Rep. William B. Black
Filed: 4/10/2008
|
|||||||
| |||||||
| |||||||
1 | AMENDMENT TO HOUSE BILL 4172
| ||||||
2 | AMENDMENT NO. ______. Amend House Bill 4172, AS AMENDED, | ||||||
3 | with reference to page and line numbers of House Amendment No. | ||||||
4 | 1, on page 2, by replacing lines 24 through 26 with "with 12 | ||||||
5 | inches of soil , within 30 days after the final placement and | ||||||
6 | completion of the structural fill project or within 120 days of | ||||||
7 | the last placement of the structural fill in cases where | ||||||
8 | filling is incomplete and no filling takes place for a period | ||||||
9 | of 90 days, "; and
| ||||||
10 | on page 3, by replacing lines 7 through 12 with the following: | ||||||
11 | " For each project utilizing 10,000 tons or more of CCB, | ||||||
12 | within 30 days after the placement of the 12 inches of cover | ||||||
13 | soil required under this item (8), the person using the CCB as | ||||||
14 | structural fill must submit to the Agency a certification | ||||||
15 | demonstrating that the use meets the requirements of this | ||||||
16 | Section. The certification shall also include the information | ||||||
17 | required to be submitted to the Agency under item (C) of |
| |||||||
| |||||||
1 | subsection (a-5) of this Section. The certification must be | ||||||
2 | submitted on forms and in a format prescribed by the Agency and | ||||||
3 | must be certified by a licensed professional engineer. For the | ||||||
4 | purposes of this subsection, "licensed professional engineer" | ||||||
5 | means a licensed professional engineer as defined in Section | ||||||
6 | 58.2 of this Act. "; and | ||||||
7 | on page 6, by replacing lines 15 and 16 with "CCB during the | ||||||
8 | effective period of the approval and any extension of the | ||||||
9 | approval ,"; and | ||||||
10 | on page 6, by replacing lines 18 and 19 with "conditions."; and | ||||||
11 | on page 7, by replacing lines 12 through 25 with the following: | ||||||
12 | "determinations in accordance with this subsection (b). No | ||||||
13 | later than January 31, 2009, the Governor, in coordination with | ||||||
14 | the Agency, shall propose to the Board rules concerning the use | ||||||
15 | of CCB under item (8) of subsection (a), and, no later than | ||||||
16 | January 31, 2010, the Board must adopt the rules. These rules | ||||||
17 | must include specific rules for the use of CCB as structural | ||||||
18 | fill. ".
|