Sen. John M. Sullivan

Filed: 8/9/2007

 

 

 

 

 

 

 

09500SB1110sam004                   OMB095 00168 JMP 20168 a

AMENDMENT TO SENATE BILL 1110

 

AMENDMENT NO. ______. Amend Senate Bill 1110 by replacing everything after the enacting clause with the following:

 

“ARTICLE 5

ILLINOIS STATE BOARD OF EDUCATION

 

    Section 5.  In addition to any other amounts appropriated for such purpose, the amount of $44,386,800, or so much thereof as may be necessary, is appropriated from the Education Assistance Fund to the Illinois State Board of Education for Early Childhood Education for the fiscal year beginning July 1, 2007.

 

    Section 10.  In addition to any other amounts appropriated for such purpose, the amount of $259,764,700, or so much thereof as may be necessary, is appropriated from the Education Assistance Fund to the Illinois State Board of Education for General State Aid for the fiscal year beginning July 1, 2007.

 

    Total, Article 5                           $304,151,500

 

ARTICLE 6

 

    Section 5.  This Act supersedes Articles 455, 465, 475, 485,  490,  495,  505, 510, 515, 520, 525, 530, 535, 545, 550, 555 and 560 of House Bill 3866 of the 95th General Assembly.  The amounts of expenditure made under the authority of the Articles are to be disregarded in determining the amounts available for expenditure under this Act, except where specifically stated otherwise in this Act.  In the event that expenditures approved by the Comptroller pursuant to the Articles exceed the new appropriation, the appropriation is increased to the amount of those approved expenditures.

 

ARTICLE 10

OFFICE OF THE ARCHITECT OF THE CAPITOL

 

    Section 5.  The amount of $3,883, or so much of this amount as may be necessary and remains unexpended on June 30, 2007, from a reappropriation heretofore made for such purpose in Section 5 of Article 92 of Public Act 94-798, is reappropriated from the Capital Development Fund to the Office of the Architect of the Capitol for plans, specifications, and continuation of work pursuant to the report and recommendations of the architectural, structural, and mechanical surveys of the State Capitol Building. This is for the continuation of the rehabilitation of the Capitol Building.

 

    Section 10.  The sum of $587,367, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made for such purposes in Section 10 of Article 92 of Public Act 94-798, is reappropriated from the Capital Development Fund to the Office of the Architect of the Capitol for remodeling, planning, relocation, permanent equipment, and other related expenses, including architectural and engineering fees associated with construction, for the remodeling of office space and other support areas under the jurisdiction of the House of Representatives and the Senate.

 

    Section 15.  No contract shall be entered into or obligation incurred for any expenditures from appropriations in Section 5 and 10 of this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, Article 10                              $591,250

 

ARTICLE 15

DEPARTMENT OF AGRICULTURE

 

    Section 5.  The following named amounts, or so much thereof as may be necessary are appropriated to the Department of Agriculture for repairs, maintenance, and capital improvements including construction, reconstruction, improvement, repair and installation of capital facilities, cost of planning, supplies, materials, equipment, services and all other expenses required to complete the work:

Payable from Agricultural Premium Fund:

  For various projects at the State

   Fairgrounds.................................... 600,000

  For various projects at the DuQuoin State

   Fairgrounds.................................... 225,000

    Total                                          $825,000

 

    Section  10.  The amount of $2,612,500 is appropriated from the Capital Development Fund to the Department of Agriculture for deposit into the Conservation 2000 Projects Fund.

 

    Section 15.  The amount of $2,612,500, or so much thereof as may be necessary, is appropriated from the Conservation 2000 Projects Fund to the Department of Agriculture for the Conservation Practices Cost-Share program.

 

    Section 20.  No contract shall be entered into or obligation incurred for any expenditures from appropriations in Section 10 of this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, Article 15                            $6,050,000

 

ARTICLE 20

DEPARTMENT OF CENTRAL MANAGEMENT SERVICES

 

    Section 5.  The sum of $9,824,959, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made for such purpose in Article 94, Section 5 of Public Act 94-0798, is reappropriated from the Capital Development Fund to the Department of Central Management Services for Information Technology infrastructure expenses including but not limited to related hardware and equipment.

 

    Section 10.  No contract shall be entered into or obligation incurred for any expenditures from appropriations in Section 5 of this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, Article 20                            $9,824,959

 

ARTICLE 25

DEPARTMENT OF COMMERCE AND ECONOMIC OPPORTUNITY

 

    Section 5.  The amount of $3,000,000, or so much thereof as may be necessary, is appropriated from the Port Development Revolving Loan Fund to the Department of Commerce and Economic Opportunity for grants and loans associated with the Port Development Revolving Loan Program pursuant to 30 ILCS 750/9-11.

 

    Section 10.  The sum of $77,500,000, or so much thereof as may be necessary, is appropriated from the Coal Development Fund to the Department of Commerce and Economic Opportunity for all costs associated with the capital development of coal gasification plants.

 

    Section 15.  The sum of $100,000, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for costs related to preliminary planning, design, and engineering of a pipeline to transport carbon dioxide produced at coal gasification facilities for storage underground.

 

    Section 20.  The sum of $100,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants, loans, and investments associated with the Illinois Community Assets Fund initiative.

 

    Section 25.  The sum of $5,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for all costs associated with the capital development and construction of biodiesel production facilities.

 

    Section 30.  The sum of $17,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to Fermi National Accelerator Laboratory for the Illinois Accelerator Research Center.

 

    Section 35.  The sum of $13,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to Argonne National Laboratory for the Advanced Protein Crystallization Facility.

 

    Section 40.  The sum of $60,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to University of Illinois at Urbana/Champaign for all costs associated with design and construction of a Petascale Computing Facility.

 

    Section 45.  The sum of $490,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to University of Illinois at Chicago for all costs associated with planning campus improvements.

 

    Section 50.  The sum of $20,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants associated with the capital development of new ethanol production facilities.

 

    Section 55.  The sum of $6,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants associated with adding new E-85 fuel pumps across that state.

 

    Section 60.  The sum of $5,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for all costs associated with loans to small businesses and manufacturers for energy efficiency investments.

 

    Section 65.  The sum of $400,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for the purpose of making grants and loans to local governments for planning, engineering, acquisition, construction, reconstruction, development, improvement and extension of the public infrastructure, and for any other purposes authorized in subsection (a) of Section 4 of the Build Illinois Bond Act and for grants to State agencies for such purposes.

 

    Section 85.  No contract shall be entered into or obligation incurred or any expenditure made from any appropriation herein made in Sections 10, 15, 20, 25, 30, 35, 40, 45, 50, 55, 60 and 65 of this Article until after the purpose and amounts have been approved in writing by the Governor.

 

    Total, Article 25                          $707,090,000

 

ARTICLE 30

DEPARTMENT OF COMMERCE AND ECONOMIC OPPORTUNITY

 

    Section 10.  The amount of $4,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 96, Section 10 of Public Act 94-798, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for a grant for planning, design, construction, and all other costs associated with a new Ford Technical Training Center.

 

    Section 30.  The sum of $3,360,199, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 96, Section 30 of Public Act 94-798, is reappropriated from the Coal Development Fund to the Department of Commerce and Economic Opportunity for Coal Development Programs.

 

    Section 35.  The sum of $50,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 96, Section 35 of Public Act 94-798, is reappropriated from the Coal Development Fund to the Department of Commerce and Economic Opportunity for grants pursuant to 20 ILCS 605/605-332 – Coal Revival Program.

 

    Section 45.  The sum of $8,093,204, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 96, Section 45 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans pursuant but not limited to Article 8, Article 9 or Article 10 of the Build Illinois Act.

 

    Section 50.  The sum of $3,130,040, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made for such purpose in Article 96, Section 50 of Public Act 94-798, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans pursuant but not limited to Article 8 or Article 10 of the Build Illinois Act.

 

    Section 55.  The sum of $2,600,251, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 96, Section 55 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans pursuant but not limited to Article 8, Article 9 or Article 10 of the Build Illinois Act.

 

    Section 60.  The sum of $7,292,122, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 96, Section 60 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans pursuant but not limited to Article 8, Article 9 or Article 10 of the Build Illinois Act.

 

    Section 65.  The sum of $5,524,172, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 96, Section 65 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans pursuant but not limited to Article 8, Article 9 or Article 10 of the Build Illinois Act.

 

    Section 70.  The sum of $3,975,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 96, Section 70 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants associated with the Illinois Renewable Fuels Development Act.

 

    Section 75.  The sum of $13,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 96, Section 75 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to the Argonne National Laboratory for the Rare Isotope Accelerator for bondable infrastructure improvements.  This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 90.  The sum of $249,979,037, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made for such purpose in Article 96, Section 90 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for the purpose of making grants and loans to local governments for planning, engineering, acquisition, construction, reconstruction, development, improvement and extension of the public infrastructure, and for any other purposes authorized in subsection (a) of Section 4 of the Build Illinois Bond Act and for grants to State agencies for such purposes.

 

    Section 95.  The sum of $50,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made for such purpose in Article 96, Section 95 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for the purpose of fostering economic development and increased employment and the well being of the citizens of Illinois, and for any other purposes authorized in subsection (b) of Section 4 of the Build Illinois Bond Act and for grants to State agencies for such purposes.

 

    Section 100.  The sum of $48,585,959, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made for such purpose in Article 96, Section 100 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for the development and improvement of educational, scientific, technical and vocational programs and facilities and the expansion of health and human services, and for any other purposes authorized in subsection (c) of Section 4 of the Build Illinois Bond Act and for grants to State agencies for such purposes.

 

    Section 105.  The sum of $30,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made for such purpose in Article 96, Section 105 of Public Act 94-798, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for open spaces, recreational and conservation purposes and the protection of land and for deposits into the Conservation 2000 Projects Fund as authorized by subsection (c) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 110.  The sum of $40,843,544, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made for such purpose in Article 96, Section 110 of Public Act 94-798, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for grants to local governments for the acquisition, financing, architectural planning, development, alteration, installation, and construction of capital facilities consisting of buildings, structures, durable equipment, and land as authorized by subsection (l) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 120.  The amount of $5,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made in Article 95, Section 10 of Public Act 94-798, is reappropriated from the Coal Development Fund to the Department of Commerce and Economic Opportunity for the specific purposes of acquisition, development, construction, reconstruction, improvement, financing, architectural and technical planning and installation of capital facilities consisting of buildings, structures, durable equipment, and land for the purpose of capital development of coal resources within the State.

 

    Section 125.  The amount of $17,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made in Article 95, Section 15 of Public Act 94-798, is reappropriated from the Coal Development Fund to the Department of Commerce and Economic Opportunity for the specific purposes of acquisition, development, construction, reconstruction, improvement, financing, architectural and technical planning and installation of capital facilities consisting of buildings, structures, durable equipment, and land for the purpose of capital development of coal resources within the State, including but not limited to a grant for a commercial scale project that produces electric power and hydrogen and demonstrates underground storage of up to 1 million metric tons annually of carbon dioxide.

 

    Section 130.  The amount of $10,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made in Article 95, Section 20 of Public Act 94-798, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for grants to local governments for the acquisition, financing, architectural planning, development, alteration, installation, and construction of capital facilities consisting of buildings, structures, durable equipment, and land as authorized by subsection (l) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 135.  The amount of $7,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made in Article 95, Section 25 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to Argonne National Laboratory for the Advanced Protein Crystallization Facility

 

    Section 140.  The amount of $15,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made in Article 95, Section 30 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant for the Illinois Science and Technology Park.

 

    Section 145.  The amount of $2,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made in Article 95, Section 35 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to the Illinois Institute of Technology for the biomedical research complex.

 

    Section 150.  The amount of $3,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made in Article 95, Section 40 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to Fermi National Accelerator Laboratory for the Illinois Accelerator Research Center.

 

    Section 155.  The amount of $25,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made in Article 95, Section 45 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants pursuant but not limited to Article 8, Article 9, or Article 10 of the Build Illinois Act.

 

    Section 160.  The amount of $20,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made in Article 95, Section 50 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants associated with the Illinois Renewable Fuels Development Act.

 

    Section 165.  The amount of $15,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made in Article 95, Section 55 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants associated with the redevelopment of brownfield sites.

 

    Section 170.  No contract shall be entered into or obligation incurred or any expenditure made from any appropriation herein made in this Article, except Section 175, until after the purpose and amounts have been approved in writing by the Governor.

 

    Section 175.  The sum of $27,662,869, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made for such purpose in Article 96, Section 115 of Public Act 94-0798, is reappropriated from the Fund for Illinois’ Future to the Department of Commerce and Economic Opportunity for grants to units of government, educational facilities and not-for-profit organizations for education and training, infrastructure improvements and other capital projects including but not limited to planning, construction, reconstruction, equipment, utilities and vehicles, and all costs associated with economic development programs, community service programs, public health programs, public safety programs, other programs and activities, and for grants to other State agencies for any capital or operating purposes.

 

    Total, Article 30                          $667,046,397

 

ARTICLE 35

DEPARTMENT OF NATURAL RESOURCES

GRANTS AND REIMBURSEMENTS - GENERAL OFFICE

 

    Section 10. The sum of $725,000, or so much thereof as may be necessary, is appropriated from the State Boating Act Fund to the Department of Natural Resources for the administration and payment of grants to local governmental units for the construction, maintenance, and improvement of boat access areas.

 

    Section 15.  The sum of $120,000, or so much thereof as may be necessary, is appropriated from the State Boating Act Fund to the Department of Natural Resources for the purposes of the Snowmobile Registration and Safety Act and for the administration and payment of grants to local governmental units for the construction, land acquisition, lease, maintenance and improvement of snowmobile trails and access areas.

 

    Section 20.  To the extent federal funds including reimbursements are available for such purposes, the sum of $75,000, or so much thereof as may be necessary, is appropriated from the State Boating Act Fund to the Department of Natural Resources for all costs for construction and development of facilities for transient, non-trailerable recreational boats, including grants for such purposes and authorized under the Boating Infrastructure Grant Program.

 

    Section 25.  The sum of $150,000, new appropriation, is appropriated from the State Boating Act Fund to the Department of Natural Resources for a grant to the Chain O’Lakes – Fox River Waterway Management Agency for the Agency’s operational expenses.

 

    Section 30. The following named sums, new appropriations, or so much thereof as may be necessary, respectively, for the objects and purposes hereinafter named, are appropriated to the Department of Natural Resources:

Payable from State Boating Act Fund:

  For multiple use facilities and

   programs for boating purposes

   provided by the Department of Natural

   Resources, including construction

   and development, all costs for supplies,

   materials, labor, land acquisition,

   services, studies and all other

   expenses required to comply with the

   intent of this appropriation.................. 1,200,000

Payable from State Parks Fund:

  For multiple use facilities and programs

   for park and trail purposes provided by

   the Department of Natural Resources, including

   construction and development, all costs

   for supplies, materials, labor, land

   acquisition, services, studies, and

   all other expenses required to comply with

   the intent of this appropriation................ 150,000

 

    Section 35.  The sum of $100,000, or so much thereof as may be necessary, is appropriated from the Wildlife and Fish Fund to the Department of Natural Resources for acquisition and development, including grants, for the implementation of the North American Waterfowl Management Plan within the Dominion of Canada or the United States which specifically provides waterfowl for the Mississippi Flyway.

 

    Section 40. To the extent federal funds including reimbursements are available for such purposes, the sum of $100,000, or so much thereof as may be necessary, is appropriated from the Wildlife and Fish Fund to the Department of Natural Resources for construction and renovation of waste reception facilities for recreational boaters, including grants for such purposes authorized under the Clean Vessel Act.

 

    Section 45.  The sum of $2,000,000, or so much thereof as may be necessary, is appropriated from the Wildlife and Fish Fund to the Department of Natural Resources for wildlife conservation and restoration plans and programs from federal and/or state funds provided for such purposes.

 

    Section 50.  The following named sums, or so much thereof as may be necessary, respectively, herein made either independently or in cooperation with the Federal Government or any agency thereof, any municipal corporation, or political subdivision of the State, or with any public or private corporation, organization, or individual, are appropriated to the Department of Natural Resources for refunds and the purposes stated:

Payable from Forest Reserve Fund:

  For U.S. Forest Service Program.................. 500,000

 

    Section 55.  The sum of $110,000, or so much thereof as may be necessary, is appropriated from the Plugging and Restoration Fund to the Department of Natural Resources, Office of Mines and Minerals for the Landowner Grant Program authorized under the Oil and Gas Act, as amended by Public Act 90-0260.

 

    Section 60.  The sum of $1,500,000, or so much thereof as may be necessary, is appropriated to the Department of Natural Resources from the Abandoned Mined Lands Set Aside Fund for grants and contracts to conduct research, planning and construction to eliminate hazards created by abandoned mines and any other expenses necessary for emergency response.

 

    Section 65.  The sum of $110,000, or so much thereof as may be necessary, is appropriated to the Department of Natural Resources from the State Furbearer Fund for the conservation of fur bearing mammals in accordance with the provisions of Section 5/1.32 of the "Wildlife Code", as now or hereafter amended.

 

    Section 70. The following named sums, new appropriations, or so much thereof as may be necessary, respectively, for the objects and purposes hereinafter named, are appropriated to the Department of Natural Resources:

Payable from Natural Areas Acquisition Fund:

  For the acquisition, preservation and

   stewardship of natural areas, including habitats

   for endangered and threatened species, high

   quality natural communities, wetlands

   and other areas with unique or unusual

   natural heritage qualities................... $9,500,000

 

    Section 75.  The sum of $24,000,000, or so much thereof as may be necessary, is appropriated from the Open Space Lands Acquisition and Development Fund to the Department of Natural Resources for expenses connected with and to make grants to local governments and to distressed communities as provided in the "Open Space Lands Acquisition and Development Act".

 

    Section 80.  The sum of $550,000, or so much thereof as may be necessary, is appropriated from the State Pheasant Fund to the Department of Natural Resources for the conservation of pheasants in accordance with the provisions of Section 5/1.31 of the "Wildlife Code", as now or hereafter amended.

 

FOR ILLINOIS HABITAT FUND PROGRAM

 

    Section 85.  The sum of $1,350,000, or so much thereof as may be necessary, is appropriated from the Illinois Habitat Fund to the Department of Natural Resources for the preservation and maintenance of high quality habitat lands in accordance with the provisions of the "Habitat Endowment Act", as now or hereafter amended.

 

    Section 90.  The sum of $250,000, or so much thereof as may be necessary, is appropriated from the Illinois Habitat Fund to the Department of Natural Resources for the preservation and maintenance of a high quality fish and wildlife habitat and to promote the heritage of outdoor sports in Illinois from revenue derived from the sale of Sportsmen Series license plates.

 

    Section 95.  The sum of $700,000, or so much thereof as may be necessary, is appropriated to the Department of Natural Resources for expenditure by the Office of Water Resources from the Flood Control Land Lease Fund for disbursement of monies received pursuant to Act of Congress dated September 3, 1954 (68 Statutes 1266, same as appears in Section 701c-3, Title 33, United States Code Annotated), provided such disbursement shall be in compliance with 15 ILCS 515/1 Illinois Compiled Statutes.

 

    Section 100.  The following named sums, or so much thereof as may be necessary, respectively, herein made either independently or in cooperation with the Federal Government or any agency thereof, any municipal corporation, or political subdivision of the State, or with any public or private corporation, organization, or individual, are appropriated to the Department of Natural Resources for refunds and the purposes stated:

Payable from Land and Water Recreation Fund:

  For Outdoor Recreation Programs............... $6,200,000

 

    Section 105.  The sum of $600,000, or so much thereof as may be necessary, is appropriated from the Off Highway Vehicle Trails Fund to the Department of Natural Resources for grants to units of local governments, not-for-profit organizations, and other groups to operate, maintain and acquire land for off-highway vehicle trails and parks as provided for in the Recreational Trails of Illinois Act, including administration, enforcement, planning and implementation of this Act.

 

    Section 110.  The following named sums, or so much thereof as may be necessary, respectively, herein made either independently or in cooperation with the Federal Government or any agency thereof, any municipal corporation, or political subdivision of the State, or with any public or private corporation, organization, or individual, are appropriated to the Department of Natural Resources for refunds and the purposes stated:

Payable from Federal Title IV Fire

 Protection Assistance Fund:

  For Rural Community Fire Protection

   Programs........................................ 325,000

 

    Section 115.  The sum of $80,000, or so much thereof as may be necessary, is appropriated from the Snowmobile Trail Establishment Fund to the Department of Natural Resources for the administration and payment of grants to nonprofit snowmobile clubs and organizations for construction, maintenance, and rehabilitation of snowmobile trails and areas for the use of snowmobiles.

 

    Section 120.  The sum of $625,000, or so much thereof as may be necessary, is appropriated from the Illinois Forestry Development Fund to the Department of Natural Resources for the payment of grants to timber growers for implementation of acceptable forestry management practices as provided in the "Illinois Forestry Development Act" as now or hereafter amended.

 

    Section 125.  To the extent Federal Funds including reimbursements are made available for such purposes, the sum of $300,000, is appropriated from the Illinois Forestry Development Fund to the Department of Natural Resources for Forest Stewardship Technical Assistance.

 

    Section 130.  The sum of $160,000, or so much thereof as may be necessary, is appropriated from the State Migratory Waterfowl Stamp Fund to the Department of Natural Resources for the payment of grants for the implementation of the North American Waterfowl Management Plan within the Dominion of Canada or the United States which specifically provides waterfowl to the Mississippi Flyway as provided in the "Wildlife Code", as amended.

 

    Section 135.  The sum of $160,000, or so much thereof as may be necessary, is appropriated from the State Migratory Waterfowl Stamp Fund to the Department of Natural Resources for the payment of grants for the development of waterfowl propagation areas within the Dominion of Canada or the United States which specifically provide waterfowl for the Mississippi Flyway as provided in the "Wildlife Code", as amended.

 

    Section 140.  The sum of $500,000, or so much thereof as may be necessary, is appropriated from the State Migratory Waterfowl Stamp Fund to the Department of Natural Resources for the purpose of attracting waterfowl and improving public migratory waterfowl areas within the State.

 

    Section 145.  The sum of $3,000,000, or so much thereof as may be necessary, is appropriated from the Park and Conservation Fund to the Department of Natural Resources for grants to units of local government for the acquisition and development of bike paths.

 

    Section 150.  The sum of $500,000, or so much thereof as may be necessary, is appropriated from the Park and Conservation Fund to the Department of Natural Resources for land acquisition, development and maintenance of bike paths and all other related expenses connected with the acquisition, development and maintenance of bike paths.

 

    Section 155.  The sum of $2,390,000, or so much thereof as may be necessary, is appropriated from the Park and Conservation Fund to the Department of Natural Resources for the development and maintenance, and other related expenses of recreational trails and trail-related projects authorized under the Intermodal Surface Transportation Efficiency Act of 1991, provided such amount shall not exceed funds to be made available for such purposes from state or federal sources.

 

    Section 160.  The following named sum, new appropriation, or so much thereof as may be necessary, for the object and purpose hereinafter named, is appropriated to the Department of Natural Resources:

Payable from the Park and Conservation Fund:

  For multiple use facilities and programs

   for park and trail purposes provided by

   the Department of Natural Resources, including

   construction and development, all costs

   for supplies, materials, labor, land

   acquisition, services, studies, and

   all other expenses required to comply with

   the intent of this appropriation.............. 1,000,000

 

    Section 165.  The following named sums, new appropriations, or so much thereof as may be necessary, respectively, for the objects and purposes hereinafter named, are appropriated to the Department of Natural Resources:

Payable from the Adeline Jay Geo-Karis

 Illinois Beach Marina Fund:

  For rehabilitation, reconstruction, repair,

   replacing, fixed assets, and improvement

   of facilities at North Point Marina at

   Winthrop Harbor................................. 375,000

 

    Section 170.  The sum of $6,000,000, or so much thereof as may be necessary, is appropriated to the Department of Natural Resources from the Abandoned Mined Lands Reclamation Council Federal Trust Fund for grants and contracts to conduct research, planning and construction to eliminate hazards created by abandoned mines, and any other expenses necessary for emergency response.

 

    Section 175.  The sum of $10,000,000, or so much thereof as may be necessary is appropriated from the Capital Development Fund to the Department of Natural Resources for the non-federal cost share of a Conservation Reserve Enhancement Program to establish long-term contracts and permanent conservation easements in the Illinois River Basin; to fund cost-share assistance to landowners to encourage approved conservation practices in environmentally sensitive and highly erodible areas of the Illinois River Basin; and to fund the monitoring of long term improvements of these conservation practices as required in the Memorandum of Agreement between the State of Illinois and the United State Department of Agriculture.

 

    Section 180. The sum of $7,800,000, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources for water development projects at the approximate cost set forth below:

 

  Ashland – Cass County - For

    participation, along with the

    Illinois Department of

    Transportation and the Village

    of Ashland, in construction of

    a drainage structure at Route

    125, and additional stream

    improvements for implementation

    of flood damage reductions in

    the Village of Ashland........ 500,000

  Crystal Creek – Cook

    County – For implementation

    of a flood damage reduction

    project along Crystal Creek

    in cooperation with the

    Villages of Franklin Park

    and Schiller Park, and

    with other units of local

    government.................... 500,000

  Fox Chain of Lakes – Lake

    and McHenry Counties –

    For the State cost share

    in the implementation of

    the comprehensive Dredging

    and Disposal Plan, including

    beneficial use of dredge

    material and island creation,

    for the Fox River and

    Chain of Lakes.............. 1,000,000

  Hickory/Spring Creek – Will

    County – For implementation

    of Stage IIIa of channel

    construction of Hickory/Spring

    Creeks flood control project

    in cooperation with the

    City of Joliet.............. 5,000,000

  Prairie/Farmers Creek- Levee

    37 - Cook County – For

    costs associated with the

    implementation of flood

    damage reduction measures

    along Prairie/Farmers Creek

    and the Des Plaines River,

    including participation in

    the U.S. Army Corps of

    Engineers’ Upper Des Plaines

    River Flood Control Project... 800,000

 

    Section 185. The sum of $10,300,000, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources for improvements needed at State-owned Dams for upgrading and rehabilitation of dams, spillways and supporting facilities, including dam removals and the required geotechnical investigations, preparation of plans and specifications, and the construction of the proposed rehabilitation to ensure reduced risk of injury to the public.

 

    Section 190.  The sum of $2,000,000, or so much thereof as may be necessary is appropriated from the Capital Development Fund to the Department of Natural Resources for planning, design and construction of ecosystem rehabilitation, habitat restoration and associated development in cooperation with the U.S. Army Corps of Engineers.

 

    Section 195.  No contract shall be entered into or obligation incurred or any expenditure made from appropriations herein made in Sections:

  100, 145, 150, 155, 175, 180, 185, 190

until after the purpose and amount of such expenditure has been approved in writing by the Governor.

 

    Total, Article 35                           $95,505,000

 

ARTICLE 40

DEPARTMENT OF NATURAL RESOURCES

 

    Section 5.  The sum of $3,563,301, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from appropriations heretofore made in Article 97, Section 10 and Article 98, Section 5, of Public Act 94-798, as amended, is reappropriated from the State Boating Act Fund to the Department of Natural Resources for the administration and payment of grants to local governmental units for the construction, maintenance, and improvement of boat access areas.

 

    Section 15.  The sum of $464,912, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from appropriations heretofore made in Article 97, Section 15, and Article 98, Section 15, of Public Act 94-798, as amended, is reappropriated from the State Boating Act Fund to the Department of Natural Resources for the purposes of the Snowmobile Registration and Safety Act and for the administration and payment of grants to local governmental units for the construction, land acquisition, lease, maintenance and improvement of snowmobile trails and access areas.

 

    Section 30.  To the extent federal funds including reimbursements are available for such purposes, the sum of $2,080,914, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from appropriations heretofore made in Article 97, Section 20 and Article 98, Section 30 of Public Act 94-798, as amended, is reappropriated from the State Boating Act Fund to the Department of Natural Resources for all costs for construction and development of facilities for transient, non-trailerable recreational boats, including grants for such purposes and authorized under the Boating Infrastructure Grant Program.

 

    Section 35.  The following named sums, or so much thereof as may be necessary, respectively, and as remains unexpended at the close of business on June 30, 2007, from appropriations heretofore made for such purposes, are reappropriated to the Department of Natural Resources for the objects and purposes set forth below:

Payable from State Boating Act Fund:

    (From Article 97, Section 25, on page 684,

    line 25, and Article 98, Section 35,

    of Public Act 94-798, as amended)

  For multiple use facilities and programs

   for boating purposes provided by the

   Department of Natural Resources including

   construction and development, all costs

   for supplies, materials, labor, land

   acquisition, services, studies and all

   other expenses required to comply with

   the intent of this appropriation............. $4,336,398

 

    Section 45.  The following named sums, or so much thereof as may be necessary, respectively, and as remain unexpended at the close of business on June 30, 2007, from appropriations heretofore made for such purposes, are reappropriated to the Department of Natural Resources for the objects and purposes set forth below:

Payable from the State Parks Fund:

    (From Article 97, Section 25 on page 684,

    lines 26-32 and page 685, lines 1-2,

    and Article 98, Section 45)

  For multiple use facilities and programs

   for park and trail purposes provided

   by the Department of Natural Resources, including

   construction and development, all costs

   for supplies, materials, labor, land

   acquisition, services, studies, and

   all other expenses required to comply with

   the intent of this appropriation............. $1,042,489

(From Article 97, Section 25 on page 685,

    lines 3-10)

  For multiple use facilities and

   purposes provided by the

   Department of Natural Resources, including

   construction and development, all costs

   for supplies, materials, labor, land

   acquisition, services, studies, and

   all other expenses required to comply with

   the intent of this appropriation............... $750,000

 

    Section 48.  The sum of $8,327,755, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from appropriations heretofore made in Article 98, Section 48 of Public Act 94-798, as amended, is reappropriated from the State Park Fund to the Department of Natural Resources, in coordination with the Capital Development Board, for the development of the World Shooting and Recreation Complex including all construction and debt service expenses required to comply with this appropriation.  Provided further, to the extent that revenues are received for such purposes, said revenues must come from non-State sources.

 

    Section 50.  The sum of $8,651,843, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from appropriations heretofore made in Article 97, Section 40 and Article 98, Section 50, of Public Act 94-798, as amended, is reappropriated from the Wildlife and Fish Fund to the Department of Natural Resources for wildlife conservation and restoration plans and programs from federal and/or state funds provided for such purposes.

 

    Section 60.  To the extent federal funds including reimbursements are available for such purposes, the sum of $527,947, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from appropriations heretofore made in Article 97, Section 35, and Article 98, Section 60, of Public Act 94-798, as amended, is reappropriated from the Wildlife and Fish Fund to the Department of Natural Resources for construction and renovation of waste reception facilities for recreational boaters, including grants for such purposes authorized under the Clean Vessel Act.

 

    Section 70.  The sum of $735,997, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 98, Section 70 of Public Act 94-798, is reappropriated from the Capital Development Fund to the Department of Natural Resources for planning, design and construction of ecosystem rehabilitation, habitat restoration and associated development in cooperation with the U.S. Army Corps of Engineers.

 

    Section 75.  The sum of $3,188,964, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 98, Section 75 of Public Act 94-798, is reappropriated from the Capital Development Fund to the Department of Natural Resources for planning, design and construction of ecosystem rehabilitation, habitat restoration and associated development in cooperation with the U.S. Army Corps of Engineers.

 

    Section 80.  The sum of $19,096,319, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 98, Section 80, of Public Act 94-798, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources to acquire, protect and preserve open space and natural lands.

 

    Section 85.  The sum of $2,784,560, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 98, Section 85 of Public Act 94-798, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for the non-federal cost share of a Conservation Reserve Enhancement Program to establish long-term contracts and permanent conservation easements in the Illinois River Basin; to fund cost-share assistance to landowners to encourage approved conservation practices in environmentally sensitive and highly erodible areas of the Illinois River Basin; and to fund the monitoring of long term improvements of these conservation practices as required in the Memorandum of Agreement between the State of Illinois and the United State Department of Agriculture.

 

    Section 90. The sum of $655,484, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 98, Section 90 of Public Act 94-798, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for the non-federal cost share of a Conservation Reserve Enhancement Program to establish long-term contracts and permanent conservation easements in the Illinois River Basin; to fund cost-share assistance to landowners to encourage approved conservation practices in environmentally sensitive and highly erodible areas of the Illinois River Basin; and to fund the monitoring of long term improvements of these conservation practices as required in the Memorandum of Agreement between the State of Illinois and the United State Department of Agriculture.

 

    Section 95.  The sum of $503,341, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 98, Section 95 of Public Act 94-798, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources for the acquisition of lands, buildings, and structures, including easements and other property interests, located in the 100-year floodplain in counties or portions of counties authorized to prepare stormwater management plans and for removing such buildings and structures and preparing the site for open space use.

 

    Section 100.  The sum of $10,249,777, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made in Article 98, Section 100 of Public Act 94-798, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources for water development projects at the approximate cost set forth below:

Union - McHenry County - for flood control

 and drainage improvement of unnamed

 Kishwaukee River tributary........................ 200,000

Flood Hazard Mitigation - For implementation

 of flood hazard mitigation plans, and

 acquisition of wetland and tree mitigation

 sites for state and local joint

 flood control projects in

 cooperation with federal agencies, state

 agencies, and units of local government,

 in various counties............................. 3,300,000

Fox Chain of Lakes - Lake and McHenry

 Counties - For the state cost share in

 implementation of the comprehensive

 Dredging and Disposal Plan, including

 beneficial use of dredge material and

 island creation, for the Fox River and

 Chain of Lakes.................................. 1,449,777

Fox River Dams - Kane County - For

 rehabilitation, modification, and

 reconstruction of Batavia

 and Yorkville Dams.............................. 2,600,000

Field Service Facility - Sangamon County -

 For site development and construction

 of a field survey service building

 and storage facility.............................. 200,000

East St. Louis & Vicinity Flood Control -

 Madison and St. Clair Counties - For

 partial payment of the non-federal cost

 requirement of an interior flood protection

 project and ecosystem restoration at East

 St. Louis and Vicinity area..................... 1,800,000

Prairie/Farmers Creeks - Cook County -

 For costs associated with the implementation

 of flood damage reduction measures along

 Prairie/Farmers Creeks and the Des Plaines

 River, including for partial payment of the

 non-federal cost requirements of the U.S.

 Army Corps of Engineers' Upper Des Plaines

 River Flood Control Project....................... 600,000

Small Drainage and Flood Control Projects -

 For implementation of

 small drainage and flood control

 improvements in accordance with plans

 developed in cooperation with local

 governments and school districts, not

 to exceed $100,000 at any single

 locality.......................................... 100,000

    Total                                       $10,249,777

 

FOR WATERWAY IMPROVEMENTS

 

    Section 105.  The sum of $17,673,687, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 98, Section 105 of Public Act 94-798, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources for the following projects at the approximate costs set forth below:

Addison Creek Watershed - Cook

 and DuPage Counties............................... 214,727

Asian Carp Barrier – Cook County.................... 10,000

Chicago Harbor Leakage Control -

 Cook County - For implementation

 of a project to identify, measure,

 control, and eliminate leakage

 flows through controlling structures at

 the mouth of the Chicago River in

 cooperation with federal agencies and

 units of local government......................... 990,416

Crisenberry Dam - Jackson County:

 For complete rehabilitation of the

 dam and spillway, including the

 required geotechnical investigation,

 the preparation of plans and

 specifications, and the construction

 of the proposed rehabilitation.................... 422,964

Crystal Creek - Cook County...................... 2,864,324

East St. Louis and Vicinity Flood Control -

 Madison and St. Clair Counties - For

 partial payment of the non-federal cost

 requirements of an interior flood protection

 project and ecosystem restoration at

 East St. Louis and Vicinity area.................. 500,000

Flood Mitigation - Disaster

 Declaration Areas............................... 2,101,826

Fox Chain O'Lakes - Lake and McHenry

 Counties  ...................................... 1,420,132

Fox River Dams - Kane, Kendall

 and McHenry Counties............................ 3,183,101

Granite City - Area  Groundwater-

 Madison County.................................... 300,000

Havana Facilities - Mason County................... 125,212

Hickory Hills - Cook County........................ 158,410

Hickory/Spring Creeks Watershed -

 Cook and Will Counties............................ 265,816

Indian Creek - Kane County.......................... 87,025

Kaskaskia River System - Randolph,

 Monroe and St. Clair Counties...................... 33,915

Kyte River - Rochelle, Ogle County............... 1,450,863

Little Calumet Watershed -

 Cook County........................................ 14,154

Loves Park - Winnebago County...................... 266,589

Lower Des Plaines River Watershed -

 Cook and Lake Counties............................ 712,127

Metro-East Sanitary District -

 Madison and St. Clair Counties..................... 60,578

North Branch Chicago River Watershed -

 Cook and Lake Counties............................. 25,690

Prairie du Rocher - Randolph County:

  For partial payment to implement the

  federal flood protection project for

  the Village of Prairie du Rocher in

  cooperation with local units of

  government........................................ 10,000

Prairie/Farmers Creek - Cook County.............. 1,800,410

Rock River Dams - Rock Island and

 Whiteside Counties................................ 151,081

Small Drainage and Flood Control

 Projects - Statewide (not to exceed

 $100,000 at any locality)......................... 366,017

Union - McHenry County.............................. 30,000

Village of Justice - Cook County................... 100,000

W. B. Stratton (McHenry) Lock

 and Dam - McHenry County............................ 8,310

    Total                                       $17,673,687

 

    Section 110.  The sum of $81,279, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 98, Section 110 of Public Act 94-798, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources in cooperation with federal agencies, state agencies and units of local government in the implementation of flood hazard mitigation plans in counties that received a Presidential Disaster Declaration as a result of flooding in calendar years 1993 and thereafter, in accordance with reports filed under Section 5 of the "Flood Control Act of 1945".

 

    Section 115.  The sum of $4,475,000, or so much thereof as may be necessary, and as remains unexpended at the close of business on June 30, 2007, from appropriations heretofore made in Article 98, Section 115 of Public Act 94-798, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for grants to public museums for permanent improvements.

 

    Section 120.  The sum of $1,573,499, or so much thereof as may be necessary, and as remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 98, Section 120 of Public Act 94-798, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for grants to public museums for permanent improvements.

 

    Section 125.  The amount of $30,115, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 98, Section 125 of Public Act 94-798, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for grants to public museums for permanent improvements.

 

    Section 130.  The amount of $2,940,287, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 98, Section 130 of Public Act 94-798, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for grants to public museums for permanent improvements.

 

    Section 135.  The sum of $206,806, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from appropriations heretofore made in Article 97, Section 60 and Article 98, Section 135, of Public Act 94-798, as amended, is reappropriated to the Department of Natural Resources from the State Furbearer Fund for the conservation of fur bearing mammals in accordance with the provisions of Section 5/1.32 of the "Wildlife Code", as now or hereafter amended.

 

    Section 145.  The following named sum, or so much thereof as may be necessary, respectively, and as remains unexpended at the close of business on June 30, 2007, from appropriations heretofore made for such purposes, is reappropriated to the Department of Natural Resources for the objects and purposes set forth below:

Payable from Natural Areas Acquisition Fund:

    (From Article 97, Section 65 and

    Article 98, Section 145

    of Public Act 94-798, as amended)

  For the acquisition, preservation and

   stewardship of natural areas,

   including habitats for endangered and

   threatened species, high quality natural

   communities, wetlands and other areas

   with unique or unusual natural

   heritage qualities........................... $6,492,787

 

    Section 150.  The sum of $90,486,480, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from appropriations heretofore made in Article 97, Section 70 and Article 98, Section 150, of Public Act 94-798, as amended, is reappropriated from the Open Space Lands Acquisition and Development Fund to the Department of Natural Resources for expenses connected with and to make grants to local governments as provided in the "Open Space Lands Acquisition and Development Act".

 

FOR STATE PHEASANT PROGRAM

    Section 160.  The sum of $969,734, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from appropriations heretofore made in Article 97, Section 75 and Article 98, Section 160, of Public Act 94-798, as amended, is reappropriated from the State Pheasant Fund to the Department of Natural Resources for the conservation of pheasants in accordance with the provisions of Section 5/1.31 of the "Wildlife Code", as now or hereafter amended.

 

    Section 170.  The sum of $2,930,880, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from appropriations heretofore made in Article 97, Section 80 and Article 98, Section 170, of Public Act 94-798, as amended, is reappropriated from the Illinois Habitat Fund to the Department of Natural Resources for the preservation and maintenance of high quality habitat lands in accordance with the provisions of the "Habitat Endowment Act", as now or hereafter amended.

 

    Section 180.  The sum of $861,703, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from appropriations heretofore made in Article 97, Section 85, and Article 98, Section 180, of Public Act 94-798, as amended, is reappropriated from the Illinois Habitat Fund to the Department of Natural Resources for the preservation and maintenance of a high quality fish and wildlife habitat and to promote the heritage of outdoor sports in Illinois from revenue derived from the sale of Sportsmen Series license plates.

 

    Section 190.  The following named sum, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from appropriations heretofore made in Article 97, Section 95 and Article 98, Section 190, of Public Act 94-798, as amended, made either independently or in cooperation with the Federal Government or any agency thereof, any municipal corporation, or political subdivision of the State, or with any public or private corporation, organization, or individual, is reappropriated to the Department of Natural Resources for refunds and the purposes stated:

Payable from Land and Water Recreation Fund:

  For Outdoor Recreation Programs.............. $24,941,878

 

    Section 195.  The sum of $2,372,178, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from appropriations heretofore made in Article 97, Section 100 and Article 98, Section 195, of Public Act 94-798, as amended, is reappropriated from the Off Highway Vehicle Trails Fund to the Department of Natural Resources for grants to units of local governments, not-for-profit organizations, and other groups to operate, maintain and acquire land for off-highway vehicle trails and parks as provided for in the Recreational Trails of Illinois Act, including administration, enforcement, planning and implementation of this Act.

 

    Section 205.  The sum of $1,863,576, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from appropriations heretofore made for such purposes in Article 98, Section 205 of Public Act 94-798, as amended, is reappropriated from the Conservation 2000 Projects Fund to the Department of Natural Resources for the acquisition, planning and development of land and long-term easements, and cost-shared natural resource management practices for ecosystem-based management of Illinois' natural resources, including grants for such purposes.

 

    Section 210.  The sum of $3,959,195, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from appropriations heretofore made for such purposes in Article 98, Section 210 of Public Act 94-798, as amended, is reappropriated from the Conservation 2000 Projects Fund to the Department of Natural Resources for the acquisition, planning and development of land and long-term easements, and cost-shared natural resource management practices for ecosystem-based management of Illinois' natural resources, including grants for such purposes.

 

    Section 215.  The following named sum, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from appropriations heretofore made in Article 97, Section 110 and Article 98, Section 215 of Public Act 94-798, as amended, made either independently or in cooperation with the Federal Government or any agency thereof, any municipal corporation, or political subdivision of the State, or with any public or private corporation, organization, or individual, is reappropriated to the Department of Natural Resources for refunds and the purposes stated:

Payable from Federal Title IV Fire

 Protection Assistance Fund:

  For Rural Community Fire

   Protection Program............................. $695,298

 

    Section 225.  The sum of $175,510, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from appropriations heretofore made in Article 97, Section 115 and Article 98, Section 225, of Public Act 94-798, as amended, is reappropriated from the Snowmobile Trail Establishment Fund to the Department of Natural Resources for the administration and payment of grants to nonprofit snowmobile clubs and organizations for construction, maintenance, and rehabilitation of snowmobile trails and areas for the use of snowmobiles.

 

    Section 235.  The sum of $1,747,274, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from appropriations heretofore made in Article 97, Section 120 and Article 98, Section 235, of Public Act 94-798, as amended, is reappropriated from the Illinois Forestry Development Fund to the Department of Natural Resources for the payment of grants to timber growers for implementation of acceptable forestry management practices as provided in the "Illinois Forestry Development Act" as now or hereafter amended.

 

    Section 245.  To the extent Federal Funds including reimbursements are made available for such purposes, the sum of $483,220, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from appropriations heretofore made in Article 97, Section 125, and Article 98, Section 245, of Public Act 94-798, as amended, is reappropriated from the Illinois Forestry Development Fund to the Department of Natural Resources for Forest Stewardship Technical Assistance.

 

    Section 260.  The sum of $2,644,762, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from appropriations heretofore made in Article 97 Section 140, and Article 98, Section 260, of Public Act 94-798, as amended, is reappropriated from the State Migratory Waterfowl Stamp Fund to the Department of Natural Resources for the purpose of attracting waterfowl and improving public migratory waterfowl areas within the State.

 

FOR BIKEWAYS PROGRAMS

    Section 270.  The following named sums, or so much thereof as may be necessary, and is available for expenditure as provided herein, are appropriated from the Park and Conservation Fund to the Department of Natural Resources for the following purposes:

 

    Section 275.  The sum of $10,886 or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made in Article 98, Section 275 of Public Act 94-798, as amended, is reappropriated for land acquisition, development and grants, for the following bike paths at the approximate costs set forth below:

  Great River Road/Vadalabene Bikeway

   through Grafton................................... 5,300

  Super Trail between the Quad Cities

   and Savannah.......................................... 0

  Illinois Prairie Path in

   Cook County....................................... 5,600

 

    Section 280.  The sum of $15,609,032, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from appropriations heretofore made in Article 97, Section 145, and Article 98, Section 280, of Public Act 94-798, as amended, is reappropriated from the Park and Conservation Fund to the Department of Natural Resources for grants to units of local government for the acquisition and development of bike paths.

 

    Section 290.  The sum of $56,700, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made in Article 98, Section 290 of Public Act 94-798, as amended, is reappropriated from the Park and Conservation Fund to the Department of Natural Resources for land acquisition, development, grants and all other related expenses connected with the acquisition and development of bike paths.

    No funds in this Section may be expended in excess of the revenues deposited in the Park and Conservation Fund as provided for in Section 2-119 of the Illinois Vehicle Code.

 

    Section 300.  The sum of $686,826, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made in Article 98, Section 300 of Public Act 94-798, as amended, is reappropriated from the Park and Conservation Fund to the Department of Natural Resources for multiple use facilities and programs for conservation purposes provided by the Department of Natural Resources, including repairing, maintaining, reconstructing, rehabilitating, replacing fixed assets, construction and development, marketing and promotions, all costs for supplies, materials, labor, land acquisition and its related costs, services, studies, and all other expenses required to comply with the intent of this appropriation.

 

    Section 305.  The sum of $5,379,873, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from appropriations heretofore made in Article 97, Section 150, and Article 98, Section 305, of Public Act 94-798, as amended, is reappropriated from the Park and Conservation Fund to the Department of Natural Resources for land acquisition, development and maintenance of bike paths and all other related expenses connected with the acquisition, development and maintenance of bike paths.

 

    Section 310.  The sum of $1,507,940, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made in Article 98, Section 310 of Public Act 94-798, as amended, is reappropriated to the Department of Natural Resources from the Park and Conservation Fund for multiple use facilities and programs for conservation purposes provided by the Department of Natural Resources, including repairing, maintaining, reconstructing, rehabilitating, replacing fixed assets, construction and development, marketing and promotions, all costs for supplies, materials, labor, land acquisition and its related costs, services, studies, and all other expenses required to comply with the intent of this appropriation.

 

    Section 320.  The sum of $7,066,627, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from appropriations heretofore made in Article 97, Section 155, and Article 98, Section 320, of Public Act 94-798, as amended, is reappropriated from the Park and Conservation Fund to the Department of Natural Resources for the development and maintenance of recreational trails and trail-related projects authorized under the Intermodal Surface Transportation Efficiency Act of 1991, provided such amount shall not exceed funds to be made available for such purposes from state or federal sources.

 

    Section 330.  The sum of $435,837, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made in Article 98, Section 330 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Department of Natural Resources for grants and contracts for well plugging and restoration projects.  The appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 335.  The sum of $2,564,367, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made in Article 98, Section 335 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Department of Natural Resources for grants to museums for permanent improvements.

 

    Section 345.  The sum of $7,348, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 98, Section 345 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Department of Natural Resources for grants and contracts for well plugging and restoration projects. The appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 350.  The sum of $54,104, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 98, Section 350 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Department of Natural Resources for grants and contracts for well plugging and restoration projects.  The appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 375.  The amount of $189,520, or so much thereof as may be necessary and remains unexpended on June 30, 2007, from a reappropriation heretofore made for such purposes in Article 98, Section 375 of Public Act 94-798, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Natural Resources for the completion of the following projects at the approximate costs set forth below:

Lower Des Plaines River at Tributaries Watershed -

   Cook and DuPage Counties - for

   construction of drainage, flood control,

   recreation and related improvements and

   facilities in the Lower Des Plaines

   Watershed; and for necessary land

   acquisition, relocation, and related

   expenses, all in general conformance with

   the Lower Des Plaines River and Tributaries

   Watershed Work plan in cooperation with the

   U.S. Soil Conservation Service and local

   governments sponsoring this Federal

   Flood Control project.......................... $189,520

 

    Section 380.  The amount of $32,507, or so much thereof as may be necessary and remains unexpended on June 30, 2007, from appropriations heretofore made for such purposes in Article 98, Section 380 of Public Act 94-798, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Natural Resources for the following projects at the approximate costs set forth below:

Indian Creek - Kane County - For implementation

   of the Indian Creek flood control project

   in Kane County in cooperation with the City

   of Aurora ....................................... 18,656

Midlothian Creek - Cook County - Improvement of

   Midlothian Creek channel to provide flood

   damage reduction for Fernway Subdivision in

   cooperation with the Villages of Orland

   Park and Tinley Park............................. 13,851

    Total                                           $32,507

 

    Section 385.  The following named sums, or so much thereof as may be necessary, respectively, and as remains unexpended at the close of business on June 30, 2007, from appropriations heretofore made for such purposes, are reappropriated to the Department of Natural Resources for the objects and purposes set forth below:

Payable from the Illinois Beach Marina Fund:

    (From Article 97, Section 160

    and Article 98, Section 385,

    of Public Act 94-798, as amended)

  For rehabilitation, reconstruction,

   repair, replacing, fixed assets,

   and improvement of facilities at

   North Point Marina at Winthrop

   Harbor....................................... $1,206,770

 

    Section 395.  The sum of $18,050,982, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from appropriations heretofore made in Article 97, Section 165, and Article 98, Section 395, of Public Act 94-798, as amended, is reappropriated to the Department of Natural Resources from the Abandoned Mined Lands Reclamation Council Federal Trust Fund for grants and contracts to conduct research, planning and construction to eliminate hazards created by abandoned mines, and any other expenses necessary for emergency response.

 

    Section 405.  The sum of $4,535,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 98, Section 405 of Public Act 94-798, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources to acquire, protect and preserve open space and natural lands.

 

    Section 410.  The sum of $14,947,431 or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 97, Section 170 of Public Act 94-798, as amended, is reappropriated from the Wildlife and Fish Fund to the Department of Natural Resources for the acquisition, engineering and rehabilitation of dedicated hunting and fishing lands in conjunction with the Illinois Hunting Heritage Protection Act; however, no more than $1,500,000 of the total appropriation may be used for engineering and rehabilitation.

 

    Section 415.  The sum of $20,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made for such purpose in Article 98, Section 415 of Public Act 94-798, is reappropriated from the Capital Development Fund to the Department of Natural Resources for water resource management projects as authorized by subsection (g) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 420.  The sum of $15,253,790, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made for such purpose in Article 98, Section 420 of Public Act 94-798, is reappropriated from the Capital Development Fund to the Department of Natural Resources for grants to local governments for the acquisition, financing, architectural planning, development, alteration, installation, and construction of capital facilities consisting of buildings, structures, durable equipment, and land as authorized by subsection (l) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 425.  The sum of $25,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made for such purpose in Article 98, Section 425 of Public Act 94-798, is reappropriated from the Capital Development Fund to the Department of Natural Resources for the Illinois Open Land Trust Program as defined by the Illinois Open Land Trust Act as authorized by subsection (m) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 430.  No contract shall be entered into or obligation incurred or any expenditure made from a reappropriation herein made in Sections:

  70 through 130,

  190, 205, 210,

  270 through 380,

  405, 410, 415, 420 and 425

until after the purpose and amount of such expenditure has been approved in writing by the Governor.

 

    Total, Article 40                          $367,160,689

 

ARTICLE 45

DEPARTMENT OF MILITARY AFFAIRS

 

    Section 5.  The sum of $238,800, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made for such purpose in Article 99, Section 5 of Public Act 94-0798, is reappropriated from the Illinois National Guard Armory Construction Fund to the Department of Miliary Affairs for land acquisition and construction of parking facilities at armories.

 

    Total, Article 45                              $238,800

 

ARTICLE 50

DEPARTMENT OF STATE POLICE

 

    Section 10.  The sum of $13,990,231, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made for such purposes in Article 100, Section 10 of Public Act 94-798, as amended, is reappropriated from the Capital Development Fund to the Department of State Police for the cost associated with a statewide voice communication system.

 

    Section 15.  No contract shall be entered into or obligation incurred for any expenditures from appropriations in Section 10 of this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, Article 50                           $13,990,231

 

ARTICLE 55

DEPARTMENT OF TRANSPORTATION

 

    Section 5.  The sum of $4,600,000, or so much thereof as may be necessary, is appropriated from the Road Fund to the Department of Transportation for Permanent Improvements to Illinois Department of Transportation facilities, including but not limited to the purchase of land, construction, repair, alterations and improvements to maintenance and traffic facilities, district and central headquarters facilities, storage facilities, grounds, parking areas and facilities, fencing and underground drainage, including plans, specifications, utilities and fixed equipment installed and all costs and charges incident to the completion thereof at various locations.

 

    Section 10.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Road Fund to the Department of Transportation for the objects and purposes hereinafter named:

  For costs associated with the

   identification and disposal of hazardous

   materials at storage facilities............... 1,158,600

  For Maintenance, Traffic and Physical

   Research Purposes (A)........................ 28,129,100

  For repair of damages by motorists

   to highway guardrails, fencing,

   lighting units, bridges, underpasses,

   signs, traffic signals, crash

   attenuators, landscaping, roadside

   shelters, rest areas, fringe parking

   facilities, sanitary facilities,

   maintenance facilities including salt

   storage buildings, vehicle weight

   enforcement facilities including scale

   houses, and other highway appurtenances,

   provided such amount shall not exceed

   funds to be made available from collections

   from claims filed by the Department

   to recover the costs of such damages.......... 5,500,000

  For Maintenance, Traffic and Physical

   Research Purposes (B)........................ 13,150,000

    Total                                       $47,937,700

 

    Section 15.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Road Fund to the Department of Transportation for the objects and purposes hereinafter named:

  For apportionment to counties for

   construction of township bridges 20

   feet or more in length as provided

   in Section 6-901 through 6-906 of the

   "Illinois Highway Code"...................... 15,000,000

  For apportionment to needy Townships and

   Road Districts, as determined by the

   Department in consultation with the County

   Superintendents of Highways, Township

   Highway Commissioners, or Road District

   Highway Commissioners........................ 10,014,300

  For apportionment to high-growth cities over

   5,000 in population, as determined by the

   Department in consultation with the Illinois

   Municipal League.............................. 4,000,000

  For apportionment to counties

   under 1,000,000 in population,

   $8,000,000 of the total apportioned

   in equal amounts to each eligible

   county, and $13,800,000 apportioned

   to each eligible county in proportion

   to the amount of motor vehicle license

   fees received from the residents of

   eligible counties............................ 21,800,000

    Total                                       $50,814,300

 

    Section 20.  The sum of $358,185,700, or so much thereof as may be necessary, is appropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program as approximated below:

 

 District 1, Schaumburg......... 3,636,000

 District 2, Dixon.............. 2,460,000

 District 3, Ottawa............. 3,350,000

 District 4, Peoria............. 2,561,000

 District 5, Paris.............. 1,273,000

 District 6, Springfield........ 1,677,000

 District 7, Effingham.......... 2,302,000

 District 8, Collinsville....... 3,174,000

 District 9, Carbondale......... 1,983,000

 Statewide (including refunds) 191,940,700

 Engineering.................. 143,829,000

 

    Section 20a.  The sum of $550,000,000, or so much thereof as may be necessary, is appropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the local portion of the Road Improvement Program as approximated below:

 District 1, Schaumburg....... 301,311,000

 District 2, Dixon............. 19,975,000

 District 3, Ottawa............ 18,729,000

 District 4, Peoria............ 21,410,000

 District 5, Paris.............. 9,133,000

 District 6, Springfield....... 23,548,000

 District 7, Effingham......... 15,377,000

 District 8, Collinsville...... 42,212,000

 District 9, Carbondale......... 8,682,000

 Statewide (including refunds). 89,623,000

 

    Section 25.  The sum of $916,000,000, or so much thereof as may be necessary, is appropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of State highways, arterial highways, roads, access areas, roadside shelters, rest areas fringe parking facilities and sanitary facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the road improvement program as approximated below:

 

District 1, Schaumburg......................... 378,701,000

District 2, Dixon............................... 70,362,000

District 3, Ottawa.............................. 95,851,000

District 4, Peoria.............................. 73,285,000

District 5, Paris............................... 36,423,000

District 6, Springfield......................... 48,001,000

District 7, Effingham........................... 65,842,000

District 8, Collinsville........................ 90,807,000

District 9, Carbondale.......................... 56,728,000

Statewide (including refunds)............................ 0

Engineering.............................................. 0

 

    Section 27.  The sum of $750,000,000, or so much thereof as may be necessary, for statewide use pursuant to Section 4(a)(1) of the General Obligation Bond Act, is appropriated from the Transportation Bond Series A Fund to the Department of Transportation for land acquisition, engineering (including environmental studies and archaeological activities and other studies and activities necessary or appropriate to secure federal participation in the project), and construction, including reconstruction, extension and improvement of State highways, arterial highways, roads, structures separating highways and railroads and bridges and for purposes allowed or required by Title 23 of the U.S. Code as provided by law in order to implement a portion of the Fiscal Year 2008 road improvements program.

 

    Section 30.  The sum of $28,750,000, or so much thereof as may be necessary, is appropriated from the Grade Crossing Protection Fund to the Department of Transportation for the installation of grade crossing protection or grade separations at places where a public highway crosses a railroad at grade, as ordered by the Illinois Commerce Commission, as provided by law.

 

    Section 35.  The sum of $137,000,000, or so much thereof as may be necessary, is appropriated from the Federal/Local Airport Fund to the Department of Transportation for funding the local or federal share of airport improvement projects, including reimbursements and/or refunds, undertaken pursuant to pertinent state or federal laws, provided such amounts shall not exceed funds available from federal and/or local sources.

 

    Section 37.  The sum of $25,000,000, or so much thereof as may be necessary, is appropriated from the Transportation Bond Series B Fund to the Department of Transportation for financial assistance to airports pursuant to Section 34 of the Illinois Aeronautics Act, as amended, for such purposes as are described in that Section and for airport acquisition and development pursuant to Section 72 of the Illinois Aeronautics Act, as amended, for such purposes as are described in that Section.

 

    Section 40.  The sum of $25,000,000, or so much thereof as may be necessary, is appropriated from the Road Fund to the Department of Transportation for grants, road construction and all other costs relating to the Chicago Region Environmental and Transportation Efficiency (CREATE) program, provided such amounts not exceed funds made available by the federal government for this program.

 

    Section 45.  The sum of $200,000,000, or so much thereof as may be necessary, is appropriated from the Transportation Bond Series B Fund to the Department of Transportation for construction costs, making grants, and providing project assistance to municipalities, special transportation districts, private non-profit carriers, mass transportation carriers and the Intercity rail program for the acquisition, construction, extension, reconstruction, and improvement of mass transportation facilities, including rapid transit, intercity rail, bus and other equipment used in connection therewith, as provided by law, pursuant to Section 4(b)(1) of the General Obligation Bond Act, as amended.

 

    Section 50.  The sum of $16,000,000, or so much thereof as may be necessary, is appropriated from the Federal Mass Transit Trust Fund to the Department of Transportation for the federal share of capital, operating, consultant services, and technical assistance grants, as well as state administration and interagency agreements, provided such amounts shall not exceed funds to be made available from the Federal Government.

 

    Section 55.  The sum of $2,700,000, or so much thereof as may be necessary, is appropriated from the State Rail Freight Loan Repayment Fund for funding the State Rail Freight Loan Repayment Program created by Section 49.25g-1 of the Civil Administrative Code of Illinois.

 

    Section 60.  The sum of $1,045,000, or so much thereof as may be necessary, is appropriated from the Rail Freight Loan Repayment Fund to the Department of Transportation for the Rail Freight Service Assistance Program, created by Section 49.25a through 49.25g-1 of the Civil Administrative Code of Illinois.

 

    Section 62.  The sum of $100,000,000, or so much thereof as may be necessary, is appropriated from the Transportation Bond Series B Fund to the Department of Transportation, pursuant to Section 4(b)(1) of the General Obligation Bond At, for track and signal improvements, AMTRAK station improvements, rail passenger equipment, and rail freight facility improvements.

 

    Section 65.  No contract shall be entered into or obligation incurred or any expenditure made from an appropriation herein made in

Section 5    Permanent Improvements

Section 27   Series A Road Program

Section 37   Series B Aeronautics

Section 45   Series B Transit

Section 55   State Rail Freight Loan Repayment

Section 60   Federal Rail Freight Loan Repayment

Section 62   Series B Rail

 

of this Article until after the purpose and the amount of such expenditure has been approved in writing by the Governor.

 

    Total, Article 55                        $3,213,032,700

 

ARTICLE 60

DEPARTMENT OF TRANSPORTATION

PERMANENT IMPROVEMENTS

 

    Section 5.  The sum of $27,082,400, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the appropriation and reappropriation concerning Permanent Improvements heretofore made in Article 101, Section 5 and Article 102, Section 5 of Public Act 94-0798, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.

 

CONSTRUCTION

    Section 10.  The sum of $21,465,072, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the reappropriations heretofore made in Article 102, Section 20 and Section 25 of Public Act 94-0798, as amended, for Engineering and Consultant Contracts only, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.

 

    Section 15.  The sum of $13,849,710, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the reappropriation heretofore made in Article 102, Section 30 of Public Act 94-0798, as amended, for Engineering and Consultant Contracts only, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.

 

    Section 20.  The sum of $67,964,891, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the reappropriation heretofore made in Article 102, Section 35 of Public Act 94-0798, as amended, for Engineering and Consultant Contracts only, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.

 

    Section 25.  The sum of $8,206,264, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the appropriation and reappropriation concerning hazardous materials made in Article 101, Section 10 and Article 102, Section 40 of Public Act 94-0798, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.

 

    Section 30.  The sum of $31,027,324, or so much thereof as may be necessary, and remains unexpended, less $2,000,000 to be lapsed from the unexpended balance, at the close of business on June 30, 2007, from the appropriation and reappropriation made for Formal Contracts in the line item, “For Maintenance, Traffic and Physical Research Purposes (A)” for the Central Offices, Division of Highways, in Article 101, Section 10 and Article 102, Section 45 of Public Act 94-0798, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.

 

    Section 35.  The sum of $8,946,943, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the appropriation and reappropriation concerning Highway Damage Claims heretofore made in Article 101, Section 10 and Article 102, Section 50 of Public Act 94-0798, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.

 

    Section 40. The sum of $24,456,199, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the reappropriation heretofore made in Article 102, Section 55 of Public Act 94-0798, as amended, for Engineering and Consultant Contracts only, is reappropriated from the State Construction Fund to the Department of Transportation for the same purposes.

 

    Section 45. The sum of $31,130,154, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the reappropriation heretofore made in Article 102, Section 60 of Public Act 94-0798, as amended, for Engineering and Consultant Contracts only, is reappropriated from the State Construction Fund to the Department of Transportation for the same purposes.

 

HIGHWAY CONSTRUCTION AND LAND ACQUISITION

AWARDS AND GRANTS

 

    Section 50.  The sum of $19,605,291, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the appropriation and reappropriation heretofore made for township bridges in Article 101, Section 15 and Article 102, Section 65 of Public Act 94-0798, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.

 

CONSTRUCTION

    Section 55.  The sum of $80,732,469, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the reappropriation heretofore made in Article 102, Section 70 of Public Act 94-0798, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.

 

    Section 60.  The sum of $700,458, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the reappropriation heretofore made in Article 102, Section 75 of Public Act 94-0798, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.

 

    Section 65.  The sum of $63,218,108, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the reappropriation heretofore made in Article 102, Section 80 of Public Act 94-0798, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.

 

    Section 70.  The sum of $43,499,157, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the reappropriation heretofore made in Article 102, Section 85 of Public Act 94-0798, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.

 

    Section 75.  The sum of $97,017,919, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the reappropriation heretofore made in Article 102, Section 90 of Public Act 94-0798, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations.

 

    Section 80.  The sum of $83,872,425, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the reappropriation heretofore made in Article 102, Section 95 of Public Act 94-0798, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations.

 

    Section 85.  The sum of $178,854,663, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the reappropriations heretofore made in Article 102, Section 100 and Section 115 of Public Act 94-0798, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program; such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations.

 

    Section 90.  The following named sums or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2007 from the reappropriations heretofore made in Article 102, Section 105 of Public Act 94-0798, as amended, are reappropriated to the Department of Transportation from the Road Fund for the FY04 federal earmarks provided in Conference Report 108-401 which accompanies Public Law 108-199.  Expenditures shall not exceed funds to be made available by the federal government.

 

BRIDGE DISCRETIONARY

North Avenue Bridge, Chicago..................... 3,768,518

National Corridor Planning & Development

  City of Forsyth Frontage Road..................... 11,917

 

FERRY BOATS/TERMINAL FACILITIES

Canal Corridor Association-Port of

  LaSalle Project.................................. 400,000

 

TRANSPORTATION & COMMUNITY & SYSTEM PRESERVATION

Homewood, Illinois railroad station/

  platform acquisition and improvement............. 191,311

Village of Glencoe, Green Bay

  Trail – North Branch Trail Connection............ 127,454

 

SECTION 115 MEMBER INITIATIVES

168th and State Streets Intersection

  Improvements..................................... 200,000

Annie Glidden Road, DeKalb......................... 227,602

Convocation Center Roadway......................... 497,696

Grand Avenue Railroad relocation................... 443,709

Great River Road in Mercer County................... 31,679

Illinois Route 38 at Union Pacific

  Railroad Grade Separation........................ 250,000

ITS – I-74 in Peoria............................... 750,000

Kaskaskia Regional Port District, access roads...... 18,449

Long Meadow Parkway Fox River Bridge

  Crossing, Bolz Road............................ 2,820,000

Milwaukee Avenue Rehabilitation.................... 200,000

Rock Island County, Illinois Milan

  Beltway Construction............................. 500,000

Sauk Trail Reconstruction

  Improvements, Park Forest........................ 330,000

Sauk Village Industrial Park Access Road........... 600,000

Sheridan Road, Evanston............................ 800,000

St. Charles, Illinois, Fox River

  Crossing at Red Gate Corridor.................. 1,098,092

US 51, Christian/Shelby Counties................. 1,631,424

West Grand Avenue. (from North

  Western to N. California Ave.)................... 800,000

Widen Route 47 from Kreutzer Road

   to Reed Road, Huntley......................... 1,000,000

    Total                                       $16,697,851

 

    Section 95.  The following named sums or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2007, from the reappropriations heretofore made in Article 102, Section 110 of Pubic Act 94-0798, as amended, are reappropriated to the Department of Transportation from the Road Fund for the FY05 federal earmarks provided in Conference Report 108-792 which accompanies Public Law 108-447.  Expenditures shall not exceed funds to be made available by the federal government.

 

BRIDGE DISCRETIONARY

North-South Wacker Drive Reconstruction

  in Chicago..................................... 1,916,666

 

INTERSTATE MAINTENANCE DISCRETIONARY

I-55 South Barrier, Darien Illinois.............. 1,400,000

 

SECTION 117 MEMBER INITIATIVES

171st Street reconstruction, East Hazel Crest...... 400,000

67th Street Pedestrian Underpass, Chicago

  Lakefront........................................ 400,000

Camp Street upgrades, East Peoria................ 2,000,000

Cermak and Kenton Avenues........................ 1,000,000

Cicero Avenue lighting in University Park.......... 200,000

Des Plaines, Illinois alley, sidewalk

  improvements..................................... 973,930

Fulton County Highway 6............................ 837,590

I-290 Cap, Oak Park.............................. 1,000,000

KBS Railroad Hazard Elimination, Kankakee

  County........................................... 300,000

MacArthur Boulevard Extension, Springfield......... 500,000

McHenry County / Crystal Lake Road............... 1,000,000

Milwaukee Avenue, Grand to Gale, Chicago......... 1,250,000

Route 178 relocation, Phase II Engineering......... 876,685

Sheridan Road Improvements, Evanston............... 500,000

Sidewalks near Ford Heights........................ 200,000

Street improvements and streetlights, Lynnwood..... 150,000

Street improvements, Bartonville................... 500,000

Street improvements, Village of Armington.......... 495,787

Streetlights and salt dome for Markham............. 300,000

U.S. 41/I-176 Interchange improvements

  Phase I study.................................... 800,000

Winfield Pedestrian Tunnel....................... 1,000,000

    Total                                       $18,000,658

 

    Section 100.  The sum of $308,108,920, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the reappropriations heretofore made in Article 102, Section 120 of Public Act 94-0798, as amended, are reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations.

 

    Section 105.  The sum of $60,094,283, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the reappropriation heretofore made in Article 102, Section 120 of Public Act 94-0798, as amended, are reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations, including refunds.

 

    Section 110.  The sum of $915,939,493, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the appropriation heretofore made in Article 101, Section 20 of Public Act 94-0798, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program, including refunds.

 

    Section 115.  The sum of $519,808,743, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the appropriation heretofore made in Article 101, Section 20a of Public Act 94-0798, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the local portion of the Road Improvement Program, including refunds.

 

    Section 120.  The sum of $2,711,248, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the appropriation and reappropriation heretofore made in Article 101, Section 30 and Article 102, Section 125 of Public Act 94-0798, is reappropriated from the Road Fund to the Department of Transportation for Pavement Preservation Programs.

 

    Section 125.  The sum of $304,509,149, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the appropriation heretofore made in Article 101, Section 25 of Public Act 94-0798, is reappropriated from the Road Fund to the Department of Transportation for High Priority Projects (HPP) and Transportation Improvement Projects (TI) pertaining to local governments as designated in Public Law 109-59, Title I, Subtitle G, Section 1702 and Subtitle I, Section 1934 of the federal reauthorization act entitled SAFETEA-LU; provided such amounts do not exceed funds made available by the federal government through Congressional designations, annual allocations, obligation limitations, or any other federal limitations.  Specific project approximations appear in Article 101, Section 25 of Public Act 94-0798.

 

     Section 125a.  The sum of $76,235,151, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the appropriation heretofore made in Article 101, Section 25a of Public Act 94-0798, is reappropriated from the Road Fund to the Department of Transportation for the local match of all other non-federally reimbursed expenses associated with the High Priority Projects (HPP) and Transportation Improvement Projects (TI) specifically identified in Article 101, Section 25 of Public Act 94-0798, provided that such amounts do not exceed funds made available and paid into the Road Fund by local governments.

 

    Section 130.  The sum of $64,025, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the reappropriation heretofore made in Article 102, Section 130 of Public Act 94-0798, as amended, is reappropriated from the Capital Development Fund to the Department of Transportation for use as matching funds for the Illinois Transportation Enhancement program for the Historic Preservation Agency.

 

    Section 135. The sum of $35,687,484, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the reappropriations heretofore made in Article 102, Section 140, Section 145, Section 150, and Section 155 of Public Act 94-0798, as amended, is reappropriated from the State Construction Account Fund to the Department of Transportation for the same purposes.

 

    Section 140.  The sum of $29,998,619, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the reappropriation heretofore made in Article 102, Section 160 of Public Act 94-0798, as amended, are reappropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations.

 

    Section 145.  The sum of $107,768,978, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the reappropriations heretofore made in Article 102, Section 165 and Section 170 of Public Act 94-0798, as amended, are reappropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations.

 

    Section 150.  The sum of $255,842,843, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the reappropriations heretofore made in Article 102, Section 175 of Public Act 94-0798, as amended, are reappropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations.

 

    Section 155.  The sum of $235,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the appropriation heretofore made in Article 101, Section 55 of Public Act 94-0798, as amended, are reappropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations.

 

BOND FUND CONSTRUCTION

CONSTRUCTION

 

    Section 160.  The sum of $49,832,246, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from the reappropriations heretofore made in Article 102, Section 180, Section 185, and Section 190 of Public Act 94-0798, for statewide purposes, is reappropriated from the Transportation Bond Series A Fund to the Department of Transportation for the same purposes.

 

    Section 162.  The sum of $100,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the reappropriation heretofore made in Article 102, Section 195 of Public Act 94-0798, as amended, for statewide purposes, is reappropriated from the Transportation Bond Series A Fund to the Department of Transportation for the same purposes.

 

GRADE CROSSING PROTECTION

CONSTRUCTION

 

    Section 165.  The sum of $87,041,538, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the appropriation and reappropriation heretofore made for grade crossing protection or grade separation in Article 101, Section 35 and Article 102, Section 200 of Public Act 94-0798, as amended, is reappropriated from the Grade Crossing Protection Fund to the Department of Transportation for the same purpose.

 

DIVISION OF AERONAUTICS

AWARDS AND GRANTS

 

    Section 170.  The sum of $379,947,867, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the appropriation and reappropriation heretofore made in Article 101, Section 40 and Article 102, Section 205 of Public Act 94-0798, as amended, is reappropriated from the Federal/Local Airport Fund to the Department of Transportation for funding the local or federal share of airport improvement projects, including reimbursements and/or refunds, undertaken pursuant to pertinent state or federal laws, provided such amounts shall not exceed funds available from federal and/or local sources.

 

    Section 175.  The sum of $23,704,028, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the reappropriation concerning airport improvements heretofore made in Article 102, Section 210 of Public Act 94-0798, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for the same purposes.

 

    Section 177.  The sum of $2,200,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the appropriation concerning airport improvements heretofore made in Article 101, Section 70 of Public Act 94-0798, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for the same purposes.

 

CONSTRUCTION

    Section 180.  The sum of $21,137,268, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the reappropriation heretofore made in Article 102, Section 215 of Public Act 94-0798, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for the same purposes.

 

DIVISION OF PUBLIC AND INTERMODAL TRANSPORTATION

AWARDS AND GRANTS

 

    Section 185.  The following named sums, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the reappropriations heretofore made in Article 102, Section 220 of Public Act 94-0798, as amended, are reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for the same purposes as follows:

 

  Pursuant to Section 4(b)(1) of the

   General Obligation Bond Act, as amended.......... 72,125

 

  For the counties of Cook, DuPage,

   Kane, Lake, McHenry and Will,

   pursuant to Section 4(b)(2) of

   the General Obligation Bond Act,

   as amended.................................... 1,064,961

 

  For the counties of the State

   outside the counties of Cook,

   DuPage, Kane, Lake, McHenry and

   Will, pursuant to Section

   4(b)(3) of the General Obligation

   Bond Act, as amended............................. 28,014

    Total                                        $1,165,100

 

    Section 190.  The following named sums, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the reappropriations heretofore made in Article 102, Section 225 of Public Act 94-0798, as amended, are reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for the same purposes as follows:

 

  Pursuant to Section 4(b)(1) of

   the General Obligation Bond Act,

   as amended................................... 73,531,186

 

  For the counties of the State

   outside the counties of Cook,

   DuPage, Kane, McHenry, and Will,

   pursuant to Section 4(b)(1)

   of the General Obligation Bond

   Act, as amended............................... 4,377,984

 

  For the Department of Transportation's

   Greenlight Program pursuant to

   Section 4(b)(1) of the General

   Obligation Bond Act, as amended.............. 16,729,065

 

  To extend the metrolink rail line

   to Mid-America Airport........................ 5,000,002

    Total                                       $99,638,237

 

    Section 195. The sum of $108,586,626, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the reappropriation heretofore made in Article 102, Section 230 of Public Act 94-0798, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for construction costs, making grants and providing project assistance to municipalities, special transportation districts, private non-profit carriers, mass transportation carriers and the Intercity rail program for the acquisition, construction, extension, reconstruction, and improvement of mass transportation facilities, including rapid transit, intercity rail, bus and other equipment used in connection therewith, as provided by law, pursuant to Section 4(b)(1) of the General Obligation Bond Act, as amended.

 

    Section 200. The sum of $43,759,496, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the appropriation and reappropriation heretofore made in Article 101, Section 50 and Article 102, Section 235 of Public Act 94-0798, as amended, is reappropriated from the Federal Mass Transit Trust Fund to the Department of Transportation for the federal share of capital, operating, consultant services, and technical assistance grants, as well as state administration and interagency agreements, provided such amounts shall not exceed funds to be made available from the Federal Government.

 

CONSTRUCTION

    Section 205.  The sum of $55,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the appropriation heretofore made in Article 101, Section 65 of Public Act 94-0798, as amended, is reappropriated from the Road Fund to the Department of Transportation for grants, road construction and all other costs relating to the Chicago Region Environmental and Transportation Efficiency (CREATE) program, provided such amounts not exceed funds made available by the federal government for this program.

 

RAIL PASSENGER AND RAIL FREIGHT

AWARDS AND GRANTS

 

    Section 210.  The sum of $13,956,386, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the appropriation and reappropriation heretofore made in Article 101, Section 45 and Article 102, Section 240 of Public Act 94-0798, as amended, is reappropriated from the State Rail Freight Loan Repayment Fund to the Department of Transportation for the same purposes.

 

    Section 215.  The sum of $17,840,405, or so much thereof as may be necessary, and remains unexpended, less $7,840,405 to be lapsed from the unexpended balance, at the close of business on June 30, 2007, from the reappropriation heretofore made in Article 102, Section 245 of Public Act 94-0798, as amended, is reappropriated from the Federal High Speed Rail Trust Fund to the Department of Transportation for the federal share of the High Speed Rail Project.

 

    Section 220.  The sum of $31,442,302, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the reappropriation heretofore made in Article 102, Section 250 of Public Act 94-0798, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for the same purposes.

 

    Section 225.  The sum of $4,066,055, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from the appropriation and reappropriations concerning the federal share of the Rail Freight Loan Repayment Program heretofore made in Article 101, Section 60 and Article 102, Section 255 of Public Act 94-0798, as amended, is reappropriated from the Rail Freight Loan Repayment Fund to the Department of Transportation for the same purposes.

 

    Section 230. No contract shall be entered into or obligation incurred or any expenditure made from a reappropriation herein made in:

 

Section 5    Permanent Improvements

Section 130  CDB – Enhancement

Section 160  Series A - Road Program

Section 162  Series A - Road Program

Section 175  Series B - Aeronautics

Section 177  Series B - Aeronautics

Section 180  Series B - Land Acquisition 3rd Airport

Section 185  Series B - Transit

Section 190  Series B - Transit

Section 195  Series B - Transit

Section 210  State Rail Freight Loan Repayment

Section 215  FHSRTF High Speed Rail-Federal

Section 220  Series B - Rail

Section 225  Federal Rail Freight Loan Repayment

 

of this Article until after the purpose and the amount of such expenditure has been approved in writing by the Governor.

 

    Total, Article 60                        $4,717,574,041

 

ARTICLE 65

CAPITAL DEVELOPMENT BOARD

 

    Section 5.  The following named amounts, or so much thereof as may be necessary are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Agriculture for the projects hereinafter enumerated:

ILLINOIS STATE FAIRGROUNDS- SPRINGFIELD

  For replacing the HVAC in

   the administration building................... 3,212,000

  For replacing the administration

   building roof................................. 1,438,000

CENTRALIA DIAGNOSTICS LAB

For replacing the roof............................ $615,000

    Total                                        $5,265,000

 

    Section 10.  The following named amounts, or so much thereof as may be necessary are appropriated from the Capital Development Fund to the Capital Development Board for the Courts of Illinois for the projects hereinafter enumerated:

SPRINGFIELD- SUPREME COURT BUILDING

  For the renovation of the 4th

   appellate court space........................ 14,400,000

    Total                                       $14,400,000

 

    Section 15.  The following named amounts, or so much thereof as may be necessary are appropriated from the Capital Development Fund to the Capital Development Board for the Office of the Architect of the Capitol for the projects hereinafter enumerated:

CAPITOL BUILDING- SPRINGFIELD

  For upgrading the HVAC systems

   and for renovations to meet

   compliance with ADA, in addition

   to funds previously appropriated............. 33,761,500

  For upgrades to life safety

   protection systems in addition

   to funds previously appropriated.............. 6,000,000

    Total                                       $39,761,500

 

    Section 20.  The following named amounts, or so much thereof as may be necessary are appropriated from the Capital Development Fund to the Capital Development Board for the Office of the Secretary of State for the projects hereinafter enumerated:

HOWLETT BUILDING- SPRINGFIELD

  For planning and beginning

   the upgrade of the HVAC system................ 3,500,000

  For installing an emergency generator............ 791,000

ILLINOIS STATE LIBRARY- SPRINGFIELD

  For replacing the roofing system................. 528,000

CAPITOL COMPLEX- SPRINGFIELD

  For upgrading fire alarm panels.................. 771,000

STRATTON OFFICE BUILDING – SPRINGFIELD

  For the renovation or replacement

   of the Stratton Office Building, in

   addition to funds previously

   appropriated................................ 100,000,000

    Total                                      $105,590,000

 

    Section 25.  The following named amounts, or so much thereof as may be necessary are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Central Management Services for the projects hereinafter enumerated:

JAMES R. THOMPSON CENTER- CHICAGO

  For renovation and repairs to

   elevators..................................... 4,433,000

  For upgrading the HVAC system.................. 4,150,000

ELGIN REGIONAL OFFICE BUILDING

  For upgrading the HVAC system.................. 2,461,000

COLLINSVILLE REGIONAL OFFICE BUILDING

  For replacing the roof......................... 1,980,000

    Total                                       $13,024,000

 

    Section 30.  The following named amounts, or so much thereof as may be necessary are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Natural Resources for the projects hereinafter enumerated:

I&M CANAL - CHANNAHON - GRUNDY COUNTY

  For repair of the spillway, in addition

   to funds previously appropriated................ 345,000

GIANT CITY STATE PARK - JACKSON COUNTY

  For replacing the sewer treatment system......... 465,000

LAKE MURPHYSBORO STATE PARK - JACKSON COUNTY

  For replacing bridges and rehab

   of hiking trail................................. 270,000

NATURAL HISTORY SURVEY - HAVANA - MASON COUNTY

  For constructing pedestrian bridge............... 325,000

WORLD SHOOTING COMPLEX – SPARTA -  RANDOLPH COUNTY

  For constructing vault toilets................. 1,750,000

  For constructing storage building.............. 1,700,000

ILLINOIS BEACH STATE PARK - LAKE COUNTY

  For stabilizing shoreline...................... 2,000,000

    Total                                        $6,855,000

 

    Section 35.  The following named amounts, or so much thereof as may be necessary are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Corrections for the projects hereinafter enumerated:

LAWRENCE CORRECTIONAL CENTER

  For installing water softeners................... 351,000

LINCOLN CORRECTIONAL CENTER

  For upgrading the building

   automation system............................. 2,147,000

LOGAN CORRECTIONAL CENTER

  For replacing housing unit roofs................. 829,000

MENARD CORRECTIONAL CENTER

  For replacing plumbing and waste lines, in

   addition to funds previously appropriated..... 3,370,000

PONTIAC CORRECTIONAL CENTER

  For replacing the steam condensate lines....... 1,293,000

  For replacing powerhouse boilers............... 2,406,000

SHAWNEE CORRECTIONAL CENTER

  For upgrading windows, in addition

   to funds previously appropriated.............. 3,100,000

  For renovation of the central dietary, in

   addition to funds previously appropriated..... 4,361,000

SOUTHWESTERN CORRECTIONAL CENTER

  For replacing the roofing system................. 825,000

STATEVILLE CORRECTIONAL CENTER

  For replacing the X house locks................ 1,597,000

VIENNA CORRECTIONAL CENTER

  For replacing the roofing system, in

   addition to funds previously appropriated....... 940,000

    Total                                       $21,219,000

 

    Section 40.  The following named amounts, or so much thereof as may be necessary are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Juvenile Justice for the projects hereinafter enumerated

ILLINOIS YOUTH C ENTER - JOLIET

  For replacing roofs, in addition

   to funds previously appropriated................ 425,874

ILLINOIS YOUTH CENTER - PERE MARQUETTE

  For replacing roofs.............................. 221,000

ILLINOIS YOUTH CENTER - ST. CHARLES

  For upgrading HVAC system........................ 606,000

    Total                                        $1,252,874

 

    Section 45.  The following named amounts, or so much thereof as may be necessary are appropriated from the Capital Development Fund to the Capital Development Board for the Historic Preservation Agency for the projects hereinafter enumerated:

LINCOLN’S TOMB - SPRINGFIELD

  For renovating the interior...................... 570,000

LINCOLN-HERNDON LAW OFFICE - SPRINGFIELD

  For purchase and restoration

   of the Tinsley Shop........................... 1,000,000

    Total                                        $1,570,000

 

    Section 50.  The following named amounts, or so much thereof as may be necessary are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Human Services for the projects hereinafter enumerated:

ALTON MENTAL HEALTH CENTER - MADISON COUNTY

  For replacing roofs............................ 1,054,000

CHICAGO-READ MENTAL HEALTH CENTER - CHICAGO

  For replacing the emergency

   generator..................................... 1,391,000

CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER - ANNA

  For upgrading the fire alarm system............ 2,085,000

  For renovating Sycamore, in

   addition to funds previously appropriated..... 1,600,000

  For replacing roofs.............................. 851,400

ELGIN MENTAL HEALTH CENTER - KANE COUNTY

  For replacing roofs.............................. 601,000

FOX DEVELOPMENTAL CENTER - DWIGHT

  For upgrading fire/life safety systems........... 353,000

ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE

  For replacing roofs.............................. 372,000

JACKSONVILLE DEVELOPMENTAL CENTER - MORGAN COUNTY

  For upgrading fire/life safety systems........... 581,000

  For upgrading the coal

   distribution system, in addition

   to funds previously appropriated................ 800,000

MADDEN MENTAL HEALTH CENTER - HINES

  For relocating and renovating

   central dietary, in addition

   to funds previously appropriated.............. 1,238,000

  For upgrading fire alarm systems................. 963,000

MCFARLAND MENTAL HEALTH CENTER - SPRINGFIELD

  For upgrading fire alarm system................ 2,800,000

MURRAY DEVELOPMENTAL CENTER - CENTRALIA

  For replacing roofs.............................. 567,000

    Total                                       $15,256,400

 

    Section 55.  The following named amounts, or so much thereof as may be necessary are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Revenue for the projects hereinafter enumerated:

WILLARD ICE BUILDING - SPRINGFIELD

  For repairing emergency generator................ 120,000

  For renovation of the parking ramp............. 2,791,000

    Total                                        $2,911,000

 

    Section 60.  The following named amounts, or so much thereof as may be necessary are appropriated from the Capital Development Fund to the Capital Development Board for the Department of State Police for the projects hereinafter enumerated:

AMERICAN GENERAL BUILDING - SPRINGFIELD

  For installing an emergency generator

   and various improvements...................... 3,000,000

METRO-EAST FORENSIC LAB - BELLEVILLE

  For constructing new forensic lab, in

   addition to funds previously appropriated.... 33,500,000

JOLIET CRIME LAB - WILL COUNTY

  For installing water and sewer lines............. 722,000

    Total                                       $37,222,000

 

    Section 65.  The following named amounts, or so much thereof as may be necessary are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Veterans Affairs for the projects hereinafter enumerated:

QUINCY VETERAN’S HOME - ADAMS COUNTY

  For replacing pumps.............................. 343,000

  For replacing waste water lines.................. 214,000

  For planning and beginning

   renovation of Kent, Shapers

   and Elmore, in addition

   to funds previously appropriated.............. 1,000,000

  For providing emergency power.................... 824,000

STATEWIDE

  For the construction of a 200-bed

   veterans’ home facility, in addition

   to funds previously appropriated............. 15,000,000

    Total                                       $17,381,000

 

    Section 70.  The following named amounts, or so much thereof as may be necessary are appropriated from the Capital Development Fund to the Capital Development Board for the projects hereinafter enumerated:

ATTORNEY GENERAL BUILDING - SPRINGFIELD

  For installing an emergency generator............ 457,000

  For upgrading security system..................... 18,500

  For replacing electronic ballasts................ 959,000

    Total                                        $1,434,500

STATEWIDE

  For surveys and abatement of

   hazardous materials, in

   addition to funds previously appropriated..... 1,200,000

  For statewide emergencies, in

   addition to funds previously appropriated..... 4,000,000

  For escalation costs for state

   facility projects, in addition

   to funds previously appropriated............. 10,000,000

  For escalation and emergencies for

   higher education projects, in

   addition to funds previously appropriated.... 25,000,000

    Total                                       $40,200,000

 

    Section 75. The sum of $560,000,000, or so much thereof as may be necessary, is appropriated from the School Construction Fund to the Capital Development Board for grants to school districts for school construction projects authorized by the School Construction Law, grants to school districts and providers for preschool construction projects, and to the Illinois State Board of Education for grants to school districts for maintenance projects authorized by the School Construction Law.

 

    Section 80. For miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete work at the various higher education institutions. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for such purposes.............................. $30,000,000

Chicago State University......... $483,100

Eastern Illinois University....... 773,300

Governors State University........ 284,600

Illinois State University....... 1,532,000

Northeastern Illinois University.. 575,500

Northern Illinois University.... 1,738,500

Western Illinois University..... 1,188,300

Southern Illinois University.... 2,437,500

Southern Illinois University-

   Edwardsville................. 1,144,600

University of Illinois-

   Chicago...................... 4,165,900

University of Illinois-

   Springfield.................... 343,700

University of Illinois-

   Urbana/Champaign............. 6,225,400

Illinois Community College

   Board........................ 9,107,600

 

    Section 85.  The sum of $75,000,000, or so much thereof may be necessary, is appropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials and all other expenses required to complete the work at the various community colleges. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 90. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Board of Higher Education for the projects hereinafter enumerated:

CHICAGO STATE UNIVERSITY

  For renovating Douglas Hall, in

   addition to funds previously appropriated.... 18,000,000

  For planning and beginning

   a new Westside campus........................ 10,000,000

GOVERNORS STATE UNIVERSITY

  For replacing roadways and sidewalks........... 1,950,000

ILLINOIS STATE UNIVERSITY

  For renovations of the Fine Arts

   Complex...................................... 44,400,000

NORTHEASTERN ILLINOIS UNIVERSITY

  For constructing an education

   building..................................... 59,329,000

NORTHERN ILLINOIS UNIVERSITY

  For renovating and expanding

   Stevens Building............................. 19,190,600

SOUTHERN ILLINOIS UNIVERSITY - EDWARDSVILLE

  For renovating and constructing

   a Science Laboratory, in addition

   to funds previously appropriated............. 69,517,600

SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE

  For constructing a Transportation

   Education Center, in addition

   to funds previously appropriated............. 43,811,600

UNIVERSITY OF ILLINOIS - CHICAGO

  For upgrading the campus infrastructure and

   renovating campus buildings.................. 19,700,000

UNIVERSITY OF ILLINOIS - URBANA/CHAMPAIGN

  For renovating Lincoln Hall, in

   addition to funds previously appropriated.... 55,100,000

  For constructing a Post Harvest

   Crop Processing and Research

   Laboratory, in addition to

   funds previously appropriated................ 16,910,000

  For constructing an Electrical

   and Computer Engineering Building,

   in addition to funds previously

   appropriated................................. 42,000,000

UNIVERSITY OF ILLINOIS - ROCKFORD

  For constructing a National

   Rural Health Center.......................... 14,250,000

WESTERN ILLINOIS UNIVERSITY - MACOMB

  For constructing a performing arts

   center, in addition to funds

   previously appropriated...................... 57,825,100

WESTERN ILLINOIS UNIVERSITY - QUAD CITIES

  For the renovation and construction

   of a Riverfront Campus,

   in addition to funds

   previously appropriated...................... 14,232,500

    Total                                      $486,216,400

 

    Section 95.  The sum of $1,500,000, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Board of Trustees of Eastern Illinois University to purchase equipment to complete the renovation and expansion of the Doudna Fine Arts Center. This appropriation is in addition to funds previously appropriated.

 

    Section 100.  The sum of $21,800,000, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Board of Trustees of Southern Illinois University to purchase equipment to complete the renovation and expansion of the Morris Library. This appropriation is in addition to funds previously appropriated.

 

    Section 105.  No contract shall be entered into or obligation incurred for any expenditures from appropriations in this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, Article 65                        $1,497,858,674

 

ARTICLE 70

CAPITAL DEVELOPMENT BOARD

 

    Section 5.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2007, from reappropriations heretofore made for such purposes in Article 104, Section 5 of Public Act 94-798, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Agriculture for the projects hereinafter enumerated:

 

ILLINOIS STATE FAIRGROUNDS - DUQUOIN

(From Article 104, Section 5 of Public Act 94-798)

For completing the upgrade of the

  electrical distribution system, in

  addition to funds previously

  appropriated..................................... 100,759

For constructing a multi-purpose

  building.......................................... 61,710

ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD

For renovating comfort stations, in addition

  to funds previously appropriated.................. 53,481

For renovating the Emmerson Building................ 93,813

    Total                                          $309,763

 

    Section 20.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2007, from reappropriations heretofore made for such purposes in Article 104, Section 20 of Public Act 94-798, as amended, are reappropriated from the Capital Development Fund to the Capital Development Board for the Courts of Illinois for the projects hereinafter enumerated:

 

SPRINGFIELD - SUPREME COURT BUILDING

(From Article 104, Section 20 of Public Act 94-798)

For replacing the roofing system, in addition

  to funds previously appropriated................... 8,895

For replacing the roof.............................. 23,575

For renovating the HVAC system on

  the 3rd Floor.................................... 140,000

For installing humidifier and water

  filtration systems............................. 1,527,950

APPELLATE COURT SECOND DISTRICT - ELGIN

For miscellaneous improvements...................... 60,520

    Total                                        $1,760,940

 

    Section 30.  The following named amount, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 104, Section 30 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Courts of Illinois for the projects hereinafter enumerated:

SUPREME COURT BUILDING - SPRINGFIELD

(From Article 104, Section 30 of Public Act 94-798)

For renovating the Library and

  completing HVAC, in addition to funds

  previously appropriated.......................... 235,000

 

    Section 35.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2007, from reappropriations heretofore made for such purposes in Article 104, Section 35 of Public Act 94-798, as amended, are reappropriated from the Capital Development Fund to the Capital Development Board for the Office of the Architect of the Capitol for the projects hereinafter enumerated:

 

CAPITOL BUILDING - SPRINGFIELD

(From Article 104, Section 35 of Public Act 94-798)

For equipment, remodeling and all other

  costs related to the maintenance, renovation

  or restoration of areas located in the

  Capitol Building............................... 1,275,971

For all costs related to asbestos and

  environmental abatement in the

  Capitol Building............................... 3,446,496

    Total                                        $4,722,467

 

    Section 40.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2007, from reappropriations heretofore made in Article 104, Section 40, of Public Act 94-798, are reappropriated from the Capital Development Fund to the Capital Development Board for the Office of the Secretary of State for the projects hereinafter enumerated:

CAPITOL BUILDING - SPRINGFIELD

(From Article 104, Section 40 of Public Act 94-798)

For planning and design, providing a study,

  historical analysis, asbestos abatement

  and all other costs associated with the

  upgrade of the HVAC system in the Capitol

  building......................................... 304,891

For all costs related to the planning

  and design of life safety and fire

  protection system improvements, hazardous

  material abatement, historical restoration

  and construction in the Capitol Building......... 775,024

For upgrading the HVAC systems, in

  addition to funds previously

  appropriated..................................... 170,111

CAPITOL COMPLEX - SPRINGFIELD

For completing the stone restoration, in

  addition to funds previously appropriated........ 911,509

For demolition of 222 S. College,

  and landscaping of Capitol Complex

  in addition to funds previously

  appropriated................................... 1,200,000

For demolition of 222 South College

  Building and landscaping of

  Capitol Complex................................ 1,393,718

DRIVER'S FACILITY WEST - CHICAGO

For renovating the building........................ 767,789

MOTOR VEHICLE SERVICES FACILITY - SPRINGFIELD

For upgrading the fire alarm and

  security systems.................................. 97,072

STATE POWER PLANT - SPRINGFIELD

For installing new water service and

  repairing power plant systems..................... 45,262

WILLIAM G. STRATTON BUILDING - SPRINGFIELD

For the planning, design, reconstruction,

  and construction to renovate or replace

  the Stratton Office Building, in addition

  to funds previously appropriated.............. 11,582,631

    Total                                       $17,248,007

 

    Section 45.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2007, from reappropriations heretofore made in Article 104, Section 45 of Public Act 94-798, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Office of the Secretary of State for the projects hereinafter enumerated:

CAPITOL COMPLEX – SPRINGFIELD

(From Article 104, Section 45 of Public Act 94-798)

For upgrading fire alarm systems in

  two buildings.................................... 17,992

    Total                                           $17,992

 

    Section 50.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2007, from appropriations and reappropriations heretofore made for such purposes in Article 103, Section 15, and Article 104, Section 50 of Public Act 94-798, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Central Management Services for the projects hereinafter enumerated:

 

STATEWIDE

(From Article 103, Section 15 of Public Act 94-798)

For renovating state owned

  property....................................... 2,000,000

(From Article 104, Section 50 of Public Act 94-798)

For upgrading the building security

  system at the James R. Thompson Center

  and the State of Illinois building

  in addition to funds previously

  appropriated..................................... 655,000

OFFICE AND LAB BUILDING, CHICAGO MEDICAL CENTER

(From Article 104, Section 50 of Public Act 94-798)

For planning and beginning the renovation

  of the facility................................ 1,382,780

DIXON STATE GARAGE - LEE COUNTY

For upgrading the lighting and

  replacing the roof............................... 198,674

JAMES R. THOMPSON CENTER - CHICAGO

For installing an emergency generator............ 3,545,000

For rehabilitating exterior columns, in

  addition to funds previously appropriated...... 1,000,000

For upgrading mechanical systems, in

  addition to funds previously appropriated........ 649,828

MEDICAL CENTER (DCFS DISTRICT OFFICE) - CHICAGO

For replacing roof and upgrading

  mechanical and electrical systems................ 321,956

ROCKFORD REGIONAL OFFICE BUILDING

For replacing Halon and upgrading

  the air conditioning............................. 296,518

ILLINOIS CENTER FOR REHABILITATION AND

EDUCATION (WOOD) - CHICAGO

For upgrading fire and safety systems.............. 105,135

SPRINGFIELD - RESEARCH AND COLLECTION CENTER

For expanding surplus warehouse.................... 415,972

SPRINGFIELD - COMPUTER FACILITY

For upgrading the computer room and the

  electrical system................................ 300,981

    Total                                       $10,871,844

 

    Section 60.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2007, from reappropriations heretofore made in Article 104, Section 60, of Public Act 94-798, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Central Management Services for the projects hereinafter enumerated:

ILLINOIS CENTER FOR REHABILITATION AND EDUCATION

(ROOSEVELT) – CHICAGO

(From Article 104, Section 60 of Public Act 94-798)

For upgrading the kitchen and plumbing............. 185,838

JAMES R. THOMPSON CENTER - CHICAGO

For rehabilitating exterior columns, in

  addition to funds previously appropriated........ 48,157

    Total                                          $233,995

 

    Section 65.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2007, from reappropriations heretofore made for such purposes in Article 104, Section 65 Public Act 94-798, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Natural Resources for the projects hereinafter enumerated:

BABE WOODYARD STATE NATURAL AREA -

VERMILION COUNTY

(From Article 104, Section 65 of Public Act 94-798)

For developing the site and associated

  land acquisition................................. 244,751

BEAVER DAM STATE PARK - MACOUPIN COUNTY

For replacing the sewage system..................... 30,008

CARLYLE LAKE STATE PARKS

For road and site improvements at

  Carlyle Lake................................... 1,477,424

For infrastructure and site

  improvements at Carlyle Lake..................... 765,485

EAGLE CREEK STATE PARK - SHELBY COUNTY

For constructing lake access boat

  docks at resort.................................. 248,793

FERNE CLYFFE STATE PARK - JOHNSON COUNTY

For replacing the campground

  sewage treatment system.......................... 367,254

FOX RIDGE STATE PARK - COLES COUNTY

For replacing spillway.............................. 84,174

GOOSE LAKE PRAIRIE NATURAL AREA - GRUNDY COUNTY

For replacing floating boardwalk.................... 24,604

HENNEPIN CANAL PARKWAY STATE PARK AND ACCESS AREA

For rehabilitating/repairing railroad

  bridges, in addition to funds

  previously appropriated.......................... 853,786

HORSESHOE LAKE CONSERVATION AREA - ALEXANDER COUNTY

For dam rehabilitation and the State's share

  to implement the ecological restoration

  plan in cooperation with the U.S.

  Army Corps of Engineers, and

  land acquisition................................. 842,605

I & M Canal - CHANNAHON STATE PARK - WILL COUNTY

For improving DuPage River Spillway................. 79,315

ILLINOIS BEACH STATE PARK - LAKE COUNTY

For replacing sanitary sewer line................... 79,748

For replacing sanitary sewer lines................. 362,372

RED HILLS STATE PARK - LAWRENCE COUNTY

For miscellaneous improvements...................... 44,740

RESEARCH & COLLECTIONS CENTER - SPRINGFIELD

For renovating the interior......................... 57,365

ROCK CUT STATE PARK - WINNEBAGO COUNTY

For upgrading the sewage system.................. 1,616,785

SILOAM SPRINGS STATE PARK - ADAMS COUNTY

For rehabilitating office/service

  area........................................... 1,119,114

WORLD SHOOTING COMPLEX – SPARTA

For construction of the World Shooting

  Complex in Sparta................................ 284,080

SPRINGFIELD

For constructing an office building and

  interpretive center.............................. 166,763

WHITE PINES FOREST STATE PARK - OGLE COUNTY

For completing the replacement of the

  sewer system, in addition to funds

  previously appropriated........................... 15,982

For planning and beginning sewer system

  replacement....................................... 44,503

WILDLIFE PRAIRIE PARK

For rehabilitating the sewage

  treatment plant.................................. 767,500

STATEWIDE

For replacing/repairing the roofing systems

  at the following locations at the approximate

  cost set forth below............................ 245,000

  Clinton Lake Recreational

   Area - DeWitt County................. 65,000

  Ferne Clyffe State Park-

   Johnson County....................... 20,000

  Hennepin Canal Parkway

   State Park........................... 26,000

  Lake Le-Aqua-Na State Park-

   Stephenson County.................... 39,000

  Mermet Lake Conservation Area-

   Massac County........................ 95,000

For replacing/repairing the roofing systems

  at the following locations at the approximate

  costs set forth below........................... 176,041

  Starved Rock State Park &

   Lodge-LaSalle County................. 60,000

  Kaskaskia River Fish & Wildlife

   Area-Randolph County................. 25,000

  Pyramid State Park-

   Perry County.......................... 4,109

  Region V Office (Benton)

   Franklin County...................... 86,932

For rehabilitating dams and bridges................ 476,803

For constructing, replacing and

  renovating lodges and concession

  buildings...................................... 3,019,233

For replacing roofs at the following locations,

  at the approximate cost set forth below.......... 134,931

  Shabbona Lake State

   Park................................. 40,850

  Hennepin Canal Parkway

   State Park........................... 15,750

  Randolph Fish &

   Wildlife Area........................ 32,271

  Dixon Springs State

   Park................................. 46,060

For replacing and constructing vault

  toilets at the following locations,

  at the approximate cost set forth

  below............................................ 167,772

   Hennepin Canal Parkway

   State Trail......................... 167,772

For rehabilitating dams at the

  following locations, at the

  approximate cost set forth below................. 450,002

   Rock Cut State Park................. 450,002

For replacing roofs at the following

  locations, at the approximate

  cost set forth below............................. 206,925

   Southern IL Arts &

    Crafts Center.......................... 412

   Frank Holten State Park................. 412

   DNR Geological Survey-

    Champaign.............................. 413

   Sangchris Lake State

    Park................................. 5,291

   Illini State Park..................... 1,692

   Shelbyville Fish &

    Wildlife Area....................... 79,480

   Trail of Tears State

    Forest............................... 3,685

   Sanganois Conservation Area............. 413

   Rice Lake State Park................. 28,090

   Hidden Spring State Park............. 53,740

   Siloam Springs State Park............. 2,417

   Mississippi Palisades

    State Park.......................... 30,880

For replacing vault toilets at the following

  locations, at the approximate cost set forth

  below............................................ 289,098

    Anderson Lake Conservation Area -

     Fulton/Schuyler Counties........... 72,275

    Giant City State Park -

     Jackson/Union Counties............. 72,274

    Randolph County Conservation Area... 72,275

    Silver Springs State Park -

      Kendall County.................... 72,274

For constructing hazardous material storage

  buildings.......................................... 9,935

For constructing vault toilets at the

  following locations at the approximate

  cost set forth below:............................ 137,897

   Apple River Canyon State Park........ 19,699

   Des Plaines Conservation Area........ 19,700

   Kankakee River State Park............ 19,700

   Lake Le-Aqua-Na State Park........... 19,699

   Marshall County Conservation Area.... 19,700

   Morrison-Rockwood State Park......... 19,699

   Rice Lake Conservation Area.......... 19,700

For planning, construction, reconstruction,

  land acquisition and related costs,

  utilities, site improvements, and all other

  expenses necessary for various capital

  improvements at parks, conservation areas,

  and other facilities under the jurisdiction

  of the Department of Natural Resources......... 1,269,996

    Total                                       $16,160,784

 

    Section 75.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2007, from reappropriations heretofore made in Article 104, Section 75 of Public Act 94-798, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Natural Resources for the project hereinafter enumerated:

GOOSE LAKE PRAIRIE NATURAL AREA - GRUNDY COUNTY

(From Article 104, Section 75 of Public Act 94-798)

For rehabilitating visitor's center

  exterior.......................................... 23,345

    Total                                           $23,345

 

    Section 80.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2007, from appropriations and reappropriations heretofore made for such purposes in Article 103, Section 20, and Article 104, Section 80 of Public Act 94-798, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Corrections for the projects hereinafter enumerated:

CENTRALIA CORRECTIONAL CENTER

(From Article 104, Section 80 of Public Act 94-798)

For replacing the cooling tower.................... 379,623

DIXON CORRECTIONAL CENTER

For planning the upgrade and expansion

  of the medical care facility...................... 48,362

DWIGHT CORRECTIONAL CENTER

For renovating Housing Unit C8, in

  addition to funds previously

  appropriated..................................... 270,000

For renovating buildings, in addition

  to funds previously appropriated................. 274,847

For renovation of buildings......................... 30,261

EAST MOLINE CORRECTIONAL CENTER

For completing replacement of the

  absorption chiller, in addition to

  funds previously appropriated..................... 68,156

For upgrading the roofing system................... 675,879

For replacing windows, in addition to

  funds previously appropriated..................... 42,450

For replacing the chiller/absorber.................. 31,546

GRAHAM CORRECTIONAL CENTER

For upgrading the cooling tower.................... 146,782

For upgrading the mechanical system................. 35,990

For planning upgrade of building automation

  system and fire alarm system...................... 34,620

HOPKINS PARK

For infrastructure improvements

  in connection with the Hopkins Park

  Correctional Center............................ 6,299,444

ILLINOIS YOUTH CENTER - HARRISBURG

For constructing a multi-purpose medical,

  vocational and confinement building.............. 375,000

For utility upgrade, including gas

  and sewer...................................... 5,169,684

ILLINOIS YOUTH CENTER - RUSHVILLE

For planning, design, construction, equipment

  and all other necessary costs to add

  a cellhouse.................................... 2,652,599

ILLINOIS YOUTH CENTER - ST. CHARLES

For constructing an R & C building

  and other improvements......................... 1,988,048

LAWRENCE COUNTY CORRECTIONAL CENTER - LAWRENCEVILLE

For constructing two cellhouses, in

  addition to funds previously appropriated........ 158,637

LINCOLN CORRECTIONAL CENTER

For replacing doors and locks....................... 31,592

LOGAN CORRECTIONAL CENTER

For planning and beginning the upgrade

  of the power plant............................... 515,960

For renovating the electrical

  distribution system.............................. 159,995

For constructing a medical building

  and dietary building........................... 2,077,170

MENARD CORRECTIONAL CENTER - CHESTER

For replacing the administration building,

  in addition to funds previously

  appropriated.................................. 12,259,441

For replacing the Administration

  Building......................................... 879,196

For replacing toilets and waste lines

  at E/W Cellhouse and upgrade

  North Cellhouse plumbing......................... 364,351

For renovation or replacement of the

  Old Hospital Building, in addition to

  funds previously appropriated..................... 56,369

For planning and construction of the

  Administration Building.......................... 733,828

PONTIAC CORRECTIONAL CENTER

For replacing doors and frames................... 1,620,000

For replacing the roof on the Training

  Center and Industry............................... 22,409

SHAWNEE CORRECTIONAL CENTER

For replacing the emergency generator............... 49,229

STATEVILLE CORRECTIONAL CENTER - JOLIET

For replacing doors and locks...................... 580,000

For replacing windows in B House................... 126,480

For replacing power plant and

  utility distribution system....................... 17,454

For upgrading electrical system and elevator

  and installing HVAC system..................... 1,071,947

VANDALIA CORRECTIONAL CENTER

For constructing a multi-purpose program

  building.......................................... 90,656

For converting Administration Building and

  planning construction of an Administration/

  Health Care Unit................................. 308,406

VIENNA CORRECTIONAL CENTER

For replacing the cooler and freezer............. 1,408,055

For upgrading the power plant.................... 4,208,871

For upgrading the HVAC system and replacing

  water lines in six housing units................. 430,361

STATEWIDE

(From Article 103, Section 20 of Public Act 94-798)

For all costs associated with

  a timekeeping and payroll system.............. 10,000,000

(From Article 104, Section 80 of Public Act 94-798)

For upgrading roofing systems at the

 following locations at the approximate

 costs set forth below............................. 183,246

  Hardin County Work

    Camp............................................. 8,808

  Illinois Youth Center

    Joliet.......................................... 44,151

  Pontiac Correctional

    Center......................................... 130,287

For replacing doors and locks

  at the following locations at the

  approximate costs set forth below.............. 1,260,098

   Dixon Correctional Center......... 1,224,587

   Vienna Correctional Center........... 35,511

For upgrading showers at the following

  locations at the approximate

  cost set forth below............................. 545,110

   Hill Correctional

    Center............................. 545,110

For upgrading water towers at the following

  locations at the approximate

  cost set forth below........................... 1,651,849

   Dixon Correctional

    Center............................. 413,466

   Illinois Youth Center -

    St. Charles...................... 1,228,853

   Illinois Youth Center -

    Valley View.......................... 9,530

For planning, design, construction, equipment

  and all other necessary costs for a

  maximum security facility..................... 87,764,762

For planning a medium security facility

  and land acquisition........................... 2,629,428

For replacing roofing systems at

  the following locations at the

  approximate cost set forth below................. 155,768

   Menard Correctional Center............ 7,353

   Vienna Correctional Center........... 81,100

   Illinois Youth Center -

    Harrisburg........................... 4,138

   Pontiac Correctional Center.............. 10

   Illinois Youth Center - Joliet....... 63,167

For replacing or upgrading security and

  monitoring systems at the following

  locations at the approximate cost set

  forth below...................................... 373,156

   Vienna Correctional

    Center............................. 250,000

   Pontiac Correctional

    Center.............................. 94,450

   Joliet Correctional

    Center.............................. 28,706

For planning and replacing windows at the

  following locations at the approximate cost

  set forth below................................ 2,226,942

   Vienna Correctional

    Center........................... 1,780,000

   Sheridan Correctional

    Center............................. 314,454

   Illinois Youth Center -

    Valley View.......................... 8,310

   Illinois Youth Center -

    Joliet.............................. 74,875

   Dixon Correctional

    Center.............................. 46,073

   Shawnee Correctional

    Center............................... 3,230

For replacing security fencing at the

  following locations at the approximate

  cost set forth below............................. 330,619

   Hill Correctional

    Center............................... 3,547

   Western IL Correctional

    Center.............................. 31,427

   Joliet Correctional

    Center.............................. 49,119

   Logan Correctional

    Center............................. 172,369

   Dixon Correctional

    Center............................... 8,752

   Shawnee Correctional

    Center............................... 5,269

   Graham Correctional

    Center.............................. 24,369

   Danville Correctional

    Center.............................. 35,767

For planning, design, construction, equipment

  and all other necessary costs for a

  female multi-security level

  correctional center........................... 59,314,299

For replacing roofing systems at the

  following locations at the approximate

  cost set forth below............................. 189,284

    Vienna Correctional Center......... 150,261

    Sheridan Correctional Center........ 17,785

    Western Illinois Correctional

     Center - Mt. Sterling.............. 21,238

For upgrading fire and safety systems at

  the following locations at the approximate

  costs set forth below, in addition to

  funds previously appropriated.................. 2,037,256

    Menard Correctional Center -

     Chester......................... 1,854,559

    Sheridan Correctional Center....... 110,620

    Vienna Correctional Center.......... 72,077

    Total                                      $214,355,515

 

    Section 85.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2007, from reappropriations heretofore made for such purpose in Article 104, Section 85, of Public Act 94-798, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Corrections for the projects hereinafter enumerated:

BIG MUDDY CORRECTIONAL FACILITY

(From Article 104, Section 85 of Public Act 94-798)

For replacing door locking controls

  and intercom systems........................... 2,673,891

STATEVILLE CORRECTIONAL CENTER

For installing fire alarm systems................ 1,600,000

    Total                                        $4,273,891

 

    Section 90.  The sum of $407,375, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made for such purpose in Article 104, Section 90 of Public Act 94-798, is reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Emergency Management Agency for costs associated with a new State Emergency Operations Center.

 

    Section 95.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2007, from reappropriations heretofore made for such purposes in Article 104, Section 95 of Public Act 94-798, are reappropriated from the Capital Development Fund to the Capital Development Board for the Historic Preservation Agency for the projects hereinafter enumerated:

BISHOP HILL HISTORIC SITE - HENRY COUNTY

(From Article 104, Section 95 of Public Act 94-798)

For restoring interior and exterior................. 50,877

CAHOKIA MOUNDS HISTORIC SITE - COLLINSVILLE

For replacement of Monk's Mounds stairs............ 275,954

For restoration of Monk's Mound.................. 1,009,932

For purchasing private land within historic

  site boundary.................................... 189,979

DAVID DAVIS HOME

To acquire a residence to be

  converted to a Visitors Center................... 249,400

JARROT MANSION STATE HISTORICAL SITE

For restoring the mansion, site improvements

  and land acquisition, in addition

  to funds previously appropriated............... 1,455,857

LINCOLN'S TOMB/VIETNAM MEMORIAL - SPRINGFIELD

For rehabilitating site and providing

  irrigation system................................ 150,532

LINCOLN'S NEW SALEM HISTORIC SITE - MENARD COUNTY

For providing electrical at

  campgrounds...................................... 110,444

LINCOLN PRESIDENTIAL CENTER - SPRINGFIELD

For constructing library and museum complex, in

  addition to funds previously appropriated...... 6,435,816

For constructing a Lincoln Presidential

  Library.......................................... 151,941

OLD STATE CAPITOL - SPRINGFIELD

For repairing elevators............................ 387,464

UNION STATION - SPRINGFIELD

For purchasing and rehabilitating.................. 497,533

STATEWIDE

For statewide ISTEA 21 Match....................... 627,570

For matching ISTEA federal grant funds............. 143,310

    Total                                       $11,736,609

 

    Section 105.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2007, from reappropriations heretofore made in Article 104, Section 105, of Public Act 94-798, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Historic Preservation Agency for the projects hereinafter enumerated:

MT. PULASKI COURTHOUSE HISTORIC SITE - LOGAN COUNTY

(From Article 104, Section 105 of Public Act 94-798)

For rehabilitating interior & exterior.............. 24,118

BISHOP HILL HISTORIC SITE – HENRY COUNTY

For restoring interior and exterior................. 78,538

PULLMAN HISTORIC SITE

For all costs associated with the

  stabilization and restoration of the

  Pullman Historic Site.......................... 2,368,684

    Total                                        $2,471,340

 

    Section 110.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2007, from reappropriations heretofore made for such purposes in Article 104, Section 110 of Public Act 94-798, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Human Services for the projects hereinafter enumerated:

ALTON MENTAL HEALTH CENTER - MADISON COUNTY

(From Article 104, Section 110 of Public Act 94-798)

For renovating the Forensic Complex and

  constructing two building additions, in

  addition to funds previously appropriated...... 3,900,000

For renovating the central dietary,

  Phase II, in addition to funds previously

  appropriated..................................... 679,378

For constructing two building additions

  at the Forensic Complex........................ 6,809,618

For rehabilitation of the central dietary.......... 180,124

CHESTER MENTAL HEALTH CENTER

For completing the replacement of

  smoke and heat detectors, in addition

  to funds previously appropriated................. 440,000

For upgrading HVAC systems......................... 451,883

For replacing smoke/heat detectors.................. 65,032

CHICAGO-READ MENTAL HEALTH CENTER - CHICAGO

For rehabbing absorbers, controls

  and valves....................................... 398,432

CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER - ANNA

For renovating Sycamore Hall........................ 94,930

ELGIN MENTAL HEALTH CENTER - KANE COUNTY

For replacing power plant and engineering

  building....................................... 7,849,540

For renovating the central dietary

  and kitchen.................................... 3,704,073

For construction of roads, parking lots

  and street lights................................ 133,664

FOX DEVELOPMENTAL CENTER - DWIGHT

For replacing and repairing interior doors,

  flooring and walls, in addition to funds

  previously appropriated.......................... 380,484

For planning and beginning replacement

  of interior doors and flooring

  and repairing walls in the Main and

  Administration Buildings......................... 145,561

HOWE DEVELOPMENTAL CENTER - TINLEY PARK

For completing upgrade of tunnels,

  Phase II, in addition to funds previously

  appropriated..................................... 366,920

For renovating residences, in addition to

  funds previously appropriated.................... 193,436

ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE

For renovating the High School Building

  Phase II......................................... 217,819

For renovating High School Building................ 123,940

ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE

For renovating auditorium, classroom

  and administration buildings................... 2,254,579

For renovating classrooms in Building 17......... 1,250,724

For renovations to the powerhouse,

  boilers and associated coal and ash

  equipment........................................ 400,000

JACKSONVILLE DEVELOPMENTAL CENTER - MORGAN COUNTY

For planning and beginning the renovation

  of the power house............................... 434,122

KILEY DEVELOPMENTAL CENTER - WAUKEGAN

For converting the facility to natural

  gas, in addition to funds previously

  appropriated..................................... 114,552

For renovating homes, Phase II, in

  addition to funds previously

  appropriated...................................... 77,343

LINCOLN DEVELOPMENTAL CENTER - LOGAN

For various capital improvements,

  including planning and construction

  of four ten-bed transitional or

  residential homes.............................. 1,700,521

LUDEMAN DEVELOPMENTAL CENTER - PARK FOREST

For upgrading the electrical panel............... 1,167,150

For repairing and replacing furnaces and

  duct work, in addition to funds previously

  appropriated..................................... 240,882

For renovating residential and neighborhood

  homes, in addition to funds previously

  appropriated..................................... 144,344

For replacing plumbing, HVAC and

  boiler systems................................... 742,685

For renovation of residential buildings,

  in addition to funds previously

  appropriated...................................... 82,963

MABLEY DEVELOPMENTAL CENTER - DIXON

For replacing mechanicals and upgrading

  the fire alarm systems........................... 231,479

For planning and beginning renovation

  of residential buildings......................... 247,967

MADDEN MENTAL HEALTH CENTER - HINES

For renovating pavilions and

  administration building for safety/

  security, in addition to

  funds previously appropriated.................... 681,098

For renovating dietary............................. 836,600

For renovation of pavilions, in addition

  to funds previously appropriated................. 108,142

MURRAY DEVELOPMENTAL CENTER - CENTRALIA

For completing the renovation of

  the boiler house, in addition to

  funds previously appropriated.................. 3,400,000

SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE

For replacing the sewer system in

  south campus................................... 2,056,004

For planning and beginning renovation

  of dietary....................................... 203,263

For work necessary to remedy fire

  damper deficiencies.............................. 284,114

For replacing water mains and valves,

  in addition to funds previously

  appropriated..................................... 217,217

SINGER MENTAL HEALTH CENTER - ROCKFORD

For upgrading fire alarm systems................... 603,742

For renovating dietary and stores................... 93,631

For renovating mechanicals and

  residential areas................................ 691,943

TINLEY PARK MENTAL HEALTH CENTER – COOK COUNTY

For completing the upgrade of fire

  and life/safety issues in Oak Hall,

  in addition to funds previously

  appropriated..................................... 600,000

STATEWIDE

For replacing roofing systems at

  the following locations, at the

  approximate costs set forth below................ 253,694

   Chicago-Read Mental

    Health Center - Cook

    County............................. 148,645

   Fox Developmental

    Center - Dwight..................... 14,000

   Kiley Developmental Center -

    Waukegan............................ 91,049

For replacing and repairing roofing systems

 at the following locations, at the

 approximate cost set forth below................ 1,096,408

Alton Mental Health Center -

  Madison............................... 89,139

Shapiro Developmental Center -

  Kankakee............................. 104,883

Ludeman Developmental Center -

  Park Forest........................... 17,134

Madden Mental Health Center -

  Hines................................ 690,364

Murray Developmental Center -

  Centralia............................ 103,309

Kiley Developmental Center -

  Waukegan.............................. 91,579

For replacing and repairing roofing

  systems at the following locations, at

  the approximate cost set forth below............. 782,838

   Chicago-Read Mental Health

    Center............................. 166,314

   Howe Developmental Center -

    Tinley Park........................ 562,126

   Shapiro Developmental Center -

    Kankakee............................ 39,730

   Illinois School for the

    Deaf - Jacksonville................. 12,087

   Kiley Developmental

    Center - Waukegan.................... 2,581

For repairing or replacing roofs

  at the following locations, at

  the approximate cost set forth below............. 328,481

   Illinois School for the

    Visually Impaired -

    Jacksonville........................ 38,368

   Jacksonville Developmental

    Center - Morgan County.............. 60,000

   Lincoln Developmental Center -

    Logan County......................... 7,001

   Murray Developmental Center -

    Centralia........................... 86,136

   Shapiro Developmental Center -

    Kankakee........................... 136,976

For planning and beginning construction

  of a facility for sexually violent

  persons.......................................... 135,896

For replacing and repairing roofing systems

  at the following locations at the approximate

  cost set forth below............................. 249,756

    Choate Developmental Center -

     Anna.................................... 0

    Chicago-Read Mental Health Center.... 3,763

    Tinley Park Mental Health Center.... 12,974

    Illinois School for the Visually

     Impaired - Jacksonville............ 19,414

    Shapiro Developmental Center -

     Kankakee........................... 25,955

    Kiley Developmental Center -

     Waukegan............................ 8,373

    Ludeman Developmental Center -

     Park Forest....................... 179,277

For replacement of roofing systems at the

  following locations at the approximate costs

  set forth below:................................. 147,798

    Lincoln Development Center.......... 36,950

    Murray Developmental Center......... 36,949

    Elgin Developmental Center.......... 36,950

    Shapiro Developmental Center........ 36,949

    Total                                       $47,994,770

 

    Section 115.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2007, from reappropriations heretofore made for such purposes in Article 104, Section 115 of Public Act 94-798, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Human Services for the projects hereinafter enumerated:

ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE

(From Article 104, Section 115 of Public Act 94-798)

For renovations to the powerhouse,

  boilers and associated coal and ash

  equipment........................................ 191,269

    Total                                          $191,269

 

    Section 125.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2007, from reappropriations heretofore made for such purposes in Article 104, Section 125 of Public Act 94-798, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Human Services for the project hereinafter enumerated:

ILLINOIS SCHOOL FOR THE DEAF – JACKSONVILLE

(From Article 104, Section 125 of Public Act 94-798)

For replacing dorm doors......................... 1,945,671

JACKSONVILLE DEVELOPMENTAL CENTER – MORGAN

For upgrading the mechanicals in the

  power plant, in addition to funds

  previously appropriated....................... 1,000,000

SINGER MENTAL HEALTH CENTER

For repair and/or replacement of roofs.............. 71,994

FOX DEVELOPMENTAL CENTER - DWIGHT

For renovating the water treatment plant........... 689,979

    Total                                        $3,707,644

 

    Section 130.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2007, from reappropriation and reappropriations heretofore made in Article 104, Section 130 of Public Act 94-798, are reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Medical District Commission for the projects hereinafter enumerated:

ILLINOIS MEDICAL DISTRICT COMMISSION - CHICAGO

(From Article 104, Section 130 of Public Act 94-798)

For upgrading utility and infrastructure,

  in addition to funds previously

  appropriated..................................... 412,685

For upgrading core utilities....................... 146,794

For upgrading research center...................... 346,714

For constructing a Lab and Research

  Biotech Grad Facility............................. 94,638

    Total                                        $1,000,831

 

    Section 140.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2007, from reappropriations heretofore made for such purposes in Article 104, Section 140 of Public Act 94-798, as amended, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Military Affairs for the projects hereinafter enumerated:

BLOOMINGTON ARMORY - McLEAN COUNTY

(From Article 104, Section 140 of Public Act 94-798)

For rehabilitating the mechanical/electrical

  systems and renovating the interior............ 2,839,158

CAIRO ARMORY

For replacing roof and renovating the

  interior and exterior............................ 136,886

CAMP LINCOLN - SPRINGFIELD

For construction of a military academy

  facility......................................... 466,295

ELGIN ARMORY - KANE COUNTY

For upgrading the interior and exterior............ 820,653

MACOMB ARMORY - McDONOUGH

For completing the mechanical/electrical

  systems upgrade, renovating the interior,

  and installing a kitchen, in addition to

  funds previously appropriated.................. 2,565,000

For replacing the mechanical and electrical

  systems and installing a kitchen................. 809,441

NORTH RIVERSIDE ARMORY

For rehabilitating the interior and

  exterior......................................... 240,667

NORTHWEST ARMORY - CHICAGO

For upgrading the electrical system.............. 2,815,000

For replacing the mechanical systems................ 49,281

For renovation of interior and exterior,

  in addition to funds previously

  appropriated for such purposes................... 173,481

SYCAMORE ARMORY

For replacing the electrical system,

  renovating the interior and installing

  air conditioning................................. 101,889

    Total                                       $11,017,751

 

    Section 145.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2007, from reappropriations heretofore made in Article 104, Section 145, of Public Act 94-798, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Military Affairs for the projects hereinafter enumerated:

 

LAWRENCEVILLE ARMORY

(From Article 104, Section 145 of Public Act 94-798)

For rehabilitating the exterior and

  replacing roofing systems....................... 177,017

    Total                                          $177,017

 

    Section 150.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2007, from reappropriations heretofore made for such purposes in Article 104, Section 150 of Public Act 94-798, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Revenue for the projects hereinafter enumerated:

WILLARD ICE BUILDING - SPRINGFIELD

(From Article 104, Section 150 of Public Act 94-798)

For completing the upgrade of

  building management controls,

  in addition to funds

  previously appropriated.......................... 400,000

For replacing the dock exhaust system.............. 552,248

For replacing and repairing concrete

  stairway and completing of parking

  deck, in addition to funds

  previously appropriated.......................... 140,973

For upgrading building management

  controls....................................... 3,495,466

For upgrading the plumbing system.................. 908,359

For upgrading parking lot/parking deck

  structural repair................................ 408,483

For renovating the interior and

  upgrading HVAC................................. 2,891,317

    Total                                        $8,796,846

 

    Section 160.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2007, from reappropriations heretofore made for such purposes in Article 104, Section 160 of Public Act 94-798, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Revenue for the project hereinafter enumerated:

WILLARD ICE BUILDING – SPRINGFIELD

(From Article 104, Section 160 of Public Act 94-798)

For completing the upgrade of the

  Plumbing System.................................. 600,000

    Total                                          $600,000

 

    Section 165.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2007, from reappropriations heretofore made for such purposes in Article 103, Section 10 and Article 104, Section 165 of Public Act 94-798, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of State Police for the projects hereinafter enumerated:

 

CHICAGO FORENSIC LABORATORY

(From Article 103, Section 10 of Public Act 94-798)

For planning and beginning the

  construction of an addition

  to the Chicago Forensic

  Laboratory..................................... 1,400,000

DISTRICT 13 HEADQUARTERS - DuQUOIN

(From Article 104, Section 165 of Public Act 94-798)

For constructing a district 13

  headquarters..................................... 108,590

SPRINGFIELD ARMORY

For planning and design of the rehabilitation

  and site improvements of the Springfield

  Armory, in addition to funds previously

  appropriated..................................... 746,906

STATE POLICE TRAINING ACADEMY - SPRINGFIELD

(From Article 103, Section 10 of Public Act 94-798)

For planning and beginning the

  construction of an addition to the

  CODIS Laboratory................................. 400,000

STATEWIDE

For replacing communications towers

  equipment and tower buildings.................. 1,681,530

For replacing radio communication towers,

  equipment buildings and installing emergency

  power generators at the following

  locations at the approximate costs

  set forth below.................................. 250,000

  Harlem & Irving – Cook County......... 62,500

  Savanna – Carroll County.............. 62,500

  Fairfield – Wayne County.............. 62,500

  Niota – Hancock County................ 62,500

    Total                                        $4,587,026

 

    Section 170.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2007, from appropriations and reappropriations heretofore made for such purposes in Article 104, Section 170 of Public Act 94-798, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of State Police for the project hereinafter enumerated:

 

STATEWIDE

(From Article 104, Section 170 of Public Act 94-798)

For upgrading firing range facilities.............. 326,181

    Total                                          $326,181

 

    Section 175.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2007, from reappropriations heretofore made for such purposes in Article 104, Section 175 of Public Act 94-798, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Veterans' Affairs for the projects hereinafter enumerated:

LASALLE VETERANS' HOME

(From Article 104, Section 175 of Public Act 94-798)

For replacing the roofing system................... 310,000

MANTENO VETERANS' HOME - KANKAKEE COUNTY

For replacing air conditioner chillers........... 1,149,002

For replacing condensing units..................... 122,241

For upgrading or constructing

  roads and parking lots............................ 28,785

For planning and constructing

  additional storage and support areas.............. 73,248

For upgrading storm sewer........................... 97,768

QUINCY VETERANS' HOME - ADAMS COUNTY

For constructing a bus and ambulance

  garage........................................... 849,073

For improvements to various buildings

  and replacement of Fletcher Building

  to meet licensure standards.................... 2,444,625

    Total                                        $5,074,742

 

    Section 185.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2007, from reappropriations heretofore made for such purposes in Article 104, Section 185 of Public Act 94-798, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Veterans' Affairs for the project hereinafter enumerated:

MANTENO VETERANS HOME

(From Article 104, Section 185 of Public Act 94-798)

For completing the upgrade of emergency

  generators....................................... 600,000

    Total                                          $600,000

 

    Section 190.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2007, from appropriations and reappropriations heretofore made for such purposes in Article 103, Sections 15 and 25, and Article 104, Section 190 of Public Act 94-798, are reappropriated from the Capital Development Fund to the Capital Development Board for the projects hereinafter enumerated:

CHICAGO

(From Article 103, Section 15 of Public Act 94-798)

  For expanding and renovating the

   Bio-Safety 3 Laboratory for the

   Department of Public Health................... 1,000,000

EXECUTIVE MANSION - SPRINGFIELD

(From Article 104, Section 190 of Public Act 94-798)

For building improvements........................... 33,006

ATTORNEY GENERAL BUILDING - SPRINGFIELD

For upgrading environmental equipment

  and HVAC, in addition to funds previously

  appropriated - Archives Building.................. 83,265

STATEWIDE

(From Article 103, Section 25 of Public Act 94-798)

For improving energy efficiency.................... 300,000

(From Article 104, Section 190 of Public Act 94-798)

For the purposes of capital planning

  and condition assessment and analysis

  of State capital facilities, to be

  expended only upon the direction of

  the Director of the Bureau of

  the Budget..................................... 3,389,055

For abating hazardous materials.................... 104,421

For retrofitting or upgrading mechanized

  refrigeration equipment (CFCs)................... 650,000

For surveys and modifications to buildings

  to meet requirements of the federal

  Americans with Disabilities Act (ADA)............ 113,816

For surveys and modifications to buildings

  to meet requirements of the federal

  Americans with Disabilities Act (ADA)............ 260,805

For abating hazardous materials..................... 23,279

For retrofitting or upgrading mechanized

  refrigeration equipment (CFCs)................. 4,000,000

For surveys and modifications to buildings

  to meet requirements of the federal

  Americans with Disabilities Act................ 2,100,234

For abating hazardous materials.................... 294,608

For retrofitting or upgrading mechanized

  refrigeration equipment (CFCs)................. 2,876,007

For upgrading and remediating

  aboveground and underground storage tanks...... 1,737,052

For retrofitting or upgrading mechanized

  refrigeration equipment (CFCs)................... 782,922

For surveys and modifications to

  buildings to meet requirements of the

  federal Americans with Disabilities Act.......... 122,017

For abatement of hazardous materials................ 51,315

For upgrading/retrofitting mechanized

  refrigeration equipment (CFCs).................... 53,118

For survey for and abatement of

  asbestos-containing materials..................... 32,471

For upgrade/retrofit of mechanized

  refrigeration equipment (CFCs).................... 28,580

For surveys and modifications to buildings

  to meet requirements of the federal

  Americans with Disabilities Act................ 1,090,595

For demolition of buildings......................... 82,050

For retrofitting/upgrading mechanical

  refrigeration equipment........................... 30,551

For the planning, upgrade

  and replacement of potentially

  hazardous underground storage tanks............... 24,492

    Total                                       $19,263,659

 

    Section 195.  The amount of $512,042, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 104, Section 195 of Public Act 94-798, is reappropriated from the Asbestos Abatement Fund to the Capital Development Board for surveying and abating asbestos-containing materials statewide.

 

    Section 200.  The amount of $980,322, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 104, Section 200 of Public Act 94-798, is reappropriated from the Asbestos Abatement Fund to the Capital Development Board for asbestos surveys and emergency abatement in relation to asbestos abatement in state governmental buildings or higher education residential and auxiliary enterprise buildings.

 

    Section 210.  The following named amount or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made for such purpose in Article 104, Section 210 of Public Act 94-798, is reappropriated from the School Construction Fund to the Capital Development Board for the State Board of Education for the projects hereinafter enumerated:

STATEWIDE

(From Article 104, Section 210 of Public Act 94-798)

Grants for facility construction................ 27,280,210

 

    Section 215.  The sum of $12,583,856, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 104, Section 215 of Public Act 94-798, is reappropriated from the School Construction Fund to the Capital Development Board for school construction grants pursuant to the School Construction Law, in addition to amounts previously appropriated for such purposes.

 

    Section 220.  The sum of $7,446,133, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 104, Section 220 Public Act 94-798, is reappropriated from the School Construction Fund to the Capital Development Board for school construction grants pursuant to the School Construction Law, in addition to amounts previously appropriated for such purposes.

 

    Section 225.  The sum of $9,363,356, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 104, Section 225 of Public Act 94-798, is reappropriated from the School Construction Fund to the Capital Development Board for school construction grants pursuant to the School Construction Law, in addition to amounts previously appropriated for such purposes.

 

    Section 230.  The sum of $363,958, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 104, Section 230 of Public Act 94-798, is reappropriated from the School Construction Fund to the Capital Development Board for school construction grants pursuant to the School Construction Law, in addition to amounts previously appropriated for such purposes.

 

    Section 240.  The amount of $6,143,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 104, Section 240 of Public Act 94-798, is reappropriated from the Capital Development Fund to the Capital Development Board for grants to units of local government and other eligible entities for all costs associated with land acquisition, construction and rehabilitation projects.

 

    Section 245.  The sum of $18,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made for such purpose in Article 104, Section 245 of Public Act 94-798, is reappropriated from the School Construction Fund to the Capital Development Board for grants to school districts for school improvement projects authorized by the School Construction Law.

 

    Section 247.  The sum of $6,870,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made for such purpose in Article 103, Section 35 of Public Act 94-798, is appropriated from the Capital Development Fund to the Capital Development Board for child care facilities, mental and public health facilities, and facilities for the care of disabled veterans and their spouses as authorized by subsection (d) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 250.  The sum of $84,766,118, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made for such purpose in Article 104, Section 250 of Public Act 94-798, is reappropriated from the Capital Development Fund to the Capital Development Board for correctional purposes at State prison and correctional centers as authorized by subsection (b) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 255.  The sum of $27,373,564, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made for such purpose in Article 104, Section 255 of Public Act 94-798, is reappropriated from the Capital Development Fund to the Capital Development Board for open spaces, recreational and conservation purposes and the protection of land and for deposits into the Conservation 2000 Projects Fund as authorized by subsection (c) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 260.  The sum of $23,756,693, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made for such purpose in Article 104, Section 260 of Public Act 94-798, is reappropriated from the Capital Development Fund to the Capital Development Board for child care facilities, mental and public health facilities, and facilities for the care of disabled veterans and their spouses as authorized by subsection (d) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 265.  The sum of $170,087,561, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made for such purpose in Article 104, Section 265 of Public Act 94-798, is reappropriated from the Capital Development Fund to the Capital Development Board for use by the State, its departments, authorities, public corporations, commissions and agencies as authorized by subsection (e) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 270.  The sum of $475,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made for such purpose in Article 104, Section 270 of Public Act 94-798, is reappropriated from the Capital Development Fund to the Capital Development Board for water resource management projects as authorized by subsection (g) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 275.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2007, from reappropriations heretofore made for such purposes in Article 104, Section 275 of Public Act 94-798, are reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for the projects hereinafter enumerated:

CITY COLLEGES OF CHICAGO

(From Article 104, Section 275 of Public Act 94-798)

For various bondable capital improvements.......... 733,240

CITY COLLEGES OF CHICAGO/KENNEDY KING

For remodeling for Workforce Preparation

  Centers........................................ 3,575,930

For remodeling for a culinary arts

  educational facility.......................... 10,875,000

CITY COLLEGES OF CHICAGO - MALCOLM X COLLEGE

For remodeling the Allied Health

  program facilities............................. 4,304,223

COLLEGE OF DUPAGE

For upgrading the Instructional Center

  heating, ventilating and air

  conditioning systems.............................. 90,937

COLLEGE OF LAKE COUNTY

For planning and beginning construction

  of a technology building -

  Phase 1........................................... 36,705

KANKAKEE COMMUNITY COLLEGE

For constructing a laboratory/classroom

  facility......................................... 257,578

LAKELAND COLLEGE

Student Services Building addition............... 6,602,331

MCHENRY COUNTY COLLEGE

For constructing classrooms and a

  student services building and remodeling

  space, in addition to funds previously

  appropriated..................................... 473,076

MORAINE VALLEY COMMUNITY COLLEGE - PALOS HILLS

For constructing a classroom/administration

  building, providing site improvements and

  purchasing equipment, in addition to

  funds previously appropriated..................... 41,635

PRAIRIE STATE COLLEGE - CHICAGO HEIGHTS

For constructing an addition to the Adult

  Training/Outreach Center, in addition to

  funds previously appropriated.................. 1,005,113

SOUTH SUBURBAN COLLEGE

For improving flood retention...................... 437,000

TRITON COMMUNITY COLLEGE - RIVER GROVE

For rehabilitating the Liberal Arts

  Building....................................... 1,536,546

For rehabilitating the potable water

  distribution system............................... 70,146

STATEWIDE

For the Illinois Community College Board

  miscellaneous capital improvements including

  construction, capital facilities, cost of

  planning, supplies, equipment, materials,

  services and all other expenses required to

  complete the work at the various community

  colleges.  This appropriated amount shall be

  in addition to any other appropriated amounts

  which can be expended for this purpose......... 1,504,506

STATEWIDE

For miscellaneous capital improvements

  including construction, capital facilities,

  cost of planning, supplies, equipment,

  materials, services and all other expenses

  required to complete the work at the

  various community colleges.  This appropriated

  amount shall be in addition to any other

  appropriated amounts which can be

  expended for these purposes.................... 4,980,846

For miscellaneous capital improvements

  including construction, capital facilities,

  cost of planning, supplies, equipment,

  materials, services and all other expenses

  required to complete the work at the

  various community colleges.  This appropriated

  amount shall be in addition to any other

  appropriated amounts which can be

  expended for these purposes.................... 3,725,065

STATEWIDE - CONSTRUCTION DEFECTS

For planning, construction and renovation

  to correct defectively designed or

  constructed community college facilities,

  provided that monies recovered based upon

  claims arising out of such defective design

  or construction shall be paid to the state

  as required by Section 105.12 of the Public

  Community College Act as reimbursement for

  monies expended pursuant to this

  appropriation.................................... 292,680

    Total                                       $40,542,557

 

    Section 280.  The amount of $414,264, or so much thereof as may be necessary, and remains unexpended on June 30, 2007, from a reappropriation heretofore made for such purposes in Article 104, Section 280 of Public Act 94-798, as amended, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Community College Board for grants to community colleges repair, renovation, and miscellaneous capital improvements including construction, reconstruction, remodeling, improvement, repair and installation of capital facilities, costs of planning, supplies, equipment, materials, services, and all other expenses required to complete the work.  This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 285.  The sum of $1,391,343, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made for such purpose in Article 104, Section 285 of Public Act 94-798, is reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete the work at the various community colleges.  This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 290.  The sum of $1,712,172, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made for such purposes in Article 104, Section 290 of Public Act 94-798, is reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, reconstruction, remodeling, improvement, repair and installation of capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete the work at the various community colleges.  This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 295.  The sum of $2,559,166, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made for such purposes in Article 104, Section 295 of Public Act 94-798, is reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, reconstruction, remodeling, improvement, repair and installation of capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete the work at the various community colleges.  This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 300.  The sum of $687,732, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made for such purposes in Article 104, Section 300 of Public Act 94-798, is reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for grants to community colleges for miscellaneous capital improvements including construction, reconstruction, remodeling, improvements, repair and installation of capital facilities, cost of planning, supplies, equipment, materials, services, and all other expenses required to complete the work. This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 305.  The sum of $72,800, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made for such purpose in Article 104, Section 305 of Public Act 94-798, is reappropriated from the Capital Development Fund to the Capital Development Board for miscellaneous capital improvements at various educational facilities statewide, in addition to funds previously appropriated.

 

    Section 310.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2007, from reappropriations heretofore made for such purposes in Article 104, Section 310 of Public Act 94-798, are reappropriated from the Capital Development Fund to the Capital Development Board for the Board of Higher Education for the projects hereinafter enumerated:

ILLINOIS MATHEMATICS AND SCIENCE ACADEMY - AURORA

(From Article 104, Section 310 of Public Act 94-798)

To plan and begin construction of a

  space for the delivery of teacher

  training and development and student

  enrichment programs.............................. 108,843

 

    Section 315.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2007, from reappropriations heretofore made in Article 104, Section 315 of Public Act 94-798, are reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Board of Higher Education for the projects hereinafter enumerated:

STATEWIDE

(From Article 104, Section 315 of Public Act 94-798)

For miscellaneous capital improvements

  including construction, capital facilities,

  cost of planning, supplies, equipment,

  materials, services and all other expenses

  required to complete the work at the various

  universities.  This appropriated amount

  shall be in addition to any other appropriated

  amounts which can be expended for these

  purposes...................................... 18,559,284

   Chicago State University............ 322,100

   Eastern Illinois University......... 515,500

   Governors State University........... 18,040

   Illinois State University........... 984,871

   Northeastern Illinois University.... 383,700

   Northern Illinois University...... 1,159,000

   Western Illinois University......... 361,092

   Southern Illinois University -

    Carbondale....................... 1,237,441

   Southern Illinois University -

    Edwardsville....................... 763,100

   University of Illinois -

    Chicago.......................... 2,777,300

   University of Illinois -

    Springfield........................ 229,100

   University of Illinois -

    Urbana/Champaign................. 4,131,963

   Illinois Community

    College Board.................... 5,676,077

For miscellaneous capital improvements

  including construction, capital

  facilities, cost of planning, supplies,

  equipment, materials, services and

  all other expenses required to complete

  the work at the various universities

  This appropriated amount shall be in

  addition to any other appropriated amounts

  which can be expended for these purposes...... 16,394,865

   Chicago State University............ 300,273

   Eastern Illinois University......... 515,500

   Governors State University........... 73,277

   Illinois State University........... 651,449

   Northeastern Illinois

    University......................... 383,700

   Northern Illinois University...... 1,159,000

   Western Illinois University.......... 41,562

   Southern Illinois University -

    Carbondale.......................... 43,777

   Southern Illinois University -

    Edwardsville........................ 14,515

   University of Illinois -

    Chicago.......................... 2,777,300

   University of Illinois -

    Springfield........................ 212,512

   University of Illinois -

    Urbana/Champaign................. 4,150,300

   Illinois Community

    College Board.................... 6,071,700

For miscellaneous capital improvements

  including construction, capital

  facilities, cost of planning, supplies,

  equipment, materials, services and

  all other expenses required to complete

  the work at the various universities

  This appropriated amount shall be in

  addition to any other appropriated amounts

  which can be expended for these purposes....... 4,755,524

   Chicago State University............. 36,022

   Eastern Illinois University......... 515,500

   Illinois State University............ 17,567

   Northern Illinois University........ 753,633

   Western Illinois University......... 140,157

   Southern Illinois University -

    Carbondale......................... 139,735

   University of Illinois -

    Chicago.......................... 2,061,465

   University of Illinois -

    Springfield........................ 209,126

   University of Illinois -

    Urbana/Champaign................... 882,319

For miscellaneous capital improvements,

  including construction, capital

  facilities, cost of planning,

  supplies, equipment, materials, services

  and all other expenses required to

  complete the work at the various universities.

  This appropriated amount shall be in

  addition to any other appropriated

  amounts which can be expended

  for these purposes............................. 2,891,414

   Eastern Illinois University......... 477,768

   Illinois State University........... 128,234

   Northern Illinois University...... 1,207,568

   Southern Illinois University -

    Carbondale.......................... 72,892

   University of Illinois -

    Chicago............................ 245,200

   University of Illinois -

    Urbana/Champaign................... 759,752

For miscellaneous capital improvements

  including construction, reconstruction

  remodeling, improvements, repair

  and installation of capital

  facilities, cost of planning, supplies,

  equipment, materials, services and all

  other expenses required to complete

  the work at the various universities set

  forth below.  This appropriated amount

  shall be in addition to any other

  appropriated amounts which can

  be expended for these purposes................. 1,837,407

  Chicago State University............. 149,156

  Eastern Illinois University........... 42,140

  Northeastern Illinois University...... 32,560

  Northern Illinois University......... 698,185

  Western Illinois University........... 12,865

  University of Illinois -

   Champaign/Urbana Campus............. 902,501

For miscellaneous capital improvements

  including construction, capital

  facilities, cost of planning, supplies,

  equipment, materials, services and

  all other expenses required to

  complete the work at the various

  universities set forth below.  This

  appropriation shall be in addition

  to any other appropriated amounts

  which can be expended for these purposes......... 888,186

For Eastern Illinois University........ 261,412

For Northeastern Illinois University .... 3,449

For Northern Illinois University........ 60,517

For University of Illinois -

  Urbana-Champaign..................... 562,808

For miscellaneous capital improvements,

  including construction, reconstruction,

  remodeling, improvement, repair and

  installation of capital facilities, cost of

  planning, supplies, equipment, materials,

  services and all other expenses

  required to complete the work at the various

  universities set forth below.  This

  appropriation shall be in addition to

  any other appropriated amounts which

  can be expended for these purposes............... 264,759

  For Northern Illinois University..... 151,292

  For Southern Illinois University -

   Carbondale........................... 22,188

  For Southern Illinois University -

   Edwardsville......................... 11,240

  For University of Illinois -

   Urbana-Champaign..................... 80,039

For miscellaneous capital improvements

  including construction, reconstruction,

  remodeling, improvement, repair and

  installation of capital facilities,

  cost of planning, supplies, equipment,

  materials, services and all other expenses

  required to complete the work at the

  various universities set forth below.

  This appropriation shall be in addition

  to any other appropriated amounts which

  can be expended for these purposes............... 797,938

  For Chicago State University.......... 21,722

  For Eastern Illinois University...... 150,380

  For Governors State University........ 71,798

  For Illinois State University......... 85,165

  For Northeastern Illinois University . 36,177

  For Northern Illinois University..... 207,446

  For University of Illinois........... 225,250

SOUTHERN ILLINOIS UNIVERSITY

For Southern Illinois University

  for miscellaneous capital improvements

  including construction, reconstruction,

  remodeling, improvements, repair and

  installation of capital facilities, cost

  of planning, supplies, equipment, materials

  services and all other expenses

  required to complete the work.  This

  appropriation shall be in addition to any

  other appropriated amounts which can

  be expended for these purposes................... 120,090

UNIVERSITY OF ILLINOIS

For the Board of Trustees of the University of

  Illinois for miscellaneous capital

  improvements including construction,

  reconstruction, remodeling, improvement,

  repair and installation of capital

  facilities, cost of planning, supplies,

  equipment, materials, services and

  all other expenses required for completing

  the work at the colleges and

  universities.  This appropriation shall

  be in addition to any other

  appropriated amounts which can be

  expended for these purposes....................... 89,723

For the Board of Higher Education for

  miscellaneous capital improvements,

  including construction, reconstruction,

  remodeling, improvements, repair and

  installation of capital facilities, cost

  of planning, supplies, equipment,

  materials, services, and all other

  expenses required to complete the

  work at the colleges and universities

  hereinafter enumerated.  This appropriation

  shall be in addition to any other

  appropriated amounts which can be

  expended for these purposes:

Northern Illinois University........................ 17,454

    Total                                       $46,616,644

 

    Section 320.  The sum of $133,306, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made for such purposes in Article 104, Section 320 of Public Act 94-798, is reappropriated from the Capital Development Fund to the Capital Development Board for the Board of Higher Education for miscellaneous capital improvements, including construction, reconstruction, remodeling, improvement, repair and installation of capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required for completing the work at the colleges and universities.  This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 325.  The following named amounts, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from reappropriations heretofore made for such purposes in Article 104, Section 325 of Public Act 94-798, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Board of Higher Education for the projects hereinafter enumerated:

(From Article 104, Section 325 of Public Act 94-798)

For miscellaneous capital improvements

  including construction, capital

  facilities, cost of planning, supplies,

  equipment, materials, services and

  all other expenses required to complete

  the work at the various universities.

  This appropriated amount shall be in

  addition to any other appropriated amounts

  which can be expended for these purposes.

Chicago State University........................... 143,813

Eastern Illinois University........................ 257,800

Governors State University.......................... 94,900

Illinois State University.......................... 510,700

Northeastern Illinois

  University....................................... 191,800

Northern Illinois University....................... 579,500

Western Illinois University........................ 145,143

Southern Illinois University - Carbondale.......... 560,973

Southern Illinois University - Edwardsville ....... 381,500

University of Illinois - Chicago................. 1,388,600

University of Illinois - Springfield............... 114,600

University of Illinois - Urbana/Champaign........ 2,075,100

Illinois Community College Board................. 2,888,562

    Total                                        $9,332,991

For miscellaneous capital improvements

  including construction, capital

  facilities, cost of planning, supplies,

  equipment, materials, services and

  all other expenses required to complete

  the work at the various universities.

  This appropriated amount shall be in

  addition to any other appropriated amounts

  which can be expended for these purposes.

Chicago State University.......................... 161,000

Eastern Illinois University........................ 255,993

Governors State University.......................... 79,550

Illinois State University.......................... 510,700

Northeastern Illinois University................... 191,800

Northern Illinois University....................... 579,500

Southern Illinois University - Carbondale........... 22,934

Southern Illinois University - Edwardsville........ 156,094

University of Illinois - Chicago................. 1,388,600

University of Illinois - Springfield............... 114,600

University of Illinois - Urbana/Champaign........ 2,075,100

Illinois Community College Board................. 2,805,684

    Total                                        $8,341,555

For miscellaneous capital improvements

  including construction, capital

  facilities, cost of planning, supplies,

  equipment, materials, services and

  all other expenses required to complete

  the work at the various universities.

  This appropriated amount shall be in

  addition to any other appropriated amounts

  which can be expended for these purposes.

Chicago State University............................ 16,042

Eastern Illinois University........................ 185,800

Governors State University.......................... 45,618

Illinois State University........................... 27,282

Northern Illinois University....................... 579,500

Western Illinois University.......................... 9,341

Southern Illinois University - Carbondale........... 37,795

University of Illinois - Chicago................... 974,174

University of Illinois - Springfield................ 76,866

University of Illinois - Urbana/Champaign........ 1,563,514

    Total                                        $3,515,932

For miscellaneous capital improvements

  including construction, capital

  facilities, cost of planning, supplies,

  equipment, materials, services and

  all other expenses required to complete

  the work at the various universities.

  This appropriated amount shall be in

  addition to any other appropriated amounts

  which can be expended for these purposes.

Eastern Illinois University......................... 21,618

Governors State University.......................... 26,826

Illinois State University.......................... 121,697

Northeastern Illinois University.................... 87,701

Northern Illinois University....................... 448,480

University of Illinois - Chicago................... 103,101

University of Illinois - Springfield................ 30,052

University of Illinois - Urbana/Champaign.......... 268,540

    Total                                        $1,108,015

For miscellaneous capital improvements

  including construction, capital

  facilities, cost of planning, supplies,

  equipment, materials, services and

  all other expenses required to complete

  the work at the various universities.

  This appropriated amount shall be in

  addition to any other appropriated amounts

  which can be expended for these purposes.

Chicago State University............................ 48,214

Eastern Illinois University........................ 134,474

Northeastern Illinois University.................... 32,547

Northern Illinois University....................... 340,000

University of Illinois- Champaign/Urbana............ 65,946

    Total                                          $621,181

 

    Section 330.  The sum of $1,598,774, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 104, Section 330 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete the work at the various community colleges. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 335.  The sum of $1,311,528, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 104, Section 335 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete the work at the various community colleges. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 340.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2007, from reappropriations heretofore made in Article 104, Section 340 of Public Act 94-798, are reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Board of Higher Education for the projects hereinafter enumerated:

CHICAGO STATE UNIVERSITY

(From Article 104, Section 340 of Public Act 94-798)

For replacing primary electrical

  feeder cable..................................... 341,332

For roof replacement projects.................... 1,445,540

For the construction of a conference

  center......................................... 4,860,186

For the construction of a day care

  facility....................................... 4,906,554

For the construction of a student

  financial outreach building.................... 4,805,809

For constructing a new library facility,

  site improvements, utilities, and

  purchasing equipment, in addition

  to funds previously appropriated............... 2,800,731

For technology improvements and

  deferred maintenance........................... 1,186,381

For remodeling Building K, in addition

  to funds previously appropriated............... 8,534,846

For planning and beginning to remodel

  Building K and improving site.................. 1,000,474

For a grant to Chicago State University for

  all costs associated with construction of

  a Convocation Center............................. 512,431

For upgrading campus infrastructure,

  in addition to the funds

  previously appropriated.......................... 573,846

For renovating buildings and upgrading

  mechanical systems................................ 61,412

EASTERN ILLINOIS UNIVERSITY

For upgrading the electrical

  distribution system............................ 2,327,480

For renovating and expanding the

  Fine Arts Center, in addition to

  funds previously appropriated................. 11,945,189

For planning and beginning to renovate

  and expand the Fine Arts Center -

  Phase 1, in addition to funds

  previously appropriated........................ 1,001,351

For planning and beginning to renovate

  and expand the Fine Arts Center................... 39,400

For upgrading campus buildings for health,

  safety and environmental improvements............ 386,432

GOVERNORS STATE UNIVERSITY

For constructing addition and

  remodeling the teaching & learning

  complex, in addition to funds

  previously appropriated....................... 14,563,783

ILLINOIS STATE UNIVERSITY

For renovating Stevenson and Turner

  Halls for life/safety......................... 21,139,192

For the upgrade and remodeling

  of Schroeder Hall.............................. 2,459,395

For planning, site improvements, utilities,

  construction, equipment and other costs

  necessary for a new facility for the

  College of Business............................... 20,480

For remodeling Julian and Moulton Halls............ 406,829

NORTHEASTERN ILLINOIS UNIVERSITY

For renovating Building "C" and

  remodeling and expanding Building "E"

  and Building "F"............................... 6,277,078

For planning and beginning to remodel

  Buildings A, B and E........................... 3,487,633

For remodeling in the Science Building

  to upgrade heating, ventilating and air

  conditioning systems........................... 2,021,400

For replacing fire alarm systems, lighting

  and ceilings..................................... 196,611

NORTHERN ILLINOIS UNIVERSITY

For renovating the Founders Library

  basement, in addition to funds previously

  appropriated..................................... 648,578

For planning a classroom building and

  developing site in Hoffman Estates............. 1,314,500

For completing the construction of the

  Engineering Building, in addition to

  amounts previously appropriated for

  such purpose..................................... 326,589

For renovating Altgeld Hall and

  purchasing equipment............................. 249,268

For upgrading storm waterway controls in

  addition to funds previously appropriated........ 218,606

SOUTHERN ILLINOIS UNIVERSITY

For planning, construction and equipment

  for a cancer center............................ 9,863,784

SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE

For renovating and constructing an

  addition to the Morris Library, in

  addition to funds previously

  appropriated.................................. 12,404,172

SIU SCHOOL OF MEDICINE - SPRINGFIELD

For constructing and for equipment for

  an addition to the combined laboratory,

  in addition to funds previously

  appropriated...................................... 68,104

UNIVERSITY OF ILLINOIS AT CHICAGO

Plan, construct, and equip the Chemical

  Sciences Building............................. 57,600,000

For planning, construction and equipment

  for a chemical sciences building............... 3,549,048

To plan and begin construction of

  a medical imaging research/clinical

  facility.......................................... 49,753

For remodeling the Clinical

  Sciences Building................................ 854,132

For the renovation of the court area and

  Lecture Center, in addition to funds

  previously appropriated.......................... 119,735

UNIVERSITY OF ILLINOIS AT CHAMPAIGN-URBANA

For planning, analysis and design

  of Lincoln Hall.  Design cannot proceed

  beyond Program Analysis/Preliminary

  Design unless approved in writing by

  the Governor................................... 2,000,000

Expansion of Microelectronics Lab................ 2,025,772

For planning, construction and equipment

  for a biotechnology genomic facility........... 6,027,073

For planning, construction and equipment

  for a supercomputing application facility........ 295,061

UNIVERSITY CENTER OF LAKE COUNTY

For constructing a university center and

  purchasing equipment, in addition to

  funds previously appropriated.................... 242,937

For land, planning, remodeling, construction

  and all costs necessary to construct a

  facility......................................... 542,946

WESTERN ILLINOIS UNIVERSITY - MACOMB

Plan and construct performing arts center........ 4,000,000

For improvements to Memorial

  Hall.......................................... 10,718,657

    Total                                      $210,420,510

 

    Section 345.  The following named amount, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made in Article 104, Section 345 of Public Act 94-798 is reappropriated from the Capital Development Fund to the Capital Development Board for Southern Illinois University School of Medicine, Springfield, for the project hereinafter enumerated:

SOUTHERN ILLINOIS UNIVERSITY SCHOOL

OF MEDICINE – SPRINGFIELD

(From Article 104, Section 345 of Public Act 94-798)

  For construction and equipment

   for an addition to the combined

   laboratory for Illinois State Police

   Crime Lab........................................ 21,980

 

    Section 360.  The amount of $73,780, or so much thereof as may be necessary, and remains unexpended on June 30, 2007, from a reappropriation heretofore made for such purpose in Article 104, Section 360 of Public Act 94-798, as amended, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the University of Illinois for miscellaneous capital improvements including construction, reconstruction, remodeling, improvement, repair and installation of capital facilities, costs of planning, supplies, equipment, materials, services, and all other expenses required to complete the work.  This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 370.  The following named amount, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 104, Section 370 of Public Act 94-798, is reappropriated from the Capital Development Fund to the Capital Development Board for the project hereinafter enumerated:

EAST ST. LOUIS COLLEGE CENTER

(From Article 104, Section 370 of Public Act 94-798)

For construction of facilities, remodeling,

  site improvements, utilities and other

  costs necessary for adapting the former

  campus of Metropolitan Community College

  for a Community College Center and Southern

  Illinois University, in addition to funds

  previously appropriated........................ 3,602,045

 

    Section 375.  The sum of $35,707,069, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 104, Section 375 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials and all other expenses required to complete the work at the various community colleges.  This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 380.  The sum of $30,625,470, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 104, Section 380 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials and all other expenses required to complete the work at the various community colleges.  This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 385.  The sum of $11,402,697, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 104, Section 385 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials and all other expenses required to complete the work at the various community colleges.  This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 390.  The sum of $3,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 104, Section 390 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for a grant to Northwestern University for planning, construction, and equipment for a Nanofabrication and Molecular Center.  This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 400.  The sum of $26,915, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made for such purpose in Article 104, Section 400 of Public Act 94-798, as amended, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for miscellaneous capital improvements to state facilities including construction, reconstruction, remodeling, improvement, repair and installation of capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete the work at the facilities.  This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 405.  The sum of $111,982,989, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made for such purpose in Article 104, Section 405 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the development and improvement of educational, scientific, technical and vocational programs and facilities and the expansion of health and human services, and for any other purposes authorized in subsection (c) of Section 4 of the Build Illinois Bond Act and for grants to State agencies for such purposes.

 

    Section 410.  The sum of $129,167,335, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made for such purpose in Article 104, Section 410 of Public Act 94-798, is reappropriated from the Capital Development Fund to the Capital Development Board for educational purposes by State universities and colleges, the Illinois Community College Board created by the Public Community College Act and for grants to public community colleges as authorized by Sections 5-11 and 5-12 of the Public Community College Act as authorized by subsection (a) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    No contract shall be entered into or obligation incurred for any expenditure made in this Article until after the purpose and amounts have been approved in writing by the Governor.

 

    Total, Article 70                        $1,440,268,009

 

ARTICLE 75

EASTERN ILLINOIS UNIVERSITY

 

    Section 5.  The sum of $5,298,718, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made for such purpose in Article 105, Section 5 of Public Act 94-798, is reappropriated from the Capital Development Fund to the Board of Trustees of Eastern Illinois University to purchase equipment for the renovation and expansion of the Fine Arts Center.  No contract shall be entered into or obligation incurred for any expenditure from the appropriation made in this Section until after the purpose and amounts have been approved in writing by the Governor.

 

    Section 10.  The sum of $95,405, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made for such purpose in Article 105, Section 10 of Public Act 94-798, is reappropriated from the Capital Development Fund to the Board of Trustees of Eastern Illinois University to purchase equipment for the renovation and expansion of Booth Library.  No contract shall be entered into or obligation incurred for any expenditure from the appropriation made in this Section until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, Article 75                            $5,394,123

 

ARTICLE 80

NORTHEASTERN ILLINOIS UNIVERSITY

 

    Section 5.  The sum of $2,071,805, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 106, Section 5 of Public Act 94-798, is reappropriated from the Capital Development Fund to the Board of Trustees of Northeastern Illinois University to purchase equipment and remodel buildings A, B and E.  This appropriation is in addition to any funds previously appropriated.

 

    Section 10.  No contract shall be entered into or obligation incurred for any expenditures from appropriations in Section 5 of this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, Article 80                            $2,071,805

 

ARTICLE 85

SOUTHERN ILLINOIS UNIVERSITY

 

    Section 5.  The sum of $3,805, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 108, Section 5 of Public Act 94-798, is reappropriated from the Capital Development Fund to the Board of Trustees of Southern Illinois University at Carbondale to purchase equipment for Altgeld Hall and the Old Baptist Foundation Building.  This appropriation is in addition to any funds previously appropriated.

 

    Section 10.  No contract shall be entered into or obligation incurred for any expenditures from appropriations in Section 5 of this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, Article 85                              $3,805

 

ARTICLE 90

UNIVERSITY OF ILLINOIS

 

    Section 5.  The sum of $4,702,332, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 109, Section 5 of Public Act 94-798, as amended, is reappropriated from the Capital Development Fund to the Board of Trustees of the University of Illinois for all costs associated with the space needs of the Department of Natural Resources, Illinois Natural History Survey Division and State Water Survey Division on the campus of the University of Illinois in Champaign, including construction, capital facilities, planning, relocation, renovation and rehabilitation, mechanical systems, materials, services and all other costs required to complete the work.

 

    Section 10.  The sum of $385,026, or so much thereof as may be necessary and remains unexpended on June 30, 2007, from a reappropriation heretofore made for such purpose in Article 109, Section 10 of Public Act 94-798, is reappropriated from the Capital Development Fund to the University of Illinois for digitalization infrastructure for WILL-TV (Urbana-Champaign).

 

    Section 15.  The sum of $108,796, or so much thereof as may be necessary and remains unexpended on June 30, 2007, from a reappropriation heretofore made for such purpose in Article 109, Section 15 of Public Act 94-798, is reappropriated from the Capital Development Fund to the University of Illinois at Springfield for constructing a classroom and office building, in addition to funds previously appropriated.

 

    Section 20.  No contract shall be entered into or obligation incurred for any expenditures from appropriations in Sections 5, 10 and 15 of this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, Article 90                            $5,196,154

 

ARTICLE 95

ILLINOIS COMMERCE COMMISSION

 

    Section 5.  The sum of $391,315, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made in Article 110, Section 5 of Public Act 94-798, is reappropriated from the Capital Development Fund to the Illinois Commerce Commission for train whistle abatement in counties with over 3,000,000 in population, where a public highway crosses a railroad at grade.

 

    Total, Article 95                              $391,315

 

ARTICLE 100

ENVIRONMENTAL PROTECTION AGENCY

 

    Section 5.  The sum of $150,000,000, or so much thereof as may be necessary, is appropriated from the Water Revolving Fund to the Environmental Protection Agency for financial assistance to units of local government for sewer systems and wastewater treatment facilities pursuant to rules defining the Water Pollution Control Revolving Loan program and for transfer of funds to establish reserve accounts, construction accounts or any other necessary funds or accounts in order to implement a leveraged loan program.

 

    Section 10.  The sum of $60,000,000, or so much thereof as may be necessary, is appropriated from the Water Revolving Fund to the Environmental Protection Agency for financial assistance to units of local government and privately owned community water supplies for drinking water infrastructure projects pursuant to the Safe Drinking Water Act, as amended, and for transfer of funds to establish reserve accounts, construction accounts or any other necessary funds or accounts in order to implement a leveraged program.

 

    Section 15.  The sum of $16,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for the protection, preservation, restoration and conservation of environmental and natural resources, for deposits into the Water Revolving Fund, and for any other purposes authorized in subsection (d) of Section 4 of the Build Illinois Bond Act and for grants to State Agencies for such purposes.

 

    Section 20.  The sum of $3,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for financial assistance to municipalities with designated River Edge Redevelopment Zones for brownfields redevelopment in accordance with Section 58.13 of the Environmental Protection Act, including costs in prior years.

 

    Section 30.  The sum of $10,000,000, or so much thereof as may be necessary is appropriated from the Underground Storage Tank Fund to the Environmental Protection Agency for deposit into the Brownfields Redevelopment Fund for use pursuant to Sections 58.13 and 58.15 of the Environmental Protection Act.

 

    Section 35.  No contract shall be entered into or obligation incurred for any expenditure made in Sections 15, 20 and 25 of this Article until after the purpose and amounts have been approved in writing by the Governor.

 

    Total, Article 100                         $389,000,000

 

ARTICLE 105

ENVIRONMENTAL PROTECTION AGENCY

 

    Section 5.  The sum of $540,796,725, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from appropriations heretofore made in Article 111, Section 5, and Article 112, Section 5 of Public Act 94-798, as amended, are reappropriated from the Water Revolving Fund to the Environmental Protection Agency for financial assistance to units of local government for sewer systems and wastewater treatment facilities pursuant to rules defining the Water Pollution Control Revolving Loan program and for transfer of funds to establish reserve accounts, construction accounts or any other necessary funds or accounts in order to implement a leveraged loan program.

 

    Section 10.  The sum of $210,011,080, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from appropriations heretofore made in Article 111, Section 10, and Article 112, Section 10 of Public Act 94-798, as amended, are reappropriated from the Water Revolving Fund to the Environmental Protection Agency for financial assistance to units of local government and privately owned community water supplies for drinking water infrastructure projects pursuant to the Safe Drinking Water Act, as amended, and for transfer of funds to establish reserve accounts, construction accounts or any other necessary funds or accounts in order to implement a leveraged loan program.

 

    Section 15.  The sum of $8,942,400, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made for such purpose in Article 112, Section 15 of Public Act 94-798, as amended, is reappropriated from the Anti-Pollution Fund to the Environmental Protection Agency for deposit into the Water Revolving Fund.

 

    Section 20.  The sum of $1,827,595, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made for such purpose in Article 112, Section 20 of Public Act 94-798, as amended, is reappropriated from the Anti-Pollution Fund to the Environmental Protection Agency for deposit into the Water Revolving Fund.

 

    Section 25.  The sum of $4,836,773, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 112, Section 25 of Public Act 94-798, as amended, is reappropriated from the Anti-Pollution Fund to the Environmental Protection Agency for grants to units of local government for wastewater facilities, pursuant to provisions of the "Anti-Pollution Bond Act."

 

    Section 30.  The amount of $55,429,959, or so much thereof as may be necessary and remains unexpended on June 30, 2007, from reappropriations heretofore made for such purposes in Article 112, Section 30 of Public Act 94-798, as amended, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for wastewater compliance grants to units of local government or sewer systems and wastewater treatment facilities pursuant to procedures and rules established under the Anti-Pollution Bond Act.  These grants are limited to projects for which the local government provides at least 30% of the project cost.  There is an approved project compliance plan, and there is an enforceable compliance schedule prior to the grant award.  The grant award will be based on eligible project cost contained in the approved compliance plan.

 

    Section 35.  The sum of $2,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 112, Section 35 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for deposit into the Brownfields Redevelopment Fund for use pursuant to Sections 58.13 and 58.15 of the Environmental Protection Act.

 

    Section 40.  The sum of $2,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made in Article 112, Section 40 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for deposit into the Brownfields Redevelopment Fund for use pursuant to Sections 58.13 and 58.15 of the Environmental Protection Act.

 

    Section 45.  The sum of $10,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made in Article 112, Section 45 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for deposit into the Hazardous Waste Fund for use pursuant to Section 22.2 of the Environmental Protection Act.

 

    Section 50.  The sum of $748,945, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made in Article 112, Section 50 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for grants and contracts for public drinking water infrastructure, including design and construction, where private drinking water wells have been contaminated by a hazardous substance.

 

    Section 55.  The sum of $5,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made for such purpose in Article 111, Section 20 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for financial assistance to municipalities with designated River Edge Redevelopment Zones for brownfields redevelopment in accordance with Section 58.13 of the Environmental Protection Act, including costs in prior years.

 

    Section 60.  The sum of $8,462,700, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made for such purpose in Article 112, Section 55 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for the protection, preservation, restoration and conservation of environmental and natural resources, for deposits into the Water Revolving Fund, and for any other purposes authorized in subsection (d) of Section 4 of the Build Illinois Bond Act and for grants to State agencies for such purposes.

 

    Section 65.  The sum of $16,600,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made for such purpose in Article 111, Section 15 of Public Act 94-798, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for the protection, preservation, restoration and conservation of environmental and natural resources, for deposits into the Water Revolving Fund, and for any other purposes authorized in subsection (d) of Section 4 of the Build Illinois Bond Act and for grants to State Agencies for such purposes.

 

    Section 70.  No contract shall be entered into or obligation incurred for any expenditure made in Sections 15 through 65 of this Article until after the purpose and amounts have been approved in writing by the Governor.

 

    Total, Article 105                         $866,656,177

 

ARTICLE 110

HISTORIC PRESERVATION AGENCY

 

    Section 5.  The sum of $437,800, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made in Article 113, Section 5 of Public Act 94-798, as amended, is reappropriated from the Capital Development Fund to the Historic Preservation Agency for costs associated with the acquisition or improvements of Sugar Loaf and/or Fox Mounds or other properties within the Cahokia Mounds National Historic Landmark Boundary.

 

    Section 10.  The sum of $460,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made in Article 113, Section 10 of Public Act 94-798, as amended, is reappropriated from the Capital Development Fund to the Historic Preservation Agency for support facilities, acquisition or improvements for Sugar Loaf and/or Fox Mounds or other properties within the Cahokia Mounds National Historic Landmark Boundary.

 

    Section 15.  No contract shall be entered into or obligation incurred for any expenditures from appropriations in Sections 5 and 10 of this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, Article 110                             $897,800

 

ARTICLE 115

ILLINOIS FINANCE AUTHORITY

 

    Section 5.  The sum of $500,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from an appropriation heretofore made in Article 114, Section 5 of Public Act 94-798, as amended, is reappropriated from the Fire Truck Revolving Loan Fund to the Illinois Finance Authority for the purpose of making loans to fire departments, fire protection districts, and township fire departments as successor in interest to the Illinois Rural Bond Bank, pursuant to Section 845-75 of Public Act 93-0205.

 

    Section 10.  The sum of $644,371, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made in Article 115, Section 5 of Public Act 94-798, is reappropriated from the Fire Truck Revolving Loan Fund to the Illinois Finance Authority for loans to fire departments, fire protection districts, and township fire departments as successor in interest to the Illinois Rural Bond Bank, pursuant to Section 845-75 of Public Act 93-0205.

 

    Total, Article 115                           $1,144,371

 

ARTICLE 120

ILLINOIS COMMUNITY COLLEGE BOARD

 

    Section 5.  The sum of $1,606,823, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2007, from a reappropriation heretofore made for such purpose in Article 118, Section 5 of Public Act 94-798, as amended, is reappropriated from the Build Illinois Bond Fund for the Illinois Community College Board for remodeling of facilities for compliance with the Americans with Disabilities Act.  This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 10.  No contract shall be entered into or obligation incurred for any expenditures from appropriations in Section 5 of this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, Article 120                           $1,606,823

 

ARTICLE 125

DEPARTMENT OF CENTRAL MANAGEMENT SERVICES

 

    Section 5.  The amount of $13,500,000, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Department of Central Management Services for infrastructure improvement, Hardware and Shared Services.

 

    Section 10.  No contract shall be entered into or obligation incurred for any expenditures from appropriations in Section 5 of this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, Article 125                          $13,500,000

 

ARTICLE 130

DEPARTMENT OF REVENUE

 

    Section 5.  The amount of $13,335,000, is appropriated from the Capital Development Fund to the Department of Revenue for a new Technology Center.

 

    Section 10.  No contract shall be entered into or obligation incurred for any expenditures from appropriations in Section 5 of this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, Article 130                          $13,335,000

 

Section 99. Effective date. This Act takes effect upon becoming law.”.