| |||||||
| |||||||
| |||||||
1 | AMENDMENT TO HOUSE BILL 1422
| ||||||
2 | AMENDMENT NO. ______. Amend House Bill 1422 on page 5, by | ||||||
3 | replacing lines 7 through 11 with " The cost effective energy | ||||||
4 | efficiency measures shall be procured whenever the cost is | ||||||
5 | lower than the combined avoided costs of energy, capacity, | ||||||
6 | transmission, and the renewable portfolio standard for a | ||||||
7 | comparable volume of energy provided that the energy efficiency | ||||||
8 | products shall: ".
|