Sen. Michael W. Frerichs

Filed: 4/1/2008

 

 


 

 


 
09500SB2567sam002 LRB095 19903 HLH 48535 a

1
AMENDMENT TO SENATE BILL 2567

2     AMENDMENT NO. ______. Amend Senate Bill 2567, AS AMENDED,
3 with reference to page and line numbers of Senate Amendment No.
4 1, on page 2, by replacing lines 24 through 26 with "with 12
5 inches of soil, within 30 days after the final placement and
6 completion of the structural fill project or within 120 days of
7 the last placement of the structural fill in cases where
8 filling is incomplete and no filling takes place for a period
9 of 90 days,"; and
 
10 on page 3, by replacing lines 7 through 12 with the following:
11     "Within 30 days after the placement of the 12 inches of
12 cover soil required under this item (8), the person using the
13 CCB as structural fill must submit to the Agency a
14 certification demonstrating that the use meets the
15 requirements of this Section. The certification shall also
16 include the information required to be submitted to the Agency
17 under item (C) of subsection (a-5) of this Section. The

 

 

09500SB2567sam002 - 2 - LRB095 19903 HLH 48535 a

1 certification must be submitted on forms and in a format
2 prescribed by the Agency and must be certified by a licensed
3 professional engineer. For the purposes of this subsection,
4 "licensed professional engineer" means a licensed professional
5 engineer as defined in Section 58.2 of this Act."; and
 
6 on page 6, by replacing lines 15 and 16 with "CCB during the
7 effective period of the approval and any extension of the
8 approval,"; and
 
9 on page 6, by replacing lines 18 and 19 with "conditions.".