|
| | HB1458 Engrossed | | LRB097 05385 PJG 45442 b |
|
|
1 | | AN ACT concerning State government.
|
2 | | Be it enacted by the People of the State of Illinois,
|
3 | | represented in the General Assembly:
|
4 | | Section 5. The Illinois Power Agency Act is amended by |
5 | | changing Section 1-10 as follows:
|
6 | | (20 ILCS 3855/1-10)
|
7 | | Sec. 1-10. Definitions. |
8 | | "Agency" means the Illinois Power Agency. |
9 | | "Agency loan agreement" means any agreement pursuant to |
10 | | which the Illinois Finance Authority agrees to loan the |
11 | | proceeds of revenue bonds issued with respect to a project to |
12 | | the Agency upon terms providing for loan repayment installments |
13 | | at least sufficient to pay when due all principal of, interest |
14 | | and premium, if any, on those revenue bonds, and providing for |
15 | | maintenance, insurance, and other matters in respect of the |
16 | | project. |
17 | | "Authority" means the Illinois Finance Authority. |
18 | | "Clean coal facility" means an electric generating |
19 | | facility that uses primarily coal as a feedstock and that |
20 | | captures and sequesters carbon emissions at the following |
21 | | levels: at least 50% of the total carbon emissions that the |
22 | | facility would otherwise emit if, at the time construction |
23 | | commences, the facility is scheduled to commence operation |
|
| | HB1458 Engrossed | - 2 - | LRB097 05385 PJG 45442 b |
|
|
1 | | before 2016, at least 70% of the total carbon emissions that |
2 | | the facility would otherwise emit if, at the time construction |
3 | | commences, the facility is scheduled to commence operation |
4 | | during 2016 or 2017, and at least 90% of the total carbon |
5 | | emissions that the facility would otherwise emit if, at the |
6 | | time construction commences, the facility is scheduled to |
7 | | commence operation after 2017. The power block of the clean |
8 | | coal facility shall not exceed allowable emission rates for |
9 | | sulfur dioxide, nitrogen oxides, carbon monoxide, particulates |
10 | | and mercury for a natural gas-fired combined-cycle facility the |
11 | | same size as and in the same location as the clean coal |
12 | | facility at the time the clean coal facility obtains an |
13 | | approved air permit. All coal used by a clean coal facility |
14 | | shall have high volatile bituminous rank and greater than 1.7 |
15 | | pounds of sulfur per million btu content, unless the clean coal |
16 | | facility does not use gasification technology and was operating |
17 | | as a conventional coal-fired electric generating facility on |
18 | | June 1, 2009 (the effective date of Public Act 95-1027). |
19 | | "Clean coal SNG facility" means a facility that uses a |
20 | | gasification process to produce substitute natural gas, that |
21 | | sequesters at least 90% of the total carbon emissions that the |
22 | | facility would otherwise emit and that uses petroleum coke or |
23 | | coal as a feedstock, with all such coal having a high |
24 | | bituminous rank and greater than 1.7 pounds of sulfur per |
25 | | million btu content. |
26 | | "Commission" means the Illinois Commerce Commission. |
|
| | HB1458 Engrossed | - 3 - | LRB097 05385 PJG 45442 b |
|
|
1 | | "Costs incurred in connection with the development and |
2 | | construction of a facility" means: |
3 | | (1) the cost of acquisition of all real property and |
4 | | improvements in connection therewith and equipment and |
5 | | other property, rights, and easements acquired that are |
6 | | deemed necessary for the operation and maintenance of the |
7 | | facility; |
8 | | (2) financing costs with respect to bonds, notes, and |
9 | | other evidences of indebtedness of the Agency; |
10 | | (3) all origination, commitment, utilization, |
11 | | facility, placement, underwriting, syndication, credit |
12 | | enhancement, and rating agency fees; |
13 | | (4) engineering, design, procurement, consulting, |
14 | | legal, accounting, title insurance, survey, appraisal, |
15 | | escrow, trustee, collateral agency, interest rate hedging, |
16 | | interest rate swap, capitalized interest and other |
17 | | financing costs, and other expenses for professional |
18 | | services; and |
19 | | (5) the costs of plans, specifications, site study and |
20 | | investigation, installation, surveys, other Agency costs |
21 | | and estimates of costs, and other expenses necessary or |
22 | | incidental to determining the feasibility of any project, |
23 | | together with such other expenses as may be necessary or |
24 | | incidental to the financing, insuring, acquisition, and |
25 | | construction of a specific project and placing that project |
26 | | in operation. |
|
| | HB1458 Engrossed | - 4 - | LRB097 05385 PJG 45442 b |
|
|
1 | | "Department" means the Department of Commerce and Economic |
2 | | Opportunity. |
3 | | "Director" means the Director of the Illinois Power Agency. |
4 | | "Demand-response" means measures that decrease peak |
5 | | electricity demand or shift demand from peak to off-peak |
6 | | periods. |
7 | | "Energy efficiency" means measures that reduce the amount |
8 | | of electricity or natural gas required to achieve a given end |
9 | | use. |
10 | | "Electric utility" has the same definition as found in |
11 | | Section 16-102 of the Public Utilities Act. |
12 | | "Facility" means an electric generating unit or a |
13 | | co-generating unit that produces electricity along with |
14 | | related equipment necessary to connect the facility to an |
15 | | electric transmission or distribution system. |
16 | | "Governmental aggregator" means one or more units of local |
17 | | government that individually or collectively procure |
18 | | electricity to serve residential retail electrical loads |
19 | | located within its or their jurisdiction. |
20 | | "Local government" means a unit of local government as |
21 | | defined in Article VII of Section 1 of the Illinois |
22 | | Constitution. |
23 | | "Municipality" means a city, village, or incorporated |
24 | | town. |
25 | | "Person" means any natural person, firm, partnership, |
26 | | corporation, either domestic or foreign, company, association, |
|
| | HB1458 Engrossed | - 5 - | LRB097 05385 PJG 45442 b |
|
|
1 | | limited liability company, joint stock company, or association |
2 | | and includes any trustee, receiver, assignee, or personal |
3 | | representative thereof. |
4 | | "Project" means the planning, bidding, and construction of |
5 | | a facility. |
6 | | "Public utility" has the same definition as found in |
7 | | Section 3-105 of the Public Utilities Act. |
8 | | "Real property" means any interest in land together with |
9 | | all structures, fixtures, and improvements thereon, including |
10 | | lands under water and riparian rights, any easements, |
11 | | covenants, licenses, leases, rights-of-way, uses, and other |
12 | | interests, together with any liens, judgments, mortgages, or |
13 | | other claims or security interests related to real property. |
14 | | "Renewable energy credit" means a tradable credit that |
15 | | represents the environmental attributes of a certain amount of |
16 | | energy produced from a renewable energy resource. |
17 | | "Renewable energy resources" includes energy and its |
18 | | associated renewable energy credit or renewable energy credits |
19 | | from wind, solar thermal energy, photovoltaic cells and panels, |
20 | | biodiesel, crops and untreated and unadulterated organic waste |
21 | | biomass, tree waste, hydropower that does not involve new |
22 | | construction or significant expansion of hydropower dams, and |
23 | | other alternative sources of environmentally preferable |
24 | | energy. For purposes of this Act, landfill gas produced in the |
25 | | State is considered a renewable energy resource. "Renewable |
26 | | energy resources" includes biogas and biosolids produced by |
|
| | HB1458 Engrossed | - 6 - | LRB097 05385 PJG 45442 b |
|
|
1 | | local government wastewater treatment plants in the State. |
2 | | "Renewable energy resources" does not include the incineration |
3 | | or burning of tires, garbage, general household, |
4 | | institutional, and commercial waste, industrial lunchroom or |
5 | | office waste, landscape waste other than tree waste, railroad |
6 | | crossties, utility poles, or construction or demolition |
7 | | debris, other than untreated and unadulterated waste wood. |
8 | | "Revenue bond" means any bond, note, or other evidence of |
9 | | indebtedness issued by the Authority, the principal and |
10 | | interest of which is payable solely from revenues or income |
11 | | derived from any project or activity of the Agency. |
12 | | "Sequester" means permanent storage of carbon dioxide by |
13 | | injecting it into a saline aquifer, a depleted gas reservoir, |
14 | | or an oil reservoir, directly or through an enhanced oil |
15 | | recovery process that may involve intermediate storage in a |
16 | | salt dome. |
17 | | "Servicing agreement" means (i) in the case of an electric |
18 | | utility, an agreement between the owner of a clean coal |
19 | | facility and such electric utility, which agreement shall have |
20 | | terms and conditions meeting the requirements of paragraph (3) |
21 | | of subsection (d) of Section 1-75, and (ii) in the case of an |
22 | | alternative retail electric supplier, an agreement between the |
23 | | owner of a clean coal facility and such alternative retail |
24 | | electric supplier, which agreement shall have terms and |
25 | | conditions meeting the requirements of Section 16-115(d)(5) of |
26 | | the Public Utilities Act. |
|
| | HB1458 Engrossed | - 7 - | LRB097 05385 PJG 45442 b |
|
|
1 | | "Substitute natural gas" or "SNG" means a gas manufactured |
2 | | by gasification of hydrocarbon feedstock, which is |
3 | | substantially interchangeable in use and distribution with |
4 | | conventional natural gas. |
5 | | "Total resource cost test" or "TRC test" means a standard |
6 | | that is met if, for an investment in energy efficiency or |
7 | | demand-response measures, the benefit-cost ratio is greater |
8 | | than one. The benefit-cost ratio is the ratio of the net |
9 | | present value of the total benefits of the program to the net |
10 | | present value of the total costs as calculated over the |
11 | | lifetime of the measures. A total resource cost test compares |
12 | | the sum of avoided electric utility costs, representing the |
13 | | benefits that accrue to the system and the participant in the |
14 | | delivery of those efficiency measures, as well as other |
15 | | quantifiable societal benefits, including avoided natural gas |
16 | | utility costs, to the sum of all incremental costs of end-use |
17 | | measures that are implemented due to the program (including |
18 | | both utility and participant contributions), plus costs to |
19 | | administer, deliver, and evaluate each demand-side program, to |
20 | | quantify the net savings obtained by substituting the |
21 | | demand-side program for supply resources. In calculating |
22 | | avoided costs of power and energy that an electric utility |
23 | | would otherwise have had to acquire, reasonable estimates shall |
24 | | be included of financial costs likely to be imposed by future |
25 | | regulations and legislation on emissions of greenhouse gases.
|
26 | | (Source: P.A. 95-481, eff. 8-28-07; 95-913, eff. 1-1-09; |