| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
1 | AN ACT concerning regulation.
| ||||||||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois,
| ||||||||||||||||||||||||
3 | represented in the General Assembly:
| ||||||||||||||||||||||||
4 | Section 5. The Public Utilities Act is amended by changing | ||||||||||||||||||||||||
5 | Section 8-406 as follows: | ||||||||||||||||||||||||
6 | (220 ILCS 5/8-406) (from Ch. 111 2/3, par. 8-406) | ||||||||||||||||||||||||
7 | Sec. 8-406. Certificate of public convenience and | ||||||||||||||||||||||||
8 | necessity. | ||||||||||||||||||||||||
9 | (a) No public utility not owning any city or village
| ||||||||||||||||||||||||
10 | franchise nor engaged in performing any public service or in | ||||||||||||||||||||||||
11 | furnishing any
product or commodity within this State as of | ||||||||||||||||||||||||
12 | July 1, 1921 and not
possessing a certificate of
public | ||||||||||||||||||||||||
13 | convenience and necessity from the Illinois Commerce | ||||||||||||||||||||||||
14 | Commission,
the State Public Utilities Commission or
the Public | ||||||||||||||||||||||||
15 | Utilities Commission, at the time this amendatory Act of 1985 | ||||||||||||||||||||||||
16 | goes
into effect, shall transact any business in this State | ||||||||||||||||||||||||
17 | until it shall have
obtained a certificate from the Commission | ||||||||||||||||||||||||
18 | that public convenience and
necessity require the transaction | ||||||||||||||||||||||||
19 | of such business. | ||||||||||||||||||||||||
20 | (b) No public utility shall begin the construction of any | ||||||||||||||||||||||||
21 | new plant,
equipment, property or facility which is not in | ||||||||||||||||||||||||
22 | substitution of any
existing plant, equipment, property or | ||||||||||||||||||||||||
23 | facility or any extension or
alteration thereof or in addition |
| |||||||
| |||||||
1 | thereto,
unless and until it shall have obtained from the
| ||||||
2 | Commission a certificate that public convenience and necessity | ||||||
3 | require such
construction. Whenever after a hearing the | ||||||
4 | Commission determines that any
new construction or the | ||||||
5 | transaction of any business by a public utility will
promote | ||||||
6 | the public convenience and is necessary thereto, it shall have | ||||||
7 | the
power to issue certificates of public convenience and | ||||||
8 | necessity. The
Commission shall determine that proposed | ||||||
9 | construction will promote the
public convenience and necessity | ||||||
10 | only if the utility demonstrates: (1) that the
proposed | ||||||
11 | construction is necessary to provide adequate, reliable, and
| ||||||
12 | efficient service to its customers and is the
least-cost means | ||||||
13 | of
satisfying the service needs of its customers or that the | ||||||
14 | proposed construction will promote the development of an | ||||||
15 | effectively competitive electricity market that operates | ||||||
16 | efficiently, is equitable to all customers, and is the least | ||||||
17 | cost means of satisfying those objectives;
(2) that the utility | ||||||
18 | is capable of efficiently managing and
supervising the | ||||||
19 | construction process and has taken sufficient action to
ensure | ||||||
20 | adequate and efficient construction and supervision thereof; | ||||||
21 | and (3)
that the utility is capable of financing the proposed | ||||||
22 | construction without
significant adverse financial | ||||||
23 | consequences for the utility or its
customers. | ||||||
24 | (c) (Blank). After the effective date of this amendatory | ||||||
25 | Act of 1987, no
construction shall commence on any new nuclear
| ||||||
26 | power plant to be located within this State, and no certificate |
| |||||||
| |||||||
1 | of public
convenience and necessity or other authorization | ||||||
2 | shall be issued therefor
by the Commission, until the Director | ||||||
3 | of the Illinois Environmental
Protection Agency finds that the | ||||||
4 | United States Government, through its
authorized agency, has | ||||||
5 | identified and approved a demonstrable technology or
means for | ||||||
6 | the disposal of high level nuclear waste, or until such
| ||||||
7 | construction has been specifically approved by a statute | ||||||
8 | enacted by the General
Assembly. | ||||||
9 | As used in this Section, "high level nuclear waste" means | ||||||
10 | those aqueous
wastes resulting from the operation of the first | ||||||
11 | cycle of the solvent
extraction system or equivalent and the | ||||||
12 | concentrated wastes of the
subsequent extraction cycles or | ||||||
13 | equivalent in a facility for reprocessing
irradiated reactor | ||||||
14 | fuel and shall include spent fuel assemblies prior to
fuel | ||||||
15 | reprocessing. | ||||||
16 | (d) In making its determination, the Commission shall | ||||||
17 | attach primary
weight to the cost or cost savings to the | ||||||
18 | customers of the utility. The
Commission may consider any or | ||||||
19 | all factors which will or may affect such
cost or cost savings, | ||||||
20 | including the public utility's engineering judgment regarding | ||||||
21 | the materials used for construction. | ||||||
22 | (e) The Commission may issue a temporary certificate which | ||||||
23 | shall remain
in force not to exceed one year in cases of | ||||||
24 | emergency, to assure maintenance
of adequate service or to | ||||||
25 | serve particular customers, without notice or
hearing, pending | ||||||
26 | the determination of an application for a certificate, and
may |
| |||||||
| |||||||
1 | by regulation exempt from the requirements of this Section | ||||||
2 | temporary
acts or operations for which the issuance of a | ||||||
3 | certificate will not be
required in the public interest. | ||||||
4 | A public utility shall not be required to obtain but may | ||||||
5 | apply for and
obtain a certificate of public convenience and | ||||||
6 | necessity pursuant to this
Section with respect to any matter | ||||||
7 | as to which it has received the
authorization or order of the | ||||||
8 | Commission under the Electric Supplier Act,
and any such | ||||||
9 | authorization or order granted a public utility by the
| ||||||
10 | Commission under that Act shall as between public utilities be | ||||||
11 | deemed to
be, and shall have except as provided in that Act the | ||||||
12 | same force and effect
as, a certificate of public convenience | ||||||
13 | and necessity issued pursuant to this
Section. | ||||||
14 | No electric cooperative shall be made or shall become a | ||||||
15 | party to or shall
be entitled to be heard or to otherwise | ||||||
16 | appear or participate in any
proceeding initiated under this | ||||||
17 | Section for authorization of power plant
construction and as to | ||||||
18 | matters as to which a remedy is available under The
Electric | ||||||
19 | Supplier Act. | ||||||
20 | (f) Such certificates may be altered or modified by the | ||||||
21 | Commission, upon
its own motion or upon application by the | ||||||
22 | person or corporation affected.
Unless exercised within a | ||||||
23 | period of 2 years from the grant thereof
authority conferred by | ||||||
24 | a certificate of convenience and necessity issued by
the | ||||||
25 | Commission shall be null and void. | ||||||
26 | No certificate of public convenience and necessity shall be |
| |||||||
| |||||||
1 | construed as
granting a monopoly or an exclusive privilege, | ||||||
2 | immunity or franchise. | ||||||
3 | (g) A public utility that undertakes any of the actions | ||||||
4 | described in items (1) through (3) of this subsection (g) or | ||||||
5 | that has obtained approval pursuant to Section 8-406.1 of this | ||||||
6 | Act shall not be required to comply with the requirements of | ||||||
7 | this Section to the extent such requirements otherwise would | ||||||
8 | apply. For purposes of this Section and Section 8-406.1 of this | ||||||
9 | Act, "high voltage electric service line" means an electric | ||||||
10 | line having a design voltage of 100,000 or more. For purposes | ||||||
11 | of this subsection (g), a public utility may do any of the | ||||||
12 | following: | ||||||
13 | (1) replace or upgrade any existing high voltage | ||||||
14 | electric service line and related facilities, | ||||||
15 | notwithstanding its length; | ||||||
16 | (2) relocate any existing high voltage electric | ||||||
17 | service line and related facilities, notwithstanding its | ||||||
18 | length, to accommodate construction or expansion of a | ||||||
19 | roadway or other transportation infrastructure; or | ||||||
20 | (3) construct a high voltage electric service line and | ||||||
21 | related facilities that is constructed solely to serve a | ||||||
22 | single customer's premises or to provide a generator | ||||||
23 | interconnection to the public utility's transmission | ||||||
24 | system and that will pass under or over the premises owned | ||||||
25 | by the customer or generator to be served or under or over | ||||||
26 | premises for which the customer or generator has secured |
| |||||||
| |||||||
1 | the necessary right of way. | ||||||
2 | (Source: P.A. 95-700, eff. 11-9-07; 96-1348, eff. 7-28-10.)
| ||||||
3 | Section 99. Effective date. This Act takes effect upon | ||||||
4 | becoming law. |