|
| | 97TH GENERAL ASSEMBLY
State of Illinois
2011 and 2012 HB2896 Introduced 2/23/2011, by Rep. Dave Winters SYNOPSIS AS INTRODUCED: |
| |
Amends the Illinois Power Agency Act. Provides that the definition of "renewable energy resources" includes synthetic gas created by the plasma gasification of waste, densified fuel pellets made from waste material that does not include materials resulting from the handling, processing, storage, and consumption of food, and fuel produced by pyrolysis of organic or waste material from a municipality. Effective immediately.
|
| |
| | A BILL FOR |
|
|
| | HB2896 | | LRB097 08516 ASK 48643 b |
|
|
1 | | AN ACT concerning State government.
|
2 | | Be it enacted by the People of the State of Illinois,
|
3 | | represented in the General Assembly:
|
4 | | Section 5. The Illinois Power Agency Act is amended by |
5 | | changing Section 1-10 as follows:
|
6 | | (20 ILCS 3855/1-10)
|
7 | | Sec. 1-10. Definitions. |
8 | | "Agency" means the Illinois Power Agency. |
9 | | "Agency loan agreement" means any agreement pursuant to |
10 | | which the Illinois Finance Authority agrees to loan the |
11 | | proceeds of revenue bonds issued with respect to a project to |
12 | | the Agency upon terms providing for loan repayment installments |
13 | | at least sufficient to pay when due all principal of, interest |
14 | | and premium, if any, on those revenue bonds, and providing for |
15 | | maintenance, insurance, and other matters in respect of the |
16 | | project. |
17 | | "Authority" means the Illinois Finance Authority. |
18 | | "Clean coal facility" means an electric generating |
19 | | facility that uses primarily coal as a feedstock and that |
20 | | captures and sequesters carbon emissions at the following |
21 | | levels: at least 50% of the total carbon emissions that the |
22 | | facility would otherwise emit if, at the time construction |
23 | | commences, the facility is scheduled to commence operation |
|
| | HB2896 | - 2 - | LRB097 08516 ASK 48643 b |
|
|
1 | | before 2016, at least 70% of the total carbon emissions that |
2 | | the facility would otherwise emit if, at the time construction |
3 | | commences, the facility is scheduled to commence operation |
4 | | during 2016 or 2017, and at least 90% of the total carbon |
5 | | emissions that the facility would otherwise emit if, at the |
6 | | time construction commences, the facility is scheduled to |
7 | | commence operation after 2017. The power block of the clean |
8 | | coal facility shall not exceed allowable emission rates for |
9 | | sulfur dioxide, nitrogen oxides, carbon monoxide, particulates |
10 | | and mercury for a natural gas-fired combined-cycle facility the |
11 | | same size as and in the same location as the clean coal |
12 | | facility at the time the clean coal facility obtains an |
13 | | approved air permit. All coal used by a clean coal facility |
14 | | shall have high volatile bituminous rank and greater than 1.7 |
15 | | pounds of sulfur per million btu content, unless the clean coal |
16 | | facility does not use gasification technology and was operating |
17 | | as a conventional coal-fired electric generating facility on |
18 | | June 1, 2009 (the effective date of Public Act 95-1027). |
19 | | "Clean coal SNG facility" means a facility that uses a |
20 | | gasification process to produce substitute natural gas, that |
21 | | sequesters at least 90% of the total carbon emissions that the |
22 | | facility would otherwise emit and that uses petroleum coke or |
23 | | coal as a feedstock, with all such coal having a high |
24 | | bituminous rank and greater than 1.7 pounds of sulfur per |
25 | | million btu content. |
26 | | "Commission" means the Illinois Commerce Commission. |
|
| | HB2896 | - 3 - | LRB097 08516 ASK 48643 b |
|
|
1 | | "Costs incurred in connection with the development and |
2 | | construction of a facility" means: |
3 | | (1) the cost of acquisition of all real property and |
4 | | improvements in connection therewith and equipment and |
5 | | other property, rights, and easements acquired that are |
6 | | deemed necessary for the operation and maintenance of the |
7 | | facility; |
8 | | (2) financing costs with respect to bonds, notes, and |
9 | | other evidences of indebtedness of the Agency; |
10 | | (3) all origination, commitment, utilization, |
11 | | facility, placement, underwriting, syndication, credit |
12 | | enhancement, and rating agency fees; |
13 | | (4) engineering, design, procurement, consulting, |
14 | | legal, accounting, title insurance, survey, appraisal, |
15 | | escrow, trustee, collateral agency, interest rate hedging, |
16 | | interest rate swap, capitalized interest and other |
17 | | financing costs, and other expenses for professional |
18 | | services; and |
19 | | (5) the costs of plans, specifications, site study and |
20 | | investigation, installation, surveys, other Agency costs |
21 | | and estimates of costs, and other expenses necessary or |
22 | | incidental to determining the feasibility of any project, |
23 | | together with such other expenses as may be necessary or |
24 | | incidental to the financing, insuring, acquisition, and |
25 | | construction of a specific project and placing that project |
26 | | in operation. |
|
| | HB2896 | - 4 - | LRB097 08516 ASK 48643 b |
|
|
1 | | "Department" means the Department of Commerce and Economic |
2 | | Opportunity. |
3 | | "Director" means the Director of the Illinois Power Agency. |
4 | | "Demand-response" means measures that decrease peak |
5 | | electricity demand or shift demand from peak to off-peak |
6 | | periods. |
7 | | "Energy efficiency" means measures that reduce the amount |
8 | | of electricity or natural gas required to achieve a given end |
9 | | use. |
10 | | "Electric utility" has the same definition as found in |
11 | | Section 16-102 of the Public Utilities Act. |
12 | | "Facility" means an electric generating unit or a |
13 | | co-generating unit that produces electricity along with |
14 | | related equipment necessary to connect the facility to an |
15 | | electric transmission or distribution system. |
16 | | "Governmental aggregator" means one or more units of local |
17 | | government that individually or collectively procure |
18 | | electricity to serve residential retail electrical loads |
19 | | located within its or their jurisdiction. |
20 | | "Local government" means a unit of local government as |
21 | | defined in Article VII of Section 1 of the Illinois |
22 | | Constitution. |
23 | | "Municipality" means a city, village, or incorporated |
24 | | town. |
25 | | "Person" means any natural person, firm, partnership, |
26 | | corporation, either domestic or foreign, company, association, |
|
| | HB2896 | - 5 - | LRB097 08516 ASK 48643 b |
|
|
1 | | limited liability company, joint stock company, or association |
2 | | and includes any trustee, receiver, assignee, or personal |
3 | | representative thereof. |
4 | | "Project" means the planning, bidding, and construction of |
5 | | a facility. |
6 | | "Public utility" has the same definition as found in |
7 | | Section 3-105 of the Public Utilities Act. |
8 | | "Real property" means any interest in land together with |
9 | | all structures, fixtures, and improvements thereon, including |
10 | | lands under water and riparian rights, any easements, |
11 | | covenants, licenses, leases, rights-of-way, uses, and other |
12 | | interests, together with any liens, judgments, mortgages, or |
13 | | other claims or security interests related to real property. |
14 | | "Renewable energy credit" means a tradable credit that |
15 | | represents the environmental attributes of a certain amount of |
16 | | energy produced from a renewable energy resource. |
17 | | "Renewable energy resources" includes energy and its |
18 | | associated renewable energy credit or renewable energy credits |
19 | | from wind, solar thermal energy, photovoltaic cells and panels, |
20 | | biodiesel, crops and untreated and unadulterated organic waste |
21 | | biomass, tree waste, synthetic gas created by the plasma |
22 | | gasification of waste, densified fuel pellets made from waste |
23 | | material that does not include materials resulting from the |
24 | | handling, processing, storage, and consumption of food, fuel |
25 | | produced by pyrolysis of organic or waste material from a |
26 | | municipality, hydropower that does not involve new |
|
| | HB2896 | - 6 - | LRB097 08516 ASK 48643 b |
|
|
1 | | construction or significant expansion of hydropower dams, and |
2 | | other alternative sources of environmentally preferable |
3 | | energy. For purposes of this Act, landfill gas produced in the |
4 | | State is considered a renewable energy resource. "Renewable |
5 | | energy resources" does not include the incineration or burning |
6 | | of tires, garbage, general household, institutional, and |
7 | | commercial waste, industrial lunchroom or office waste, |
8 | | landscape waste other than tree waste, railroad crossties, |
9 | | utility poles, or construction or demolition debris, other than |
10 | | untreated and unadulterated waste wood. |
11 | | "Revenue bond" means any bond, note, or other evidence of |
12 | | indebtedness issued by the Authority, the principal and |
13 | | interest of which is payable solely from revenues or income |
14 | | derived from any project or activity of the Agency. |
15 | | "Sequester" means permanent storage of carbon dioxide by |
16 | | injecting it into a saline aquifer, a depleted gas reservoir, |
17 | | or an oil reservoir, directly or through an enhanced oil |
18 | | recovery process that may involve intermediate storage in a |
19 | | salt dome. |
20 | | "Servicing agreement" means (i) in the case of an electric |
21 | | utility, an agreement between the owner of a clean coal |
22 | | facility and such electric utility, which agreement shall have |
23 | | terms and conditions meeting the requirements of paragraph (3) |
24 | | of subsection (d) of Section 1-75, and (ii) in the case of an |
25 | | alternative retail electric supplier, an agreement between the |
26 | | owner of a clean coal facility and such alternative retail |
|
| | HB2896 | - 7 - | LRB097 08516 ASK 48643 b |
|
|
1 | | electric supplier, which agreement shall have terms and |
2 | | conditions meeting the requirements of Section 16-115(d)(5) of |
3 | | the Public Utilities Act. |
4 | | "Substitute natural gas" or "SNG" means a gas manufactured |
5 | | by gasification of hydrocarbon feedstock, which is |
6 | | substantially interchangeable in use and distribution with |
7 | | conventional natural gas. |
8 | | "Total resource cost test" or "TRC test" means a standard |
9 | | that is met if, for an investment in energy efficiency or |
10 | | demand-response measures, the benefit-cost ratio is greater |
11 | | than one. The benefit-cost ratio is the ratio of the net |
12 | | present value of the total benefits of the program to the net |
13 | | present value of the total costs as calculated over the |
14 | | lifetime of the measures. A total resource cost test compares |
15 | | the sum of avoided electric utility costs, representing the |
16 | | benefits that accrue to the system and the participant in the |
17 | | delivery of those efficiency measures, as well as other |
18 | | quantifiable societal benefits, including avoided natural gas |
19 | | utility costs, to the sum of all incremental costs of end-use |
20 | | measures that are implemented due to the program (including |
21 | | both utility and participant contributions), plus costs to |
22 | | administer, deliver, and evaluate each demand-side program, to |
23 | | quantify the net savings obtained by substituting the |
24 | | demand-side program for supply resources. In calculating |
25 | | avoided costs of power and energy that an electric utility |
26 | | would otherwise have had to acquire, reasonable estimates shall |
|
| | HB2896 | - 8 - | LRB097 08516 ASK 48643 b |
|
|
1 | | be included of financial costs likely to be imposed by future |
2 | | regulations and legislation on emissions of greenhouse gases.
|
3 | | (Source: P.A. 95-481, eff. 8-28-07; 95-913, eff. 1-1-09; |
4 | | 95-1027, eff. 6-1-09; 96-33, eff. 7-10-09; 96-159, eff. |
5 | | 8-10-09; 96-784, eff. 8-28-09; 96-1000, eff. 7-2-10.)
|
6 | | Section 99. Effective date. This Act takes effect upon |
7 | | becoming law.
|