|
| | 97TH GENERAL ASSEMBLY
State of Illinois
2011 and 2012 HB3139 Introduced 2/23/2011, by Rep. Roger L. Eddy SYNOPSIS AS INTRODUCED: |
| |
Amends the Illinois Highway Code. Provides that the Department of Transportation may issue a switchgrass production permit authorizing the planting and harvesting of switchgrass on a specified right-of-way in this State. Provides that an owner or owner's designee has priority until March 1 of each year to receive a permit for the portion of right-of-way that is adjacent to the owner's land, and after March 1 of each year, a permit may be issued to an applicant that is not the owner of the land adjacent to the right-of-way for a maximum distance of 5 miles. Provides that permits are valid for 5 years. Provides that the non-refundable application fee for every permit is $200, and all fees collected by the Department shall be deposited into the Road Fund. Provides for permit application requirements, including assumption of all liability for activities permitted by the Department and proof of liability insurance. Provides limitations on the use of the permit, cancellation procedures, and provides that the Department of Transportation may promulgate rules for the administration of the permit program.
|
| |
| | | FISCAL NOTE ACT MAY APPLY | |
| | A BILL FOR |
|
|
| | HB3139 | | LRB097 08797 HEP 48927 b |
|
|
1 | | AN ACT concerning highways.
|
2 | | Be it enacted by the People of the State of Illinois,
|
3 | | represented in the General Assembly:
|
4 | | Section 5. The Illinois Highway Code is amended by adding |
5 | | Section 9-119.6 as follows: |
6 | | (605 ILCS 5/9-119.6 new) |
7 | | Sec. 9-119.6. Switchgrass production permit. |
8 | | (a) The Department may issue a switchgrass production |
9 | | permit authorizing the planting and harvesting of switchgrass |
10 | | on a specified right-of-way in this State. An owner or owner's |
11 | | designee has priority until March 1 of each year to receive a |
12 | | permit for the portion of right-of-way that is adjacent to the |
13 | | owner's land and for which no permit is in effect. After March |
14 | | 1 of each year, a permit may be issued to an applicant that is |
15 | | not the owner of the land adjacent to the right-of-way for a |
16 | | maximum distance of 5 miles. A permit issued under this |
17 | | subsection may be valid for a period of 5 years, and the |
18 | | Department must include the timeframe that the permit is valid |
19 | | on every permit issued under this subsection. Commencement of |
20 | | harvesting activity notice instructions must be included on |
21 | | every permit under this subsection in accordance with paragraph |
22 | | (1) of subsection (c) of this Section. The non-refundable |
23 | | application fee for every permit under this subsection is $200, |