97TH GENERAL ASSEMBLY
State of Illinois
HB2189
Introduced , by Rep. Michael J. Madigan - Luis Arroyo
SYNOPSIS AS INTRODUCED:
Makes Capital appropriations and reappropriations for the fiscal year beginning July 1, 2011.
OMB097 00161 MAW 40161 b
|
|
|
AN ACT concerning appropriations.
Be it enacted by the People of the State of Illinois, represented in the General Assembly:
ARTICLE 1
ARCHITECT OF THE CAPITOL
Section 5. The amount of $3,883, or so much of this amount as may be necessary and remains unexpended on June 30, 2011, from a reappropriation heretofore made for such purpose in Section 5 of Article 105 of Public Act 96-0956, is reappropriated from the Capital Development Fund to the Office of the Architect of the Capitol for plans, specifications, and continuation of work pursuant to the report and recommendations of the architectural, structural, and mechanical surveys of the State Capitol Building. This is for the continuation of the rehabilitation of the Capitol Building.
Section 10. The sum of $548,180, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purposes in Section 10 of Article 105 of Public Act 96-0956, is reappropriated from the Capital Development Fund to the Office of the Architect of the Capitol for remodeling, planning, relocation, permanent equipment, and other related expenses, including architectural and engineering fees associated with construction, for the remodeling of office space and other support areas under the jurisdiction of the House of Representatives and the Senate.
Section 15. The sum of $49,758,619, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 105, Section 15 of Public Act 96-0956, as amended, is reappropriated from the Capital Development Fund to the Office of the Architect of the Capitol for all costs associated with capital upgrades and improvements.
Section 20. No contract shall be entered into or obligation incurred for any expenditures from appropriations in Sections 5, 10 and 15 of this Article until after the purposes and amounts have been approved in writing by the Governor.
Total, this Article $50,310,682
ARTICLE 5
SECRETARY OF STATE
Section 5. The sum of $50,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 106, Section 5 of Public Act 96-0956, is reappropriated from the Build Illinois Bond Fund to the Secretary of State for capital grants to public libraries for permanent improvements.
Section 10. No contract shall be entered into or obligation incurred or any expenditures made from appropriations in this Article until after the purposes and amounts have been approved in writing by the Governor.
Total, this Article $50,000,000
ARTICLE 6
DEPARTMENT OF AGRICULTURE
Section 20. The amount of $8,000,000, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Department of Agriculture for deposit into the Partners for Conservation Projects Fund.
Section 25. No contract shall be entered into or obligation incurred for any expenditures from appropriations in Section 20 of this Article until after the purposes and amounts have been approved in writing by the Governor.
ARTICLE 9
DEPARTMENT OF CENTRAL MANAGEMENT SERVICES
Section 5. The sum of $20,000,000, or so much thereof as may be necessary is appropriated from the Capital Development Fund to the Department of Central Management Services for the Department of Corrections for OTS conversion.
Section 10. The sum of $10,000,000, or so much thereof as may be necessary is appropriated from the Capital Development Fund to the Department of Central Management Services for capital costs relating to a pilot program to develop centralized citizen servicing centers; including, but not limited to renovation of facilities.
Section 15. The sum of $19,000,000, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Department of Central Management Services for the Illinois Century Network.
Section 16. The sum of $200,000,000, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Department of Central Management Services for a Healthcare/Medicaid IT financial system.
Section 20. No contract shall be entered into or obligation incurred or any expenditures made from appropriations in this Article until after the purposes and amounts have been approved in writing by the Governor.
ARTICLE 10
CENTRAL MANAGEMENT SERVICES
Section 5. The sum of $6,521,890, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 107, Section 5 of Public Act 96-0956, is reappropriated from the Capital Development Fund to the Department of Central Management Services for Information Technology infrastructure expenses including but not limited to related hardware and equipment.
Section 10. The amount of $13,500,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purposes in Section 10 of Article 107 of Public Act 96-0956, is reappropriated from the Capital Development Fund to the Department of Central Management Services for infrastructure improvement, hardware and related costs.
Section 15. The sum of $26,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 107, Section 15 of Public Act 96-0956, as amended, is reappropriated from the Capital Development Fund to the Department of Central Management Services for the Illinois Century Network.
Section 20. No contract shall be entered into or obligation incurred or any expenditures made from appropriations in this Article until after the purposes and amounts have been approved in writing by the Governor.
Total, this Article $46,021,890
ARTICLE 14
DEPARTMENT OF COMMERCE AND ECONOMIC OPPORTUNITY
Section 10. The sum of $6,300,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant for infrastructure to match Federal funds.
Section 15. The sum of $10,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity to develop a grant program for new and existing commercial fisheries and processing facilities to reduce or eliminate Asian Carp populations in Illinois.
Section 40. The sum of $5,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for the University of Chicago Medical Center for costs related to the Center for Community Health and for a community-based facility for job training and education.
Section 45. The sum of $1,800,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for the YMCA of Metropolitan Chicago for Camp Duncan for capital costs for Camp Independence.
Section 50. The sum of $2,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to the H-Group for construction of a laundry facility and related equipment for job creation for the developmentally disabled to match federal funds.
Section 55. The sum of $7,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to Southern Illinois Regional Social Services for a new facility.
Section 56. The sum of $4,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to Morton East School for permanent improvements.
Section 57. The sum of $250,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to Lindenwood University for permanent improvements.
Section 60. No contract shall be entered into or obligation incurred or any expenditure made from any appropriation herein made in this Article until after the purpose and amounts have been approved in writing by the Governor.
ARTICLE 15
DEPARTMENT OF COMMERCE AND ECONOMIC OPPORTUNITY
Section 1. The sum of $3,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purposes in Section 1 of Article 108 of Public Act 96-0956, from the Port Development Revolving Loan Fund to the Department of Commerce and Economic Opportunity for grants and loans associated with the Port Development Revolving Loan Program pursuant to 30 ILCS 750/9-11.
Section 20. The amount of $25,000,000 or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purposes in Section 20 of Article 108 of Public Act 96-0956, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants associated with the redevelopment of brownfield sites.
Section 25. The sum of $50,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 108, Section 25 of Public Act 96-0956, is reappropriated from the Coal Development Fund to the Department of Commerce and Economic Opportunity for grants pursuant to 20 ILCS 605/605-332 – Coal Revival Program.
Section 30. The sum of $1,975,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 108, Section 30 of Public Act 96-0956, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants associated with the Illinois Renewable Fuels Development Act.
Section 35. The sum of $13,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 108, Section 35 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to Argonne National Laboratory for bondable infrastructure improvements to match federal and private funds of equal or greater value.
Section 40. The amount of $5,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 108, Section 40 of Public Act 96-0956, is reappropriated from the Coal Development Fund to the Department of Commerce and Economic Opportunity for the specific purposes of acquisition, development, construction, reconstruction, improvement, financing, architectural and technical planning and installation of capital facilities consisting of buildings, structures, durable equipment, and land for the purpose of capital development of coal resources within the State.
Section 50. The amount of $7,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 108, Section 50 of Public Act 96-0956, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to Argonne National Laboratory for the Advanced Protein Crystallization Facility.
Section 55. The amount of $15,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 108, Section 55 of Public Act 96-0956, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant for the Illinois Science and Technology Park.
Section 65. The amount of $20,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 108, Section 65 of Public Act 96-0956, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants associated with the Illinois Renewable Fuels Development Act.
Section 70. The amount of $15,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 108, Section 70 of Public Act 96-0956, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants associated with the redevelopment of brownfield sites.
Section 75. The amount of $17,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 108, Section 75 of Public Act 96-0956, is reappropriated from the Coal Development Bond Fund to the Department of Commerce and Economic Opportunity for the purpose of facility cost reports prepared pursuant to Section 1-75(d)(4) of the Illinois Power Agency Act.
Section 80. The sum of $3,980,704, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 108, Section 80 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans pursuant but not limited to Article 8, Article 9 or Article 10 of the Build Illinois Act.
Section 85. The sum of $3,130,040, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 108, Section 85 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans pursuant but not limited to Article 8 or Article 10 of the Build Illinois Act.
Section 90. The sum of $2,600,251, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 108, Section 90 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans pursuant but not limited to Article 8, Article 9 or Article 10 of the Build Illinois Act.
Section 95. The sum of $5,567,122, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 108, Section 95 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans pursuant but not limited to Article 8, Article 9 or Article 10 of the Build Illinois Act.
Section 100. The sum of $4,524,172, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 108, Section 100 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans pursuant but not limited to Article 8, Article 9 or Article 10 of the Build Illinois Act.
Section 105. The sum of $159,691,078, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 108, Section 105 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for the purpose of making grants and loans to local governments for planning, engineering, acquisition, construction, reconstruction, development, improvement and extension of the public infrastructure, and for any other purposes authorized in subsection (a) of Section 4 of the Build Illinois Bond Act and for grants to State agencies for such purposes.
Section 110. The sum of $47,500,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 108, Section 110 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for the purpose of fostering economic development and increased employment and the well being of the citizens of Illinois, and for any other purposes authorized in subsection (b) of Section 4 of the Build Illinois Bond Act and for grants to State agencies for such purposes.
Section 115. The sum of $20,537,276, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 108, Section 115 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for the development and improvement of educational, scientific, technical and vocational programs and facilities and the expansion of health and human services, and for any other purposes authorized in subsection (c) of Section 4 of the Build Illinois Bond Act and for grants to State agencies for such purposes.
Section 120. The sum of $30,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 108, Section 120 of Public Act 96-0956, as amended, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for open spaces, recreational and conservation purposes and the protection of land and for deposits into the Conservation 2000 Projects Fund as authorized by subsection (c) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.
Section 125. The sum of $33,209,688, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 108, Section 125 of Public Act 96-0956, as amended, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for grants to local governments for the acquisition, financing, architectural planning, development, alteration, installation, and construction of capital facilities consisting of buildings, structures, durable equipment, and land as authorized by subsection (l) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.
Section 130. The amount of $10,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 108, Section 130 of Public Act 96-0956, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for grants to local governments for the acquisition, financing, architectural planning, development, alteration, installation, and construction of capital facilities consisting of buildings, structures, durable equipment, and land as authorized by subsection (l) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.
Section 135. The amount of $25,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 108, Section 135 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants pursuant but not limited to Article 8, Article 9, or Article 10 of the Build Illinois Act.
Section 140. The sum of $13,745,450, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 108, Section 140 of Public Act 96-0956, as amended, is reappropriated from the Fund for Illinois’ Future to the Department of Commerce and Economic Opportunity for grants to units of government, educational facilities and not-for-profit organizations for education and training, infrastructure improvements and other capital projects including but not limited to planning, construction, reconstruction, equipment, utilities and vehicles, and all costs associated with economic development programs, community service programs, public health programs, public safety programs, other programs and activities, and for grants to other State agencies for any capital or operating purposes.
Section 145. The amount of $25,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 145 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants to local governments for capital improvements to civic centers for the projects hereinafter enumerated:
Quad Cities Metropolitan
Exposition and Auditorium
Authority..................... 4,000,000
Peoria Metropolitan Exposition
Authority..................... 4,000,000
Springfield Metropolitan
Exposition and Auditorium
Authority..................... 4,000,000
Rockford Metropolitan Exposition,
Auditorium and Office Building
Authority..................... 4,000,000
Will County Metropolitan Exposition,
Auditorium and Office Building
Authority..................... 2,200,000
Aurora Metropolitan Exposition,
Auditorium and Office Building
Authority..................... 2,100,000
Decatur Metropolitan Exposition,
Auditorium and Office Building
Authority..................... 2,100,000
Vermilion County Exposition,
Auditorium and Office Building
Authority....................... 850,000
Collinsville Metropolitan Exposition,
Auditorium and Office Building
Authority....................... 625,000
LaSalle County Metropolitan Exposition,
Auditorium and Office Building
Authority....................... 250,000
Quincy Metropolitan Exposition,
Auditorium and Office Building
Authority....................... 800,000
Section 150. The sum of $9,699,985, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 150 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to the Chicago Zoological Society for capital improvements.
Section 155. The sum of $11,700,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 155 of Public Act 96-0956, as amended, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for a grant to the Chicago Housing Authority for LeClaire Courts.
Section 160. The sum of $17,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 160 of Public Act 96-0956, as amended, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for a grant to the Medical District Commission for capital improvements, including previously incurred costs.
Section 165. The sum of $17,100,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 165 of Public Act 96-0956, as amended, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for a grant to Southwestern Illinois Community College for campus and building improvements.
Section 170. The sum of $424,967,935, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 170 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants awarded under the Urban Weatherization Initiative Act.
Section 175. The amount of $29,590,932, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 175 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans including but not limited to broadband deployment to expand and strengthen existing broadband network infrastructure, health information technology, telemedicine, distance learning, and public safety.
Section 180. The amount of $9,739,250, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 180 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans for transportation electrification infrastructure projects; including, but not limited to grants and loans for the purpose of encouraging electric car manufacturing and infrastructure for electric vehicles.
Section 185. The amount of $25,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 185 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for infrastructure projects that lead directly to private sector expansion or retention activities including but not limited public infrastructure construction and renovation, financing for the purchase of land and buildings, construction or renovation of fixed assets, site preparation and purchase of machinery and equipment.
Section 190. The amount of $5,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 190 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to Chicago Film Studios.
Section 195. The sum of $5,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 195 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to BMI, Inc for a biodiesel plant in Mapleton.
Section 200. The sum of $5,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 200 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to Robbins Community Power for a biomass to energy project.
Section 205. The amount of $15,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 205 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity to provide loans and grants for the modification, alteration, or retrofitting of renewable fuel plants in Illinois in order to encourage the implementation of technologies that increase the overall efficiency of the renewable fuel production process or reduce the life-cycle greenhouse gas emissions of the renewable fuel produced including, but not limited to: (i) improved water conservation; (ii) improved energy conservation; (iii) added value to bio-fuel co-products and bi-products; (iv) utilization of renewable energy resources; (v) utilization of fractionation; or (vi) utilization of cellulosic or other biomass conversion.
Section 210. The sum of $37,158,250, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 210 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for the requirements necessary to leverage capital-related American Recovery and Reinvestment Act of 2009 funds of equal or greater value in order to make Illinois or Illinois applicants more competitive.
Section 215. The sum of $2,250,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 215 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to the Phoenix Foundation of Southern Illinois for hospital renovation and equipment.
Section 220. The sum of $13,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 220 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for costs associated with the redevelopment of brownfield sites.
Section 221. The sum of $84,228,063, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 221 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to the United Neighborhood Organization for the acquisition, construction, rehabilitation, renovation and equipping facilities, to a silver certification from the United States Green Building Council’s Leadership in Energy and Environmental Design Green Building Rating System, to assist in alleviating school overcrowding in the state.
Section 225. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from appropriations heretofore made for such purposes in Article 108, Section 225 of Public Act 96-0956, as amended, are reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to the Rockford District 205 for the projects hereinafter enumerated:
GREENTEK CARVER ACADEMY
For the acquisition, construction,
rehabilitation, renovation and
equipping to a silver certification
from the United States Green
Building Council’s Leadership in
Energy and Environmental Design
Green Building Rating System................... 500,000
CICS ROCKFORD CHARTER PATRIOTS CENTER
For the acquisition, construction,
rehabilitation, renovation and
equipping to a silver certification
from the united States Green
Building Council’s Leadership in
Energy and Environmental Design
Green Building Rating System................... 500,000
SIGMA BETA LEADERSHIP SCHOOL
For the acquisition, construction,
rehabilitation, renovation and
equipping to a silver certification
from the united States Green
Building Council’s Leadership in
Energy and Environmental Design
Green Building Rating System................. 1,000,000
Total 2,000,000
Section 230. The sum of $32,500,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 230 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants for acquisition, construction, renovation and equipping new charter schools, to a silver certification from the United States Green Building Council’s Leadership in Energy and Environmental Design Green Building Rating System as approximated below:
For Erie Elementary Charter School............. 8,500,000
For ASPIRA Association........................ 12,000,000
For Instituto Del Progresso Latino............ 12,000,000
Total 32,500,000
Section 235. The sum of $15,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 235 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity to provide grants, loans, and other investments to emerging technology enterprises to support and encourage: (i) commercialization of technology based products and services; (ii) technology transfer projects involving the promotion of new or innovative technologies; or (iii) research and development projects to respond to unique, advanced technology projects and which foster the development of Illinois’ economy through the advancement of the State’s economic, scientific, and technological assets.
Section 240. The sum of $15,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 240 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity to provide grants for land acquisition, infrastructure, equipment and other permissible capital expenditures to businesses that will encourage new investment and the creation or retention of jobs in economically depressed areas of the state.
Section 245. The sum of $1,500,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 245 of Public Act 96-0956, as amended, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for a grant to the South Shore Hospital for costs associated with infrastructure improvements at the facility.
Section 255. The sum of $5,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 255 of Public Act 96-0956, as amended, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for a grant to the University of Chicago Medical Center for costs associated with Provident Hospital.
Section 265. The sum of $2,500,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 265 of Public Act 96-0956, as amended, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for a grant to the Illinois Masonic Hospital for capital improvements.
Section 270. The sum of $3,517,447, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 270 of Public Act 96-0956, as amended, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for a grant to Rush University Medical Center.
Section 275. The sum of $3,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 275 of Public Act 96-0956, as amended, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for a grant to Sacred Heart Hospital in Chicago.
Section 280. The sum of $3,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 280 of Public Act 96-0956, as amended, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for a grant to Community Health and Emergency Services, Inc. for the construction of a hospital wing at the Cairo Megaclinic.
Section 285. The sum of $3,750,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 285 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to Northwestern University to purchase equipment for the Science and Technology Center, as well as other bondable infrastructure improvements to match federal funds of equal or greater value.
Section 290. The amount of $826,563, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 290 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a capital grant to the Black Ensemble Theater.
Section 300. The amount of $1,500,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 300 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to the University of Chicago Center for HIV Excellence at Provident Hospital.
Section 305. The amount of $1,045,626, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 305 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a capital grant to The Hope Institute for Children and Families.
Section 310. The amount of $5,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 310 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a capital grant to the City of Chicago for Salvation Army for brownfield remediation and cleanup.
Section 325. The amount of $2,567,879, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 325 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to the Ruth M. Rothstein CORE Center for capital improvement projects to modify space to increase patient capacity.
Section 330. The amount of $10,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 108, Section 330 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity to provide loans and grants for capital-related projects for qualified grocery stores statewide located in underserved communities.
Section 345. The amount of $3,052,727, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made in Article 108, Section 345 of Public Act 96-0956, as amended, is reappropriated from the Coal Development Bond Fund to the Department of Commerce and Economic Opportunity for the purpose of facility cost reports prepared for not more than one facility pursuant to Section 1-56 of the Illinois Power Agency Act.
Section 350. The amount of $6,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made in Article 108, Section 350 of Public Act 96-0956, as amended, is reappropriated from the Coal Development Bond Fund to the Department of Commerce and Economic Opportunity for the purpose of development costs pursuant to Section 8.1 of the Energy Conservation and Coal Development Act.
Section 355. This Article is not subject to limitations under Section 5 of Article 48 of Public Act 95-734 or any similar limitation.
Section 360. No contract shall be entered into or obligation incurred or any expenditure made from any appropriation herein made in Sections 20 through 355 of this Article until after the purpose and amounts have been approved in writing by the Governor.
Total, this Article $1,384,655,438
ARTICLE 19
DEPARTMENT OF NATURAL RESOURCES
Section 10. The sum of $725,000, or so much thereof as may be necessary, is appropriated from the State Boating Act Fund to the Department of Natural Resources for the administration and payment of grants to local governmental units for the construction, maintenance, and improvement of boat access areas.
Section 15. The sum of $120,000, or so much thereof as may be necessary, is appropriated from the State Boating Act Fund to the Department of Natural Resources for the purposes of the Snowmobile Registration and Safety Act and for the administration and payment of grants to local governmental units for the construction, land acquisition, lease, maintenance and improvement of snowmobile trails and access areas.
Section 20. To the extent federal funds including reimbursements are available for such purposes, the sum of $1,575,000, or so much thereof as may be necessary, is appropriated from the State Boating Act Fund to the Department of Natural Resources for all costs for construction and development of facilities for transient, non-trailerable recreational boats, including grants for such purposes and authorized under the Boating Infrastructure Grant Program.
Section 25. The sum of $150,000, new appropriation, is appropriated from the State Boating Act Fund to the Department of Natural Resources for a grant to the Chain O’Lakes – Fox River Waterway Management Agency for the Agency’s operational expenses.
Section 30. The following named sums, new appropriations, or so much thereof as may be necessary, respectively, for the objects and purposes hereinafter named, are appropriated to the Department of Natural Resources:
Payable from State Boating Act Fund:
For multiple use facilities and programs
for boating purposes provided by the
Department of Natural Resources,
Including construction and development,
all costs for supplies, materials,
labor, land acquisition, services, studies
and all other expenses required to comply
with the intent of this appropriation........ 1,500,000
Payable from State Parks Fund:
For multiple use facilities and programs
for park and trail purposes provided by
the Department of Natural Resources, including
construction and development, all costs
for supplies, materials, labor, land
acquisition, services, studies, and
all other expenses required to comply with
the intent of this appropriation................ 150,000
Section 35. The sum of $100,000, or so much thereof as may be necessary, is appropriated from the Wildlife and Fish Fund to the Department of Natural Resources for acquisition and development, including grants, for the implementation of the North American Waterfowl Management Plan within the Dominion of Canada or the United States which specifically provides waterfowl for the Mississippi Flyway.
Section 40. To the extent federal funds including reimbursements are available for such purposes, the sum of $100,000, or so much thereof as may be necessary, is appropriated from the Wildlife and Fish Fund to the Department of Natural Resources for construction and renovation of waste reception facilities for recreational boaters, including grants for such purposes authorized under the Clean Vessel Act.
Section 50. The following named sums, or so much thereof as may be necessary, respectively, herein made either independently or in cooperation with the Federal Government or any agency thereof, any municipal corporation, or political subdivision of the State, or with any public or private corporation, organization, or individual, are appropriated to the Department of Natural Resources for refunds and the purposes stated:
Payable from Forest Reserve Fund:
For U.S. Forest Service Program............... 500,000
Section 55. The sum of $110,000, or so much thereof as may be necessary, is appropriated from the Plugging and Restoration Fund to the Department of Natural Resources, Office of Mines and Minerals for the Landowner Grant Program authorized under the Oil and Gas Act, as amended by Public Act 90-0260.
Section 60. The sum of $1,500,000, or so much thereof as may be necessary, is appropriated to the Department of Natural Resources from the Abandoned Mined Lands Set Aside Fund for grants and contracts to conduct research, planning and construction to eliminate hazards created by abandoned mines and any other expenses necessary for emergency response.
Section 65. The sum of $110,000, or so much thereof as may be necessary, is appropriated to the Department of Natural Resources from the State Furbearer Fund for the conservation of fur bearing mammals in accordance with the provisions of Section 5/1.32 of the "Wildlife Code", as now or hereafter amended.
Section 70. The following named sums, new appropriations, or so much thereof as may be necessary, respectively, for the objects and purposes hereinafter named, are appropriated to the Department of Natural Resources:
Payable from Natural Areas Acquisition Fund:
For the acquisition, preservation and
stewardship of natural areas, including habitats
for endangered and threatened species, high
quality natural communities, wetlands
and other areas with unique or unusual
natural heritage qualities.................. 2,000,000
Section 75. The sum of $11,000,000, or so much thereof as may be necessary, is appropriated from the Open Space Lands Acquisition and Development Fund to the Department of Natural Resources for expenses connected with and to make grants to local governments and to distressed communities as provided in the "Open Space Lands Acquisition and Development Act".
Section 80. The sum of $550,000, or so much thereof as may be necessary, is appropriated from the State Pheasant Fund to the Department of Natural Resources for the conservation of pheasants in accordance with the provisions of Section 5/1.31 of the "Wildlife Code", as now or hereafter amended.
FOR ILLINOIS HABITAT FUND PROGRAM
Section 85. The sum of $1,350,000, or so much thereof as may be necessary, is appropriated from the Illinois Habitat Fund to the Department of Natural Resources for the preservation and maintenance of high quality habitat lands in accordance with the provisions of the "Habitat Endowment Act", as now or hereafter amended.
Section 90. The sum of $250,000, or so much thereof as may be necessary, is appropriated from the Illinois Habitat Fund to the Department of Natural Resources for the preservation and maintenance of a high quality fish and wildlife habitat and to promote the heritage of outdoor sports in Illinois from revenue derived from the sale of Sportsmen Series license plates.
Section 95. The sum of $900,000, or so much thereof as may be necessary, is appropriated to the Department of Natural Resources for expenditure by the Office of Water Resources from the Flood Control Land Lease Fund for disbursement of monies received pursuant to Act of Congress dated September 3, 1954 (68 Statutes 1266, same as appears in Section 701c-3, Title 33, United States Code Annotated), provided such disbursement shall be in compliance with 15 ILCS 515/1 Illinois Compiled Statutes.
Section 100. The following named sums, or so much thereof as may be necessary, respectively, herein made either independently or in cooperation with the Federal Government or any agency thereof, any municipal corporation, or political subdivision of the State, or with any public or private corporation, organization, or individual, are appropriated to the Department of Natural Resources for refunds and the purposes stated:
Payable from Land and Water Recreation Fund:
For Outdoor Recreation Programs ............. 2,500,000
Section 105. The sum of $400,000, or so much thereof as may be necessary, is appropriated from the Off-Highway Vehicle Trails Fund to the Department of Natural Resources for grants to units of local governments, not-for-profit organizations, and other groups to operate, maintain and acquire land for off-highway vehicle trails and parks as provided for in the Recreational Trails of Illinois Act, including administration, enforcement, planning and implementation of this Act.
Section 110. The following named sums, or so much thereof as may be necessary, respectively, herein made either independently or in cooperation with the Federal Government or any agency thereof, any municipal corporation, or political subdivision of the State, or with any public or private corporation, organization, or individual, are appropriated to the Department of Natural Resources for refunds and the purposes stated:
Payable from Federal Title IV Fire
Protection Assistance Fund:
For Rural Community Fire Protection
Programs........................................ 325,000
Section 115. The sum of $80,000, or so much thereof as may be necessary, is appropriated from the Snowmobile Trail Establishment Fund to the Department of Natural Resources for
the administration and payment of grants to nonprofit snowmobile clubs and organizations for construction, maintenance, and rehabilitation of snowmobile trails and areas for the use of snowmobiles.
Section 120. The sum of $625,000, or so much thereof as may be necessary, is appropriated from the Illinois Forestry Development Fund to the Department of Natural Resources for the payment of grants to timber growers for implementation of
acceptable forestry management practices as provided in the "Illinois Forestry Development Act" as now or hereafter amended.
Section 125. To the extent Federal Funds including reimbursements are made available for such purposes, the sum of $300,000, is appropriated from the Illinois Forestry Development Fund to the Department of Natural Resources for Forest Stewardship Technical Assistance.
Section 130. The sum of $160,000, or so much thereof as may be necessary, is appropriated from the State Migratory Waterfowl Stamp Fund to the Department of Natural Resources for the payment of grants for the implementation of the North American Waterfowl Management Plan within the Dominion of Canada or the United States which specifically provides waterfowl to the Mississippi Flyway as provided in the "Wildlife Code", as amended.
Section 135. The sum of $160,000, or so much thereof as may be necessary, is appropriated from the State Migratory Waterfowl Stamp Fund to the Department of Natural Resources for the payment of grants for the development of waterfowl propagation areas within the Dominion of Canada or the United States which specifically provide waterfowl for the Mississippi Flyway as provided in the "Wildlife Code", as amended.
Section 140. The sum of $750,000, or so much thereof as may be necessary, is appropriated from the State Migratory Waterfowl Stamp Fund to the Department of Natural Resources for the purpose of attracting waterfowl and improving public migratory waterfowl areas within the State.
Section 145. The sum of $1,000,000, or so much thereof as may be necessary, is appropriated from the Park and Conservation Fund to the Department of Natural Resources for grants to units of local government for the acquisition and development of bike paths.
Section 150. The sum of $750,000, or so much thereof as may be necessary, is appropriated from the Park and Conservation Fund to the Department of Natural Resources for land acquisition, development and maintenance of bike paths and all other related expenses connected with the acquisition, development and maintenance of bike paths.
Section 155. The sum of $2,000,000, or so much thereof as may be necessary, is appropriated from the Park and Conservation Fund to the Department of Natural Resources for the development and maintenance, and other related expenses of recreational trails and trail-related projects authorized under the Intermodal Surface Transportation Efficiency Act of 1991, provided such amount shall not exceed funds to be made available for such purposes from State or federal sources.
Section 160. The following named sum, new appropriation, or so much thereof as may be necessary, for the object and purpose hereinafter named, is appropriated to the Department of Natural Resources:
Payable from the Park and Conservation Fund:
For multiple use facilities and programs
for park and trail purposes provided by
the Department of Natural Resources, including
construction and development, all costs
for supplies, materials, labor, land
acquisition, services, studies, and
all other expenses required to comply with
the intent of this appropriation .............. 1,000,000
Section 165. The following named sums, new appropriations, or so much thereof as may be necessary, respectively, for the objects and purposes hereinafter named, are appropriated to the Department of Natural Resources:
Payable from the Adeline Jay Geo-Karis
Illinois Beach Marina Fund:
For rehabilitation, reconstruction, repair,
replacing, fixed assets, and improvement
of facilities at North Point Marina at
Winthrop Harbor................................. 375,000
Section 170. The sum of $6,000,000, or so much thereof as may be necessary, is appropriated to the Department of Natural Resources from the Abandoned Mined Lands Reclamation Council Federal Trust Fund for grants and contracts to conduct research, planning and construction to eliminate hazards created by abandoned mines, and any other expenses necessary for emergency response.
Section 210. The sum of $2,000,000, or so much thereof as may be necessary, is appropriated from the State Park Fund to the Department of Natural Resources, in coordination with the Capital Development Board, for the development of the World Shooting and Recreation Complex including all construction and debt service expenses required to comply with this appropriation. Provided further, to the extent that revenues are received for such purposes, said revenues must come from non-State sources.
Total, this Article $41,115,000
ARTICLE 20
DEPARTMENT OF NATURAL RESOURCES
Section 1. The sum of $45,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made in Article 109, Section 1 of Public Act 96-0956, is reappropriated from the Capital Development Fund to the Department of Natural Resources for the non-federal cost share of a Conservation Reserve Enhancement Program to establish long-term contracts and permanent conservation easements in Illinois; to fund cost-share assistance to landowners to encourage approved conservation practices in environmentally sensitive and highly erodible areas of Illinois; and to fund the monitoring of long-term improvements of these conservation practices as required in the Memorandum of Agreement between the State of Illinois and the United States Department of Agriculture.
Section 5. The sum of $41,213,701, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made in Article 109, Section 5 of Public Act 96-0956, is reappropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources for water development projects at the approximate cost set forth below:
Addison Creek - Cook & Dupage
Counties - For construction
of the Addison Creek Flood
Control Project as developed
by the Addison Creek Restoration
Commission...................................... 200,000
Ashland – Cass County – For
construction of a flood
control project to relieve flooding............. 590,000
County Stormwater Improvements –
For funding to assist County
Stormwater Programs with
implementation of flood relief
projects........................................ 900,000
Crystal Creek – Cook County –
To design and construct the
Crystal Creek Flood Control Project
in Schiller Park and Franklin Park............ 1,898,701
Des Plaines River Phase 1 Big
Bend Lake - Cook County –
For non-federal cost sharing
requirements of the Upper
Des Plaines Flood Control Project,
Phase 1...................................... 10,800,000
East St. Louis Ecosystem and
IFC - Madison & St. Clair
Counties - For the non-federal
funding to design and construct
this multipurpose ecosystem project........... 1,300,000
Flood Hazard Mitigation –
Statewide - For cost sharing
to acquire repetitive and
severely damaged flood prone
structures................................... 10,000,000
Granite City Groundwater Pumping –
To implement the pilot project
to reduce flood damages associated
with high groundwater........................... 600,000
Hickory/Spring Creek – Will County –
For implementation of Stage IIIb-2
of channel construction of
Hickory/Spring Creeks flood
control project in cooperation
with the City of Joliet....................... 4,500,000
Hickory/Spring Creek – Will County –
For implementation of Stage IV-A
of channel construction of
Hickory/Spring Creeks flood
control project in cooperation
with the City of Joliet....................... 7,600,000
Mattoon - Coles County – For
implementation of local
improvements to reduce
flood damages................................. 1,000,000
Village of Union - McHenry County -
For the implementation of flood
damage relief measures........................ 1,125,000
Small Drainage and Flood
Control Projects - to fund
flood damage reduction projects
in partnership with local
units of government............................. 700,000
Total $39,400,854
Section 10. The sum of $40,500,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made in Article 109, Section 10 of Public Act 96-0956, is reappropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources for improvements needed at State-owned Dams for upgrading and rehabilitation of dams, spillways and supporting facilities, including dam removals and the required geotechnical investigations, preparation of plans and specifications, and the construction of the proposed rehabilitation to ensure reduced risk of injury to the public.
Section 15. The sum of $14,175,910, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made in Article 109, Section 15 of Public Act 96-0956, is reappropriated from the Capital Development Fund to the Department of Natural Resources for planning, design and construction of ecosystem rehabilitation, habitat restoration and associated development in cooperation with the U.S. Army Corps of Engineers.
Section 20. The sum of $150,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made in Article 109, Section 20 of Public Act 96-0956, is reappropriated from the Build Illinois Bond Fund to the Department of Natural Resources for capital grants to parks or reactional units for permanent improvements.
Section 25. The sum of $50,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made in Article 109, Section 25 of Public Act 96-0956, is reappropriated from the Capital Development Fund to the Department of Natural Resources for capital grants to public museums for permanent improvements.
Section 30. The sum of $4,554,950, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made in Article 109, Section 30 of Public Act 96-0956, is reappropriated from the Build Illinois Bond Fund to the Department of Natural Resources for capital grants to the Museum of Broadcast Communications for permanent improvements.
Section 35. The sum of $3,750,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made in Article 109, Section 35 of Public Act 96-0956, is reappropriated from the Build Illinois Bond Fund to the Department of Natural Resources for capital grants to Peoria County for costs associated with construction and development of the Peoria Riverfront Museum.
Section 40. The amount of $7,927,600, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 109, Section 40 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Natural Resources for the Mud to Parks dredging Illinois rivers and sediment reuse.
Section 45. The sum of $10,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 109, Section 45 of Public Act 96-0956, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources for improvements needed at State-owned Dams for upgrading and rehabilitation of dams, spillways and supporting facilities, including dam removals and the required geotechnical investigations, preparation of plans and specifications, and the construction of the proposed rehabilitation to ensure reduced risk of injury to the public, and for needed repairs and improvements on and to waterways and infrastructure.
Section 50. The sum of $4,025,533, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2011, from appropriations heretofore made in Article 109, Section 50 of Public Act 96-0956, as amended, is reappropriated from the State Boating Act Fund to the Department of Natural Resources for the administration and payment of grants to local governmental units for the construction, maintenance, and improvement of boat access areas.
Section 55. The sum of $434,929, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2011, from appropriations heretofore made in Article 109, Section 55 of Public Act 96-0956, as amended, is reappropriated from the State Boating Act Fund to the Department of Natural Resources for the purposes of the Snowmobile Registration and Safety Act and for the administration and payment of grants to local governmental units for the construction, land acquisition, lease, maintenance and improvement of snowmobile trails and access areas.
Section 60. To the extent federal funds including reimbursements are available for such purposes, the sum of $4,338,900, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from appropriations heretofore made in Article 109, Section 60 of Public Act 96-0956, as amended, and Article 3, Section 20 of Public Act 96-0957, is reappropriated from the State Boating Act Fund to the Department of Natural Resources for all costs for construction and development of facilities for transient, non-trailerable recreational boats, including grants for such purposes and authorized under the Boating Infrastructure Grant Program.
Section 65. The following named sums, or so much thereof as may be necessary, respectively, and as remains unexpended at the close of business on June 30, 2011, from appropriations heretofore made for such purposes, are reappropriated to the Department of Natural Resources for the objects and purposes set forth below:
Payable from State Boating Act Fund:
(From Article 109, Section 65
of Public Act 96-0956, as amended,
and Article 3, Section 30 of
Public Act 96-0957)
For multiple use facilities and programs
for boating purposes provided by the
Department of Natural Resources including
construction and development, all costs
for supplies, materials, labor, land
acquisition, services, studies and all
other expenses required to comply with
the intent of this appropriation.............. 5,815,418
Section 70. The following named sums, or so much thereof as may be necessary, respectively, and as remain unexpended at the close of business on June 30, 2011, from appropriations heretofore made for such purposes, are reappropriated to the Department of Natural Resources for the objects and purposes set forth below:
Payable from the State Parks Fund:
(From Article 109, Section 70,
of Public Act 96-0956, as amended,
and Article 3, Section 30 of
Public Act 96-0957)
For multiple use facilities and programs
for park and trail purposes provided
by the Department of Natural Resources, including
construction and development, all costs
for supplies, materials, labor, land
acquisition, services, studies, and
all other expenses required to comply with
the intent of this appropriation................ 994,234
(From Article 109, Section 45
of Public Act 96-0956, as amended)
For multiple use facilities and
purposes provided by the
Department of Natural Resources, including
construction and development, all costs
for supplies, materials, labor, land
acquisition, services, studies, and
all other expenses required to comply with
the intent of this appropriation................ 244,857
Section 75. The sum of $783,487, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 109, Section 75 of Public Act 96-0956, is reappropriated from the State Park Fund to the Department of Natural Resources, in coordination with the Capital Development Board, for the development of the World Shooting and Recreation Complex including all construction and debt service expenses required to comply with this appropriation. Provided further, to the extent that revenues are received for such purposes, said revenues must come from non-State sources.
Section 80. The sum of $2,652,407, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 109, Section 80 of Public Act 96-0956, as amended, is reappropriated from the Wildlife and Fish Fund to the Department of Natural Resources for wildlife conservation and restoration plans and programs from federal and/or state funds provided for such purposes.
Section 85. To the extent federal funds including reimbursements are available for such purposes, the sum of $887,948, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2011, from appropriations heretofore made in Article 109, Section 85 of Public Act 96-0956, as amended, and Article 3, Section 40 of Public Act 96-0957, is reappropriated from the Wildlife and Fish Fund to the Department of Natural Resources for construction and renovation of waste reception facilities for recreational boaters, including grants for such purposes authorized under the Clean Vessel Act.
Section 90. The sum of $287,710, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 109, Section 90 of Public Act 96-0956, is reappropriated from the Capital Development Fund to the Department of Natural Resources for planning, design and construction of ecosystem rehabilitation, habitat restoration and associated development in cooperation with the U.S. Army Corps of Engineers.
Section 95. The sum of $2,095,777, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 109, Section 95 of Public Act 96-0956, is reappropriated from the Capital Development Fund to the Department of Natural Resources for planning, design and construction of ecosystem rehabilitation, habitat restoration and associated development in cooperation with the U.S. Army Corps of Engineers.
Section 100. The sum of $364,496, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 109, Section 100 of Public Act 96-0956, is reappropriated from the Capital Development Fund to the Department of Natural Resources to acquire, protect and preserve open space and natural lands.
Section 105. The sum of $1,049,783, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 109, Section 105 of Public Act 96-0956, is reappropriated from the Capital Development Fund to the Department of Natural Resources for the non-federal cost share of a Conservation Reserve Enhancement Program to establish long-term contracts and permanent conservation easements in Illinois; to fund cost-share assistance to landowners to encourage approved conservation practices in environmentally sensitive and highly erodible areas of Illinois; and to fund the monitoring of long term improvements of these conservation practices as required in the Memorandum of Agreement between the State of Illinois and the United States Department of Agriculture.
Section 110. The sum of $503,341, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 109, Section 110 of Public Act 96-0956, is reappropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources for the acquisition of lands, buildings, and structures, including easements and other property interests, located in the 100-year floodplain in counties or portions of counties authorized to prepare stormwater management plans and for removing such buildings and structures and preparing the site for open space use.
Section 115. The sum of $8,079,294, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 109, Section 115 of Public Act 96-0956, is reappropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources for water development projects at the approximate cost set forth below:
Union - McHenry County - for flood control
and drainage improvement of unnamed
Kishwaukee River tributary........................ 200,000
Flood Hazard Mitigation - For implementation
of flood hazard mitigation plans, and
acquisition of wetland and tree mitigation
sites for state and local joint
flood control projects in
cooperation with federal agencies, state
agencies, and units of local government,
in various counties............................. 3,150,000
Fox Chain of Lakes - Lake and McHenry
Counties - For the state cost share in
implementation of the comprehensive
Dredging and Disposal Plan, including
beneficial use of dredge material and
island creation, for the Fox River and
Chain of Lakes.................................... 229,294
Fox River Dams - Kane County - For
rehabilitation, modification, and
reconstruction of Batavia
and Yorkville Dams.............................. 2,600,000
East St. Louis & Vicinity Flood Control -
Madison and St. Clair Counties - For
partial payment of the non-federal cost
requirement of an interior flood protection
project and ecosystem restoration at East
St. Louis and Vicinity area..................... 1,800,000
Small Drainage and Flood Control Projects -
For implementation of
small drainage and flood control
improvements in accordance with plans
developed in cooperation with local
governments and school districts, not
to exceed $100,000 at any single
locality.......................................... 100,000
Total $8,079,294
FOR WATERWAY IMPROVEMENTS
Section 120. The sum of $9,516,528, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 109, Section 120 of Public Act 96-0956, is reappropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources for the following projects at the approximate costs set forth below:
Addison Creek Watershed - Cook
and DuPage Counties............................... 214,700
Chicago Harbor Leakage Control -
Cook County - For implementation
of a project to identify, measure,
control, and eliminate leakage
flows through controlling structures at
the mouth of the Chicago River in
cooperation with federal agencies and
units of local government.......................... 57,285
Crisenberry Dam - Jackson County:
For complete rehabilitation of the
dam and spillway, including the
required geotechnical investigation,
the preparation of plans and
specifications, and the construction
of the proposed rehabilitation..................... 20,000
Crystal Creek - Cook County.......................... 1,000
East St. Louis and Vicinity Flood Control -
Madison and St. Clair Counties - For
partial payment of the non-federal cost
requirements of an interior flood protection
project and ecosystem restoration at
East St. Louis and Vicinity area.................. 329,300
Flood Mitigation - Disaster
Declaration Areas............................... 4,027,830
Fox Chain O'Lakes - Lake and McHenry
Counties ...................................... 1,724,540
Fox River Dams - Kane, Kendall
and McHenry Counties.............................. 935,206
Granite City - Area Groundwater-
Madison County..................................... 10,000
Hickory/Spring Creeks Watershed -
Cook and Will Counties............................ 265,800
Prairie/Farmers Creek - Cook County.............. 1,521,301
Rock River Dams - Rock Island and
Whiteside Counties................................. 79,566
Small Drainage and Flood Control
Projects - Statewide (not to exceed
$100,000 at any locality)......................... 300,000
Union - McHenry County.............................. 30,000
Total $9,516,528
Section 135. The sum of $224,587, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2011, from appropriations heretofore made in Article 109, Section 135 of Public Act 96-0956, as amended, and Article 3, Section 65 of Public Act 96-0957,is reappropriated to the Department of Natural Resources from the State Furbearer Fund for the conservation of fur bearing mammals in accordance with the provisions of Section 5/1.32 of the "Wildlife Code", as now or hereafter amended.
Section 140. The following named sum, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2011, from appropriations heretofore made for such purposes, is reappropriated to the Department of Natural Resources for the objects and purposes set forth below:
Payable from Natural Areas Acquisition Fund:
(From Article 109, Section 140 of
Public Act 96-0956, as amended
and Article 3, Section 70 of Public
Act 96-0957,)
For the acquisition, preservation and
stewardship of natural areas,
including habitats for endangered and
threatened species, high quality natural
communities, wetlands and other areas
with unique or unusual natural
heritage qualities............................ 8,762,925
Section 145. The sum of $91,934,573, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2011, from appropriations heretofore made in Article 109, Section 145 of Public Act 96-0956, as amended, and Article 3, Section 75 of Public Act 96-0957, is reappropriated from the Open Space Lands Acquisition and Development Fund to the Department of Natural Resources for expenses connected with and to make grants to local governments as provided in the "Open Space Lands Acquisition and Development Act".
FOR STATE PHEASANT PROGRAM
Section 150. The sum of $1,355,261, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2011, from appropriations heretofore made in Article 109, Section 150 of Public Act 96-0956, as amended, and Article 3, Section 80 of Public Act 96-0957, is reappropriated from the State Pheasant Fund to the Department of Natural Resources for the conservation of pheasants in accordance with the provisions of Section 5/1.31 of the "Wildlife Code", as now or hereafter amended.
Section 155. The sum of $4,450,654, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2011, from appropriations heretofore made in Article 109, Section 155 of Public Act 96-0956, as amended, and Article 3, Section 85 of Public Act 96-0957, is reappropriated from the Illinois Habitat Fund to the Department of Natural Resources for the preservation and maintenance of high quality habitat lands in accordance with the provisions of the "Habitat Endowment Act", as now or hereafter amended.
Section 160. The sum of $1,517,033, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2011, from appropriations heretofore made in Article 109, Section 180 of Public Act 96-0956, as amended, and Article 3, Section 90 of Public Act 96-0957, is reappropriated from the Illinois Habitat Fund to the Department of Natural Resources for the preservation and maintenance of a high quality fish and wildlife habitat and to promote the heritage of outdoor sports in Illinois from revenue derived from the sale of Sportsmen Series license plates.
Section 165. The following named sum, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2011, from appropriations heretofore made in Article 109, Section 165 of Public Act 96-0956, as amended, and Article 3, Section 100 of Public Act 96-0957, made either independently or in cooperation with the Federal Government or any agency thereof, any municipal corporation, or political subdivision of the State, or with any public or private corporation, organization, or individual, is reappropriated to the Department of Natural Resources for refunds and the purposes stated:
Payable from Land and Water Recreation Fund:
For Outdoor Recreation Programs................ 8,881,481
Section 170. The sum of $2,307,918, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2011, from appropriations heretofore made in Article 109, Section 170 of Public Act 96-0956, as amended, and Article 3, Section 105 of Public Act 96-0957, is reappropriated from the Off Highway Vehicle Trails Fund to the Department of Natural Resources for grants to units of local governments, not-for-profit organizations, and other groups to operate, maintain and acquire land for off-highway vehicle trails and parks as provided for in the Recreational Trails of Illinois Act, including administration, enforcement, planning and implementation of this Act.
Section 175. The sum of $1,432,515, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 109, Section 205 of Public Act 96-0956, is reappropriated from the Partners for Conservation Projects Fund to the Department of Natural Resources for the acquisition, planning and development of land and long-term easements, and cost-shared natural resource management practices for ecosystem-based management of Illinois' natural resources, including grants for such purposes.
Section 180. The sum of $1,783,280, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 109, Section 210 of Public Act 96-0956, is reappropriated from the Partners for Conservation Projects Fund to the Department of Natural Resources for the acquisition, planning and development of land and long-term easements, and cost-shared natural resource management practices for ecosystem-based management of Illinois' natural resources, including grants for such purposes.
Section 185. The following named sum, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2011, from appropriations heretofore made in Article 109, Section 215 of Public Act 96-0956, as amended, and Article 3, Section 110 of Public Act 96-0957, made either independently or in cooperation with the Federal Government or any agency thereof, any municipal corporation, or political subdivision of the State, or with any public or private corporation, organization, or individual, is reappropriated to the Department of Natural Resources for refunds and the purposes stated:
Payable from Federal Title IV Fire
Protection Assistance Fund:
For Rural Community Fire
Protection Program.............................. 832,186
Section 190. The sum of $186,620, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2011, from appropriations heretofore made in Article 109, Section 225 of Public Act 96-0956, as amended, and Article 3, Section 115 of Public Act 96-0957, is reappropriated from the Snowmobile Trail Establishment Fund to the Department of Natural Resources for the administration and payment of grants to nonprofit snowmobile clubs and organizations for construction, maintenance, and rehabilitation of snowmobile trails and areas for the use of snowmobiles.
Section 195. The sum of $3,043,156, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2011, from appropriations heretofore made in Article 109, Section 235 of Public Act 96-0956, as amended, and Article 3, Section 120 of Public Act 96-0957, is reappropriated from the Illinois Forestry Development Fund to the Department of Natural Resources for the payment of grants to timber growers for implementation of acceptable forestry management practices as provided in the "Illinois Forestry Development Act" as now or hereafter amended.
Section 200. To the extent Federal Funds including reimbursements are made available for such purposes, the sum of $706,460, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2011, from appropriations heretofore made in Article 109, Section 245 of Public Act 96-0956, as amended, and Article 3, Section 125 of Public Act 96-0957, is reappropriated from the Illinois Forestry Development Fund to the Department of Natural Resources for Forest Stewardship Technical Assistance.
Section 205. The sum of $2,760,577, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2011, from appropriations heretofore made in Article 109, Section 260 of Public Act 96-0956, as amended, and Article 3, Section 140 of Public Act 96-0957, is reappropriated from the State Migratory Waterfowl Stamp Fund to the Department of Natural Resources for the purpose of attracting waterfowl and improving public migratory waterfowl areas within the State.
FOR BIKEWAYS PROGRAMS
Section 210. The sum of $9,421,572, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2011, from appropriations heretofore made in Article 109, Section 280 of Public Act 96-0956, as amended, and Article 3, Section 145 of Public Act 96-0957, is reappropriated from the Park and Conservation Fund to the Department of Natural Resources for grants to units of local government for the acquisition and development of bike paths.
Section 215. The following named sum, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 109, Section 285 of Public Act 96-0956, as amended, and Article 3, Section 160 of Public Act 96-0957, is reappropriated to the Department of Natural Resources:
Payable from the Park and Conservation Fund:
For multiple use facilities and programs
for park and trail purposes provided by
the Department of Natural Resources, including
construction and development, all costs
for supplies, materials, labor, land
acquisition, services, studies, and
all other expenses required to comply with
the intent of this appropriation.............. 3,423,642
Section 220. The sum of $686,826, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 109, Section 300 of Public Act 96-0956, is reappropriated from the Park and Conservation Fund to the Department of Natural Resources for multiple use facilities and programs for conservation purposes provided by the Department of Natural Resources, including repairing, maintaining, reconstructing, rehabilitating, replacing fixed assets, construction and development, marketing and promotions, all costs for supplies, materials, labor, land acquisition and its related costs, services, studies, and all other expenses required to comply with the intent of this appropriation.
Section 225. The sum of $5,035,626, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2011, from appropriations heretofore made in Article 109, Section 305 of Public Act 96-0956, as amended, and Article 3, Section 150 of Public Act 96-0957, is reappropriated from the Park and Conservation Fund to the Department of Natural Resources for land acquisition, development and maintenance of bike paths and all other related expenses connected with the acquisition, development and maintenance of bike paths.
Section 230. The sum of $1,177,550, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 109, Section 310 of Public Act 96-0956, is reappropriated to the Department of Natural Resources from the Park and Conservation Fund for multiple use facilities and programs for conservation purposes provided by the Department of Natural Resources, including repairing, maintaining, reconstructing, rehabilitating, replacing fixed assets, construction and development, marketing and promotions, all costs for supplies, materials, labor, land acquisition and its related costs, services, studies, and all other expenses required to comply with the intent of this appropriation.
Section 235. The sum of $8,552,852, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2011, from appropriations heretofore made in Article 109, Section 320 of Public Act 96-0956, as amended, and Article 3, Section 155 of Public Act 96-0957, is reappropriated from the Park and Conservation Fund to the Department of Natural Resources for the development and maintenance of recreational trails and trail-related projects authorized under the Intermodal Surface Transportation Efficiency Act of 1991, provided such amount shall not exceed funds to be made available for such purposes from state or federal sources.
Section 240. The following named sum, or so much thereof as may be necessary, respectively, and as remains unexpended at the close of business on June 30, 2011, from appropriations heretofore made for such purposes, are reappropriated to the Department of Natural Resources for the objects and purposes set forth below:
Payable from the Adeline Jay Geo-Karis
Illinois Beach Marina Fund:
(From Article 109, Section 385
of Public Act 96-0956, as amended
and Article 3, Section 165 of
Public Act 96-0957,)
For rehabilitation, reconstruction,
repair, replacing, fixed assets,
and improvement of facilities at
North Point Marina at Winthrop
Harbor........................................ 1,852,126
Section 245. The sum of $18,722,142, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2011, from appropriations heretofore made in Article 109, Section 395 of Public Act 96-0956, as amended, and Article 3, Section 170 of Public Act 96-0957, is reappropriated to the Department of Natural Resources from the Abandoned Mined Lands Reclamation Council Federal Trust Fund for grants and contracts to conduct research, planning and construction to eliminate hazards created by abandoned mines, and any other expenses necessary for emergency response.
Section 250. The sum of $244,933, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 109, Section 410 of Public Act 96-0956, is reappropriated from the Wildlife and Fish Fund to the Department of Natural Resources for the acquisition, engineering and rehabilitation of dedicated hunting and fishing lands in conjunction with the Illinois Hunting Heritage Protection Act; however, no more than $1,500,000 of the total appropriation may be used for engineering and rehabilitation.
Section 255. The sum of $20,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 109, Section 415 of Public Act 96-0956, is reappropriated from the Capital Development Fund to the Department of Natural Resources for water resource management projects as authorized by subsection (g) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.
Section 260. The sum of $5,053,378, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 109, Section 420 of Public Act 96-0956, is reappropriated from the Capital Development Fund to the Department of Natural Resources for grants to local governments for the acquisition, financing, architectural planning, development, alteration, installation, and construction of capital facilities consisting of buildings, structures, durable equipment, and land as authorized by subsection (l) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.
Section 265. The sum of $25,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 109, Section 425 of Public Act 96-0956, is reappropriated from the Capital Development Fund to the Department of Natural Resources for the Illinois Open Land Trust Program as defined by the Illinois Open Land Trust Act as authorized by subsection (m) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.
Section 270. The sum of $25,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made in Article 109, Section 430 of Public Act 96-0956, is reappropriated from the Capital Development Fund to the Department of Natural Resources for the Open Land Trust Program.
Section 275. The sum of $5,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made in Article 109, Section 435 of Public Act 96-0956, is reappropriated from the Capital Development Fund to the Department of Natural Resources for upgrades to lodges, camps and campsites, including but not limited to previously incurred costs.
Section 280. The following named sums, or so much thereof as may be necessary, respectively, and as remain unexpended at the close of business on June 30, 2011, from appropriations heretofore made for such purposes, are reappropriated to the Department of Natural Resources for the objects and purposes set forth below:
Payable from State Parks Fund:
(From Article 3, Section 30 of Public
Act 96-0957)
For multiple use facilities and programs
for park and trail purposes provided by
the Department of Natural Resources, including
construction and development, all costs
for supplies, materials, labor, land
acquisition, services, studies, and
all other expenses required to comply with
the intent of this appropriation................ 150,000
Section 285. No contract shall be entered into or obligation incurred or any expenditure made from a reappropriation herein made in Sections:
1 through 45, 75, 80, 90 through 120, 175, 180, and 250 through 275
of this Article until after the purpose and amount of such expenditure has been approved in writing by the Governor.
Total, this Article $670,116,379
ARTICLE 25
DEPARTMENT OF MILITARY AFFAIRS
Section 5. The sum of $91,600, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 110, Section 5 of Public Act 96-0956, is reappropriated from the Illinois National Guard Armory Construction Fund to the Department of Military Affairs for land acquisition and construction of parking facilities at armories.
Total, this Article 91,600
ARTICLE 30
DEPARTMENT OF PUBLIC HEALTH
Section 5. The sum of $150,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 111, Section 5 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Public Health for grants associated with the Hospital Capital Investment Program.
Section 10. The sum of $4,996,234, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 111, Section 10 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Illinois Department of Public Health for the CLEAR-WIN Grant Program to correct lead based paint hazards in residential buildings.
Section 15. No contract shall be entered into or obligation incurred or any expenditures made from appropriations in this Article until after the purposes and amounts have been approved in writing by the Governor.
Total, this Article $154,996,234
ARTICLE 35
DEPARTMENT OF REVENUE
Section 5. The sum of $100,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 112, Section 5 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Revenue for the Illinois Housing Development Authority for affordable housing grants, loans, and investments for low-income families, low-income senior citizens, low-income persons with disabilities and at risk displaced veterans.
Section 10. The sum of $30,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 112, Section 10 of Public Act 96-0956, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Revenue for the Illinois Housing Development Authority affordable housing grants, loans, and investments to provide access to affordable and supportive housing for at risk displaced veterans and low-income persons with disabilities.
Section 15. No contract shall be entered into or obligation incurred or any expenditures made from appropriations in this Article until after the purposes and amounts have been approved in writing by the Governor.
Total, this Article $130,000,000
ARTICLE 40
DEPARTMENT OF TRANSPORTATION
PERMANENT IMPROVEMENTS
Section 5. The sum of $13,500,000, or so much thereof as may be necessary, is appropriated from the Road Fund to the Department of Transportation for Permanent Improvements to Illinois Department of Transportation facilities, including but not limited to the purchase of land, construction, repair, alterations and improvements to maintenance and traffic facilities, district and central headquarters facilities, storage facilities, grounds, parking areas and facilities, fencing and underground drainage, including plans, specifications, utilities and fixed equipment installed and all costs and charges incident to the completion thereof at various locations.
OTHER LUMP SUMS
Section 10. The following named amounts, or so much thereof as may be necessary, are appropriated from the Road Fund to the Department of Transportation for the objects and purposes hereinafter named:
For costs associated with the identification,
corrective action, and disposal of hazardous
materials at storage facilities................. 750,000
For Maintenance, Traffic and Physical
Research Purposes (A)........................ 34,429,100
For repair of damages by motorists
to highway guardrails, fencing,
lighting units, bridges, underpasses,
signs, traffic signals, crash
attenuators, landscaping, roadside
shelters, rest areas, fringe parking
facilities, sanitary facilities,
maintenance facilities including salt
storage buildings, vehicle weight
enforcement facilities including scale
houses, and other highway appurtenances,
provided such amount shall not exceed
funds to be made available from collections
from claims filed by the Department
to recover the costs of such damages.......... 5,500,000
For Maintenance, Traffic and Physical
Research Purposes (B)........................ 13,150,000
Total $53,829,100
HIGHWAY CONSTRUCTION AND LAND ACQUISITION
GRANTS AND AWARDS
Section 15. The following named amounts, or so much thereof as may be necessary, are appropriated from the Road Fund to the Department of Transportation for the objects and purposes hereinafter named:
For apportionment to counties for
construction of township bridges 20
feet or more in length as provided
in Section 6-901 through 6-906 of the
"Illinois Highway Code"...................... 15,000,000
For apportionment to needy Townships and
Road Districts, as determined by the
Department in consultation with the County
Superintendents of Highways, Township
Highway Commissioners, or Road District
Highway Commissioners........................ 10,014,300
For apportionment to high-growth cities over
5,000 in population, as determined by the
Department in consultation with the Illinois
Municipal League.............................. 4,000,000
For apportionment to counties
under 1,000,000 in population,
$8,000,000 of the total apportioned
in equal amounts to each eligible
county, and $13,800,000 apportioned
to each eligible county in proportion
to the amount of motor vehicle license
fees received from the residents of
eligible counties............................ 21,800,000
Total $50,814,300
HIGHWAY CONSTRUCTION AND LAND ACQUISITION
CONSTRUCTION
Section 20. The sum of $12,800,000, or so much thereof as may be necessary, is appropriated from the Road Fund to the Department of Transportation for Transportation Investment Generating Economic Recovery II (TIGER II) earmarks pertaining to State & local governments as designated in Division A of the Consolidated Appropriations Act, 2010, Public Law 111-117; provided such amounts do not exceed funds made available by the federal government through Congressional designations, annual allocations, obligation limitations, or any other federal limitations, as approximated below:
US-14 Underpass (Barrington)..................... 2,800,000
Warehouse District Complete Streets
Project (Peoria).............................. 10,000,000
Section 25. The sum of $720,000,000, or so much thereof as may be necessary, is appropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of State highways, arterial highways, roads, access areas, roadside shelters, rest areas fringe parking facilities and sanitary facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the Road Improvement Program as approximated below:
District 1, Schaumburg................................ ???
District 2, Dixon..................................... ???
District 3, Ottawa.................................... ???
District 4, Peoria.................................... ???
District 5, Paris..................................... ???
District 6, Springfield............................... ???
District 7, Effingham................................. ???
District 8, Collinsville.............................. ???
District 9, Carbondale................................ ???
Statewide (including refunds)......................... ???
Engineering................................... ???????????
Total $720,000,000
HIGHWAY CONSTRUCTION AND LAND ACQUISITION
LUMP SUMS
Section 30. The sum of $564,000,000 or so much thereof as may be necessary, is appropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program as approximated below:
District 1, Schaumburg................................ ???
District 2, Dixon..................................... ???
District 3, Ottawa.................................... ???
District 4, Peoria.................................... ???
District 5, Paris..................................... ???
District 6, Springfield............................... ???
District 7, Effingham................................. ???
District 8, Collinsville.............................. ???
District 9, Carbondale................................ ???
Statewide (including refunds)........................... 0
Engineering........................................ 0
Total $564,000,000
Section 35. The sum of $565,185,700, or so much thereof as may be necessary, is appropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the local portion of the Road Improvement Program as approximated below:
District 1, Schaumburg................................ ???
District 2, Dixon..................................... ???
District 3, Ottawa.................................... ???
District 4, Peoria.................................... ???
District 5, Paris..................................... ???
District 6, Springfield............................... ???
District 7, Effingham................................. ???
District 8, Collinsville.............................. ???
District 9, Carbondale................................ ???
Statewide (including refunds)................. ???,???,???
Total $565,185,700
Section 40. The sum of $3,200,000, or so much thereof as may be necessary, is appropriated from the Road Fund to the Department of Transportation for the local match of all other non-federally reimbursed expenses associated with the Transportation Investment Generating Economic Recovery II (TIGER II) earmarks specifically identified in Section X of this Article of this Act, provided such amounts do not exceed funds made available and paid in to the Road Fund by local governments.
GRADE CROSSING PROTECTION
CONSTRUCTION
Section 50. The sum of $39,000,000 or so much thereof as may be necessary, is appropriated from the Grade Crossing Protection Fund to the Department of Transportation for the installation of grade crossing protection or grade separations at places where a public highway crosses a railroad at grade, as ordered by the Illinois Commerce Commission, as provided by law.
DIVISION OF AERONAUTICS
AWARDS AND GRANTS
Section 55. The sum of $130,000,000 or so much thereof as may be necessary, is appropriated from the Federal/Local Airport Fund to the Department of Transportation for funding airport improvement projects, including reimbursements and/or refunds, undertaken pursuant to pertinent state or federal laws.
DIVISION OF PUBLIC AND INTERMODAL TRANSPORTATION
AWARDS AND GRANTS
Section 60. The sum of $33,000,000, or so much thereof as may be necessary, is appropriated from the Transportation Bond Series B Fund to the Department of Transportation for construction costs, making grants, and providing project assistance to airports pursuant to Section 34 of the Illinois Aeronautics Act, as amended, for such purposes as are described in the Section and for airport acquisition and development pursuant to Section 72 of the Illinois Aeronautics Act, as amended, for such purposes as are described in that Section, without regard to the fiscal year in which the service was rendered or the cost incurred.
Section 80. The sum of $38,000,000, or so much thereof as may be necessary, is appropriated from the Federal Mass Transit Trust Fund to the Department of Transportation for the federal share of capital, operating, consultant services, and technical assistance grants, as well as state administration and interagency agreements, provided such amounts shall not exceed funds to be made available from the Federal Government.
RAIL PASSENGER AND RAIL FREIGHT
AWARDS AND GRANTS
Section 95. The sum of $2,700,000, or so much thereof as may be necessary, is appropriated from the State Rail Freight Loan Repayment Fund to the Department of Transportation for funding the State Rail Freight Loan Repayment Program created by Section 49.25g-1 of the Civil Administrative Code of Illinois.
Section 105. The sum of $500,000, or so much thereof as may be necessary, is appropriated from the Rail Freight Loan Repayment Fund to the Department of Transportation for the Rail Freight Service Assistance Program, created by Section 49.25a through 49.25g-1 of the Civil Administrative Code of Illinois.
Section 110. No contract shall be entered into or obligation incurred or any expenditure made from an appropriation herein made in
Section 5 Permanent Improvements
Section 95 State Rail Freight Loan Repayment
Section 105 Federal Rail Freight Loan Repayment
of this Article until after the purpose and the amount of such expenditure has been approved in writing by the Governor.
Total, this Article $2,226,529,100
ARTICLE 45
DEPARTMENT OF TRANSPORTATION
PERMANENT IMPROVEMENTS
Section 5. The sum of $29,253,009, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the appropriation and reappropriation concerning Permanent Improvements heretofore made in Article 113, Section 5 and Article 114, Section 5 of Public Act 96-0956, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.
CONSULTANT AND PRELIMINARY ENGINEERING
Section 10. The sum of $7,593,442, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 10 of Public Act 96-0956, as amended, for Engineering and Consultant Contracts only, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.
Section 15. The sum of $6,265,236, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 15 of Public Act 96-0956, as amended, for Engineering and Consultant Contracts only, is reappropriated from the State Construction Fund to the Department of Transportation for the same purposes.
OTHER LUMP SUMS
Section 20. The sum of $9,110,803, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the appropriation and reappropriation concerning hazardous materials made in Article 113, Section 10 and Article 114, Section 20 of Public Act 96-0956, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.
Section 25. The sum of $40,026,120, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the appropriation and reappropriation made for Formal Contracts in the line item, “For Maintenance, Traffic and Physical Research Purposes (A)” for the Central Offices, Division of Highways, in Article 113, Section 10 and Article 114, Section 25 of Public Act 96-0956, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.
Section 30. The sum of $10,594,282, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the appropriation and reappropriation concerning Highway Damage Claims heretofore made in Article 113, Section 10 and Article 114, Section 30 of Public Act 96-0956, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.
HIGHWAY CONSTRUCTION AND LAND ACQUISITION
AWARDS AND GRANTS
Section 35. The sum of $27,655,202, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the appropriation and reappropriation heretofore made for township bridges in Article 113, Section 15 and Article 114, Section 35 of Public Act 96-0956, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.
Section 40. The sum of $400,046,849, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 40 of Public Act 96-0956, as amended, is reappropriated from the Transportation Bond Series D Fund to the Department of Transportation for grants to counties, municipalities, and road districts for planning, engineering, acquisition, construction, reconstruction, development, improvement, extension, and all construction related expenses of the public infrastructure and other transportation improvement projects which are related to economic development in the State of Illinois as allocated in Article 50, Section 36 of Public Act 96-0956.
HIGHWAY CONSTRUCTION AND LAND ACQUISITION
Section 50. The following named sums or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011 from the reappropriations heretofore made in Article 114, Section 50 of Public Act 96-0956, as amended, are reappropriated to the Department of Transportation from the Road Fund for the FY04 federal earmarks provided in Conference Report 108-401 which accompanies Public Law 108-199. Expenditures shall not exceed funds to be made available by the federal government.
Bridge Discretionary
North Avenue Bridge, Chicago..................... 324,335
National Corridor Planning & Development
City of Forsyth Frontage Road..................... 11,917
Ferry Boats/Terminal Facilities
Canal Corridor Association-Port of
LaSalle Project.................................. 400,000
Transportation & Community & System Preservation
Homewood, Illinois railroad station/
platform acquisition and improvement.............. 16,042
Village of Glencoe, Green Bay
Trail – North Branch Trail Connection............ 104,718
Section 115 Member Initiatives
Annie Glidden Road, DeKalb....................... 151,977
Convocation Center Roadway......................... 151,655
Great River Road in Mercer County................... 14,882
ITS – I-74 in Peoria............................... 750,000
Kaskaskia Regional Port District, access roads....... 9,586
Long Meadow Parkway Fox River Bridge
Crossing, Bolz Road.............................. 125,434
Sauk Trail Reconstruction
Improvements, Park Forest........................ 330,000
Sauk Village Industrial Park Access Road........... 472,494
St. Charles, Illinois, Fox River
Crossing at Red Gate Corridor.................... 430,342
US 51, Christian/Shelby Counties................... 900,129
West Grand Avenue. (from North
Western to N. California Ave.)................... 800,000
Total $4,993,511
Section 55. The following named sums or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from the reappropriations heretofore made in Article 114, Section 55 of Public Act 96-0956, as amended, are reappropriated to the Department of Transportation from the Road Fund for the FY05 federal earmarks provided in Conference Report 108-792 which accompanies Public Law 108-447. Expenditures shall not exceed funds to be made available by the federal government.
Bridge Discretionary
North-South Wacker Drive Reconstruction
in Chicago..................................... 1,916,666
Interstate Maintenance Discretionary
I-55 South Barrier, Darien Illinois............ 1,400,000
Section 117 Member Initiatives
171st Street reconstruction, East Hazel Crest...... 6,429
67th Street Pedestrian Underpass, Chicago
Lakefront........................................ 400,000
Camp Street upgrades, East Peoria.................. 271,882
Cermak and Kenton Avenues.......................... 835,058
Cicero Avenue lighting in University Park.......... 200,000
Des Plaines, Illinois alley, sidewalk
improvements...................................... 16,073
Fulton County Highway 6............................. 51,783
I-290 Cap, Oak Park................................ 980,808
KBS Railroad Hazard Elimination, Kankakee
County........................................... 300,000
MacArthur Boulevard Extension, Springfield......... 170,040
McHenry County / Crystal Lake Road................. 275,503
Milwaukee Avenue, Grand to Gale, Chicago............ 20,091
Route 178 relocation, Phase II Engineering......... 457,032
Sheridan Road Improvements, Evanston............... 340,421
Sidewalks near Ford Heights........................ 200,000
Street improvements and streetlights, Lynnwood....... 1,831
Street improvements, Bartonville................... 143,548
Street improvements, Village of Armington........... 13,620
Streetlights and salt dome for Markham............. 300,000
U.S. 41/I-176 Interchange improvements
Phase I study.................................... 800,000
Winfield Pedestrian Tunnel.......................... 98,400
Total $9,199,185
Section 60. The sum of $183,901,474, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 60 of Public Act 96-0956, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations.
Section 65. The sum of $154,260, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 65 of Public Act 96-0956, is reappropriated from the Road Fund to the Department of Transportation for Pavement Preservation Programs.
Section 70. The sum of $190,608,487, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 70 of Public Act 96-0956, is reappropriated from the Road Fund to the Department of Transportation for High Priority Projects (HPP) and Transportation Improvement Projects (TI) pertaining to local governments as designated in Public Law 109-59, Title I, Subtitle G, Section 1702 and Subtitle I, Section 1934 of the federal reauthorization act entitled SAFETEA-LU; provided such amounts do not exceed funds made available by the federal government through Congressional designations, annual allocations, obligation limitations, or any other federal limitations. Specific project approximations appear in Article 101, Section 25 of Public Act 94-0798.
Section 75. The sum of $12,352,091, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 75 of Public Act 96-0956, is reappropriated from the Road Fund to the Department of Transportation for Transportation, Community and System Preservation (TCSP), Discretionary Interstate Maintenance and Surface Transportation Priorities earmarks pertaining to state and local governments as designated in the Consolidated Appropriation Act, 2008, Division K, Public Law 110-161; provided such amounts do not exceed funds made available by the federal government through Congressional designations, annual allocations, obligation limitations, or any other federal limitations, as approximated in Article 35, Section 20 of Public Act 95-0734.
Section 80. The sum of $16,079,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 80 of Public Act 96-0956, is reappropriated from the Road Fund to the Department of Transportation for Transportation, Community and System Preservation (TCSP), Discretionary Interstate Maintenance, Federal Lands Highway Discretionary, and Surface Transportation Priorities earmarks pertaining to state and local governments as designated in the Omnibus Appropriations Act, 2009, Public Law 111-8; provided such amounts do not exceed funds made available by the federal government through Congressional designations, annual allocations, obligation limitations, or any other federal limitations, as approximated in Article 2, Section 20 of Public Act 96-0956.
Section 85. The sum of $8,242,390 or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 115, Section 05 of Public Act 96-0956, as amended, is reappropriated from the Road Fund to the Department of Transportation, for Transportation, Community and System Preservation (TCSP), Discretionary Interstate Maintenance, and Surface Transportation Priorities earmarks pertaining to state and local governments as designated in the Consolidated Appropriations Act, 2010, Public Law 111-11 117; provided such amounts do not exceed funds made available by the federal government through Congressional designations, annual allocations, obligation limitations, or any other federal limitations.
Section 90. The sum of $83,885,631, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriations heretofore made in Article 114, Section 85 and Section 90 of Public Act 96-0956, as amended, are reappropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations.
Section 95. The sum of $19,392,211, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 95 of Public Act 96-0956, as amended, are reappropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations.
Section 100. The sum of $6,070,590, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 100 of Public Act 96-0956, as amended, are reappropriated from the State Construction Account Fund to the Department of Transportation for all expenses related to Phase II of the I-57/294 interchange in the County of Cook.
Section 105. The sum of $62,155,845, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 105 of Public Act 96-0956, as amended, are reappropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations.
Section 110. The sum of $402,829,325, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 110 of Public Act 96-0956, as amended, are reappropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations.
Section 115. The sum of $452,024,657, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the appropriation heretofore made in Article 113, Section 25 of Public Act 96-0956, as amended, is reappropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations.
HIGHWAY CONSTRUCTION AND LAND ACQUISITION
LUMP SUMS
Section 120. The sum of $52,804,801, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 120 of Public Act 96-0956, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program, including refunds.
Section 125. The sum of $77,841,157, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 125 of Public Act 96-0956, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the local portion of the Road Improvement Program, including refunds.
Section 130. The sum of $50,785,622, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 130 of Public Act 96-0956, is reappropriated from the Road Fund to the Department of Transportation for the local match of all other non-federally reimbursed expenses associated with the High Priority Projects (HPP) and Transportation Improvement Projects (TI) specifically identified in Article 101, Section 25 of Public Act 94-0798, provided that such amounts do not exceed funds made available and paid into the Road Fund by local governments.
Section 135. The sum of $70,654,185, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 135 of Public Act 96-0956, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program, including refunds.
Section 140. The sum of $177,731,144, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 140 of Public Act 96-0956, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the local portion of the Road Improvement Program, including refunds.
Section 145. The sum of $246,128,725, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 145 of Public Act 96-0956, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program, including refunds.
Section 150. The sum of $300,002,344, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 150 of Public Act 96-0956, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the local portion of the Road Improvement Program, including refunds.
Section 155. The sum of $1,504,471, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 155 of Public Act 96-0956, is reappropriated from the Road Fund to the Department of Transportation for the local match of all other non-federally reimbursed expenses associated with the Transportation, Community and System Preservation (TCSP) and Discretionary Interstate Maintenance earmarks specifically identified in Article 35, Section 20a of Public Act 96-0734, provided that such amounts do not exceed funds made available and paid into the Road Fund by local governments.
Section 160. The sum of $88,038,799, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 160 of Public Act 96-0956, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations. (Emergency Repair Program)
Section 165. The sum of $73,631,856, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 165 of Public Act 96-0956, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program, including refunds.
Section 170. The sum of $284,706,477, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 170 of Public Act 96-0956, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the local portion of the Road Improvement Program, including refunds.
Section 175. The sum of $2,654,125, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 175 of Public Act 96-0956, is reappropriated from the Road Fund to the Department of Transportation for the local match of all other non-federally reimbursed expenses associated with the Transportation, Community and System Preservation (TCSP) and Discretionary Interstate Maintenance earmarks specifically identified in Article 2, Section 20 of Public Act 96-0956, provided that such amounts do not exceed funds made available and paid into the Road Fund by local governments.
Section 180. The sum of $895,900, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 115, Section 10 of Public Act 96-0956, as amended, is reappropriated from the Road Fund to the Department of Transportation, for the local match of all other non-federally reimbursed expenses associated with the Transportation, Community and System Preservation (TCSP) and Discretionary Interstate Maintenance earmarks specifically identified in Article 50, Section 16 of Public Act 96-0956, provided that such amounts do not exceed funds made available and paid into the Road Fund by local governments.
Section 185. The sum of $990,225,218, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the appropriation heretofore made in Article 113, Section 30 of Public Act 96-0956, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program, including refunds.
Section 190. The sum of $386,238,902, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the appropriation heretofore made in Article 113, Section 35 of Public Act 96-0956, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the local portion of the Road Improvement Program, including refunds.
BOND FUND
CONSTRUCTION
Section 195. The sum of $1,185,219,755, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from the appropriation and the reappropriations heretofore made in Article 113, Section 40 and Article 114, Section 180, Section 185 and Section 190 of Public Act 96-0956, as amended, for statewide purposes, is reappropriated from the Transportation Bond Series A Fund to the Department of Transportation for the same purposes.
Section 200. The sum of $2,735,391,800, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 200 of Public Act 96-0956, as amended, for statewide purposes, is reappropriated from the Transportation Bond Series D Fund to the Department of Transportation for the same purposes.
GRADE CROSSING PROTECTION
CONSTRUCTION
Section 205. The sum of $104,653,592, or so much thereof as may be necessary and remains unexpended, at the close of business on June 30, 2011, from the appropriation and reappropriation heretofore made for grade crossing protection or grade separation in Article 113, Section 50 and Article 114, Section 205 of Public Act 96-0956, as amended, is reappropriated from the Grade Crossing Protection Fund to the Department of Transportation for the same purpose.
DIVISION OF AERONAUTICS
AWARDS AND GRANTS
Section 210. The sum of $582,338,318, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the appropriation and reappropriation heretofore made in Article 113, Section 55 and Article 114, Section 210 of Public Act 96-0956, as amended, is reappropriated from the Federal/Local Airport Fund to the Department of Transportation for funding the local or federal share of airport improvement projects, including reimbursements and/or refunds, undertaken pursuant to pertinent state or federal laws, provided such amounts shall not exceed funds available from federal and/or local sources.
DIVISION OF AERONAUTICS
CONSTRUCTION
Section 220. The sum of $99,681,492, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 220 of Public Act 96-0956, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for expenses associated with land acquisition for the South Suburban Airport.
Section 225. The sum of $13,720,130, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 225 of Public Act 96-0956, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for expenses associated with land acquisition for the South Suburban Airport.
DIVISION OF PUBLIC AND INTERMODAL TRANSPORTATION
AWARDS AND GRANTS
Section 230. The following named sums, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriations heretofore made in Article 114, Section 230 of Public Act 96-0956, as amended, are reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for the same purposes as follows:
Pursuant to Section 4(b)(1) of the
General Obligation Bond Act, as amended......... 17,818
For the counties of Cook, DuPage,
Kane, Lake, McHenry and Will,
pursuant to Section 4(b)(2) of
the General Obligation Bond Act,
as amended..................................... 368,962
For the counties of the State
outside the counties of Cook,
DuPage, Kane, Lake, McHenry and
Will, pursuant to Section
4(b)(3) of the General Obligation
Bond Act, as amended............................. 1,355
Total $388,135
Section 235. The following named sums, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriations heretofore made in Article 114, Section 235 of Public Act 96-0956, as amended, are reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for the same purposes as follows:
Pursuant to Section 4(b)(1) of
the General Obligation Bond Act,
as amended.................................. 17,796,684
For the counties of the State
outside the counties of Cook,
DuPage, Kane, McHenry, and Will,
pursuant to Section 4(b)(1)
of the General Obligation Bond
Act, as amended.............................. 2,087,150
For the Department of Transportation's
Greenlight Program pursuant to
Section 4(b)(1) of the General
Obligation Bond Act, as amended.............. 5,522,613
Total $25,406,447
Section 240. The sum of $5,000,002, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the appropriation heretofore made in Article 05, Section 237 of Public Act 96-0957, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation to extend the metrolink rail-line to Mid-America Airport, including but not limited to, general infrastructure improvements authorized under Section 2705-305 of the Department of Transportation Law (20 ILCS 2705/2705-305) such as parking lot infrastructure upgrades, pedestrian access improvements, ingress and egress infrastructure and construction of a pedestrian overpass at the Southwestern Illinois College metrolink station.
Section 245. The sum of $47,291,849, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 240 of Public Act 96-0956, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for construction costs, making grants and providing project assistance to municipalities, special transportation districts, private non-profit carriers, mass transportation carriers and the Intercity rail program for the acquisition, construction, extension, reconstruction, and improvement of mass transportation facilities, including rapid transit, intercity rail, bus and other equipment used in connection therewith, as provided by law, pursuant to Section 4(b)(1) of the General Obligation Bond Act, as amended.
Section 250. The sum of $900,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 245 of Public Act 96-0956, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for construction costs, making grants and providing project assistance to the Regional Transportation Authority.
Section 255. The sum of $100,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 250 of Public Act 96-0956, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for construction costs, making grants and providing project assistance to municipalities, special transportation districts, private non-profit carriers, mass transportation carriers and the Intercity rail program for the acquisition, construction, extension, reconstruction, and improvement of mass transportation facilities, including rapid transit, intercity rail, bus and other equipment used in connection therewith, as provided by law, for the purpose of downstate public transit systems.
Section 260. The sum of $1,744,200,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 255 of Public Act 96-0956, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for construction costs, making grants and providing project assistance to the Regional Transportation Authority.
Section 265. The sum of $200,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 260 of Public Act 96-0956, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for construction costs, making grants and providing project assistance to municipalities, special transportation districts, private non-profit carriers, mass transportation carriers and the Intercity rail program for the acquisition, construction, extension, reconstruction, and improvement of mass transportation facilities, including rapid transit, intercity rail, bus and other equipment used in connection therewith, as provided by law, for the purpose of downstate public transit systems.
Section 270. The sum of $42,108,533, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the appropriation and reappropriation heretofore made in Article 113, Section 80 and Article 114, Section 265 of Public Act 96-0956, as amended, is reappropriated from the Federal Mass Transit Trust Fund to the Department of Transportation for the federal share of capital, operating, consultant services, and technical assistance grants, as well as state administration and interagency agreements, provided such amounts shall not exceed funds to be made available from the Federal Government.
DIVISION OF PUBLIC AND INTERMODAL TRANSPORTATION
LUMP SUMS
Section 275. The sum of $55,784,108, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 270 of Public Act 96-0956, as amended, is reappropriated from the Road Fund to the Department of Transportation for grants, road construction and all other costs relating to the Chicago Region Environmental and Transportation Efficiency (CREATE) program, provided such amounts not exceed funds made available by the federal government for this program.
Section 280. The sum of $297,349,264, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 275 of Public Act 96-0956, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for grants, road construction and all other costs relating to the Chicago Region Environmental and Transportation Efficiency (CREATE) program.
RAIL PASSENGER AND RAIL FREIGHT
AWARDS AND GRANTS
Section 285. The sum of $475,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 280 of Public Act 96-0956 as amended, is reappropriated from the Road Fund to the Department of Transportation for the Quad City Track Improvements capital grant designated in the Omnibus Appropriations Act, 2009, Public Law 111-8, provided such amounts do not exceed funds made available by the federal government.
Section 290. The sum of $18,704,736, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the appropriation and reappropriation heretofore made in Article 113, Section 95 and Article 114, Section 285 of Public Act 96-0956, as amended, is reappropriated from the State Rail Freight Loan Repayment Fund to the Department of Transportation for the same purposes.
Section 295. The sum of $10,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 290 of Public Act 96-0956, as amended, is reappropriated from the Federal High Speed Rail Trust Fund to the Department of Transportation for the federal share of the High Speed Rail Project.
Section 300. The sum of $200,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 115, Section 15 of Public Act 96-0956, as amended, is reappropriated from the Federal High Speed Rail Trust Fund to the Department of Transportation for grants, construction, and all other costs relating to high speed rail projects, provided such amounts not exceed funds made available by the federal government for this purpose.
Section 305. The sum of $26,918,673, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 295 of Public Act 96-0956, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for the same purposes.
Section 310. The sum of $150,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 300 of Public Act 96-0956, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for track and signal improvements, AMTRAK station improvements, rail passenger equipment, and rail freight facility improvements.
Section 315. The sum of $379,063,663, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 305 of Public Act 96-0956, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation to leverage federal funding in accordance with the Department of Transportation’s Federal Railroad Administration’s Capital Assistance for High Speed Rail Corridors and Intercity Passenger Rail Service Program and any other federal grant programs made available for capital and operating improvements for intercity passenger rail.
Section 320. The sum of $5,117,923, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from the appropriation and reappropriation concerning the federal share of the Rail Freight Loan Repayment Program heretofore made in Article 113, Section 105 and Article 114, Section 310 of Public Act 96-0956, as amended, is reappropriated from the Rail Freight Loan Repayment Fund to the Department of Transportation for the same purposes.
STIMULUS
HIGHWAY CONSTRUCTION AND LAND ACQUISITION
LUMP SUMS
Section 325. The sum of $344,118,062, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 315 of Public Act 96-0956, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the State portion, provided such amounts not exceed federal funds made available by the American Recovery and Reinvestment Act of 2009.
Section 330. The sum of $136,755,709, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 320 of Public Act 96-0956, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the State and Local portion, provided such amounts not exceed federal funds made available by the American Recovery and Reinvestment Act of 2009.
Section 335. The sum of $34,907,601, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 325 of Public Act 96-0956, as amended, is reappropriated from the Road Fund to the Department of Transportation to provide local funding for project expenses in excess of the Local portion of federal funds made available from the American Recovery and Reinvestment Act of 2009, provided such amounts do not exceed funds made available and paid into the Road Fund by the local governments.
STIMULUS
DIVISION OF AERONAUTICS
LUMP SUM
Section 340. The sum of $123,153,705 or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 330 of Public Act 96-0956, as amended, is reappropriated from the Federal/Local Airport Fund to the Department of Transportation for funding the federal share of airport improvement projects, including reimbursements and/or refunds, undertaken pursuant to pertinent state and federal laws, provided such amounts not exceed federal funds made available by the American Recovery and Reinvestment Act of 2009.
STIMULUS
DIVISION OF PUBLIC AND INTERMODAL TRANSPORTATION
LUMP SUMS
Section 345. The sum of $33,296,244 , or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 335 of Public Act 96-0956, as amended, is reappropriated from the Federal Mass Transit Trust Fund to the Department of Transportation for capital, operating, consultant services, and technical assistance grants, state administration, and intergovernmental and interagency agreements, provided such amounts not exceed federal funds made available by the American Recovery and Reinvestment Act of 2009.
Section 350. The sum of $300,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 340 of Public Act 96-0956, as amended, is reappropriated from the Road Fund to the Department of Transportation for grants, road construction and all other costs relating to the Chicago Region Environmental and Transportation Efficiency (CREATE) program, provided such amounts not exceed federal funds made available by the American Recovery and Reinvestment Act of 2009.
STIMULUS
RAIL PASSENGER AND RAIL FREIGHT
LUMP SUMS
Section 355. The sum of $285,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 345 of Public Act 96-0956, as amended, is reappropriated from the Road Fund to the Department of Transportation for track and signal improvements, AMTRAK station improvements, passenger rail equipment, and facility improvements, provided such amounts not exceed federal funds made available by the American Recovery and Reinvestment Act of 2009.
Section 360. The sum of $6,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 114, Section 350 of Public Act 96-0956, as amended, is reappropriated from the Road Fund to the Department of Transportation for track and signal improvements, rail freight equipment, and rail freight facility improvements, provided such amounts not exceed federal funds made available by the American Recovery and Reinvestment Act of 2009.
Section 370. The sum of $1,300,000,000 or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from the reappropriation heretofore made in Article 115, Section 20 and Article 114, Section 355 of Public Act 96-0956, as amended, is reappropriated from the Federal High Speed Rail Trust Fund to the Department of Transportation for grants, construction, and all other costs relating to high speed rail projects in compliance with the American Recovery and Reinvestment Act of 2009, provided such amounts not exceed funds made available by the federal government for this purpose.
Section 375. No contract shall be entered into or obligation incurred or any expenditure made from a reappropriation herein made in:
Section 5 Permanent Improvements
Section 40 Series D – Local Govt Grants
Section 195 Series A - Road Program
Section 200 Series D - Road Program
Section 215 Series B - Aeronautics
Section 220 Series B - Aeronautics
Section 225 Series B - Land Acquisition 3rd Airport
Section 230 Series B - Transit
Section 235 Series B – Transit
Section 240 Series B - Transit
Section 245 Series B - Transit
Section 250 Series B – Transit
Section 255 Series B - Transit
Section 260 Series B - Transit
Section 265 Series B - Transit
Section 280 Series B - Transit
Section 290 State Rail Freight Loan Repayment
Section 295 FHSRTF High Speed Rail-Federal
Section 305 Series B - Rail
Section 310 Series B - Rail
Section 315 Series B - Rail
Section 320 Federal Rail Freight Loan Repayment
of this Article until after the purpose and the amount of such expenditure has been approved in writing by the Governor.
Total, this Article $16,311,535,443
ARTICLE 50
CAPITAL DEVELOPMENT BOARD
Section 5. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Agriculture for the projects hereinafter enumerated:
ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
For Upgrading the Electrical System,
in addition to funds previously
appropriated.................................. 11,200,000
For Replacing Roofing Systems
on various buildings........................... 2,174,000
For providing life safety improvements
throughout the fairgrounds..................... 3,000,000
ILLINOIS STATE FAIRGROUNDS - DUQUOIN
For providing life safety improvements
throughout the fairgrounds..................... 3,000,000
Total $19,374,000
Section 10. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Central Management Services for the projects hereinafter enumerated:
CENTRAL COMPUTING FACILITY - SPRINGFIELD
For upgrading the HVAC and Electrical
Systems........................................ 5,078,000
RESEARCH AND COLLECTION CENTER - SPRINGFIELD
For replacing the chiller and cooling tower........ 350,000
ILLINOIS CENTER FOR REHABILITATION
AND EDUCATION (WOOD) - CHICAGO
For renovating for code compliance............... 1,004,000
ILLINOIS CENTER FOR REHABILITATION
AND EDUCATION (ROOSEVELT) - CHICAGO
For renovating the facility...................... 5,813,000
JAMES R. THOMPSON CENTER - CHICAGO
For upgrading and renovating elevators........... 4,932,000
For repairing the exterior....................... 5,000,000
STATEWIDE
For Renovating State Owned property.............. 4,000,000
For repairing or replacing roofs,
windows and exterior façade.................... 4,000,000
For upgrading and replacing HVAC systems......... 8,000,000
For planning and beginning the renovation
of the HVAC system at the James R.
Thompson Center................................ 2,500,000
Total $40,677,000
Section 15. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Courts of Illinois for the projects hereinafter enumerated:
SECOND DISTRICT APPELLATE COURT - ELGIN
For replacing the roofing systems.................. 241,000
THIRD DISTRICT APPELLATE COURT - OTTAWA
For upgrading security and
providing ADA improvements...................... 212,000
FIFTH DISTRICT APPELLATE COURT – MT. VERNON
For renovating the courthouse...................... 929,000
Total $1,382,000
Section 20. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Human Services for the projects hereinafter enumerated:
CHESTER MENTAL HEALTH CENTER
For replacing roofing systems...................... 416,000
ELGIN MENTAL HEALTH CENTER – KANE COUNTY
For renovating the central dietary,
in addition to funds
previously appropriated........................ 4,354,000
FOX DEVELOPMENTAL CENTER – DWIGHT
For planning and beginning the
power plant renovation......................... 2,000,000
JACKSONVILLE DEVELOPMENTAL CENTER
For upgrading the power plant.................... 2,278,000
KILEY DEVELOPMENTAL CENTER – WAUKEGAN
For upgrading the fire alarm
system and replacing sprinkler heads............. 481,000
LUDEMAN DEVELOPMENTAL CENTER – PARK FOREST
For renovating seven residences.................. 3,550,000
MADDEN MENTAL HEALTH CENTER – HINES
For renovating pavilions and
Administration building for
safety/security, in addition
to funds previously appropriated................. 625,000
MCFARLAND MENTAL HEALTH CENTER – SPRINGFIELD
For upgrading the electrical system.............. 3,101,000
MURRAY DEVELOPMENTAL CENTER – CENTRALIA
For renovating the central dietary
and residential kitchens....................... 5,028,000
RUSHVILLE
For planning and beginning a Treatment
And Detention facility......................... 3,000,000
SHAPIRO DEVELOPMENTAL CENTER – KANKAKEE
For upgrading steam and condensate lines......... 5,000,000
STATEWIDE
For replacing roofing systems.................... 6,500,000
For providing life safety improvements.......... 15,000,000
Total $51,333,000
Section 25. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Juvenile Justice for the projects hereinafter enumerated:
STATEWIDE
For replacing roofing systems.................... 5,000,000
For upgrading HVAC and utility systems........... 8,000,000
For upgrading security systems................... 5,000,000
Total $18,000,000
Section 30. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Corrections for the projects hereinafter enumerated:
DIXON CORRECTIONAL CENTER
For replacing the fire alarm
system in addition to funds
previously appropriated........................ 8,600,000
PINCKNEYVILLE CORRECTIONAL CENTER
Plan and Begin the correction of
Structural issues.............................. 1,000,000
STATEVILLE CORRECTIONAL CENTER
For constructing an X-House..................... 20,000,000
For constructing a centralized medical and
long-term facility............................ 55,000,000
STATEWIDE
For providing life safety improvements........... 7,000,000
For replacing roofing systems................... 10,000,000
For security systems and locks.................. 10,000,000
For upgrading HVAC and utility systems.......... 25,000,000
Total $136,600,000
Section 35. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Natural Resources for the projects hereinafter enumerated:
STATEWIDE
For rehabilitating dams.......................... 7,000,000
For upgrading campground electrical
and site utilities............................ 10,000,000
For replacing roofing systems.................... 3,000,000
For upgrading waste treatment
and sewage systems........................... 12,000,000
For renovating and replacing lodge,
concession and site office buildings........... 5,000,000
For rehabilitating and replacing bridges......... 3,000,000
For replacing and constructing
vault toilets.................................. 2,000,000
For replacing and upgrading
playground equipment............................. 500,000
Total $42,500,000
Section 40. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of State Police for the projects hereinafter enumerated:
ILLINOIS STATE POLICE CENTRAL HEADQUARTERS – SPRINGFIELD
For upgrading the HVAC system -
Facility Building.............................. 3,956,000
STATEWIDE
For upgrading firing ranges at the
following locations at the
approximate costs set forth below:............. 7,000,000
Elgin.................. 2,500,000
Pecatonica............. 2,300,000
Litchfield............. 2,200,000
For replacing radio communication
towers, equipment buildings and
installing emergency power generators
at the following locations: Chicago
Heights, Savanna, Fairfield, Niota,
Stockton, Beaver Dam and Crestwood............. 2,500,000
Total $13,456,000
Section 45. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Historic Preservation Agency for the projects hereinafter enumerated:
OLD STATE CAPITOL - SPRINGFIELD
For replacing elevators and
restoring the interior and exterior............ 3,819,000
MT. PULASKI COURTHOUSE STATE HISTORIC SITE
For restoring the interior
and exterior................................... 1,346,000
STATEWIDE
For repairing, renovating and
restoring Lincoln Historic Sites............... 7,000,000
Total $12,165,000
Section 50. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Veterans’ Affairs for the projects hereinafter enumerated:
QUINCY VETERANS HOME
For planning and beginning
cemetery renovation............................. $100,000
Life Safety Improvements/Upgrade HVAC,
Utilities & Roofing Systems.................... 8,000,000
MANTENO VETERANS HOME
For planning and beginning
cemetery renovation.............................. $70,000
For improving life safety
and upgrading HVAC and utility
systems........................................ 6,000,000
LASALLE VETERANS HOME
For improving life safety
and upgrading HVAC and utility
systems........................................ 4,000,000
ANNA VETERANS HOME
Life Safety Improvements/Upgrade HVAC,
Utilities & Roofing Systems.................... 2,000,000
For replacing the roof............................. 425,000
Total $20,595,000
Section 55. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Office of the Attorney General for the projects hereinafter enumerated:
For installing an emergency generator.............. 521,000
Section 60. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Revenue for the projects hereinafter enumerated:
STATEWIDE
For planning and beginning
security upgrades................................ 300,000
WILLARD ICE BUILDING - SPRINGFIELD
For upgrading building systems
and renovations............................... 15,000,000
Total $15,300,000
Section 65. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Office of the Architect for the projects hereinafter enumerated:
CAPITOL BUILDING - SPRINGFIELD
For replacing exterior doors
and vestibules................................. 5,703,000
For renovating the east
entrance for ADA compliance...................... 556,000
Total $6,259,000
Section 70. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Secretary of State for the projects hereinafter enumerated:
CAPITOL COMPLEX – SPRINGFIELD
For replacing steam absorption
Chillers......................................... 593,000
For upgrading HVAC and utility
systems, replacing roofs and
providing life safety improvements............. 5,000,000
For Capitol Complex roof......................... 1,670,000
MOTOR VEHICLE SERVICES – DIRKSEN PARKWAY – SPRINGFIELD
For upgrading the HVAC system,
replacing the roof and providing
life safety improvements...................... 15,854,000
Total $23,117,000
Section 75. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Military Affairs for the projects hereinafter enumerated:
CAMP LINCOLN – SPRINGFIELD
For land acquisition............................. 1,500,000
For installing a geothermal system ................ 400,000
NORMAL
For planning and beginning
a new readiness center......................... 6,500,000
STATEWIDE
For replacing roofing systems.................... 5,000,000
For upgrading mechanical and
utility systems and interior
and exterior renovations...................... 10,000,000
Total $23,400,000
Section 76. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Public Health for the projects hereinafter enumerated:
JOLIET
For planning and beginning renovation
and construction of a public health
laboratory...................................... 15,000,000
Section 80. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the projects hereinafter enumerated:
STATEWIDE
For the purposes of capital planning
and condition assessment and analysis............ 900,000
For providing surveys and
modifications to buildings
to meet requirements of
the federal Americans with
Disabilities Act............................... 5,000,000
For energy efficiency upgrades................... 5,000,000
For tuckpointing and exterior repairs............ 3,000,000
For upgrading elevators.......................... 5,000,000
For minor repairs and emergencies............... 12,000,000
For abatement of hazardous materials............. 5,000,000
For capital improvements........................ 13,000,000
Total $48,900,000
Section 85. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Illinois Board of Higher Education for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete work at the various higher education institutions. These appropriated amounts shall be in addition to any other appropriated amounts which can be expended for such purposes:
Chicago State University....................... 4,992,000
Eastern Illinois University................... .7,990,800
Governors State University..................... 2,940,900
Northeastern Illinois University............... 5,946,800
Western Illinois University................... 12,279,100
Illinois State University..................... 15,830,700
Northern Illinois University.................. 17,964,500
Southern Illinois University – Carbondale..... 25,187,500
Southern Illinois University – Edwardsville... 11,827,500
University of Illinois – Chicago.............. 43,047,600
University of Illinois – Springfield........... 3,551,600
University of Illinois – Urbana/Champaign..... 64,329,100
Illinois Community College Board.............. 94,111,900
Total $310,000,000
Section 90. In addition to any amounts previously appropriated for these purposes, the following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for the projects hereinafter enumerated:
JOLIET JUNIOR COLLEGE
For Construction/Building-out Academic
. Space – City Center Campus.................... 21,565,500
LINCOLN LAND COMMUNITY COLLEGE – TAYLORVILLE
For expanding the regional
education center in Taylorville................ 3,024,300
SAUK VALLEY COMMUNITY COLLEGE
For renovating natural sciences
Laboratories................................... 2,721,000
SOUTHEASTERN ILLINOIS COLLEGE – CARMI
For constructing a vocational
building in Carmi.............................. 1,310,700
SPOON RIVER COLLEGE – CANTON
For expanding and renovating
educational buildings.......................... 4,942,200
RICHARD J DALEY COLLEGE – CHICAGO
For an Industrial Technology Center............. 32,761,100
Total $66,324,800
Section 95. In addition to any amounts previously appropriated, the following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Board of Higher Education for the projects hereinafter enumerated:
CHICAGO STATE UNIVERSITY
For upgrading electrical systems................. 6,500,000
UNIVERSITY OF ILLINOIS – CHICAGO
For constructing an advanced chemical
technology facility, in addition to
funds previously appropriated................. 43,000,000
Total $49,500,000
Section 110. No contract shall be entered into or obligation incurred for any expenditure from appropriations made in this Article until after the purpose and amounts have been approved in writing by the Governor.
ARTICLE 55
CAPITAL DEVELOPMENT BOARD
Section 1. The sum of $45,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 116, Section 1 of Public Act 96-956, is reappropriated from the Capital Development Fund to the Capital Development Board for grants awarded under the Community Health Center Construction Act.
Section 2. The sum of $3,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 116, Section 2 of Public Act 96-956, is reappropriated from the Capital Development Fund to the Capital Development Board for grants to school-based health centers that are operated by a Community Health Center as defined in the federal Public Health Service Act (42 U.S.C. 254b).
Section 5. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from reappropriations heretofore made for such purposes in Article 116, Section 5 of Public Act 96-956, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Agriculture for the projects hereinafter enumerated:
ILLINOIS STATE FAIRGROUNDS - DUQUOIN
(From Article 116, Section 5 of Public Act 96-956)
For completing the upgrade of the
electrical distribution system, in
addition to funds previously
appropriated..................................... 100,759
For constructing a multi-purpose
building.......................................... 61,710
For Emergency Roof Replacement....................... 6,790
ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
For replacing the HVAC in
the administration building.................. $3,212,000
For replacing roofing systems –
Administration Building and
Lower Roof.................................... 1,200,256
Plan and begin electrical
system replacement.............................. 465,600
For replacement of water and sewer
service to various buildings...................... 76,977
For an airlock addition to Metrology
(Weights and Measures) Lab........................ 52,791
CENTRALIA ANIMAL DIAGNOSTICS LAB
For replacing the roof............................. 580,000
Total $5,756,883
Section 20. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from reappropriations heretofore made for such purposes in Article 116, Section 20 of Public Act 96-956, are reappropriated from the Capital Development Fund to the Capital Development Board for the Courts of Illinois for the projects hereinafter enumerated:
SPRINGFIELD - SUPREME COURT BUILDING
(From Article 116, Section 20 of Public Act 96-956)
Plan and begin renovation of
Supreme Court Building....................... 14,400,000
For renovating the HVAC system on
the 3rd Floor.................................... 140,000
For installing humidifier and water
filtration systems............................. 1,140,155
APPELLATE COURT SECOND DISTRICT - ELGIN
For miscellaneous improvements...................... 60,520
Total $15,740,675
Section 30. The following named amount, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 116, Section 30 of Public Act 96-956, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Courts of Illinois for the projects hereinafter enumerated:
SUPREME COURT BUILDING - SPRINGFIELD
(From Article 116, Section 30 of Public Act 96-956)
For renovating the Library and
completing HVAC, in addition to funds
previously appropriated.......................... 235,000
Section 35. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from reappropriations heretofore made for such purposes in Article 116, Section 35 of Public Act 96-956, are reappropriated from the Capital Development Fund to the Capital Development Board for the Office of the Architect of the Capitol for the projects hereinafter enumerated:
CAPITOL BUILDING - SPRINGFIELD
(From Article 116, Section 35 of Public Act 96-956)
For upgrading the HVAC systems
and for renovations to meet
compliance with ADA, in addition
to funds previously appropriated............. 42,868,604
For upgrades to life safety
protection systems in addition
to funds previously appropriated.............. 6,000,000
For equipment, remodeling and all other
costs related to the maintenance, renovation
or restoration of areas located in the
Capitol Building................................. 978,984
For all costs related to asbestos and
environmental abatement in the
Capitol Building................................. 223,176
Total $50,070,764
Section 40. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from reappropriations heretofore made in Article 116, Section 40 of Public Act 96-956, are reappropriated from the Capital Development Fund to the Capital Development Board for the Office of the Secretary of State for the projects hereinafter enumerated:
CAPITOL BUILDING - SPRINGFIELD
(From Article 116, Section 40 of Public Act 96-956)
For all costs related to the planning
and design of life safety and fire
protection system improvements, hazardous
material abatement, historical restoration
and construction in the Capitol Building......... 344,150
CAPITOL COMPLEX - SPRINGFIELD
For upgrading fire alarm panels.................. 771,000
Plan/begin upgrade of high voltage
distribution system........................... 1,500,000
For capital upgrades......................... 250,000,000
For completing the stone restoration, in
addition to funds previously appropriated........ 323,373
For demolition of 222 S. College,
and landscaping of Capitol Complex
in addition to funds previously
appropriated..................................... 963,567
For demolition of 222 South College
Building and landscaping of
Capitol Complex.................................. 585,151
To upgrade a high voltage monitoring
system............................................ 34,261
DRIVER SERVICES FACILITIES, NORTH, SOUTH AND
WEST - CHICAGO
For HVAC upgrades.............................. 2,074,000
(From Article 116, Section 40 of Public Act 96-956)
To upgrade electrical systems...................... 117,144
HOWLETT BUILDING- SPRINGFIELD
For upgrading the North Patio for
public safety................................... 461,000
For installing an emergency generator............ 791,000
For replacing roofing systems.................... 639,863
ILLINOIS STATE LIBRARY- SPRINGFIELD
For replacing the roofing system................. 107,785
MOTOR VEHICLE SERVICES FACILITY - SPRINGFIELD
For upgrading the fire alarm and
security systems.................................. 16,809
WILLIAM G. STRATTON BUILDING - SPRINGFIELD
For the planning, design, reconstruction,
and construction to renovate or replace
the Stratton Office Building, in addition
to funds previously appropriated............... 6,735,662
Total $265,464,765
Section 45. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from reappropriations heretofore made in Article 116, Section 45 of Public Act 96-956, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Office of the Secretary of State for the projects hereinafter enumerated:
CAPITOL COMPLEX – SPRINGFIELD
(From Article 116, Section 45 of Public Act 96-956)
For upgrading fire alarm systems in
two buildings.................................... 17,992
Total $17,992
Section 50. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from reappropriations heretofore made for such purposes in Article 116, Section 50 of Public Act 96-956, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Central Management Services for the projects hereinafter enumerated:
STATEWIDE
(From Article 116, Section 50 of Public Act 96-956)
For the renovation of state-owned property....... 2,000,000
For renovating state owned
property....................................... 1,473,803
For upgrading the building security
system at the James R. Thompson Center
and the State of Illinois building
in addition to funds previously
appropriated..................................... 655,000
For renovation of State-owned
property at the following
locations: Kenneth Hall Regional
Office Building, AIG (Franklin Complex)
Building, James R. Thompson Center,
Sangamo Complex (IEPA), Champaign Regional
Office Building (IEPA), Springfield
Regional Office Building, Natural
Resource Center (DNR) and Read -
Building (Elgin Mental Health Center)............ 990,523
CHICAGO MEDICAL CENTER - OFFICE AND LAB BUILDING
For installing an emergency generator
and upgrading the electrical system.............. 2,000,000
(From Article 116, Section 50 of Public Act 96-956)
For planning and beginning the renovation
of the facility.................................. 462,651
COLLINSVILLE REGIONAL OFFICE COMPLEX
For replacing the roof......................... 1,849,368
(From Article 116, Section 50 of Public Act 96-956)
To replace an emergency generator.................. 180,811
ELGIN REGIONAL OFFICE BUILDING
For upgrading the HVAC system.................. 2,461,000
ILLINOIS CENTER FOR REHABILITATION AND
EDUCATION (WOOD) - CHICAGO
For upgrading fire and safety systems............... 27,113
JAMES R. THOMPSON CENTER - CHICAGO
For the purpose of emergency stone
repair at the James R. Thompson Center......... 2,125,013
(From Article 116, Section 25 of Public Act 96-956)
For planning and beginning electrical
system and life safety system upgrades........ 1,000,000
For upgrading the HVAC system.................. 4,053,665
For installing an emergency generator............ 3,545,000
For rehabilitating exterior columns, in
addition to funds previously appropriated......... 68,730
For upgrading mechanical systems, in
addition to funds previously appropriated......... 27,341
KENNETH HALL REGIONAL OFFICE BUILDING – EAST ST. LOUIS
For design services for emergency parapet
wall repairs...................................... 22,656
MEDICAL CENTER (DCFS DISTRICT OFFICE) - CHICAGO
For replacing roof and upgrading
mechanical and electrical systems................ 321,956
MEDICAL CENTER ( EDWARDS CENTER) - CHICAGO
For medical center (Edwards Center)................ 449,968
MICHAEL A. BILANDIC BUILDING, CHICAGO
For upgrading HVAC and domestic water
system........................................... 697,486
ROCKFORD REGIONAL OFFICE BUILDING
For replacing Halon and upgrading
the air conditioning............................. 162,614
SPRINGFIELD - RESEARCH AND COLLECTION CENTER
For expanding surplus warehouse..................... 73,584
SPRINGFIELD - COMPUTER FACILITY
For upgrading the computer room and the
electrical system................................. 23,421
SPRINGFIELD REGIONAL OFFICE BUILDING
For emergency cooling tower replacement
at 4500 S. Sixth Street Road...................... 56,864
SUBURBAN NORTH REGIONAL OFFICE FACILITY, DES PLAINES
For renovating office space......................... 92,465
Total $24,821,032
Section 60. The following named amount, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 116, Section 60, of Public Act 96-956, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Central Management Services for the project hereinafter enumerated:
ILLINOIS CENTER FOR REHABILITATION AND EDUCATION
(ROOSEVELT) – CHICAGO
(From Article 116, Section 60 of Public Act 96-956)
For upgrading the kitchen and plumbing............. 185,838
Total $185,838
Section 65. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from appropriations and reappropriations heretofore made for such purposes in Article 116, Section 65 of Public Act 96-956, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Natural Resources for the projects hereinafter enumerated:
BABE WOODYARD STATE NATURAL AREA -
VERMILION COUNTY
(From Article 116, Section 65 of Public Act 96-956)
For developing the site and associated
land acquisition................................. 244,604
BIG RIVER STATE FOREST
For ADA improvements............................... 322,611
BUFFALO ROCK STATE PARK – LASALLE COUNTY
For replacing the septic system, in
addition to funds previously
appropriated..................................... 623,901
CARLYLE LAKE STATE PARKS
For road and site improvements at
Carlyle Lake................................... 1,477,424
For infrastructure and site
improvements at Carlyle Lake..................... 765,485
CARLYLE STATE FISH AND WILDLIFE AREA – FAYETTE COUNTY
To replace Cox Bridge at Carlyle State
Fish and Wildlife Area........................... 550,000
EAGLE CREEK STATE PARK - SHELBY COUNTY
For constructing lake access boat
docks at resort.................................. 248,793
FERNE CLYFFE STATE PARK - JOHNSON COUNTY
For replacing the campground
sewage treatment system.......................... 365,054
GIANT CITY STATE PARK - JACKSON COUNTY
For replacing the sewer treatment system........... 482,036
GOOSE LAKE PRAIRIE NATURAL AREA - GRUNDY COUNTY
For replacing floating boardwalk.................... 24,604
HENNEPIN CANAL PARKWAY STATE PARK AND ACCESS AREA
For rehabilitating/repairing railroad
bridges, in addition to funds
previously appropriated.......................... 851,685
HORSESHOE LAKE CONSERVATION AREA - ALEXANDER COUNTY
For dam rehabilitation and the State's share
to implement the ecological restoration
plan in cooperation with the U.S.
Army Corps of Engineers, and
land acquisition................................. 842,605
I & M Canal - CHANNAHON – GRUNDY COUNTY
For repair of the spillway, in addition
to funds previously appropriated................. 364,320
For improving DuPage River Spillway................. 30,730
For replacing Lock 14 Bridge....................... 319,561
For improving the DuPage River Spillway............ 853,884
ILLINOIS BEACH STATE PARK - LAKE COUNTY
For stabilizing shoreline........................ 1,000,000
(From Article 116, Section 65 of Public Act 96-956)
For replacing sanitary sewer line................... 78,306
For replacing sanitary sewer lines.................. 28,293
JAKE WOLF MEMORIAL FISH HATCHERY
For replacing or upgrading
electrical system................................ 348,000
MORAINE HILLS STATE PARK – MCHENRY COUNTY
For replacing yellow-head marshy dam culverts...... 400,000
NAUVOO STATE PARK
For ADA improvements............................... 312,215
PERE MARQUETTE STATE PARK – JERSEY COUNTY
For replacing lodge pool dehumidifier,
in addition to funds previously
appropriated..................................... 676,845
For design services to replace a lodge
pool dehumidifier................................. 54,268
For emergency replacement of a sewage
treatment plant.................................. 352,741
PYRAMID STATE PARK
(From Article 116, Section 30 of Public Act 96-956)
For renovating the Galum building for a
mine rescue station.............................. 808,670
RED HILLS STATE PARK – LAWRENCE COUNTY
For miscellaneous improvements...................... 44,740
RESEARCH & COLLECTIONS CENTER - SPRINGFIELD
For renovating the interior......................... 17,796
ROCK CUT STATE PARK - WINNEBAGO COUNTY
For rehabilitating water and sewer
system........................................... 350,000
SILOAM SPRINGS STATE PARK – ADAMS COUNTY
For rehabilitating office/service area........... 1,119,114
STEPHEN A. FORBES STATE PARK, MARION COUNTY
For replacing dump and fish cleaning
stations, in addition to funds
previously appropriated........................... 14,925
For design services to replace dump and
fish cleaning stations............................ 26,188
WORLD SHOOTING COMPLEX – SPARTA
For infrastructure improvements.................... 426,399
SPRINGFIELD
For constructing an office building and
interpretive center.............................. 166,153
STARVED ROCK STATE PARK AND LODGE
For replacing roofing systems...................... 500,000
WAYNE FITZGERRELL STATE RECREATION AREA
For replacing roofs................................ 247,875
WHITE PINES FOREST STATE PARK - OGLE COUNTY
For completing the replacement of the
sewer system, in addition to funds
previously appropriated........................... 10,907
WILDLIFE PRAIRIE PARK
For rehabilitating the sewage
treatment plant.................................. 683,164
For upgrading sewage treatment plant............. 1,032,000
STATEWIDE
For replacing/repairing the roofing systems
at the following locations at the approximate
cost set forth below............................ 245,000
Clinton Lake Recreational
Area - DeWitt County.................. 65,000
Ferne Clyffe State Park-
Johnson County....................... 20,000
Hennepin Canal Parkway
State Park........................... 26,000
Lake Le-Aqua-Na State Park-
Stephenson County.................... 39,000
Mermet Lake Conservation Area-
Massac County........................ 95,000
For replacing/repairing the roofing systems
at the following locations at the approximate
costs set forth below............................ 115,267
Starved Rock State Park &
Lodge-LaSalle County.................. 4,726
Kaskaskia River Fish & Wildlife
Area-Randolph County................. 19,500
Pyramid State Park-
Perry County.......................... 4,109
Region V Office (Benton)
Franklin County...................... 86,932
For rehabilitating dams and bridges................ 116,946
For constructing, replacing and
renovating lodges and concession
buildings........................................ 878,761
For replacing roofs at the following locations,
at the approximate cost set forth below.......... 134,931
Shabbona Lake State
Park................................. 40,850
Hennepin Canal Parkway
State Park........................... 15,750
Randolph Fish &
Wildlife Area........................ 32,271
Dixon Springs State
Park................................. 46,060
For replacing and constructing vault
toilets at the following locations,
at the approximate cost set forth
below............................................ 167,772
Hennepin Canal Parkway
State Trail......................... 167,772
For rehabilitating dams at the
following locations, at the
approximate cost set forth below................. 108,607
Rock Cut State Park................. 108,607
For replacing roofs at the following
locations, at the approximate
cost set forth below............................. 206,925
Southern IL Arts &
Crafts Center.......................... 412
Frank Holten State Park................. 412
DNR Geological Survey-
Champaign.............................. 413
Sangchris Lake State
Park................................. 5,291
Illini State Park..................... 1,692
Shelbyville Fish &
Wildlife Area....................... 79,480
Trail of Tears State
Forest............................... 3,685
Sanganois Conservation Area............. 413
Rice Lake State Park................. 28,090
Hidden Spring State Park............. 53,740
Siloam Springs State Park............. 2,417
Mississippi Palisades
State Park.......................... 30,880
For replacing vault toilets at the following
locations, at the approximate cost set forth
below............................................ 285,813
Anderson Lake Conservation Area -
Fulton/Schuyler Counties........... 71,453
Giant City State Park -
Jackson/Union Counties............. 71,453
Randolph County Conservation Area... 71,453
Silver Springs State Park -
Kendall County.................... 71,454
For constructing hazardous material storage
buildings.......................................... 9,935
For constructing vault toilets at the
following locations at the approximate
cost set forth below:............................ 137,897
Apple River Canyon State Park........ 19,699
Des Plaines Conservation Area........ 19,700
Kankakee River State Park............ 19,700
Lake Le-Aqua-Na State Park........... 19,699
Marshall County Conservation Area.... 19,700
Morrison-Rockwood State Park......... 19,699
Rice Lake Conservation Area.......... 19,700
For planning, construction, reconstruction,
land acquisition and related costs,
utilities, site improvements, and all other
expenses necessary for various capital
improvements at parks, conservation areas,
and other facilities under the jurisdiction
of the Department of Natural Resources........... 415,159
Total $19,888,909
Section 75. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from reappropriations heretofore made in Article 116, Section 75 of Public Act 96-956, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Natural Resources for the project hereinafter enumerated:
GOOSE LAKE PRAIRIE NATURAL AREA - GRUNDY COUNTY
(From Article 116, Section 75 of Public Act 96-956)
For rehabilitating visitor's center
exterior.......................................... 23,345
Total $23,345
Section 80. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from reappropriations heretofore made for such purposes, Article 116, Section 80 of Public Act 96-956, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Corrections for the projects hereinafter enumerated:
CENTRALIA CORRECTIONAL CENTER
(From Article 116, Section 80 of Public Act 96-956)
For replacing roofing systems.................... 3,313,683
For replacing the cooling tower.................... 201,948
To upgrade a sewage treatment plant................. 66,918
DIXON CORRECTIONAL CENTER
For replacing the fire alarm system............ 2,078,389
For planning the upgrade and expansion
of the medical care facility...................... 24,127
DWIGHT CORRECTIONAL CENTER
For renovating Housing Unit C8, in
addition to funds previously
appropriated..................................... 270,000
For renovating buildings, in addition
to funds previously appropriated................. 274,847
For renovation of buildings......................... 30,261
For repair and replacement of roofing
system............................................ 18,721
EAST MOLINE CORRECTIONAL CENTER
For upgrading the roofing system................... 439,642
For replacing windows, in addition
to funds previously appropriated.................. 42,450
GRAHAM CORRECTIONAL CENTER
For upgrading the mechanical system................. 14,439
HARDIN COUNTY WORK CAMP
To upgrade a sewage treatment plant................. 23,581
ILLINOIS RIVER CORRECTIONAL CENTER – CANTON
For replacing domestic hot water
heater, in addition to
funds previously appropriated.................... 625,000
For design services to replace a domestic
hot water heater.................................. 13,763
ILLINOIS YOUTH CENTER - HARRISBURG
For constructing a multi-purpose medical,
vocational and confinement building.............. 322,181
For utility upgrade, including gas
and sewer...................................... 4,682,876
ILLINOIS YOUTH CENTER - ST. CHARLES
For constructing an R & C building
and other improvements......................... 1,957,557
JACKSONVILLE CORRECTIONAL CENTER
For upgrading the fire alarm system............ 1,573,158
LINCOLN CORRECTIONAL CENTER
For upgrading the building
automation system............................. 2,147,000
For replacing doors and locks....................... 31,592
LOGAN CORRECTIONAL CENTER
For replacing housing unit roofs................. 820,930
(From Article 116, Section 80 of Public Act 96-956)
For planning and beginning the upgrade
of the power plant............................... 155,805
For renovating the electrical
distribution system.............................. 159,995
For constructing a medical building
and dietary building............................. 729,328
MENARD CORRECTIONAL CENTER - CHESTER
For replacing the administration building,
in addition to funds previously
appropriated.................................. 11,395,000
For replacing the Administration
Building......................................... 100,123
For replacing toilets and waste lines
at E/W Cellhouse and upgrade
North Cellhouse plumbing......................... 364,351
For renovation or replacement of the
Old Hospital Building, in addition to
funds previously appropriated..................... 35,574
For planning and construction of the
Administration Building.......................... 513,777
PONTIAC CORRECTIONAL CENTER
For replacing doors and frames................... 1,620,000
SHAWNEE CORRECTIONAL CENTER
For replacing the emergency generator............... 44,867
SOUTHWESTERN CORRECTIONAL CENTER
For replacing the roofing system................. 782,716
STATEVILLE CORRECTIONAL CENTER - JOLIET
For replacing the X House locks................ 1,597,000
For the emergency compressor
failure at Stateville RNC........................ 874,470
For replacing doors and locks...................... 580,000
For replacing windows in B House................... 126,480
For replacing power plant and
utility distribution system....................... 17,454
For upgrading electrical system and elevator
and installing HVAC system....................... 349,307
TAYLORVILLE CORRECTIONAL CENTER
For replacing operators and
main gates, in addition to
funds previously appropriated................... 300,000
For design services to replace operators
and main gates.................................... 18,527
VANDALIA CORRECTIONAL CENTER
For an emergency generator......................... 815,000
For replacing roofing systems.................... 2,343,000
For constructing a multi-purpose program
building.......................................... 90,656
For converting Administration Building and
planning construction of an Administration/
Health Care Unit................................. 308,406
For replacement of roofing system.................. 130,332
VIENNA CORRECTIONAL CENTER
For replacing windows.......................... 2,118,000
For replacing roofing systems.................... 917,205
For replacing the cooler and freezer............... 356,663
For upgrading the power plant....................... 20,234
For upgrading the HVAC system and replacing
water lines in six housing units................. 423,601
For emergency roof replacement on
various buildings................................ 155,698
STATEWIDE
For the purpose of funding all
costs associated with constructing
an X-House..................................... 2,000,000
For the purpose of funding all costs
associated with constructing a
Centralized Medical and
Long-Term Care Facility........................ 5,340,000
For upgrading roofing systems at the
following locations at the approximate
costs set forth below.............................. 76,642
Hardin County Work Camp................ 8,808
Illinois Youth Center Joliet.......... 33,917
Pontiac Correctional Center........... 33,917
For replacing doors and locks
at the following locations at the
approximate costs set forth below.............. 1,016,068
Dixon Correctional Center........... 992,187
Vienna Correctional Center........... 23,881
For upgrading water towers at the following
locations at the approximate
cost set forth below........................... 1,626,865
Dixon Correctional
Center............................. 388,482
Illinois Youth Center -
St. Charles...................... 1,228,853
Illinois Youth Center -
Valley View.......................... 9,530
For planning, design, construction, equipment
and all other necessary costs for a
maximum security facility..................... 77,469,151
For planning a medium security facility
and land acquisition........................... 2,629,428
For replacing roofing systems at
the following locations at the
approximate cost set forth below................. 150,461
Menard Correctional Center............ 6,194
Vienna Correctional Center........... 81,080
Illinois Youth Center -
Harrisburg.............................. 10
Pontiac Correctional Center.............. 10
Illinois Youth Center - Joliet....... 63,167
For replacing or upgrading security and
monitoring systems at the following
locations at the approximate cost set
forth below...................................... 278,707
Vienna Correctional
Center............................. 250,000
Pontiac Correctional
Center................................... 0
Joliet Correctional
Center.............................. 28,707
For planning and replacing windows at the
following locations at the approximate cost
set forth below................................ 2,226,942
Vienna Correctional
Center........................... 1,780,000
Sheridan Correctional
Center............................. 314,454
Illinois Youth Center -
Valley View.......................... 8,310
Illinois Youth Center -
Joliet.............................. 74,875
Dixon Correctional
Center.............................. 46,073
Shawnee Correctional
Center............................... 3,230
For replacing security fencing at the
following locations at the approximate
cost set forth below............................. 292,225
Hill Correctional
Center............................... 3,547
Western IL Correctional
Center.............................. 30,864
Joliet Correctional
Center.............................. 49,119
Logan Correctional
Center............................. 158,964
Dixon Correctional
Center............................... 8,694
Shawnee Correctional
Center............................... 5,269
Graham Correctional
Center.............................. 24,369
Danville Correctional
Center.............................. 11,399
For planning, design, construction, equipment
and all other necessary costs for a
female multi-security level
correctional center........................... 55,938,782
For replacing roofing systems at the
following locations at the approximate
cost set forth below............................. 130,115
Vienna Correctional Center......... 108,867
Sheridan Correctional Center............ 10
Western Illinois Correctional
Center - Mt. Sterling.............. 21,238
For upgrading fire and safety systems at
the following locations at the approximate
costs set forth below, in addition to
funds previously appropriated.................. 1,162,289
Menard Correctional Center -
Chester........................... 979,592
Sheridan Correctional Center....... 110,620
Vienna Correctional Center.......... 72,077
Total $196,754,307
Section 85. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from reappropriations heretofore made for such purpose in Article 116, Section 85, of Public Act 96-956, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Corrections for the projects hereinafter enumerated:
BIG MUDDY CORRECTIONAL FACILITY
(From Article 116, Section 85 of Public Act 96-956)
For replacing door locking controls
and intercom systems........................... 2,221,298
STATEVILLE CORRECTIONAL CENTER
For installing fire alarm systems................ 1,600,000
Total $3,821,298
Section 86. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from appropriations heretofore made in Article 116, Section 86 of Public Act 96-956, are reappropriated from the Capital Development Fund to the Capital Development Board for the projects hereinafter enumerated:
ILLINOIS YOUTH CENTER - JOLIET
(From Article 116, Section 86 of Public Act 96-956)
For replacing roofs, in addition
to funds previously appropriated................. 425,874
ILLINOIS YOUTH CENTER – KEWANEE
For replacing the sprinkler system............... 6,382,950
ILLINOIS YOUTH CENTER - PERE MARQUETTE
For replacing roofs................................ 221,000
ILLINOIS YOUTH CENTER - ST. CHARLES
For upgrading HVAC system.......................... 606,000
Total $7,635,824
Section 90. The sum of $177,999, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 116, Section 90 of Public Act 96-956, is reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Emergency Management Agency for costs associated with a new State Emergency Operations Center.
Section 95. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from appropriations and reappropriations heretofore made for such purposes in Article 116, Section 95 of Public Act 96-956, are reappropriated from the Capital Development Fund to the Capital Development Board for the Historic Preservation Agency for the projects hereinafter enumerated:
BLACK HAWK STATE HISTORIC SITE – ROCK ISLAND
(From Article 116, Section 95 of Public Act 96-956)
For renovating a retaining wall and two
shelters ........................................ 179,432
CAHOKIA MOUNDS HISTORIC SITE - COLLINSVILLE
For replacement of Monk's Mounds stairs............ 211,080
For restoration of Monk's Mound.................... 606,489
For purchasing private land within historic
site boundary.................................... 189,979
To create a new entrance around existing
bronze artwork doors.............................. 67,301
DANA THOMAS HOUSE STATE HISTORIC SITE
To rehabilitate the interior and exterior
at Dana Thomas House State Historic Site....... 2,976,875
JARROT MANSION STATE HISTORICAL SITE
For restoring the mansion, site improvements
and land acquisition, in addition
to funds previously appropriated............... 1,447,021
LINCOLN-HERNDON LAW OFFICE - SPRINGFIELD
For purchase and restoration
of the Tinsley Shop............................ 1,000,000
LINCOLN LOG CABIN STATE HISTORIC SITE, COLES COUNTY
To replace a sewer system at Historic Site.......... 11,918
LINCOLN'S TOMB/VIETNAM MEMORIAL - SPRINGFIELD
For rehabilitating site and providing
irrigation system................................ 110,011
LINCOLN’S TOMB - SPRINGFIELD
For renovating the interior........................ 700,000
For replacing the HVAC system,
in addition to funds
previously appropriated.......................... 172,631
LINCOLN'S NEW SALEM HISTORIC SITE - MENARD COUNTY
For providing electrical at
campgrounds...................................... 110,444
LINCOLN PRESIDENTIAL CENTER - SPRINGFIELD
For constructing library and museum complex, in
addition to funds previously appropriated...... 2,505,208
OLD STATE CAPITOL - SPRINGFIELD
For repairing elevators............................ 387,464
UNION STATION - SPRINGFIELD
For purchasing and rehabilitating................... 21,721
STATEWIDE
For statewide ISTEA 21 Match....................... 394,032
For matching ISTEA federal grant funds............. 143,310
Total $11,234,916
Section 105. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from reappropriations heretofore made in Article 116, Section 105, of Public Act 96-956, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Historic Preservation Agency for the projects hereinafter enumerated:
MT. PULASKI COURTHOUSE HISTORIC SITE - LOGAN COUNTY
(From Article 116, Section 105 of Public Act 96-956)
For rehabilitating interior & exterior.............. 24,118
PULLMAN HISTORIC SITE
For all costs associated with the
stabilization and restoration of the
Pullman Historic Site.......................... 1,132,661
Total $1,156,779
Section 110. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from reappropriations heretofore made for such purposes in Article 116, Section 110 of Public Act 96-956, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Human Services for the projects hereinafter enumerated:
ALTON MENTAL HEALTH CENTER - MADISON COUNTY
(From Article 116, Section 110 of Public Act 96-956)
For life/safety improvements....................... 910,343
For renovating the Forensic Complex and
constructing two building additions, in
addition to funds previously appropriated...... 3,900,000
For constructing two building additions
at the Forensic Complex........................ 6,780,876
For rehabilitation of the central dietary............ 9,179
CHESTER MENTAL HEALTH CENTER
For completing the replacement of
smoke and heat detectors, in addition
to funds previously appropriated................. 440,000
For upgrading HVAC systems......................... 144,664
For replacing smoke/heat detectors.................. 37,133
CHICAGO-READ MENTAL HEALTH CENTER - CHICAGO
For renovating Unit J-East for
forensic use, in addition to
funds previously appropriated.................. 3,500,000
For replacing the emergency
generator...................................... 1,369,500
For design services to renovate Unit
J-East for forensic use........................... 47,560
CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER - ANNA
For upgrading the fire alarm system.............. 2,085,000
For life/safety improvements..................... 7,255,748
(From Article 116, Section 110 of Public Act 96-956)
For renovating Sycamore Hall........................ 94,930
For renovating Sycamore.......................... 4,385,000
ELGIN MENTAL HEALTH CENTER - KANE COUNTY
For converting the Read Building
for office space, in addition
to funds previously appropriated............... 1,750,000
For replacing power plant and engineering
building....................................... 4,925,502
For renovating the central dietary
and kitchen.................................... 3,704,073
For construction of roads, parking lots
and street lights................................ 133,664
FOX DEVELOPMENTAL CENTER - DWIGHT
For upgrading fire/life safety systems............. 342,166
For replacing and repairing interior doors,
flooring and walls, in addition to funds
previously appropriated.......................... 249,122
For planning and beginning replacement
of interior doors and flooring
and repairing walls in the Main and
Administration Buildings.......................... 35,888
HOWE DEVELOPMENTAL CENTER - TINLEY PARK
For completing upgrade of tunnels,
Phase II, in addition to funds previously
appropriated..................................... 366,920
For renovating residences, in addition to
funds previously appropriated..................... 85,209
ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
For replacing the roof on the main
building and renovating the bathrooms
in three dormitories........................... 3,658,853
For installing sprinkler systems
in the dormitories and elementary
buildings...................................... 3,841,000
For renovating the High School Building
Phase II......................................... 135,066
For renovating High School Building................. 96,859
ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE
For replacing roofs................................ 392,832
For renovating auditorium, classroom
and administration buildings................... 2,026,155
For renovating classrooms in Building 17......... 1,250,724
For renovations to the powerhouse,
boilers and associated coal and ash
equipment......................................... 37,501
For renovating the power house..................... 656,458
JACKSONVILLE DEVELOPMENTAL CENTER - MORGAN COUNTY
For upgrading fire/life safety systems............. 581,000
For planning and beginning the renovation
of the power house................................ 37,297
KILEY DEVELOPMENTAL CENTER - WAUKEGAN
For improving power reliability and
installing emergency lighting, in
addition to funds previously
appropriated..................................... 940,000
For upgrading Building C ceiling................... 444,000
For converting the facility to natural
gas, in addition to funds previously
appropriated..................................... 112,391
For renovating homes, Phase II, in
addition to funds previously
appropriated...................................... 77,343
LINCOLN DEVELOPMENTAL CENTER - LOGAN
For various capital improvements,
including planning and construction
of four ten-bed transitional or
residential homes................................ 582,596
LUDEMAN DEVELOPMENTAL CENTER - PARK FOREST
For upgrading the electrical panel................. 175,717
For repairing and replacing furnaces and
duct work, in addition to funds previously
appropriated...................................... 41,569
For renovating residential and neighborhood
homes, in addition to funds previously
appropriated...................................... 45,810
For replacing plumbing, HVAC and
boiler systems.................................... 47,586
For renovation of residential buildings,
in addition to funds previously
appropriated...................................... 73,252
MABLEY DEVELOPMENTAL CENTER - DIXON
For replacing mechanicals and upgrading
the fire alarm systems............................ 38,840
MADDEN MENTAL HEALTH CENTER - HINES
For renovating residential pavilions,
in addition to funds previously
appropriated..................................... 550,000
For renovating pavilions and
administration building for safety/
security, in addition to
funds previously appropriated.................... 621,882
For renovating dietary............................. 729,885
For renovation of pavilions, in addition
to funds previously appropriated.................. 60,833
MCFARLAND MENTAL HEALTH CENTER - SPRINGFIELD
For upgrading fire alarm system.................. 2,711,688
For replacing roofs – Kennedy and
Administration Building........................ 2,167,409
MURRAY DEVELOPMENTAL CENTER - CENTRALIA
For completing the renovation of
the boiler house, in addition to
funds previously appropriated.................. 2,991,120
SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
For replacing the sewer system in
south campus................................... 2,056,004
For planning and beginning renovation
of dietary....................................... 203,263
For work necessary to remedy fire
damper deficiencies.............................. 117,020
For replacing water mains and valves,
in addition to funds previously
appropriated..................................... 210,015
SINGER MENTAL HEALTH CENTER - ROCKFORD
For upgrading fire alarm systems.................... 47,651
For renovating dietary and stores................... 55,334
For renovating mechanicals and
residential areas................................ 691,943
TINLEY PARK MENTAL HEALTH CENTER – COOK COUNTY
For completing the upgrade of fire
and life/safety issues in Oak Hall,
in addition to funds previously
appropriated..................................... 600,000
STATEWIDE
For replacing roofing systems at
the following locations, at the
approximate costs set forth below................ 244,866
Chicago-Read Mental
Health Center - Cook
County............................. 148,645
Fox Developmental
Center - Dwight..................... 11,932
Kiley Developmental Center -
Waukegan............................ 84,289
For replacing and repairing roofing systems
at the following locations, at the
approximate cost set forth below................... 35,240
Alton Mental Health Center -
Madison................................ 5,873
Shapiro Developmental Center -
Kankakee............................... 5,873
Ludeman Developmental Center -
Park Forest............................ 5,873
Madden Mental Health Center -
Hines.................................. 5,873
Murray Developmental Center -
Centralia.............................. 5,874
Kiley Developmental Center -
Waukegan............................... 5,874
For replacing and repairing roofing
systems at the following locations, at
the approximate cost set forth below............. 558,859
Chicago-Read Mental Health
Center.............................. 13,767
Howe Developmental Center -
Tinley Park........................ 488,032
Shapiro Developmental Center -
Kankakee............................ 42,392
Illinois School for the
Deaf - Jacksonville................. 12,087
Kiley Developmental
Center - Waukegan.................... 2,581
For repairing or replacing roofs
at the following locations, at
the approximate cost set forth below............. 188,248
Illinois School for the
Visually Impaired -
Jacksonville........................ 37,624
Jacksonville Developmental
Center - Morgan County.............. 60,000
Lincoln Developmental Center -
Logan County......................... 2,039
Murray Developmental Center -
Centralia............................ 2,039
Shapiro Developmental Center -
Kankakee............................ 86,546
For replacing and repairing roofing systems
at the following locations at the approximate
cost set forth below.............................. 58,410
Chicago-Read Mental Health Center....... 32
Tinley Park Mental Health Center.... 12,974
Illinois School for the Visually
Impaired - Jacksonville............ 19,414
Shapiro Developmental Center -
Kankakee........................... 25,955
Kiley Developmental Center -
Waukegan................................ 3
Ludeman Developmental Center -
Park Forest............................ 32
For replacement of roofing systems at the
following locations at the approximate costs
set forth below:................................. 118,670
Lincoln Development Center.......... 29,667
Murray Developmental Center......... 29,667
Elgin Developmental Center.......... 29,667
Shapiro Developmental Center........ 29,669
Total $72,863,666
Section 125. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from reappropriations heretofore made for such purposes in Article 116, Section 125 of Public Act 96-956, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Human Services for the project hereinafter enumerated:
ILLINOIS SCHOOL FOR THE DEAF – JACKSONVILLE
(From Article 116, Section 125 of Public Act 96-956)
For replacing dorm doors......................... 1,945,671
JACKSONVILLE DEVELOPMENTAL CENTER – MORGAN
For upgrading the mechanicals in the
power plant, in addition to funds
previously appropriated........................... 45,582
SINGER MENTAL HEALTH CENTER
For repair and/or replacement of roofs.............. 61,150
FOX DEVELOPMENTAL CENTER - DWIGHT
For renovating the water treatment plant........... 678,331
Total $2,730,734
Section 130. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from reappropriations heretofore made in Article 116, Section 130 of Public Act 96-956, are reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Medical District Commission for the projects hereinafter enumerated:
ILLINOIS MEDICAL DISTRICT COMMISSION - CHICAGO
(From Article 116, Section 130 of Public Act 96-956)
For upgrading utility and infrastructure,
in addition to funds previously
appropriated..................................... 412,685
For upgrading core utilities....................... 104,646
For upgrading research center...................... 346,714
Total $864,045
Section 140. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from appropriations and reappropriations heretofore made for such purposes in Article 116, Section 140 of Public Act 96-956, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Military Affairs for the projects hereinafter enumerated:
BLOOMINGTON ARMORY - McLEAN COUNTY
(From Article 116, Section 140 of Public Act 96-956)
For rehabilitating the mechanical/electrical
systems and renovating the interior.............. 105,931
CAMP LINCOLN - SPRINGFIELD
For construction of a military academy
facility......................................... 142,417
ELGIN ARMORY - KANE COUNTY
For upgrading the interior and exterior............. 32,395
MACOMB ARMORY - McDONOUGH
For replacing the mechanical and electrical
systems and installing a kitchen.................. 73,951
NORTH RIVERSIDE ARMORY
For rehabilitating the interior and
exterior.......................................... 14,648
NORTHWEST ARMORY - CHICAGO
For upgrading the electrical system.............. 2,448,641
For replacing the mechanical systems................ 46,187
SYCAMORE ARMORY
For replacing the electrical system,
renovating the interior and installing
air conditioning.................................. 22,310
STATEWIDE
For capital improvements to the
Lincoln’s ChalleNGe Academy................... 38,140,000
For constructing an army aviation
support facility............................... 6,252,000
To complete construction and
Purchase equipment for the Shiloh,
Mt. Vernon, and Carbondale Readiness
Center........................................... 400,000
Total $47,678,480
Section 145. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from reappropriations heretofore made in Article 116, Section 145 of Public Act 96-956, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Military Affairs for the projects hereinafter enumerated:
LAWRENCEVILLE ARMORY
(From Article 116, Section 145 of Public Act 96-956)
For rehabilitating the exterior and
replacing roofing systems....................... 176,837
Total $176,837
Section 150. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from appropriations and reappropriations heretofore made for such purposes in Article 116, Section 150 of Public Act 96-956, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Revenue for the projects hereinafter enumerated:
WILLARD ICE BUILDING - SPRINGFIELD
(From Article 116, Section 150 of Public Act 96-956)
For repairing emergency generator.................. 120,000
For renovation of the parking ramp............... 2,786,067
For completing the upgrade of
building management controls,
in addition to funds
previously appropriated.......................... 400,000
For replacing the dock exhaust system.............. 172,722
For upgrading building management
controls....................................... 3,495,466
For upgrading the plumbing system.................. 908,359
For renovating the interior and
upgrading HVAC................................. 2,847,517
Total $10,730,131
Section 160. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from reappropriations heretofore made for such purposes in Article 116, Section 160 of Public Act 96-956, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Revenue for the project hereinafter enumerated:
WILLARD ICE BUILDING – SPRINGFIELD
(From Article 116, Section 160 of Public Act 96-956)
For completing the upgrade of the
Plumbing System.................................. 600,000
Total $600,000
Section 165. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from reappropriations heretofore made for such purposes in Article 116, Section 165 of Public Act 96-956, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of State Police for the projects hereinafter enumerated:
AMERICAN GENERAL BUILDING - SPRINGFIELD
(From Article 116, Section 165 of Public Act 96-956)
For installing an emergency generator
and various improvements....................... 3,000,000
METRO-EAST FORENSIC LAB - BELLEVILLE
For constructing a new forensic
lab in Belleville, in addition
to funds previously appropriated.............. 37,000,000
For constructing new forensic lab, in
addition to funds previously appropriated...... 2,158,494
For planning and beginning the
construction of a Metro East
forensic laboratory, in addition to
funds previously appropriated.................... 750,000
EFFINGHAM DISTRICT 12
For Effingham District 12 Firing Range.............. 61,586
CHICAGO FORENSIC LABORATORY
For planning and beginning the
construction of an addition
to the Chicago Forensic
Laboratory..................................... 1,129,393
SPRINGFIELD ARMORY
For planning and design of the rehabilitation
and site improvements of the Springfield
Armory, in addition to funds previously
appropriated..................................... 352,523
STATE POLICE TRAINING ACADEMY - SPRINGFIELD
For planning and beginning the
construction of an addition to the
CODIS Laboratory................................. 277,750
ULLIN DISTRICT 22
For emergency roof and interior and
exterior repairs.................................. 71,651
STATEWIDE
For replacing communications towers
equipment and tower buildings.................... 539,005
For replacing radio communication towers,
equipment buildings and installing emergency
power generators at the following
locations at the approximate costs
set forth below.................................. 250,000
Harlem & Irving – Cook County......... 62,500
Savanna – Carroll County.............. 62,500
Fairfield – Wayne County.............. 62,500
Niota – Hancock County................ 62,500
Total $45,590,402
Section 175. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from appropriations and reappropriations heretofore made for such purposes in Article 116, Section 175 of Public Act 96-956, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Veterans' Affairs for the projects hereinafter enumerated:
ANNA VETERAN’S HOME
(From Article 116, Section 175 of Public Act 96-956)
To plan and begin the construction
of a 40-50 bed addition.......................... 622,261
LASALLE VETERAN’S HOME – LASALLE COUNTY
For the replacement of the galvanized water
piping........................................... 201,809
MANTENO VETERANS' HOME - KANKAKEE COUNTY
For replacing air conditioner chillers.............. 36,141
For replacing condensing units...................... 65,237
For upgrading or construction of roads
and parking lots.................................. 28,785
For planning and constructing additional
storage and support areas......................... 73,248
For upgrading storm sewer........................... 97,768
QUINCY VETERANS' HOME - ADAMS COUNTY
For constructing a central chiller plant......... 5,394,839
For planning and beginning
renovation of Kent, Shapers
and Elmore, in addition
to funds previously appropriated............... 1,022,543
For constructing a bus and
ambulance garage................................. 345,555
For improvements to various buildings
and replacement of Fletcher Building
to meet licensure standards.................... 2,251,078
To replace a chimney stack and ash handling
system......................................... 2,235,540
STATEWIDE
for the construction of a 200-bed
veterans’ home facility, in addition
to funds previously appropriated.............. 48,500,000
For planning and beginning the
Construction of a skilled care
Veterans home.................................. 2,000,000
For the construction of a 200-bed
veterans’ home facility, in addition
to funds previously appropriated.............. 14,747,939
Total $77,622,743
Section 186. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from appropriations heretofore made for such purposes in Article 116, Section 186 of Public Act 96-956, are reappropriated from the Capital Development Fund to the Capital Development Board for the Office of the Attorney General for the projects hereinafter enumerated:
ATTORNEY GENERAL BUILDING - SPRINGFIELD
(From Article 116, Section 186 of Public Act 96-956)
For renovating and waterproofing terrace........... 190,000
For replacing electronic ballasts.................. 959,000
For replacing the roof............................. 378,000
Total $1,527,000
Section 187. The amount of $2,282,202, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 116, Section 187 of Public Act 96-956, to the Capital Development Board for the Department of Corrections for the Illinois Youth Center – Rushville for planning, design, construction, equipment and all other necessary costs to add a cellhouse, is reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Human Services for the same purpose.
Section 190. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from appropriations and reappropriations heretofore made for such purposes in Article 116, Section 190 of Public Act 96-956, are reappropriated from the Capital Development Fund to the Capital Development Board for the projects hereinafter enumerated:
CHICAGO
(From Article 116, Section 190 of Public Act 96-956)
For expanding and renovating the
Bio-Safety 3 Laboratory for the
Department of Public Health..................... 166,738
ATTORNEY GENERAL BUILDING - SPRINGFIELD
For upgrading the snow melt system at
the Attorney General Building..................... 66,116
For upgrading environmental equipment
and HVAC, in addition to funds previously
appropriated - Archives Building.................. 35,633
STATEWIDE
For American with Disabilities Act
(ADA) upgrades at the following
locations at the approximate
cost set forth below........................... 3,500,000
DNR – I & M Canal Corridor .. 1,652,000
IBHE – Eastern Illinois
University................... 1,848,000
For providing construction contingency
for the following projects at
the approximate cost set forth below,
in addition to funds
previously appropriated.......................... 773,500
LINCOLN’S TOMB HISTORIC SITE -
Rehab site/Provide
. irrigation system............... 85,600
. MICHAEL BILANDIC BUILDING -
Upgrade HVAC and Domestic Water
System.......................... 184,700
SUBURBAN NORTH REGIONAL OFFICE FACILITY -
Renovate for Office Space....... 300,200
SECRETARY OF STATE -
Upgrade Electrical Systems at three
Motor Vehicle Facilities........ 203,000
For all costs associated with
a timekeeping and payroll system,
including prior year costs..................... 8,301,122
For emergencies and abatement of
hazardous materials, in
addition to funds previously appropriated...... 9,935,194
For escalation costs for state
facility projects, in addition
to funds previously appropriated.............. 17,000,000
For escalation and emergencies for
higher education projects, in
addition to funds previously appropriated..... 24,530,779
For improving energy efficiency..................... 56,107
For Emergency Repairs and Hazardous
Material Abatement at State-Owned
Facilities, State Universities, and
Community Colleges............................. 2,129,290
For the purposes of capital planning
and condition assessment and analysis
of State capital facilities, to be
expended only upon the direction of
the Director of the Governor’s Office
of Management and Budget.......................... 15,326
For abating hazardous materials..................... 12,027
For retrofitting or upgrading mechanized
refrigeration equipment (CFCs)................... 650,000
For surveys and modifications to buildings
to meet requirements of the federal
Americans with Disabilities Act (ADA)............. 44,004
For surveys and modifications to buildings
to meet requirements of the federal
Americans with Disabilities Act (ADA)............ 200,755
For retrofitting or upgrading mechanized
refrigeration equipment (CFCs)................. 1,031,994
For surveys and modifications to buildings
to meet requirements of the federal
Americans with Disabilities Act.................. 858,011
For upgrading and remediating
aboveground and underground storage tanks...... 1,007,781
For surveys and modifications to
buildings to meet requirements of the
federal Americans with Disabilities Act.......... 115,979
For surveys and modifications to buildings
to meet requirements of the federal
Americans with Disabilities Act................... 57,620
For the planning, upgrade
and replacement of potentially
hazardous underground storage tanks................ 5,725
Total $70,496,426
Section 195. The amount of $76,279, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 116, Section 195 of Public Act 96-956, is reappropriated from the Asbestos Abatement Fund to the Capital Development Board for surveying and abating asbestos-containing materials statewide.
Section 200. The amount of $218,124, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 116, Section 200 of Public Act 96-956, is reappropriated from the Asbestos Abatement Fund to the Capital Development Board for asbestos surveys and emergency abatement in relation to asbestos abatement in state governmental buildings or higher education residential and auxiliary enterprise buildings.
Section 201. The sum of $1,323,580,566, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made in Article 116, Section 201 of Public Act 96-956, is reappropriated from the School Construction Fund to the Capital Development Board for grants to school districts for school construction projects authorized by the School Construction Law.
Section 202. The amount of $74,433,562, or so much
of that amount as may be necessary and remains unexpended at the close of
business on June 30, 2011, from an appropriation heretofore made in Article
116, Section 202 of Public Act 96-956, is reappropriated from the School
Construction Fund to the Capital Development Board for Fiscal Year 2002 School
Construction Program grant recipients as follows:
Fairfield Public School District 112........... 3,898,926
Stewardson-Strasburg Community Unit
District 5A.................................. 2,046,533
Johnston City Community Unit School District 1... 528,822
East St. Louis School District 189............ 29,025,628
Silvis School District 34..................... 11,900,936
Joliet Public School District 86............... 6,456,651
Community Consolidated School Dist. 93
Carol Stream................................. 1,554,822
West Northfield School District 31............. 1,780,688
DuQuoin Community Unit School District 300..... 7,731,057
Benton Community Consolidated School
District 47.................................. 2,464,790
Westchester School District 92 1/2................. 4,913
Big Hollow School District 38.................... 251,812
Central School District 104...................... 415,622
Bradley School District 61..................... 1,338,888
Bethalto Community School District 8........... 3,816,474
Westmont Community Unit School District 201.... 1,217,000
Section 210. The following named amount or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 116, Section 210 of Public Act 96-956, is reappropriated from the School Construction Fund to the Capital Development Board for the State Board of Education for the projects hereinafter enumerated:
STATEWIDE
(From Article 116, Section 210 of Public Act 96-956)
Grants for facility construction................. 2,724,785
Section 215. The sum of $7,376,493, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 116, Section 215 of Public Act 96-956, is reappropriated from the School Construction Fund to the Capital Development Board for school construction grants pursuant to the School Construction Law, in addition to amounts previously appropriated for such purposes.
Section 220. The sum of $3,224,584, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 116, Section 220 of Public Act 96-956, is reappropriated from the School Construction Fund to the Capital Development Board for school construction grants pursuant to the School Construction Law, in addition to amounts previously appropriated for such purposes.
Section 225. The sum of $414,268, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 116, Section 225 of Public Act 96-956, is reappropriated from the School Construction Fund to the Capital Development Board for school construction grants pursuant to the School Construction Law, in addition to amounts previously appropriated for such purposes.
Section 230. The sum of $145,888, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 116, Section 230 of Public Act 96-956, is reappropriated from the School Construction Fund to the Capital Development Board for school construction grants pursuant to the School Construction Law, in addition to amounts previously appropriated for such purposes.
Section 245. The sum of $18,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 116, Section 245 of Public Act 96-956, is reappropriated from the School Construction Fund to the Capital Development Board for grants to school districts for school improvement projects authorized by the School Construction Law.
Section 270. The sum of $475,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 116, Section 270 of Public Act 96-956, is reappropriated from the Capital Development Fund to the Capital Development Board for water resource management projects as authorized by subsection (g) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.
Section 275. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from reappropriations heretofore made for such purposes in Article 116, Section 275 of Public Act 96-956, are reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for the projects hereinafter enumerated:
CITY COLLEGES OF CHICAGO
(From Article 116, Section 275 of Public Act 96-956)
For various bondable capital improvements.......... 570,171
CITY COLLEGES OF CHICAGO/KENNEDY KING
For remodeling for Workforce Preparation
Centers........................................ 3,575,930
For remodeling for a culinary arts
educational facility.......................... 10,875,000
CITY COLLEGES OF CHICAGO - MALCOLM X COLLEGE
For remodeling the Allied Health
program facilities............................. 4,298,223
COLLEGE OF DUPAGE
For Installation of the
Instructional Center Noise Abatement........... 1,544,600
For upgrading the Instructional Center
heating, ventilating and air
conditioning systems.............................. 27,908
COLLEGE OF LAKE COUNTY
For Construction of a Student
Service Building.............................. 35,927,000
ELGIN COMMUNITY COLLEGE
For Spartan Drive Extension...................... 2,244,800
IECC – LINCOLN TRAIL COLLEGE
For Construction of a Center
for Technology................................. 7,569,800
ILLINOIS VALLEY COMMUNITY COLLEGE
For Construction of a Community
Technology Center ............................ 16,323,100
JOLIET JUNIOR COLLEGE
For renovation of Utilities...................... 4,498,585
KANKAKEE COMMUNITY COLLEGE
For constructing a laboratory/classroom
facility......................................... 244,893
KASKASKIA COLLEGE
For all costs associated with
construction of new facilities as
part of Phase Two of the Vandalia Campus....... 5,600,000
LAKELAND COLLEGE
For renovating and expanding
Student Services Building Addition............. 2,361,100
For Construction of a Rural
Development Technology Center.................. 7,524,100
For Student Services Building addition........... 6,498,007
LEWIS AND CLARK COLLEGE
For construction and infrastructure
improvements to the National Great
Rivers Research and Education Center........... 3,065,064
MCHENRY COUNTY COLLEGE
(From Article 116, Section 275 of Public Act 96-956)
For constructing classrooms and a
student services building and remodeling
space, in addition to funds previously
appropriated..................................... 473,076
MORAINE VALLEY COMMUNITY COLLEGE - PALOS HILLS
For constructing a classroom/administration
building, providing site improvements and
purchasing equipment, in addition to
funds previously appropriated..................... 41,635
MORTON COLLEGE
For costs associated with capital
improvements................................... 5,000,000
PARKLAND COLLEGE
For renovating and expanding
the Student Services Center Addition.......... 15,442,100
PRAIRIE STATE COLLEGE - CHICAGO HEIGHTS
For costs associated with capital
improvements at Prairie State College.......... 5,200,000
For constructing an addition to the Adult
Training/Outreach Center, in addition to
funds previously appropriated.................... 811,858
REND LAKE COLLEGE
For Art Program Addition
and minor remodeling............................. 451,300
RICHLAND COMMUNITY COLLEGE
For Renovation of the Student
Success Center and Construction
of an Addition to the Student
Success Center................................. 3,524,000
ROCK VALLEY COLLEGE
For Construction of an
Arts Instructional Center..................... 26,711,900
SOUTH SUBURBAN COLLEGE
For improving flood retention...................... 437,000
TRITON COMMUNITY COLLEGE - RIVER GROVE
For renovating and expanding
the Technology Building....................... 10,666,100
For rehabilitating the Liberal Arts
Building....................................... 1,536,546
For rehabilitating the potable water
distribution system............................... 70,146
TRUMAN COLLEGE
For costs associated with capital
improvements................................... 5,000,000
WILBUR WRIGHT COLLEGE
For costs associated with capital
improvements to the Humboldt Park
Vocational Education Center
at Wilbur Wright College....................... 5,000,000
WILLIAM RAINEY HARPER COLLEGE
For Engineering and Technology
Center Renovations............................ 20,188,400
For Construction of a One
Stop/Admissions and Campus/
Student Life Center........................... 40,653,900
STATEWIDE
For the Illinois Community College Board
miscellaneous capital improvements including
construction, capital facilities, cost of
planning, supplies, equipment, materials,
services and all other expenses required to
complete the work at the various community
Colleges. This appropriated amount shall be
in addition to any other appropriated amounts
which can be expended for this purpose......... 1,406,085
STATEWIDE
For miscellaneous capital improvements
including construction, capital facilities,
cost of planning, supplies, equipment,
materials, services and all other expenses
required to complete the work at the
various community colleges. This appropriated
amount shall be in addition to any other
appropriated amounts which can be
expended for these purposes.................... 4,837,570
For miscellaneous capital improvements
including construction, capital facilities,
cost of planning, supplies, equipment,
materials, services and all other expenses
required to complete the work at the
various community colleges. This appropriated
amount shall be in addition to any other
appropriated amounts which can be
expended for these purposes.................... 3,563,951
Total $263,764,226
Section 280. The amount of $400,281, or so much thereof as may be necessary, and remains unexpended on June 30, 2011, from a reappropriation heretofore made for such purposes in Article 116, Section 280 of Public Act 96-956, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Community College Board for grants to community colleges repair, renovation, and miscellaneous capital improvements including construction, reconstruction, remodeling, improvement, repair and installation of capital facilities, costs of planning, supplies, equipment, materials, services, and all other expenses required to complete the work. This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 281. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from appropriations heretofore made for such purpose in Article 116, Section 281 of Public Act 96-956, are reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for the Temporary Facility Replacement Program for the projects hereinafter enumerated:
COLLEGE OF DUPAGE
(From Article 116, Section 281 of Public Act 96-956)
For Temporary Facilities Replacement............ 25,000,000
COLLEGE OF LAKE COUNTY
For Construction of a Classroom Building
at the Grayslake Campus....................... 17,569,200
IECC – LINCOLN TRAIL COLLEGE
For Construction of an AC/Refrigeration
and Sheet Metal Technology Building............ 1,495,500
IECC – OLNEY CENTRAL
For Construction of the Collision
Repair Technology Center....................... 1,122,800
IECC – WABASH VALLEY
For Construction of a Student Center............. 4,029,400
ILLINOIS CENTRAL COLLEGE
For Renovation and Additions to
Dirksen Hall................................... 2,633,700
ILLINOIS VALLEY COMMUNITY COLLEGE
For Construction of a Community
. Technology Center.............................. 6,521,700
JOLIET JUNIOR COLLEGE
For Temporary Facilities Replacement............. 8,815,900
LAKE LAND COLLEGE
For Construction of a Workforce
Relocation Center.............................. 9,881,700
LEWIS & CLARK COMMUNITY COLLEGE
For Construction of a Daycare
and Montessori................................. 1,663,000
For Construction of an Engineering
Annex.......................................... 1,536,600
LINCOLN LAND COMMUNITY COLLEGE
For Renovations to Sangamon Hall South........... 2,991,200
MCHENRY COUNTY COLLEGE
For Construction of a Greenhouse................... 671,600
For Construction of a Pumphouse.................... 115,900
OLIVE HARVEY COLLEGE
For Construction of a New Building.............. 30,671,600
PARKLAND COLLEGE
For Construction of an Applied
Technology Addition............................ 9,180,600
SPOON RIVER COLLEGE
For Construction of a Multi-Purpose
Building....................................... 4,027,100
WAUBONSEE COMMUNITY COLLEGE
To Replace Building “A”
Temporary Building............................. 2,615,200
WILLIAM RAINEY HARPER COLLEGE
To Replace the Hospitality Facility.............. 3,944,800
Total $134,487,500
Section 285. The sum of $1,324,346, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 116, Section 285 of Public Act 96-956, is reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete the work at the various community colleges. This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 290. The sum of $1,660,227, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purposes in Article 116, Section 290 of Public Act 96-956, is reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, reconstruction, remodeling, improvement, repair and installation of capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete the work at the various community colleges. This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 295. The sum of $2,528,831, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purposes in Article 116, Section 295 of Public Act 96-956, is reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, reconstruction, remodeling, improvement, repair and installation of capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete the work at the various community colleges. This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 300. The sum of $668,166, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purposes in Article 116, Section 300 of Public Act 96-956, is reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for grants to community colleges for miscellaneous capital improvements including construction, reconstruction, remodeling, improvements, repair and installation of capital facilities, cost of planning, supplies, equipment, materials, services, and all other expenses required to complete the work. This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 306. The sum of $27,312,110, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 116, Section 306 of Public Act 96-956, is reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Board of Higher Education for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete work at the various higher education institutions. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for such purposes.
Section 310. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from reappropriations heretofore made for such purposes in Article 116, Section 310 of Public Act 96-956, are reappropriated from the Capital Development Fund to the Capital Development Board for the Board of Higher Education for the projects hereinafter enumerated:
ILLINOIS MATHEMATICS AND SCIENCE ACADEMY - AURORA
(From Article 116, Section 310 of Public Act 96-956)
To plan and begin construction of a
space for the delivery of teacher
training and development and student
enrichment programs.............................. 108,843
Section 314. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from appropriations heretofore made in Article 116, Section 314 of Public Act 96-956, are reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Board of Higher Education for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete work at the various higher education institutions. These appropriated amounts shall be in addition to any other appropriated amounts which can be expended for such purposes....................................... $62,445,032
Chicago State University........ 1,230,589
Eastern Illinois University..... 2,319,900
Governors State University........ 853,800
Illinois State University....... 4,596,000
Northeastern Illinois University 1,726,500
Northern Illinois University.... 5,215,500
Western Illinois University..... 3,564,900
Southern Illinois University-
Carbondale................... 7,312,500
Southern Illinois University-
Edwardsville................. 3,420,343
University of Illinois-
Chicago..................... 12,497,700
University of Illinois-
Springfield.................. 1,031,100
University of Illinois-
Urbana/Champaign............ 18,676,200
Section 315. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from reappropriations heretofore made in Article 116, Section 315 of Public Act 96-956, are reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Board of Higher Education for the projects hereinafter enumerated:
STATEWIDE
(From Article 116, Section 315 of Public Act 96-956)
For miscellaneous capital improvements
including construction, capital facilities,
cost of planning, supplies, equipment,
materials, services and all other expenses
required to complete the work at the various
universities. This appropriated amount
shall be in addition to any other appropriated
amounts which can be expended for these
purposes...................................... 16,892,786
Chicago State University............ 322,100
Eastern Illinois University......... 515,500
Governors State University............ 2,533
Illinois State University........... 984,871
Northeastern Illinois University.... 383,700
Northern Illinois University...... 1,159,000
Western Illinois University......... 219,551
Southern Illinois University -
Carbondale......................... 801,859
Southern Illinois University -
Edwardsville....................... 763,100
University of Illinois -
Chicago.......................... 2,777,300
University of Illinois -
Springfield........................ 227,400
University of Illinois -
Urbana/Champaign................. 3,551,272
Illinois Community
College Board.................... 5,184,600
For miscellaneous capital improvements
including construction, capital
facilities, cost of planning, supplies,
equipment, materials, services and
all other expenses required to complete
the work at the various universities.
This appropriated amount shall be in
addition to any other appropriated amounts
which can be expended for these purposes...... 15,244,418
Chicago State University............ 108,919
Eastern Illinois University......... 515,500
Governors State University............ 1,001
Illinois State University........... 111,197
Northeastern Illinois
University......................... 383,700
Northern Illinois University...... 1,159,000
Southern Illinois University -
Carbondale.......................... 31,277
Southern Illinois University -
Edwardsville........................... 712
University of Illinois -
Chicago.......................... 2,777,300
University of Illinois -
Springfield........................ 212,512
University of Illinois -
Urbana/Champaign................. 3,871,600
Illinois Community
College Board.................... 6,071,700
For miscellaneous capital improvements
including construction, capital
facilities, cost of planning, supplies,
equipment, materials, services and
all other expenses required to complete
the work at the various universities
This appropriated amount shall be in
addition to any other appropriated amounts
which can be expended for these purposes....... 4,102,538
Eastern Illinois University......... 515,500
Illinois State University............. 1,007
Northern Illinois University........ 510,002
Western Illinois University......... 138,442
Southern Illinois University -
Carbondale......................... 131,311
University of Illinois -
Chicago.......................... 2,049,066
University of Illinois -
Springfield........................ 209,126
University of Illinois -
Urbana/Champaign................... 548,084
For miscellaneous capital improvements,
including construction, capital
facilities, cost of planning,
supplies, equipment, materials, services
and all other expenses required to
complete the work at the various universities.
This appropriated amount shall be in
addition to any other appropriated
amounts which can be expended
for these purposes............................. 2,795,330
Eastern Illinois University......... 477,768
Illinois State University............ 77,206
Northern Illinois University...... 1,207,568
Southern Illinois University -
Carbondale.......................... 71,189
University of Illinois -
Chicago............................ 245,200
University of Illinois -
Urbana/Champaign................... 716,399
For miscellaneous capital improvements
including construction, reconstruction
remodeling, improvements, repair
and installation of capital
facilities, cost of planning, supplies,
equipment, materials, services and all
other expenses required to complete
the work at the various universities set
forth below. This appropriated amount
shall be in addition to any other
appropriated amounts which can
be expended for these purposes................. 1,115,816
Chicago State University............. 118,057
Eastern Illinois University........... 42,140
Northeastern Illinois University...... 32,560
Northern Illinois University......... 690,260
Western Illinois University........... 12,865
University of Illinois -
Champaign/Urbana Campus............. 219,934
For miscellaneous capital improvements
including construction, capital
facilities, cost of planning, supplies,
equipment, materials, services and
all other expenses required to
complete the work at the various
universities set forth below. This
appropriation shall be in addition
to any other appropriated amounts
which can be expended for these purposes......... 779,359
For Eastern Illinois University........ 252,912
For Northeastern Illinois University .... 3,449
For Northern Illinois University........ 58,820
For University of Illinois -
Urbana-Champaign..................... 464,178
For miscellaneous capital improvements,
including construction, reconstruction,
remodeling, improvement, repair and
installation of capital facilities, cost of
planning, supplies, equipment, materials,
services and all other expenses
required to complete the work at the various
universities set forth below. This
appropriation shall be in addition to
any other appropriated amounts which
can be expended for these purposes............... 234,399
For Northern Illinois University..... 151,292
For Southern Illinois University -
Carbondale........................... 22,188
For Southern Illinois University -
Edwardsville......................... 11,240
For University of Illinois -
Urbana-Champaign..................... 49,679
For miscellaneous capital improvements
including construction, reconstruction,
remodeling, improvement, repair and
installation of capital facilities,
cost of planning, supplies, equipment,
materials, services and all other expenses
required to complete the work at the
various universities set forth below.
This appropriation shall be in addition
to any other appropriated amounts which
can be expended for these purposes............... 715,448
For Eastern Illinois University...... 150,380
For Governors State University........ 71,798
For Illinois State University......... 55,040
For Northeastern Illinois University . 36,177
For Northern Illinois University..... 207,446
For University of Illinois........... 194,607
SOUTHERN ILLINOIS UNIVERSITY
For Southern Illinois University
for miscellaneous capital improvements
including construction, reconstruction,
remodeling, improvements, repair and
installation of capital facilities, cost
of planning, supplies, equipment, materials
services and all other expenses
required to complete the work. This
appropriation shall be in addition to any
other appropriated amounts which can
be expended for these purposes................... 118,119
UNIVERSITY OF ILLINOIS
For the Board of Trustees of the University of
Illinois for miscellaneous capital
improvements including construction,
reconstruction, remodeling, improvement,
repair and installation of capital
facilities, cost of planning, supplies,
equipment, materials, services and
all other expenses required for completing
the work at the colleges and
universities. This appropriation shall
be in addition to any other
appropriated amounts which can be
expended for these purposes....................... 89,723
For the Board of Higher Education for
miscellaneous capital improvements,
including construction, reconstruction,
remodeling, improvements, repair and
installation of capital facilities, cost
of planning, supplies, equipment,
materials, services, and all other
expenses required to complete the
work at the colleges and universities
hereinafter enumerated. This appropriation
shall be in addition to any other
appropriated amounts which can be
expended for these purposes:
Northern Illinois University........................ 17,448
Total $42,105,384
Section 320. The sum of $109,850, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purposes in Article 116, Section 320 of Public Act 96-956, is reappropriated from the Capital Development Fund to the Capital Development Board for the Board of Higher Education for miscellaneous capital improvements, including construction, reconstruction, remodeling, improvement, repair and installation of capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required for completing the work at the colleges and universities. This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 325. The following named amounts, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from reappropriations heretofore made for such purposes in Article 116, Section 325 of Public Act 96-956, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Board of Higher Education for the projects hereinafter enumerated:
(From Article 116, Section 325 of Public Act 96-956)
For miscellaneous capital improvements
including construction, capital
facilities, cost of planning, supplies,
equipment, materials, services and
all other expenses required to complete
the work at the various universities.
This appropriated amount shall be in
addition to any other appropriated amounts
which can be expended for these purposes.
Chicago State University........................... 140,767
Eastern Illinois University........................ 257,800
Governors State University.......................... 94,900
Illinois State University.......................... 510,700
Northeastern Illinois University................... 191,800
Northern Illinois University....................... 579,500
Western Illinois University......................... 96,101
Southern Illinois University - Carbondale.......... 560,973
Southern Illinois University - Edwardsville ....... 381,500
University of Illinois - Chicago................. 1,388,600
University of Illinois - Springfield............... 114,600
University of Illinois - Urbana/Champaign........ 2,075,100
Illinois Community College Board................. 2,888,562
Total $9,280,903
For miscellaneous capital improvements
including construction, capital
facilities, cost of planning, supplies,
equipment, materials, services and
all other expenses required to complete
the work at the various universities.
This appropriated amount shall be in
addition to any other appropriated amounts
which can be expended for these purposes.
Chicago State University.......................... 161,000
Eastern Illinois University........................ 255,993
Governors State University.......................... 21,306
Northeastern Illinois University................... 191,800
Northern Illinois University....................... 579,500
Southern Illinois University - Carbondale........... 22,934
Southern Illinois University - Edwardsville......... 82,753
University of Illinois - Chicago................. 1,388,600
University of Illinois - Springfield............... 114,600
University of Illinois - Urbana/Champaign........ 1,886,627
Illinois Community College Board................. 2,805,684
Total $7,510,797
For miscellaneous capital improvements
including construction, capital
facilities, cost of planning, supplies,
equipment, materials, services and
all other expenses required to complete
the work at the various universities.
This appropriated amount shall be in
addition to any other appropriated amounts
which can be expended for these purposes.
Eastern Illinois University........................ 185,800
Governors State University.......................... 45,618
Illinois State University........................... 27,182
Northern Illinois University....................... 579,500
Western Illinois University.......................... 9,341
Southern Illinois University - Carbondale........... 14,758
University of Illinois - Chicago................... 974,174
University of Illinois - Springfield................ 76,866
University of Illinois - Urbana/Champaign........ 1,539,425
Total $3,452,664
For miscellaneous capital improvements
including construction, capital
facilities, cost of planning, supplies,
equipment, materials, services and
all other expenses required to complete
the work at the various universities.
This appropriated amount shall be in
addition to any other appropriated amounts
which can be expended for these purposes.
Eastern Illinois University......................... 21,618
Governors State University.......................... 26,826
Illinois State University.......................... 110,469
Northeastern Illinois University.................... 87,701
Northern Illinois University....................... 335,923
University of Illinois - Chicago................... 103,101
University of Illinois - Springfield................ 30,052
University of Illinois - Urbana/Champaign.......... 117,891
Total $833,581
For miscellaneous capital improvements
including construction, capital
facilities, cost of planning, supplies,
equipment, materials, services and
all other expenses required to complete
the work at the various universities.
This appropriated amount shall be in
addition to any other appropriated amounts
which can be expended for these purposes.
Eastern Illinois University........................ 134,474
Northeastern Illinois University.................... 32,547
Northern Illinois University....................... 340,000
University of Illinois- Champaign/Urbana............ 54,204
Total $561,225
Section 330. The sum of $1,598,774, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 116, Section 330 of Public Act 96-956, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete the work at the various community colleges. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 335. The sum of $1,253,180, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 116, Section 335 of Public Act 96-956, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete the work at the various community colleges. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 340. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2011, from appropriations and reappropriations heretofore made in Article 116, Section 340 of Public Act 96-956, are reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Board of Higher Education for the projects hereinafter enumerated:
CHICAGO STATE UNIVERSITY
(From Article 116, Section 340 of Public Act 96-956)
For a grant for the construction
of a Westside campus.......................... 40,000,000
For renovating Douglas Hall, in
addition to funds previously appropriated..... 18,500,000
For Construction of an Early
Childhood Development Center................... 3,000,000
For Remediation of the Convocation
Building, in addition to funds
previously appropriated........................ 5,000,000
For replacing primary electrical
feeder cable..................................... 115,049
For the construction of a conference
Center, Daycare Facility,
renovating Building K (Robinson
Center) and Financial Outreach
Building in addition to funds
previously appropriated........................ 4,835,310
For the construction of a day care
facility....................................... 4,863,999
For the construction of a student
financial outreach building.................... 4,719,982
For constructing a new library facility,
site improvements, utilities, and
purchasing equipment, in addition
to funds previously appropriated................. 284,097
For technology improvements and
deferred maintenance........................... 1,171,770
For remodeling Building K, in addition
to funds previously appropriated............... 8,473,432
For planning and beginning to remodel
Building K and improving site.................. 1,000,474
For upgrading campus infrastructure,
in addition to the funds
previously appropriated.......................... 315,848
For renovating buildings and upgrading
mechanical systems................................ 28,077
EASTERN ILLINOIS UNIVERSITY
For remodeling of the HVAC in the
Life Science Building and Coleman Hall......... 4,757,100
For upgrading the electrical
distribution system.............................. 225,707
For renovating and expanding the
Fine Arts Center, in addition to
funds previously appropriated..................... 46,796
For planning and beginning to renovate
and expand the Fine Arts Center -
Phase 1, in addition to funds
previously appropriated.......................... 133,604
For upgrading campus buildings for health,
safety and environmental improvements.............. 9,809
GOVERNORS STATE UNIVERSITY
For renovation of a Teaching/Learning
Complex, in addition to funds
previously appropriated........................ 8,000,000
For replacing roadways and sidewalks............. 2,028,000
For constructing addition and
remodeling the teaching & learning
complex, in addition to funds
previously appropriated....................... 14,424,570
ILLINOIS STATE UNIVERSITY
(From Article 116, Section 100 of Public Act 96-956)
For renovations of the Fine Arts
Complex....................................... 54,250,100
For renovating Stevenson and Turner
Halls for life/safety............................ 736,394
For the upgrade and remodeling
of Schroeder Hall.............................. 1,918,544
For remodeling Julian and Moulton Halls............ 376,727
NORTHEASTERN ILLINOIS UNIVERSITY
For costs associated with renovations
to the facility for the construction
of a Latino Cultural Center ................... 1,500,000
For constructing an education building.......... 72,977,200
For renovating Building "C" and
remodeling and expanding Building "E"
and Building "F"............................... 6,233,200
For planning and beginning to remodel
Buildings A, B and E............................. 130,610
For remodeling in the Science Building
to upgrade heating, ventilating and air
conditioning systems........................... 2,021,400
For replacing fire alarm systems, lighting
and ceilings..................................... 116,081
NORTHERN ILLINOIS UNIVERSITY
For the renovation of Cole Hall.................. 6,427,734
For renovating and expanding
Stevens Building.............................. 22,517,600
For planning Computer Sciences
Technology Center.............................. 2,787,400
For renovating the Founders Library
basement, in addition to funds previously
appropriated..................................... 626,578
For planning a classroom building and
developing site in Hoffman Estates............. 1,314,500
For completing the construction of the
Engineering Building, in addition to
amounts previously appropriated for
such purpose...................................... 12,488
For renovating Altgeld Hall and
purchasing equipment.............................. 94,434
SOUTHERN ILLINOIS UNIVERSITY - EDWARDSVILLE
For renovating and constructing
a Science Laboratory, in addition
to funds previously appropriated.............. 75,186,419
SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE
For constructing a Transportation
Education Center, in addition
to funds previously appropriated.............. 49,977,313
For planning and beginning
Communications Building.......................... 4,255,400
For renovating and constructing an
addition to the Morris Library, in
addition to funds previously
appropriated...................................... 13,826
SIU SCHOOL OF MEDICINE - SPRINGFIELD
For constructing and for equipment for
an addition to the combined laboratory,
in addition to funds previously
appropriated....................................... 5,470
UNIVERSITY OF ILLINOIS AT CHICAGO
For upgrading the campus infrastructure
and renovating campus buildings............... 20,800,000
Plan, construct, and equip the Chemical
Sciences Building............................. 57,600,000
For planning, construction and equipment
for a chemical sciences building............... 3,549,048
To plan and begin construction of
a medical imaging research/clinical
facility.......................................... 49,753
For remodeling the Clinical
Sciences Building................................ 854,132
For the renovation of the court area and
Lecture Center, in addition to funds
previously appropriated........................... 54,793
UNIVERSITY OF ILLINOIS AT CHAMPAIGN-URBANA
For renovating Lincoln Hall, in
addition to funds previously appropriated..... 45,477,641
For constructing a Post Harvest
Crop Processing and Research
Laboratory, in addition to
funds previously appropriated................. 20,034,000
For constructing an Electrical
and Computer Engineering Building,
in addition to funds previously
appropriated.................................. 44,520,000
Expansion of Microelectronics Lab................... 41,764
For planning, construction and equipment
for a biotechnology genomic facility............. 465,962
For planning, construction and equipment
for a supercomputing application facility......... 94,416
UNIVERSITY OF ILLINOIS - SPRINGFIELD
For renovation and construction
of the Public Safety Building.................. 4,000,000
UNIVERSITY CENTER OF LAKE COUNTY
For constructing a university center and
purchasing equipment, in addition to
funds previously appropriated...................... 7,803
For land, planning, remodeling, construction
and all costs necessary to construct a
facility........................................... 1,504
WESTERN ILLINOIS UNIVERSITY - MACOMB
For constructing a performing arts
center, in addition to funds
previously appropriated....................... 67,835,768
Plan and construct performing arts center........ 1,930,150
For improvements to Memorial
Hall........................................... 1,193,297
WESTERN ILLINOIS UNIVERSITY - QUAD CITIES
For renovation and construction of a
Riverfront Campus, in addition to
funds previously appropriated................. 42,000,000
For the renovation and construction
of a Riverfront Campus,
in addition to funds
previously appropriated....................... 12,150,040
ILLINOIS MATH AND SCIENCE ACADEMY
For residence hall rehabilitation
and main building addition..................... 6,260,000
For “A” wing laboratories remodeling............. 3,600,000
Total $757,933,821
Section 360. The amount of $73,780, or so much thereof as may be necessary, and remains unexpended on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 116, Section 360 of Public Act 96-956, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the University of Illinois for miscellaneous capital improvements including construction, reconstruction, remodeling, improvement, repair and installation of capital facilities, costs of planning, supplies, equipment, materials, services, and all other expenses required to complete the work. This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 370. The following named amount, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 116, Section 370 of Public Act 96-956, is reappropriated from the Capital Development Fund to the Capital Development Board for the project hereinafter enumerated:
EAST ST. LOUIS COLLEGE CENTER
(From Article 116, Section 370 of Public Act 96-956)
For construction of facilities, remodeling,
site improvements, utilities and other
costs necessary for adapting the former
campus of Metropolitan Community College
for a Community College Center and Southern
Illinois University, in addition to funds
previously appropriated........................ 1,794,693
Section 375. The sum of $13,432,210, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 116, Section 375 of Public Act 96-956, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials and all other expenses required to complete the work at the various community colleges. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 380. The sum of $21,642,222, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 116, Section 380 of Public Act 96-956, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials and all other expenses required to complete the work at the various community colleges. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 385. The sum of $4,325,579, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 116, Section 385 of Public Act 96-956, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials and all other expenses required to complete the work at the various community colleges. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 390. The sum of $3,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 116, Section 390 of Public Act 96-956, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for a grant to Northwestern University for planning, construction, and equipment for a Nanofabrication and Molecular Center. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 400. The sum of $6,445, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 116, Section 400 of Public Act 96-956, as amended, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for miscellaneous capital improvements to state facilities including construction, reconstruction, remodeling, improvement, repair and installation of capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete the work at the facilities. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 405. The sum of $60,360,346, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 116, Section 405 of Public Act 96-956, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the development and improvement of educational, scientific, technical and vocational programs and facilities and the expansion of health and human services, and for any other purposes authorized in subsection (c) of Section 4 of the Build Illinois Bond Act and for grants to State agencies for such purposes.
Section 410. The sum of $690,655, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 116, Section 410 of Public Act 96-956, is reappropriated from the Capital Development Fund to the Capital Development Board for educational purposes by State universities and colleges, the Illinois Community College Board created by the Public Community College Act and for grants to public community colleges as authorized by Sections 5-11 and 5-12 of the Public Community College Act as authorized by subsection (a) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.
Section 425. The sum of $265,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 116, Section 425 of Public Act 96-956, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Board of Higher Education for grants to various private colleges and universities.
Section 430. The amount of $2,476,501 or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 116, Section 430 of Public Act 96-956, is reappropriated from the Capital Development Fund to the Capital Development Board for grants to units of local government and other eligible entities for all costs associated with land acquisition, construction and rehabilitation projects.
Section 435. The sum of $2,517,200, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 116, Section 435 of Public Act 96-956, is reappropriated from the Capital Development Fund to the Capital Development Board for child care facilities, mental and public health facilities, and facilities for the care of disabled veterans and their spouses as authorized by subsection (d) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.
Section 440. The sum of $77,592,104, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 116, Section 440 of Public Act 96-956, is reappropriated from the Capital Development Fund to the Capital Development Board for correctional purposes at State prison and correctional centers as authorized by subsection (b) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.
Section 445. The sum of $24,197,426, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 116, Section 445 of Public Act 96-956, is reappropriated from the Capital Development Fund to the Capital Development Board for open spaces, recreational and conservation purposes and the protection of land and for deposits into the Conservation 2000 Projects Fund as authorized by subsection (c) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.
Section 450. The sum of $5,114,766, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 116, Section 450 of Public Act 96-956, is reappropriated from the Capital Development Fund to the Capital Development Board for child care facilities, mental and public health facilities, and facilities for the care of disabled veterans and their spouses as authorized by subsection (d) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.
Section 455. The sum of $93,794,270, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 116, Section 455 of Public Act 96-956, is reappropriated from the Capital Development Fund to the Capital Development Board for use by the State, its departments, authorities, public corporations, commissions and agencies as authorized by subsection (e) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.
Section 460. The sum of $45,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 116, Section 460 of Public Act 96-956, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for early childhood construction grants to school districts and not-for-profit providers of early childhood services for children ages birth to 5 years of age for construction or renovation of early childhood facilities, with priority given to projects located in those communities in this State with the greatest underserved population of young children, as identified by the Capital Development Board, in consultation with the State Board of Education, using census data and other reliable local early childhood service date.
Section 470. The sum of $50,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 116, Section 470 of Public Act 96-956, is reappropriated from the Capital Development Fund to the Capital Development Board for the State Board of Education for grants to school districts for energy efficiency projects.
Section 485. The sum of $75,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 116, Section 485 of Public Act 96-956, is reappropriated from the Capital Development Fund to the Capital Development Board for the Chicago Board of Education for costs associated with school renovation and construction for the purposes of providing vocational education.
Section 490. This Article is not subject to limitations under Section 5 of Article 48 of Public Act 95-734 or any similar limitation.
Section 495. No contract shall be entered into or obligation incurred for any expenditure in this Article until after the purpose and amounts have been approved in writing by the Governor.
Total, this Article $4,580,748,596
ARTICLE 60
ILLINOIS EMERGENCY MANAGEMENT AGENCY
Section 5. The sum of $25,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 117, Section 5 of Public Act 96-956, is reappropriated from the Build Illinois Bond Fund to the Illinois Emergency Management Agency for safety and security improvements at various public universities, private colleges or universities and community colleges.
Section 10. No contract shall be entered into or obligation incurred for any expenditures from appropriations in Section 5 of this Article until after the purposes and amounts have been approved in writing by the Governor.
Total, this Article $25,000,000
ARTICLE 65
ILLINOIS STATE BOARD OF EDUCATION
Section 5. The sum of $100,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 118, Section 5 of Public Act 96-956, as amended, is reappropriated from the School Construction Fund to the Illinois State Board of Education for school districts for maintenance projects authorized by School Construction Law.
Section 10. The sum of $10,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 118, Section 10 of Public Act 96-956, as amended, is reappropriated from the Build Illinois Bond Fund to the Illinois State Board of Education to fund all costs associated with the Technology Immersion Project.
Section 15. The sum of $25,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 118, Section 15 of Public Act 96-956, as amended, is reappropriated from the Capital Development Fund to the Illinois State Board of Education for grants to school districts for school construction projects pursuant to 105 ILCS 5/2-3.146.
Section 20. No contract shall be entered into or obligation incurred or any expenditures made from appropriations in this Article until after the purposes and amounts have been approved in writing by the Governor.
Total, this Article $135,000,000
ARTICLE 70
EASTERN ILLINOIS UNIVERSITY
Section 10. The sum of $1,551,914, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 119, Section 10 of Public Act 96-956, is reappropriated from the Capital Development Fund to the Board of Trustees of Eastern Illinois University to purchase equipment to complete the renovation and expansion of the Doudna Fine Arts Center. This appropriation is in addition to funds previously appropriated.
Section 15. No contract shall be entered into or obligation incurred for any expenditures from appropriations in this Article until after the purposes and amounts have been approved in writing by the Governor.
Total, this Article $1,551,914
ARTICLE 75
SOUTHERN ILLINOIS UNIVERSITY
Section 5. The sum of $17,564,400, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 120, Section 5 of Public Act 96-956, is reappropriated from the Capital Development Fund to the Board of Trustees of Southern Illinois University for construction and equipment expenses to complete the renovation and expansion of the Morris Library. This appropriation is in addition to funds previously appropriated.
Section 10. No contract shall be entered into or obligation incurred for any expenditures from appropriations in Section 5 of this Article until after the purposes and amounts have been approved in writing by the Governor.
Total, this Article $17,564,400
ARTICLE 80
NORTHEASTERN ILLINOIS UNIVERSITY
Section 5. The sum of $16,018, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 121, Section 5 of Public Act 96-956, is reappropriated from the Capital Development Fund to the Board of Trustees of Northeastern Illinois University to purchase equipment and remodel buildings A, B and E. This appropriation is in addition to any funds previously appropriated.
Section 10. No contract shall be entered into or obligation incurred for any expenditures from appropriations in Section 5 of this Article until after the purposes and amounts have been approved in writing by the Governor.
Total, this Article $16,018
ARTICLE 85
UNIVERSITY OF ILLINOIS
Section 5. The sum of $185,089, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 122, Section 5 of Public Act 96-956, as amended, is reappropriated from the Capital Development Fund to the Board of Trustees of the University of Illinois for all costs associated with the space needs of the Department of Natural Resources, Illinois Natural History Survey Division and State Water Survey Division on the campus of the University of Illinois in Champaign, including construction, capital facilities, planning, relocation, renovation and rehabilitation, mechanical systems, materials, services and all other costs required to complete the work.
Section 20. No contract shall be entered into or obligation incurred for any expenditures from appropriations in this Article until after the purposes and amounts have been approved in writing by the Governor.
Total, this Article $185,089
ARTICLE 90
ILLINOIS COMMERCE COMMISSION
Section 5. The sum of $52,857, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 123, Section 5 of Public Act 96-956, is reappropriated from the Capital Development Fund to the Illinois Commerce Commission for train whistle abatement in counties with over 3,000,000 in population, where a public highway crosses a railroad at grade.
Total, this Article $52,857
ARTICLE 94
ENVIRONMENTAL PROTECTION AGENCY
Section 5. The amount of $29,400,000, or so much thereof as may be necessary, is appropriated from the Water Revolving Fund to the Environmental Protection Agency for state matching purposes.
Section 10. No contract shall be entered into or obligation incurred for any expenditures from appropriations in Section 20 of this Article until after the purposes and amounts have been approved in writing by the Governor.
ARTICLE 95
ENVIRONMENTAL PROTECTION AGENCY
Section 1. The sum of $286,000,000, or so much thereof as may be necessary, is appropriated from the Water Revolving Fund to the Environmental Protection Agency for financial assistance to units of local government for sewer systems and wastewater treatment facilities pursuant to rules defining the Water Pollution Control Revolving Loan program and for transfer of funds to establish reserve accounts, construction accounts or any other necessary funds or accounts in order to implement a leveraged loan program.
Section 5. The sum of $106,000,000, or so much thereof as may be necessary, is appropriated from the Water Revolving Fund to the Environmental Protection Agency for financial assistance to units of local government and privately owned community water supplies for drinking water infrastructure projects pursuant to the Safe Drinking Water Act, as amended, and for transfer of funds to establish reserve accounts, construction accounts or any other necessary funds or accounts in order to implement a leveraged loan program.
Section 10. The sum of $5,000,000, or so much thereof as may be necessary is appropriated from the Water Revolving Fund to the Environmental Protection Agency for a green infrastructure financial assistance program to address water quality issues.
Total, this Article $397,000,000
ARTICLE 100
ENVIRONMENTAL PROTECTION AGENCY
Section 5. The sum of $783,926,039, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2011, from appropriations heretofore made in Article 4, Section 5 of Public Act 96-957 and Article 124, Section 5 of Public Act 96-956, as amended, are reappropriated from the Water Revolving Fund to the Environmental Protection Agency for financial assistance to units of local government for sewer systems and wastewater treatment facilities pursuant to rules defining the Water Pollution Control Revolving Loan program and for transfer of funds to establish reserve accounts, construction accounts or any other necessary funds or accounts in order to implement a leveraged loan program.
Section 10. The sum of $406,648,771, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2011, from appropriations heretofore made in Article 4, Section 10 of Public Act 96-957 and Article 124, Section 10 of Public Act 96-956, as amended, are reappropriated from the Water Revolving Fund to the Environmental Protection Agency for financial assistance to units of local government and privately owned community water supplies for drinking water infrastructure projects pursuant to the Safe Drinking Water Act, as amended, and for transfer of funds to establish reserve accounts, construction accounts or any other necessary funds or accounts in order to implement a leveraged loan program.
Section 15. The sum of $80,430,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 124, Section 15 of Public Act 96-956, is reappropriated from the Anti-Pollution Fund to the Environmental Protection Agency for deposit into the Water Revolving Fund.
Section 20. The sum of $5,300,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 124, Section 20 of Public Act 96-956, is reappropriated from the Capital Development Fund to the Environmental Protection Agency for financial assistance to municipalities with designated River Edge Redevelopment Zones for brownfields redevelopment in accordance with Section 58.13 of the Environmental Protection Act, including costs in prior years.
Section 25. The sum of $75,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 124, Section 25 of Public Act 96-956, is reappropriated from the Anti-Pollution Fund to the Environmental Protection Agency for reimbursements to eligible owners/operators of Leaking Underground Storage Tanks, including claims submitted in prior years and for costs associated with site remediation.
Section 30. The sum of $2,574,622, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 124, Section 30 of Public Act 96-956, as amended, is reappropriated from the Anti-Pollution Fund to the Environmental Protection Agency for grants to units of local government for wastewater facilities, pursuant to provisions of the "Anti-Pollution Bond Act."
Section 35. The amount of $26,708,175, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 124, Section 35 of Public Act 96-956, as amended, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for wastewater compliance grants to units of local government or sewer systems and wastewater treatment facilities pursuant to procedures and rules established under the Anti-Pollution Bond Act. These grants are limited to projects for which the local government provides at least 30% of the project cost. There is an approved project compliance plan, and there is an enforceable compliance schedule prior to the grant award. The grant award will be based on eligible project cost contained in the approved compliance plan.
Section 40. The sum of $2,000,000, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 124, Section 40 of Public Act 96-956, as amended, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for deposit into the Brownfields Redevelopment Fund for use pursuant to Sections 58.13 and 58.15 of the Environmental Protection Act.
Section 45. The sum of $2,000,000, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 124, Section 45 of Public Act 96-956, as amended, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for deposit into the Brownfields Redevelopment Fund for use pursuant to Sections 58.13 and 58.15 of the Environmental Protection Act.
Section 50. The sum of $10,000,000, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 124, Section 50 of Public Act 96-956, as amended, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for deposit into the Hazardous Waste Fund for use pursuant to Section 22.2 of the Environmental Protection Act.
Section 55. The sum of $471,885, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 124, Section 55 of Public Act 96-956, as amended, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for grants and contracts for public drinking water infrastructure, including design and construction, where private drinking water wells have been contaminated by a hazardous substance.
Section 60. The sum of $4,776,725, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 124, Section 60 of Public Act 96-956, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for financial assistance to municipalities with designated River Edge Redevelopment Zones for brownfields redevelopment in accordance with Section 58.13 of the Environmental Protection Act, including costs in prior years.
Section 65. The sum of $50,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 124, Section 65 of Public Act 96-956, as amended, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for grants to units of local government and privately owned community water supplies for sewer systems, wastewater treatment facilities and drinking water infrastructure projects.
Section 70. The sum of $8,942,400, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 124, Section 70 of Public Act 96-956, as amended, is reappropriated from the Anti-Pollution Fund to the Environmental Protection Agency for deposit into the Water Revolving Fund.
Section 75. The sum of $1,407,069, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 124, Section 75 of Public Act 96-956, as amended, is reappropriated from the Anti-Pollution Fund to the Environmental Protection Agency for deposit into the Water Revolving Fund.
Section 80. The sum of $7,858,247, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 124, Section 80 of Public Act 96-956, as amended, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for the protection, preservation, restoration and conservation of environmental and natural resources, for deposits into the Water Revolving Fund, and for any other purposes authorized in subsection (d) of Section 4 of the Build Illinois Bond Act and for grants to State agencies for such purposes.
Section 85. The sum of $16,600,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 124, Section 85 of Public Act 96-956, as amended, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for the protection, preservation, restoration and conservation of environmental and natural resources, for deposits into the Water Revolving Fund, and for any other purposes authorized in subsection (d) of Section 4 of the Build Illinois Bond Act and for grants to State Agencies for such purposes.
Section 90. The sum of $22,073,619, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 124, Section 90 of Public Act 96-956, as amended, is reappropriated from the Water Revolving Fund to the Environmental Protection Agency for financial assistance to units of local government for sewer systems and wastewater treatment facilities pursuant to the American Recovery and Reinvestment Act of 2009.
Section 95. The sum of $1,995,083, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 124, Section 95 of Public Act 96-956, as amended, is reappropriated from the Water Revolving Fund to the Environmental Protection Agency for financial assistance to local governments and privately owned community water supplies for drinking water infrastructure projects pursuant to the American Recovery and Reinvestment Act of 2009.
Section 100. The sum of $5,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 4, Section 15 of Public Act 96-957, is reappropriated from the Water Revolving Fund to the Environmental Protection Agency for a green infrastructure financial assistance program to address water quality issues.
Section 105. The sum of $2,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from an appropriation heretofore made for such purpose in Article 4, Section 20 of Public Act 96-957, is reappropriated from the Water Revolving Fund to the Environmental Protection Agency for a small community water supply financial assistance program to address compliance problems.
Section 110. No contract shall be entered into or obligation incurred for any expenditure made in Sections 15 through 85 of this Article until after the purpose and amounts have been approved in writing by the Governor.
Total, this Article $1,515,712,635
ARTICLE 105
HISTORIC PRESERVATION AGENCY
Section 5. The sum of $143,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made in Article 125, Section 5 of Public Act 96-956, as amended, is reappropriated from the Capital Development Fund to the Historic Preservation Agency for support facilities, acquisition or improvements for Sugar Loaf and/or Fox Mounds or other properties within the Cahokia Mounds National Historic Landmark Boundary.
Section 10. No contract shall be entered into or obligation incurred for any expenditures from appropriations in Section 5 of this Article until after the purposes and amounts have been approved in writing by the Governor.
Total, this Article $143,000
ARTICLE 110
ILLINOIS FINANCE AUTHORITY
Section 5. The sum of $6,003,342, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from appropriations heretofore made in Article 126, Section 5 of Public Act 96-956, as amended, is reappropriated from the Fire Truck Revolving Loan Fund to the Illinois Finance Authority for the purpose of making loans to fire departments, fire protection districts, and township fire departments as successor in interest to the Illinois Rural Bond Bank, pursuant to Section 845-75 of Public Act 93-0205.
Section 10. The sum of $7,006,800, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from appropriations heretofore made in Article 126, Section 10 of Public Act 96-956, amended, is reappropriated from the Ambulance Revolving Loan Fund to the Illinois Finance Authority for the purpose of making loans to fire departments, fire protection districts, township fire departments or non-profit ambulance services as successor in interest to the Illinois Rural Bond Bank.
Total, this Article $13,010,142
ARTICLE 115
ILLINOIS COMMUNITY COLLEGE BOARD
Section 5. The sum of $314,597, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2011, from a reappropriation heretofore made for such purpose in Article 127, Section 5 of Public Act 96-956, as amended, is reappropriated from the Build Illinois Bond Fund for the Illinois Community College Board for remodeling of facilities for compliance with the Americans with Disabilities Act. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 10. No contract shall be entered into or obligation incurred for any expenditures from appropriations in Section 5 of this Article until after the purposes and amounts have been approved in writing by the Governor.
Total, this Article $314,597