(A) through (f)(2)(D) of |
20 | | this Section shall not limit any rules adopted by the Board. |
21 | | (A) Document the following information for each load of |
22 | | clean construction or demolition debris or uncontaminated |
23 | | soil received: (i) the name of the hauler, the address of |
24 | | the site of origin, and the owner and the operator of the |
25 | | site of origin of the clean construction or demolition |
26 | | debris or uncontaminated soil, (ii) the weight or volume of |
|
| | HB3371 Engrossed | - 8 - | LRB097 10931 JDS 51492 b |
|
|
1 | | the clean construction or demolition debris or |
2 | | uncontaminated soil, and (iii) the date the clean |
3 | | construction or demolition debris or uncontaminated soil |
4 | | was received. |
5 | | (B) For all soil, obtain either (i) a certification |
6 | | from the owner or operator of the site from which the soil |
7 | | was removed that the site has never been used for |
8 | | commercial or industrial purposes and is presumed to be |
9 | | uncontaminated soil or (ii) a certification from a licensed |
10 | | Professional Engineer that the soil is uncontaminated |
11 | | soil. Certifications required under this subdivision |
12 | | (f)(2)(B) must be on forms and in a format prescribed by |
13 | | the Agency. For purposes of this subparagraph (B), the |
14 | | following should be considered when determining whether |
15 | | soil within a transportation right of way or a utility |
16 | | easement has been used for commercial or industrial |
17 | | purposes: the current use of the property as a right of way |
18 | | or easement, the uses of the property prior to its use as a |
19 | | right of way or easement, and the uses of adjoining |
20 | | property. |
21 | | (C) Confirm that the clean construction or demolition |
22 | | debris or uncontaminated soil was not removed from a site |
23 | | as part of a cleanup or removal of contaminants, including, |
24 | | but not limited to, activities conducted under the |
25 | | Comprehensive Environmental Response, Compensation, and |
26 | | Liability Act of 1980, as amended; as part of a Closure or |
|
| | HB3371 Engrossed | - 9 - | LRB097 10931 JDS 51492 b |
|
|
1 | | Corrective Action under the Resource Conservation and |
2 | | Recovery Act, as amended; or under an Agency remediation |
3 | | program, such as the Leaking Underground Storage Tank |
4 | | Program or Site Remediation Program, but excluding sites |
5 | | subject to Section 58.16 of this Act where there is no |
6 | | presence or likely presence of a release or a substantial |
7 | | threat of a release of a regulated substance at, on, or |
8 | | from the real property. |
9 | | (D) Document all activities required under subdivision |
10 | | (f)(2) of this Section. Documentation of any chemical |
11 | | analysis must include, but is not limited to, (i) a copy of |
12 | | the lab analysis, (ii) accreditation status of the |
13 | | laboratory performing the analysis, and (iii) |
14 | | certification by an authorized agent of the laboratory that |
15 | | the analysis has been performed in accordance with the |
16 | | Agency's rules for the accreditation of environmental |
17 | | laboratories and the scope of accreditation. |
18 | | (3) Owners and operators of clean construction or |
19 | | demolition debris fill operations must maintain all |
20 | | documentation required under subdivision (f)(2) of this |
21 | | Section for a minimum of 3 years following the receipt of each |
22 | | load of clean construction or demolition debris or |
23 | | uncontaminated soil, except that documentation relating to an |
24 | | appeal, litigation, or other disputed claim must be maintained |
25 | | until at least 3 years after the date of the final disposition |
26 | | of the appeal, litigation, or other disputed claim. Copies of |
|
| | HB3371 Engrossed | - 10 - | LRB097 10931 JDS 51492 b |
|
|
1 | | the documentation must be made available to the Agency and to |
2 | | units of local government for inspection and copying during |
3 | | normal business hours. The Agency may prescribe forms and |
4 | | formats for the documentation required under subdivision |
5 | | (f)(2) of this Section. |
6 | | Chemical analysis conducted under subdivision (f)(2) of |
7 | | this Section must be conducted in accordance with the |
8 | | requirements of 35 Ill. Adm. Code 742, as amended, and "Test |
9 | | Methods for Evaluating Solid Waste, Physical/Chemical |
10 | | Methods", USEPA Publication No. SW-846, as amended. |
11 | | (g)(1) No person shall use soil other than uncontaminated |
12 | | soil as fill material at a clean construction or demolition |
13 | | debris fill operation. |
14 | | (2) No person shall use construction or demolition debris |
15 | | other than clean construction or demolition debris as fill |
16 | | material at a clean construction or demolition debris fill |
17 | | operation.
|
18 | | (Source: P.A. 96-1416, eff. 7-30-10.) |
19 | | (415 ILCS 5/22.51a) |
20 | | Sec. 22.51a. Uncontaminated Soil Fill Operations. |
21 | | (a) For purposes of this Section: |
22 | | (1) The term "uncontaminated soil" shall have the same |
23 | | meaning as uncontaminated soil under Section 3.160 of this |
24 | | Act. |
25 | | (2) The term "uncontaminated soil fill operation" |
|
| | HB3371 Engrossed | - 11 - | LRB097 10931 JDS 51492 b |
|
|
1 | | means a current or former quarry, mine, or other excavation |
2 | | where uncontaminated soil is used as fill material, but |
3 | | does not include a clean construction or demolition debris |
4 | | fill operation. |
5 | | (b) No person shall use soil other than uncontaminated soil |
6 | | as fill material at an uncontaminated soil fill operation. |
7 | | (c) Owners and operators of uncontaminated soil fill |
8 | | operations must register the fill operations with the Agency. |
9 | | Uncontaminated soil fill operations that received |
10 | | uncontaminated soil prior to the effective date of this |
11 | | amendatory Act of the 96th General Assembly must be registered |
12 | | with the Agency no later than March 31, 2011. Uncontaminated |
13 | | soil fill operations that first receive uncontaminated soil on |
14 | | or after the effective date of this amendatory Act of the 96th |
15 | | General Assembly must be registered with the Agency prior to |
16 | | the receipt of any uncontaminated soil. Registrations must be |
17 | | submitted on forms and in a format prescribed by the Agency. |
18 | | (d)(1) No later than one year after the effective date of |
19 | | this amendatory Act of the 96th General Assembly, the Agency |
20 | | shall propose to the Board, and, no later than one year after |
21 | | the Board's receipt of the Agency's proposal, the Board shall |
22 | | adopt, rules for the use of uncontaminated soil as fill |
23 | | material at uncontaminated soil fill operations. The rules must |
24 | | include standards and procedures necessary to protect |
25 | | groundwater, which shall include, but shall not be limited to, |
26 | | testing and certification of soil used as fill material and |
|
| | HB3371 Engrossed | - 12 - | LRB097 10931 JDS 51492 b |
|
|
1 | | requirements for recordkeeping. |
2 | | (2) Until the effective date of the Board rules adopted |
3 | | under subdivision (d)(1) of this Section, owners and operators |
4 | | of uncontaminated soil fill operations must do all of the |
5 | | following in subdivisions (d)(2)(A) through (d)(2)(F) of this |
6 | | Section for all uncontaminated soil accepted for use as fill |
7 | | material. The requirements in subdivisions (d)(2)(A) through |
8 | | (d)(2)(F) of this Section shall not limit any rules adopted by |
9 | | the Board. |
10 | | (A) Document the following information for each load of |
11 | | uncontaminated soil received: (i) the name of the hauler, |
12 | | the address of the site of origin, and the owner and the |
13 | | operator of the site of origin of the uncontaminated soil, |
14 | | (ii) the weight or volume of the uncontaminated soil, and |
15 | | (iii) the date the uncontaminated soil was received. |
16 | | (B) Obtain either (i) a certification from the owner or |
17 | | operator of the site from which the soil was removed that |
18 | | the site has never been used for commercial or industrial |
19 | | purposes and is presumed to be uncontaminated soil or (ii) |
20 | | a certification from a licensed Professional Engineer that |
21 | | the soil is uncontaminated soil. Certifications required |
22 | | under this subdivision (d)(2)(B) must be on forms and in a |
23 | | format prescribed by the Agency. For purposes of this |
24 | | subparagraph (B), the following should be considered when |
25 | | determining whether soil within a transportation right of |
26 | | way or a utility easement has been used for commercial or |
|
| | HB3371 Engrossed | - 13 - | LRB097 10931 JDS 51492 b |
|
|
1 | | industrial purposes: the current use of the property as a |
2 | | right of way or easement, the uses of the property prior to |
3 | | its use as a right of way or easement, and the uses of |
4 | | adjoining property. |
5 | | (C) Confirm that the uncontaminated soil was not |
6 | | removed from a site as part of a cleanup or removal of |
7 | | contaminants, including, but not limited to, activities |
8 | | conducted under the Comprehensive Environmental Response, |
9 | | Compensation, and Liability Act of 1980, as amended; as |
10 | | part of a Closure or Corrective Action under the Resource |
11 | | Conservation and Recovery Act, as amended; or under an |
12 | | Agency remediation program, such as the Leaking |
13 | | Underground Storage Tank Program or Site Remediation |
14 | | Program, but excluding sites subject to Section 58.16 of |
15 | | this Act where there is no presence or likely presence of a |
16 | | release or a substantial threat of a release of a regulated |
17 | | substance at, on, or from the real property. |
18 | | (D) Visually inspect each load to confirm that only |
19 | | uncontaminated soil is being accepted for use as fill |
20 | | material. |
21 | | (E) Screen each load of uncontaminated soil using a |
22 | | device that is approved by the Agency and detects volatile |
23 | | organic compounds. Such a device may include, but is not |
24 | | limited to, a photo ionization detector or a flame |
25 | | ionization detector. All screening devices shall be |
26 | | operated and maintained in accordance with the |
|
| | HB3371 Engrossed | - 14 - | LRB097 10931 JDS 51492 b |
|
|
1 | | manufacturer's specifications. Unacceptable soil must be |
2 | | rejected from the fill operation. |
3 | | (F) Document all activities required under subdivision |
4 | | (d)(2) of this Section. Documentation of any chemical |
5 | | analysis must include, but is not limited to, (i) a copy of |
6 | | the lab analysis, (ii) accreditation status of the |
7 | | laboratory performing the analysis, and (iii) |
8 | | certification by an authorized agent of the laboratory that |
9 | | the analysis has been performed in accordance with the |
10 | | Agency's rules for the accreditation of environmental |
11 | | laboratories and the scope of accreditation. |
12 | | (3) Owners and operators of uncontaminated soil fill |
13 | | operations must maintain all documentation required under |
14 | | subdivision (d)(2) of this Section for a minimum of 3 years |
15 | | following the receipt of each load of uncontaminated soil, |
16 | | except that documentation relating to an appeal, litigation, or |
17 | | other disputed claim must be maintained until at least 3 years |
18 | | after the date of the final disposition of the appeal, |
19 | | litigation, or other disputed claim. Copies of the |
20 | | documentation must be made available to the Agency and to units |
21 | | of local government for inspection and copying during normal |
22 | | business hours. The Agency may prescribe forms and formats for |
23 | | the documentation required under subdivision (d)(2) of this |
24 | | Section. |
25 | | Chemical analysis conducted under subdivision (d)(2) of |
26 | | this Section must be conducted in accordance with the |
|
| | HB3371 Engrossed | - 15 - | LRB097 10931 JDS 51492 b |
|
|
1 | | requirements of 35 Ill. Adm. Code 742, as amended, and "Test |
2 | | Methods for Evaluating Solid Waste, Physical/Chemical |
3 | | Methods", USEPA Publication No. SW-846, as amended.
|
4 | | (Source: P.A. 96-1416, eff. 7-30-10.)
|
5 | | Section 99. Effective date. This Act takes effect upon |
6 | | becoming law. |