Rep. Thomas Holbrook
Filed: 4/1/2011
| | 09700HB0680ham001 | | LRB097 03508 ASK 53721 a |
|
|
1 | | AMENDMENT TO HOUSE BILL 680
|
2 | | AMENDMENT NO. ______. Amend House Bill 680 by replacing |
3 | | everything after the enacting clause with the following:
|
4 | | "Section 1. Short title. This Act may be cited as the |
5 | | Carbon Dioxide Geologic Storage Act . |
6 | | Section 5. Statement of policy. It is in the public |
7 | | interest to promote the geologic storage of carbon dioxide. |
8 | | Doing so will help ensure the viability of the Illinois coal, |
9 | | natural gas, power, and other industries under a spectrum of |
10 | | potential environmental regulations and will promote economic |
11 | | development in Illinois. Further, geologic storage of carbon |
12 | | dioxide, a potentially valuable commodity, may allow for its |
13 | | ready availability if needed for commercial, industrial, or |
14 | | other uses, including enhanced recovery of oil, gas, and other |
15 | | minerals.
|
16 | | To be practical and effective, geologic storage of carbon |
|
| | 09700HB0680ham001 | - 2 - | LRB097 03508 ASK 53721 a |
|
|
1 | | dioxide requires cooperative use of surface and subsurface |
2 | | property interests often across large areas. It is therefore in |
3 | | the public interest to employ procedures that promote, in a |
4 | | manner fair to all interests, the use of all pore space in a |
5 | | clearly defined reservoir to ensure comprehensive management |
6 | | of the reservoir and the efficient use of natural resources. It |
7 | | is important that rules governing the use and development of |
8 | | subsurface pore space be consistent with both established |
9 | | precedents and subsurface private property rights.
|
10 | | Section 10. Definitions. As used in this Act, unless the |
11 | | context requires a different meaning:
|
12 | | "Carbon dioxide injection well" means a well that is used |
13 | | to inject carbon dioxide into a reservoir for geologic storage. |
14 | | "Department" means the Department of Natural Resources.
|
15 | | "Geologic storage" means the underground storage of carbon |
16 | | dioxide in a reservoir.
|
17 | | "Gross revenue" means the aggregate total revenue actually |
18 | | received by the storage operator from third parties for |
19 | | operation of the storage facility, including any sales of |
20 | | federal, State, or other production or investment tax credits |
21 | | received in connection with the operation of the storage |
22 | | facility, free of any costs, charges, or deductions.
|
23 | | "Mineral owner" means, as identified in the tax assessor's |
24 | | records for each county containing some portion of the proposed |
25 | | reservoir, any owner of a whole or fractional interest in any |
|
| | 09700HB0680ham001 | - 3 - | LRB097 03508 ASK 53721 a |
|
|
1 | | or all minerals in real property above, below, or within the |
2 | | proposed reservoir that has been severed from the surface |
3 | | estate by grant, exception, reservation, lease, or other means.
|
4 | | "Pore space" means subsurface cavities or voids, whether |
5 | | natural or artificially created, that can be used as storage |
6 | | space for carbon dioxide or other substances.
|
7 | | "Pore space owner" means the person, trust, corporation, or |
8 | | other entity who has title to the pore space.
|
9 | | "Reservoir" means any depleted oil or gas reservoir, saline |
10 | | formation, coal seam, or any natural or artificial subsurface |
11 | | stratum or formation with a clearly defined reservoir boundary |
12 | | and pore space of sufficient porosity and permeability for |
13 | | injection and storage of carbon dioxide. "Reservoir" does not |
14 | | include an underground source of drinking water.
|
15 | | "Reservoir boundary" means the area specified in the |
16 | | certificate of unit designation that delineates the vertical |
17 | | and horizontal limits of the reservoir, including buffer areas, |
18 | | such that any carbon dioxide injected into the reservoir will |
19 | | remain within the boundary. The reservoir boundary must be |
20 | | established by identifying physical parameters, such as |
21 | | structural or stratigraphic geologic features, that will |
22 | | constrain buoyant migration of the injected carbon dioxide such |
23 | | that it will remain within the boundary. The reservoir boundary |
24 | | need not include the entirety of a geologic formation if it can |
25 | | be shown that physical parameters, such as geologic features, |
26 | | will contain injected carbon dioxide within the boundary. |
|
| | 09700HB0680ham001 | - 4 - | LRB097 03508 ASK 53721 a |
|
|
1 | | "Reservoir permit" means a permit issued by the Department |
2 | | allowing a person to establish and operate a storage facility.
|
3 | | "Storage facility" means the reservoir, underground |
4 | | equipment, and surface facilities and equipment used or |
5 | | proposed to be used in a geologic storage operation. "Storage |
6 | | facility" does not include pipelines used to transport carbon |
7 | | dioxide to the storage facility from the carbon dioxide source. |
8 | | "Storage facility" also does not include a single carbon |
9 | | dioxide injection well to be used for experimental, research, |
10 | | or evaluation purposes as long as the well does not inject more |
11 | | than 100,000 tons of carbon dioxide in total and does not |
12 | | operate for more than 5 years.
|
13 | | "Storage operator" means a person holding or applying for a |
14 | | certificate of unit designation and a reservoir permit under |
15 | | this Act and holding or applying for a UIC permit for the |
16 | | injection of carbon dioxide.
|
17 | | "Surface owners" means, as identified in the tax assessor's |
18 | | records for each county containing some portion of the proposed |
19 | | reservoir, any owner of a whole or undivided fee simple |
20 | | interest or other freehold interest, which may or may not |
21 | | include mineral rights, in the surface above the proposed |
22 | | reservoir, but does not include an owner of a right-of-way, |
23 | | easement, leasehold, or any other lesser estate.
|
24 | | "UIC permit" means an Underground Injection Control permit |
25 | | authorized under the federal Safe Drinking Water Act's |
26 | | Underground Injection Control (UIC) Program that allows a |
|
| | 09700HB0680ham001 | - 5 - | LRB097 03508 ASK 53721 a |
|
|
1 | | person to operate a carbon dioxide injection well. |
2 | | Section 12. Applicability. This Act applies only to carbon |
3 | | dioxide injections that commence on or after January 1, 2012. |
4 | | Section 15. Reservoir permit.
|
5 | | (a) A storage operator must have a reservoir permit issued |
6 | | by the Department to operate a storage facility in the State. A |
7 | | reservoir permit may be transferred or assigned from one |
8 | | storage operator to another upon written consent of the |
9 | | Department. |
10 | | (b) The Department shall issue a reservoir permit to the |
11 | | storage operator if the Department finds that:
|
12 | | (1) a certificate of unit designation has been issued |
13 | | as provided in Section 25;
|
14 | | (2) the interests of non-consenting pore space owners |
15 | | within the reservoir boundary have been addressed as |
16 | | provided in Section 35;
|
17 | | (3) the interests of mineral owners within the |
18 | | reservoir boundary have been addressed as provided in |
19 | | Section 40;
and |
20 | | (4) the storage operator has applied for a UIC permit |
21 | | or has been issued a UIC permit. |
22 | | The Department may condition the granting of a reservoir |
23 | | permit on obtaining a UIC permit, but no State agency may delay |
24 | | the processing of the reservoir permit application on the |
|
| | 09700HB0680ham001 | - 6 - | LRB097 03508 ASK 53721 a |
|
|
1 | | grounds that the application for another required permit is |
2 | | pending. |
3 | | (c) The Department shall issue only one reservoir permit |
4 | | per reservoir. A storage operator may not apply for a reservoir |
5 | | permit where the reservoir permit encompasses an area that is |
6 | | included in certificate of unit designation the storage |
7 | | operator does not hold. A storage operator may apply to expand |
8 | | the reservoir boundary of an existing reservoir permit it does |
9 | | hold.
|
10 | | (d) The Department shall hold a public hearing regarding a |
11 | | reservoir permit application to ensure that the requirements of |
12 | | subsection (b) of this Section have been satisfied.
|
13 | | (1) Notice of the public hearing shall include:
|
14 | | (A) The type of proceedings before the Department |
15 | | and a general statement of purpose for such |
16 | | proceedings.
|
17 | | (B) A description of the reservoir boundary, |
18 | | including a legal description of the reservoir.
|
19 | | (C) A description of the proposed storage facility |
20 | | and its operations. |
21 | | (D) The time, date, and place of the public |
22 | | hearing. |
23 | | (E) The limitations on standing provided by |
24 | | subsection (h) of this Section. |
25 | | (2) Upon receipt of the reservoir permit application, |
26 | | the Department shall fix the time and place for the public |
|
| | 09700HB0680ham001 | - 7 - | LRB097 03508 ASK 53721 a |
|
|
1 | | hearing, which shall be no less than 30 days nor more than |
2 | | 60 days after the date of filing of the application. The |
3 | | Department shall give notice of the hearing at least 30 |
4 | | days prior to the hearing in the following manner:
|
5 | | (A) By United States first class mail directed to |
6 | | all local governments with jurisdiction over some |
7 | | portion of the proposed reservoir, and to all surface |
8 | | owners and all mineral owners within the proposed |
9 | | reservoir boundary at their last-known address as |
10 | | shown by the records described for each in Section 10 |
11 | | of this Act. For any surface owner or mineral owner |
12 | | within the proposed reservoir boundary that is not |
13 | | identified in such records, the storage operator shall |
14 | | be deemed to have acted in good faith, shall not be |
15 | | subject to further obligations, and shall have no |
16 | | liability to such owners for any legal or equitable |
17 | | remedy or relief arising from, in connection with, or |
18 | | otherwise relating to the storage facility, provided |
19 | | the published notice required by subparagraph (B) of |
20 | | paragraph (2) of this subsection (d) is given. The |
21 | | storage operator shall not be liable for any errors or |
22 | | omissions in such records.
The Department's |
23 | | certificate that it has mailed the notices is evidence |
24 | | that it has done so. |
25 | | (B) By publication of such notice in a newspaper of |
26 | | general circulation published in each county |
|
| | 09700HB0680ham001 | - 8 - | LRB097 03508 ASK 53721 a |
|
|
1 | | containing some portion of the reservoir at least once |
2 | | each week for 3 successive weeks. The first publication |
3 | | shall be at least 30 days prior to the date of the |
4 | | public hearing. If there is no newspaper published in a |
5 | | county containing some portion of the reservoir, then |
6 | | the publication shall be in a newspaper published in an |
7 | | adjoining county in this State, having circulation in |
8 | | the county in which that portion of the reservoir is |
9 | | located. |
10 | | (e) If the Department does not complete the review of a |
11 | | reservoir permit application within 90 days after receipt, |
12 | | including the public notice and hearing as described in |
13 | | subsection (d) of this Section, then the reservoir permit shall |
14 | | be issued. If the Department does not find the storage operator |
15 | | to have met the requirements detailed in subsection (b) of this |
16 | | Section, then the Department may either decline the application |
17 | | or require amendment to the application before granting the |
18 | | reservoir permit. If the Department requires amendment to the |
19 | | application, then the Department shall have 30 days after the |
20 | | storage operator amends its application to either grant or |
21 | | decline to grant the reservoir permit or the reservoir permit.
|
22 | | (f) The Department may charge a fee to the storage operator |
23 | | for review of the reservoir permit application. The fee must be |
24 | | in the amount set by Department rule. The amount must be based |
25 | | on the Department's anticipated expenses that it will incur in |
26 | | reviewing the reservoir permit application and shall not exceed |
|
| | 09700HB0680ham001 | - 9 - | LRB097 03508 ASK 53721 a |
|
|
1 | | $10,000.
|
2 | | (g) The Department may include conditions in the reservoir |
3 | | permit to carry out the reservoir permit requirements. The |
4 | | reservoir permit shall contain a description of the reservoir |
5 | | boundary and shall authorize the storage operator to use all |
6 | | pore space within the reservoir as a storage facility.
|
7 | | (h) The Department shall have the right at all times to go |
8 | | upon and inspect a storage facility for the purpose of |
9 | | ascertaining compliance with the provisions of this Act.
|
10 | | Section 20. Ownership and conveyance of pore space.
|
11 | | (a) Title to pore space is vested in the owner of the |
12 | | overlying surface estate.
|
13 | | (b) A conveyance of title to the surface estate conveys the |
14 | | pore space in all strata underlying the surface estate.
|
15 | | (c) Title to pore space may not be severed from the surface |
16 | | estate.
|
17 | | (d) Grants of easement to use or leasing of pore space is |
18 | | not a severance prohibited by this Section.
|
19 | | (e) The grants of easement or leasing of pore space shall |
20 | | not confer any right to enter upon or otherwise use the surface |
21 | | of the land unless the grant of easement or lease expressly so |
22 | | provides.
|
23 | | Section 25. Unit designation.
|
24 | | (a) The Department shall issue a certificate of unit |
|
| | 09700HB0680ham001 | - 10 - | LRB097 03508 ASK 53721 a |
|
|
1 | | designation to the storage operator if the Department finds |
2 | | that:
|
3 | | (1) the reservoir has a clearly defined boundary;
|
4 | | (2) the reservoir is suitable for carbon dioxide |
5 | | injection and storage, including the presence of physical |
6 | | parameters, such as structural or stratigraphic geologic |
7 | | features, to ensure injected carbon dioxide remains within |
8 | | the reservoir boundary;
|
9 | | (3) the reservoir boundary encompasses an area of at |
10 | | least 5,000 acres; |
11 | | (4) the storage operator has made a good-faith effort |
12 | | to identify all surface owners and all mineral owners and |
13 | | their last-known addresses using the records described for |
14 | | each in Section 10 of this Act; |
15 | | (5) the storage operator has made a good-faith effort |
16 | | to obtain ownership, grants of easement, or leaseholds from |
17 | | all known pore space owners within the reservoir boundary; |
18 | | and |
19 | | (6) the storage operator owns or has obtained grants of |
20 | | easement or leaseholds from persons who own at least 51% of |
21 | | the proposed reservoir's pore space based upon the number |
22 | | of surface acres within the reservoir boundary.
|
23 | | (b) If the Department does not complete the review of a |
24 | | unit designation application within 60 days after receipt, then |
25 | | the certificate of unit designation shall be issued. If the |
26 | | Department does not find the storage operator to have met the |
|
| | 09700HB0680ham001 | - 11 - | LRB097 03508 ASK 53721 a |
|
|
1 | | requirements detailed in subsection (a) of this Section, then |
2 | | the Department may either decline the application or require |
3 | | amendment to the application before granting the certificate of |
4 | | unit designation. If the Department requires amendment to the |
5 | | application, then the Department shall have 30 days after the |
6 | | storage operator amends the application to either grant or |
7 | | decline to grant the certificate of unit designation or the |
8 | | certificate of unit designation shall be issued.
|
9 | | (c) The Department may charge a fee to the storage operator |
10 | | for review of the unit designation application. The Department |
11 | | shall set the fee amount by rule, but the amount must be based |
12 | | on the Department's anticipated expenses that it will incur in |
13 | | reviewing the unit designation application and shall not exceed |
14 | | $10,000. |
15 | | Section 35. Amalgamating property interests.
|
16 | | (a) If a storage operator does not own, or has not obtained |
17 | | grants of easement or leaseholds from persons who own, all of |
18 | | the pore space within the reservoir boundary, then the |
19 | | Department shall require that the pore space owned by |
20 | | nonconsenting pore space owners be included in a storage |
21 | | facility and subject to geologic storage for the purposes of |
22 | | administering the reservoir permit. Any amalgamation of pore |
23 | | space shall not include the right to use the surface above |
24 | | nonconsenting pore space owners' pore space.
|
25 | | (b) Each nonconsenting pore space owner shall be entitled |
|
| | 09700HB0680ham001 | - 12 - | LRB097 03508 ASK 53721 a |
|
|
1 | | to compensation for the use of their pore space in the |
2 | | reservoir equal to 4% of gross revenues multiplied by a |
3 | | fraction, the numerator of which is the number of surface acres |
4 | | within the reservoir boundary that are owned by the |
5 | | nonconsenting pore space owner and the denominator of which is |
6 | | the total number of surface acres within the reservoir |
7 | | boundary.
|
8 | | (c) The Department shall have the authority to commit |
9 | | State-owned pore space within the reservoir boundary to the |
10 | | storage facility on the terms described in subsection (b) of |
11 | | this Section.
|
12 | | Section 40. Mineral interests.
|
13 | | (a) A reservoir permit may not be issued if the interests |
14 | | of mineral owners would be adversely affected. For purposes of |
15 | | this Section, "adversely affected" means that the Department |
16 | | finds that:
|
17 | | (1) the reservoir contains a commercially valuable |
18 | | mineral that a mineral owner has verifiable plans to |
19 | | extract and that such extraction would be precluded by |
20 | | operation of the reservoir;
|
21 | | (2) the cost of mineral extraction of a commercially |
22 | | valuable mineral that the mineral owner has verifiable |
23 | | plans to extract would be significantly increased by the |
24 | | operation of the reservoir; or
|
25 | | (3) the extraction rate of a commercially valuable |
|
| | 09700HB0680ham001 | - 13 - | LRB097 03508 ASK 53721 a |
|
|
1 | | mineral that the mineral owner has verifiable plans to |
2 | | extract would be significantly reduced by the operation of |
3 | | the reservoir.
|
4 | | (b) Mineral owners may drill through or near a reservoir to |
5 | | explore for or extract minerals, provided the drilling, |
6 | | extraction, and related activities are conducted in |
7 | | cooperation with the storage operator and comply with |
8 | | Department requirements that preserve the storage facility's |
9 | | integrity.
|
10 | | (c) A storage operator may drill through or near a mineral |
11 | | producing area to operate the storage facility, provided the |
12 | | drilling, carbon dioxide storage, and related activities are |
13 | | conducted in cooperation with the mineral owners and comply |
14 | | with Department requirements that ensure no adverse effect on |
15 | | mineral extraction.
|
16 | | (d) Mineral owners shall provide the storage operator |
17 | | reasonable access to wells and other equipment, as necessary, |
18 | | to ensure that mineral production equipment does not provide a |
19 | | leakage pathway for stored carbon dioxide. Storage operators |
20 | | shall compensate mineral owners for any losses associated with |
21 | | loss of production or business interruption due to such |
22 | | activities.
|
23 | | Section 45. Title to carbon dioxide; liability.
The storage |
24 | | operator has title to the carbon dioxide injected into and |
25 | | stored in a reservoir and holds title until the Department |
|
| | 09700HB0680ham001 | - 14 - | LRB097 03508 ASK 53721 a |
|
|
1 | | issues a certificate of completion. While the storage operator |
2 | | holds title, the operator is liable for any damage the carbon |
3 | | dioxide may cause, including damage caused by carbon dioxide |
4 | | that escapes from the storage facility. The pore space owner |
5 | | shall have no liability associated with operation of a storage |
6 | | facility, unless the storage operator is the pore space owner.
|
7 | | Section 55. Project completion and title transfer.
|
8 | | (a) After carbon dioxide injections at a storage facility |
9 | | cease, the storage operator may apply for a certificate of |
10 | | completion. Before issuing a certificate of completion, the |
11 | | Department, in consultation with the issuer of the UIC permit, |
12 | | must find that:
|
13 | | (1) the storage operator is in full compliance with all |
14 | | laws governing the storage facility, including any ongoing |
15 | | UIC permit requirements;
|
16 | | (2) the storage operator has addressed all pending |
17 | | claims, if any, regarding the storage facility's |
18 | | operation; |
19 | | (3) all carbon dioxide injection wells have been |
20 | | plugged, equipment and facilities has been removed, and |
21 | | reclamation work has been completed as required by the UIC |
22 | | permit issuer or the Department; |
23 | | (4) the carbon dioxide in the reservoir has become |
24 | | stable; stored carbon dioxide is stable if it is |
25 | | essentially stationary or, if it is migrating or may |
|
| | 09700HB0680ham001 | - 15 - | LRB097 03508 ASK 53721 a |
|
|
1 | | migrate, that any migration will be unlikely to cross the |
2 | | reservoir boundary; |
3 | | (5) all monitoring wells, equipment, and facilities to |
4 | | be used in the post-closure period are in good condition |
5 | | and retain mechanical integrity; and |
6 | | (6) the storage operator has transferred to the |
7 | | Department a carbon storage project fund that contains |
8 | | sufficient funds to carry out the site care and monitoring |
9 | | activities required by the UIC permit, if applicable.
|
10 | | (b) If the Department does not complete the review of a |
11 | | certificate of completion application within 90 days after |
12 | | receipt, including the public notice and input deemed |
13 | | appropriate by the Department, then the certificate of |
14 | | completion shall be issued. If the Department does not find |
15 | | that the requirements detailed in subsection (a) of this |
16 | | Section have been met, then it may either decline the |
17 | | application or require amendment to the application before |
18 | | granting the certificate of completion. If the Department |
19 | | requires amendment to the application, then the storage |
20 | | operator shall have 30 days to amend the application. |
21 | | Thereafter, the Department shall have 30 days to either grant |
22 | | or decline to grant the certificate of completion or the |
23 | | certificate of completion shall be issued.
|
24 | | (c) The Department may charge a fee to the storage operator |
25 | | for reviewing the certificate of completion application. The |
26 | | fee must be in the amount set by Department rule. The amount |
|
| | 09700HB0680ham001 | - 16 - | LRB097 03508 ASK 53721 a |
|
|
1 | | must be based on the Department's anticipated expenses that it |
2 | | shall incur in reviewing the certificate of completion |
3 | | application and shall not exceed $10,000.
|
4 | | (d) Once a certificate of completion is issued the |
5 | | following occurs:
|
6 | | (1) Title to the storage facility and to the stored |
7 | | carbon dioxide transfers, without compensation, to the |
8 | | State.
|
9 | | (2) Title acquired by the State includes all rights and |
10 | | interests in, and all responsibilities associated with, |
11 | | the stored carbon dioxide.
|
12 | | (3) The storage operator is released from all |
13 | | regulatory requirements associated with the storage |
14 | | facility.
|
15 | | (4) Monitoring and managing the storage facility is the |
16 | | State's responsibility to be overseen by the Department |
17 | | until such time as the federal government assumes |
18 | | responsibility for the long-term monitoring and management |
19 | | of storage facilities.
|
20 | | (5) If the federal government has not assumed |
21 | | responsibility for the long-term monitoring and management |
22 | | of storage facilities, then the carbon storage project fund |
23 | | shall be used for the purposes of monitoring and managing |
24 | | the storage facility. If the federal government has assumed |
25 | | responsibility for the long-term monitoring and management |
26 | | of storage facilities, then the carbon storage project fund |
|
| | 09700HB0680ham001 | - 17 - | LRB097 03508 ASK 53721 a |
|
|
1 | | shall be refunded to the storage operator.
|
2 | | Section 60. Enhanced recovery projects.
|
3 | | (a) This Act does not apply to applications filed with the |
4 | | Department proposing to use carbon dioxide for an enhanced oil |
5 | | or gas recovery project. Such applications shall be processed |
6 | | pursuant the Illinois Oil and Gas Act.
|
7 | | (b) The Department may allow an enhanced oil or gas |
8 | | recovery project to be converted to a storage facility. In |
9 | | considering whether to approve a conversion, and upon |
10 | | conversion, the provisions of this Act and its implementing |
11 | | rules apply, but if during the conversion process unique |
12 | | circumstances arise, then the Department, may waive such |
13 | | provisions or impose additional ones to better ensure that the |
14 | | Act's objectives are fulfilled.
|
15 | | Section 65. Memorandum of Understanding. The Department |
16 | | and the Illinois Environmental Protection Agency shall enter |
17 | | into a Memorandum of Understanding with respect to their |
18 | | respective roles under this Act and the UIC program, if |
19 | | applicable. The Memorandum of Understanding shall provide for |
20 | | procedures to ensure a streamlined and concurrent permitting |
21 | | process for storage facilities. |
22 | | Section 70. Department; home rule. The Department may adopt |
23 | | rules and issue orders to enforce this Act. The Department may |
|
| | 09700HB0680ham001 | - 18 - | LRB097 03508 ASK 53721 a |
|
|
1 | | authorize its employees, qualified by training and experience, |
2 | | to perform the powers and duties set forth in this Act. No |
3 | | agency of State government or political subdivision of the |
4 | | State may regulate a storage facility except as expressly |
5 | | authorized under this Act. |
6 | | Section 75. Restraint of trade. None of the rights and |
7 | | responsibilities pursuant to this Act shall be held or |
8 | | construed to violate any of the statutes of this State relating |
9 | | to trusts, monopolies, or contracts and combinations in the |
10 | | restraint of trade.
|
11 | | Section 97. Severability. The provisions of this Act are |
12 | | severable under Section 1.31 of the Statute on Statutes.".
|