Rep. John E. Bradley
Filed: 5/1/2008
|
|
09500HB5576ham002 |
|
LRB095 17514 MJR 50033 a |
|
|
1 |
| AMENDMENT TO HOUSE BILL 5576
|
2 |
| AMENDMENT NO. ______. Amend House Bill 5576, AS AMENDED, by |
3 |
| replacing everything after the enacting clause with the |
4 |
| following:
|
5 |
| "Section 5. The Public Utilities Act is amended by changing |
6 |
| Section 16-125 as follows:
|
7 |
| (220 ILCS 5/16-125)
|
8 |
| Sec. 16-125. Transmission and distribution reliability
|
9 |
| requirements.
|
10 |
| (a) To assure the reliable delivery of electricity to all
|
11 |
| customers in this State and the effective implementation of
the |
12 |
| provisions of this Article, the Commission shall, within
180 |
13 |
| days of the effective date of this Article, adopt rules
and |
14 |
| regulations for assessing and assuring the reliability of
the |
15 |
| transmission and distribution systems and facilities that
are |
16 |
| under the Commission's jurisdiction.
|
|
|
|
09500HB5576ham002 |
- 2 - |
LRB095 17514 MJR 50033 a |
|
|
1 |
| (b) These rules and regulations shall require each electric |
2 |
| utility or
alternative retail electric supplier owning, |
3 |
| controlling, or operating
transmission and distribution |
4 |
| facilities and equipment subject to the
Commission's |
5 |
| jurisdiction, referred to in this Section as "jurisdictional
|
6 |
| entities", to adopt and implement procedures for restoring |
7 |
| transmission and
distribution services to customers after |
8 |
| transmission or distribution outages
on a nondiscriminatory |
9 |
| basis without regard to whether a customer has chosen
the |
10 |
| electric utility, an affiliate of the electric utility, or |
11 |
| another entity
as its provider of electric power and energy. |
12 |
| These rules and regulations
shall also, at a minimum, |
13 |
| specifically require each jurisdictional entity to
submit |
14 |
| annually to the Commission.
|
15 |
| (1) the number and duration of planned and
unplanned |
16 |
| outages during the prior year and their impacts
on |
17 |
| customers;
|
18 |
| (2) outages that were controllable and outages that
|
19 |
| were exacerbated in scope or duration by the condition of
|
20 |
| facilities, equipment or premises or by the actions or
|
21 |
| inactions of operating personnel or agents;
|
22 |
| (3) customer service interruptions that were due
|
23 |
| solely to the actions or inactions of an alternative
retail |
24 |
| electric supplier or a public utility in supplying
power or |
25 |
| energy;
|
26 |
| (4) a detailed report of the age, current
condition, |
|
|
|
09500HB5576ham002 |
- 3 - |
LRB095 17514 MJR 50033 a |
|
|
1 |
| reliability and performance of the
jurisdictional entity's |
2 |
| existing transmission and
distribution facilities, which |
3 |
| shall include, without
limitation, the following data:
|
4 |
| (i) a summary of the jurisdictional entity's
|
5 |
| outages and voltage variances reportable under the
|
6 |
| Commission's rules;
|
7 |
| (ii) the jurisdictional entity's expenditures
for |
8 |
| transmission construction and maintenance, the
ratio |
9 |
| of those expenditures to the jurisdictional
entity's |
10 |
| transmission investment, and the average
remaining |
11 |
| depreciation lives of the entity's
transmission |
12 |
| facilities, expressed as a percentage
of total |
13 |
| depreciation lives;
|
14 |
| (iii) the jurisdictional entity's expenditures
for |
15 |
| distribution construction and maintenance, the
ratio |
16 |
| of those expenditures to the jurisdictional
entity's |
17 |
| distribution investment, and the average
remaining |
18 |
| depreciation lives of the entity's
distribution |
19 |
| facilities, expressed as a percentage
of total |
20 |
| depreciation lives;
|
21 |
| (iv) a customer satisfaction survey covering,
|
22 |
| among other areas identified in Commission rules,
|
23 |
| reliability, customer service, and understandability
|
24 |
| of the jurisdictional entity's services and prices;
|
25 |
| and
|
26 |
| (v) the corresponding information, in the same
|
|
|
|
09500HB5576ham002 |
- 4 - |
LRB095 17514 MJR 50033 a |
|
|
1 |
| format, for the previous 3 years, if available;
|
2 |
| (5) a plan for future investment and reliability
|
3 |
| improvements for the jurisdictional entity's transmission
|
4 |
| and distribution facilities that will ensure continued
|
5 |
| reliable delivery of energy to customers and provide the
|
6 |
| delivery reliability needed for fair and open competition; |
7 |
| and
|
8 |
| (6) a report of the jurisdictional entity's
|
9 |
| implementation of its plan filed pursuant to subparagraph |
10 |
| (5)
for the previous reporting period.
|
11 |
| (c) The Commission rules shall set forth the criteria
that |
12 |
| will be used to assess each jurisdictional entity's annual |
13 |
| report and
evaluate its reliability performance. Such criteria
|
14 |
| must take into account, at a minimum: the items required to be
|
15 |
| reported in subsection (b); the relevant characteristics of
the |
16 |
| area served; the age and condition of the system's
equipment |
17 |
| and facilities; good engineering practices; the
costs of |
18 |
| potential actions; and the benefits of avoiding the
risks of |
19 |
| service disruption.
|
20 |
| (d) At least every 3 years, beginning in the year
the |
21 |
| Commission issues the rules required by subsection
(a) or the |
22 |
| following year if the rules are issued after June
1, the |
23 |
| Commission shall assess the annual report of each
|
24 |
| jurisdictional entity and evaluate its reliability |
25 |
| performance. The
Commission's evaluation shall
include |
26 |
| specific identification of, and recommendations
concerning, |
|
|
|
09500HB5576ham002 |
- 5 - |
LRB095 17514 MJR 50033 a |
|
|
1 |
| any potential reliability problems that it has
identified as a |
2 |
| result of its evaluation.
|
3 |
| (e) In the event that more than either (i) 30,000 customers |
4 |
| or (ii) 0.8% of the total customers of an electric
utility are |
5 |
| subjected to a continuous power interruption of
4 hours or more |
6 |
| that results in the transmission of power
at less than 50% of |
7 |
| the standard voltage, or that results in
the total loss of |
8 |
| power transmission, the utility shall be
responsible for |
9 |
| compensating customers affected by that interruption for 4
|
10 |
| hours or more for all
actual damages, which shall not include |
11 |
| consequential
damages, suffered as a result of the power |
12 |
| interruption.
The utility shall also reimburse the affected |
13 |
| municipality,
county, or other unit of local government in |
14 |
| which the power
interruption has taken place for all
emergency |
15 |
| and contingency expenses incurred by the unit of
local |
16 |
| government as a result of the interruption. A waiver
of the |
17 |
| requirements of this subsection may be granted by the
|
18 |
| Commission in instances in which the utility can show that
the |
19 |
| power interruption was a result of any
one or more of the |
20 |
| following causes:
|
21 |
| (1) Unpreventable damage due to weather events or
|
22 |
| conditions.
|
23 |
| (2) Customer tampering.
|
24 |
| (3) Unpreventable damage due to civil or
international |
25 |
| unrest or animals.
|
26 |
| (4) Damage to utility equipment or other actions by a |
|
|
|
09500HB5576ham002 |
- 6 - |
LRB095 17514 MJR 50033 a |
|
|
1 |
| party other
than the utility, its employees, agents, or
|
2 |
| contractors.
|
3 |
| Loss of revenue and expenses incurred in complying with this
|
4 |
| subsection may not be recovered from ratepayers.
|
5 |
| (f) In the event of a power surge or other fluctuation
that |
6 |
| causes damage and affects more than either (i) 30,000 customers |
7 |
| or (ii) 0.8% of the total customers, the electric utility
shall |
8 |
| pay to
affected customers the replacement value of all goods
|
9 |
| damaged as a result of the power surge or other fluctuation
|
10 |
| unless the utility can show that the power surge or other
|
11 |
| fluctuation was due to one or more of the following causes:
|
12 |
| (1) Unpreventable damage due to weather events or
|
13 |
| conditions.
|
14 |
| (2) Customer tampering.
|
15 |
| (3) Unpreventable damage due to civil or
international |
16 |
| unrest or animals.
|
17 |
| (4) Damage to utility equipment or other actions by a |
18 |
| party other
than the utility, its employees, agents, or
|
19 |
| contractors.
|
20 |
| Loss of revenue and expenses incurred in complying with this
|
21 |
| subsection may not be recovered from ratepayers. Customers with |
22 |
| respect to
whom a waiver has been granted by the Commission |
23 |
| pursuant to subparagraphs
(1)-(4) of subsections (e) and (f) |
24 |
| shall not count toward the either (i) 30,000 customers or (ii) |
25 |
| 0.8% of the total customers
required therein.
|
26 |
| (g) Whenever an electric utility must perform
planned or |
|
|
|
09500HB5576ham002 |
- 7 - |
LRB095 17514 MJR 50033 a |
|
|
1 |
| routine maintenance or repairs on its equipment
that will |
2 |
| result in transmission of power at less than 50%
of the |
3 |
| standard voltage, loss of power, or power fluctuation
(as |
4 |
| defined in subsection (f)), the utility shall make
reasonable |
5 |
| efforts to notify potentially affected customers
no less than |
6 |
| 24 hours in advance of performance of the
repairs or |
7 |
| maintenance.
|
8 |
| (h) Remedies provided for under this Section may be
sought |
9 |
| exclusively through the Illinois Commerce Commission
as |
10 |
| provided under Section 10-109 of this Act. Damages
awarded |
11 |
| under this Section for a power interruption shall be
limited to |
12 |
| actual damages, which shall not include
consequential damages, |
13 |
| and litigation costs. A utility's request for a waiver of this |
14 |
| Section shall be timely if tiled no later than 30 days after |
15 |
| the date on which a claim is filed with the Commission seeking |
16 |
| damages or expense reimbursement under this Section. If no |
17 |
| claims are pending at the expiration of the 30 days, then the |
18 |
| utility need not file the request for waiver until 30 days |
19 |
| after an additional claim is filed with the Commission. No |
20 |
| utility shall be liable under this Section while a request for |
21 |
| waiver is pending. Damage awards
may not be paid out of utility |
22 |
| rate funds.
|
23 |
| (i) The provisions of this Section shall not in any way
|
24 |
| diminish or replace other civil or administrative remedies
|
25 |
| available to a customer or a class of customers.
|
26 |
| (j) The Commission shall by rule require an electric
|
|
|
|
09500HB5576ham002 |
- 8 - |
LRB095 17514 MJR 50033 a |
|
|
1 |
| utility to maintain service records detailing
information on |
2 |
| each instance of transmission of power at
less than 50% of the |
3 |
| standard voltage, loss of power, or
power fluctuation (as |
4 |
| defined in subsection (f)), that
affects 10 or more customers. |
5 |
| Occurrences that are
momentary shall not be required to be |
6 |
| recorded or reported.
The service record shall include, for |
7 |
| each occurrence, the
following information:
|
8 |
| (1) The date.
|
9 |
| (2) The time of occurrence.
|
10 |
| (3) The duration of the incident.
|
11 |
| (4) The number of customers affected.
|
12 |
| (5) A description of the cause.
|
13 |
| (6) The geographic area affected.
|
14 |
| (7) The specific equipment involved in the
fluctuation |
15 |
| or interruption.
|
16 |
| (8) A description of measures taken to restore
service.
|
17 |
| (9) A description of measures taken to remedy the
cause |
18 |
| of the power interruption or fluctuation.
|
19 |
| (10) A description of measures taken to prevent
future |
20 |
| occurrence.
|
21 |
| (11) The amount of remuneration, if any, paid to
|
22 |
| affected customers.
|
23 |
| (12) A statement of whether the fixed charge was
waived |
24 |
| for affected customers.
|
25 |
| Copies of the records containing this information shall
be |
26 |
| available for public inspection at the utility's offices,
and |
|
|
|
09500HB5576ham002 |
- 9 - |
LRB095 17514 MJR 50033 a |
|
|
1 |
| copies thereof may be obtained upon payment of a fee not
|
2 |
| exceeding the reasonable cost of reproduction. A copy of
each |
3 |
| record shall be filed with the Commission and shall be
|
4 |
| available for public inspection. Copies of the records may
be |
5 |
| obtained upon payment of a fee not exceeding the
reasonable |
6 |
| cost of reproduction.
|
7 |
| (k) The requirements of subsections (e) through (j) of
this |
8 |
| Section shall apply only to an electric public utility
having |
9 |
| 100,000 1,000,000 or more customers. |
10 |
| (l) Notwithstanding any other rulemaking authority that |
11 |
| may exist, neither the Governor nor any agency or agency head |
12 |
| under the jurisdiction of the Governor has any authority to |
13 |
| make or promulgate rules to implement or enforce the provisions |
14 |
| of this amendatory Act of the 95th General Assembly. If, |
15 |
| however, the Governor believes that rules are necessary to |
16 |
| implement or enforce the provisions of this amendatory Act of |
17 |
| the 95th General Assembly, the Governor may suggest rules to |
18 |
| the General Assembly by filing them with the Clerk of the House |
19 |
| and the Secretary of the Senate and by requesting that the |
20 |
| General Assembly authorize such rulemaking by law, enact those |
21 |
| suggested rules into law, or take any other appropriate action |
22 |
| in the General Assembly's discretion. Nothing contained in this |
23 |
| amendatory Act of the 95th General Assembly shall be |
24 |
| interpreted to grant rulemaking authority under any other |
25 |
| Illinois statute where such authority is not otherwise |
26 |
| explicitly given. For the purposes of this amendatory Act of |
|
|
|
09500HB5576ham002 |
- 10 - |
LRB095 17514 MJR 50033 a |
|
|
1 |
| the 95th General Assembly, "rules" is given the meaning |
2 |
| contained in Section 1-70 of the Illinois Administrative |
3 |
| Procedure Act, and "agency" and "agency head" are given the |
4 |
| meanings contained in Sections 1-20 and 1-25 of the Illinois |
5 |
| Administrative Procedure Act to the extent that such |
6 |
| definitions apply to agencies or agency heads under the |
7 |
| jurisdiction of the Governor.
|
8 |
| (Source: P.A. 90-561, eff. 12-16-97.)
|
9 |
| Section 99. Effective date. This Act takes effect upon |
10 |
| becoming law.".
|